HomeMy WebLinkAboutDSHW-2024-0094091
Division of Waste Management and
Radiation Control
Solid Waste Management Program
Mailing Address Office Location Phone (801) 536-0200
P.O. Box 144880 195 North 1950 West Fax (801) 536-0222
Salt Lake City, Utah 84114-488 Salt Lake City, Utah 84116 www.deq.utah.gov
APPLICATION FOR A TEMPORARY PERMIT TO OPERATE AN
EXPLORATION AND PRODUCTION WASTE FACILITY
In 2019, the Utah Legislature made changes to the Solid and Hazardous Waste Act, Utah Code § 19-6-
101 et seq., which required jurisdiction over the disposal of Oil and Gas Exploration and Production
Waste move from the Department of Natural Resources’ Division of Oil, Gas, and Mining (DOGM) to the
Department of Environmental Quality’s Division of Waste Management and Radiation Control (DWMRC).
In preparation for this regulatory shift, DWMRC has proposed a temporary permitting mechanism for
existing Exploration and Production (E&P) facilities as defined in the proposed Utah Admin. Code R315-
301-2(22)(a).
The proposed rules state that the Director of DWMRC may issue a temporary permit for the purposes of
facilitating the owner’s or operator’s good faith transition from regulation under Utah Admin. Code R649-9
to regulation under Utah Admin. Code R315-321 or R315-322. Applications for temporary permits must
be received by the Director of DWMRC no less than 30 days before October 1, 2024. The temporary
permits will expire one year from the effective date, which is the date the financial assurance mechanism
held by DOGM is transferred to DWMRC.
To complete a temporary permit application to operate an E&P facility, an owner or operator of an existing
E&P facility must:
1. Register the company in DWMRC’s Community Portal and complete facility information within the
Community Portal.
2. Complete the attached Exploration and Production Waste Facility Temporary Permit Application
Form.
3. Provide DWMRC with the following required documentation, to the extent it has not already been
provided to DWMRC or is not already in DWMRC’s possession:
a. Facility map with each landfarm cell, landfill cell, and surface impoundment labeled;
b. Copy of Division of Oil, Gas, and Mining Permit;
c. Copy of Division of Oil, Gas, and Mining Permit Approval/Issuance Letter; and
d. Copy of Division of Oil, Gas, and Mining Bonding (financial assurance).
4. Submit the Application Form and required documentation to DWMRC through the Community
Portal Miscellaneous Document Submission.
5. Within 120 days of DWMRC’s issuance of a temporary permit, the financial assurance
mechanism held by DOGM must be transferred to DWMRC. If the Director issues a temporary
permit, it shall not become effective until the financial assurance mechanism held by DOGM is
transferred to DWMRC. An effective temporary permit is required to operate an E&P Facility
under DWMRC’s jurisdiction.
2
Exploration and Production Waste Facility Temporary Permit Application Form
I. Facility Name and Location
Name of Facility
Chapita Waste Management Facility
Facility Address (Street or Directions to Facility)
26770 S. Fantasy Canyon
County
Uintah
City.
Vernal
Zip Code
84078
Telephone
435-722-2800
Township
T9S
Range
R22E
Section
S2
Quarter Section
Quarter/Quarter
Section
Main Gate Latitude: 40° 4'2.23"N Longitude: 109°24'45.71"W
II. Existing E&P Facilities
☐ Open Landfarm Cell(s)
☐ Evaporation Pond(s)
Number of Open Landfarm Cells: 0
Number of Evaporation Ponds: 7
III. Facilities to be Permitted by DWMRC
☐ Landfill Cell(s)
☐ Surface Impoundment(s)
Number of Landfill Cells:
Number of Surface Impoundments:0
III. Facility Owner(s) Information
Legal Name of Facility Owner
R.N. Industries Inc.
Mailing Address
P.O Box 1168
City
Vernal
State
Utah
Zip Code
84087
Telephone
435-722-2800
IV. Facility Operator(s) Information
Legal Name of Facility Operator
Dalbo Holdings, Inc.
Mailing Address
P.O. Box 1168
City
Vernal
State
Utah
Zip Code
84078
Telephone
435-828-0867
V. Property Owner(s) Information
Is the property leased? Yes
Name of Property Owner
SITLA-Utah School and Institutional Trust Lands
Mailing Address
152 E. 100 N. 4th Floor S.
City
Vernal
State
Utah
Zip Code
84078
Telephone
435-781-5304
VI. Designated Contact Information
Facility Owner Designated Contact (if different than
above)
Title
3
Mailing Address
City. State
Zip Code
Telephone
Email Address
Alternative Telephone (cell phone or other)
Facility Operator Designated Contact (if different than
above)
Title
Mailing Address
City
State
Zip Code
Telephone
Email Address
Alternative Telephone (cell phone or other)
Property Owner Contact (if different than above)
Title
Mailing Address
City
State
Zip Code
Telephone
Email Address
Alternative Telephone (cell phone or other)
VII. Waste Types to be Disposed of (check all that
apply) VIII. Facility Area
☐ Exploration and Production wastes that are exempt from
hazardous waste rules (R315-260-4(b)(5)).
