HomeMy WebLinkAboutDWQ-2024-000474STATE OF UTAHDIVISION OF WATER QUALITYDEPARTMENT OF ENVIRONMENTAL QUALITYSALT LAKE CITY, UTAHUTAH POLLUTANT DISCHARGE ELIMINATION SYSTEM (UPDES) PERMITSMinorIndustrial Permit No. UT0022896In
compliance with provisions of the Utah Water Quality Act, Title 19, Chapter 5, Utah Code (the "Act"),PacifiCorpis hereby authorized to discharge from PacifiCorp - Cottonwood/Wilberg
Mineto receiving waters named Cottonwood Canyon Creek, in accordance with specific limitations, outfalls, and other conditions set forth herein.This permit shall become effective on
May 1, 2024.This permit expires at midnight on April 30, 2029.Signed this XXth day of February, 2024._________________________John K. Mackey, P.E. DirectorTable of ContentsOutline
Page NumberI. DISCHARGE LIMITATIONS AND REPORTING REQUIREMENTS5A. Description
of Discharge Points5B. Narrative Standard5C. Specific Limitations and Self-Monitoring Requirements5D. Reporting of Monitoring Results7II. PRETREATMENT REQUIREMENTS8A. Definitions8B.
Pretreatment Monitoring and Reporting Requirements.9C. Industrial Wastes9D. General and Specific Prohibitions9E. Significant Industrial Users Discharging to the POTW9III. STORM
WATER REQUIREMENTS10IV. MONITORING, RECORDING & GENERAL REPORTING REQUIREMENTS11A. Representative Sampling11B. Monitoring Procedures11C. Penalties for Tampering11D. Compliance Schedules11E.
Additional Monitoring by the Permittee11F. Records Contents11G. Retention of Records11H. Twenty-four Hour Notice of Noncompliance Reporting11I. Other Noncompliance Reporting12J.
Inspection and Entry12V. COMPLIANCE RESPONSIBILITIES14A. Duty to Comply14B. Penalties for Violations of Permit Conditions14C. Need to Halt or Reduce Activity not a Defense14D.
Duty to Mitigate14E. Proper Operation and Maintenance14F. Removed Substances14G. Bypass of Treatment Facilities14H. Upset Conditions16I. Toxic Pollutants16J. Changes in Discharge
of Toxic Substances16VI. GENERAL REQUIREMENTS18A. Planned Changes18B. Anticipated Noncompliance18C. Permit Actions18D. Duty to Reapply18E. Duty to Provide Information18F. Other
Information18G. Signatory Requirements18H. Penalties for Falsification of Reports19I. Availability of Reports19J. Oil and Hazardous Substance Liability19K. Property Rights20L.
Severability20M. Transfers20N. State or Federal Laws20O. Water Quality - Reopener Provision21P. Toxicity Limitation - Reopener Provision21VII. DEFINITIONS22A. Wastewater22
DISCHARGE LIMITATIONS AND REPORTING REQUIREMENTS
Description of Discharge Points. The authorization to discharge wastewater provided under this part is limited to those outfalls specifically designated below as discharge locations.
Discharges at any location not authorized under a UPDES permit are violations of the Act and may be subject to penalties under the Act. Knowingly discharging from an unauthorized location
or failing to report an unauthorized discharge may be subject to criminal penalties as provided under the Act.Outfall NumberLocation of Discharge Outfall001Located at latitude 3919'03"N
and longitude 11111'22"W. Continuous groundwater discharge from reclaimed mine site to culvert in Cottonwood Canyon Creek drainage.
Narrative Standard. It shall be unlawful, and a violation of this permit, for the Permittee to discharge or place any waste or other substance in such a way as will be or may become
offensive such as unnatural deposits, floating debris, oil, scum, or other nuisances such as color, odor or taste, or cause conditions which produce undesirable aquatic life or which
produce objectionable tastes in edible aquatic organisms; or result in concentrations or combinations of substances which produce undesirable physiological responses in desirable resident
fish, or other desirable aquatic life, or undesirable human health effects, as determined by a bioassay or other tests performed in accordance with standard procedures.
Specific Limitations and Self-Monitoring Requirements.
Effective immediately and lasting through the life of this permit, there shall be no acute or chronic toxicity in Outfall 001 as defined in Part VII, and determined by test procedures
described in this permit.
