Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRC-2023-070672 - 0901a0688125ef1b
CA, '-1_ ~NERGYFUELS August 16, 2023 VIA OVERNIGHT DELIVERY Mr. Doug Hansen Director Division of Waste Management and Radiation Control Utah Department of Environmental Quality 195 North 1950 West Salt Lake City, UT 84116 Energy Fuels Resources (USA) Inc. 225 Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 www .energyfuels.com Div of Waste Management and Radiation Control AUG 2 2 2023 Re: State of Utah Radioactive Material License No. UT1900479 White Mesa Mill, Blanding, Utah Semi-Annual Effluent Monitoring Report for Period January 1 through June 30, 2023 Mr. Hansen: As required by Utah Administrative Code, R 313-24-4 (incorporating by reference 10 CFR 40.65 (subpart-1)), and License Condition 11.3A of State of Utah Radioactive Materials License No. UTl 900479, enclosed is the Semi-Annual Effluent Monitoring Report for the White Mesa Mill for the period Januaryl through June 30, 2023. If you have any questions regarding this report, please contact the undersigned at (303) 389- 4134. Yours very truly, ENERGY FUELS RESOURCES (USA) INC. Kathy Weinel Director, Regulatory Compliance cc: Jordan App David Frydenlund Garrin Palmer Scott Bakken Logan Shumway DRC-2023-070672 August 16, 2023 VIA OVERNIGHT DELIVERY Mr. Doug Hansen Director Division of Waste Management and Radiation Control Utah Department of Environmental Quality 195 North 1950 West Salt Lake City, UT 84116 Energy Fuels Resources (USA) Inc. 225 Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 www.energyfuels.com Re: State of Utah Radioactive Material License No. UT1900479 White Mesa Mill, Blanding, Utah Semi-Annual Effluent Monitoring Report for Period January 1 through June 30, 2023 Mr. Hansen: As required by Utah Administrative Code, R 313-24-4 (incorporating by reference 10 CFR 40.65 (subpart1)), and License Condition 11.3A of State of Utah Radioactive Materials License No. UT1900479, enclosed is the Semi-Annual Effluent Monitoring Report for the White Mesa Mill for the period Januaryl through June 30, 2023. If you have any questions regarding this report, please contact the undersigned at (303) 389- 4134. Yours very truly, ENERGY FUELS RESOURCES (USA) INC. Kathy Weinel Director, Regulatory Compliance cc: Jordan App David Frydenlund Garrin Palmer Scott Bakken Logan Shumway White Mesa Uranium Mill Radioactive Materials License UT900479 Semi-Annual Effluent Monitoring Report (January through June 2023) Prepared For: Utah Department of Environmental Quality Division of Waste Management and Radiation Control Prepared by: Energy Fuels Resources (USA) Inc. 225 Union Boulevard, Suite 600 Lakewood, CO 80228 August 16, 2023 TABLE OF CONTENTS 1.0 INTRODUCTION ................................................................................................... 1 1. 1 Modifications to the Monitoring Programs ............................................................... 1 2.0 ENVIRONMENTAL AIR PARTICULATE SAMPLING ...................................... 2 2.1 Program Overview ................................................................................................ 2 2.2 Sampling Protocol and Analytical Results ........................................................... .3 2.3 General Observations ............................................................................................ 4 2.4 Site Specific Sampling Data ................................................................................. 5 2.5 Radon-222 ............................................................................................................. 5 3.0 EXTERNAL RADIATION (DIRECT GAMMA) ................................................... 6 4.0 VEGETATION SAMPLES ...................................................................................... 7 5.0 STACK SAMPLING ................................................................................................ 7 6.0 SURFACE WATER MONITORING ...................................................................... 8 7.0 SOIL SAMPLING .................................................................................................... 9 8.0 METEOROLOGICAL MONITORING ................................................................... 9 9.0 CELL 2 RADON FLUX ........................................................................................... 9 10.0 SIGNATURE AND CERTIFICATION ................................................................. 11 Table 1 Table 2 Table 3 Table 4 Table 5 Table 6 Table 7 Table 8 LIST OF TABLES NCRP Report 94-Global Pb-210 Concentration Example Air Monitoring Station Results U-Nat (Comparison to Limits) Air Monitoring Station Results Th-230 (Comparison to Limits) Air Monitoring Station Results Ra-226 (Comparison to Limits) Air Monitoring Station Results Pb-210 (Comparison to Limits) Air Monitoring Station Results Th-232 (Comparison to Limits) Environmental OSL Dosimeter Measurements (Gamma) Stack Effluent Concentrations and Release Rates 1 INDEX OF TABS A High Volume Air Monitoring Stations B BHV Air Sampling Graphs and Data Tables Tabl BHV-1 Air Sampling Graphs and Data Table Tab 2 BHV-2 Air Sampling Graphs and Data Table Tab 3 BHV-3 Air Sampling Graphs and Data Table Tab 4 BHV-4 Air Sampling Graphs and Data Table Tab 5 BHV-5 Air Sampling Graphs and Data Table Tab 6 BHV-6 Air Sampling Graphs and Data Table Tab 7 BHV-7 Air Sampling Graphs and Data Table Tab 8 BHV-8 Air Sampling Graphs and Data Table C BHV Air Sampling Laboratory Results and QA/QC D Air Particulate Loading Graphs and Supporting Data E Environmental Gamma (OSL) Dosimeter Graphs and Supporting Data F Vegetation Graphs, Data Table, Laboratory Results and QA/QC G Stack Sample Laboratory Results H Surface Water Graphs and Field Data Sheets I Soil Sample Graphs, Data Table, Laboratory Results and QA/QC J Radon Monitoring Graphs and Data K Cell 2 Radon Flux Data 11 WHITE MESA URANIUM MILL SEMI-ANNUAL EFFLUENT REPORT, JANUARY THROUGH JUNE 2023 1.0 INTRODUCTION The White Mesa Mill (the "Mill") has established monitoring programs to evaluate compliance with effluent limitations and to assess the potential for release of radioactive material into the local environment. These monitoring programs were developed and implemented at the time of Mill construction, operated with appropriate adaptation over time, and are consistent with the Mill's State of Utah Radioactive Materials License No. UTl 900479 (the "License") and guidelines developed by the United States Nuclear Regulatory Commission ("NRC") (NRC Regulatory Guide 4.14, Radiological Effluent and Environmental Monitoring at Uranium Mills- Rev. I, ML003739941), 1980). 1.1 Modifications to the Monitoring Programs As stated above, the monitoring programs implemented to date are consistent with the Mill's License and guidelines developed by the NRC and described in Regulatory Guide 4.14. The Mill's License modifies and expands the effluent monitoring programs implemented at the Mill beyond what is regularly required by NRC Regulatory Guide 4.14. Specific changes to the individual monitoring programs are discussed in the subsequent sections of this report. In a letter dated July 23, 2014, the Division of Waste Management and Radiation Control ("DWMRC") stated that because "Tailings Cell 2 is no longer in operation (receiving tailings), the Division of Air Quality and the Division of Radiation Control agree that Subpart W NESHAPs requirements (40 CFR Part 61) no longer apply; however, at this phase of cell 2 closure activities, the requirements of 10 CFR Part 40, Appendix A, Criterion 6 do apply." The July 23, 2014 letter further requires that radon flux measurements for Cell 2 be collected semi- annually in accordance with methodology specified in 40 CFR Part 61, Appendix B, Method 115 and that the measured results be included in the Semi-Annual Effluent Reports submitted to DWMRC. As a result of the July 23, 2014 letter, Cell 2 radon flux monitoring data are reported herein. Additional details regarding the monitoring and data collection activities for the Cell 2 radon flux are included in Section 9.0. As specified by the License and the documents described above, the Mill monitors the following environmental media and conditions: a) Airborne particulate radionuclide concentrations obtained from the following sampling stations: • North, east and south of the Mill Site: BHV-1, BHV-2, and BHV-8 (north), BHV- 5 and BHV-7 (east), and BHV-4 (south). BHV-1 and BHV-8 serve as surrogates for the nearest resident (BHV-1 and BHV-8 are approximately 1.2 miles north of the Mill, but approximately 0.4 miles closer to the Mill than the nearest resident); 1 • A background location distant to and west of the Mill (BHV-3) that was monitored for airborne particulates up until November, 1995 (at which time background was established), which is no longer monitored for air particulates; and • A station specifically requested by the White Mesa Ute Community south of the Mill Site (BHV-6); b) External ( direct) gamma radiation measured at air monitoring stations BHV-1, BHV-2, BHV-3, BHV-4, BHV-5, BHV-6, BHV-7, and BHV-8; c) Vegetation at three site periphery locations, for uptake of radionuclides; d) Stack release rates from the Mill's air emissions sources; e) Surface water at Cottonwood Creek and, when flowing, Westwater Creek, both located west of the Mill; f) Soil radionuclide activity at 52 locations during the third quarter of each year; g) Radon-222 at the air particulate monitoring stations (BHV-1 through BHV-8); h) Meteorological conditions; i) Radon flux of the Cell 2 cover as specified by the DWMRC in correspondence dated July 23, 2014; j) Groundwater (up and down gradient) of the Mill facility; and1 k) Seeps and springs in the vicinity of the Mill.1 This semi-annual effluent report provides the results of the specific monitoring and sampling activities that were undertaken during the subject reporting period. 