HomeMy WebLinkAboutDWQ-2024-001802Blackstone Class V Public Hearing February 21, 2024
[Transcript Begins]
Dan Hall:
But we'll go through a little bit more of that when it comes. I'm Dan Hall and the section manager for the
Groundwater Protection section at the Division of Water Quality. And this is Porter Henze. He's the
project manager for the underground injection control program. So with that, we'll go ahead and view
the presentation hopefully reasonably well on both of the monitors.
00:00:31 Porter Henze
Anyway, so I'm Porter Henze . I'm the project manager for this particular site. I handled the underground
injection control wells. For the state of Utah. Specifically, we're here for the Blackstone permit, which is
just outside of Green River, Utah. I know we have a lot of comments about the A1 lithium sites. This
particular permit is does not involve A1 lithium, this is strictly just for Blackstone. So just to keep that in
mind as we're going through this. That permit is still in review.
Anyway, I'm just going to go through a brief rundown of what this with the permitting process is, what's
going on, and to make sure that people are more informed.
We'll start off with a brief summary of underground injection wells, a brief geology of the area, some
hydrology, the actual project itself and then goes into like the design and production of a well and how
to protect it. But when it becomes abandoned, and so on.
OK, so underground injection wells are a relatively new thing with like past 30 years, we've got a lot of
attention for regulation and stuff. The purpose is to place fluids into a porous geological formation and
maintain protection of the USDW's or underground sources of drinking water.
So specifically, these lists can go anything from, like a mining well, that goes and injects chemicals into
the ground to extract minerals, to aquifer recharge where you might take clean water and inject it into
an aquifer to refresh it, or stormwater wells, all these things fall underground injection control. We want
to make sure that we're not going to contaminate any existing groundwater.
Specific regulations involved are R-317-7 and 40 CFR 24. Originally underground injection control wells
are federally regulated by the EPA, but the state of Utah has primacy, which means that we've applied
for permission to regulate ourselves. So we follow both the rules for EPA and the laws that the state
legislature has enacted.
There's a lot of different types of wells, as I said before. There are currently six different classifications
and they range from disposal to aquifer recharge to exploration. This specifically is a class five well,
which is a catch all sort of thing. And this particular one is a 5C1 spent brine return well, this specific well
takes Brine that has been processed in a chemical process or evaporation pond and reinjected back into
the formation that it came from.
OK, So what does the permitting process look like? These application permit processes can last six
months to a year as we work with the applicant to make sure that it's protecting Utah's water. We
received this particular permit in the beginning of June. We previously have not had a spent buying
return well permit made, so we worked with a couple of attorneys from the state to put together a new
permit to protect Utah's environment, and so on.
We put out. For public comment in November and received about 7 comments, plus a drafl letter
requesting a public hearing here that is happening here today. Afler today, we will compile the different
comments. We won't be able to probably respond to every comment individually, but we'll probably take
we'll compile all the notes to different themes and topics that each of the comments, and then we'll
address those topics or comments or things and anybody who has given a comment or anybody who has
requested it will receive a copy of the response. And based on that response, we will either issue the
permit. Or request additional changes to the permit based on what we find.
So let's go move on to a brief geology lesson. So we are currently located on the northern part of the
Paradox Basin. It's a rather exciting area. The world knows about Moab. It's really cool. It's an old
asymmetric foreland basin. To give an example of asymmetric foreland basin, basically imagine if you had
a shelf and you put a bunch of heavy books on it. It starts to bend. A Portland Basin is basically when a
mountain range starts being made and starts compressing the rock beneath it. It creates these little
pockets where these inland seas happen. A good modern example of this is the Persian Gulf in the
Middle East. Basically, that heavy weights of the mountain range pushes down and allows water to
collect
So that was Utah, where I was, SE Utah about 300 million years ago in the Pennsylvania and it created
this inland sea and the Inland Sea got trapped and that created all these brines that we're talking about.
This particular project is about lithium, but all these pockets in this inland sea created natural resources
including oil, uranium, copper, potash and lithium, which have been explored since the 1920s. Lot of oil
exploration. I actually put up a stratigraphic column sort of showing what.
The current geology is this specific Strat column is from the Cane Creek or close to Moab, but the
geology is close enough that I it is a good example. We basically have a bunch of layers of salt and shale
interbedded on top of everything, and then about 6000 feet down below we start getting to these
interbedded evaporites, sandstone and brine layers. It's about 6000 feet. So, Blackstone is extracting
from classic 31, which is at the very bottom. With the pillar on the right side and then disposing it back
into the paradox formation on the upper side around 7 and 19.
Anyway, here's a brief general hydrology discussion. So currently Green River sources. Most of its water
from the Green River, Surprise surprise. There is no current USDW or underground source of drinking
water. There are a lot of minor aquifers and pockets of water, but those are either not enough to like,
sustain a well, or they're not potable or they're too briny and so on.
Even though there might be some wells that might tap into these things, these aren't enough to be
considered USDW water by the state. There are two existing non-potable aquifers that are significant.
They're located above the brine layers, but they're non-potable and we don't really source water from
them
00:08:21 Audience Member
Are those traceable in the clastics that you have?
00:08:24 Porter Henze
I mean, I mean, they are in the clastics above the brine layers, but.
00:08:27 Audience Member
You know which ones?
00:08:28 Porter Henze
There's one in the Mesozoic. I don't know exactly where they are, but it's not the targeted areas for this
specific project.
The brines themselves are confined by evaporate beds at depth of between 6000 to 9000 feet. They
don't connect hydraulically to the Green River or any other aquifer. These are very saturated, very briny
areas. If they connected to the Great River, we could tell, and if they did. They wouldn't be valuable
because this water has just sat there for millions and millions of years, condensing and contracting and
collecting.
