1.0 MONITORING OBJECTIVES
The objectives of this monitoring plan are as follows:
1.To characterize any potential water quality impacts resulting from
potential future acidification of tailings material.
2.To accurately predict the acidification potential that will occur on the
impoundment.
3.To present an adequate characterization of acidification potential for thedifferent units of both the existing and expansion portion of the Tailings
Impoundment.
2.0 MONITORING PLAN
2.1 Acidification Monitoring
The primary objective of this portion of the monitoring program is to determine the acidification potential of both the existing and expansion portions of the tailings impoundment, using acid/base accounting (ABA) and Net Acid
Generation (NAG) testing (Table 1).
2.1.1 Sampling Locations
The Tailings North Expansion embankment is constructed of coarse underflow material from two cyclone stations (designated East and West
Cyclones). The fine-grained overflow material is placed in the interior of the impoundment. The East and West Cyclone stations receives material
only from the Copperton Concentrator. The Single Point discharge which
flows to the impoundment interior receives Copperton tailings, Power Plant fly ash and inputs from the Smelter slag and hydrometallurgical
tailings. In the future, Smelter process waters may be directed to the
West Cyclone station as well.
Both slag tailings and the power plant ash contain abundant neutralizing capacity, so there is little to no risk of acid generation from these materials. Hydrometallurgical tailings comprise <0.5% of the flow
entering the impoundment from the Single Point discharge.
June 2017 2
The exterior of the existing south impoundment has been adequately characterized by previous sampling efforts. Sampling locations to
characterize the active North Impoundment include the following sites, to
be sampled at the frequencies indicated in section 2.1.2.
I. Embankment of the North Impoundment (cycloned tailings underflow)
II. Interior of North Impoundment (cycloned tailings overflow)
2.1.2 Sampling and Analysis for ABA Values
Samples will routinely be collected from a depth interval of 0 to 12 inches
for tailings that are in place. However, additional samples may be taken from other depths for evaluation of areas of incipient acidification.
SOP #2 describes the standard protocol for sampling, preservation, chain of custody and archiving of samples. All samples will be archived for at
least two years. The locations of the samples from the existing impoundment will be marked in the field with a stake and will be indicated on a reference map.
2.1.2.1 Whole Tailings
A. Copperton Tailings (BCP1483) – A quarterly grab
sample will be collected from this tailings stream.
B. Hydromet/Slag/Copperton Tailings (TLP2593) – A semi-annual grab sample will be collected from this
tailings stream
C. North Splitter Box (MCP2536) – A quarterly grab
sample will be collected from this tailings stream.
2.1.2.2 Underflow Material in North Embankment
Grab samples of underflow tailings (TLP1485 and
TLP1487) will be collected quarterly from each cyclone station (two samples per quarter). The samples will be collected as the underflow is discharged from the
cyclone.
2.1.2.3 Overflow Material in the North Impoundment
Grab samples of overflow tailings (TLP1486 and TLP1488) will be collected semi-annually from each
cyclone station (two samples every six months). The samples will be collected as the overflow material is
discharged from the cyclone.
June 2017 3
2.1.3 Testing Methods and Parameters
Samples of tailings solids will be analyzed using methods described in detail in the attached Standard Operating Procedures listed in section 4.0
(SOP’s 1, 2, and 3). 2.1.3.1 Static Testing
Samples of tailings solids will be analyzed for acid/base accounting using the protocol for ABA potential in SOP #1.
2.1.3.2 Kinetic Testing
The protocol for the kinetic Net Acid Generation (NAG) test is
listed in SOP #3. The kinetic NAG test involves the addition of a
strong oxidizing agent, hydrogen peroxide, to the tailings sample. The hydrogen peroxide oxidizes the available sulfide in the
sample at a rapid rate, mimicking years or decades of surface weathering in a matter of hours.
A minimum of six kinetic NAG tests will be completed each year. The tests will be run on samples that have been analyzed by acid/base accounting techniques (SOP #1). The samples will be
selected to provide a data set with a broad range of ABA potentials and neutralization potential ratios; however testing emphasis will be placed on samples with NNP values of ±10; the
acidification of these samples are typically less predictable.