2.0 ENVIRONMENTAL AIR PARTICULATE SAMPLING 2.1 Program Overview Prior to 2014, the environmental airborne particulate monitoring program at the Mill utilized four air sampling stations. Four high-volume continuous air sampling stations (BHV-1, BHV-2, BHV-4, and BHV-5) were required by the License. In addition to these four environmental air sampling locations, an additional station (BHV -6) was installed at the request of the White Mesa Ute Community. This station began operation in July of 1999 and provides airborne particulate 1 Groundwater sampling and seeps and springs sampling are reported separately pursuant to the Mill's State of Utah Ground Water Discharge Permit No. UGW370004, and are not included with this report. 2 information in the southerly direction between the Mill and the White Mesa Ute Community. In 2014 the air particulate monitoring program has expanded to include the following: • The addition of two air monitoring stations (BHV -7 and BHV -8); • The addition of thorium-232 ("Th-232") to the list of air particulate analytes; These sampling stations serve as sentinels for airborne particulate which could potentially emanate from the Mill site. In addition to its general site monitoring function, BHV-1 and BHV - 8 also serve as conservative surrogates for concentrations at the nearest resident, because they are located approximately 1.2 miles north of the Mill just south of the nearest resident but between the Mill and that resident. With regard to background monitoring, the Mill previously operated a continuous high-volume air sampling station (BHV-3) which was located 3.5 miles west of the Mill site. With the approval of NRC, this station (BHV-3) was removed from the active air monitoring program in November 1995. At that time, NRC determined that a sufficient air monitoring database had been compiled at BHV-3 to establish a representative airborne radionuclide background for the Mill. The NRC approval to remove BHV-3 from the active air monitoring program specified background radionuclide concentrations based on the historic data. These concentrations are shown on the graphs and tables in Tab B3. While air sampling was discontinued at this location, gamma measurements, radon measurements and soil sampling continue at BHV-3. 2.2 Sampling Protocol and Analytical Results Airborne particulate monitors are operated continuously at each of the high-volume air sampling stations except BHV-3. As noted above, BHV-3 was removed from the active air monitoring program in November 1995, but the NRC specified background concentrations are shown in Attachment B. Particulate sample collection filters are gathered by site technicians weekly in accordance with the Mill's environmental air sampling procedures and are composited on a quarterly basis for laboratory analyses. The collected filters are analyzed for Unat activity, Th-230 activity, Ra-226 activity, Th-232 activity and Pb-210 activity. Fugitive dust standards for the facility are limited by the Mill's State of Utah Air Approval Order. The specific locations of the Mill's airborne particulate monitoring stations are depicted on the figure entitled Particulate Monitoring Stations included as Attachment A. Station BHV-3, which is no longer sampled for air particulates, is located approximately 3.5 miles west of the Mill facility. The analytical results of radionuclide particulate sampling for each monitoring station operated during this reporting period are provided in Attachment B under separate sampling station attachment tabs (Tabs 1-8). Each tab contains graphical illustrations of the radionuclide concentrations in log-scale presentation format. The graphs display reported data over time since the 1981 inception of the Mill's environmental air particulate monitoring program or the installation of the locations, whichever is appropriate. The actual analytical results ( and 3 associated QA/QC information) reported by the laboratory for the reporting period are provided under Attachment C. In addition to the analyses for radionuclides, particulate loading is determined for each filter and composited as a quarterly mass-loading estimate for review purposes only. Graphs showing particulate loading at each station and the underlying data are included as Attachment D. Analytical data were reviewed against the laboratory established acceptance limits specified in the data packages. The analytical data are usable for their intended purpose. Any deviations noted did not affect the quality or usability of the data. For graphical illustration purposes, values reported at zero, values reported at less than the prescribed detection limit (< 1 x 10-16 uCi/ml), and missing values were plotted as 1 x 10-16 uCi/ml concentrations. Where other "less than" values were indicated (i.e., where detection limits for the data varied from 1 x 10-16 uCi/ml), the detection limit concentration was utilized for plotting the data point. This graphing convention is not utilized to formulate station average information, nor is it intended as a precedent for data treatment. Rather, the intent is to provide a conservative viewable depiction of site airborne radionuclide information. This is considered to be a conservative approach, because the actual concentration below the detection limit cannot be determined and, as a result, the plotted point will be at the same or a higher concentration than the actual activity concentration of the collected sample. 2.3 General Observations The results of environmental air monitoring for this semi-annual period indicate that for all radionuclides at all monitoring stations, airborne radionuclide particulate activity concentrations were well below regulatory Effluent Concentration Limits ("ECL's") and the Mill's ALARA goals, which are set at 25% of the ECLs. It is noteworthy and expected that Pb-210 concentrations are elevated when compared to the other parent radionuclide concentrations (i.e. U-nat, Th-230 and Ra-226). This phenomenon is due to the well-established controlling effect experienced worldwide as a result of the ubiquitous presence of radon in the earth's atmosphere. Accordingly, the elevated Pb-210 presence in disequilibrium with parent radionuclides measured here is not associated with uranium milling operations. Rn-222 emanates as a decay-chain progeny of the Ra-226 contained in the soil of the earth's crust and is dispersed generally throughout the earth's atmosphere. The electrically charged short and long-lived decay products of Rn-222 attach to ambient dust particles found naturally in the atmosphere and are carried with the air. Pb-210 is the longest lived of these decay products and is the decay product of the shorter-lived radon progeny. As such, it accumulates as an electrical attachment on the natural ambient dust in the atmosphere and is generally measured at elevated activity when compared to local decay-chain parent radionuclide activity, regardless of uranium milling activity. At the Mill's BHV air monitoring stations, all dust (ambient natural and mill derived) is collected by the sample filter. Because of the natural elevation of Pb-210 accumulated as an attachment to the naturally occurring ambient dust particles collected by the air sampling equipment, Pb-210 is commonly elevated and in disequilibrium when compared to parent radionuclide activity, regardless of the Mill's presence. 4 By way of illustration, average ground-level concentrations have been reported for selected States (NCRP Report 94, 1992) and are summarized in Table 1 in the Tables Tab of this report, demonstrating that elevated Pb-210 activity is present where no uranium milling operations are located nearby. In April 1977, prior to Mill construction and Mill operations, air particulate Pb- 210 was measured at the Mill site to be 1.3E-14 uCi/ml (13.0E-3 pCi/m3)2. 2.4 Site Specific Sampling Data The results of airborne particulate monitoring for the period (without background subtraction) are provided by sampling station and radionuclide in Tables 2 through 6 in the Tables Tab of this report. Along with these data, the tables present comparative ECLs and the ECL percentage measured at each of the monitoring stations sampled during the period. A review of these data support the conclusion that airborne particulates are well controlled at the Mill. In all cases, the measured activity concentrations were well within the ECL, as well as the Mill's ALARA goal (i.e. 25% of the ECL). Lower Limits of Detection consistent with NRC Regulatory Guide 4.14 were maintained by the Mill's contract analytical laboratory for this reporting period. The data obtained since program inception in 1981 indicates that only one individual quarterly measurement (Th-230 at BHV-5 for the 2nd Quarter of 1996) has ever exceeded the ECL at the Mill. While it is important to consider and evaluate an individual measurement exceeding the ECL, it is the average annual concentration that is of primary significance for public dose estimation purposes. In that instance, the average annual concentration of Th-230 for BHV-5 in 1996 was well below the ECL. Data obtained since program inception in 1981 also indicate that, with very few exceptions, the gross (background inclusive) measurements do not exceed the site's ALARA goal (i.e. only ten of the several thousand total gross radionuclide determinations to date exceeded the Mill's self-imposed 25% ALARA goal). 