So the most important part basically is what we want to talk about is that Green River doesn't have an
underground source drink. Water comes from this Green River, although sometimes the aquifers above
do drain to the Green River. For the most part, they just get transferred down. They source most of their
water from like the Book cliffs up near prices.
00:09:32 Audience Member
Yes, Sir. You're saying there's no underground source of drink? Water and no wells in this valley?
00:09:37 Porter Henze
There are wells, but they're not like public drinking water wells, like a farmer might have, like a stock
well or something like that. But in terms of what we're looking for. With the water Quality. There's not
[any public water wells]
00:09:49 Audience member
What about? What about?
00:09:49 Porter Henze
Enough to like source it.
00:09:50 Audience Member
That is not his livestock, it’s for his family drinking.
00:09:54 Porter Henze
There might be some people who do have their own private well, but from what division of water quality
looks for it wouldn't be considered what we're looking at for wells that would potentially supply, Town or
something like that. So but these specific Wells wouldn't be targeted by the brain. Those are. Separated.
Does that answer your question?
So let's talk a little bit about the process specifically. We do remember that this permit does not regulate
the extraction process, only the disposal of the brand. We received a lot of comments about DLE and we
will receive those comments if you want to give it tonight, but this. Permit itself only regulates their
disposal. Basically, lithium extraction happens a lot of their ways. Typically, it's through an evaporation
pond.
Basically, what Blackstone is proposing to do is that they're going to extract Brine from the paradox
formation, and I pulled up this stratigraphic column sort of show where they’re going, where they're
taking it from, and they're taking it from the bottom of the paradox formation. So down below.
They're going to extract it and they're going to pump it to like a warehouse or chemical factory, and
they're going to perform something called direct lithium extraction, where they use chemicals and other
processes to extract lithium from the brine. The brine is then reinjected back into the formation. In this
case, it's going to be around 6 to 17 based on their geology wells.
Specifically, how UIC wills. There's a lot of specific requirements that are involved for underground
injection control wells because these are typically very deep wells and they oflen punch through various
rock layers and offers or so have you, they're oflen required to be case through with cement, which stops
a contamination from infiltrating different layers and so on. So there is natural geology stopping the
brink from getting through, these will be cemented through to avoid contamination
On the lefl side of the screen, there's going to be an example of what a well might look like. You have the
original casing and then you have cement casing around it. So there's a lot of engineering controls that
are involved. We get a lot of questions about how is a well abandoned, how well is it plugged? How can
We make sure that it is properly plugged?
If the company does go bankrupt, how do we make sure that the well doesn't just sit there? One of our
requirements is that the company has to provide the financial bond, which means in the state that they
have to abandon the well or they go bankrupt or whatever. There's money already in place to Abandon
the well. Those prices can be like up in the millions, depending on how many wells you're closing or
whatever. There's a significant amount of money involved to make sure that that well doesn't stay like
for so for example, there's a very popular well called Crystal Springs Geyser which was an old well that
was not plugged up properly and now it’s under our current regulations that well would be required to
be plugged and abandoned and It wouldn't happen.
Any other questions regarding that?
00:13:31 Audience member
[audio is muftfed, but the member asked if the bonding information is similarly funded as the petroleum
storage tank insurance fund].
00:13:37 Porter Henze
No. So well, the underground storage… I mean like….
00:13:41 Audience Member
Did the federal money or did the company have money set aside?
00:13:45 Porter Henze
Yeah. So they [blackstone] have to, like, go with like an insurance company or something like that. And
they, the bank holds reserve basically.
00:13:52 Audience member
So it's not.
00:13:53 Porter Henze
Like with the underground storage tank where you pay into a fund. This is Money that they [the
company] put up to make sure that they can't touch until they leave.
00:14:03 Porter Henze
And that's updated whenever the permit is reissued, which is five years.
00:14:09 Audience Member
So I’m looking at this one you're talking about 6 to 9 thousand feet. But if you back up the page before
that disposal will is not that deep.
Audience Member
That's what he was talking about today.
Audience Member
So they not extracting from, they're extraction site is lower than their disposal. Site is not as deep.
[quiet audio]
00:14:40 Porter Henze
So we can't… this our this particular permit is only for the disposal well and this is an example of what it
might look like. This is the finalized designs. Once they know the final geology of the area, what exactly
they want, they'll give us a more specific design. A blueprint for it so we know exactly. Oh, we want to
make sure that the casing goes through this amount and so on.
00:15:03 Audience Member
Yes, what happens afler the first year of operation?
00:15:08 Porter Henze
Like from permit life or From when they start injecting.
00:15:13 Audience Member
You mentioned that it's a one year.
00:15:16 Porter Henze
So it's Five year permit. Application cycle. Yeah. So basically they have from issue they have five years to
before they have to reapply basically and when they reapply, they have to submit the new information
whenever.
00:15:17 Dan Hall
5 minutes.
00:15:33 Porter Henze
They just reissue whatever application they originally submitted and then we'll go through it to make
sure that everything. We evaluate the bond information like with inflation. Obviously you'll have the Cost
will increase, so we'll update the bonding information.
[multiple Audience members speaking]
00:15:59 Porter Henze
Periodic testing. OK, so there's something that we do called mechanical integrity testing and that's
required annually. Basically, we just require that the company pass certain tests to make sure that that
well isn't leaking. And I'm supposed to go down there to inspect, report and they have to report back.
And then the mechanical integrity testing has to be done before they start injecting as well.
00:16:26 Audience member 3
Yeah. What was the rationale for reinjecting in a different elevation?
00:16:31 Porter Henze
They don't want to dilute the original brine, so they're going to extract the brine, taking up lithium. If
they reinject the brine that's diluting their source.
