APPLICATION FOR A TEMPORARY PERMIT TO OPERATE AN
EXPLORATION AND PRODUCTION WASTE FACILITY
In 2019, the Utah Legislature made changes to the Solid and Hazardous Waste Act, Utah Code § 19-6-
101 et seq., which required jurisdiction over the disposal of Oil and Gas Exploration and Production
Waste move from the Department of Natural Resources’ Division of Oil, Gas, and Mining (DOGM) to the
Department of Environmental Quality’s Division of Waste Management and Radiation Control (DWMRC).
In preparation for this regulatory shift, DWMRC has proposed a temporary permitting mechanism for
existing Exploration and Production (E&P) facilities as defined in the proposed Utah Admin. Code R315-
301-2(22)(a).
The proposed rules state that the Director of DWMRC may issue a temporary permit for the purposes of
facilitating the owner’s or operator’s good faith transition from regulation under Utah Admin. Code R649-9
to regulation under Utah Admin. Code R315-321 or R315-322. Applications for temporary permits must
be received by the Director of DWMRC no less than 30 days before October 1, 2024. The temporary
permits will expire one year from the effective date, which is the date the financial assurance mechanism
held by DOGM is transferred to DWMRC.
To complete a temporary permit application to operate an E&P facility, an owner or operator of an existing
E&P facility must:
1. Register the company in DWMRC’s Community Portal and complete facility information within the
Community Portal.
2. Complete the attached Exploration and Production Waste Facility Temporary Permit Application
Form.
3. Provide DWMRC with the following required documentation, to the extent it has not already been
provided to DWMRC or is not already in DWMRC’s possession:
a. Facility map with each landfarm cell, landfill cell, and surface impoundment labeled;
b. Copy of Division of Oil, Gas, and Mining Permit;
c. Copy of Division of Oil, Gas, and Mining Permit Approval/Issuance Letter; and
d. Copy of Division of Oil, Gas, and Mining Bonding (financial assurance).
4. Submit the Application Form and required documentation to DWMRC through the Community
Portal Miscellaneous Document Submission.
5. Within 120 days of DWMRC’s issuance of a temporary permit, the financial assurance
mechanism held by DOGM must be transferred to DWMRC. If the Director issues a temporary
permit, it shall not become effective until the financial assurance mechanism held by DOGM is
transferred to DWMRC. An effective temporary permit is required to operate an E&P Facility
under DWMRC’s jurisdiction.
2
Exploration and Production Waste Facility Temporary Permit Application Form
I. Facility Name and Location
Name of Facility
Seep Ridge Waste Management Facility
Facility Address (Street or Directions to Facility)
38180 South Seep Ridge Rd.
County
Uintah
City. Zip Code
84078
Telephone
435-722-2800
Township
T10S
Range
R20E
Section
S36
Quarter Section
Quarter/Quarter
Section
Main Gate Latitude: 39°54'13.84"N Longitude: 109°36'17.83"W
II. Existing E&P Facilities
☐ Open Landfarm Cell(s)
☐ Evaporation Pond(s)
Number of Open Landfarm Cells:
Number of Evaporation Ponds: 5
III. Facilities to be Permitted by DWMRC
☐ Landfill Cell(s)
☐ Surface Impoundment(s)
Number of Landfill Cells:
Number of Surface Impoundments:
III. Facility Owner(s) Information
Legal Name of Facility Owner
R.N. Industries Inc.
Mailing Address
P.O Box 1168
City
Vernal
State
Utah
Zip Code
84087
Telephone
435-722-2800
IV. Facility Operator(s) Information
Legal Name of Facility Operator
Dalbo Holdings, Inc.
Mailing Address
P.O. Box 1168
City
Vernal
State
Utah
Zip Code
84078
Telephone
435-828-0867
V. Property Owner(s) Information
Is the property leased? Yes
Name of Property Owner
SITLA-Utah School and Institutional Trust Lands
Mailing Address
152 E. 100 N. 4th Floor S.
City
Vernal
State
Utah
Zip Code
84078
Telephone
435-781-5304
VI. Designated Contact Information
Facility Owner Designated Contact (if different than
above)
Title
3
Mailing Address
City. State
Zip Code
Telephone
Email Address
Alternative Telephone (cell phone or other)
Facility Operator Designated Contact (if different than
above)
Title
Mailing Address
City
State
Zip Code
Telephone
Email Address
Alternative Telephone (cell phone or other)
Property Owner Contact (if different than above)
Title
Mailing Address
City
State
Zip Code
Telephone
Email Address
Alternative Telephone (cell phone or other)
VII. Waste Types to be Disposed of (check all that
apply) VIII. Facility Area
☐ Exploration and Production wastes that are exempt from
hazardous waste rules (R315-260-4(b)(5)).
☐ Very Small Quantity Generator hazardous waste
Facility Area: 654 acres
Disposal Area: 28.3 acres
IX. Application Documents
Indicate documents attached to this application (all are required):
☐ Facility Map with each landfarm cell, landfill cell, and surface impoundment labeled
☐ Copy of Division of Oil, Gas, and Mining Permit
☐ Copy of Division of Oil, Gas, and Mining Approval/Issuance Letter
☐ Copy of Division of Oil, Gas, and Mining Bonding (Financial Assurance)
STATE OF UTAH Waste Disposal Permit
DEPARTMENT OF NATURAL RESOURCES AMENDED REPORT
DIVISION OF OIL, GAS AND MINING Original Filing Date: 4/15/2019
WASTE DISPOSAL PERMIT
1. Name of Operator
R N Industries
2. Utah Account Number
101818.0
3. Address of Operator City State Zip
PO Box 1168 Vernal UT 84078
4. Phone Number
435-722-3800
5. Name of 3rd Party Contractor
GeoStrata Engineering & Geo-Sciences
6. Facility Name
Seep Ridge
7. Address of Contractor City State Zip
14425 South Center Point Way Bluffdale UT 84055
7. Phone Number
9. Additional Comments
April 15, 2019
Sundry Number: 95391
RECEIVED: Apr. 15, 2019
ENERGY SERVICE
2180 S 1300 E Ste 310, Salt Lake City, UT 84106 and 2002 Timberloch Pl. The Woodlands, TX 77380
Rev 20190325 Engineering and Geo-Sciences
Permit Renewal Application
for
RN Industries
(a subsidiary of DHI)
Seep Ridge E&P Waste Disposal Facility
Five Year Permit Renewal
Presented To:
State of Utah
Division of Oil, Gas and Mining
Department of Natural Resources
Prepared by:
GeoStrata Engineering & Geo-Sciences
14425 South Center Point Way
Bluffdale, UT 84055
on
March 25, 2019
Initial Submittal Date: May 15, 2018
Property Location:
640 Acres in Section 36, T 10S, R 20E, SLB&M
Uintah County, Utah
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Seep Ridge Exploration & Production Waste Disposal
38180 South Seep Ridge Road, Uintah County, Utah
Rev 20190325 1 Page of 7 Engineering and Geo-Sciences
TABLE OF CONTENTS
A.Introduction and Narrative
B.Site Description and Assessment and Closure and Post Closure Cost Estimate
1. Description and Assessment of Existing Conditions
a. Site Description
b. Contamination Evaluation
c. Equipment Assessment
d. Practices Assessment
e. Monitoring Program
2. Closure Cost and Bonding Evaluation
a. Contamination Evaluation
b. Remediation of E&P Waste Contamination
c. Site Closure Evaluation Scope of Work
d. Infrastructure Removal Scope of Work
e. Seeding and Revegetation Scope of Work
f. Initial Closure Monitoring Report
g. Post Closure Monitoring Scope of Work
3. Observations and Recommendations
C.Attachments
1. Attachment 1 – Maps and drawings
2. Attachment 2 – Third Party Closure Cost Estimate
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Seep Ridge Exploration & Production Waste Disposal
38180 South Seep Ridge Road, Uintah County, Utah
Rev 20190325 2 Page of 7 Engineering and Geo-Sciences
A. Introduction and Narrative
RNI submits this Exploration and Production (E&P) Waste Disposal Permit Renewal Application
(Application) for the subject facility (Facility) in accordance with the requirements of Utah
Administrative Code, Rules R649-9-8.2, R649-9-8.2.1 and R649-9-8.5.1. This Application includes
an assessment of site reclamation requirements and closure cost estimates compiled by a
responsible third-party contractor.
RNI understands that permit renewals may be approved for a five-year period depending on the
results of DOGM’s review and consideration of the Application and historic Facility compliance
performance.
The Facility receives and treats produced water, natural gas liquids (NGL), other Exploration and
Production (E&P) wastes, and other wastes as may be permitted.
The Facility is located about 34 miles south-southeast of Roosevelt, Utah and is outside of the
Roosevelt City limits. The address to the Facility is:
38180 South Seep Ridge Road
Uintah County, Utah 84021
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Seep Ridge Exploration & Production Waste Disposal
38180 South Seep Ridge Road, Uintah County, Utah
Rev 20190325 3 Page of 7 Engineering and Geo-Sciences
B.Site Description and Assessment, Closure and Post Closure Cost Estimate and
Bond Evaluation
The following narrative addresses requirements established for permit renewal of the titled facility as
described in in Utah Division of Oil, Gas and Mining guidance document, Five Year E&P Waste Disposal
Facility Permit Renewals, (re: Utah Oil & Gas Conservation General Rules R649-9-8.5.1 Bonding of
Disposal Facilities), dated August 2017.
1. Description and Assessment of Existing Conditions
a. Site Description:
The RN Industries (RNI) Seep Ridge Exploration & Production(E&P) Waste Disposal occupies
Section 36, T 10S, R 20E, SLB&M. Section 36 has been leased from Utah State Institutional Trust
Lands by RNI. About 100 acres in the southeast corner of Section 36 is being used for E&P
Waste disposal and treatment. See DISPOSAL site map in Attachment 1.