2.5 Radon-222 With the approval of the NRC, Radon-222 monitoring at BHV stations at the Mill was discontinued in 1995 due to the unavailability of monitoring equipment to detect the revised 10 CFR Part 20 standard. Instead, compliance with these limits and the requirements of R313-15- 301 was demonstrated by a calculation, authorized by the NRC and as contemplated by R313- 15-302(2)(a) which states "A licensee or registrant shall show compliance with the annual dose limit in Section R313-15-301 by: (a) Demonstrating by measurement or calculation that the total effective dose equivalent to the individual likely to receive the highest dose from the licensed or registered operation does not exceed the annual dose limit;". This calculation is performed by use of the MILDOS code for estimating environmental radiation doses for uranium recovery operations. R313-15-302(2)( a) contemplates demonstrating compliance either through modeling or measurement. 2 See the Environmental Report, White Mesa Uranium Project, San Juan County, Utah for Energy Fuels Nuclear, Inc. prepared by Dames & Moore, January 30, 1978, Section 2.9 .1.1 5 In order to determine whether or not detection equipment has improved since 1995, EFRI voluntarily began ambient Radon-222 monitoring at the BHV stations in 2013. The Radon-222 data collected from 2013 through present are presented in Attachment J. The Mill's effluent monitoring programs were expanded in 2014 and the expanded monitoring programs require the collection of Radon-222 data at all of the BHV stations. For the BHV stations EFRI calculated ECLs using methodology shown in Attachment J. The calculated ECLs for all of the BHV stations are included on the data table found in Attachment J. The radon-222 results are below the calculated ECLs and within the range of historic levels as shown in Attachment J. Radon-222 monitoring is completed using detectors with an effective reporting limit of 0.06 pCi/L. Field blank detectors are collected quarterly and the results (with background included) are included in Attachment J. During the reporting period, one field blank was collected during each quarter. Field blanks are opened at the beginning of the monitoring period and immediately sealed in the manufacturer supplied packaging. The field blanks are stored in the environmental office until the end of the monitoring period, when they are packaged with the field samples and shipped to the laboratory for processing. While relatively low concentrations were reported for the field blanks, the field blank data show detections which are greater than the highest detection reported for any of the samples collected at the high volume stations. The field blank data have been consistently higher than the samples. Despite the detections reported for the field blanks, there is no indication that the results reflect contamination during shipping. If the detections on the field blanks indicated contamination resulting from shipment, then all of the detectors would be affected in the same manner and the sample data are below the field blank levels. It appears that the field blanks have been affected by the storage prior to shipping. EFRI is conducting an investigation into the possible causes of the anomalous field blank detections. 3.0 EXTERNAL RADIATION (DIRECT GAMMA) Gamma exposure rate estimates were measured for the reporting period utilizing optically stimulated luminescence dosimeters ("OSLs"). Previously, these dosimeters were located at each of the Mill's high-volume air sampling stations (BHV-1, BHV-2, BHV-4, BHV-5 and BHV-6) and at the designated background monitoring station (BHV-3). In 2014 the effluent monitoring programs at the Mill were expanded to include expansion of the gamma exposure monitoring program through the addition of gamma monitoring at the two new air monitoring stations (BHV-7 and BHV-8). Measurements obtained from location BHV-3 have been designated as background due to BHV- 3's remoteness from the Mill site (i.e., BHV-3 is located approximately 3.5 miles west of the Mill site). The results of the environmental OSL measurements and semi-annual cumulative above-background data are provided in Table 7 in the Tables Tab of this report. In addition, measurement data obtained at these locations are graphically presented in Attachment E to this report. 6 The results for this period indicate that above background measurements for stations BHV -1, BHV-2, BHV-4, BHV-5, BHV-6, BHV-7, and BHV-8 are within regulatory limits and are consistent with historical data. BHV -1 and BHV-8 are at the location of the nearest potential residence. The nearest actual residence is approximately 0.4 miles north of BHV-1 and BHV-8. The annual limit for an individual member of the public is 100 mrem/yr for combined internal and external exposure. 4.0 VEGETATION SAMPLES The NRC Regulatory Guide 4.14 requires that three samples be collected during the grazing season, without specifying exact months or times during the season. Two samples were collected during the January through June reporting period. The third sample will be collected during the July through December reporting period. In 2014 the vegetation sampling program was expanded through the addition of Th-232 and U-Nat. During the January through June reporting period, samples were collected on April 25, 2023, and June 7, 2023. The data from the sampling events are included in Attachment F. Graphical log-scale presentation of the vegetation sampling results, together with the analytical results reported by the Mill's contract laboratory (including QA/QC information) for these sampling periods, are included as Attachment F of this report. The 2023 data results are within the variation of previous sampling episodes and are comparable to historic results. Analytical data were reviewed against the laboratory established acceptance limits specified in the data packages. The analytical data are usable for their intended purpose. Any deviations noted did not affect the quality or usability of the data. The value in the MDC column in the data package is the sample-specific minimum detectable concentration ("MDC"). The MDC is based on the sample moisture, composition and other sample-specific variables. The lower limit of detection which is a limit representing the detection capability of the measurement system is referred to as the Reporting limit ("RL") in the data package. 5.0 STACK SAMPLING Under Section 5.0 of Tab 1.4 of the Mill's EPM gas stack samples are collected at the Mill in accordance with the schedule shown below: 7 Stack Sampling Requirements Grizzly North and/or Yellowcake Vanadium South Packaging Vanadium Frequency Baghouse Yellowcake Baghouse Dryer Stack Packaging Stack Dryer Stacks Stack Stack Quarterly If operating, If operating, If operating, If operating, If operating, U-nat, Th-U-nat, Th-U-nat, Th-U-nat, Th-U-nat, Th- 230, Ra-226, 230, Ra-226, 230, Ra-226, 230, Ra-226, 230, Ra-226, Pb-210, Th-Pb-210, Th-Pb-210, Th-Pb-210, Th-Pb-210, Th- 232, Ra-228, 232, Ra-228, 232, Ra-228, 232, Ra-228, 232, Ra-228, and Th-228. and Th-228. and Th-228. and Th-228. and Th-228. No stack sampling was conducted in the reporting period because none of the stacks were operated during the reporting period. The uranium dryers (south yellowcake dryer and yellowcake baghouse) last operated fourth quarter 2022, as previously reported. The north yellowcake dryer has not been in operation since the third quarter 2012 and therefore, has not been sampled since was last in operation. The vanadium dryer and vanadium baghouse did not operate during the reporting period. The vanadium dryers last operated first quarter 2020. The analytical results of stack sampling conducted in the reporting period, as well as for the previous two quarters, are provided in Table 8 of the Tables Tab in this report. The analytical results reported by the laboratory for the reporting period are provided in Attachment G to this report. It is also important to note that uranium stack effluent concentrations are not comparable to environmental air sampling station ECLs for regulatory compliance purposes. The ECL is a limit that applies to the receptor locations and is not applicable to effluents from mill processes on the Mill site. These stack release data are more appropriately utilized for dose modeling purposes, and dose modeling is not computed for semi-annual reporting purposes. When analytical data are collected they are reviewed against the laboratory established acceptance limits specified in the data packages. 