00:16:42 Dan Hall
So if I may, I could this is meant to be informational and we're happy to try and answer as much
questions as we can within reasons, but it's a hearing to take comment which will start at 6:30. This is
going to help you to to make good comments. So anything we said we really encourage you to make
those comments so that we can give you a full written.
00:17:06 Porter Henze
And of course, if you have any other questions, you can always e-mail me or call me and I'm more than
happy to talk to you one on one.
00:17:11 Dan Hall
One for anything and I would encourage them. I'm sure you've looked like I I can appreciate that it might
be a little mind numbing me to look, but there are a lot of details about the questions you're asking
about reporting and the testing requirements as you mentioned. The mechanical integrity and other
such things and the question I think you asked about, you know, there's explanations about the, about
the different depths and why they chose those and that kind of thing. But make that comment as well.
So we can give you the full written explanation as well.
00:17:39 Porter Henze
Yeah, we're here for you. We want to make sure that you're understanding what's happening now.
00:17:42 Dan Hall
Yes, and we don't want to. Again, I don't this common thing people want to ask question. We appreciate
that. But at the same time, you gotta understand we've got to have a time to actually write out the
answer. So we're here to try and help you. Part of this is just to make sure you can have the best
comments possible.
00:17:58 Audience Member
So the actual public comment period, no.
00:18:01 Dan Hall
630 yeah, we'll start in just a few more minutes. Yes. No, sorry. What's the last one? This is just.
[Multiple people speaking]
00:18:12 Dan Hall
The information let me just be this, just the information. Again, the intent of these things are to to kind
of get your mind thinking about these things. You can ask the question some questions. Haven't you
made comments tonight or we'll set them until the end of the week. But it's intended to help you get
more information where to look as well all the time. Extra time to look because the things are listed on
our website to make the best comments possible.
00:18:34 Audience Member
Do you guys use settling ponds?
00:18:36 Porter Henze
Not, I mean, I have other projects but this project does not have a.
00:18:40 Audience Member
And it doesn't have certain points on this project.
00:18:43 Porter Henze
Not as as far as I'm aware.
00:18:46 Audience Member
If they did, how big would they be on those projects?
00:18:48 Audience Member
Right.
00:18:49 Dan Hall
So again, they can be huge. We've got ponds out and Magnum, you know, haven't delta, but in this
particular case, most of these types of facilities these days have moved to what's called DLE, Direct
Lithium Extraction. They're not using the ponds as a general rule anymore.
00:19:09 Audience Member
That’s the Project in Delta that's going on.
00:19:11 Dan Hall
Magnum. Magnum gas. Yes. Yeah, yeah.
00:19:19 Porter Henze
Anyway, I don't have much more to add to that. This is my current contact information. If you would like
to e-mail me or call me, we can even set up a meeting if you want more questions and answers or
whatever clarification, feel free to reach out to me. We have about two or three more minutes. Do we
have any other questions?
00:19:40 Audience Member
Is there any chance that they'll they can change to the settling? On under this contract, that is, they're
trying to get permit, I mean, is there any chance that that can happen in this permit?
00:19:54 Porter Henze
It would require a modification, which might, I mean. Again, it depends exactly what they're proposing.
But if they want to change something like that, they would have to apply for our modification and it
would go out to public comment, again depending.
00:20:06 Dan Hall
And in the case at Magnum, where we have both, they have injection wells out there where they
solution mine the salt Dome down there and then they've got those big ponds out there. We have both
the UIC, which is what this permit is for those wells, but we also have groundwater permits. So both
things would happen if they were to have it have ponds. They would have. This permit and then they
would almost certainly would likely need groundwater permit.
00:20:32 Speaker 4
How contingent are the two on each other? I read the I read the Application and it doesn't seem to
connect the two, so let's say they get the injection well, but they don't get surface water or brine
permits. Are the two connected to in a way where that wouldn't affect the ability, like you could Pass on
this. If they don't get the other permit.
00:20:54 Porter Henze
So in certain projects there are situations like that where we do work with inter agencies and be like, OK,
if you get this we can issue this or whatever. In this case, we don't have any specific qualifications
because of the specificity of this permit. At this point, if Blackstone were to move on. Without the other
things, that's them spending a million. Dollars on a miniseries.
00:21:19 Audience member
Sure, under understood. But given what they spent, do you see any adverse impact on? To expand or
develop another project and or even for local citizens. With that, do you see any impact there and is that
why you haven't connected to?
00:21:34 Dan Hall
We can't comment on what impact speculate on that kind of thing. We're not aware of any. They've
proposed a direct lithium extraction that a requires only an underground injection control permit.
00:21:45 Audience Member
OK, OK.
00:21:48 Audience Member
Thanks. And just for clarification, the permit that this is all about is for is for injecting reinjecting, they've
already got the permits for drilling and it's separate, OK, so we're just.
00:21:56 Porter Henze
It's just for the reinjection nothing. No, I don't think they. Have, but we can't say it's.
[Multiple people speaking
00:22:05 Speaker Dan hall
Correct. It's injection. And so you.
00:22:08 Audience Member
For five years.
00:22:10 Dan Hall
They're renewed on A5 year basis.
[Multiple People Talking]
00:22:12 Audience Member
I've just they. They came. There was a lot of, yes, they came and talked to the City Council and he was
saying, yeah, but it was experimental and temporary is what? How he phrased that. So I guess that's the
five years.
00:22:13 Audience Member
Yeah, yeah.
00:22:26 Porter Henze
I mean, they don't have that. They don't have to act in five years, they just, that's their reissue time.
00:22:33 Audience Member
I have a question about the waste stream from the chemicals that will use. I assume they're either basic
or acidic. Is that part of the wastewater that gets injected?
00:22:44 Porter Henze
No, at this point.