The current site has one small office building, an off-loading area, one concrete oil/water
separation vault (OWS), and three API-12 above-ground storage tanks. The site has a single
skimming pond and five operational evaporation ponds. The operational evaporation ponds are
nominally 6.6 acres each.
Liquid E&P Waste is discharged from tank trucks into the treatment system at the in-ground
OWS. It is then directed into the skimming pond for further oil removal, recovered oil is stored in
another set of above ground storage tanks. Water is then discharged to the operational
evaporation ponds. Solids from all treatment processes are transported off-site. See Existing
Process Flow Diagram in Attachment 1.
One stormwater detention basin, located near the center of Section 36 has been designed to hold
runoff generated by a 25-year, 24-hour storm until the runoff can be sampled and lab-tested.
Depending on lab results the water will be either released to the local drainage, held to
evaporate in place, diverted to evaporation ponds or disposed by some combination of the three
aforementioned methods.
Site has been mapped by the US Army Corps of Engineers (USACOE) in accordance with
procedures to satisfy Rapanos v. United States, 547 U.S. 715 (2006). USACOE has determined
that over 75% of the site contains “Waters of the United States” and cannot be disturbed without
obtaining a 33 CFR Part 323, Section 404 Permit specific to the site and each drainage channel
on the site.
b. Contamination Evaluation
There is no known or observable surface soil contamination on this site.
No process-induced vadose zone soil or unconfined aquifer contamination is known to exist.
There are no known records of incomplete spill clean-up.
Process containment berms, sumps and similar enclosures are free from pooled oil and/ or
measurable contaminated oil accumulation.
c. Equipment Assessment
Major construction and equipment operated at this facility has been observed by Engineer. Any
tests performed to assess equipment condition were cursory in nature. A review of equipment
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Seep Ridge Exploration & Production Waste Disposal
38180 South Seep Ridge Road, Uintah County, Utah
Rev 20190325 4 Page of 7 Engineering and Geo-Sciences
repair and maintenance records provided by Owner form the basis of the Engineer’s opinion of
service life expectancy.
Service life expectancy is based upon the assumption that appropriate, regular maintenance and
equipment repair has been and will continue to be performed.
It is the Engineer’s opinion that all major equipment and infrastructure construction at this facility
is in expected condition for its age. Future assessment of life expectancy can be based on age.
More particularly:
i. Site roadways are constructed and maintained with appropriate wearing surface, drainage
and turning radii for expected traffic.
ii. Road and site drainage show no signs of overflow, debris accumulation or excessive
erosion.
iii. Earthen structures are free of excessive erosion.
iv. Observable portions of piping and HDPE liners are not excessively worn or weathered.
v. No observable pump seals showed excessive leakage and drips are installed where
necessary for bearing water.
vi. Process heaters appear to be appropriately maintained. They are thermostatically
controlled and manually brought into and out of service by facility operators.
vii. Exposed surfaces of tanks and piping are corrosion free with the exception of mill scale
and light, tightly adhering rust. No pitting corrosion was observed.
viii. Buildings - An approximately 300 square foot, stick-framed office building with no potable
water or wash water supply or wastewater drainage is located in the northeast portion of
the area that has been developed for a waste disposal.
d. Practices Assessment
Engineer has reviewed Owner provided operating procedures and has observed those procedures
in practice. Owner and Engineer offer the following practice changes to improve efficiency and
environmental protections.
i. Water Disposal and Solids Disposal Operation Assessment
This Disposal has been operated less than 50% of the time during the last five years. The
following observations apply to time periods when the Disposal is regularly used in a
normal operating mode.
Strong consideration should be given to complete closure, step-wise closure or sale of this
facility to reduce Owner liability unless there is a superseding business reason to do
otherwise.
Controls for the process described in B.1.a., above and shown on the Process Flow
Diagram in Attachment 1. Only minor portions of equipment and controls are automated.
- Operators appear to be very familiar with the overall plant process and perform
process Quality Control for a large percentage of their time. Throughout their
working hours operators sample process liquids for anomalies. Whenever process
liquids or machinery operation appears abnormal operators will intervene in one of
two ways.
Most often the operator will make equipment and process adjustments for which the
operator has been trained and given authority to perform.
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Seep Ridge Exploration & Production Waste Disposal
38180 South Seep Ridge Road, Uintah County, Utah
Rev 20190325 5 Page of 7 Engineering and Geo-Sciences
Process and equipment adjustments which appear to be needed, but which operator
has not been authorized to perform, are immediately brought to the attention of
other operating staff and plant management for resolution.
- Large equipment temperatures, pressures, flowrates and the like are constantly
monitored by operating staff and management. Although some process monitoring
parameters are observed via remote displays, most instrument monitoring and all
sampling is locally observed/performed.
- Leak detection equipment is monitored regularly.
- Solids that accumulate in onsite tanks and vaults will be periodically cleaned out and
disposed offsite.
- It is the Engineer’s opinion that:
No additional process monitoring automation is warranted for any reason at this
Disposal unless it is returned to regular, continuous use or operation.
Frequency leak detection monitoring should be decreased (i.e. allow a longer time
between subsequent observations) to quarterly time periods when the ponds are
empty. Otherwise, if ponds remain full, monitoring should be weekly.
Process sampling should continue to be performed manually and locally when
Disposal is in operation because this facility is not big enough to warrant remote
and/or automated process sampling.
The biggest process variable is the type of waste brought to the Facility. It is the
Engineer’s opinion there is no commercially available, off- the-shelf (COTS)
equipment to classify incoming waste. There is no Reasonably Available Control
Technology (RACT) or even Best Available Control Technology (BACT) that is
economically viable for RNI to implement. The methods that remain (client waste
certification, periodic waste testing by client, waste evaluation by experienced staff
and similar) are best available for the RNI operation and should continue to be used.
e. Monitoring Program
Soil and water sampling and testing, visual equipment inspection, pressure tests, sampling and
analysis of material collected by leak detection systems and waste mass balance calculations
used at this facility are described below. Additional or re-configured monitoring practices which
could reasonably and economically improve detection of inadvertent waste release are also
described below. Sampling and testing for spill and/or leak clean-up is always performed to
verify that all needed clean-up is complete.
i. Water Sampling and testing is performed on all liquid taken from leak detection sumps.
ii. Leak Detection Monitoring of designated leak detection sumps is performed regularly.
f. Additional or re-configured monitoring practices which could reasonably and economically
improve operational efficacy and detection of inadvertent waste release are described below.
i. To enhance early detection of inadvertent waste release and more accurately determine
leak sources RNI should consider:
- Adding a chemical tracer to certain waste streams.
- Low pressure leak testing followed by Dry Lay-Up of buried pipe.
- Periodic liner leak testing.
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Seep Ridge Exploration & Production Waste Disposal
38180 South Seep Ridge Road, Uintah County, Utah
Rev 20190325 6 Page of 7 Engineering and Geo-Sciences
2. Closure Cost and Bonding Evaluation
Bond cost components referenced in this section have been determined by applying unit costs to
quantity take-off from drawings and documents provided by Owner and cursory field inspections and
surveys by the Engineer.
a. Contamination Evaluation
No evidence of Soil, Surface Water or Groundwater contamination was found at this facility.
b. Remediation of E&P Waste Contamination
Any salt precipitated out and remaining on liner after evaporation will be cleaned off and
removed by hydrovac. Rates were determined by Badger Daylighting of SLC, Utah and are
included in this component of closure cost estimate.
c. Site Closure Evaluation Scope of Work
Upon closure, potential soil contamination will be identified with a Photo Ionization Detector
(PID) survey. Groundwater quality and surface water will be sampled lab-tested. Hazardous
substances stored or used on site will be inventoried. Costs for this evaluation are included in
calculated closure costs.
d. Infrastructure Removal Scope of Work
The cost to remove all site infrastructure and equipment as may be reasonable and necessary to
return site to a condition similar to its use and appearance before being used as an E&P Waste
Disposal is included in reclamation cost estimate.
No costs are included to reclaim and/or improve the site to conditions better than those occurring
before its use as and E&P Disposal or markedly better than exist on adjacent property. Grading
and contouring the site to the exact site geometry before site was used as an E&P Disposal has
not been used as a reclamation criterion.
As a general rule, infrastructure removal closure cost estimates include:
i. Removal all tanks, security fence, buildings, liner materials, piping and concrete structures
which do not add value to the site are included in the Infrastructure Removal portion of
closure costs.
ii. Earthwork and grading to restore site to a serviceable condition similar to, and in keeping
with surrounding land use and drainage. *Soil used for embankment was sourced from
offsite and is classified as common earth and will be referenced as so in bonding
estimates.
e. Seeding and Revegetation Scope of Work
Seeding/revegetation cost is based drag harrowing and hydroseeding is included in the closure
cost estimate. Seed mixture and application rate determined by Great Basin Company of
Ephraim, Utah are included in this component of closure cost estimate.
f. Initial Closure Monitoring Report
This report will describe:
i. Closure PID survey results and required sampling and lab testing.
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Seep Ridge Exploration & Production Waste Disposal
38180 South Seep Ridge Road, Uintah County, Utah
Rev 20190325 7 Page of 7 Engineering and Geo-Sciences
ii. Groundwater and surface water sampling and lab-testing.
iii. Inventory of hazardous substances removed from site.
iv. Site grading, revegetation and erosion control.
g. Post Closure Monitoring Scope of Work
Post closure monitoring and care cost will include annual:
i. Erosion control and surface drainage management.
ii. Sampling and testing of site ground and surface water as described in the initial closure
report.
iii. Written reports describing the condition of the reclaimed site and work performed to
monitor and maintain reclaimed site.
3. Observations and Recommendations
Included in Articles 1. d. and 1. f, above.