6.0 SURFACE WATER MONITORING Under the License, Part 11.2 B surface water samples are required to be obtained annually from Westwater Canyon and semi-annually from Cottonwood Creek for radionuclide analyses when water is present. During the reporting period, no surface water was present in Westwater Canyon and therefore no surface water samples were collected. Sediment samples from Westwater Canyon are taken in place of the Westwater Canyon surface water sample when surface water is not available for sampling. If surface water samples are not collected from 8 Westwater Canyon a sediment sample will be collected in the third or fourth quarter of 2023. The Mill's EPM requires that samples from Cottonwood Creek be analyzed for TDS and total suspended solids ("TSS") quarterly and the License, Part 11.2 B requires that samples from Cottonwood Creek be analyzed for dissolved and suspended radionuclides including Gross Alpha, U-nat, Ra-226, and Th-230 semi-annually. During the reporting period, surface water was present in the first and second quarters at Cottonwood Creek and samples were collected on January 18, 2023, and April 27, 2023, respectively. Graphical presentation of the water sampling results, together with the analytical results reported by the Mill's contract laboratory (including QA/QC information) for this sampling period, are included as Attachment H of this report. The 2023 data results are within the variation of previous sampling episodes and are comparable to historic results. For graphical illustration purposes, values reported at less than the prescribed detection limit were plotted as 0.0 pCi/g concentrations. This graphing convention is not utilized to formulate station average information, nor is it intended as a precedent for data treatment. Rather, the intent is to provide a viewable depiction of location radionuclide information because the actual concentration below the detection limit cannot be determined. 7.0 SOIL SAMPLING In accordance with the Mill's EPM and License, surface soils will be collected during the third quarter of 2023. The sampling results will be discussed in the July through December Semi- Annual Effluent Report submitted to DWMRC on or before March 1, 2024. 8.0 METEOROLOGICAL MONITORING As in prior reporting periods, an independent contractor has prepared the White Mesa Mill Semi- annual Meteorological Monitoring Report for the reporting period. This information is retained at the Mill site for agency review. 9.0 CELL 2 RADON FLUX The July 23, 2014 letter, DWMRC stated that because "Tailings Cell 2 is no longer in operation (receiving tailings), the Division of Air Quality and the Division of Radiation Control agree that Subpart W NESHAPs requirements (40 CFR Part 61) no longer apply; however, at this phase of Cell 2 closure activities, the requirements of 10 CFR Part 40, Appendix A, Criterion 6 do apply." Further, the DWMRC July 23, 2014 letter states that "since the MILDOS-Area Models that have been run to show compliance with dose limits for releases from the Mill were based on a limit of 20 picocuries per square meter second (pCi/m2-sec ), in order to ensure compliance with previously analyzed conditions, the DWMRC will require the licensee to continue to measure the radon flux in accordance with [the latest revision of] 40 CFR 61, Appendix B, Method 115, "Monitoring for Radon-222 Emissions". The measured radon flux for Cell 2 shall not exceed a value of 20 (pCi/m2-sec) until a new MILDOS-Area Model to analyze a higher radon flux is 9 completed and demonstrates compliance with dose limits based on the releases from the Mill. As required by Method 115, a minimum of 100 measurements are required and shall be performed on a semi-annual basis." Per the requirements detailed above, EFRI sampled Cell 2 radon flux in April 2023 for the January through June 2023 reporting period. The April 2023 measurement was 0.6 pCi/(m2-sec ). The full data report for the April 2023 Cell 2 radon flux sampling is provided in Attachment K. It is important to note that Cell 2 Phase 1 cover placement/construction commenced in April 2016 and was completed in April 2017. The Phase 1 cover activities include the placement and compaction of approximately 4.5 feet of soil materials. 10.0 SIGNATURE AND CERTIFICATION This document was prepared by Energy Fuels Resources (USA) Inc. Energy Fuels Resources (USA) Inc. By: Vice President, Regulatory Affairs 11 Certification: I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Scott A. Bakken Vice President, Regulatory Affairs Energy Fuels Resources (USA) Inc. 12 TABLES Table 1-NCRP Report 94-GJobal Pb-210 Concentration Example State Pb-2J0 Concentration uBq/M3 uCi/ml California 600 1.60E-14 Illinois 1500 4.l0E-14 Ohio 300 8.I0E-15 Massachusetts 700 l.90E-J4 Table 2 -Air Monitoring Station Results U-Nat (Comparison to Limits) 1st and 2nd Quarter 2023 Monitoring 1st 2nd Effluent Average Station Qtr.Result Qtr.Result Concentration Percent ECL (uCi/ml) (uCi/ml) Limit (ECL) (uCI/ml} BHVl 1.00E-17 7.00E-17 9.00E-14 4.44E-02 BHV2 9.00E-18 2.00E-17 9.00E-14 1.61E-02 BHV4 5.00E-17 3.00E-17 9.00E-14 4.44E-02 BHV5 5.00E-17 1.00E-16 9.00E-14 8.33E-02 BHV6 3.00E-17 6.00E-17 9.00E-14 5.00E-02 BHV7 3.00E-17 2.00E-16 9.00E-14 1.28E-01 BHV8 3.00E-17 8.00E-17 9.00E-14 6.1 lE-02 Table 3 -Air Monitoring Station Results Th-230 (Comparison to Limits) 1st and 2nd QuaTter 2023 Monitoring 1st 2nd Effluent Average Station Qtr.Result Qtr.Result Concentration PercentECL (uCi/ml) (uCi/ml) Limit (ECL) (uCI/ml) BHVl 1.00E-17 2.00E-16 2.00E-14 5.25E-01 BHV2 8.00E-18 4.00E-17 2.00E-14 l .20E-01 BHV4 2.00E-16 3.00E-17 2.00E-14 5.75E-01 BHV5 2.00E-16 4.00E-16 2.00E-14 1.50E+00 BHV6 2.00E-17 2.00E-16 2.00E-14 5.50E-01 BHV7 2.00E-17 8.00E-16 2.00E-14 2.05E+00 BHV8 6.00E-17 2.00E-16 2.00E-14 6.50E-01 Table 4 -Air Monitoring Station Results Ra-226 (Comparison to Limits) 1st and 2nd Quarter 2023 Monitoring 1st 2nd Effluent Average Station Qtr.Result Qtr.Result Concentration PercentECL (uCi/ml) (uCi/ml) Limit (ECL) (uCl/ml} BHVl 9.00E-17 1.70E-15 9.00E-13 9.94E-02 BHV2 3.00E-17 3.00E-16 9.00E-13 1.83E-02 BHV4 7.00E-16 2.00E-16 9.00E-13 5.00E-02 BHV5 1.20E-15 4.00E-15 9.00E-13 2.89E-01 BHV6 5.00E-17 1.00E-15 9.00E-13 5.83E-02 BHV7 1.00E-16 6.40E-15 9.00E-13 3.61E-01 BHV8 4.00E-16 2.50E-15 9.00E-13 1.61E-0l Table 5 -Air Monitoring Station Results Pb-210 (Comparison to Limits) 1st and 2nd Quarter 2023 Monitoring 1st 2nd Effluent Average Station Qtr.Result Qtr.Result Concentration Percent ECL (uCi/ml) (uCi/ml) Limit (ECL) (uCI/ml) BHVl 8.00E-15 8.00E-15 6.00E-13 l.33E+00 BHV2 6.00E-15 6.00E-15 6.00E-13 l.00E+00 BHV4 8.00E-15 8.00E-15 6.00E-13 1.33E+00 BHV5 l .00E-14 9.00E-15 6.00E-13 l.58E+00 BHV6 8.00E-15 8.00E-15 6.00E-13 1.33E+00 BHV7 8.00E-15 l.00E-14 6.00E-13 l.50E+00 BHV8 8.00E-15 8.00E-15 6.00E-13 l .33E+00 Table 6 -Air Monitoring Station Results Th-232 (Comparison to Limits) 1st and 2nd Quarter 2023 Monitoring 1st 2nd Effluent Average Station Qtr.Result Qtr.Result Concentration Percent ECL (uCi/ml) (uCi/ml) Limit (ECL) (uCI/ml) BHVl 2.00E-18 8.00E-18 4.00E-15 1.25£-01 BHV2 2.00E-18 8.00E-18 4.00E-15 1.25£-01 BHV4 4.00E-18 4.00E-18 4.00E-15 l .00E-01 BHV5 4.00E-18 7.00E-18 4.00E-15 1.38£-01 BHV6 4.00E-18 l .00E-17 4.00E-15 1.75£-01 BHV7 3.00E-18 l.00E-17 4.00E-15 1.63£-01 BHV8 3.00E-18 7.00E-18 4.00E-15 1.25£-01 Table 7 -Environmental Optically Stimulated Luminescence Dosimeter 1st and 2nd Quarter 2023 1st 2nd 1st Quarter 2nd Quarter Cumulative Quarter Quarter Result Less Result Less Semiannual Monitoring Result Result Background Background Estimate Station (mrem) (mrem) (mrem) (mrem) (mrem) BHVl 36.2 30.1 6.1 0 6.1 BHV2 34.4 30.5 4.3 0.3 4.6 BHV3 30.1 30.2 0 0 0 BHV4 33.0 28.3 2.9 0 2.9 BHV5 41.9 33.5 11.8 3.3 15.1 BHV6 34.7 31.0 4.6 0.8 5.4 BHV7 38.3 30.9 8.2 0.7 8.9 BHV8 32.6 30.9 2.5 0.7 3.2 Table 8 Uranium Stack Effluent Concentrations and Release Rates 3rd Qtr. 2022 No uranium slack sam1)1ing was conducted as 1hc dryers did not run. No uranium pnc'kaaing was completed during the quarter. 4th Qtr. 2022 U-Nat U-Nat. Th-228 Th-228 Th-230 Th-230 Th-232 Th-232 Pb-210 Pb-210 Ra-226 Ra-226 Ra-228 Ra-228 uCi/cc uCi/sec uCi/cc uCi/sec uCi/cc uCi/sec uCi/cc uCi/sec uCi/cc uCi/sec uCi/cc uCi/sec uCi/cc uCi/sec SYCDryer Scrubber I 3.90E-09 2.96E-03 3.37E-15 2.56E-09 l .46E-13 1.l lE-07 1.12E-14 8.54E-09 1.35E-12 1.02E-06 l.80E-13 l.37E-07 5.17E-13 3.93E-07 SYC Dryer Scrubber 2 3.07E-09 2.22E-03 0.00E+00 0.00E+00 i,66E-13 1.20E-07 0.00E+00 0.00E+00 1.30E-12 9.41 E-07 1.18E-13 8.56E-08 1.18E-13 8.56E-08 YC Packaging Baghouse 1.27E-10 2.12E-04 0.00E+00 0.00E+00 1.00E-13 l .67E-07 0.00E+00 0.00E+00 7.30E-13 l.21E-06 2.28E-13 3.79E-07 4.56E-13 7.58E-07 1st Qtr. 2023 No uranium stack sampling was conducted as the dryers did not run. No uranium packaging was completed during the quarter. 2nd Qtr. 2023 No uranium srnck sam1>line was conducted as t11e dryers did not run. No uranium packaging was c-0mpletcd during the quarter. Table 9 Vandium Stack Effluent Concentrations and Release Rates 3rd Qtr. 2022 No vanadium stack sampling was conducted as the dryers did not run. No vanadium packaging was completed during the quarter. 4th Qtr. 2022 No vanadium stack sampling was conducted as the dryers did not run. No vanadium packnging was completed during the quarter. 1st Qtr. 2023 No vanadium stack sampling was conducted as the dryers did not run. No vanadium p~ckaging was completed during the quarter. 2nd Qtr. 2023 No vanadium stack Silmpi'ing was conducted as the dryers did not run. No vanadium packaging was completed during the qLmrier: ATTACHMENT A HIGH VOLUME AIR MONITORING STATIONS ii :~ \ i-,, u . ' ;, ) /' ( . <--:, r '}. .I r •! ' ' •) , . . ~ ,, ♦-~HV-3_ T3]S -~'--T38S Legend ·w l ~~ ..... :.,. ;~ \ . , ',:, ~ , J \ . . I I I ' , -, . ,· l w N (N , 0:: I' ✓ ( I ,' I I r , ( \. ( I 1 " ' / ♦ Air Monitoring Station D Township and Range U II Property Boundary i==} Section D Tailings Cell Pond --Road Drainage I ' ) , ,, ,, BHV-2 ' I ' ·, \ I --- ,.. I._J . r. ,,_ r. -r¥ ... ~-- • HN OJF • I 0 . 