00:22:46 Audience Member
Where does that? How do they separate and where? Does that go?
00:22:49 Dan Hall
So again, that's a great comment.
00:22:54 Audience Member
That that's pretty.
00:22:55 Dan Hall
We don't want to make any errors. And I appreciate that. You want to and this comes up, but that's a
great comment and we'll respond fully in writing. OK.
00:23:04 Porter Henze
Yeah, because that gets complicated.
00:23:07 Audience Member
How detailed are your reports when they come? Out like, are you actually? Explain the science and the
chemicals that you're using. Or is it just? Generic. Well, it depends.
00:23:19 Dan Hall
If you want, I'd, I'd encourage you to make your own judgment. We feel they're more than adequate to
meet the regulations and to be satisfied. If we had to go to court and I had to go to court on some of
these and to make to make the right determinations that would, that we would prevail.
00:23:37 They're very detailed. In general, they do a lot of work
00:23:40 Porter Henze
It's over 10 pages right there, so 10 pages right now so.
00:23:49 Audience Member
It's 630.
[multiple people speaking
00:24:00 Dan Hall
Yeah, 630. All right, we'll go ahead. So just in case anybody didn't hear, there are two sign up sheets in
the back ones just to say you're here. The other one is to comment. I'm Dan Hall, I'm the section
manager for the Groundwater Protection section. Porter is here And when we get going and I'll grab the
sign up sheet. Afler I get done speaking, when you come up kind of get right there. John, I think kind of
give. Yeah, that's it. So yeah. So if you just come up and make. Sure that the microphone.
00:24:30 Audience Member
Are you guys at the EQ? Yes.
00:24:32 Dan Hall
We both are. Yeah. Division of water quality so. We'll start to start the public hearing. I'm going to read a
statement and then quarter we'll read a statement into the record and then you can come up. If you
haven't signed up. And yet there's enough time come up, you know, but sign it. We'll start with the
people who have signed in for to speak. OK.
00:24:54
All right. Well, good evening, ladies and gentlemen. I'm Dan Hall from the division of water quality. I've
agreed upon the request of the director of the Division of Water Quality to be the Hearing Officer
tonight. We are here to receive comment from the Class V spent brine return. Well, underground
injection permit for the Blackstone mineral.
00:25:16
There are some specific ground rules for the meeting that I will explain a little later. A public notice of the
proposed drafl permit and legal notice for the hearing was published. In the ETV news on January 17th,
2024, individual notices were emailed directly to interested parties and organizations. Based on initial
comments received to date.
Copies of the drafl permit fact sheet and statement of basis and supporting data have been available
online on the division of Water Quality website as described in the January, January 17, 2024 public
notice. Or comment will be received for this issue until the end of the hearing tonight. Written an e-mail
comments will be received until 5:00 PM February Friday, February 24th.
Friday is the 24th, I believe. February 24th, as directed by on the public. Notice. The public comments
will be considered in the final determination to be imposed on the permit. A formal comment response
summary of all comments received during the comment period will be issued with the final permit.
OK.
I will now explain the ground rules for this meeting. If you wish to make a formal statement during this
meeting comment period, please sign in at the door. The division will make a list of names submitted and
call for comments by name in the order received. If you have a written statement, please provide it.
Provide a copy by sending it via post or e-mail to division, or you can hand it to us. Right via the e-mail
address identified on the public. Notice for the accuracy of the record, we will attempt to allow anyone
who desires to speak an opportunity subject to reasonable time limitations. We are recording the
proceedings and transcribing the statements afler the hearing for the public record, anyone who makes
unrelated unfair. Inappropriate comments will be cut off based on my discretion or that of the division
staff. It is requested that those making statements confine their remarks to the issues at hand and try to
limit statements to 5 minutes if there is additional time, people may make additional comments. Again,
deviation from the issues related to this permit will not be allowed direct questioning of anyone who
make making a statement will also not be allowed, but I will attempt to point to obtain clarification from
the person making the statement or from the staff if requested speakers are asked to avoid repeating
arguments or comments of previous speakers, but should not hesitate to express support or opposition
to earlier statements.
Those making statements are advised of the possible need by the hearing officers officer to interrupt for
questions to questions during their presentation, but such interruptions or comments should only be
viewed as needed for clarification and attempt by the hearing officer to clarify and understand each
speaker's position. Following the hearing, comments will be evaluated in a response summary prepared
and sent to those who have made comments.
Any questions?
00:28:29 Audience Member
Friday is the 23rd, so I suppose on the 23rd.
00:28:32 Dan Hall
That's a good question. Whatever it says in, that's what I thought. I thought the 23rd when I said that.
What does it say in our hearing? Whatever it says in the public notice is what's official. I think we have a
typo on our on my sheet. So the 23rd Friday, the 23rd, that's great. Thank you.
Any other questions?
It was asked that if you have comments for others, you can provide them to this or you can read them
for the other person. If they're not here. If there are no more questions, Porter can give his statement
and then we will start taking comments.
00:29:12 Porter Henze
So I'm Porter Henze of the division of Water Quality Representing the director. We'd like to take the
opportunity to provide information on the statutory and regulatory basis of and process for underground
injection control permitting and permit requirements and for the receipt of public comments as this may
assist in the formation formulation of your comments.
The city of Utah administers programs to protect the quality of water under statute. Statutory authority
of the Utah Administrative rules found in Utah Administrative Code UAC, R317-8, the Utah Water Quality
Act found in the UCA section 19-5 and Federal Overlake regulations found in Title 48 of the Code of
Federal Regulations CFR. More specifically to this permit and as part of the Clean Water Act
Requirements Division, has been delegated authority from the EPA to administer the UIC program as
incorporated by reference in UAC R-317-7.