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Seep Ridge Exploration & Production Waste Disposal
38180 South Seep Ridge Road, Uintah County, Utah
Rev 20190325 Engineering and Geo-Sciences
‘C. Attachments
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Seep Ridge Exploration & Production Waste Disposal
38180 South Seep Ridge Road, Uintah County, Utah
Rev 20190325 Engineering and Geo-Sciences
ATTACHMENT 1
MAPS and DRAWINGS
Site & Vicinity
PFD
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
0 500 1,000 1,500 2,000250Feet
1:9,019
BASE MAP: 2016 NAIP 1 Meter Orthophotography Obtained from the State of Utah AGRC ±
Disposal Facility Permit RenewalRN IndustriesProject Number 524-084
Seep Ridge Disposal Facility
Map1
Legend
Site Boundary
5 4 3
7
6
Copyright GeoStrata, 2018
SKIM POND
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
Produced
Water
Copyright GeoStrata, 2018
Permit Renewal
RN Industries
Project Number: 524-084
Legend
Water
Oil Solids
Vault
Oil/Water/solids
Separator
Skim Pond Evaporation
Ponds
Oil Tanks
Figure
2
Solids Disposed
at off site
Landfarm
Seep Ridge Process Flow Diagram
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Seep Ridge Exploration & Production Waste Disposal
38180 South Seep Ridge Road, Uintah County, Utah
Rev 20190325 Engineering and Geo-Sciences
ATTACHMENT 2
CLOSURE COST ESTIMATE
DOGM summary &
GeoStrata Backup Calcs
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
RN Industries Date: 3/25/2019
Facility: Seep Ridge E&P Disposal
Number of Acres to be Reclaimed 91.0 Acres 0
Contamination Remediation Cost Estimates 53,537$ 2
Removal of Infrastructure Costs Estimates 40,787$ 3
Earthwork and Grading Cost Estimates 437,506$ 4
Revegetation Cost Estimates 54,721$ 5
Final Closure & Post Closure Cost Estimates 34,000$ 6
Total Cost Estimate 620,551$
(Increase above total cost estimate by 14% if indirect costs are not included) 86,877$
Total Reclamation Cost Required 707,428$
Bond Posted 1,171,244$ 7
Difference Between Cost Estimate and Bond 463,816$
Direct and Indirect Costs
Five Year E&P Waste Disposal Facility Bond Calculation Summary Form
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
Item
0 References & Comments
Percentage
7% 01 21 55.50 0200 With an additional 2% of unforseeable events
3% 01 31 00 Adjusted to reflect a percentage, also referenced ACEC and ASCE for rates
1% 01 41 26.50 0100
0% 01 51 00 Not applicable for the scope and scale of a project like this
3% 01 71 00 Adjusted to reflect a percentage, also referenced ACEC and ASCE for rates
Total: 14%
1 91 Acres Total Site 640 Acres
2
Unit Quantity Unit Price Extended Cost Reference
Gallon 574,983 -$22,760$02 65 10.30 0130 (modifed for scale)
Bbl 17,869 0.72$12,780$
31 23 23.20 4096 adjusted to cy for hauling (with $.65 / bbl cost for disposal facility
to accept waste) Includes removal by Vac Truck and disposal of 10% of tank bottom
Day 6.75 2,000.00$6,100$ Badger Daylighting, SLC. Cost for total removal with Hydrovac
0 -$-$
0 -$-$
Positive Samples 3.528736 Varies 11,898$MWH Standard
0 -$-$
Total: 53,537$
3
Unit Quantity Unit Price Extended Cost
Cubic Feet 1,284 Varies 655$02 41 19.20 0020
Each 3 Varies No Cost (net of salvage) 02 65 10.30 1253 No Cost net of Salvage
Each 4 200.00$No Cost (net of salvage) 02 65 10.30 1253 No Cost net of Salvage
Cubic Yard 67 8.10$543$22 05 05.10 2164 Modified to add truck loading
Cubic Yard 2,538 Varies 6,903$31 23 16.42 1550 Modified to add truck loading
Square Foot 2,176 Varies 2,621$02 41 16.17 0440, 2500,2620
Linear Foot 7,342 Varies 16,593$02 41 13.60 1600
Cubic Yard 207 1.73$4,737$31 23 23.20 4104 Modified for Proximity to Duchesne LF
Ton 209 20.00$8,735$Tonnage Rates for Wasatch/Bluebench Disposal
Total: 40,787$
4
Unit Quantity Unit Price Extended Cost
cubic yard 234,659 1.76$415,485$31 23 16.46 5020
cubic yard -2.83$-$31 23 16.46 5040
cubic yard -1.53$-$31 23 16.46 5000
square foot 440,432 0.05$22,022$31 22 13.20 0280 (modifed for scale)
Total: 437,506$
5
Unit Quantity Unit Price Extended Cost
MSF 1,891 28.94 54,721$32 92 19.14 5800 (modified with specific seeding costs of Granite Seed in Lehi, UT)
Total: 54,721$
6
Unit Quantity Unit Price Extended Cost
Year 1 450.00$4,500$GeoStrata estimates based off of inhouse estimates
Year 10 120.00$1,200$GeoStrata estimates based off of inhouse estimates
Year 10 600.00$6,000$GeoStrata estimates based off of inhouse estimates
Annual 9 1,000.00$9,000$32 91 13.23 Structural Soil Mixing (pg 331)
Year 1 Varies 2,100$GeoStrata estimates based off of inhouse estimates
Year 8 1,000.00$8,000$GeoStrata estimates based off of inhouse estimates
Year 2 1,600.00$3,200$GeoStrata estimates based off of inhouse estimates
Total: 34,000$
7
Type ID Number Posted Amount
1 7 1,171,244$
Total: 1,171,244$
Initial and Final Post Closure Report
Descripiton
Well Inspection & Sampling
Rough Grading
Revegetation Cost Estimates
Descripiton
Listed Reclamation
Water Quality Meter Rental
Lab Analysis
Grounds Maintenance
Monitoring Well Abandonment
Annual Report
Initial and Final Post Closure Report
Bond Posted
Bond Descripiton & Date
Hydro Seeding of Indian Rice Grass
Sand & Gravel to be Moved
Tanks
Gensets
Buried Piping
Concrete Vault
Fencing
Earthwork and Grading Cost Estimates
Descripiton
Common Earth to be Dozed
Clay to be Moved
Hauling
Dumping
Removal of Infrastructure Costs Estimates
Descripiton
Buildings
Shred and Remove Liner
RN Industries
Seep Ridge E&P Disposal
Site Assessment, Closure & Post Closure Cost Estimate & Re-statement of Existing Bonds in Suport of DOGM Bonding Evaluation
Reclaimed Area
Contamination Remediation Cost Estimates
DOGM Line Item
Indirect Costs
Descripiton
Contingencies Price and Payments Procedures
Administrative Requirements
Quality Requirements