0.5 · 1. -. \ ~1 ,, J I , , REVISIONS Project: WHITE MESA MILL Dale: By: County: San Juan Stale: Utah Location: - \ --Canyon Rim Coordinate System: NAO 1----1---1 1983 StatePlane Utah ATTACHMENT A PARTICULATE MONITORING STATIONS South FIPS 4303 Feet Author: rellis Dale: 2/20/2017 Drafted By: rellis r I ATTACHMENT B BHV AIR SAMPLING GRAPHS AND DATA TABLES TAB 1 BHV-1 AIR SAMPLING GRAPHS AND DATA TABLE Date Effluent 9E-14 uCi/ml BHV-lU Effluent ZE-14 uCi/ml BHV-1T230 Effluent 9E-13 uCi/ml BHV-lR Effluent 6E-13 uCi/ml BHV-lPB Effluent 4e-15 uCi/ml BHV-1T232 Concentration Concentration Concentration Concentration Concentration Umlt= Limit= limit= Limit= Limit= AIARAGoal= 2.ZSE-14 uCi/ml ALARA Goal= SE-15 uCi/ml AIARAGoal= 2.ZSE-13 uCi/ml AIARA Goal= 1.SE-13 uCi/ml AIARAGoal= lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC ZE-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable limit= limit= Limit= Limit= limit= Pre 1994 1.ZSE-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable AIARAGOAL= AIARAGOAL= ALARA GOAL= ALARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 9/28/1981 2.35E-15 5.00E-12 1..ZSE-12 7.82E-16 8.00E-14 2.00E-14 1.06E-15 2.00E-12 5.00E-13 2.57E-14 4.00E-12 1.00E-12 Not Analyzed Not Aoolicable Not Aoolic.a.ble 12/14/1981 1.56E-15 5.00E-12 1.25E-12 1.49E-15 8.00E-14 2.00E-14 l.93E-15 2.00E-12 5.00E-13 2.64E-14 4.00E-12 1.00E-12 Not Analyzed Not Apolicable N.ot Applica.ble. 3/29/1982 2.16E-15 5.00E-12 l.25E-12 2.93E-15 8.00E-14 2.00E-14 1.16E•l5 2.00E-12 5.00E-13 2.09E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 6/30/1982 4.69E·l5 5.00E-12 l.25E-12 3.46E-15 8.00E-14 2.00E-14 2.38E-15 2.00E-12 5.00E-13 2.14E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 9/27/1982 4.45E-15 5.00E-12 l .25E-12 3.29E-15 8,00E-14 2.00E-14 3.23E-15 2.00E-12 S.OOE-13 l,99E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 1/3/1983 4.39E-15 5.00E-12 1.25E-12 5.91E-16 8.00E-14 2.00E-14 9.14E-16 2.00E-12 5.00E-13 4.87E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 4/4/1983 7.51E-16 5.00E-12 1.25E-12 2.13E-16 8.00E-14 2.00E-14 3.20E-16 2.00E-12 S.OOE-13 1.88E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 6/30/1983 2.68E-16 , S.00E-12 U5E-12 6.92E-16 8.00E-14 2.00E-14 7.92E-16 2.00E-12 5.00E-13 2.00E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Aoplicable 10/3/1983 5.00E-12 1.25E-12 8,00E-14 2.00E-14 0.OOE+00 2.00E-12 S.OOE-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 1/3/1984 2.87E-15 5.00E-12 1..25E-12 1.14E-16 8.00E-14 2.00E-14 1.79E·16 2.00E-12 5.00E-13 1.06E-14 4.00E-12 l.00E-12 Not Analyzed Not APPiicabie Not APPiicabie 4/2/1984 l.59E-15 5.00E-12 1.25E-12 3.40E-16 8.00E-14 2.00E-14 3.71E-16 2.00E-12 5.00E-13 3.34E-14 4.00E-12 l ,00E-12 Not Anal11zed Not Applicable Not Applicable 7/2/1984 3.l0E-15 5.00E-12 1.25E-12 1.00E-15 8,00E-14 2.00E-14 2.09E-15 2.00E-12 5.00E-13 1.88E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not APPiicabie 10/1/1984 6.42E-16 5.Q0E-12 1.25E-12 1.39E-16 8.00E-14 2.00E-14 1.94E·16 2.00E-12 5.00E-13 1.85E-14 4.00E-12 l.00E-12 Not Analyzed Not APPiicabie Not APPiicabie 1/2/1985 5.06£-16 5.00E-12 1.25E-12 4.56E·16 8,00E-14 2.00E-14 3.49E-16 2.00E-12 5.00E-13 3.03E-14 4.00E-12 1.00E-12 Not Analyzed Not Aoplicable Not Aopllcable 4/1/1985 0.00E+00 5.00E-12 1.25E-12 l.23E-15 8.00E-14 2.00E-14 4.88E-16 2.00E-12 5.00E-13 8.06E-15 4.00E-12 1,00E-12 Not Analyzed Not Applicable Not Applicable 7/1/1985 7.17E-16 5.00E-12 1.25E-12 8.00E-14 2.00E-14 1.05E-15 2.00E-12 5.00E-13 2.15E-14 4.00E-12 l .00E-12 Not Analyzed Not Applicable Not Applicable 9/30/1985 6.13E-16 5.00E-12 1.25E-12 1.18E·16 8.00E-14 2.00E-14 3.71E-16 2.00E-12 5.00E-13 3.64E-15 4.00E-12 1.00E-12 Not Analvzed Not Applicable Not Applicable 1/2/1986 3.42E-15 5.00E-12 l.25E-12 4.74E-16 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 4/1/1986 3.98E-15 5.00E-12 1.25E-12 9.74E-16 8.00E-14 2.00E-14 1.50E-15 2.00E-12 5.00E-13 l.41E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 6/30/1986 5.51E-17 5.00E-12 1.25E-12 3.52E-16 8.00E-14 2.00E-14 l.37E-15 2.00E-12 5.00E-13 1.23E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 10/27/1986 l .99E-15 5.00E-12 1.25E-12 3.06E-16 8.00E-14 2.00E-14 l.ZSE-15 2.00E-12 5.00E-13 1.08E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 12/15/1986 1.67E-15 5.00E-1.2 1.25E-12 l .16E-16 8.00E-14 2.00E-14 5.98E-16 2.00E-12 5.00E-13 l.37E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 3/16/1987 2.33E-15 5.00E-12 1.ZSE-12 4.30E-16 8.00E-14 2.00E-14 l.92E-16 2.00E-12 5.00E-13 5.59E-14 4,00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 5/11/1987 2.36E-15 5.00E-12 1.ZSE-12 7.69E-16 8.00E-14 2.00E-14 8.76E-16 2.00E-12 5.00E-13 1.45E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 9/9/1987 2.27E-15 5.00E-12 1.25E-12 2.44E-15 8.00E-14 2.00E-14 8.SlE-16 2.00E-12 5.00E-13 3.14E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/2/1987 2.75E-15 5.00E-12 1.ZSE-12 2.46E-15 8.00E-14 2.00E-14 1.34E-15 . 2.00E-12 5.00E,13 2.79E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/16/1988 l.07E-15 5.00E-12 1.25E-12 l.47E-16 8.00E-14 2.00E-14 4.44E-16 2.00E-12 5.00E-13 4.0lE-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 5/18/1988 1.98E-15 5.00E-12 1.25E-12 l.25E-15 8.00E-14 2.00E-14 6.40E-16 2.00E-12 5.00E-13 1.07E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 8/15/1988 2.06E-15 5.00E-12 1.25E-12 3.41E-15 8.00E-14 2.00E-14 5.08E-16 2.00E-12 S.00E-13 1.62E-14 4.00E-12 l .00E-12 Not Analyzed Not Applicable Not Applicable 11/14/1988 3.94E-15 5.00E-12 1.25E-12 2.12E·l5 8.00E-14 2.00E-14 l.0lE-15 2.00E-12 5.00E-13 2.47E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/13/1989 l.99E•l5 5.00E-12 1.25E-12 5.73E-16 8.00E-14 2.00E-14 5.99E-16 2.00E-12 5.00E-13 3.23E-14 4.00E-12 l ,00E-12 Not Analyzed Not Applicable Not Applicable 5/15/1989 l.70E-15 5.00E-12 1.25E-l2 6.32E-16 8.00E-14 2.00E-14 5.86E·16 2.00E-12 5.00E-13 6.16E-15 4.00E-12 1.00E-12 Not Analvzed Not Apolicable Not APPiicabie 8/14/1989 .2.3.lE-15 5.00E-12 l.25E-12 2.31E-16 8.00E-14 2.00E-14 l.77E-16 2.00E-12 :S.OOE-13 7.65E-15 4.00E-12 l.00E-12 Not Analyzed Not Aoplicable Not Aoplicable 11/13/1989 4.72E-15 5.00E-12 1.25E-12 l.71E-15 8.00E-14 2.00E-14 1.SZE-15 2.00E-12 5.00E-13 1.89E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 2/12/1990 3.44E-16 5.00E-12 l.25E-12 8.39E-16 8.00E-14 2.00E-14 8.31E-16 2.00E-12 S.00E-13 2.57E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 5/14/1990 3.03E-15 5.00E-12 1.25E-12 l.47E-15 8.00E-14 2.00E-14 1.04E-15 2.00E-12 :S.00E-13 1.79E-14 4.00E-12 1.00E-12 Not Analyzed Not Apolicable Not Apolicable 8/13/1990 l.64E-15 5.00E-12 1.ZSE-12 1.49E-15 8,00E-14 2.00E-14 3.34E-16 2.00E-12 S.00E-13 8.27E-15 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Apolicable 11/12/1990 l.48E-15 5.00E-12 1.25E-12 7.50E-16 8.00E-14 2.00E-14 5.80E-16 2.00E-12 5.00E-13 2.16E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/11/1991 l.90E-16 5.00E-12 1.25E-12 3.48E-17 8.00E-14 2.00E-14 '7.91E-17 2.00E-12 5.00E-13 3.79E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not APPiicabie 5/13/1991 3.42E·16 5.00E-12 1.25E-12 l.34E-15 8.00E-14 2.00E-14 7.39E-16 2.00E-12 5.00E-13 l.46E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 8/12/1991 2.77E-16 5.00E-12 1.25E-12 4.17E-17 8,00E-14 2.00E-14 '1.45E-16 2.00E-12 5.00E-13 1.80E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not A1wlicable 11/11/1991 6.65E-17 5.00E-12 1.25E-12 9.13E-17 8.00E-14 2.00E-14 l.77E-17 2.00E-12 5.00E-13 1.06E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 2/10/1992 l.94E-16 5.00E-12 1.25E-12 4.28E-17 8.00E-14 2.00E-14 ll.08E-17 2.00E-12 5.00E-13 3.51E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 5/11/1992 2.54E-16 5.00E-12 l.ZSE-12 6.49E-16 8.00E-14 2.00E-14 6.86E-17 2.00E-12 S.OOE-13 1.38E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Aoolicable 8/10/1992 1.73E-16 5.00E-12 l.25E-12 l.SSE-16 8.00E-14 2.00E-14 1.20E-16 2.00E-12 S.00E-13 1.53E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/9/1992 1.56E-16 5.00E-12 l.ZSE-12 3.19E-17 8.00E-14 2.00E-14 4.90E-18 2.00E-12 5.00E-13 1.86E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Aoplicable 2/9/1993 2.l0E-16 5.00E-12 l.25E-12 8.00E-14 2.00E-14 3.89E-17 2.00E-1.2 5.00E-13 2.52E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 5/10/1993 l.00E-16 S.OOE-12 l.25E-12 4.llE-17 8.00E-14 2.00E-14 6.43E-17 2.00E-12 6.00E-13 1.26E-14 4.00E-12 1.00E-12 Not AnalYzed Not Apolicable Not APPiicabie 8/10/1993 2.30E-1.6 5.00E-12 1.25E-12 6.00E-17 8,00E-14 2.00E-14 6.43E-17 2.00E-12 5.00E-13 1.60E-14 4.00E-12 l.00E-12 Not Analyzed Not Aoolicable Not Aoolicable 11/8/1993 5.00E-12 1.ZSE-12 8.00E-14 2.00E-14 O.00E+o0 2.00E-12 5.00E-13 1.57E-14 4.00E-12 1.00E-12 Not Analyzed Not.Applicable Not Applicable 2/7/1994 1.82E-16 5.00E-12 1.25E-12 5.00E-18 8.00E-14 2.00E-14 4.30E-17 2.00E-12 5.00E-13 2.59E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable Date Effluent 9E-14 uCi/ml BHV-lU Effluent 2E-14 uCi/ml BHV-1T230 Effluent 9E-13 uCi/ml BHV-lR Effluent 6E-13 uCi/ml BHV-lPB Effluent 4e-15 uCi/ml BHV-1TZ3Z Concentration Concentration Concentration Concentration Concentration limit= limit= limit= limit= limit= AIARAGoal = Z.ZSE-14 uCi/ml AIARA Goal= SE-15 uCi/ml AIARAGoal= Z.ZSE-13 uCi/ml AIARA Goal= 1.SE-13 uCi/ml AIARAGoal= lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC ZE-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable limit= limit= limit= limit= limit= Pre 1994 1.ZSE-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable AIARAGOAL= AIARAGOAL= ALARAGOAL=s AIARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 5/9/1994 3.60E-16 5.00E-12 1.ZSE-12 2.70E-16 8.00E-14 2.00E-14 2.87E-16 2.00E-12 S.OOE-13 l.60E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 8/9/1994 4.04E-16 5.00E-12 USE-12 2.70E-16 8.00E-14 2.00E-14 2.94E-16 2.00E-12 5.00E-13 2.00E-15 4.00E-12 1.00E-12 Not Analyzed Not Applic.able Not Aopl.icable 1.1/7 /1994 9.18E-17 5.00Ecll 1.25E-12 3.60E-16 8.00E-14 2.00E-14 2.91E-16 2.00E-12 S.OOE-13 2.00E-15 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/7/1995 1.77E-16 9.00E-14 2.25E-14 9.70E-17 2,00E-14 5.00E-15 9.70E-17 . 