☐ Very Small Quantity Generator hazardous waste
Facility Area: 183 acres
Disposal Area: 40 acres
IX. Application Documents
Indicate documents attached to this application (all are required):
☐ Facility Map with each landfarm cell, landfill cell, and surface impoundment labeled
☐ Copy of Division of Oil, Gas, and Mining Permit
☐ Copy of Division of Oil, Gas, and Mining Approval/Issuance Letter
☐ Copy of Division of Oil, Gas, and Mining Bonding (Financial Assurance)
Sundry Number: 93411
STATE OF UTAH Waste Disposal Permit
DEPARTMENT OF NATURAL RESOURCES AMENDED REPORT ✓
1.Name of Operator
R N Industries
3.Address of Operator City
PO Box 98 Roosevelt UT 84066
5.Name of 3rd Party Contractor
GeoStrata Engineering & GeoSciences
7. Address of Contractor City
14425 South Center Point Way Bluffdale
9.Additional Comments
DIVISION OF OIL, GAS AND MINING
UT
WASTE DISPOSAL PERMIT
2.Utah Account Number
101818.0
State Zip 4.Phone Number
435-722-3800
6.Facility Name
Chapita
State Zip 7. Phone Number
84055
Approved by the
Utah Division of
Oil, Gas and Mining
Date: February 22, 2019
By:�
Original Filing Date: 1/15/2019
RECEIVED: Jan. 15, 2019
RECEIVED
DIV. OF OIL, GAS & MINING
Sundry Number: 93411 File: Detailed Site Description
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Chapita Exploration & Production Waste Disposal
26770 South Fantasy Canyon Road Uintah County, Utah
TABLE OF CONTENTS
A.Introduction and Narrative
B.Site Description and Assessment and Closure and Post Closure Cost Estimate
1.Description and Assessment of Existing Conditions
a.Site Description
b.Contamination Evaluation
C.Equipment Assessment
d.Practices Assessment
e.Monitoring Program
2.Closure Cost and Bonding Evaluation
a.Contamination Evaluation
b.Remediation of E&P Waste Contamination
C.Site Closure Evaluation Scope of Work
d.Infrastructure Removal Scope of Work
e.Seeding and Revegetation Scope of Work
f.Initial Closure Monitoring Report
g.Post Closure Monitoring Scope of Work
3.Observations and Recommendations
c.Attachments
1.Attachment 1 -Maps and drawings
2.Attachment 2 -Third Party Closure Cost Estimate
Rev 20180515 1 Page of 7
r-�"' c .............. .,._,�v.-11 W IW Engineering and Geo-Sciences
RECEIVED: Jan. 15, 2019
Sundry Number: 93411 File: Detailed Site Description
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Chapita Exploration & Production Waste Disposal
26770 South Fantasy Canyon Road Uintah County, Utah
A.Introduction and Narrative
RNI submits this Exploration and Production (E&P) Waste Disposal Permit Renewal Application
(Application) for the subject facility (Facility) in accordance with the requirements of Utah
Administrative Code, Rules R649-9-8.2, R649-9-8.2.1 and R649-9-8.5.1. This Application includes
an assessment of site reclamation requirements and closure cost estimates compiled by a
responsible third-party contractor.
RNI understands that permit renewals may be approved for a five-year period depending on the
results of DOGM's review and consideration of the Application and historic Facility compliance
performance.
The Facility receives and treats produced water, natural gas liquids (NGL), other Exploration and
Production (E&P) liquid wastes. This facility does not receive solid E&P wastes.
The Facility is located about 27 miles southwest of Vernal, Utah and is outside of any incorporated
City Limits. The address to the Facility is:
Rev 20180515
26770 South Fantasy Canyon Road
Uintah County, Utah 84078
2 Page of 7
r-�"' C,1, .. ..,.1,..,..,._,�v.-11 W IW Engineering and Geo-Sciences
RECEIVED: Jan. 15, 2019
Sundry Number: 93411 File: Detailed Site Description
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Chapita Exploration & Production Waste Disposal
26770 South Fantasy Canyon Road Uintah County, Utah
B.Site Description and Assessment, Closure and Post Closure Cost Estimate and
Bond Evaluation
The following narrative addresses requirements established for permit renewal of the titled facility as
described in in Utah Division of Oil, Gas and Mining guidance document, Five Year E&P Waste Disposal
Facility Permit Renewals. (re: Utah Oil & Gas Conservation General Rules R649-9-8.5.1 Bonding of
Disposal Facilities), dated August 2017.