Temporary Facilities and Controls
Executions of Closeout Requirements
PID Closure Soil Sampling
Post Remediation Monitoring
Descripiton
Removal of Contaminated Liquid
Disposal of Contaminated Liquid (Haul and
Dump)
Removal of Salt Deposits
Pump & Treat
Self Attenuating
Sundry Number: 95391 File: Detailed Site Description
RECEIVED: Apr. 15, 2019
&ŽƌŝǀŝƐŝŽŶhƐĞKŶůLJ
Compliance Review Completed:
No outstanding compliance
Active violation/compliance matter
Signature:
Comments
&ŝǀĞzĞĂƌΘWtĂƐƚĞDisposal Facility Wermit Renewal Checkůisƚ
WĞƌŵŝƚZĞŶĞǁĂůƉƉůŝĐĂƚŝŽŶ^ƵďŵŝƐƐŝŽŶ
^ƵďŵŝƚĂŶĂƐƐĞƐƐŵĞŶƚŽĨƐŝƚĞƌĞĐůĂŵĂƚŝŽŶƌĞƋƵŝƌĞŵĞŶƚƐĨƌŽŵĂĐĞƌƚŝĨŝĞĚ
ƚŚŝƌĚƉĂƌƚLJĐŽŶƚƌĂĐƚŽƌZϲϰϵͲϵͲϴ͘Ϯ
^ƵďŵŝƚĐůŽƐƵƌĞĐŽƐƚĞƐƚŝŵĂƚĞƐĨƌŽŵĂĐĞƌƚŝĨŝĞĚƚŚŝƌĚƉĂƌƚLJĐŽŶƚƌĂĐƚŽƌ
ZϲϰϵͲϵͲϴ͘Ϯ
WƌŽǀŝĚĞďŽŶĚĂŵŽƵŶƚĂƉƉƌŽǀĞĚďLJƚŚĞŝǀŝƐŝŽŶZϲϰϵͲϵͲϴ
ĞƚĂŝůĞĚ^ŝƚĞĞƐĐƌŝƉƚŝŽŶ
&ƵŶĐƚŝŽŶŽĨƚŚĞǁĂƐƚĞĚŝƐƉŽƐĂůĨĂĐŝůŝƚLJ
ƵƌƌĞŶƚĨĂĐŝůŝƚLJŵĂƉ
^ŝƚĞĚĞƐĐƌŝƉƚŝŽŶƐĂŶŶŽƚĂƚĞĚǁŝƚŚĨĂĐŝůŝƚLJŝŶĨƌĂƐƚƌƵĐƚƵƌĞĂŶĚĂƐƐŽĐŝĂƚĞĚĨƵŶĐƚŝŽŶ
ŽŶƚĂŵŝŶĂƚŝŽŶƐƐĞƐƐŵĞŶƚ
ĞƐĐƌŝƉƚŝŽŶŽĨĞdžŝƐƚŝŶŐĐŽŶƚĂŵŝŶĂƚŝŽŶǁŝƚŚƐĂŵƉůĞƌĞƐƵůƚƐ
WƌŽƉŽƐĞĚŵŽŶŝƚŽƌŝŶŐͬƌĞŵĞĚŝĂƚŝŽŶ
WƌŽƉŽƐĞĚƉƌĂĐƚŝĐĞƐƚŽƉƌĞǀĞŶƚĨƵƌƚŚĞƌĐŽŶƚĂŵŝŶĂƚŝŽŶ
ƋƵŝƉŵĞŶƚƐƐĞƐƐŵĞŶƚ
ĞƐĐƌŝƉƚŝŽŶĂŶĚĂƐƐĞƐƐŵĞŶƚŽĨĞƋƵŝƉŵĞŶƚůŽĐĂƚĞĚĂƚƚŚĞĨĂĐŝůŝƚLJ
ĞƐĐƌŝďĞŝŶĚĞƚĂŝůƐĞƌǀŝĐĞůŝĨĞĨŽƌĞƋƵŝƉŵĞŶƚƵƐĞĚŝŶĨĂĐŝůŝƚLJŽƉĞƌĂƚŝŽŶƐĞƐĐƌŝƉƚŝŽŶŽĨƚĞƐƚŝŶŐ
ĐŽŵƉůĞƚĞĚĨŽƌĞƋƵŝƉŵĞŶƚ;ƚĂŶŬƐ͕ƉŝƉŝŶŐ͕ůŝŶĞƌƐ͕ůĞĂŬĚĞƚĞĐƚŝŽŶĞƋƵŝƉŵĞŶƚ͕ĞǀĂƉŽƌĂƚŝŽŶĨĂŶƐͿ
WƌĂĐƚŝĐĞƐƐƐĞƐƐŵĞŶƚ
ƐƐĞƐƐŵĞŶƚŽĨŵĂŶĂŐĞŵĞŶƚƉƌĂĐƚŝĐĞƐƵƚŝůŝnjĞĚƚŽŽƉĞƌĂƚĞƚŚĞĨĂĐŝůŝƚLJ/ĚĞŶƚŝĨLJĂůƚĞƌŶĂƚŝǀĞ
ƉƌĂĐƚŝĐĞƐǁŚŝĐŚĐŽƵůĚŝŵƉƌŽǀĞŽƉĞƌĂƚŝŽŶƐŽƌƌĞĚƵĐĞƉƌŽďĂďŝůŝƚLJŽĨĨƵƚƵƌĞĐŽŶƚĂŵŝŶĂƚŝŽŶ
Name of &ĂĐŝůŝƚLJOperator:
Name of &ĂĐŝůŝƚLJ͗
>ŽĐĂƚŝŽŶ͗
ĂƚĞ͗
WƌĞƉĂƌĞƌ͗
ĂƚĞ /ŶŝƚŝĂůƐ ĂƚĞ/ŶŝƚŝĂůƐ
ZĞĐĞŝǀĞĚ ZĞǀŝĞǁĞĚ
ZĞǀŝĞǁŽŵƉůĞƚĞĚ͗ƉƉůŝĐĂƚŝŽŶ^ƚĂƚƵƐ͗ WWZKs
&ŽƌŝǀŝƐŝŽŶhƐĞKŶůLJĞůŽǁdŚŝƐ>ŝŶĞ
RN Industries
Seep Ridge E&P Waste Disposal
Section 36, T10S, R20E, SLBM
05/30/18
GeoStrata
✔
Bart Kettle Digitally signed by Bart Kettle
Date: 2019.01.14 11:21:02 -07'00'
05/30/18 ASM 01/14/19 BTK
05/30/18 ASM 01/14/19 BTK
05/30/18 BW 03/26/18 BW $ 710,000
See Notes section for three questions on cost estimate
Dayne Doucet Digitally signed by Dayne Doucet
DN: cn=Dayne Doucet, o=DNR, ou=DOGM,
email=daynedoucet@utah.gov, c=US
Date: 2019.04.15 10:01:05 -06'00'✔
01/01/19 BTK Army Corps of Eng 404 permit(?)-ASM
Site Diagram Attachment 1 -BTK 1/14/2019
07/05/18 ASM Volume of solids contained by evaporation ponds not
addressed in cost estimate -BTK 1/14/2019
07/05/18 ASM
07/05/18 ASM Fencing for facility, and the Sludge Pond in place?
Sundry Number: 95391
RECEIVED: Apr. 15, 2019
/ŶĨƌĂƐƚƌƵĐƚƵƌĞZĞŵŽǀĂůŽƐƚƐ
Contouring or RegradingŽƐƚƐ
SeediŶŐŽƐƚƐ
Notes:
ŽŶƚĂŵŝŶĂƚŝŽŶŽƐƚƐ
ƐƚŝŵĂƚŝŶŐůŽƐƵƌĞŽƐƚĂŶĚŽŶĚŝŶŐǀĂůƵĂƚŝŽŶ
ZĞŵŽǀĂůͬZĞŵĞĚŝĂƚŝŽŶ
^ĂŵƉůŝŶŐ
WŽƐƚĐůŽƐƵƌĞŵŽŶŝƚŽƌŝŶŐ
džƉĞŶƐĞƐƚŽƌĞŵŽǀĞĂůůŝŶĨƌĂƐƚƌƵĐƚƵƌĞĂŶĚĞƋƵŝƉŵĞŶƚ
WƌŽũĞĐƚĞdžƉĞŶƐĞƚŽĐŽŶƚŽƵƌƐŝƚĞďĂĐŬƚŽŽƌŝŐŝŶĂůŐƌĂĚĞ
sŽůƵŵĞƐŽĨŵĂƚĞƌŝĂů
ƋƵŝƉŵĞŶƚĐŽƐƚƐ
>ĂďŽƌĐŽƐƚƐ
DĞƚŚŽĚŽĨƌĞƐĞĞĚŝŶŐ
^ƉĞĐŝĞƐƵƐĞĚĨŽƌƌĞǀĞŐĞƚĂƚŝŽŶ
ĂƚĞ/ŶŝƚŝĂůƐ
ZĞĐĞŝǀĞĚ
Comments
DŽŶŝƚŽƌŝŶŐWƌŽŐƌĂŵ
ĞƚĂŝůĞĚĚĞƐĐƌŝƉƚŝŽŶŽĨŵŽŶŝƚŽƌŝŶŐƉƌŽŐƌĂŵƐŝŶƵƐĞŽƌďĞŝŶŐƉƌŽƉŽƐĞĚ;ǀŝƐƵĂůŝŶƐƉĞĐƚŝŽŶƐŽĨ
ĞƋƵŝƉŵĞŶƚ͕ƉƌĞƐƐƵƌĞƚĞƐƚƐ͕ůĞĂŬĚĞƚĞĐƚŝŽŶƐLJƐƚĞŵƐ͕ǁĂƐƚĞĂĐĐŽƵŶƚĂďŝůŝƚLJ͕ĂƵƚŽŵĂƚĞĚƐLJƐƚĞŵƐ͕
ƉƌŽƉŽƐĞĚƉƌĂĐƚŝĐĞƐǁŚŝĐŚĐĂŶƌĞĚƵĐĞƚŚĞƌŝƐŬŽĨĨƵƚƵƌĞĐŽŶƚĂŵŝŶĂƚŝŽŶͿĐŽŶƚĂŵŝŶĂƚŝŽŶͿ
03/25/19 ASM
Leak detection system will be monitored on a weekly
basis-ASM.
Corrected in V3-25-2019 - ASM
03/25/19 BW See notes. Updated submitted.
03/25/19 BW Liners and buried piping will be removed. SITLA Lease.
03/25/19 BW
03/25/19 BW
01/14/2019 Cost Estimate Notes -BTK
1. Sec 3 Removal of Infrastructure estimate is based on shredding liner material. Anticipating SITLA will require removal. Response: New Cost include liner and buried piping removed.
2. Sec 2 Contamination Remediation Cost unable to see figures for removal of accumulated salts contained by ponds. Response: Additional contamination removal costs added.
3. Sec 4 Earthwork and Grading used Common Earth instead of clay in unit price, NRCS soils survey indicates clay is 20% of the site. Response: The soil, Common Earth, was brought in
during construction are not the original clay soils.
An email was sent to GeoStrata requesting updated cost to include items 2 and 3 above. 1/14/2019
3/26/2019 $710,000. bond required includes updates for corrected sq. Current bond held is about $1,171,244.00 These cost also Includes Monitoring, annual, initial and final closure
reports and well abandonment costs. BW
Sundry Number: 95391
RECEIVED: Apr. 15, 2019
State of Utah
DEPARTMENT OF NATURAL RESOURCES
GARY R. HERBERT
Governor
SPENCER J. COX
Lieutenant Governor
MICHAEL R. STYLER
Executive Director
Division of Oil, Gas and Mining
JOHN R. BAZA
Division Director
Permit to Operate
********************
Facility Name:Seep Ridge
Facility Type: Commercial Waste Disposal Facility
Location: Section 36, Township 10S, Range 20E
County:Uintah
Approval Date:April 15, 2019
1. Issued to:
R N Industries (80635)
2. Authority:
Pursuant to Utah Code Ann. §§ 40-6-1 et seq., and Utah Admin. Code §§ R649-9 et seq., the
Utah Division of Oil, Gas and Mining (“Division”) issues this Permit to operate an E and P waste
disposal facility.
3. Duration:
This Permit shall expire five years from the Approval Date. The Division may revoke, suspend,
or impose additional operating conditions or limitations on a disposal facility permit at any time,
for good cause, after notice to the operator. The Division may suspend a waste disposal permit or
impose additional conditions or limitations in an emergency to forestall an imminent threat to
fresh water, public health, or safety of the environment. Suspension of a disposal facility permit
may be for a fixed period of time or until the operator remedies the violation or potential
violation. If the Division suspends a disposal facility permit, the disposal facility shall not accept
E and P waste during the suspension period.