9.00E-13 2.25E-13 8.60E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 5/9/1995 9.40E-17 9.00E-14 2.25E-14 5.36E-16 2.00E-14 5.00E-15 '1.60E-15 9.00E-13 2.25E-13 3.84E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 8/9/1995 2.70E-16 9.00E-14 2.ZSE-1!1 1.60E-16 2,00E-14 5.00E-15 2.76E-16 9.00E-13 2.ZSE-13 3.76E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 11/11/1995 4.SOE-15 9.00E-14 2.25E-14 6.41E-16 2.00E-14 5.00E-15 8.93E-16 '9.00E-13 2.ZSE-13 5.20E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 2/5/1996 5.34E-15 9.00E-14 2.ZSE-14 2.30E-15 2,00E-14 5.00E-15 l.30E-15 9.00E-13 2.25E-13 4.20E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 5/6/1996 5.llE-16 9.00E-14 2.ZSE-14 3.06E-16 2.00E-14 5.00E-15 l.40E-16 9.00E-13 2.ZSE-13 7.03E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 8/5/1996 6.99E-16 9.00E-14 2.ZSE-14 l.55E-15 2,00E-14 5.00E-15 2.03E-16 9.00E-13 2.25E-13 5.94E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 11/6/1996 .3.38E-16 9.QOE-14 2.ZSE-111 5.45E-16 2c00E-14 5.00E-15 'l.OOE,16 9.00E-13 2,ZSE.-13 l.22E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable N_ot ApplicabJe 2/6/1997 1.00E-16 9.00E-14 2.25E-14 1.25E-16 2.00E-14 5.00E-15 l.28E-16 9.00E-13 2.25E-13 S.68E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 5/5/1997 1.09E-16 9.00E-14 2.25E-14 l.OOE-16 2,00E-14 5.00E-15 1.00E-16 9.00E-13 2.ZSE-13 4.39E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 8/11/1997 2.88E-16 9.00E-14 2.ZSE-14 3.83E-16 2,00E-14 5.00E-15 1.82E-ll;i 9.0QE-13 2.25E-13 S.29E-1S 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Annlicable 1/5/1998 3.24E-16 , 9.00E-14 2.ZSE-1.4 3.47E-16 2.00E-14 5.00E-15 1.19E-16 9.00E-13 2.25E-13 4.73E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 4/28/1998 4.75E-16 9.00E-14 2.ZSE-14 6.73E-16 2.00E-14 S.OOE-1S '5.69E-16 9.00E-13 2.25E-13 S.94E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 7/31/1998 8.84E-16 9.00E-14 2.ZSE-14 1.93E-15 2.00E-14 5.00E-15 1.43E-15 9.00E-13 ;2.25E-13 S.22E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 9/28/1998 2.81E-16 9.00E-14 2.ZSE-14 2.89E-16 2.00E-14 5.00E-15 1.SOE-16 9.00E-13 2.25E-13 4.64E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/28/1998 8.0BE-16 9.00E-14 2.ZSE-14 4.93E-16 2.00E-14 5.00E-15 5.0lE-16 9.00E-13 .2.ZSE-13 1.06E-14 6.00E-13 1.50E-13 N_ot Analyzed Not.Applicable N_ot Apolicable 3/29/1999 2.06E-16 9.00E-14 2.ZSE-14 2.06E-16 2.00E-14 5.00E-15 1.42E-16 9.00E-13 2.25E-13 6.69E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/3/1999 5.31E-16 9.00E-14 2.25E-14 2.47E-16 2.00E-14 5.00E-15 .2.23E-16 9.00E-13 2.25E-13 6.44E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/27/1999 8.98E-16 9.00E-14 2.25E-14 3.90E-16 2,00E-14 5.00E-15 2.96E-16 9.00E-13 ,2.25E-13 7.29E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/28/1999 1.48E-15 9.00E-14 2.25E-14 6.00E-16 2.00E-14 5.00E-15 5.57E-16 . 9.00E-13 .2.25E-13 6.19E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/27/2000 1.00E-16 9.00E-14 2.ZSE-14 1.06E-16 2.00E-14 5.00E-15 '1.00E-16 • 9.00E-13 2.25E-13 6.23E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/26/2000 3.47E-16 9.00E-14 2.25E-14 3.46E-16 2,00E-14 S.OOE-15 .3.62E-16 9.00E-13 ,2.25E-13 4,SOE-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/26/2000 2.51E-16 9.00E-14 2.25E-14 1.78E-16 2.00E-14 5.00E-15 3.ZSE-16 9.00E-13 2.25E-13 8.55E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/26/2000 1.00E-16 9.00E-14 2.25E-14 1.42E-16 2.00E-14 5.00E-15 1.31E-16 9.00E-13 2.25E-13 7.77E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/26/2001 3.lOE-16 9.00E-14 2.25E-14 1.00E-15 2.00E-14 5.00E-15 1.00E-15 9.00E-13 .2.25E-13 7.19E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicabl.e Not Applicable 7/29/2001 1.52E-16 9.00E-14 2.25E-14 1.44E-16 2.00E-14 5.00E-15 1.77E-16 9.00E-13 2.25E-13 7.21E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 9/24/2001 1.03E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 8.09E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 12/31/2001 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.39E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 4/1/2002 2.05E-16 9.00E-14 2.25E-14 2.44E-16 2.00E-14 5.00E-15 2.29E-16 . 9.00E-13 2.25E-13 8.lSE-15 6.00E-13 1.50E-13 Not Analyzed Not Aoplicable Not Aoolicable 7/1/2002 3.SSE-16 9.00E-14 2.2.SE-l.4 4,85E-16 2,00E-14 5.00E-15 l.06E,16 9.00E-13 2.ZSE-13 7.65E-15 6.00E-13 1.50E-13 Not AnaJyzed Not Applicable Not Applicable 9/30/2002 1.17E-16 9.00E-14 2.25E-14 1.61E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 3.68E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/30/2002 1.00E-16 9.00E-14 2.25E-14 1.03E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 '2.25E-13 9.46E-15 6.00E-13 1,50E-13 Not Analyzed Not Applicable Not Applicable 3/31/2003 1.ZOE-16 9.00E-14 2.25E-14 1.12E-16 2.00E-14 S.OOE-15 1.00E-16 9.00E-13 2.25E-13 4.68E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/30/2003 2.lSE-16 . 9.00E-14 2.25E-14 3.40E-16 2,00E-14 5.QOE-15 1.67E-16 9,00E-13 2.25E-13 5.96E-15 6.00E-13 1.50E-13 Not Analvzed Not Apolicable Not Aoolicable 9/29/2003 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 '2.25E-13 7.28E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 12/29/2003 1.00E-16 9.00E-14 2.25E-14 2.54E-16 2.00E-14 5.00E-15 3.35E-16 9.00E-13 2.25E-13 6.25E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/29/2004 1.00E-16 . 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.54E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/27/2004 1.00E-16 9.00E-14 2.ZSE-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 3.04E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 9/27/2004 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.05E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/27/2004 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 l.OOE-16 9.00E-13 2.25E-13 1.59E-14 6.00E-13 1,50E-13 Not Analyzed Not Applicable Not Applicable 3/28/2005 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5,00E-15 l,OOE-16 9._00E-13 2,25E-13 7.42E-15 6.00E-13 1,50E-13 Not Analyzed Not Applicable Not Applicable 6/29/2005 1.00E-16 9.00E-14 2.25E-14 l.30E-16 2.00E-14 5.00E-15 1.20E-16 9.00E-13 2.25E-13 7.94E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 9/26/2005 1.00E-16 9.00E-14 2.25E-14 2.56E-16 2.00E-14 5.00E-15 2.42E-16 9.00E-13 2.25E-13 1.22E-14 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 1/3/2006 2.13E-16 9.00E-14 2.25E-14 1.04E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 3.73E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 4/3/2006 1.62E-16 9.00E-14 2.25E-14 1.86E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 8.36E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 7/3/2006 l.86E-16 9.00E-14 2.ZSE-14 1.00E-16 2.00E-14 S.OOE-15 1.00E-16 9.00E-13 2.ZSE-13 9.77E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable. Not Applicable 10/2/2006 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.30E-14 6.00E-13 l ,50E-13 Not Analvzed Not Applicable Not Applicable 1/1/2007 1.00E-16 9.00E-14 2.25E-14 1.47E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 '2.25E-13 l.17E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable Date Effluent 9E-14 uCi/ml BHV-lU Effluent ZE-14 uCi/ml BHV-1TZ30 Effluent 9E-13 uCi/ml BHV-lR Effluent 6E-13 uCi/ml BHV-lPB 'Effluent 4e-15 uCi/ml BHV-1T232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= Limit= AIARAGoal= 2.25E-14 uCi/ml ALARA Goal= SE-15 uCi/ml AIARA Goal= 2.25E-13 uCi/ml ALARA Goal= 1.SE-13 uCi/ml AIARAGoal= lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC ZE-12 uCi/ml Pre 1994 MPC 4E-1Z uCi/ml .Pre 1994 MPC Not Applicable Limit= Limit= Limit= Limit= Limit= Pre 1994 1.25E-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable ALARAGOAL= ALARAGOAL= ALARAGOAL= ALARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 4/2/2007 2.23E-16 9.00E-14 2.25E-14 1.63E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.65E-14 6.00E-13 1.SOE-13 Not Analyzed Not Aoplicable Not Aoplicable 7/2/2007 3.35E-16 9.00E-14 2.ZSE-14 1.34E-16 2.00E-14 5.00E-15 1.36E-16 9.00E-13 2.ZSE-13 1.78E-14 6.00E-13 l.SOE-13 Not Analyzed , Not Applicable Not Applicable 9/30/2007 l.15E-16 9.00E-14 2.ZSE-1-4 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 7.68E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/31/2007 l.OOE-16 9.00E-14 2.25E-14 1.93E-16 2.00E-14 5.00E-15 l.OOE-16 9.00E-13 2.25E-13 l.31E-14 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 3/31/2008 l.14E-16 9.00E-14 2.25E-14 l.13E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 6.44E-15 6.00E-13 1.50E-13 Not Analyzed Not Aoplicable Not Applicable 6/30/2008 7.09E-16 9.00E-14 2.25E-14 3.83E-16 2.00E-14 5.00E-15 2.27E-J.6 9.00E-13 2.ZSE-13 6.52E-15 6,00E-13 l ,50E-13 Not Analyzed Not Applicable Not Apolicable 9/30/2008 7.69E-16 9.00E-14 2.25E-14 2.94E-16 2.00E-14 5.00E-15 l.90E-16 9.00E-13 2.25E-13 7.64E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 12/31/2008 l.21E-15 9.00E-14 2.25E-14 4.76E-16 2.00E-14 5.00E-15 3.34E-16 9.00E-13 2.25E-13 l.16E-14 6.00E-13 l ,50E-13 Not Analyzed Not Aoplicable