1.Description and Assessment of Existing Conditions
a.Site Description:
The RN Industries (RNI) Chapita Exploration & Production (E&P) Waste Disposal is located
on approximately 240 Acres in the NW/4 of Section 2 of T 9S, R 22E, SLB&M. See site map
in Attachment 1.
The current site has one Skimming pond, an off-load area and nine operational evaporation
ponds. The operational evaporation ponds range nominally from 0.11 to 4.46 acres in size.
Liquid E&P Waste is discharged from tank trucks into the skim pond. It is then directed into one
of the nine operational evaporation ponds. Oil is removed from the skimming pond as needed
and transported to a separate oil cleaning facility. See Existing Process Flow Diagram in
Attachment 1.
Stormwater Detention basins are located in the NW/4, NW/4, SE/4, NW/4 and SW/4, NE/4, Sect
9 have been designed to hold runoff generated by a 25-year, 24-hour storm until the runoff can
be sampled and lab-tested. Depending on lab results the water will be either released to the
local drainage, held to evaporate in place, diverted to evaporation ponds or disposed by some
combination of the three aforementioned methods.
b.Contamination Evaluation
There is no known or observable surface soil contamination on this site.
No process-induced vadose zone soil or unconfined aquifer contamination is known to exist.
There are no known records of incomplete spill clean-up.
Process containment berms, sumps and similar enclosures are free from pooled oil and/ or
measurable contaminated oil accumulation.
c.Equipment Assessment
Major construction and equipment operated at this facility has been observed by Engineer. Any
tests performed to assess equipment condition were cursory in nature. A review of equipment
repair and maintenance records provided by Owner form the basis of the Engineer's opinion of
service life expectancy.
Service life expectancy is based upon the assumption that appropriate, regular maintenance and
equipment repair has been and will continue to be performed.
It is the Engineer's opinion that all major equipment and infrastructure construction at this facility
is in expected condition for its age. Future assessment of life expectancy can be based on age.
Rev 20180515 3 Page of 7
r-�"' C,1, .. ..,.1,..,..,._,�v.-11 W IW Engineering and Geo-Sciences
RECEIVED: Jan. 15, 2019
Sundry Number: 93411 File: Detailed Site Description
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Chapita Exploration & Production Waste Disposal
26770 South Fantasy Canyon Road Uintah County, Utah
More particularly:
i.Site roadways are constructed and maintained with appropriate wearing surface, drainage
and turning radii for expected traffic.
ii.Road and site drainage show no signs of overflow, debris accumulation or excessive
erosion.
iii.Earthen structures are free of piping and excessive erosion.
iv.Observable portions of piping and HDPE liners are not excessively worn or weathered.
v.When last operated no observable pump seals showed excessive leakage.
vi.Buildings -There are no permanent buildings located at the Chapita Disposal Site.
vii.Mobile Equipment
No mobile equipment is permanently assigned to this site
d.Practices Assessment
Engineer has reviewed Owner provided operating procedures and has observed those procedures
in practice. Owner and Engineer offer the following practice changes to improve efficiency and
environmental protections.
i.Water Disposal Operation Assessment
Rev 20180515
This Disposal has been operated less than 50% of the time during the last five years. The
following observations apply to time periods when the Disposal is regularly used in a
normal operating mode.
Strong consideration should be given to complete closure, step-wise closure or sale of this
facility to reduce Owner liability unless there is a superseding business reason to do
otherwise.
Controls for the process described in B.1.a., above and shown on the Process Flow
Diagram in Attachment 1, have, for the most part not been automated. Only minor
portions of equipment and controls are automated. Most automation is intrinsic to
individual pieces of equipment.
Operators appear to be very familiar with the overall plant process and perform
process Quality Control for a large percentage of their time. Throughout their
working hours operators sample process liquids for anomalies. Whenever process
liquids or machinery operation appears abnormal operators will intervene in one of
two ways.
Most often the operator will make equipment and process adjustments for which the
operator has been trained and given authority to perform.
Process and equipment adjustments which appear to be needed, but which operator
has not been authorized to perform, are immediately brought to the attention of
other operating staff and plant management for resolution.
Large equipment temperatures, pressures, flowrates and the like are constantly
monitored by operating staff and management. Although some process monitoring
parameters are observed via remote displays, most instrument monitoring and all
sampling is locally observed/performed.
Leak detection equipment is monitored regularly.
4 Page of 7
r-�"' C,1, .. ..,.1,..,..,._,�v.-11 W IW Engineering and Geo-Sciences
RECEIVED: Jan. 15, 2019
Sundry Number: 93411 File: Detailed Site Description
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Chapita Exploration & Production Waste Disposal
26770 South Fantasy Canyon Road Uintah County, Utah
It is the Engineer's opinion that:
No additional process monitoring automation is warranted for any reason at this
Disposal unless it is returned to regular, continuous use or operation.
Frequency of leak detection monitoring should be decreased (i.e. allow a longer time
between subsequent observations) to quarterly time periods.
