Loading...
HomeMy WebLinkAboutDWQ-2024-005385July 18, 2024DIVISION OF WATER QUALITYUTAH DEPARTMENT OF ENVIRONMENTAL QUALITYPUBLIC NOTICE TO RENEW A UPDES PERMITPURPOSE OF PUBLIC NOTICE THE PURPOSE OF THIS PUBLIC NOTICE IS TO DECLARE THE STATE OF UTAH'S INTENTION TO RENEW A UTAH POLLUTANT DISCHARGE ELIMINATION SYSTEM (UPDES) PERMIT UNDER AUTHORITY OF THE UTAH WATER POLLUTION CONTROL ACT, SECTION 19-5-104(9) AND 107(2), UTAH CODE ANNOTATED 1953, AS AMENDED. SAID “PERMIT” REFERS TO THE UPDES PERMIT AND THE FACT SHEET STATEMENT OF BASIS.PERMIT INFORMATIONPERMITTEE NAME: ANFIELD RESOURCES HOLDING CORPFACILITY NAME:VELVET WOOD MINEMAILING ADDRESS: 10808 S RIVER FRONT PARKWAY, SUITE 321TELEPHONE NUMBER:(307) 857-3079FACILITY LOCATION:T31S, R25E, SECTION 3, LISBON VALLEY, SAN JUAN COUNTYUPDES PERMIT NO.:UT0025810PERMITTED OUTFALLS:001OUTFALL LOCATION:LATITUDE: 38°07’10”LONGITUDE: 109°06’23”RECEIVING WATER: UNNAMED DRY WASH TO BIG INDIAN WASH TO HATCH WASH TO KANE SPRINGS CREEKBACKGROUND Anfield Resources Holding Corporation owns and operates Velvet Wood Mine (Mine), which is an underground uranium and vanadium mine. The mean monthly design discharge for the facility is 0.5 MGD. The discharge treatment system for this facility consists of a chemical precipitation process with barium chloride. The intercepted mine water is pumped and mixed with barium chloride and then up to an initial treatment tank where the barium chloride assists in radium reduction. The facility has a Standard Industrial Classification (SIC) code of 1094, for Uranium mining. The facility Outfall 001has been labeled as “Inactive,” as of December 21, 2021. If the facility would like to reactivate Outfall 001, approval must be granted by the Division of Water Quality Director at least sixty (60) days prior to the commencement of discharge. PUBLIC COMMENTSDuring the public comment period provided under Utah Administrative Code (UAC) R317-8-6.5, any interested person may submit written comments on the draft permit and may request a public hearing if no hearing has already been scheduled. A request for a public hearing shall be in writing and shall state the nature of the issues proposed to be raised in the hearing. All comments will be considered in making the final decision and shall be answered as provided in UAC R317-8-6.12. Public comments are invited any time prior to the deadline of the close of business on MONTHXX, 202X. Written public comments can be submitted to: Jennifer Berjikian UPDES Individual Permits Section, Utah Division of Water Quality, PO Box 144870, Salt Lake City, Utah 84114-4870 or by email at: wqcomments@utah.gov .After considering public comments, the Utah Division of Water Quality may execute the permit issuance, revise it, or abandon it. The permit is available for public review under “Public Participation” at www.waterquality.utah.gov/. If internet access is not available, a copy may be obtained by calling Jennifer Berjikian at (385) 341-0272. DWQ-2023-118754