Effective immediately and lasting through the life of this permit, the Permittee is authorized to discharge from Outfall 001. Such discharges shall be limited and monitored by the Permittee
as specified below:
Parameter, Units
Effluent Limitations *a
Maximum Monthly Avg
Maximum Weekly Avg
Daily Minimum
Daily Maximum
Total Flow, MGD
0.54
--
--
--
TSS, mg/L
20
30
--
--
Total Iron, mg/L
--
--
--
1.0
TDS, mg/L
1136
--
--
Report
TDS, lbs/day *b
--
--
--
2000
pH, Standard Units
--
--
6.5
9
Temperature, ℃
--
--
--
Report
Oil & Grease, mg/L *c
--
--
--
10.0
Self-Monitoring and Reporting Requirements *a*d
Parameter
Frequency
Sample Type
Units
Total Flow
Monthly
Measured
MGD
TSS
Monthly
Grab
mg/L
Total Iron
Monthly
Grab
mg/L
TDS
Monthly
Grab
mg/L
TDS *b
Monthly
Grab
lbs/day
pH
Monthly
Grab
SU
Temperature
Monthly
Grab
℃
Oil & Grease *c
Monthly
Visual/Grab
mg/L*aSee Definitions, Part VII, for definition of terms.*bNo lbs/tons per day loading limit will be applied if the concentration of TDS in the discharge is equal to or less than 500
mg/L as a thirty-day average. However, if the thirty-day average TDS concentration exceeds 500 mg/L at any Outfall, then the permittee cannot discharge more than 1 ton per day (or 366
tons per year) as a sum from all discharge points exceeding 500 mg/L as a thirty-day average. If the permittee cannot achieve one ton per day (or 366 tons per year) as a sum from all
applicable Outfalls, the permittee will be required to account for the excess salinity/TDS tonnage by developing a treatment process, participating in a salinity off-set program, or
other type of mechanism to remove or offset the excess salinity/TDS. The selection of a salinity control program, or other type of treatment process, must be approved by the Directorof
the Division of Water Quality.*cOil & Grease shall be sampled when sheen is present or observed. If no sheen is present or visible, report NA. In addition to monthly monitoring for
oil and grease, a visual inspection for floating solids and visible foam shall be performed monthly at all Outfalls. There shall be no sheen, floating solids, or visible foam in other
than trace amounts.*d Samples collected in compliance with the monitoring requirements specified above shall be collected at outfall 001prior to mixing with the receiving water.
Reporting of Monitoring Results.
Reporting of Wastewater Monitoring ResultsMonitoring results obtained during the previous month shall be summarized for each month and reported on a Discharge Monitoring Report Form
(EPA No. 3320-1)or by NetDMR, post-marked or entered into NetDMR no later than the 28th day of the month following the completed reporting period. If no discharge occurs during the reporting
period, “no discharge” shall be reported. Legible copies of these, and all other reports including whole effluent toxicity (WET) test reports required herein, shall be signed and certified
in accordance with the requirements of Signatory Requirements (see Part VII.G), and submitted by NetDMR, or to the Division of Water Quality at the following address:Department of Environmental
QualityDivision of Water QualityPO Box 144870Salt Lake City, Utah 84114-4870
PRETREATMENT REQUIREMENTSThis section is only applicable when the permittee discharges to a POTW. Definitions. For this section, the following definitions shall apply:Indirect Discharge
means the introduction of pollutants into a publicly-owned treatment works (POTW) from any non-domestic source regulated under section 307 (b), (c) or (d) of the CWA. Interference means
a discharge which, alone or in conjunction with a discharge or discharges from other sources, both:Inhibits or disrupts the POTW, its treatment processes or operations, or its sludge
processes, use or disposal; andTherefore is a cause of a violation of any requirement of the POTW's NPDES permit (including an increase in the magnitude or duration of a violation) or
of the prevention of sewage sludge use or disposal in compliance with the following statutory provisions and regulations or permits issued thereunder (or more stringent State or local
regulations): Section 405 of the Clean Water Act, the Solid Waste Disposal Act (SWDA) (including title II, more commonly referred to as the Resource Conservation and Recovery Act (RCRA),
and including State regulations contained in any State sludge management plan prepared pursuant to subtitle D of the SWDA), the Clean Air Act, the Toxic Substances Control Act, and the
Marine Protection, Research and Sanctuaries Act.Pass Through means a Discharge which exits the POTW into waters of the United States in quantities or concentrations which, alone or in
conjunction with a discharge or discharges from other sources, is a cause of a violation of any requirement of the POTW's NPDES permit (including an increase in the magnitude or duration
of a violation).Publicly Owned Treatment Works or POTW means a treatment works, as defined by section 212 of the CWA, which is owned by a State or municipality (as defined by section
502(4) of the CWA). This definition includes any devices and systems used in the storage, treatment, recycling and reclamation of municipal sewage or industrial wastes of a liquid nature.