Blackstone Minerals first minute UIC permit to the division in June of 2023. The application was reviewed
by the vision and the company subsequently modified the application to provide the updated technical
information and to reflect changes and other information as requested by the division. The updated
permit application information was completed in November of 2023. The division drafled the UIC permit
and repaired the drafl permit documents for a public notice and a comment period as required and the
applicable provisions of UAC are 317-8. Public notice of the drafl, UC permit and initial public comment
period, which ended on December 14th, 2023, was published in the state of Utah and Divisions website
for at least 30 days as required by UAC R3178 Dash 6.5, the public notice stated that the drafl permit,
including the fact sheet and the company documents were available for review on the division’s website.
The public participation process was described in the public notice and the fact sheet as published on
the division website, along with the drafl permit during the initial public notice and comment period,
approximately 7 written comments were received via e-mail, including separate requests and assigned
petition for a public hearing. Upon reviewing the comments and requests as received.
Division made a determination to hold a second public comment period and to include a public hearing.
Individual notices of the hearing were emailed directly to the parties based on the initial comments
received during the First public notice period.
The Division advertised notes of setting second public comment period and this public hearing and the
Green River ETV News on January 27th, 2024 and also posted notice on its website once again along
with the drafl permit documents.
This public hearing is being conducted to solicit further comments on the drafl UIC permit. The goal of
the public hearing are to provide information on the drafl U PD drafl, UIC permit itself, and to receive
any additional public comments regarding the drafler or comments or comments regarding this drafl
USC permit will be received as recorded here tonight until the end of this hearing and any additional
written comments emails will be received until 5:00 PM February 23rd, 2023.
All public comments received by the vision during each of the two public notices and comments will be
considered in the final determination to be made regarding UAC permits. A formal comment response
summary of the comments received during both comment periods will be issued at the time of the final
permit action decide decision by the division. Thank you for your interest in the this UIC permit and you
now yield back to The hearing officer.
[multiple people speaking]
00:32:53 Dan Hall
Any I'm sorry. So thank you. OK. So we have a list of four people, like I said. We'll start in order, and if you
don't mind, come up, you know, right about the middle or, you know, close enough and just state your
main as clearly as you can for the record. And if you're represent anybody or or anything like that, Mister
John Weisheit.
00:33:18 John Weigheit
I would rather yield to somebody who's from Green River. I'm from Moab.
00:33:24 Dan Hall
OK, Jeremy Pearson.
00:33:36 Audience Member
Just stand there.
00:33:36 Dan Hall
In between the two? That's fine. I'm sure it'll pick it up right there. Where?
00:33:40 Audience Member
I'm not.
00:33:40 Speaker 1
You feel comfortable.
00:33:41 Speak 9
Yeah. OK. And I apologize, I attempted to yield as well since I’m from Castledale.
00:33:53 Jerry McPherson
Invested in in projects. So I'm doctor Jerry McPherson, director of the San Rafael Energy Research Center,
and orderville, Henry County and. And So I'm interested in this project. Well, I grew up in California just a
just a couple, just short distance from the Salton Sea, where they're doing a direct lithium extraction
from a really hot reservoir, they're also getting geothermal energy injection and came to Utah for
schooling and ended up where I end right now.
But at our Research Center we investigate a lot of advanced energy, nuclear and coal and solar and as
well as water resources. So it's a really great thing for emery county, especially with like coal plants
retiring and but one of the reasons they got into water I was at a nuclear energy conference and
research, right. Sitting from Idaho National Laboratory. Was talking about these Brine aquifers, but
there's one that Underlays Arizona specifically that could supply fresh water and was desalinated for 200
years and I thought that was that was pretty fascinating. And so. So I got into that. And so my main
question and I'll just stay on topic is is on interconnectivity, but what it was what she I approached her
later and said where did that project go because you can. Take out these aquifers. Take out the minerals
and sell them and then supply fresh water to our region.
And she said that the project installed because there was concern within her interconnectivity. So if you
pulled out that salt water, desalinated it, then the Colorado River would really seep into it. And you kind
of just be robbing Peter to pay Paul, that kind of thing. And so appreciate the answer you gave that there
aren't any inter connectivity concerns, but just wanted to highlight it to the extent that we have. Staffers
in Utah they could The very real source of water augmentation. For our state and in fact that our
Research Center, we're working with two companies, one from Salt Lake that's testing in advanced
thermal dissemination system that came out of UC Berkeley and another one that spun out spun out of
Utah Tech in southern Utah and advanced centrifugal reverse osmosis technology.
They're called Eden Tech and and we're going to be demonstrating the technologies at our center and
they could even couple together to take desolation all the way to the LD 0 liquid and. And so we're really
enthusiastic this year. We're going to be demonstrating the projects and at some point in the future that
could be applied to these Brine aquifers to it.
I'm not saying blackstone has to do this, but there's a potential that that you can pull it up and then
never have to push that down. If you can desalinate it can. Recover the fresh water. So just wanted to say
I'm supportive. Interested in the interconnectivity and not just this, but other reservoirs. And then just
mention that I trust the DEQ competency and capability to evaluate all the safety necessary for these
projects.
OK.
00:37:10 Dan Hall
Terrific. Kim McFarlane.
00:37:17 Kim McFarlane
Kim Mcfarlane, resident of Green River on planning and zoning so my biggest concern is that given the
proximity to the river. There should be adequate casing to a depth that is beyond what is necessary to
protect the local aquifers and the groundwater, and that should be extended beyond what the minimum
would be. And I would also question why the injection well would not be deeper than the extraction well
and would think that that should be evaluated and that the injection rule should be deeper than the
extraction and go to the lower aquifer and that that would be important to maintaining the quality of
our water in the valley and the potential to do extraction for other projects in the future if there is a
potential for salvageable aquifer to supplement drinking water or higher quality water, hopefully that
would be closer to the surface. So we should not allow them to do the minimal depth on each injection
well.
