HomeMy WebLinkAboutDWQ-2024-007658STATE OF UTAHDEPARTMENT OF ENVIRONMENTAL QUALITYDIVISION OF WATER QUALITYWATER QUALITY BOARDP.O. BOX 144870SALT LAKE CITY, UTAH 84114-4870GROUND WATER DISCHRGE PERMITPermit No. UGW190002
In compliance with the provisions of the Utah Water Quality Act, Title 19, Chapter 5, Utah Code Annotated 1953, as amended, the Act,Danish Flats Waste Solutions1540 P RoadLoma, CO 81524
Hereafter referred to as the Permittee, is granted a Ground Water Discharge Permit for a fluids disposal facility for evaporation of wastewater in Grand County, Utah. The evaporation
pond facility is located at Latitude 39o 04’ 36.44” North, Longitude 1090 17’ 28.69” West on the following tracts of land (Salt Lake Base and Meridian)
In Section 8, Township 20 South, Range 24 East in Grand County, Utah
This permit is based on representation made by the Permittee and other information contained in the administrative record. It is the responsibility of the Permittee to read and understand
all provisions of this permit.
The facility shall be operated in accordance with conditions set forth in the permit and the Utah Administrative Rules for Ground Water Quality Protection (UAC R317-6).
This permit shall become effective on December ##, 2024
The permit and authorization to operate shall expire onDecember ##, 2029
___________________________________________
John K. Mackey, P.E.
Director
Utah Division of Water Quality
ii ART I SPECIFIC CONDITIONS A. GROUND WATER CLASSIFICATION
Based on information submitted in the permit application, ground water at the Danish Flats Waste Solutions evaporation pond site is defined as Class IV Saline Ground Water. B. BACKGROUND
GROUND WATER QUALITY
There are no shallow, continuous, permeable aquifers in the Mancos Shale underlying the site. The presence of at least 900 feet of Mancos Shale coupled with the absence or poor quality
of shallow ground water beneath the site indicates a very low vulnerability and low risk to ground water quality. C. GROUND WATER PROTECTION LEVELS
The site is assigned Class IV Protection Levels based on the lack of a shallow aquifer and the characteristics of the Mancos Shale. In accordance with UAC R317-6-4.7, Class IV ground
water protection levels are established to protect human health and the environment. D. BEST AVAILABLE TECHNOLOGY (BAT)STANDARD
Authorized Construction - The Danish Flats Waste Solutionssite is designed and operated as a non-discharging facility. Six ponds constructed during Phase 2 are authorized by this permit.
Each pond is approximately 5.5 acres in size (600ft x 400 ft). Ancillary features formerly permitted by rule included six concrete acceptance pits and one sludge pond. These features
have been removed and reclaimed under the guidance of the Utah Division of Oil, Gas, and Mining.
Design and Construction - The composite liner system for each pond consists of a 6-inch clay underliner, a 60-mil HDPE primary synthetic liner, and leak detection sump. Approved construction
elements include:
Subgrade Preparation - the subgrade has been scarified and re-compacted to 95% on the Standard Proctor Scale (ASTM D698) prior to clay placement.
Clay underliner - the clay underliner is 6 inches thick and has a compacted permeability of 1x10-5 cm/sec.
60-mil HDPE Primary Liner - a 60-mil high density polyethylene liner is installed immediately above the clay subliner in accordance with the construction quality assurance/quality control
manual approved by the Construction Permit.
Leak Detection Sump – The pond bases are slightly sloped at a minimum of 0.4% and a gravel filled leak detection sump is constructed beneath the lowest section of each evaporation pond
under the primary HDPE liners and clay underliner. A riser access pipe allows sump water detection measurements and samples to be collected if any leakage is detected in the sump.
h. Perimeter Berm – a secondary containment berm was constructed above surrounding grade along the low end of the Phase 2 ponds (southeast side) to contain the catastrophic failure of
one pond volume (20 acre-feet).
BAT Performance Monitoring - Best available technology monitoring will include minimum vertical freeboard, maximum allowable leakage rate, and maximum allowable head monitoring. These
performance standards are based on the precedence of previous ground water discharge permits and Action Leakage Rates for Leak Detection Systems (EPA, January 1992).
Minimum Vertical Freeboard – a minimum of 24 inches of vertical
freeboard shall be maintained to ensure total containment of the evaporation/surge pond and peripheral ditches.
Maximum Allowable Leakage Rate – the maximum allowable leakage rate through the primary HDPE liner of an evaporation pond is 200 gallons per acre per day. The allowable leakage rate
per pond is shown in Table 1. Table 1: Allowable Leakage Rate (ALR)
Construction Phase
Approximate Liner
area (acres) per pond
Allowable Leakage
Rate per pond
(gallons per day)
2
5.5
1100
Any fluids collected in the leak detection sump will be removed and placed back into the pond.