Not Applicable 3/15/2009 2.14E-15 9.00E-14 2.25E-14 1.02E-15 2.00E-14 5.00E-15 1.00E-15 9.00E-13 2.25E-13 4.44E-15 6.00E-13 1.50E-13 !'fat Analyzed Not Applicable Not Applicable 6/15/2009 5.97E-17 9.00E-14 !2.25E-14 2.35E-16 2.00E-14 5.00E-15 2.lSE-16 9.00E-13 2.25E-13 5.13E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Aoplicable 9/15/2009 9.55E-16 9.00E-14 2.25E-14 l.71E-16 2.00E-14 5.00E-15 9.87E-17 9.00E-l3 2.ZSE-13 9.47E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 12/15/2009 1.24E-15 9.00E-14 2.25E-14 9.25E-17 2.00E-14 5.00E-15 5.60E-17 9.00E-13 2.25E-l3 5.95E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/31/2010 1.97E-15 9.00E-14 2.25E-14 2.15E-16 2.00E-14 5.00E-15 3.27E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 6/30/2010 1.SSE-15 9.00E-14 2.25E-14 4.71E-16 2.00E-14 5.00E-15 7.70E-16 9.00E-13 2.25E-13 4.07E-15 6.00E-13 l.50E-13 Not Analyzed Not AopJicable Not Annlicable 9/30/2010 8.42E-16 9.00E-14 2.25E-14 2.SOE-16 2,00E-14 5.00E-15 1.31Ec16 9.00E-13 2.25£-13 6.SOE-15 6,00E-13 l .50E-13 Not Analyzed Not Applicable Not Applicable 12/31/2010 l.27E-15 9.00E,14 2.ZSE-14 2.32E-16 2.00E-14 5.00E-15 2.30E-16 9.00E-13 2.25E-13 1.27E-14 6.00E-13 1.50E-13 Not Analyzed ' Not Applicable Not Applicable 4/4/2011 9.0lE-16 9.00E-14 2.25E-14 1.90E-16 2.00E-14 5.00E-15 3.64E-16 9.00E-13 2.25E-13 1.09E-14 6.00E-13 l .50E-13 Not Analyzed Not Applicable Not Applicable 7/4/2011 1.59E-15 9.00E-14 2.25E-14 5.31E-16 2.00E-14 5.00E-15 4.99E-16 9.00E-13 2.25E-13 8,38E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 10/3/2011 2.92E-16 9.00E-14 2.ZSE-14 l.17E-16 2.00E-14 5,00E-15 6.76E-.17 9.00E-13 2.ZSE-13 1.14E-14 6.00E-13 l.50E-13 Not Analyzed Not Aoplicable Not Applicable 1/3/2012 6.73E-16 9.00E-14 2.25E-14 l.19E-16 2.00E-14 5.00E-15 8.58E-17 9.00E-13 2.ZSE-13 1.73E-14 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 4/3/2012 7.87E-16 9.00E-14 2.25E-14 2.64E-16 2.00E-14 5.00E-15 3.95E-16 9.00E-13 2.25E-13 U5E-14 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 7/2/2012 1.86E-15 9.00E-14 2.25E-14 8.33E-16 2.00E-14 5.00E-15 9.85E-16 9.00E-13 2.25E-.13 9.55E-15 {i.OOE-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 10/1/2012 1.06E-15 9.00E-14 2.25E-14 2.llE-16 2.00E-14 5.00E-15 2.34E-16 9.00E-13 2.25E-13 l.13E-14 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 12/31/2012 6.86E-16 9.00E-14 2.25E-14 1.27E-16 2.00E-14 5.00E-15 1.38E-16 9.00E-13 2.25E-13 1.54E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/25/2013 9.91E-16 9.00E-14 2.25E-14 1.86E-16 2.00E-14 5,00E-15 2.04E-16 9.00E-13 2.25E-13 1.82E-14 6,00E-13 1.50E-13 Not Analyzed Not APoltcable. Not ApplicabJe 7/2/2013 1.46E-16 9.00E-14 2.25E-14 3.34E-16 2.00E-14 5.00E-15 3.91E-16 9.00E-13 2.25E-13 5.78E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/30/2013 8.89E-16 9.00E-14 2.25E-14 9.13E-17 2.00E-14 5.00E-15 l.05E-16 9.00E-13 2.25E-13 8.00E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 12/30/2013 5.21E-16 9.00E-14 2.25E-14 4.34E-17 2.00E-14 5.00E-15 3.70E-17 9.00E-13 2.25E-13 2.59E-14 6,00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/31/2014 1.07E-15 9.00E-14 2.25E-14 2.07E-16 2.00E-14 5.00E-15 3.69E-16 9.00E-13 2.25E-13 l .24E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/30/2014 2.24E-15 9.00E-14 2.25E-14 5.14E-16 2.00E-14 5.00E-15 1.09E-15 9.00E-13 2.25E-13 l ,23E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/30/2014 1.59E-15 9.00E-14 '2.25E-14 2.00E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.25E-13 l ,39E-14 6,00E-13 1.50E-13 1.00E-16 4.00E-15 1.00E-15 12/29/2014 2.00E-16 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5.00E-15 7.00E-17 9.00E-13 2,25E-13 2.00E-14 6.00E-13 l.50E-13 7.00E-18 4.00E-15 1.00E-15 3/30/2015 1.90E-15 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 6.00E-17 9.00E-13 2.25E-13 2.80E-14 6.00E-13 l.50E-13 4.00E-18 4.00E-15 1.00E-15 6/29/2015 6.00E-16 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 7.00E-16 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.50E-13 1.00E-17 4.00E-15 1.00E-15 9/28/2015 1.60E-15 9.00E-14 2.25E-14 8.00E-17 2.00E-14 5.00E-15 6.00E-16 9.00E-13 2.25E-13 1,00E-14 6.00E-13 1.50E-13 7.00E-18 4.00E-15 1.00E-15 12/28/2015 2.20E-16 9.00E-14 Q.25E-14 5.00E-17 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 1.20E-14 6.00E-13 1.50E-13 1.00E-18 4.00E-15 l.OOE-15 3/28/2016 2.00E-16 9.00E-14 '2.25E-14 3.00E-17 2.00E-14 5.00E-15 3.00E-16 9.00E-13 2,25E-13 1.40E-14 6.00E-13 l.50E-13 2.00E-18 4.00E-15 l.OOE-15 6/27/2016 l ,lOE-15 9 .. 00E-14 2.ZSE-14 7.00E-17 2.00E-14 5.00E-15 9.00E-16 9.00E-13 2.25E-13 9.60E-15 6.00E-13 1.50E-13 3.00E-18 4.00E-15 1.00E-15 9/27/2016 1.lOE-15 9.00E-14 2.25E-14 8.70E-17 2.00E-14 5.00E-15 1.80E-16 9.00E-13 2.25E-13 1.20E-14 6.00E-13 l.50E-13 9.SOE-18 4.00E-15 1.00E-15 12/27/2016 9.80E-16 9.00E-14 '2.25E-14 7.80E-17 2.00E-14 5.00E-15 1.30E-16 9.00E-13 2.25E-13 2.20E-14 6.00E-13 1.50E-13 4.80E-18 4.00E-15 l.OOE-15 3/27/2017 1.40E-15 9.00E-14 2.25E-14 8.00E-17 '2.00E-14 5,00E-15 8.00E-16 9.00E-13 2.25E-13 1.SOE-14 6,00E-13 1.50E-13 2.00E-18 4.00E-15 1.00E-15 6/26/2017 l.lOE-lS 9.00E-14 2.25E-14 9.00E-17 2.00E-14 5.00E-15 3.00E-16 9.00E-13 2.25E-13 l .lOE-14 6.00E-13 1.50E-13 8.00E-18 4.00E-15 l.OOE-15 9/25/2017 6.00E-16 9.00E-14 2.25E-14 6.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.20E-14 6.00E-13 1.50E-13 8.00E-18 4.00E-15 l.OOE-15 12/26/2017 2.40E-15 9.00E-14 ,2.25E-14 5.00E-17 2.00E-14 5,00E-15 7.00E-17 9.00E-13 2.25E-13 l.80E-14 6,00E-13 1.50E-13 1.00E-17 4.00E-15 'l.OOE-15 3/26/2018 1.90E-16 9.00E-14 2.25E-14 5.30E-17 2.00E-14 5.00E-15 9.20E-17 9.00E-13 2.2SE·13 1.SOE-14 6.00E-13 1.50E-13 5.30E-18 4.00E-15 l.OOE-15 6/25/2018 8.00E-16 ,9.00E-14 l.25E-14 1.20E-16 2.00E-14 5.00E-15 2.SOE-16 9.00E-13 2.25E-13 1.20E-14 6.00E-13 1.50E-13 9.30E-18 4.00E-15 1.00E-15 9/24/2018 4.00E-16 9.00E-14 2.25E-14 9.00E-17 2.00E-14 5.00E-15 7.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.50E-13 1.00E-17 4.00E-15 l.OOE-15 12/31/2018 1.SOE-15 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5.00E-15 2.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.SOE-13 ~.OOE-18 4.00E-15 1.00E-15 4/1/2019 8.QOE-lJ 9.00E-14 .2..25.E.-14 5.00E-17 2.00E-14 5.00E-15 1.0QE-16 9.00E-J.3 2.25E-13 l.OOE-14 6.00E-13 1.SOE-13 3.00E-18 4.00E-15 LOOE-15 7/1/2019 7.00E-17 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 8.00E-16 9.00E-13 2.25E-13 7.00E-15 6.00E-13 1.50E-13 '7.00E-18 4.00E-15 l.OOE-15 9/30/2019 1.00E-16 9.00E-14 :2.25E-14 5.00E-16 2.00E-14 5.00E-15 8.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.50E-13 7.00E-18 4.00E-15 1.00E-15 Date Effluent 9E-14 uCi/ml BHV-lU Effluent 2E-14 uCi/ml BHV-1T230 Effluent 9E-13 uCi/ml BHV-lR Effluent 6E-13 uCi/ml BHV-lPB Effluent 4e-15 uCi/ml BHV-1T232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= Limit= ALARAGoal = 2.25E-14 uCi/ml ALARA Goal= SE-15 uCi/ml ALARA Goal= 2.25E-13 uCi/ml ALARA Goal= 1.SE-13 uCi/ml ALARAGoal = lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC BE-14 uCi/ml Pre 1994 MPC 2E-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable Limit= Limit= Limit= Limit= Limit= Pre 1994 1.25E-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable ALARAGOAL= ALARAGOAL= ALARAGOAL= ALARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 1/6/2020 4.00E-17 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 6.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.SOE-13 3.00E-18 4.00E-15 1.00E-15 3/30/2020 3.00E-17 9.00E-14 2.25E-14 1.00E-17 2.00E-14 S.OOE-15 7.00E-17 9.00E-13 2.2SE-13 8.00E-15 6.00E-13 l.SOE-13 3.00E-18 4.00E-15 1.00E-15 6/30/2020 8.00E-16 9.00E-14 2 .. 25E-14 8.00E-17 2.00E-14 S.OOE-15 2.00E-16 9.00E-13 2.25E-.13 4.00E-15 6.00E-13 l.SOE-13 1.00E-18 4.00E-15 1.00E-15 10/12/2020 ·1.ooE-16 9.00E-14 2.25E-14 4,00E-17 2.00E-14 S.OOE-15 6.00E-17 9.00E-13 2.2SE-13 1.00E-14 6.00E-13 l.SOE-13 7.00E-18 4.00E-15 1.00E-15 1/4/2021 2.00E-16 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5.00E-15 4.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 l.SOE-13 S.OOE-18 4.00E-15 1.00E-15 4/5/2021 S.OOE-17 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 8.00E-17 9.00E-13 2.25E-13 2.00E-15 6.00E-13 1.SOE-13 4.00E-18 4.00E-15 1.00E-15 6/28/2021 7.00E-17 9.00E-14 2.25E-14 7.00E-17 2.00E-14 S.OOE-15 2.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 l.SOE-13 1.00E-17 4.00E-15 1.00E-15 10/4/2021 3.00E-17 9.00E-14 2.25E-14 2.00E-17 2.00E-14 S.OOE-15 4.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 l.SOE-13 S.OOE-18 4.00E-15 1.00E-15 1/4/2022 2.00E-17 9.00E-14 2.25E-14 2.00E-17 2.00E-14 S.OOE-15 4.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.SOE-13 3.00E-18 4.00E-15 1.00E-15 4/4/2022 1.00E-16 9.00E-14 2.25E-14 3.00E-17 2.00E-14 S.OOE-15 5.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 l.SOE-13 3.00E-18 4.00E-15 1.00E-15 7/5/2022 2.00E-16 9.00E-14 2.25E-14 3.00E-16 2.00E-14 S.OOE-15 1.lOE-15 9.00E-13 2.25E-13 1.00E-14 6.00E-13 l.SOE-13 1.00E-17 4.00E-15 1.00E-15 10/3/2022 3.00E-17 9.00E-14 2.25E-14 2,00E-17 2.00E-14 S.OOE-15 2.00E-17 9.00E-13 2.2SE-13 8.00E-15 6.00E-13 1.SOE-13 S.OOE-18 4.00E-15 1.00E-15 1/3/2023 2.00E-16 9.00E-14 2.25E-14 3.00E-17 2.00E-14 S.OOE-15 3.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 l.SOE-13 3.00E-18 4.00E-15 1.00E-15 4/3/2023 1.00E-17 9.00E-14 2.25E-14 1.00E-17 2.00E-14 S.OOE-15 9.00E-17 9.00E-13 2.25E-13 8.00E-15 6.00E-13 1.SOE-13 2.00E-18 4.00E-15 1.00E-15 7/3/2023 7.00E-17 9.00E-14 2.25E-14 2,00E-16 2.00E-14 S.OOE-15 1.70E-15 9.00E-13 2.25E-13 8.00E-15 6.00E-13 1.SOE-13 8.00E-18 4.00E-15 1.00E-15 -E :::: (.) ::::, -en C 0 .::; f -C C1) CJ C 0 (.) C1) "C CJ ::::, C 0 "C c,s 0:: T"" > :I: m ---, ----r--+- +:::::; .. 