Process sampling should continue to be performed manually and locally when
Disposal is in operation because this facility is not big enough to warrant remote
and/or automated process sampling.
The biggest process variable is the type of waste brought to the Facility. It is the
Engineer's opinion there is no commercially available, off-the-shelf (COTS)
equipment to classify incoming waste. There is no Reasonably Available Control
Technology (RACT) or even Best Available Control Technology (BACT) that is
economically viable for RNI to implement. The methods that remain ( client waste
certification, periodic waste testing by client, waste evaluation by experienced staff
and similar) are best available for the RNI operation and should continue to be used.
ii.Landfarm Operation Assessment
No landfarms have ever been operated at this facility.
e.Monitoring Program
Water sampling and testing, visual equipment inspection, pressure tests, sampling and analysis of
material collected by leak detection systems and waste mass balance calculations used at this
facility are described below. Additional or re-configured monitoring practices which could
reasonably and economically improve detection of inadvertent waste release are also described
below. According to Owner provided records, sampling and testing for spill and/or leak clean-up
is always performed to verify that all needed clean-up is complete.
i.Water Sampling and testing is performed on all liquid taken from leak detection sumps.
ii.Leak Detection Monitoring of designated leak detection sumps occurs regularly.
f.Additional or re-configured monitoring practices which could reasonably and economically
improve operational efficacy and detection of inadvertent waste release are described below.
To enhance early detection of inadvertent waste release and more accurately determine leak
sources while this Disposal is dormant RNI should consider adding a chemical marker to certain
waste streams.
2.Closure Cost and Bonding Evaluation
Bond cost components referenced in this section have been determined by applying unit costs to
quantity take-off from drawings and documents provided by Owner and cursory field inspections and
surveys by the Engineer.
a.Contamination Evaluation
No evidence of Soil, Surface Water or Groundwater contamination was found at this facility.
b.Remediation of E&P Waste Contamination
Rev 20180515 5 Page of 7
r-�"' c .............. .,._,�v.-11 W IW Engineering and Geo-Sciences
RECEIVED: Jan. 15, 2019
Sundry Number: 93411 File: Detailed Site Description
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Chapita Exploration & Production Waste Disposal
26770 South Fantasy Canyon Road Uintah County, Utah
None required.
c.Site Closure Evaluation Scope of Work
Upon closure, potential soil contamination will be identified with a Photo Ionization Detector
(PID) survey. Groundwater quality and surface water will be sampled lab-tested. Hazardous
substances stored or used on site will be inventoried and removed as appropriate. Costs for this
evaluation are included in calculated closure costs.
d.Infrastructure Removal Scope of Work
The cost to remove all site infrastructure and equipment as may be reasonable and necessary to
return site to a condition similar to its use and appearance before being used as an E&P Waste
Disposal is included in reclamation cost estimate.
No costs are included to reclaim and/or improve the site to conditions better than those occurring
before its use as and E&P Disposal or markedly better than exist on adjacent property. Grading
and contouring the site to the exact site geometry before site was used as an E&P Disposal has
not been used as a reclamation criterion.
Generally, infrastructure removal closure cost estimates include:
i.Removal all tanks, security fence, buildings, liner materials, piping and concrete structures
which do not add value to the site are included in the Infrastructure Removal portion of
closure costs.
ii.Earthwork and grading to restore site to a serviceable condition similar to, and in keeping
with surrounding land use and drainage.
e.Seeding and Revegetation Scope of Work
Seeding/revegetation cost based on drag harrowing and hydroseeding is included in the closure
cost estimate. Seed mixture and application rate determined by Great Basin Company of
Ephraim, Utah are included in this component of closure cost estimate.
f.Initial Closure Monitoring Report
This report will describe:
i.Estimated closure PID survey results and required sampling and lab testing.
ii.Groundwater and surface water sampling and lab-testing.
iii.Inventory of hazardous substances removed from site.
iv.Site grading, revegetation and erosion control.
g.Post Closure Monitoring Scope of Work
Post closure monitoring and care cost will include annual:
i.Erosion control and surface drainage management.
ii.Sampling and testing of site ground and surface water as described in the initial closure
report.
iii.Written reports describing the condition of the reclaimed site and work performed to
monitor and maintain reclaimed site.
Rev 20180515 6 Page of 7
r-�"' C,1, .. ..,.1,..,..,._,�v.-11 W IW Engineering and Geo-Sciences
RECEIVED: Jan. 15, 2019
Sundry Number: 93411 File: Detailed Site Description
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Chapita Exploration & Production Waste Disposal
26770 South Fantasy Canyon Road Uintah County, Utah
3.Observations and Recommendations
Included in Articles 1. d. and 1. f, above.