It also includes sewers, pipes and other conveyances only if they convey wastewater to a POTW Treatment Plant. The term also means the municipality, as defined in section 502(4) of the
CWA, which has jurisdiction over the Indirect Discharges to and the discharges from such a treatment works.Significant Industrial User (SIU) is defined as an Industrial User discharging
to a POTW that satisfies any of the following: Has a process wastewater flow of 25,000 gallons or more per average work day;Has a flow greater than five percent of the flow carried
by the municipal system receiving the waste; Is subject to Categorical Pretreatment Standards, or Has a reasonable potential for adversely affecting the operation of the POTW or violating
any pretreatment standard or requirement.User or Industrial User (IU) means a source of Indirect Discharge.Discharge to POTW. Any wastewaters discharged to the sanitary sewer, either
as a direct discharge or as a hauled waste, are subject to Federal, State and local pretreatment regulations. Pursuant to Section 307 of The Water Quality Act of 1987, the permittee
shall comply with all applicable federal General Pretreatment Regulations promulgated at 40 CFR 403, the State Pretreatment Requirements at UAC R317-8-8, and any specific local discharge
limitations developed by the Publicly Owned Treatment Works (POTW) accepting the wastewaters. At a minimum, the discharge into a POTW must meet the requirements of Part II.D. and E.
of the permit.Hazardous Waste Notification. The permittee must notify the POTW, the EPA Regional Waste Management Director, the Director and the State hazardous waste authorities in
writing if they discharge any substance into a POTW that, if otherwise disposed of, would be considered a hazardous waste under 40 CFR 261. This notification must include the name of
the hazardous waste, the EPA hazardous waste number, and the type of discharge (continuous or batch).General and Specific Prohibitions. General Prohibitions. The permittee may not introduce
into a POTW any pollutant(s) which cause Pass Through or Interference. These general prohibitions and the specific prohibitions in paragraph 2. of this section apply to the introducing
pollutants into a POTW whether or not the permittee is subject to other National Pretreatment Standards or any national, State, or local Pretreatment Requirements.Specific Prohibitions.
The following pollutants shall not be introduced into a POTW:Pollutants which create a fire or explosion hazard in the publicly owned treatment works (POTW), including, but not limited
to, wastestreams with a closed cup flashpoint of less than 140˚F (60˚C);Pollutants, which will cause corrosive structural damage to the POTW, but in no case, discharges with a pH lower
than 5.0;Solid or viscous pollutants in amounts which will cause obstruction to the flow in the POTW resulting in Interference;Any pollutant, including oxygen demanding pollutants (BOD,
etc.), released in a discharge at such volume or strength as to cause Interference in the POTW;Heat in amounts, which will inhibit biological activity in the POTW, resulting in Interference,
but in no case, heat in such quantities that the influent to the sewage treatment works exceeds 104˚F (40˚C)); Petroleum oil, nonbiodegradable cutting oil, or products of mineral oil
origin in amounts that will cause Interference or Pass Through;Pollutants, which result in the presence of toxic gases, vapor, or fumes within the POTW in a quantity that may cause worker
health or safety problems;Any trucked or hauled pollutants, except at discharge points designated by the POTW; orAny pollutant that causes Pass Through or Interference at the POTW.Any
specific pollutant which exceeds any Local Limitation established by the POTW.Categorical Standards. In addition to the general and specific limitations expressed in Part II. D.of this
section, applicable National Categorical Pretreatment Standards must be met by all Industrial Users discharging into a POTW. These standards are published in the federal regulations
at 40 CFR 405 through 471.