Maximum Allowable head in any pond sump is 1.0 foot.
Spill Containment - The permittee shall maintain all pipelines, delivery pads, storage tanks, and pond facilities with a spill containment system that shall:
Prevent any spills or leakage from any contact with the ground surface or ground water.
Convey all spills or leakage to an evaporation pond.
Any spill that does come into contact with the ground surface or ground water that causes pollution or has the potential to cause pollution to waters of the state shall be reported in
accordance with Part II.I.
Monitoring Well Construction - Monitoring wells are not a permit compliance monitoring requirement as there is no shallow groundwater underlying the site. E. Compliance Monitoring Requirements
Non-hazardous low and high salinity fluids will be placed into the ponds and evaporated. Regular pond water sample collection is not a condition of this permit. However, the operator
will obtain laboratory analyses of any proposed discharge water of unknown character prior to placement into the ponds. Excepting dissolved metals in water, hazardous or radioactive
waste materials cannot be discharged into the Phase 2 ponds without a permit amendment, as these wastes are subject to other Utah Department of Environmental Quality (DEQ) disposal regulations.
Storage and evaporation of petroleum E&P wastes is limited to Phase 1 evaporation ponds under the jurisdiction of the Utah Division of Oil, Gas, and Mining (DOGM). 1. Weekly Leak Detection
Monitoring
Fluid Measurement – the leak detection sump will be monitored weekly for the presence of fluids.
Sampling if Fluids Present - if fluids are detected in the leak detection sump, the permittee will either collect samples or measure conductivity to determine the source of fluid. F.
NON-COMPLIANCE STATUS
Probable Out-of-Compliance Status - The permittee shall evaluate results of each leak detection sampling event to determine any exceedance of the Allowable Leakage Rate found in Table
1 above. Upon determination that an allowable leakage rate has been exceeded at any leak detection sump, the permittee shall:
Pump fluids from the sump and determine the leakage rate from the pond.
Out-of-Compliance Based Upon Failure To Maintain Best Available Technology
Out of Compliance Status shall be defined as follows:
Exceeding the allowable leakage rate (ALR) for a consecutive period of 30 days.
Notification and Accelerated Monitoring - In the event that BAT monitoring indicates a violation of any of the construction or performance standards outlined in Part I.D of this permit,
the permittee shall submit to the Director both verbal and written notification and description of the violation in accordance with Part II.I of this permit.
Increase leak detection monitoring frequency of the non-compliant
pond/sump until the facility is brought into compliance as determined by the Director.
Source Assessment Study Plan - within 30 days after the written notice to the Director required in Part I.F.2.b above, the permittee shall submit an assessment study plan and compliance
schedule for:
Assessment of the source or cause of the leakage, and determination
of steps necessary to correct the source.
Assessment of the extent of any potential dispersion in the underlying soil.
Evaluation of potential remedial actions to restore the pond to compliance. G. REPORTING REQUIREMENTS
Leak Detection Sump Monitoring - monitoring required in Part I.E.2 above shall be reported according to the schedule in Table 2 below, unless modified by the Director: Table 2: Compliance
Monitoring Report Schedule Quarter Report Due Date
1st (January, February, March) April30th 2nd (April, May, June) July 31st
3rd (July, August, September) October 31st4th (October, November, December) January 31st
Leak Detection Sump Monitoring- reporting will include:
Presence or absence of fluid in the leak detection sumps.
Volume of fluid in a leak detection sump, if present.
Depth of fluid in a leak detection sump, if present.
Results of sampling and analysis of fluid collected for compliance or leak assessment purposes.
The disposition of any fluids in a leak detection sump.
The volume of fluid removed from the leak detection sumps.
Electronic Filing Requirements - In addition to submittal of the hard copy data, above, the permittee will electronically submit the required ground water monitoring data in the electronic
format specified by the Director. A hard copy of the required reports, including data analysis will be provided to the Director. In addition, a pdf version of the full report, including
analytical data, will be submitted through the DEQ Web Portal. All analytical data and updated tables will be provided in xlsx format. The data may be submitted through the online DEQ
Submission Portal at https://deq.utah.gov/water-quality/water-qualityelectronic-submissions.H. COMPLIANCE SCHEDULE
Submit a revised and updated version of the Leak Detection Manual for Phase 2 Ponds to the Director that describes the physical features, operation, monitoring,
and maintenance of the ponds and leak detection system. This manual is due within 90 days after permit issuance.
Submit a revised and updated version of the BAT monitoring plan to the Director that describes all of the procedures and methods to ensure compliance with BAT performance standards.
This includes minimum vertical freeboard, maximum leakage rate, and maximum allowable head. This manual is due within 90 days after permit issuance.