00:38:57 Audience Member
10/10.
[Multiple Thank you’s]
00:39:00 Tanner Mcfarlane
So the questions that I have are specifics, I would love to know what the state says the specific depth of
our highest aquifers are. I'm sure that there's going to be multiple. Are there Safety tests done on the
quality of the water before, during and afler specifics as to what those results are, how they're
published, where we can research that information and collect it for ourselves, and how frequently those
tests will be done? If they have to reapply for the permit every five years and the samples only taken
once. Or are they taking every six months or every four months? If community member notices A
substantial change because they've had water coming out of their pivots that are fed by a well, how
would they bring those concerns and address those concerns? Would it have to go through the state or
could it be taken up directly with the company? Or is it a mix and match? And then finally, Can we get,
He gave us an example of a [stratigraphic column]. Yeah. Could we get something that's more specific as
they're doing the drill? So I assume that it's going to be a pilot drill first to proof of concept basically and
then they'll. Probably come in. Aflerwards, to do the direct injection well rather than. Drilling the
injection well first and then doing their exploratory correct?
00:40:38 Dan Hall
You know, I don't. I don't know what the, what the steps, sorry
00:40:45 Porter Henze
I think we come at the at that point, but yeah, that's typically the Process. Yeah, so.
00:40:51 Tanner Mcfarlane
Either way, just as they're doing that, whatever information they can provide the community, great, but
that that helps us feel a little more comfortable with new technologies in our backyard that due to
similar technologies raising Red flags where could? Obviously bring a little bit more concern. To all, so
those are. The questions that I have.
[Multiple Thank you’s]
00:41:19 Dan Hall
I will give a brief respond Porter Is the project manager, so you know review, review to Specific things
that they report on and those types of things, or if you see something, we oflen get comments or
questions as permits, progress and people are active. You know you call a lot of people, you call the
company. Sometimes they know they.
00:41:36 Porter Henze
I'm on the state liaison on project manager. Yeah.
00:41:44 Speaker 2
All right, you're up John.
00:41:44 John Weishheit
OK, thank you. Sure.
My name is John Weisheit. Hi. I'm the conservation director for Living rivers. I also have a contract with
the Waterkeeper Alliance, and I serve as the Colorado River keeper.
And I also managed the Canyonlands Watershed Council. I've lived in Utah for 45 years as a professional
river guide. Before that, I lived in Maricopa County. I worked on a farm for three years, and I worked in
the construction trades for 15 years. I'm going to. I lefl my home without my paperwork, but I brought
my computer, so I'm going to read from the screen if that's OK, I'm going to start with my conclusion.
There's some things I think we need to be aware of and one that the targeted brine layers at depth are
under significant natural high pressure. The saturated brines at depth can flow as the velocity current.
The natural high temperatures of the brine at death at death is quite significant. Which means blowouts
of well casings have happened in the past and will be and will happen again in the future. Accidental
discharges of brine from failures of well casings and plumbing conduits can cause harm to residents, to
workers and the environment, and the visitors to Green River City. An industrial accident will defeat the
objectives of the Colorado River Salinity Control Act of 1974 and the Mexican Water Treaty of 1944.
Concerning this activity, most of the peer reviews considered direct lithium extraction and untested
technology. So we're this community is basically an experimental community. This technology uses harsh
chemicals and it is not clear to the public what the waste stream of these chemicals. How they are being
regulated not only for water quality but for air quality. And last, there is a profound weakness in the
planning and zoning dishes. Decisions made for a high risk activity. We think decision makers are making
serious missteps that could lead to future litigation. Essentially, what I mean by that is we're putting a
very big project in the wrong place. How much time do I have?
00:44:33 Dan Hall
We're here till 8:00, so keep going.
00:44:42 John Weishheit
There is a person missing from here and had that he's my partner and his name is Kyle Warrank. He's the
executive director of the Great Basin Water Network. He's currently in the legislative selections of the
Utah legislation. He regrets not being here. Our general concern is that the agencies and service
providers do acknowledge that well casings that penetrate into the paradox formation have been
problematic in the past. And this is a very, very serious permit and it needs to be and because it's
experimental, it needs wonderful oversight. I have documents that I would like to and submit to perfect
the administrative record. One is our comment letter to the state engineer. I spent a lot of time
researching paradox formation geology and it has lots of references that I think would be helpful. I was
here for the Bureau of Reclamation presentation to the hearing for the state engineer. And it was an
excellent, excellent presentation. And I would like to share that with you. I was hoping they would be
here. They too feel that this could threat threaten the some of the salinity Control Act and the millions of
dollars that have been spent. Handling the salt that comes out to Mancos shell and Colorado, Utah and
Wyoming.
My biggest concern is that they're basically inflating zone 7 through 19, much like the view of
reclamation is in the paradox Unity control unit in Bedrock, Colorado, which and you know that worked
for about 10 years, 15 years, and now we have. Richter scale 4 to 5 earthquakes and so I'm concerned
that. Between the earthquakes, the salt flows and things like that, you know the it's very highly the
conduit would be the well casing would be severed and then? Terrible things would happen. I was well, I
would be curious to know. What the full fail safes are to prevent those kinds of accidents that's from
happening. So we don't have another crystal springs geyser going into the grid, but also I mean the plan
is right next to Browns, wash, that Browns Wash is because the conduit for an accident spill that would
go in to the Green River. So that's a big issue to me as well.
Let's see, I think. That pretty much covers it, except I'm also concerned about green rivers. Water
purification plant. Very close proximity, I would hate for that to just be part of an accident that takes the
critical water away from for sanitation until for the Community. So I think you should be consulting with
the city manager and mayor about. That water treatment plant for drinking water.