STORM WATER REQUIREMENTS.
Industrial Storm Water Permit. Based on the type of past industrial activities at the facility, the permittee may or may not be required to maintain separate coverage or an appropriate
exclusion under the Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities (UTR000000). If the facility has not already determined if separate
MSGP coverage is required, the permittee has 30 days from when this permit is issued to submit the appropriate Notice of Intent (NOI) for the MSGP or exclusion documentation.
Construction Storm Water Permit. Any construction at the facility that disturbs an acre or more of land, including less than an acre if it is part of a common plan of development or
sale, is required to obtain coverage under the UPDES Construction General Storm Water Permit (UTRC00000). Permit coverage must be obtained prior to land disturbance. If the site qualifies,
a Low Erosivity Waiver (LEW) Certification may be submitted instead of permit coverage.
MONITORING, RECORDING & GENERAL REPORTING REQUIREMENTS
Representative Sampling. Samples taken in compliance with the monitoring requirements established under Part I shall be collected from the effluent stream prior to discharge into the
receiving waters. Samples and measurements shall be representative of the volume and nature of the monitored discharge. Samples of biosolids shall be collected at a location representative
of the quality of biosolids immediately prior to the use-disposal practice.
Monitoring Procedures.Monitoring must be conducted according to test procedures approved under Utah Administrative Code ("UAC'') R317-2-10, UAC R317-8-4.1(10)(d), and/or 40 CFR 503 utilizing
sufficiently sensitive test methods unless other test procedures have been specified in this permit. Monitoring must be conducted according to the test procedures listed above unless
another method is required under 40 CFR subchapters N or O. Sufficiently sensitive test method means: (1) The method minimum level (ML) is at or below the level of the effluent limit
established in the permit for the measured pollutant or pollutant parameter; or(2) The method has the lowest ML of the analytical methods approved under 40 CFR part 136 or required under
40 CFR chapter I, subchapter N or O for the measured pollutant or pollutant parameter as per40 CFR 122.44(i)(1)(iv)(A).
Penalties for Tampering. The Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under
this permit shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than six months per violation, or by both.
Compliance Schedules. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any Compliance Schedule of this permit shall
be submitted no later than 14 days following each schedule date.
Additional Monitoring by the Permittee. If the permittee monitors any parameter more frequently than required by this permit, using test procedures approved under Permit Part V.B.,
the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or the Biosolids Report Form.
Records Contents. Records of monitoring information shall include:
The date, exact place, and time of sampling or measurements:
The individual(s) who performed the sampling or measurements;
The date(s) and time(s) analyses were performed;
The individual(s) who performed the analyses;
The analytical techniques or methods used; and,
The results of such analyses.
Retention of Records. The permittee shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for
continuous monitoring instrumentation, copies of all reports required by this permit, and records of all data used to complete the application for this permit, for a period of at least
five years from the date of the sample, measurement, report or application. This period may be extended by request of the Director at any time. A copy of this UPDES permit must be maintained
on site during the duration of activity at the permitted location
Twenty-four Hour Notice of Noncompliance Reporting.
The permittee shall (orally) report any noncompliance including transportation accidents, spills, and uncontrolled runoff from biosolids transfer or land application sites which may
seriously endanger health or environment, as soon as possible, but no later than twenty-four (24) hours from the time the permittee first became aware of circumstances. The report shall
be made to the Division of Water Quality (DWQ) via the 24-hour answering service (801) 536-4123.
The following occurrences of noncompliance shall initially be reported by telephone to the DWQ via the 24-hour answering service as soon as possible but no later than 24 hours from the
time the permittee becomes aware of the circumstances:
Any noncompliance which may endanger health or the environment;
Any unanticipated bypass, which exceeds any effluent limitation in the permit (See Part V.G, Bypass of Treatment Facilities.);
Any upset which exceeds any effluent limitation in the permit (See Part V.H, Upset Conditions.);
Violation of a daily discharge limitation for any of the pollutants listed in the permit. For other permit violations which will not endanger health or the environment, DWQ may otherwise
be notified during business hours (801) 536-4300; or,
Violation of any of the Table 3 metals limits, the pathogen limits, the vector attraction reduction limits or the management practices for biosolids that have been sold or given away.