4. General:
4.1 Effect on Prior Permits. This Permit supersedes any existing E and P waste disposal permit
previously obtained for the Facility and provides the terms that govern operations at this
Facility.
4.2 Incorporation of Application.The Division issues this Permit in response to RNI’s “Permit
Renewal Application” dated 3/25/2019 and received by the Division on 3/25/2019,
(“Application”). The Facility shall operate in accordance with the best management practices
described in the Application.
4.3 Compliance with Applicable Laws. The Facility shall comply with Utah Code Ann. §§ 40-6-
1 et seq. and Utah Administrative Code §§ R649-9 et seq..
5. Reporting and Recordkeeping Requirements:
1594 West North Temple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801
telephone (801) 538-5340 x facsimile (801) 359-3940 x TTY (801) 538-7458 x www.ogm.utah.gov
Sundry Number: 95391
RECEIVED: Apr. 15, 2019
The Facility shall comply with the reporting and recordkeeping requirements in Utah Admin.
Code § R649-9-11.
6. Modifications:
This Permit only applies to the Facility as it is described in the Application. Any additions to the
Facility or modifications of the waste treatment processes described in the Application are not
allowed and require a permit modification.
7. Enforcement:
The issuance of this permit does not supersede local ordinances, county planning and zoning
requirements, or other permits required to conduct business at the Facility. A copy of this
approval should be kept at the Seep Ridge field office, and field personnel shall be aware of the
Conditions of Approval.
8. Approval:
Therefore, having met all the technical permit requirements of Utah Admin. Code §§ R649-9 et
seq., final approval to operate the Facility in accordance with this Permit is hereby granted.
9. Contact Information:
The following are Division of Oil, Gas and Mining contacts and their telephone numbers:
Dayne Doucet, Permit Manager: 801-538-5303
Bart Kettle, Operations Manager: 435-820-0862
Ammon McDonald, Environmental Scientist: 801-538-5337
Approved By:
________________________
By: Dayne Doucet
Title: Permit Manager
Dayne
Doucet
Digitally signed by Dayne Doucet
DN: cn=Dayne Doucet, o=DNR,
ou=DOGM,
email=daynedoucet@utah.gov,
c=US
Date: 2019.04.15 10:32:24 -06'00'
Sundry Number: 95391
RECEIVED: Apr. 15, 2019
Conditions of Approval:
1. Evaporation Facilities
1.1 A minimum of 2 feet of freeboard shall be maintained in the pit(s) at all times, and that a
method of obviously displaying the freeboard shall be devised and implemented. Utah
Admin. Code § R649-9-4.6.4.
1.2 Pit(s) are to be maintained such that hydrocarbons will not collect on the surface.
Hydrocarbon accumulations, other than de minimis quantities, shall be removed within 24
hours. Utah Admin. Code § R649-9-4.6.4.
1.3 Spraying water to accelerate evaporation should be closely monitored. Overspray outside the
lined pit area is considered a violation. Utah Admin. Code § R649-9-4.9.2.
1.4 The leak detection system must be checked weekly. Any leak must be reported to the
Division immediately, and corrective measures must be taken as directed by the Division.
1.5 The compacted secondary containment berms at the Facility shall be inspected quarterly and
after a major rainstorm or windstorm to ensure integrity Utah Admin. Code § R649-9-11.3.2.
1.6 Evaporation ponds are permitted to accept produced water.
FAILURE TO COMPLY WITH THE ABOVE LISTED CONDITIONS OF
APPROVAL MAY RESULT IN CLOSURE OF THE FACILITY.
Sundry Number: 95391
RECEIVED: Apr. 15, 2019
GARY R. HERBERT
Governor
SPENCER J. COX
/LHXWHQDQW*RYHUQRU
State of Utah
DEPARTMENT OF NATURAL RESOURCES
1594 West North Temple, Suite 1210,6DOW/DNH&LW\87
PO Box 145801, Salt Lake City, UT 84114-5801
telephone (801) 538-5340 x facsimile (801) 359-3940 x TTY (801) 538-7458 x www.ogm.utah.gov
MICHAEL R. STYLER
Executive Director
Division of Oil, Gas and MininJ
127,&(2)9,2/$7,21
87$+2,/$1'*$6&216(59$7,21$&7
727+()2//2:,1*23(5$725
5XOH5HIHUHQFHV
8QGHUWKHDXWKRULW\RIWKH8WDK2LODQG*DV&RQVHUYDWLRQ$FW6HFWLRQHW6HT8WDK&RGH$QQRWDWHGDV
DPHQGHGWKHXQGHUVLJQHGDXWKRUL]HGUHSUHVHQWDWLYHRIWKH'LYLVLRQRI2LO*DVDQG0LQLQJ'LYLVLRQKDVFRQGXFWHGDQ
LQVSHFWLRQRIWKHGHVFULEHGVLWHDQGRUUHFRUGVRQWKHGDWHOLVWHGEHORZDQGKDVIRXQGDOOHJHGYLRODWLRQVRIWKHDFWUXOHV
RUSHUPLWFRQGLWLRQVDVGHVFULEHGEHORZ
'HVFULSWLRQRI9LRODWLRQV
:HOOVRU)DFLOLW\LQ9LRODWLRQOLVWHGRQQH[WSDJH
3DJHRI
-2+15%$=$
'LYLVLRQ'LUHFWRU
Date of Mailing:
Certified Mail No.:
&RPSOLDQFH'HDGOLQH
Austin Weddle
Dalbo Holdings Inc./RN Industries
P.O. Box 1168
Vernal, UT 84078
April 15, 2019
7017 1070 0000 9113 5570
4/15/2019
The operator has failed to submit 4th Quarter 2018 E&P Waste Facility Quarterly Reports for all
Dalbo Holding Inc./RN Industries facilities to the Utah Division of Oil, Gas and Mining in an
accurate and timely manner.
R649-9-11.3 Reporting and Recordkeeping for Disposal Facilities
Well or )DFLLW\1DPH API #
Date of Inspection
)LQHVPD\EHOHYLHGXSWRSHUGD\IRUHYHU\ZHOOLQYLRODWLRQ
5HTXLUHG$FWLRQV
JLYHQWKHDXWKRULW\SURYLGHGXQGHU8&$SDUW
This notice shall remain in effect until it is modified, terminated, or vacated by a written notice of an authorized representative
of the director of the Division of Oil, Gas and Mining. Failure to comply with this notice will result in the Division pursuing
further actions against said operator. Further actions may include initiation of agency actions to order full cost bonding and
plugging and abandonment of wells and requests for bond forfeiture and civil penalties.
&RPSOLDQFH'HDGOLQH
cc
/LVWRI:HOOVRU)DFLOLW\LQ9LRODWLRQ
3DJHRI
E & P Waste Facility Quarterly Reports along with results of weekly leak detection system
inspections should be properly completed and submitted to the division for the above
facilities IMMEDIATELY.
All reports thereafter should be submitted quarterly by the15th of the month following the end
of the quarter in order to avoid additional enforcement action.
4/15/2019
Permit Manager (801) 538-8303
Compliance FileCompliance File
Well / Facility File
Bart Kettle, Operations Manager
Josh Payne, Compliance Manager
Dalbo Inc. Glen Bench facility 1/31/2019
Dalbo Inc. Ace Disposal facility 1/31/2019
RN Industries Bluebell facility 1/31/2019
RN Industries Chapita facility 1/31/2019
RN Industries Glen Bench facility 1/31/2019
RN Industries Pleasant Valley facility 1/31/2019
RN Industries Seep Ridge facility 1/31/2019
RN Industries Wonsit facility 1/31/2019
Dayne Doucet
Digitally signed by Dayne Doucet
DN: cn=Dayne Doucet, o=DNR,
ou=DOGM,
email=daynedoucet@utah.gov, c=US
Date: 2019.04.12 14:32:34 -06'00'
Dalbo Holdings Inc./RN Industries 2/5/2019 version
Jean Sweet <jsweet@utah.gov>
Fwd: March 2020 Monthly AOC Reports
1 message
Dayne Doucet <daynedoucet@utah.gov>Thu, Apr 9, 2020 at 3:11 PM
To: Jean Sweet <jsweet@utah.gov>
Dayne Doucet
Oil &Gas Permit Manager
Utah Division of Oil, Gas, and Mining
801-538-5303 (office)
oilgas.ogm.utah.gov
@UtahOGM
---------- Forwarded message ---------
From: Bart Kettle <bartkettle@utah.gov>
Date: Thu, Apr 9, 2020 at 3:10 PM
Subject: Fwd: March 2020 Monthly AOC Reports
To: Chase Hanberg <chanberg@utah.gov>, Ammon McDonald <ammonmcdonald@utah.gov>, Dayne
Doucet <daynedoucet@utah.gov>
Bart Kettle
Utah Division of Oil, Gas and Mining
Acting Deputy Director, Oil and Gas Program
Phone 435-820-0862
---------- Forwarded message ---------
From: Kirk Fleetwood <kfleetwood@dalboholdings.com>
Date: Mon, Apr 6, 2020 at 9:43 AM
Subject: March 2020 Monthly AOC Reports
To: McNeill, Kristin <McNeill.Kristin@epa.gov>
Cc: Bart Kettle <bartkettle@utah.gov>
Kristie,
Here are the monthly reports. I am waiting on some additional pictures from Seep Ridge and them I will be
ready to submit the Corrective Measures Summary Report for that facility.
Regards,
Kirk Fleetwood
Regulatory/Compliance
DHI Energy Service
T 435.828.3451
E kfleetwood@dalboholdings.com
W www.dalboholdings.com
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error please notify the system manager. This message contains confidential
information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail
from your system. If you are not the intended recipient you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited.
