Loading...
HomeMy WebLinkAboutDAQ-2024-008712State of Utah Department of Environmental Quality Division of Air Quality ATLAS Section195 North 1950 West, 4th Floor P.O. Box 144820 Salt Lake City, Utah 84114-4820 asbestos@utah.gov For Official Use Only Postmark Date: __________________ Initials: _______ Check #/Credit Card Amount: _____________________ Notification ID: ____________________________ DEMOLITION NOTIFICATION FORM A.Type of Notification (choose one) Demolition or Moving a Building Notification Form Intentional Burning Notification Form Ordered Demolition Notification Form Moving of a School Portable Classroom Does this notification require an emergency form or alternative work practice request? Document Types (Choose one) CancellationInitial Filing Revision Person Contacted at DAQ Date Phoned Other: B. Demolition Activity Location Residential Structure Public/Commercial Building School Structure Name Structure Address Part of Facility Involved (All or part, describe the part) Year Built Total Facility Size # of Floors Total Demo. Size Prior Facility Use Present Use Future Use C.Facility Owner/Contact Person Facility Owner Name Facility Owner Address Contact Person, Phone & Email D.Demolition Contractor Information Name Mailing Address Contact Person, Phone & Email ASB # ASBC # F.Asbestos Inspection Report Information Utah *ACM is asbestos containing material Certified Asbestos Inspector Utah Certified Asbestos Company Date of Inspection Asbestos Analytical Method Used Was ACM Present at the Time of Inspection Y/N Was Regulated ACM (RACM) Present Y/N Was the ACM Sampled or Assumed: Date of Removal for Regulated ACM G.Asbestos Containing Material to be Left in the Facility During Demolition Roofing ft2 Flooring ft2 Other ft2 Other ft3 Materials that have asbestos coating or contain asbestos must not be recycled. This includes concrete that has asbestos flooring and/or mastic. Are you recycling concrete or other materials? Y/N Was the asbestos removed? Y/N H.Procedures to be followed in the event that RACM is found or generated during demolition: I.Comments General Contractor Name, if applicable Mailing Address Contact Person, Phone & Email E. Demolition Dates Start Date:End Date: Work Days: M T W Th Fr Sat Sun General Instructions This Form must be completely filled out with the appropriate fee and returned to the DAQ at least ten working days before starting demolition activities. Start counting the ten working days after the day that the notification was of submitted. This form can be emailed to asbestos@utah.gov and the fee paid by credit card at the DAQ Marketplace, click on Step 3 or the form can be filled out and paid online once you receive a login at https://asbestos-lead.utah.gov. Request access here: Atlas login request If you use this form’s PDF fillable capability, please remember to save it to your desktop before closing or all information will be lost. The definition of “demolition” in UAC R307-801 Utah Asbestos Rule means, “…the wrecking, salvage, or removal of any load supporting structural member of a regulated facility together with any related handling operations or the intentional burning of any regulated facility. This includes the moving of an entire building, but excludes the moving of structures, vehicles, or equipment with permanently attached axles, such as trailers, motor homes, and mobile homes that are specifically designed to be moved.” Utah law requires you have a copy of the asbestos inspection report produced by a Utah Certified Asbestos Inspector working for a Utah Certified Asbestos Company on-site and available at all times when demolition activities are being performed. A. Type of Notification•Intentional burning requires the removal of all asbestos containing material prior to demolition. •Ordered demolition requires a signed letter on government letterhead saying the structure is unsound or in danger of imminent collapse (from state, county, or city engineer) or a health hazard (from State Health Official or Local Health Department Health Officer). •Moving a school portable classroom specifically designed to be moved and has no asbestos containing material. There is no fee. •Revisions require section B, C, D and any additional section to be filled out. If the revision is sent before the previously accepted start date, a phone call is not required. A phone call is only required when the date is changed on the accepted start date. B.Demolition Activity Type of structure and facility use is important because different rules apply depending on the type and use. Include the total facility size and the demolition size if the whole building is not being demolished. The fee is based on the actual size of the demolished structures. J. Demolition Notification Fee: Base Fee + Square Footage Fee K. Certification Statement I hereby attest and affirm that the information included on this Demolition Notification Form, including any attachments, is true and accurate to the best of my belief and knowledge. I acknowledge that any approval authorized pursuant to this notification will be subject to revocation if issuance was based on incorrect or inadequate information that materially affected the decision to issue the demolition project approval. I also attest and affirm that I will follow all work practice standards required by Utah Administrative Code (UAC) R307-801. _______________________________________________________________________________________________ Applicant’s Signature Date Signed _____________________________________________________________________________________________ Applicant’s Printed Name Applicant’s Title Total Fee ______ $ Structure Type Regulated Structure Moving School Portable Classroom Base Fee + Each 5,000 ft2 (or fraction thereof) Fee $31.63 + (_____ x $63.25)= $0 $0 J. Demolition Notification Fee The fee is calculated by adding the base fee and a per unit fee of the total structure square footage. For structures with multiple levels or floors, be sure to include the area of all levels (including subsurface levels) when determining the total fee. The per unit fees are in blocks of 5,000 square feet or any fraction thereof. For example a building that is 6,000 square feet would be calculated as follows: $31.63 + (2 x $63.25) = $158.13. The fee for a building under 5,000 square feet is $94.88. B.School definition: All public and non-profit private elementary and secondary schools must inspect all buildings that they lease, own, or otherwise use as a school building. A school building includes any structure suitable for a classroom or other school facility (i.e., laboratory, food prep/dining areas, athletic facilities, student housing, research, portico, covered exterior hallway or walkway and any maintenance, storage, or utility facilities essential to the operation of any of the school buildings listed above. For a detailed definition, please refer to: 40 CFR § 763 Subpart E—Asbestos-Containing Materials in Schools D.Demolition Contractor Information If there is a general and a subcontractor, list both. E.Demolition Dates Specify the dates when you will actually begin and end the demolition activities. These are the days that you will start and end the demolition (including the removal of all demolition debris) and it is NOT a window of opportunity when you MAY be demolishing the structure. If necessary, estimate the end date using your best professional judgment and revise the notification form, if necessary. Revisions can be made without charge. Include all days you will be working on the project. For revisions, if the new start date and work times are later than the original start date and work times, then notice by phone, or electronic means shall be given as soon as possible before the start date and a revised notification form shall be submitted in accordance with R307-801-12(10) as soon as possible before, but no later than, the original start date. If the written notification form is received by the director no later than the day before the original start date and work times, no notice by phone is required. F.Asbestos Inspection Report. If you have questions about filling out this portion, contact your asbestos inspector. G.Asbestos Containing Material to be Left in the Facility During Demolition If non-friable asbestos will be left in place, enter in the amounts. Any material that has asbestos coating or contains asbestos must not be recycled.