A written submission shall also be provided within five days of the time that the permittee becomes aware of the circumstances. The written submission shall contain:
A description of the noncompliance and its cause;
The period of noncompliance, including exact dates and times;
The estimated time noncompliance is expected to continue if it has not been corrected;
Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance; and,
Steps taken, if any, to mitigate the adverse impacts on the environment and human health during the noncompliance period.
The Director may waive the written report on a case-by-case basis if the oral report has been received within 24 hours by the Division of Water Quality, (801) 536-4300.
Reports shall be submitted to the addresses in Part I.D, Reporting of Monitoring Results.
Other Noncompliance Reporting. Instances of noncompliance not required to be reported within 24 hours shall be reported at the time that monitoring reports for Part I.D are submitted.
The reports shall contain the information listed in Part IV.H.3
Inspection and Entry The permittee shall allow the Director, or an authorized representative, upon the presentation of credentials and other documents as may be required by law, to:
Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of the permit;
Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit;
Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this permit, including but not
limited to, biosolids treatment, collection, storage facilities or area, transport vehicles and containers, and land application sites;
Sample or monitor at reasonable times, for the purpose of assuring permit compliance or as otherwise authorized by the Act, any substances or parameters at any location, including, but
not limited to, digested biosolids before dewatering, dewatered biosolids, biosolids transfer or staging areas, any ground or surface waters at the land application sites or biosolids,
soils, or vegetation on the land application sites; and,
The permittee shall make the necessary arrangements with the landowner or leaseholder to obtain permission or clearance, the Director, or authorized representative, upon the presentation
of credentials and other documents as may be required by law, will be permitted to enter without delay for the purposes of performing their responsibilities.
COMPLIANCE RESPONSIBILITIES
Duty to Comply. The Permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the Act and is grounds for enforcement action; for
permit termination, revocation and reissuance, or modification; or for denial of a permit renewal application. The Permittee shall give advance notice to the Director of any planned
changes in the permitted facility or activity, which may result in noncompliance with permit requirements.
Penalties for Violations of Permit Conditions. The Act provides that any person who violates a permit condition implementing provisions of the Act is subject to a civil penalty not
to exceed $10,000 per day of such violation. Except as provided at Part V.G, Bypass of Treatment Facilities and Part V.H, Upset Conditions, nothing in this permit shall be construed
to relieve the permittee of the civil or criminal penalties for noncompliance.
Need to Halt or Reduce Activity not a Defense. It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity
in order to maintain compliance with the conditions of this permit.
Duty to Mitigate. The Permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this permit, which has a reasonable likelihood of adversely affecting
human health or the environment. The permittee shall also take all reasonable steps to minimize or prevent any land application in violation of this permit.
Proper Operation and Maintenance. The Permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which
are installed or used by the permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate laboratory controls and quality
assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by a permittee only when the operation is necessary
to achieve compliance with the conditions of the permit.
Removed Substances. Collected screening, grit, solids, sludge, or other pollutants removed in the course of treatment shall be disposed of in such a manner so as to prevent any pollutant
from entering any waters of the state or creating a health hazard. Sludge/digester supernatant and filter backwash shall not directly enter either the final effluent or waters of the
state by any other direct route.
Bypass of Treatment Facilities.
Bypass Not Exceeding Limitations. The Permittee may allow any bypass to occur which does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance
to assure efficient operation. These bypasses are not subject to paragraph 2and 3 of this section.
Prohibition of Bypass.
Bypass is prohibited, and the Director may take enforcement action against a permittee for bypass, unless:
Bypass was unavoidable to prevent loss of human life, personal injury, or severe property damage;
There were no feasible alternatives to bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime.
This condition is not satisfied if adequate backup equipment should have been installed in the exercise of reasonable engineering judgement to prevent a bypass which occurred during
normal periods of equipment downtime or preventive maintenance, and
The Permittee submitted notices as required under Part V.G.3.
The Director may approve an anticipated bypass, after considering its adverse effects, if the Director determines that it will meet the three conditions listed in Parts V.G.2.a (1),
(2) and (3).
Notice.
