Loading...
HomeMy WebLinkAboutDWQ-2025-000110Comments/Responses Utah Department of Transportation (UDOT) MS4 Permit Modification Public Notice Period: May 16, 2023 to June 16, 2023 Comment # Commenter Section Stakeholder Comment DWQ Response 1 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.3.6.1 Permit part 4.2.3.6.1 has not been fully changed to reflect what Kelsee put in her email on 4/19, which is copied and pasted below. The text in red is what it should read, but is incorrect in the draft permit. Permit Part 4.2.3.6.1. was updated to improve clarity and readability. The reference to Permit part 4.2.3.6. was included to direct any potential enforcement actions to the established SOPs developed by the permittee for situations involving illicit discharges. “Upon detection of an illicit discharge, the Permittee shall take actions to require immediate cessation of illicit discharges pursuant to Part 4.2.3.2.1. of this Permit. Upon confirmation of responsible parties, the Permittee shall take all necessary actions in accordance with its enforcement procedures pursuant to Part 4.2.3.6. of the Permit.” After discussions with UDOT staff. This permit part was updated to: “Upon detection of an illicit discharge, the Permittee shall take actions to require immediate cessation of illicit discharges pursuant to Part 4.2.3.2.1. of this Permit. Upon confirmation of responsible parties, the Permittee shall take all necessary actions in accordance with its enforcement procedures pursuant to Part 4.2.3.6. of the Permit." 2 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.5.1.4 The first link in permit part 4.2.5.1.4 is broken. The link in permit part 4.2.5.1.4. was fixed. 3 Bryan Rue, UDOT Stormwater Specialist Permit part 5. The numbering is off at the end of Section 5. Part 5.2.4.4 should be 5.2.4. The numbering Section 5 was corrected. Part 5.2.4.4. was updated to 5.2.4. 4 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.1.7 4.2.1.7 seems to have an incomplete sentence, “Any methods used to evaluate the effectiveness of the education messages and overall effectiveness of the program.” It might be a fragment of the following sentence? The last sentence in Permit part 4.2.1.7. was updated to, “Any methods used to evaluate the effectiveness of the program shall be tied to the defined goals of the program and the overall objective of changes in behavior and knowledge.” 5 Bryan Rue, UDOT Stormwater Specialist Permit part 7.28 7.28 defines a Medium MS4 based on population data from the 1990 Decennial Census. Should 1990 be replaced with “current” so that it matches the definition of a Large MS4 in 7.23? This definition was not updated. This definition matches the definition contained in Utah Admin Code R317-8-1(1.6)(8). The 1990 date references the date in which the MS4 was designated. The current population of the MS4 would not be the appropriate population value for the MS4, as this definition is referencing the initial population trigger for designation. 6 Bryan Rue, UDOT Stormwater Specialist Permit Part 1.5. Header for Section 1.5 should be updated to include text in red below: 1.5. Documents the Permittee Shall Develop to Append to the Permit OR 1.5. Documents the Permittee Shall Develop as Appendicesto Append the Permit Permit part 1.5. was updated to, “Documents the Permittee Shall Develop to Append to the Permit.” 7 Bryan Rue, UDOT Stormwater Specialist Permit Part 1.5.4. Update Section on page 6: 1.5.4. Modification and Maintenance of AppendixesAppendices: No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 8 Bryan Rue, UDOT Stormwater Specialist Permit parts 1.1, 1.5.4.2., 2.2.7., 4.2.1.1., 4.2.1.3., 4.2.1.6., 4.2.1.7., 4.2.3.3.2., 4.2.3.4., 4.2.3.5., 4.2.4.1., 4.2.4.4.2., 4.2.4.6., 4.2.5.1.2., 4.2.5.1.4., 4.2.5.2.3., 4.2.5.2.4., 4.2.5.4., 4.2.6., 4.2.6.7.1., 4.3.2., 4.4.4., 5.2.2.5., 5.2.4.4., 5.3.4., 5.4.2., 6.7., 6.15., 6.17., 6.20.1., 7.14, 7.15., 7.28., 7.38., Space needed, or extra space should be removed between words. Spacing updates were made throughout the document to address this comment. 9 Bryan Rue, UDOT Stormwater Specialist Permit parts 2.2.1., 3.1.1.2., 3.1.3., 3.3.1.3., 4.1.7.2., 4.1.8., 4.2.1.2., 4.2.1.3., 4.2.1.5., 4.2.1.7., 4.2.2.1., 4.2.2.2., 4.2.2.3., 4.2.2.4., 4.2.3., 4.2.3.1., 4.2.3.2.1., 4.2.3.3., 4.2.3.5., 4.2.3.6., 4.2.3.6.3., 4.2.3.10., 4.2.3.11., 4.2.4.1., 4.2.4.1.1., 4.2.4.3.2., 4.2.4.3., 4.2.4.3.3., 4.2.4.5., 4.2.5., 4.2.5.1.3., 4.2.5.2.4., 4.2.5.2.6., 4.2.6.7.1., 4.2.6.7.3., 4.2.6.10., 5.1., 5.2.1., 5.2.1.4., 5.2.2.4., 5.2.2.6.1., 5.2.3.1., 5.3.3., 5.5., 5.5.5., 5.5.6., 6.1., 6.8., 6.9., 6.10., 6.12., 6.13., 6.16., 6.17., 6.18.2., 6.18.3.5., 6.20.1., 6.20.2., 6.20.3., 6.20.3., 6.20.4., 7.19., 7.21., 7.23., 7.24., 7.28., 7.30., 7.32., 7.34., 7.38., 7.41., 7.42., 7.44., 7.46., 7.47. Comma needed between words, or a comma should be removed between words. In some cases, commas were added or removed. However, in cases where the comma addition or removal did not significantly alter the intent of the permit requirement, the permit parts were not changed. 10 Bryan Rue, UDOT Stormwater Specialist Permit parts 3.2., 4.2.6.3., 4.2.6.4., 5.2.2.3., 5.2.2.4., 5.2.2.6.4., 5.2.4.4., 7.26., Adjust paragraph formatting to match the rest of the document. Paragraph formatting was changed from left align to justified as a result of this comment. 11 Bryan Rue, UDOT Stormwater Specialist Permit part 4.1.1.3. Add “of” between “development” and “and/or.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 12 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.1.1. Add “the” between “of” and “receiving water.” Add “(s)” after water. Add “s” after describe. No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 13 Bryan Rue, UDOT Stormwater Specialist Permit parts 4.2.1.2., 4.2.1.3. Add “and garden” after lawn. No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 14 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.1.3. Add “s” after fertilizer. No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 15 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.1.7. “Any methods used to evaluate the effectiveness of the educational methods and overall effectiveness of the program.” Incomplete sentence? Seems redundant with the previous and/or following sentence? This fragmented sentence was removed. 