Final Closure Plan. In the event that the permittee decides to discontinue its operations at the facility the permittee shall notify the Director of such a decision and submit a Final
Closure Plan. The Final Closure Plan shall be submitted no later than 180 days prior to the closure of the facility. The permittee shall resubmit Final Closure Plans within 60 days
of receipt of written notice from the Director of deficiencies therein.
Duty to Reapply. 180 days prior to permit expiration, an application for the ground water discharge permit renewal is due. The application notice will include an updated operational
plan describing the proposed operational and closure activities expected to occur in the next five-year term of the permit. PART II MONITORING, RECORDING AND REPORTING REQUIREMENTS
A. REPRESENTATIVE SAMPLING
Samples taken in compliance with the monitoring requirements established under Part I shall be representative of the monitored activity. B. ANALYTICAL PROCEDURES
Water sample analysis must be conducted according to test procedures specified under UAC R317-6-6.3.L, unless other test procedures have been specified in this permit. C. PENALTIES FOR
TAMPERING
The Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this permit shall, upon
conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than six months per violation, or by both. D. REPORTING OF MONITORING RESULTS
Monitoring results obtained during each reporting period specified in the permit, shall be submitted to the Director, Utah Division of Water Quality at the following address no later
than the 30th day of the month following the completed reporting period:
State of Utah
Division of Water Quality PO Box 144870
Salt Lake City, Utah 84114-4870
Attention: Ground Water Protection Section
In addition to the hard copy of the required reports, a pdf version of the full report, including analytical data, will be submitted through the DEQ Web Portal. All analytical data and
updated tables will be provided in xlsx format. The data may be submitted through the online DEQ Submission Portal at https://deq.utah.gov/water-quality/waterquality-electronic-submissions.E.
COMPLIANCE SCHEDULES
Reports of compliance or noncompliance with, or any progress reports on interim and final requirements contained in any Compliance Schedule of this permit shall be submitted no later
than 14 days following each schedule date. F. ADDITIONAL MONITORING BY THE PERMITTEE
If the permittee monitors any pollutant more frequently than required by this permit, using approved test procedures as specified in this permit, the results of this monitoring shall
be included in the calculation and reporting of the data submitted. Such increased frequency shall also be indicated. G. RECORDS CONTENTS
Records of monitoring information shall include:
The date, exact place, and time of sampling or measurements:
The individual(s) who performed the sampling or measurements;
The date(s) and time(s) analyses were performed;
The individual(s) who performed the analyses; 5. The analytical techniques or methods used; and, 6. The results of such analyses. H. RETENTION OF RECORDS
The permittee shall retain records of all monitoring information, including all calibration and maintenance records and copies of all reports required by this permit, and records of
all data used to complete the application for this permit, for a period of at least three years from the date of the sample, measurement, report or application. This period may be extended
by request of the Director at any time. I. TWENTY-FOUR HOUR NOTICE OF NONCOMPLIANCE REPORTING
The permittee shall verbally report any noncompliance which may endanger public health or the environment as soon as possible, but no later than 24 hours from the time the permittee
first became aware of the circumstances. The report shall be made to the Utah Department of Environmental Quality 24 hour number, (801) 536-4123, AND to the Division of Water Quality,
Ground Water Protection Section at (801) 536-4300, during normal business hours (Monday through Friday 8:00 am - 5:00 pm Mountain Time).
A written submission shall also be provided to the Director within five days of the time that the permittee becomes aware of the circumstances. The written submission shall contain:
A description of the noncompliance and its cause;
The period of noncompliance, including exact dates and times;
The estimated time noncompliance is expected to continue if it has not been corrected; and,
Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.
Reports shall be submitted to the addresses in Part II.D, Reporting of Monitoring Results. J. OTHER NONCOMPLIANCE REPORTING
Instances of noncompliance not required to be reported within 24 hours, shall be reported at the time that monitoring reports for Part II.D are submitted. K. INSPECTION AND ENTRY
The permittee shall allow the Director, or an authorized representative, upon the presentation of credentials and other documents as may be required by law, to:
Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of the permit;
Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit;
Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this
permit; and,
Sample or monitor at reasonable times, for the purpose of assuring permit compliance or as otherwise authorized by the Act, any substances or parameters at any location.