Rev 20180515 7 Page of 7
r-�"' C,1, .. ..,.1,..,..,._,�v.-11 W IW Engineering and Geo-Sciences
RECEIVED: Jan. 15, 2019
Rev 20180515
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Chapita Exploration & Production Waste Disposal
26770 South Fantasy Canyon Road Uintah County, Utah
'C. Attachments
Engineering and Geo-Sciences
Rev 20180515
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Chapita Exploration & Production Waste Disposal
26770 South Fantasy Canyon Road Uintah County, Utah
ATTACHMENT 1
MAPS and DRAWINGS
Site & Vicinity
PFD
Engineering and Geo-Sciences
7 98
4
5
2 6
1
3
Disposal Facility Permit Renewal
RN Industries
Project Number 524-084
0 200 400 600 800100
Feet
Chapita Disposal Facility
Map
1
Legend
Site Boundary
Copyright GeoStrata, 2018
±1:6,000
BASE MAP:
Aerial Orthphotography obtained from the State of Utah AGRC
Produced
Water
Copyright GeoStrata, 2018
Permit Renewal
RN Industries
Project Number: 524
Legend
Water
Oil
Skim Pond Evaporation
Ponds
Oil Tanks
Chapita Process Flow Diagram
Rev 20180515
Utah Division of Oil Gas & Mining Permit Renewal Application
for
Chapita Exploration & Production Waste Disposal
26770 South Fantasy Canyon Road Uintah County, Utah
ATTACHMENT 2
CLOSURE COST ESTIMATE
Bev summary &
GeoStrata Backup Cales
Engineering and Geo-Sciences
Five Year E&P Waste Disposal Facility Bond Calculation Summary Form
Direct and Indirect Costs OIL GAS• MINING
RN Industries
Facility: Chapita E&P Disposal
Number of Acres to be Reclaimed
Contamination Remediation Cost Estimates
Removal of Infrastructure Costs Estimates
Earthwork and Grading Cost Estimates
Revegetation Cost Estimates
Final Closure & Post Closure Cost Estimates
Total Cost Estimate
Date:
(Increase above total cost estimate by 14% if indirect costs are not included)
Total Reclamation Cost Required
Bond Posted
Difference Between Cost Estimate and Bond
7/19/2018
60.3 Acres
$ 79,547
$ 59,276
$ 606,520
$ 75,960
$ 53,813
$ 875,115
$ 122,516
$ 997,632
$ 1,598,959
$ 601,327
0
2
3
4
5
6
7
Sundry Number: 93411 File: Detailed Site Description
RN Industries
Olapita E&P Disposal
Site Assessment Closure & Post Closure Cost Estimate & Re-statement of Existing Bonds in Suport of DOGM Bonding Evaluation
Item I DOGM Une Item
0 I Indirect Costs
Desaioltoo
Contingencies Price and Payments Procedures
Administrative Requirements
Quality Requirements
Temporary Facil�ies and Controls
Executions of Ooseout Requirements I Total:
1 I Site Arel
2 I Contamination Remediation Cost Estimates
Descrioiton Unit Ouantitv Unit Price
Removal of Contaminated Liauid Gallon 1162529.535 $
D�oosal of Contaminated Liouid bbl 27 679 $
Vaoor Extraction 0
Pumo & Treat 0
Self Attenuatino 0
PID Oosure Soil samolino Positive 5amoles 5.503266079
Post Remediation Monitoring 0
Total:
3 I Removal of lnfrastrudura Costs Estimates
Descripiton Unit
Buildinas Cubic Yard
Tanks Each
Gensets Each
Buried Pioina Linear Foot
Cut and Remove Liner Cf
Concrete Pads Cubic Yard
Fencino Linear Foot
Haulina Cubic Yard
Dumoino Ton
4 I Earthwork and Gradina Cost Estimates
Descrioiton Unit
Common Earth to be Dozed cubic vard
Oav to be Moved cubic vard
sand & Gravel to be Moved cubic vard
Rough Grading square foot
5 I Reveaetatlan Cast Estimates
Descr1Ditoo Unit
Hydro Seeding of Indian Rice Grass MSF
I
6 I Inltlal and Flnal Past aosure Renart
Descrioiton Unit
Well Insnomon & samolino Year
Water Qualitv Meter Rental Year
Lab Analvsis Year
Grounds Maintenance Annual
Monitorino Well Abandonment Year
Annual Reoort Year
Initial and Final Post Closure Reoort Year
7 I Band Pasted
Bond Descrioiton &. Date Tvoe ID Number
I
Quantity
Ouantitv
Ouantitv
Ouantitv
4
40 606
1856
17 800
114
96
254 984
2,624,727
2,625
10
10
10
9
1
8
2
Listed Reclamation
Unit Price
$
$
$
$
$
Total:
Unit Price
$ •
$
$
Total:
Unit Price
ITotal:
Unit Price
$
$
$
$
$
$
Total:
1 I
Total:
Percentaqe
7%
3%
1%
0%
3%