OK, I will submit that I have. I will submit these documents in this letter by Friday. And do I have till
midnight or until Friday? OK and.
I'll. I'll yield to somebody else, but.
[multiple people speaking]
John Weishheit
And I, I will say she has three hyperlinks here to documents that I will submit to the record, but I'm going
To read this.
Audience Member
From Gayna Salinas, my sister
John Weishheit [for Gayna Salinas]
And first of all, she says thank you and she's appreciative And she's sorry that she can't be here.Several
points I am concerned about the Utah Division of Natural Resources oversees all the drilling water rights
and water quality concerns in the state. To my understanding, Anson is saying that they are very least
they have all the permits to start drilling this next week, February 11th statement from Hanson. That's
one of the. Documents that I will send to you, they say the brine water will only be above ground for six
hours before being reinjected. Page 3 February 11th newsletter from income resources. I do not see any
water rights granted yet, nor do I see any permits for the injection. If the brine water is to be only above
ground for six hours, then the injection wells need to be in place before the drilling of the wells. To bring
up the brine water or there will or there need to be or there need to be huge tanks in. Brine and that's
another comment. I think the fire department needs to be aware they need to, you know, high pressure,
high volume water thing for Accidents, and I don't know if that I haven't seen any literature? On that,
sorry for the diversion, but that's a good point. I am not seeing any communication between the
different organizations, IE DWQ. Division of Water Quality, Utah Division of oil, gas and mining and water
rights. I am not sure what DW will say about.
In the Anson 11 February notice, Page 3 footprints the information about the geological formations and
the salts is from the 1970s. Is there no other more current research that can give a better indication of
what is happening between the geologic layers?
Anson says the salts are plastic. They can flow between layers, but then it reseals they insist there is no
interruption from Green River aquifer. The salt brine will flow to the demonstration pro. Processing plant
but it does not say how this bent Brian gets to the injection well. Or are they drawing Brine up and then
reinjecting in the same well. Also this does not mention anything about the extremely high gas pressure.
What happens to the natural gas. That brings the brine up. Are they forcing the gas back underground, or
does it just go airborne?
I assume, oh, I assume John will be at the hearing and let's see if any other things to be concerned about
other than what I mentioned before in my first letter. I will Contact you again. That's it.
00:52:20 Porter Henze
OK, terrific. Thank you for your comments.
00:52:25 Dan Hall
Anybody else?
Go ahead. No.
00:52:27 Christine Sheeter
OK, I'm Christine sheeter. I'm a citizen and I was curious about the when you're talking about, there was
Jeremy, about the interconnectivity of geologic layers and what is the certainty that there isn't any
Passing or ability to pass there I I'm just wondering. That's a huge thing, and no one talked about the
data percentage of knowledge known there or how that's determined when we're talking about death.
And then just as a a point of interest, I was wondering when the EPA did no longer had jurisdiction over
this type of process. I don't know if you guys can answer. That now, but.
00:53:19 Audience Member
They still have jurisdiction. We just have first jurisdiction.
00:53:23 Dan Hall
So the way that all the federal safe drinking water, Clean Water Act, the Fed, where states can get
primacy, so they are the first line to issue permits under the safe Drinking Water Act in this case for for
drinking water plants and the UIC program or the Clean Water Act for UPDS for surface water discharges.
But the EPA retains oversight authority. So we're the prime, we have primacy. This state does some
states don't, but most states have primacy. So we enforce the federal regulations with their oversight,
they haven't given it up. They've delegated it. Yeah. Does that make sense?
00:53:58 Christine Sheeter
OK. Thank you. They haven't given It up. So they're your boss.
00:54:03 Porter Henze
Yeah, basically they're aware of this project
00:54:06 Christine Sheeter
OK.
00:54:15 Kelly Denham
If nobody else has someone else.
My name is Kelly Denham and I'm a citizen also. Just repeating pretty much everything that John and
Dana my sister had to say, but that the big thing is.
Who also like if something does go wrong, is there any kind of repercussion? Is there anything that and
it's like because it is speculation and round wash is right there? And there is a drill rig on site right now.
What if they start drilling? I know like the same thing if they drill out, it's got to go back in somewhere
supposedly that so if they start prior to having all of the permits and stuff in place.
The information that John referenced Anson's in all of their information, it says Anson/Blackstone. So it's
the same.
But today's information says very specifically that they do have all permitting in place already, so they are
planning on starting now and I don't know if it's all in place just for the exploration or if its for the whole
deal. Is that? So I guess and then like for the exploration, well, there has a very small berm that if
anything I mean. Anything a good rainstorm could breach the burn into. Brown's wash, so just the
concern of All the gas and water going to where It's not supposed to. Thank you.
00:56:15 Austin Carter
My name is Austin Carter. I used to be a citizen here. Now I'm up in the book. close more or less. I have
some concerns when I hear everybody keep repeating what if something happens, what's in set in place?
I'm currently dealing with the DEQ of Utah and some pretty substantial things are harming the river and
the integrity of the river and a real serious manner and my own livelihood and my own health and I
haven't seen any integrity from the DEQ by any means and I don't think you guys will. I think you're here
for an agenda. I think all the decisions have already been made. I don't think you made our Voices make
any difference. I think the state of Utah is probably making a big paycheck off of green river as usual.
