Loading...
HomeMy WebLinkAboutDWQ-2024-007543Official Draft Public Notice Version Month Day, year The findings, determinations, and assertions contained in this document are not final and subject to change following the public comment period. FACT SHEET AND STATEMENT OF BASIS SKF SALT LAKE CITY PERMIT TERMINATION UPDES PRETREATMENT PERMIT NUMBER: UTP000057 INDUSTRIAL USER FACILITY CONTACTSFacility Contact:Stephen MesserianPosition: Business Excellence, SPS & EHS Manager Phone Number:(801) 978-3121Signatory Authority:Said Mendez Position:Factory ManagerPhone Number:(801) 978-3171Permittee Name:SKF Salt Lake CityMailing and Facility Address:2464 South 6755 West Suite BValley City, Utah 84128 DESCRIPTION SKF Salt Lake City (SKF) manufactures seals from various materials, including rubber and plastic. Previously, the Permittee discharged wet deck contact water to the local Publicly Owned Treatment Works (POTW) and was categorized as a significant industrial user in accordance with 40 CFR §428.56. On September 10, 2024, the Division of Water Quality (DWQ) received a request to terminate the UPDES Permit from the Permittee. According to the request, SKF no longer has equipment on site that would facilitate a discharge of the above-mentioned process water to the POTW. As of September 4, 2024, the Permittee will no longer discharge to the POTW. As such, DWQ is terminating UPDES Permit No. UTP000057. PERMIT TERMINATIONDrafted by:Jennifer Robinson, PretreatmentUtah Division of Water Quality, (801) 536-4300PUBLIC NOTICEBegan: Month Day, YearEnded: Month Day, YearComments will be received at: 195 North 1950 West PO Box 144870 Salt Lake City, UT 84114-4870The Public Noticed of the draft permit was published on the DWQ webpage.During the public comment period provided under R317-8-6.5, any interested person may submit written comments on the draft permit and may request a public hearing, if no hearing has already been scheduled. A request for a public hearing shall be in writing and shall state the nature of the issues proposed to be raised in the hearing. All comments will be considered in making the final decision and shall be answered as provided in R317-8-6.12.ADDENDUM TO FSSOBDuring finalization of the Permit certain dates, spelling edits and minor language corrections were completed. Due to the nature of these changes they were not considered Major and the permit is not required to be re Public Noticed.Responsiveness SummaryTBD. DWQ-2024-000000