14%
60.3Aaeo
Extended Cost
0.04 $ 46 016
0.68 $ 18 960
0 $
0 $
0 $
Varies $ 14 571
0 $
$ 79,547
Extended Cost
Varies $
Varies No Cost (net of salvaoel
200.00 No Cost fnet of salvaoel
Varies $
2.28 $ 6 101
1.09 $
Varies $ 40 228
1.76 $ 3,473
20.00 $ 9,473
$ 59 276
Extended Cost
1.76 $ 595 545
2.83 •
1.53 $ o.os $ 10,975
$ 606 520
Extended Cost
28.94 $ 61,666
I $ 75 960
Extended Cost
630.00 $ 6 300
120.00 $ 1200
600.00 $ 6 000
2 690.35 $ 24 213
Varies $ 2100
1 200.00 $ 9 600
2,200.00 $ 4,400
$ 53 813
Posted Amount
7 I $ 1,598,959
$ 1 598 959
01 21 55.50 0200 With an additional 2% of unforseeable events
01 31 00 Adjusted to reflect a percentage, also referenced ACEC and ASCE for rates
01 41 26,50 0100
01 51 00 Not applicable for the scope and scale of a project like this
01 71 00 Adjusted to reflect a percentage, also referenced ACEC and ASCE for rates
Total Site 240 Aaes I
02 65 10.30 0130 (modled for scale)
31 23 23.20 4096 adjusted to cy for hauling (w� $.65 / bbl cost for d�posal facility to
accept waste)
Above costs include the removal (by vac truck) and disposal of 10% of tank volume
MWH Standard
02 41 19.20 0020
02 65 10.30 1253 No Cost net of salvage
02 65 10.30 1253 No Cost net of salvage
Included in Liner Removal
31 23 16.42 1550 MoMied to add truck loading
02 41 16.17 0440
02 41 13.60 1600
31 23 23.20 4104 Modmed for proximity of Landfill
Duchesne/ Wasatch Bluebench Landfill Tonnage Rates
31 23 16.46 5020
31 23 16.46 5040
31 23 16.46 5000
31 22 13.20 0280 (modled for scale)
GeoStrata Inhouse Estimates
GeoStrata Inhouse Estimates
GeoStrata Inhouse Estimates
32 9113.23 Structural Soil Mixina foa 331) I
GeoStrata Inhouse Estimates
GeoStrata Inhouse Estimates
GeoStrata Inhouse Estimates
RECEIVED: Jan. 15, 2019
Compliance Review Completed:
No outstanding compliance
Active violation/compliance m
Signature:
Comments
Disposal Facility ermit Renewal Check is
Name of Operator:
Name of
RN Industries
Chapita E&P Waste Disposal
Section 2, T9S, R22E, SLBM
05/30/18
GeoStrata
05/30/18 ASM 01/10/19 BTK
05/30/18 ASM 01/10/19 BTK
05/30/18 BW 01/15/19 BW $ 998,000
Uncertainty regarding lease
letters 12/17-3/18. SULA
07/03/18 ASM Facility Map included.
07/03/18 ASM No contamination anticipated
07/03/18 ASM Includes HDPE liners and
07/03/18 ASM Inactive 2013
Contouring or Regrading
Seedi
Notes:
Comments
02/04/19 ASM Leak detection sumps will
a weekly basis-ASM
01/11/19 BW
01/11/19 BW Liner and piping to be removed
01/11/19 BW
01/11/19 BW
SITLA requires liner/solids to be removed, should be reflected in the bond estimate -BTK 6/25
Series of correspondence between SITLA and RNI between Dec 2017 and March 2018
-December 19, 2017 SITLA letter requesting reclamation plan by Jan 30, 2018
-January 29, 2018 RNI response containing reclamation plan for Chapita, requesting to continue use at Seep Ridge
-March 19, 2018 SITLA response rejecting liner burial and requiring sediment removal from ponds. Request time line for reclamation steps.
-January 11, 2019 reviewed most recent reclamation costs. Liner and Piping are being removed as per SITLA request. Bond Estimate is $998,000.
1111
ENERGY SERVICE
Mr. Jim Davis
SITLA I Utah Trust Lands Administration
675 East 500 South, Suite 500
Salt Lake City, UT 84102-2813
Mr. Davis;
RU
F b ...
TRUST LAt✓o s
.. , A DMINISTRATION
FEB 2 8 20 1~
TRUST LAN r:J'
AOMINI S H1 AI
February, 25, 2019
The purpose of this letter is to respond to your questions regarding the Seep Ridge and Cha pita
disposal facilities posed in an email to Austin Weddle on January 18. 2019:
1. Which of the ponds are currently in use?
• The Seep Ridge facility is currently active and receiving water
• The Chapita facility is currently inactive .
2. What work was done last year?
• There was no reclamation work performed in 2018
3 . Please provide me a plan for this year including a rough anticipated timeline.