3 attachments
image001.png
10K
March 2020 Wonsits.pdf
135K
March 2020 Seep Ridge.pdf
134K
Seep Ridge Disposal Monthly Progress Report
March 2020
RN Industries submits the following report per the requirements of Section VIII, 39 Reporting.
A1 Activities conducted
• The tasked identified in Section VIII 37 Corrective Measures A1 and A3 have been
completed.
• Per the Operations and Maintenance Plan, the skim pond netting was inspected every
day that the facility was staffed during the month and no holes are gaps in the netting
was observed.
• Per the Operations and Maintenance Plan, the bird deterrent devices were visually
inspected every day that the facility was staffed during the month and they were found
to be operating as designed.
• On March 15 the facility operator installed additional reflective deterrent tape around
Pond 7
• Per the Operations and Maintenance Plan, the pond and grounds were monitored for
birds and other wildlife. No dead or injured birds were observed. No other wildlife was
observed in or on the banks of the ponds.
A2 Summary of problems encountered
• There were no problems were encountered during the month.
A3 Changes in work performed at the Facility
• All work required in the Seep Ridge Disposal AOC Work Plan has been completed. There
were no deviations from the approved Operations and Maintenance Plan.
A4 Projected work for the next reporting period
• N/A, all work required in the Seep Ridge Disposal AOC Work Plan has been completed. I
will be submitting a Corrective Measures Summary Report this month that
demonstrates and certifies that all work committed to in the Work Plan has been
complete and requesting approval to transition to Quarterly Reporting.
A5 Monitoring log for deceased birds
• There were no deceased, or injured birds observed at the facility during the month.
I certify that the information contained in or accompanying this report is true, accurate, and complete.
As to the identified portions of this report for which I cannot personally verify their accuracy, I certify
under penalty of law that this report and all attachments were prepared in accordance with procedures
designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, or the immediate supervisor of such persons, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that
there are significant penalties for submitting false information, including the possibility of fines and
imprisonment for knowing violations.
Signature·
Name: Austin Weddle
Title: Operations Manager
Date: 4/6/2020
Jean Sweet <jsweet@utah.gov>
Fwd: Seep Ridge CMSR approval
1 message
Dayne Doucet <daynedoucet@utah.gov>Tue, Apr 21, 2020 at 8:20 AM
To: Jean Sweet <jsweet@utah.gov>
FYI. Should probably go in the file.
Dayne Doucet
Oil &Gas Permit Manager
Utah Division of Oil, Gas, and Mining
801-538-5303 (office)
oilgas.ogm.utah.gov
@UtahOGM
---------- Forwarded message ---------
From: Bart Kettle <bartkettle@utah.gov>
Date: Tue, Apr 21, 2020 at 8:12 AM
Subject: Fwd: Seep Ridge CMSR approval
To: Chase Hanberg <chanberg@utah.gov>, Ammon McDonald <ammonmcdonald@utah.gov>, Dayne
Doucet <daynedoucet@utah.gov>
Bart Kettle
Utah Division of Oil, Gas and Mining
Acting Deputy Director, Oil and Gas Program
Phone 435-820-0862
---------- Forwarded message ---------
From: McNeill, Kristin <McNeill.Kristin@epa.gov>
Date: Mon, Apr 20, 2020 at 3:38 PM
Subject: Seep Ridge CMSR approval
To: kfleetwood@dalboholdings.com <kfleetwood@dalboholdings.com>
Cc: bartkettle@utah.gov <bartkettle@utah.gov>, Cline, Chris <Chris_cline@fws.gov>, Agee, Erin
<Agee.Erin@epa.gov>
Hi Kirk,
Please see the attached letter approving the RNI Seep Ridge Corrective Measures Summary Report that
you submitted on April 10, 2020. Because this letter was electronically signed and processed, you will not
be receiving a hard copy.
Please let me know if you have any questions.
Thanks,
Kristie
Kristie McNeill
U. S. EPA Region 8
RCRA Enforcement Branch
Enforcement and Compliance Assurance Division
1595 Wynkoop St, 8ENF-RO-R
Denver, CO 80202
303.312.6278
RNI Seep Ridge CMSR approval_signed.pdf
166K
April 20, 2020
REF: 8ENF-RO-R
SENT VIA EMAIL
DIGITAL READ RECEIPT REQUESTED
Mr. Kirk Fleetwood
RN Industries
kfleetwood@dalboholdings.com
Re: Approval of Seep Ridge Disposal Corrective Measures Summary Report, RN Industries
Seep Ridge OWDF, EPA ID No. UTR000014761
Dear Mr. Fleetwood:
This correspondence serves to notify RN Industries that, per section VIII.37.K. of the RCRA 7003
Administrative Order on Consent (AOC), Docket No. RCRA-08-2020-0003, the Corrective Measures
Summary Report (CMSR) for the Seep Ridge Oilfield Wastewater Disposal Facility, dated April 10,
2020, is approved by the U.S. Environmental Protection Agency.
Per VIII.39.C. of the RCRA 7003 AOC, upon the acceptance of the CMSR, the reporting
requirement in VIII.39.A. becomes a quarterly reporting requirement. The first report will be due on
July 10, 2020, with subsequent reports due quarterly. Recent photographs showing the up-to-date status
of netting and evaporation ponds shall be included, at minimum, twice annually. According to
VIII.39.D., RN Industries shall continue submitting quarterly reports until the EPA determines that
reporting can continue on a semi-annual or annual basis, which may be requested at any time after two
quarterly reports have been submitted.
Thank you for your attention to this important matter. If you have questions regarding this
correspondence, please contact Ms. Kristin McNeill of my staff at (303) 312-6278 or
mcneill.kristin@epa.gov. Any legal questions should be raised with Ms. Erin Agee at (303) 312-6374 or
agee.erin@epa.gov.
Sincerely,
Janice Pearson, Chief
RCRA/OPA Enforcement Branch
cc via email: Bart Kettle, Utah Division of Oil, Gas and Mining
Christine Cline, U.S. Fish and Wildlife Service
Erin Agee, EPA
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
REGION 8
1595 Wynkoop Street
Denver, CO 80202-1129
Phone 800-227-8917
www.epa.gov/region8
Seep Ridge Disposal Monthly Progress Report
May 2020
RN Industries submits the following report per the requirements of Section VIII, 39 Reporting.
A1 Activities conducted
• All tasked identified in Section VIII 37 Corrective Measures A1 and A3 have been
completed.
• Per the Operations and Maintenance Plan, the skim pond netting was inspected every
day that the facility was staffed. There were and no holes or gaps observed in the
netting.
• Per the Operations and Maintenance Plan, the bird deterrent devices were visually
inspected every day that the facility was staffed during the month. They were found to
be in good condition and operating as designed.
• Per the Operations and Maintenance Plan, the pond and grounds were monitored for
birds. No dead or injured birds were found
• No other wildlife was observed in or on the banks of the ponds.
A2 Summary of problems encountered
• There were no problems were encountered during the month.
A3 Changes in work performed at the Facility
• All work required in the Seep Ridge Disposal AOC Work Plan has been completed. There
were no deviations from the approved Operations and Maintenance Plan.
A4 Projected work for the next reporting period
• In March of this year we submitted a Corrective Measures Summary that demonstrated
and certified that all work committed to in the Work Plan has been completed. In the
April 2020 Progress report, we requested approval to transition to Quarterly Reporting.
We are still waiting for approval to make that transition and will continue to submit
Monthly reports until it is approved.
A5 Monitoring log for deceased birds
• There were no deceased, or injured birds observed at the facility during the month.
I certify that the information contained in or accompanying this report is true, accurate, and complete.
As to the identified portions of this report for which I cannot personally verify their accuracy, I certify
under penalty of law that this report and all attachments were prepared in accordance with procedures
designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, or the immediate supervisor of such persons, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that
there are significant penalties for submitting false information, including the possibility of fines and
imprisonment for knowing violations.
Signature·
Name: Austin Weddle
Title: Operations Manager
Date: 6/2/2020
RECEIVED: Apr. 02, 2021
STATE OF UTAH
DEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING
FORM 9
SUNDRY NOTICES AND REPORTS ON FACILITIES
1. TYPE OF FACILITY
Waste Facility/Commercial
5. FACILITY NAME:
Seep Ridge
2. NAME OF OPERATOR:
R N Industries
6. FACILITY NUMBER:
273
3. ADDRESS OF OPERATOR:
PO Box 1168 , Vernal, UT, 84078
7. PHONE NUMBER:
435-722-3800
4. LOCATION OF FACILITY
Qtr/Qtr:NWSE Section: 36 Township: 10S Range: 20E Meridian: S
COUNTY:
UINTAH
STATE:
UTAH
11.
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
NOTICE OF INTENT
Approximate date work will start:
SUBSEQUENT REPORT
Date of Work Completion:
4/2/2021
New Facility Construction
Repair of Facility
Facility Reclamation
Facility Status Report
Results of Sampling
Change to Previous Plans
E&P Waste Disposal Facility Permit
Other EPA Administrative Order of Consent Monthly Report
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
The Quarterly OAC report as required by US EPA
NAME (PLEASE PRINT)
Austin Weddle
PHONE NUMBER
435-790-6690
TITLE
Disposal Manager
SIGNATURE
N/A
DATE
4/2/2021
(This is not an approval)
April 12, 2021
Sundry Number: 109300 Facility Number: 273
RECEIVED: Apr. 02, 2021
Seep Ridge Disposal Quarterly Progress Report
March 2021
RN Industries submits the following report per the requirements of Section VIII, 39 Reporting.
A1 Activities conducted
• The facility was closed to new water deliveries in February. RNI does not currently have
plans to reopen the facility.
• Per the Operations and Maintenance Plan, the skim pond netting was inspected every
day that the facility was staffed.