Anticipated bypass. Except as provided above in Part V.G.2 and below in Part V.G.3.b, if the permittee knows in advance of the need for a bypass, it shall submit prior notice, at least
ninety days before the date of bypass. The prior notice shall include the following unless otherwise waived by the Director:
Evaluation of alternative to bypass, including cost-benefit analysis containing an assessment of anticipated resource damages:
A specific bypass plan describing the work to be performed including scheduled dates and times. The permittee must notify the Director in advance of any changes to the bypass schedule;
Description of specific measures to be taken to minimize environmental and public health impacts;
A notification plan sufficient to alert all downstream users, the public and others reasonably expected to be impacted by the bypass;
A water quality assessment plan to include sufficient monitoring of the receiving water before, during and following the bypass to enable evaluation of public health risks and environmental
impacts; and,
Any additional information requested by the Director.
Emergency Bypass. Where ninety days advance notice is not possible, the permittee must notify the Director, and the Director of the Department of Natural Resources, as soon as it becomes
aware of the need to bypass and provide to the Director the information in Part V.G.3.a.(1) through (6) to the extent practicable.
Unanticipated bypass. The permittee shall submit notice of an unanticipated bypass to the Director as required under PartV.H, Twenty-Four Hour Reporting. The permittee shall also immediately
notify the Director of the Department of Natural Resources, the public and downstream users and shall implement measures to minimize impacts to public health and environment to the extent
practicable.
Upset Conditions.
Effect of an upset. An upset constitutes an affirmative defense to an action brought for noncompliance with technology-based permit effluent limitations if the requirements of paragraph
2 of this section are met. Director's administrative determination regarding a claim of upset cannot be judiciously challenged by the permittee until such time as an action is initiated
for noncompliance.
Conditions necessary for a demonstration of upset. A permittee who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating
logs, or other relevant evidence that:
An upset occurred and that the permittee can identify the cause(s) of the upset;
The permitted facility was at the time being properly operated;
The permittee submitted notice of the upset as required under Part IV.H, Twenty-four Hour Notice of Noncompliance Reporting; and,
The permittee complied with any remedial measures required under Part V.D, Duty to Mitigate.
Burden of proof. In any enforcement proceeding, the permittee seeking to establish the occurrence of an upset has the burden of proof.
Toxic Pollutants. The permittee shall comply with effluent standards or prohibitions established under Section 307(a) of The Water Quality Act of 1987 for toxic pollutants within the
time provided in the regulations that establish those standards or prohibitions, even if the permit has not yet been modified to incorporate the requirement.
Changes in Discharge of Toxic Substances. Notification shall be provided to the Executive Secretary as soon as the permittee knows of, or has reason to believe:That any activity has
occurred or will occur which would result in the discharge, on a routine or frequent basis, of any toxic pollutant which is not limited in the permit, if that discharge will exceed the
highest of the following "notification levels":
One hundred micrograms per liter (100 ug/L);
Two hundred micrograms per liter (200 ug/L) for acrolein and acrylonitrile; five hundred micrograms per liter (500 ug/L) for 2,4-dinitrophenol and for 2-methyl-4, 6-dinitrophenol; and
one milligram per liter (1 mg/L) for antimony;
Five (5) times the maximum concentration value reported for that pollutant in the permit application in accordance with UAC R317-8-3.4(7) or (10); or,
The level established by the Executive Secretary in accordance with UAC R317-8-4.2(6).
That any activity has occurred or will occur which would result in any discharge, on a non-routine or infrequent basis, of a toxic pollutant which is not limited in the permit, if that
discharge will exceed the highest of the following "notification levels":\
Five hundred micrograms per liter (500 ug/L);
One milligram per liter (1 mg/L) for antimony:
Ten (10) times the maximum concentration value reported for that pollutant in the permit application in accordance with UACR317-8-3.4(9); or,
The level established by the Executive Secretary in accordance with UACR317-8-4.2(6).
GENERAL REQUIREMENTS
Planned Changes. The permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required
only when:
The alteration or addition to a permitted facility may meet one of the criteria for determining whether a facility is a new source in 122.29(b); or
The alteration or addition could significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants which are subject neither
to effluent limitations in the permit nor to notification requirements under Subsection R317-8-4.1(15).