2.1.4 Quality Assurance
Replicate Samples: Split replicate samples will be included to evaluate
the precision of the analyses. At least one replicate sample will be
analyzed for every 20 samples (5%). Results will be acceptable if the Relative Percent Differences (RPD) of the ABA values differ by less than
35%. Reference Samples: A large quantity of Kennecott underflow tailings
sample has been collected, dried, homogenized, and archived as a reference material. The reference sample is a composite sample of tailings underflow material that has been thoroughly mixed and split into
individual samples. (This is the same material as was used in the previous evaluation of the acidification potential of the tailings). Samples of the reference tailings material will be submitted to the analytical
laboratory, together with the unknown samples, to determine the precision and consistency of the laboratory analyses. One reference
sample will be submitted per 20 unknown samples. The results will be
compared to those obtained for the same reference material in the previous evaluation of potential acidification (Shepherd Miller, Inc. and
Schafer and Associates, 1995). If the RPD is within ± 1.5 standard
June 2017 4
deviations about the mean relative to past results for the same reference materials, the results will be accepted.
2.1.5 Inspection of Tailings North Impoundment Embankment
Annual inspection of the North Embankment will be conducted to visually identify potential “hot-spots.” If acidification appears to be developing based upon changes in color or lack of previously cultivated vegetation,
the approximate outlines of the site will be marked on a map and a sample collected for soil paste pH and paste conductivity. 2.2 Operational Monitoring
The operational monitoring will be conducted as outlined in Kennecott’s
Operational Monitoring Plan (see Appendix B)
3.0 REPORTING An annual report will be submitted by March 31 addressing the previous years
monitoring as described in this plan and Appendix B.
The report will include:
• summary tables of the results of the ABA analyses and the analyses of the final
kinetic NAG test leachate,
• graphs showing the pH and temperature variation during the kinetic NAG tests,
• a comparison of the past year’s geochemical data with the preceding years,
• a comparison between the ABA and kinetic test results (In particular, at what ABA potential and neutralization potential ratio the tailings will acidify),
• a summary of the results of the North Embankment inspection including a map of any areas that have acidified.
• a summary of all surface water, seep and groundwater data collected in
accordance with Appendix B.
4.0 STANDARD OPERATING PROCEDURES (SOP’s)
The following SOP’s are attached to this plan:
1. Standard Operating Procedure #1 – The Complete Modified Sobek Acid
Base Accounting.
June 2017 5
2. Standard Operating Procedure #2 – Sample Collection, Preservation, Chain of Custody, Archiving, and Quality Assurance.
3. Standard Operating Procedure #3 – Kinetic Testing by the Net Acid Generation (NAG) Procedure.
June 2017 6
Table 1
Repeat Sample Description
Sample ID Location Frequency¹ Sample Source Material Type Analysis Required
BCP1483 Copperton Quarterly Sampling Crew Tailings ABA, MC
MCP2536 North Splitter Box Quarterly Sampling Crew Tailings ABA, MC
TLP2593 Smelter Slag/Hydromet Semi-annual Sampling Crew Smelter Tailings ABA, MC, Total Metals, SPLP
TLP1485 Tailings (East Cyclone) Quarterly Sampling Crew Cycloned Tailings Underflow ABA, MC, Total Metals, SPLP
TLP1486 Tailings (East Cyclone) Semi-Annually Sampling Crew Cycloned Tailings Overflow ABA, MC, Total Metals, SPLP
TLP1487 Tailings (West Cyclone) Quarterly Sampling Crew Cycloned Tailings Underflow ABA, MC, Total Metals, SPLP
TLP1488 Tailings (West Cyclone) Semi-Annually Sampling Crew Cycloned Tailings Overflow ABA, MC, Total Metals, SPLP
Notes:
¹Frequency listed for ABA samples may be more than listed and if more samples are collected, ABA analysis will be performed on all samples.
Abbreviations: ABA = Acid/Base Accounting
MC = Moisture Content
SPLP = Synthetic Precipitation Leach Procedures