Part III PART III COMPLIANCE RESPONSIBILITIES A. DUTY TO COMPLY
The permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the Act and is grounds for enforcement action; for permit termination,
revocation and reissuance, or modification; or for denial of a permit renewal application. The permittee shall give advance notice to the Director of any planned changes in the permitted
facility or activity which may result in noncompliance with permit requirements. B. PENALTIES FOR VIOLATIONS OF PERMIT CONDITIONS
The Act provides that any person who violates a permit condition implementing provisions of the Act is subject to a civil penalty not to exceed $10,000 per day of such violation. Any
person who willfully or negligently violates permit conditions is subject to a fine not exceeding $25,000 per day of violation. Any person convicted under Section 19-5-115(2) of the
Act a second time shall be punished by a fine not exceeding $50,000 per day. Nothing in this permit shall be construed to relieve the permittee of the civil or criminal penalties for
noncompliance. C. NEED TO HALT OR REDUCE ACTIVITY NOT A DEFENSE
It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the
conditions of this permit. D. DUTY TO MITIGATE
The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this permit which has a reasonable likelihood of adversely affecting human health or
the environment. E. PROPER OPERATION AND MAINTENANCE
The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee
to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate laboratory controls and quality assurance procedures. This provision
requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions
of the permit. PART IV GENERAL REQUIREMENTS A. PLANNED CHANGES
The permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required when the alteration
or addition could significantly change the nature of the facility or increase the quantity of pollutants discharged. B. ANTICIPATED NONCOMPLIANCE
The permittee shall give advance notice of any planned changes in the permitted facility or activity which may result in noncompliance with permit requirements. C. PERMIT ACTIONS
This permit may be modified, revoked and reissued, or terminated for cause. The filing of a request by the permittee for a permit modification, revocation and reissuance, or termination,
or a notification of planned changes or anticipated noncompliance, does not stay any permit condition. D. DUTY TO REAPPLY
If the permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the permittee must apply for and obtain a permit renewal or extension.
The application should be submitted at least 180 days before the expiration date of this permit. E. DUTY TO PROVIDE INFORMATION
The permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing,
or terminating this permit, or to determine compliance with this permit. The permittee shall also furnish to the Director, upon request, copies of records required to be kept by this
permit. F. OTHER INFORMATION
When the permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or any report to the
Director, it shall promptly submit such facts or information. G. SIGNATORY REQUIREMENTS
All applications, reports or information submitted to the Director shall be signed and certified.
All permit applications shall be signed as follows:
For a corporation: by a responsible corporate officer;
For a partnership or sole proprietorship: by a general partner or the proprietor, respectively.
For a municipality, State, Federal, or other public agency: by either a principal executive officer or ranking elected official.
All reports required by the permit and other information requested by the
Director shall be signed by a person described above or by a duly authorized representative of that person. A person is a duly authorized representative only if:
The authorization is made in writing by a person described above and submitted to the Director, and,
The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of plant manager,
operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the
company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.)
Changes to Authorization. If an authorization under Part IV.G.2 is no longer accurate because a different individual or position has responsibility for the overall operation of the
facility, a new authorization satisfying the requirements of Part IV.G.2 must be submitted to the Director prior to or together with any reports, information, or applications to be signed
by an authorized representative.
Certification. Any person signing a document under this section shall make the following certification:
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,
the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations." H. PENALTIES FOR FALSIFICATION OF REPORTS
The Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under
this permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction be punished by a fine of not more than $10,000 per violation, or by imprisonment
for not more than six months per violation, or by both. I. AVAILABILITY OF REPORTS
Except for data determined to be confidential by the permittee, all reports prepared in accordance with the terms of this permit shall be available for public inspection at the offices
of the Director. As required by the Act, permit applications, permits, effluent data, and ground water quality data shall not be considered confidential. J. PROPERTY RIGHTS
The issuance of this permit does not convey any property rights of any sort, or any
exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of federal, state or local laws or regulations. K.
SEVERABILITY
The provisions of this permit are severable, and if any provision of this permit, or the application of any provision of this permit to any circumstance, is held invalid, the application
of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby. L. TRANSFERS
This permit may be automatically transferred to a new permittee if:
The current permittee notifies the Director at least 30 days in advance of the proposed transfer date;
The notice includes a written agreement between the existing and new permittee containing a specific date for transfer of permit responsibility, coverage, and liability between them;
and,
The Director does not notify the existing permittee and the proposed new permittee of his or her intent to modify, or revoke and reissue the permit. If this notice is not received,
the transfer is effective on the date specified in the agreement mentioned in paragraph 2 above. M. STATE LAWS
Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, penalties established pursuant
to any applicable state law or regulation under authority preserved by Section 19-5-117 of the Act. N. REOPENER PROVISION
This permit may be reopened and modified (following proper administrative procedures) to include the appropriate limitations and compliance schedule, if necessary, if one or more of
the following events occurs:
If new ground water standards are adopted by the Board, the permit may be reopened and modified to extend the terms of the permit or to include pollutants covered by new standards.
The permittee may apply for a variance under the conditions outlined in R317-6-6.4.D.
If alternative compliance mechanisms are required.
If monitoring data reveal the wastewater quality is different from that authorized by this permit.