The alteration or addition results in a significant change in the permittee's sludge use or disposal practices, and such alteration, addition, or change may justify the application of
permit conditions that are different from or absent in the existing permit, including notification of additional use or disposal sites not reported during the permit application process
or not reported pursuant to an approved land application plan.The permittee shall give notice to the Director of any planned changes at least 30 days prior to their implementation.
Anticipated Noncompliance. The permittee shall give advance notice to the Director of any planned changes in the permitted facility or activity, which may result in noncompliance with
permit requirements.
Permit Actions. This permit may be modified, revoked and reissued, or terminated for cause. The filing of a request by the permittee for a permit modification, revocation and reissuance,
or termination, or a notification of planned changes or anticipated noncompliance, does not stay any permit condition.
Duty to Reapply. If the permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the permittee shall apply for and obtain a new permit.
The application shall be submitted at least 180 days before the expiration date of this permit.
Duty to Provide Information. The permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists
for modifying, revoking and reissuing, or terminating this permit, or to determine compliance with this permit. The permittee shall also furnish to the Director, upon request, copies
of records required to be kept by this permit.
Other Information. When the permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or
any report to the Director, it shall promptly submit such facts or information.
Signatory Requirements. All applications, reports or information submitted to the Director shall be signed and certified.
All permit applications shall be signed by either a principal executive officer or ranking elected official.A person is a duly authorized representative only if:
The authorization is made in writing by a person described above and submitted to the Director, and,
The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility, such as the position of plant manager, superintendent,
position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters. A duly authorized representative may thus be either a named
individual or any individual occupying a named position.
For a corporation. By a responsible corporate officer. For the purpose of this section, a responsible corporate officer means:
A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who perfoms similar policy- or decision-making
functions for the corporation, or
the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated
facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term
environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information
for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.
For a partnership or sole proprietorship. By a general partner or the proprietor, respectively; or
For a municipality, State, Federal, or other public agency. By either a principal executive officer or ranking elected official. For purposes of this section, a principal executive
officer of a Federal agency includes:
The chief executive officer of the agency, or
a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrators of EPA).
All reports required by the permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that person.
Changes to authorization. If an authorization under paragraph VI.G.2 is no longer accurate because a different individual or position has responsibility for the overall operation of
the facility, a new authorization satisfying the requirements of paragraph VI.G.2. must be submitted to the Director prior to or together with any reports, information, or applications
to be signed by an authorized representative.
Certification. Any person signing a document under this section shall make the following certification:
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,
the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations."
Penalties for Falsification of Reports. The Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted
or required to be maintained under this permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction be punished by a fine of not more than $10,000.00
per violation, or by imprisonment for not more than six months per violation, or by both.
Availability of Reports. Except for data determined to be confidential under UAC R317-8-3.2, all reports prepared in accordance with the terms of this permit shall be available for
public inspection at the office of Director. As required by the Act, permit applications, permits and effluent data shall not be considered confidential.
Oil and Hazardous Substance Liability. Nothing in this permit shall be construed to preclude the permittee of any legal action or relieve the permittee from any responsibilities, liabilities,
or penalties to which the permittee is or may be subject under the Act.
Property Rights. The issuance of this permit does not convey any property rights of any sort, or any exclusive privileges, nor does it authorize any injury to private property or any
invasion of personal rights, nor any infringement of federal, state or local laws or regulations.
Severability. The provisions of this permit are severable, and if any provisions of this permit, or the application of any provision of this permit to any circumstance, is held invalid,
the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby.
Transfers. This permit may be automatically transferred to a new permittee if:
The current permittee notifies the Director at least 20 days in advance of the proposed transfer date;
The notice includes a written agreement between the existing and new permittee’s containing a specific date for transfer of permit responsibility, coverage, and liability between them;
and,
The Director does not notify the existing permittee and the proposed new permittee of his or her intent to modify, or revoke and reissue the permit. If this notice is not received,
the transfer is effective on the date specified in the agreement mentioned in paragraph 2 above.
State or Federal Laws. Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the Permittee from any responsibilities, liabilities, or
penalties established pursuant to any applicable state law or regulation under authority preserved bySections19-5-117 and 510 of the Clean Water Act or any applicable Federal or State
transportation regulations, such as but not limited to the Department of Transportation regulations.