• RHI is evaluating reclamation options for the Cha pita facility for 2019. We would prefer to do
reclamation work with our own crews and equipment but for at least the first half of this year
we will be using our resources to perform work that UDOGM has requested at our Wonsits and
Bluebell facilities . We are also waiting on approval from the Utah State DEQ to begin expansion
work on our landfill at the Wonsits facility. This expansion will be a necessary part of the
Cha pita reclamation as it will provide us a place to take the liners and other solids from the
facility prior to recontouring.
If you have additional questions, please feel free to contact me .
Kirk Fleetwood
(435) 828-3451
DALBO HOLDINGS INC.
355 South 1000 East, Vernal UT 84078
0: 435 -722 -2800
www.dalboholdings .com
Governor
www.ogm.utah.gov
Executive Director
Austin Weddle
Dalbo Holdings Inc./RN Industries
P.O. Box 1168
Vernal, UT 84078
April 15, 2019
7017 1070 0000 9113 5570
4/15/2019
The operator has failed to submit 4th Quarter 2018 E&P Waste Facility Quarterly Reports for all
Dalbo Holding Inc./RN Industries facilities to the Utah Division of Oil, Gas and Mining in an
accurate and timely manner.
R649-9-11.3 Reporting and Recordkeeping for Disposal Facilities
E & P Waste Facility Quarterly Reports along with results of weekly leak detection system
inspections should be properly completed and submitted to the division for the above
facilities IMMEDIATELY.
All reports thereafter should be submitted quarterly by the15th of the month following the end
of the quarter in order to avoid additional enforcement action.
4/15/2019
Permit Manager (801) 538-8303
Compliance FileCompliance File
Well / Facility File
Bart Kettle, Operations Manager
Josh Payne, Compliance Manager
Dalbo Inc. Glen Bench facility 1/31/2019
Dalbo Inc. Ace Disposal facility 1/31/2019
RN Industries Bluebell facility 1/31/2019
RN Industries Chapita facility 1/31/2019
RN Industries Glen Bench facility 1/31/2019
RN Industries Pleasant Valley facility 1/31/2019
RN Industries Seep Ridge facility 1/31/2019
RN Industries Wonsit facility 1/31/2019
Dayne Doucet
Digitally signed by Dayne Doucet
DN: cn=Dayne Doucet, o=DNR,
ou=DOGM,
email=daynedoucet@utah.gov, c=US
Date: 2019.04.12 14:32:34 -06'00'
Dalbo Holdings Inc./RN Industries 2/5/2019 version
Lieutenant Governor
R.
Division Director
www.ogm.utah.gov OIL, GAS&. MINING
GARY R. HERBERT
Governor
SPENCER J. COX
Lieutenant Governor
State of Utah
DEPARTMENT OF NATURAL RESOURCES
1594 West North Temple, Suite 1210, Salt Lake City, UT 84116
PO Box 145801, Salt Lake City, UT 84114-5801
telephone (801) 538-5340 facsimile (801) 359-3940 TTY (801) 538-7458 www.ogm.utah.gov
BRIAN C. STEED
Executive Director
Division of Oil, Gas and Mining
JOHN R. BAZA
Division Director
November 24, 2020
RN Industries
C/O Mr. Austin Weddle
P.O. Box 1168
Vernal, UT 84078
SUBJECT: Re: RNI Chapita Pond #7 Reclamation
Dear Mr. Weddle:
The Utah Division of Oil, Gas and Mining (Division) received DHI Energy Service’s
Proposed Pond Closure Plan prepared for the RNI Chapita Evaporation Facility. Division
approval was granted for the submitted reclamation proposal.
Sampling points have shown that the soil samples beneath Pond #7 are within the
expected background range for all of the contaminants of concern. DHI Energy is hereby
permitted to continue with the final reclamation of Pond #7, as proposed in the approved Pond
Closure Plan.
If you have questions, feel free to contact Ammon McDonald at (801) 538-5337.