16 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.2.2. Add “the” between “including” and “development.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 17 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.3.1. Add “s,” after “pipe.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 18 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.3.3.4. Remove “or” between “inspection” and “dry.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 19 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.3.5.1. Add “the” between “discovery” and “date.” Add “the” between “and” and “method.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 20 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.3.6. Replace colon with a semi-colon between the words “discharge” and “follow-up.” Add semi-colon after the word “prohibited” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 21 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.3.11. Use "whom" instead of “that” between the words “entities” and “as.” Add “their” between the words “of” and “hire.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 22 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.4.1.1. Add “is” between “but” and “not.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 23 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.4.1.2. Remove semi-colon between the words “renewed” and “or.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 24 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.4.3.1. Add semi-colon between the words “development” and “as.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 25 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.5.2.3. Add period after the word “measures” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 26 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.5.2.4. Add “the” between the words “for” and “transfer.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 27 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.5.2.6. Add “more frequently” between the words “or” and “as.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 28 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.6.7. Add “(s)” after the word “Vehicle.” Add “(s)” after the word “system.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 29 Bryan Rue, UDOT Stormwater Specialist Permit part 4.2.6.7.1. Add “(s)” after the word “clipping.” Add “the” between the words “including” and “use.” Add “and” between the words “mowing” and “herbicide.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 30 Bryan Rue, UDOT Stormwater Specialist Permit part 4.3. Add “the” between the words “to” and “UDOT.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 31 Bryan Rue, UDOT Stormwater Specialist Permit part 4.3.1. Add period after the word “facilities” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 32 Bryan Rue, UDOT Stormwater Specialist Permit part 4.4.4. Remove “due to” after “due to.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 33 Bryan Rue, UDOT Stormwater Specialist Permit part 4.5.1. Add “the” between the words “with” and “preparation.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 34 Bryan Rue, UDOT Stormwater Specialist Permit part 5.2.1.4. Add semi-colon between the words “controls” and “and.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 35 Bryan Rue, UDOT Stormwater Specialist Permit part 5.2.2. Add “-“ between the words “in” and “stream.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 36 Bryan Rue, UDOT Stormwater Specialist Permit part 5.2.2.3. (2 footnote) Add period after “event” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 37 Bryan Rue, UDOT Stormwater Specialist Permit part 5.3. Capitalize “K” in keeping No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 38 Bryan Rue, UDOT Stormwater Specialist Permit part 5.3.1. Add “-“ between the words “up” and “to” and “date.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 39 Bryan Rue, UDOT Stormwater Specialist Permit part 5.4.2.1. Uncapitalize “T” in the word “this.” Add semi-colon after the word “requirements.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 40 Bryan Rue, UDOT Stormwater Specialist Permit part 5.5. Insert “of” between the words “portions” and “the.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 41 Bryan Rue, UDOT Stormwater Specialist Permit part 5.5.5. Add “s,” after the word “contract” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 42 Bryan Rue, UDOT Stormwater Specialist Permit part 6.2. Should "Act" be italicized, as it is in the rest of the document? No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 43 Bryan Rue, UDOT Stormwater Specialist Permit part 6.7. Add “or” between the words “application” and “submitted.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 44 Bryan Rue, UDOT Stormwater Specialist Permit part 6.8.2.1. Add semi-colon after the word “Director.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 45 Bryan Rue, UDOT Stormwater Specialist Permit part 7.24. Add “an” between the words “is” and “approach.” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 46 Bryan Rue, UDOT Stormwater Specialist Permit part 7.28. Add period after “census” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 47 Bryan Rue, UDOT Stormwater Specialist Permit part 7.30. Add “the” between the words “over” and “disposal” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 48 Bryan Rue, UDOT Stormwater Specialist Permit part 7.36. Add “the” between the words “has” and “potential.” Add semi-colon after the word “discharges No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language. 49 Bryan Rue, UDOT Stormwater Specialist Permit part 7.48. Add period after the word “code” No changes were made as a result of this comment. This was outside of the scope of the modification, and the proposed change did not significantly alter the meaning of the current permit language.