Water Quality - Reopener Provision. This permit may be reopened and modified (following proper administrative procedures) to include the appropriate effluent limitations and compliance
schedule, if necessary, if one or more of the following events occurs:
Water Quality Standards for the receiving water(s) to which the permittee discharges are modified in such a manner as to require different effluent limits than contained in this permit.
A final wasteload allocation is developed and approved by the State and/or EPA for incorporation in this permit.
Revisions to the current CWA § 208 areawide treatment management plans or promulgations/revisions to TMDLs (40 CFR 130.7) approved by the EPA and adopted by DWQ which calls for different
effluent limitations than contained in this permit.Toxicity Limitation - Reopener Provision. This permit may be reopened and modified (following proper administrative procedures) to
include WET testing, a WET limitation, a compliance schedule, a compliance date, additional or modified numerical limitations, or any other conditions related to the control of toxicants
if toxicity is detected during the life of this permit.
DEFINITIONSWastewater.
The “7-day (and weekly) average”, other than for E. coli bacteria, fecal coliform bacteria, and total coliform bacteria, is the arithmetic average of all samples collected during a consecutive
7-day period or calendar week, whichever is applicable. Geometric means shall be calculated for E. coli bacteria, fecal coliform bacteria, and total coliform bacteria. The 7-day and
weekly averages are applicable only to those effluent characteristics for which there are 7-day average effluent limitations. The calendar week, which begins on Sunday and ends on Saturday,
shall be used for purposes of reporting self-monitoring data on discharge monitoring report forms. Weekly averages shall be calculated for all calendar weeks with Saturdays in the month.
If a calendar week overlaps two months (i.e., the Sunday is in one month and the Saturday in the following month), the weekly average calculated for that calendar week shall be included
in the data for the month that contains Saturday.
The "30-day (and monthly) average," other than for E. coli bacteria, fecal coliform bacteria and total coliform bacteria, is the arithmetic average of all samples collected during a
consecutive 30-day period or calendar month, whichever is applicable. Geometric means shall be calculated for E. coli bacteria, fecal coliform bacteria and total coliform bacteria.
The calendar month shall be used for purposes of reporting self-monitoring data on discharge monitoring report forms.
“Act,” means the Utah Water Quality Act.
“Acute toxicity” occurs when 50 percent or more mortality is observed for either test species at any effluent concentration (lethal concentration or “LC50”).
“Bypass,” means the diversion of waste streams from any portion of a treatment facility.
“Chronic toxicity” occurs when the IC25< XX% effluent. The XX% effluent is the concentration of the effluent in the receiving water, at the end of the mixing zone expressed as per cent
effluent.
"IC25" is the concentration of toxicant (given in % effluent) that would cause a 25% reduction in mean young per female, or a 25% reduction in overall growth for the test population.
“Composite Samples” shall be flow proportioned. The composite sample shall, as a minimum, contain at least four (4) samples collected over the compositing period. Unless otherwise
specified, the time between the collection of the first sample and the last sample shall not be less than six (6) hours nor more than 24 hours. Acceptable methods for preparation of
composite samples are as follows:
Constant time interval between samples, sample volume proportional to flow rate at time of sampling;
Constant time interval between samples, sample volume proportional to total flow (volume) since last sample. For the first sample, the flow rate at the time the sample was collected
may be used;
Constant sample volume, time interval between samples proportional to flow (i.e., sample taken every “X” gallons of flow); and,
Continuous sample volume, with sample collection rate proportional to flow rate.
“CWA”means The Federal Water Pollution Control Act, as amended, by The Clean Water Act of 1987.
“Daily Maximum” (Daily Max.) is the maximum value allowable in any single sample or instantaneous measurement.
“EPA,” means the United States Environmental Protection Agency.
“Director,” means Director of the Division of Water Quality.
A “grab” sample, for monitoring requirements, is defined as a single “dip and take” sample collected at a representative point in the discharge stream.
An “instantaneous” measurement, for monitoring requirements, is defined as a single reading, observation, or measurement.
“Severe Property Damage,” means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss
of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production.
“Upset,” means an exceptional incident in which there is unintentional and temporary noncompliance with technology-based permit effluent limitations because of factors beyond the reasonable
control of the permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities,
lack of preventative maintenance, or careless or improper operation.