I think we're a Sacrificial lamb in this case and I think the things that are set in case if something
happens, is that its just green river. We'll just be the sacrificial lamb. There won't be any you know? It'll
just be lefl because that's experience I have. I have underground fuel tank removal program materials
that never are supposed to be lefl, supposed to go to certified landfills. Somehow destroyed my cabbing
operation along the Green River. I've tested it myself. The DEQ refuses the test. You can visually look at
the pile. You can visually look at the water source going. Into the river. My animals became sick. I no
longer live on that property over those things, so I don't think the integrity will be showing that the
people in this valley deserve. If something does happen. I'm that's my big concerns and I think people
should know those things. I don't think that Department of Environmental quality is in place to watch
out for the environment or the people. It's to make money for the state of Utah. Right. Now, and that's
heartbreaking for me. So I honestly believe it was there to protect the people and the environment. And
I'm somebody who has to carry my water or haul every drop of water I have 30 plus miles a day. And
when I'm on the mountain, I have to carry it and go find it with a shovel. So I know the value of water. It's
beyond what these wells and this project's worth. I guess that's all I have to say about it. Thanks for your
time. You guys have a good night.
[Multiple thank you’s]
00:59:03 Dan Hall
Well, anybody else?
00:59:21 Audience Member
I'm sorry, I'm sorry.
00:59:24 Unnamed Commenter
I would like to say that I appreciate that John and what he had to say, and also Austin when with the
sacrificial lamb thing and Green River being an experiment thing. I mean, look at the missile base where
boom and Bust town and it feels like that again.
I agree with Austin. That you guys are just like having an agenda. There's people in the background doing
whatever and let's go boom. Let it happen. It's just Green River. So what? Kick it to the side.
Thank you.
01:00:11 Unnamed commenter
Have you been a project?
01:00:12 Speaker 7
Manager over on the projects, yeah.
01:00:13 Porter Henze
Uh, yes. I’ve issued a few permits. This is my first spent brine, this is the first time Brian return well for
Utah.
01:00:21 Unnamed Commenter
Do you? OK, first spent? Sorry. How many spent Brine projects are there in Utah.
01:00:29 Porter Henze
In Utah, there are 0.
01:00:31 Unnamed Commenter
Exactly 0 all right.
01:00:32 Speaker 3
Sorry, I should refrain from answering.
01:00:34 Audience member
Yeah. Yeah, maybe we shouldn't cause. Sorry, that's not.
01:00:38 unnamed Commenter
I got a chance.
01:00:38 Audience Member
Well, that might sort of be.
01:00:39 Dan Hall
It might sort of be true, there's intrepid pot. That's there's other facilities.
01:00:42 Audience Member
Like but you have to.
01:00:43 Audience member
Like in your defense, these guys are doing their job too. So like, take that into consideration, that's all.
01:00:54 Audience Member
I was wondering more If you have examples of when things have gone wrong, what were the
remediations that were taking?
01:01:04 Porter Henze
I will respond in the actual response because I can get better answers. It’s Complicated.
01:01:12 Audience Member
No, Absolutely, especially afler some of the concerns you've recently heard, that would be an resource.
01:01:19 Diane Chandler
I'm Diane Chandler. I live down just down from Browns, Browns. Watch the 1st next property and I have
a big concern about the if something happens is that water? Is that Brine going to go into the river? And I
think it's been mentioned Brown’s wash, Is, you know, like conflict. So I just wanted to. Amway, that’s my
concern
01:01:44 Porter Henze
Thank you.
01:01:48 audience member
I have a question. Sorry, will your Official responses to these comments be public.
01:01:58 Porter Henze
Yes, they will. It will be an official document that we'll Send out to everybody.
01:02:11 Audience member
On your Website can we access any? You don't have anything on the website that we can ask like on
water rights or that kind of thing.
01:02:22 Dan Hall
Not so much. Other the agencies. You know, typically public notice the sub back sheets, their basis in the
permit, sometimes some other documents, but they're available if you'd like something if there's
something mentioned in there or Tanner asked about some of the reports and that kind of stuff. They're
public access documents, they're available. If you would like them for sure. Just tell us what you'd like.
Yeah. Sometimes we post stuff, but there's no requirement that we post anything, but it's all available. If
you'd like.
01:02:50 Porter Henze
Yeah. If you need help. If you need help navigating it or finding something.
01:02:51 Audience Member
For sure, yeah.
01:02:54 Audience Member
We'll be there now.
01:02:56 Audience Member
That that's the big one.
01:02:57 Audience Member
Yeah, yeah.
01:03:00 Audience Member
You can you hyperlink that helps.
01:03:03 Audience Member
I mean, it could be.
01:03:09 Dan Hall
So we are scheduled to go until 8:00. We'll wait another 15 or 20 minutes, but feel free if somebody
wants to comment.
01:03:17 Audience Member
One more question, just to be clear, you have not approved any injection wells at this point here for this
project?
01:03:25 Dan Hall
This is, yeah, this is a drafl permit where, you know, we have not issued it. It will, the final issuance will
come afler we have made responses to all the public comments and any changes in in the general way
that if in not just in this case but in any case, if there were really substantial one, Really substantial ones.
We would then go back out to public comment again if they were really the change important
conditions. But the answer the direct answer is no. This permanent permit has not been issued and
won't be until we read through all the comments, give a final risk, give a response to all of them. And
then if there aren't substantial changes, if there's just, you know some basic. Changes or none or
whatever, then we'll issue it. We would all be issued together the permit and the comment responses.
01:04:14 Porter Henze
There are also some requirements that the Blackstone will have to submit some additional documents
before they can begin. Going even afler, the issue of permits they have to submit more things to us.
01:04:28 Audience Member
Off the top of your Head. Do you know what the difference in distance between the depth of the natural
gas? Around here versus the Salt from where they're Attempting to get.
01:04:39 Porter Henze
So, there's not like a specific layer for natural gas, like it's in pockets all around, so I can't give a specific
answer to that question.
01:04:45 Audience Member
Yeah. OK
[END OF PUBLIC Hearing]