Sincerely,
Dayne Doucet
Oil & Gas Permit Manager
DD/AM/js
Mr. Jim Davis; SITLA
N:\O&G Permits\Disposal Facilities (Pits, LF, etc)\RN Industries (Chapita – S2, T9S, R2E, Uintah)
Facility State Agency
Bonding Type Account # Issuer
RNI GL
Account
Number
Actual Interest
Rate as of
12/31/2023
Confirmed
12/31/2023
Value
YTD
ESTIMATED
Interest
Income(net of
interest
earned and
released) YTD
Y/E Interest
Adjustment
to actual
2024
Deposits Releases
Transfer
In/Out Ending Estimated Balance EOM Per GL Difference
Exceed FDIC
Per 12/31/2024
Confirm
GL Confirm
Difference
Actual
Interest Rate
as of
12/31/2023
BlueBell RNI Utah DOGM Business MM 027766005 Zions Bank
18201 see statement $144,810.23 $0.00 $91.96 reconciled at cash recon worksheet $144,821.87 reconciled at cash recon worksheet $0.00 144,810.23 -$11.64 0.75%
Glen Bench RNI Utah DOGM Business MM 027765999 Zions Bank
18202 see statement $123,860.37 $0.00 $78.66 reconciled at cash recon worksheet $123,870.33 reconciled at cash recon worksheet $0.00 123,860.37 -$9.96 0.75%
Pleasant Valley - RNI Utah Duchesne County Business MM 027765973 Zions Bank
18203 see statement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 0.00%
Pleasant Valley - RNI Utah DOGM Business MM 027765932 Zions Bank
18204 see statement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 0.00%
Seep Ridge Utah DOGM Business MM 027765940 Zions Bank
18205 see statement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 0.00%
Bluebell Utah DOGM CD
579-156795-0 Zions First National 18206 5.07% $601,621.13 $17,792.94 -$404,215.86 $215,198.21 $215,198.21 $0.00 $0.00 601,621.13 $386,422.92 5.07%
Chapita Utah DOGM CD
579-156799-2 Zions First National 18207 0.19% $57,809.07 $64.07 $57,873.14 $57,873.14 $0.00 $0.00 57,809.07 -$64.07 0.19%
Chapita Utah DOGM CD
579-156796-8 Zions First National 18208 5.07% $941,783.28 $27,853.24 -$208,573.00 $761,063.52 $761,063.52 $0.00 $511,063.52 941,783.28 $180,719.76 5.07%
Glen Bench - RNI Utah DOGM CD
579-156797-6 Zions First National 18209 5.07% $643,711.72 $19,037.77 $662,749.49 $662,749.49 $0.00 $412,749.49 643,711.72 -$19,037.77 5.07%
Wonsit Utah DOGM CD
579-156798-4 Zions First National 18210 5.07% $1,201,951.28 $35,547.71 -$87,599.67 $1,149,899.32 $1,149,899.32 $0.00 $899,899.32 1,201,951.28 $52,051.96 5.07%
Ace Utah DOGM CD 579-156800-8
Zions First National 18211 5.07% $197,568.34 $5,843.08 $203,411.42 $203,411.42 $0.00 $0.00 197,568.34 -$5,843.08 5.07%
Glen Bench Utah DOGM CD 579-156801-6
Zions First National 18212 5.07% $574,582.63 $16,993.28 $591,575.91 $591,575.91 $0.00 $341,575.91 574,582.63 -$16,993.28 5.07%
Seep Ridge Utah DOGM CD 579-156803-2
Zions First National 18213 5.07% $448,453.13 $13,263.00 $461,716.13 $461,716.13 $0.00 $211,716.13 448,453.13 -$13,263.00 5.07%
Seep Ridge Utah DOGM CD 579-156804-0
Zions First National 18214 5.07% $306,868.61 $9,075.64 $315,944.25 $315,944.25 $0.00 $65,944.25 306,868.61 -$9,075.64 5.07%
Ace Utah DOGM CD 579-156805-7
Zions First National 18215 5.07% $251,995.44 $7,452.77 $259,448.21 $259,448.21 $0.00 $9,448.21 251,995.44 -$7,452.77 5.07%
Piceance Creek Colorado CDPHE CD 5780001086
Vectra Bank 18216 0.14% $138,699.61 $113.27 $138,812.88 $138,812.88 $0.00 $0.00 138,699.61 -$113.27 0.00%
Piceance Creek Colorado CDPHE CD 5780001078
Vectra Bank 18217 0.14% $195,285.46 $159.48 $195,444.94 $195,444.94 $0.00 $0.00 195,285.46 -$159.48 0.00%
Rangely Colorado CDPHE CD 11023600100407 Bank of the San Juans
18218 0.21% $285,283.72 $349.47 $285,633.19 $285,633.19 $0.00 $35,633.19 285,283.72 -$349.47 0.00%
Wonsit Pond 9 Utah Solid Waste CD 579-234585-1 Zions Bank
18219 0.19% $542,893.64 $601.71 $543,495.35 $543,495.35 $0.00 $293,495.35 542,893.64 -$601.71 0.19%
Bluebell Landfill Utah Solid Waste Savings 579-741682-2 Zions Bank
18220 0.19% $358,003.09 $396.79 $358,399.88 $358,399.88 $0.00 $108,399.88 358,003.09 -$396.79 0.19%
Chapita Utah SITLA 8911974 Zions Money Market
18221 0.19% $117,260.43 $129.96 $117,390.39 $117,390.39 $0.00 $0.00 $117,260.43 -$129.96 0.00%
TOTALS - RESTRICTED CASH $7,132,441.18 $154,674.18 $0.00 $0.00 -$700,388.53 $170.62 $6,318,056.23 $6,586,748.43 $0.00 $2,889,925.25