• Per the Operations and Maintenance Plan, the bird deterrent devices were visually
inspected every day that the facility was staffed during the month. During the quarter,
additional reflective tape and flashers were installed to replace some which had become
degraded by UV light. The owl decoys were inspected and found to be in good
condition and operating as designed.
• Per the Operations and Maintenance Plan, the pond and grounds were monitored for
birds. No dead or injured birds were found
• No other wildlife was observed in or on the banks of the ponds.
A2 Summary of problems encountered
• On March 13th, the site received 6 inches of heavy wet snow. The weight of the snow on
the pond nettting pulled one of the cable support anchors out of the ground which
allowed the net to sag. The anchor was repaired, and the net retightened the following
week. There were and no holes or gaps observed in the netting during the quarter.
There were no other problems encountered.
A3 Changes in work performed at the Facility
• There were no deviations from the approved Operations and Maintenance Plan.
A4 Projected work for the next reporting period
• Per Section VIII 39 (D) RNI would like to propose that the reporting interval be changed
to semi-annually starting in July.
A5 Monitoring log for deceased birds
• There were no deceased birds observed at the facility during the 4th quarter of 2020
Sundry Number: 109300 Facility Number: 273
RECEIVED: Apr. 02, 2021
I certify that the information contained in or accompanying this report is true, accurate, and complete.
As to the identified portions of this report for which I cannot personally verify their accuracy, I certify
under penalty of law that this report and all attachments were prepared in accordance with procedures
designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, or the immediate supervisor of such persons, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that
there are significant penalties for submitting false information, including the possibility of fines and
imprisonment for knowing violations.
Signature·
Name: Austin Weddle
Title: Operations Manager
Date: 4/2/2021
Sundry Number: 109300 Facility Number: 273
RECEIVED: Jul. 07, 2021
STATE OF UTAH
DEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING
FORM 9
SUNDRY NOTICES AND REPORTS ON FACILITIES
1. TYPE OF FACILITY
Waste Facility/Commercial
5. FACILITY NAME:
Seep Ridge
2. NAME OF OPERATOR:
R N Industries
6. FACILITY NUMBER:
273
3. ADDRESS OF OPERATOR:
PO Box 1168 , Vernal, UT, 84078
7. PHONE NUMBER:
435-722-3800
4. LOCATION OF FACILITY
Qtr/Qtr:NWSE Section: 36 Township: 10S Range: 20E Meridian: S
COUNTY:
UINTAH
STATE:
UTAH
11.
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
NOTICE OF INTENT
Approximate date work will start:
SUBSEQUENT REPORT
Date of Work Completion:
7/7/2021
New Facility Construction
Repair of Facility
Facility Reclamation
Facility Status Report
Results of Sampling
Change to Previous Plans
E&P Waste Disposal Facility Permit
Other EPA Administrative Order of Consent Monthly Report
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
This is the Quarterly AOC report
NAME (PLEASE PRINT)
Austin Weddle
PHONE NUMBER
435-790-6690
TITLE
Disposal Manager
SIGNATURE
N/A
DATE
7/7/2021
July 09, 2021
Sundry Number: 110898 Facility Number: 273
RECEIVED: Jul. 07, 2021
Seep Ridge Disposal Quarterly Progress Report
June 2021
RN Industries submits the following report per the requirements of Section VIII, 39 Reporting.
A1 Activities conducted
• The facility was closed to new water deliveries in February 2021. RNI does not currently
have plans to reopen the facility and will notified UDOGM that they intend to close the
facility and begin reclamation this year.
• Per the Operations and Maintenance Plan, the skim pond netting was inspected every
day that the facility was staffed.
• Per the Operations and Maintenance Plan, the bird deterrent devices were visually
inspected every day that the facility was staffed during. The owl decoys were inspected
and found to be in good condition and operating as designed.
• Per the Operations and Maintenance Plan, the pond and grounds were monitored for
birds. Ducks were observed swimming on Pond #7 on June 10th and June 20th. Both
times when the facility operator approached the pond the ducks flew away.
• No dead or injured birds were found.
• No other wildlife was observed in or on the banks of the ponds.
A2 Summary of problems encountered
• There were no other problems encountered.
A3 Changes in work performed at the Facility
• There were no deviations from the approved Operations and Maintenance Plan.
A4 Projected work for the next reporting period
• Per Section VIII 39 (D) RNI proposes that the reporting interval be changed to semi-
annually. If this proposal is approved the next report for the facility would be due in
January of 2022.
A5 Monitoring log for deceased birds
• There were no deceased birds observed at the facility during the 2nd quarter of 2021
Sundry Number: 110898 Facility Number: 273
RECEIVED: Jul. 07, 2021
I certify that the information contained in or accompanying this report is true, accurate, and complete.
As to the identified portions of this report for which I cannot personally verify their accuracy, I certify
under penalty of law that this report and all attachments were prepared in accordance with procedures
designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, or the immediate supervisor of such persons, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that
there are significant penalties for submitting false information, including the possibility of fines and
imprisonment for knowing violations.
Signature·
Name: Austin Weddle
Title: Operations Manager
Date: 7/7/2021
Sundry Number: 110898 Facility Number: 273
RECEIVED: Aug. 04, 2021
STATE OF UTAH
DEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING
FORM 9
SUNDRY NOTICES AND REPORTS ON FACILITIES
1. TYPE OF FACILITY
Waste Facility/Commercial
5. FACILITY NAME:
Seep Ridge
2. NAME OF OPERATOR:
R N Industries
6. FACILITY NUMBER:
273
3. ADDRESS OF OPERATOR:
PO Box 1168 , Vernal, UT, 84078
7. PHONE NUMBER:
435-722-3800
4. LOCATION OF FACILITY
Qtr/Qtr:NWSE Section: 36 Township: 10S Range: 20E Meridian: S
COUNTY:
UINTAH
STATE:
UTAH
11.
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
NOTICE OF INTENT
Approximate date work will start:
SUBSEQUENT REPORT
Date of Work Completion:
8/4/2021
New Facility Construction
Repair of Facility
Facility Reclamation
Facility Status Report
Results of Sampling
Change to Previous Plans
E&P Waste Disposal Facility Permit
Other EPA Administrative Order of Consent Monthly Report
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
July EPA AOC Report
NAME (PLEASE PRINT)
Austin Weddle
PHONE NUMBER
435-790-6690
TITLE
Disposal Manager
SIGNATURE
N/A
DATE
8/4/2021
August 09, 2021
Sundry Number: 111576 Facility Number: 273
RECEIVED: Aug. 04, 2021
Wonsits Disposal Monthly Progress Report
July 2021
RN Industries submits the following report per the requirements of Section VIII, 41 Reporting.
1. Activities Conducted in the Previous Month
• Additional progress was made in removing material from Pond 5 and transferring it to
the landfill during July. I have included a video and a couple images that show the
current state of the pond remediation.
2. Summary of problems encountered, and solutions employed
• No problems were encountered during the month
3. Changes in work performed at the Facility
• The source of the netted skim pond leak was identified and repaired. We are waiting
on UDOGM approval to add water to the netted pond
4. Projected work for the next reporting period
• We will continue moving material from Pond 5 to the landfill.
• Receive approval from UDOGM and begin taking water at the facility.
Sundry Number: 111576 Facility Number: 273
RECEIVED: Aug. 04, 2021
I certify that the information contained in or accompanying this report is true, accurate, and complete.
As to the identified portions of this report for which I cannot personally verify their accuracy, I certify
under penalty of law that this report and all attachments were prepared in accordance with procedures
designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, or the immediate supervisor of such persons, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that
there are significant penalties for submitting false information, including the possibility of fines and
imprisonment for knowing violations.
Signature·
Name: Austin Weddle
Title: Operations Manager
Date: 8/4/2021
Sundry Number: 111576 Facility Number: 273
RECEIVED: Jan. 21, 2022
STATE OF UTAH
DEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING
FORM 9
SUNDRY NOTICES AND REPORTS ON FACILITIES
1. TYPE OF FACILITY
Waste Facility/Commercial
5. FACILITY NAME:
Seep Ridge
2. NAME OF OPERATOR:
R N Industries
6. FACILITY NUMBER:
273
3. ADDRESS OF OPERATOR:
PO Box 1168 , Vernal, UT, 84078
7. PHONE NUMBER:
435-722-3800
4. LOCATION OF FACILITY
Qtr/Qtr:NWSE Section: 36 Township: 10S Range: 20E Meridian: S
COUNTY:
UINTAH
STATE:
UTAH
11.
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
NOTICE OF INTENT
Approximate date work will start:
SUBSEQUENT REPORT
Date of Work Completion:
1/21/2022
New Facility Construction
Repair of Facility
Facility Reclamation
Facility Status Report
Results of Sampling
Change to Previous Plans
E&P Waste Disposal Facility Permit
Other AOC Reprot
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
AOC report, pictures were included to Bart Kettle in email from Austin Weddle
NAME (PLEASE PRINT)
Austin Weddle
PHONE NUMBER
435-790-6690
TITLE
Disposal Manager
SIGNATURE
N/A
DATE
1/21/2022
January 21, 2022
Sundry Number: 114692 Facility Number: 273
RECEIVED: Jan. 21, 2022
Seep Ridge Disposal Semi-Annual Progress
Report, July-December 2021
RN Industries submits the following report per the requirements of Section VIII, 39 Reporting.
A1 Activities conducted
•The facility was closed to new water deliveries in February 2021. RNI does not currently
have plans to reopen the facility.
•Per the Operations and Maintenance Plan, the skim pond netting was inspected every
day that the facility was staffed.
•Per the Operations and Maintenance Plan, the bird deterrent devices were visually
inspected every day that the facility was staffed. The owl decoys were inspected and
found to be in good condition and operating as designed per each inspection.
•Per the Operations and Maintenance Plan, the pond and grounds were monitored for
birds.
•No dead or injured birds were found.
•No other wildlife was observed in or on the banks of the ponds.
A2 Summary of problems encountered
•A few small holes were found in netting and repaired with zip ties.
A3 Changes in work performed at the Facility
•There were no deviations from the approved Operations and Maintenance Plan.
A4 Projected work for the next reporting period
•Per Section VIII 39 (D) RNI will report on a smei-annual basis, and the next report will
be sent out on July of 2022.
A5 Monitoring log for deceased birds
•There were no deceased birds observed at the facility during the 2nd half of 2021
Sundry Number: 114692 Facility Number: 273
RECEIVED: Jan. 21, 2022
I certify that the information contained in or accompanying this report is true, accurate, and complete.
As to the identified portions of this report for which I cannot personally verify their accuracy, I certify
under penalty of law that this report and all attachments were prepared in accordance with procedures
designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, or the immediate supervisor of such persons, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that
there are significant penalties for submitting false information, including the possibility of fines and
imprisonment for knowing violations.
Signature·
Name: Austin Weddle
Title: Operations Manager
Date: 1-14-22
Sundry Number: 114692 Facility Number: 273
RECEIVED: Jul. 14, 2022
STATE OF UTAH
DEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING
FORM 9
SUNDRY NOTICES AND REPORTS ON FACILITIES
1. TYPE OF FACILITY
Waste Facility/Commercial
5. FACILITY NAME:
Seep Ridge
2. NAME OF OPERATOR:
R N Industries
6. FACILITY NUMBER:
273
3. ADDRESS OF OPERATOR:
PO Box 1168 , Vernal, UT, 84078
7. PHONE NUMBER:
435-722-3800
4. LOCATION OF FACILITY
Qtr/Qtr:NWSE Section: 36 Township: 10S Range: 20E Meridian: S
COUNTY:
UINTAH
STATE:
UTAH
11.
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
NOTICE OF INTENT
Approximate date work will start:
SUBSEQUENT REPORT
Date of Work Completion:
7/14/2022
New Facility Construction
Repair of Facility
Facility Reclamation
Facility Status Report
Results of Sampling
Change to Previous Plans
E&P Waste Disposal Facility Permit
Other AOC Report
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Seep Ridge Semi annual AOC report
NAME (PLEASE PRINT)
Kendal Hacking
PHONE NUMBER
435-828-8712
TITLE
Operations Manager-Environment
SIGNATURE
N/A
DATE
7/14/2022
August 17, 2022
Sundry Number: 118027 Facility Number: 273
RECEIVED: Jul. 14, 2022
Seep Ridge Disposal Semi-Annual Progress
Report, January-June 2022
RN Industries submits the following report per the requirements of Section VIII, 39 Reporting.
A1 Activities conducted
• The facility was closed to new water deliveries in February 2021. RNI does not currently
have plans to reopen the facility.
• Per the Operations and Maintenance Plan, the skim pond netting was inspected every
day that the facility was staffed.
• Per the Operations and Maintenance Plan, the bird deterrent devices were visually
inspected every day that the facility was staffed. The owl decoys were inspected and
found to be in good condition and operating as designed per each inspection.
• Per the Operations and Maintenance Plan, the pond and grounds were monitored for
birds.
• No dead or injured birds were found.
• No other wildlife was observed in or on the banks of the ponds.
A2 Summary of problems encountered
• A few small holes were found in netting and repaired with zip ties.
• Small hole in top of cell liner ~1” in diameter was found and fixed.
A3 Changes in work performed at the Facility
• There were no deviations from the approved Operations and Maintenance Plan.
A4 Projected work for the next reporting period
• Per Section VIII 39 (D) RNI will report on a semi-annual basis, and the next report will
be sent out on January of 2023.
A5 Monitoring log for deceased birds
• There were no deceased birds observed at the facility during the 1st half of 2022.
Sundry Number: 118027 Facility Number: 273
RECEIVED: Jul. 14, 2022
I certify that the information contained in or accompanying this report is true, accurate, and complete.
As to the identified portions of this report for which I cannot personally verify their accuracy, I certify
under penalty of law that this report and all attachments were prepared in accordance with procedures
designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, or the immediate supervisor of such persons, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that
there are significant penalties for submitting false information, including the possibility of fines and
imprisonment for knowing violations.
Signature·
Name: Kendal Hacking
Title: Operations Manager
Date: 7-14-22
Sundry Number: 118027 Facility Number: 273
Facility State Agency
Bonding Type Account # Issuer
RNI GL
Account
Number
Actual Interest
Rate as of
12/31/2023
Confirmed
12/31/2023
Value
YTD
ESTIMATED
Interest
Income(net of
interest
earned and
released) YTD
Y/E Interest
Adjustment
to actual
2024
Deposits Releases
Transfer
In/Out Ending Estimated Balance EOM Per GL Difference
Exceed FDIC
Per 12/31/2024
Confirm
GL Confirm
Difference
Actual
Interest Rate
as of
12/31/2023
BlueBell RNI Utah DOGM Business MM 027766005 Zions Bank
18201 see statement $144,810.23 $0.00 $91.96 reconciled at cash recon worksheet $144,821.87 reconciled at cash recon worksheet $0.00 144,810.23 -$11.64 0.75%
Glen Bench RNI Utah DOGM Business MM 027765999 Zions Bank
18202 see statement $123,860.37 $0.00 $78.66 reconciled at cash recon worksheet $123,870.33 reconciled at cash recon worksheet $0.00 123,860.37 -$9.96 0.75%
Pleasant Valley - RNI Utah Duchesne County Business MM 027765973 Zions Bank
18203 see statement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 0.00%
Pleasant Valley - RNI Utah DOGM Business MM 027765932 Zions Bank
18204 see statement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 0.00%
Seep Ridge Utah DOGM Business MM 027765940 Zions Bank
18205 see statement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 0.00%
Bluebell Utah DOGM CD
579-156795-0 Zions First National 18206 5.07% $601,621.13 $17,792.94 -$404,215.86 $215,198.21 $215,198.21 $0.00 $0.00 601,621.13 $386,422.92 5.07%
Chapita Utah DOGM CD
579-156799-2 Zions First National 18207 0.19% $57,809.07 $64.07 $57,873.14 $57,873.14 $0.00 $0.00 57,809.07 -$64.07 0.19%
Chapita Utah DOGM CD
579-156796-8 Zions First National 18208 5.07% $941,783.28 $27,853.24 -$208,573.00 $761,063.52 $761,063.52 $0.00 $511,063.52 941,783.28 $180,719.76 5.07%
Glen Bench - RNI Utah DOGM CD
579-156797-6 Zions First National 18209 5.07% $643,711.72 $19,037.77 $662,749.49 $662,749.49 $0.00 $412,749.49 643,711.72 -$19,037.77 5.07%
Wonsit Utah DOGM CD
579-156798-4 Zions First National 18210 5.07% $1,201,951.28 $35,547.71 -$87,599.67 $1,149,899.32 $1,149,899.32 $0.00 $899,899.32 1,201,951.28 $52,051.96 5.07%
Ace Utah DOGM CD 579-156800-8
Zions First National 18211 5.07% $197,568.34 $5,843.08 $203,411.42 $203,411.42 $0.00 $0.00 197,568.34 -$5,843.08 5.07%
Glen Bench Utah DOGM CD 579-156801-6
Zions First National 18212 5.07% $574,582.63 $16,993.28 $591,575.91 $591,575.91 $0.00 $341,575.91 574,582.63 -$16,993.28 5.07%
Seep Ridge Utah DOGM CD 579-156803-2
Zions First National 18213 5.07% $448,453.13 $13,263.00 $461,716.13 $461,716.13 $0.00 $211,716.13 448,453.13 -$13,263.00 5.07%
Seep Ridge Utah DOGM CD 579-156804-0
Zions First National 18214 5.07% $306,868.61 $9,075.64 $315,944.25 $315,944.25 $0.00 $65,944.25 306,868.61 -$9,075.64 5.07%
Ace Utah DOGM CD 579-156805-7
Zions First National 18215 5.07% $251,995.44 $7,452.77 $259,448.21 $259,448.21 $0.00 $9,448.21 251,995.44 -$7,452.77 5.07%
Piceance Creek Colorado CDPHE CD 5780001086
Vectra Bank 18216 0.14% $138,699.61 $113.27 $138,812.88 $138,812.88 $0.00 $0.00 138,699.61 -$113.27 0.00%
Piceance Creek Colorado CDPHE CD 5780001078
Vectra Bank 18217 0.14% $195,285.46 $159.48 $195,444.94 $195,444.94 $0.00 $0.00 195,285.46 -$159.48 0.00%
Rangely Colorado CDPHE CD 11023600100407 Bank of the San Juans
18218 0.21% $285,283.72 $349.47 $285,633.19 $285,633.19 $0.00 $35,633.19 285,283.72 -$349.47 0.00%
Wonsit Pond 9 Utah Solid Waste CD 579-234585-1 Zions Bank
18219 0.19% $542,893.64 $601.71 $543,495.35 $543,495.35 $0.00 $293,495.35 542,893.64 -$601.71 0.19%
Bluebell Landfill Utah Solid Waste Savings 579-741682-2 Zions Bank
18220 0.19% $358,003.09 $396.79 $358,399.88 $358,399.88 $0.00 $108,399.88 358,003.09 -$396.79 0.19%
Chapita Utah SITLA 8911974 Zions Money Market
18221 0.19% $117,260.43 $129.96 $117,390.39 $117,390.39 $0.00 $0.00 $117,260.43 -$129.96 0.00%
TOTALS - RESTRICTED CASH $7,132,441.18 $154,674.18 $0.00 $0.00 -$700,388.53 $170.62 $6,318,056.23 $6,586,748.43 $0.00 $2,889,925.25