1 ' ~-;;;;:;'" u;-das "'".:::: ~c;-das ' I -,.I m"' .... rt::l::, ==--t m:-das .l:-l ili==1rrf1="t--+I it :::: ~ - 6 ~-das J..;-I · -e~-das ~ _. . rrl: I ...... ~~ ~► ~ L ~ -das ~•H=l=I ·l=t• t::1:'i..--,, ~.. ..,►: ::.__ g ~ -das ill I ~ K"'" •-- --., -- .., __ ► I .. ... I :. 'II .. ... - ~ _. I a+-H-t-i-,: 9 ~ -das -v~-das -£ ~-das -u-das ~ ~-das -o~-das -so-das eo-das Lo-das go-das go-das vo-das £0-das c:o-das ~o-das oo-das ss-das es-das Ls-das gs-das gs-das vs-das -£s-das -c:s-das ~s-das os-das se-das ee-das -Le-das -99-das -99-das .::=t 1 --ve-das _j~ ...... ~ _ ... ... £e-das .. -in ► i _..1 F',i,,._ c;g-das WlJLULLJJ, Wlll_(si~L_JlJ, lWII :t:~W.Ulll._l__Jl, lWJJ_l__J,illl.LLLJ_J_ ~e-das N ..... I llJ 0 0 C"') ..... I llJ 0 0 '<t ..... I llJ 0 0 ..... I!) ..... ' llJ 0 0 ..... co ..... I llJ 0 0 ..... I'-..-I llJ 0 0 CX) ..... I llJ 0 0 N C"') ~ E ::::, ·.:::: 0 .s:::. f- t 0 ..... N I "C Cll Q) _J + co N N E ::::, "C Cll 0::: + rn ..... ::::, -Cll z E ::::, C: ~ ::, + 0 C"') ~ E ::::, ·.:::: 0 .s:::. f- + ...... 0 0 m I ...... '-I ...... 0 0 m I ...... 0) 0 0 m I ...... en (Log ~cale) 0 0 m I ...... ~ 0 0 m I ...... c.,,:, 0 0 m I ...... N ...... 0 0 m I ...... ...... ~~~~l 11 1111111 li ll ~II 1 111111111 11 11 1 111 11'1111 I I IIIIIII ~ Sep-85 Sep-86 Sep-87 Sep-88 Sep-89 Sep-90 Sep-91 Sep-92 Sep-93 - Sep-94 Sep-95 Sep-96 Sep-97 Sep-98 Sep-99 Sep-00 - Sep-01 Sep-02 Sep-03 Sep-04 • Sep-05 Sep-06 • Sep-07 Sep-08 Sep-09 Sep-10 Sep-11 Sep-12 Sep-13 • Sep-14 Sep-15 Sep-16 • Sep-17 Sep-18 Sep-19 Sep-20 Sep-21 U1 ~ rl t:J.11 1 !i ll 'f tJ CC I • ' ' ~ ' ........ . L! ~II I ll~ m m 11-J ~ '· ~ T ~ I ~. T t-11"1::i. __lil I ~ r 11 I I lillL~ kH:fflll Sep-22 i If I :i t:t:1 111 111 11 1 1 1111 111 11 1111 1111 1111 11 111 111111 11 1 "tl "tl )>m iil iil ~ :!! ........ ;;o lii :8 :8 ►a .s:,. .s:,. G) C') l>S:o o r "ti Ill ::J ~n ;g ► c: "" a 3 N -. G) -• UI ~ g -;;-r;n o· -"""::J II gi .s:,. r ~ I C: -• · """0 3 N N -, -· Ul c -.,... m 0 3 n .!a,::,:-CD N 3 m C: -!a. C') .s:,. :::.: C 3 Q 3 DJ :::c ~ -C "'I D) ::::J C: 3 I z D) -C: iii (") 0 ::::J n (D ::::J -iii !:!:. 0 ::::J tn -C: (") :::: 3 - Sep-81 Sep-82 Sep-83 Sep-84 Sep-85 Sep-86 Sep-87 Sep-88 Sep-89 Sep-90 Sep-91 Sep-92 Sep-93 Sep-94 Sep-95 Sep-96 Sep-97 Sep-98 Sep-99 Sep-00 Sep-01 Sep-02 Sep-03 Sep-04 Sep-05 Sep-06 Sep-07 Sep-08 Sep-09 Sep-10 Sep-11 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 ...... 6 0 m I ...... CX) ...... ...... 6 6 0 0 m m I I ...... ...... "--.I O> (Log :5-cale) ...... 0 0 0 0 m m I I ...... ...... (]1 .t,,. ...... ...... 6 0 0 0 m m I I ...... ...... (.,J N "ti )> m cil ~~ .... ::ti (I) :g ► a ""G> n S: 0 0 "ti Ill ::::J n ii g r U1 :::I -· m ,.. 3 I iil ~.Jr,~ II UI 0 00 C ::::J m9.c: I -3 :;: ~ ;:;: f} II -• N 3 r;n .... "" C Q 3 DJ :::c 'f= ~ -I :::r 0 :::::!. C: 3 I N w 0 C") 0 :::s (") C'D :::s -... SI) !:!': 0 :::s tn -C: C") ::.: 3 - Sep-81 Sep-82 Sep-83 Sep-84 Sep-85 Sep-86 Sep-87 Sep-88 Sep-89 Sep-90 Sep-91 Sep-92 Sep-93 Sep-94 Sep-95 Sep-96 Sep-97 Sep-98 Sep-99 Sep-00 Sep-01 Sep-02 Sep-03 Sep-04 Sep-05 Sep-06 Sep-07 Sep-08 Sep-09 Sep-10 Sep-11 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 ...... 0 0 m I ...... 0) ...... ...... 0 0 0 0 m m I I ...... ...... --.J 0) ~Log Scale~ ...... 0 0 0 0 0 0 m m m I I I ...... ...... ...... 0, .i:,. w ...... ...... 0 0 0 0 m m I I ...... ...... N ...... "tl "tl ►m iil cil ~3! _.._..Al e :8 :8 ►~ .i::,. .i::,. G) c=; ►:s:o o '"ti Ill :I ~n jj i;i )> 3c: !'> ~ G) -· ~ iil g -;;-r;n g: ""'~:I u,r;n c C: m .... n 3 I I\,)-■-■ ...a.c:--r+ w n 3 n C -• - C') 3 ~ :::.: -!ii. 3 w C Q 3 CJ ::I: ~ ..loo :::0 DJ C. C: 3 I N N en 0 0 :::s C, C'D :::s -... DJ ~ 0 :::s tn -C: 0 ::.: 3 - -E :::: (.) :::::s -u, C: 0 +:i ca I,. ... C: C1) CJ C: 0 (.) 0 T"" N I "C ca C1) ...J T"" > :::c al ' ..-..-I w 0 ~ ..- ' ' N ('I') ..-..-I I w w 0 0 ~ ~ ..-..- . I -., I 4-L :~' • +.; ~ ~ 1 ..... ~ ::,. 11 ►, ~ • ':O► ~~ • ,_ +::: I~ "",...._ t-+. +:::::;; ....... ~~I ,, F? I ... ◄I • •• /)f ... ~~t I I~ ,~ ~ ... ,-.. I~ ~ ' • r:.: t-+..... i◄ 't_ ........ ·~ ,_ .. ::.t -!1,. -~· "<t ..-I w 0 0 (e1e:)s 607) . I LO ..-I w 0 ~ ..- . co ..- I w 0 ~ ..- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I'-..- I w 0 ~ ..- zz-des ~z-des oz-des 6~-des e~-des L~-des g~-des g~-des v~-des £~-des z~-des ~ ~-des o~-des 50-des ea-des Lo-des go-des go-des vo-des £a-des zo-des ~a-des oo-des 55-des e5-des L6-des 95-des 95-des p,5-des £5-des z5-des ~5-des 05-des 5e-des ee-des Le-des ge-des ge-des ve-des rn-des ze-des ~e-des ...... ...... ...... 6 6 6 0 0 0 m m m I I I ...... ...... ...... 00 -.J 0) Sep-14 Dec-14 Mar-15 Jun-15 Sep-15 Dec-15 Mar-16 Jun-16 Sep-16 Dec-16 Mar-17 Jun-17 Sep-17 Dec-17 Mar-18 Jun-18 Sep-18 Dec-18 Mar-19 Jun-19 Sep-19 Dec-19 Mar-20 Jun-20 Sep-20 Dec-20 Mar-21 Jun-21 Sep-21 Dec-21 Mar-22 Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 ...... 0 0 m I ...... (Jl ...... ...... J.Log _§caleL 6 0 6 6 6 0 0 0 0 0 m m m m m I I I I I -lrr. ....lr,, ....lr,, ....lr,, ....lr,, ~ W N -" 0 ...... 6 0 m I 0 co ...... ...... 0 0 0 0 m m I I 0 0 00 -.J I .I ... ...... ...... 6 6 0 0 0 0 m m m I I I 0 0 0 0) (Jl ~ 111 ul Ii 11 I Il l .. 1 I i :11 ►m ►3! ~~ ... G>o 0 O !2. ::::, II g .... ::::, .... 0 ., m ~ I -• .... 0 UI ::::, C ' o -· :::: 3 3 ;::;: -II .i:-, m I .... UI C 0 :::: 3 OJ :::c ~ -~ ::::r 0 ::::!. C: 3 I N w N (") 0 :::::, (") CD :::::, -; -er :::::, 0 -C (") ::::.: 3 - TAB2 BHV-2 AIR SAMPLING GRAPHS AND DATA TABLE Date Effluent 9E-14 uCl/ml BHV-2U Effluent 2E-14 uCi/ml BHV-2T230 Effluent 9E-15 uCi/ml BHV-2R Effluent 6E-13 uCi/ml BHV-2PB Effluent 4e-15 uCi/ml BHV-2T232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= ~imit= Limit= Limit= ALARAGoal = 2.25E-14 uCi/ml ALARA Goal= SE-15 uCi/ml ALARAGoaJ = 2.25E-13 uCi/ml ALARA Goal= 1.SE-13 uCi/ml ALARAGoal= lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC BE-14 uCi/ml Pre 1994 MPC 2E-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable Limit= Limit= ~imit= Limit= Limit= Pre 1994 ALARA 1.25E-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable GOAL= ALARAGOAL= ALARA GOAL= ALARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 9/28/1981 1.39E-15 5.00E-12 l.25E-12 3.69E-16 8.00E-14 2.00E-14 5.92E-16 2.00E-12 5.00E-13 1.67E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 12/14/1981 4.62E-16 5.00E-12 1.25E-12 8.03E-16 8.00E-14 2.00E-14 3.62E-16 2.00E-12 5.00E-13 1.33E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 3/29/1982 7.07E-16 _5.00E-12 1.25E-12 l.lOE-15 8.00E-14 2.00E-14 7.27E-16 2.00E-12 :S.OOE-13 l.52E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 6/30/1982 8.84E-16 5.00E-12 1.25E-12 7.73E-16 8.00E-14 2.00E-14 4.78E-16 2.00E-12 5.00E-13 l.98E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 9/27/1982 l.23E-15 5.00E-12 1.25E-12 3.60E-16 8.00E-14 2.00E-14 8.73E-16 2.00E-12 5.00E-13 2.35E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 1/3/1983 2.64E-15 ·5.00E-12 1.25E-12 2.55E-16 8.00E-14 2.00E-14 1.98E-16 2,00E-12 5.00E-13 2.85E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 4/4/1983 2.14E-16 5.00E-12 1.25E-12 1.02E-16 8.00E-14 2.00E-14 1.57E-16 2.00E-12 5.00Ecl3 2.48E-14 4.00E-12 l.OOE-12 Not Analyzed N_ot AnnlicabJ.e Not Applicable 6/30/1983 2.85E-16 5.00E-12 1.25E-12 2.06E-16 8.00E-14 2.00E-14 2.24E-16 2.00E-12 5.00E-13 1.79E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable N_ot Applicable 10/3/1983 2.70E-16 5.00E-12 1.25E-12 3,36E-16 8.00E-14 2.00E-14 4.37E-16 2.00E-12 S.OOE-13 l.78E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 1/3/1984 2.78E-15 5.00E-12 1.25E-12 l.20E-16 8.00E-14 ~.OOE-14 6.64E-17 2.00E-12 5.00E-13 ,9.14E-15 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 4/2/1984 4.28E-16 5.00E-12 1.25E-12 1.75E-16 8.00E-14 2.00E-14 4.57E-17 2.00E-12 5.00E-13 3.55E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 7/2/1984 2.78E-15 5.00E-12 1.25E-12 8.12E-16 8.00E-14 2.00E-14 1.98E-16 2.00E-12 5.00E-13 l.68E-14 4,00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 10/1/1984 2.69E-16 5.00E-12 1.25E-12 2.66E-17 8,00E-14 2.00E-14 O.OOE+OO 2.00E-12 5.00E-13 l.77E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applica.ble Not Applica.ble 1/2/1985 2.15E-16 5.00E-12 1.25E-12 7.55E-16 8,00E-14 2.00E-14 2.87E-16 2.00E-12 5.00E-13 .3.19E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 4/1/1985 1.00E-16 5.00E-12 1.25E-12 l.67E-16 8.00E-14 2.00E-14 6.75E-17 2.00E-12 5.00E-13 7.56E-15 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 7/1/1985 3.70E-17 5.00E-12 1.25E-12 9.00E-16 8.00E-14 2.00E-14 4.90E-17 2.00E-12 5.00E-13 l.31E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 9/30/1985 9.32E-17 5.00E-12 1.25E-12 2.18E-16 8.00E-14 2.00E-14 3.71E-16 2.00E-12 5.00E-13 3.64E-15 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 1/2/1986 1.00E-16 5.00E-12 1.25E-12 2.16E-16 8.00E-14 2.00E-14 2.lSE-17 2.00E-12 5.00E-13 3.04E-16 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 4/1/1986 1.31Ecl5 5.00E-12. l.25E-.12 1.SOE-16 8.00E-14 2.00E-14 3.71E-16 '2.00E-12 5.0083 2.90E-15 4.00E-12 1,00E-12 Not Analvzed Not Applicable Not Applicable 6/30/1986 2.23E-16 5.00E-12 1.25E-12 l.32E-16 8.00E-14 2.00E-14 7.09E-17 2.00E-12 5.00E-13 2.53E-14 4.00E-12 1.00E-12 Not Analy:ted Not Applicable Not Applicable 10/27/1986 6.41E-16 5.00E-12 1.25E-12 1.74E-16 8.00E-14 2.00E-14 3.67E-16 2.00E-12 5.00E-13 1.04E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 12/15/1986 3.56E-16 5.00E-12 1.25E-12 1.00E-16 8.00E-14 2.00E-14 l.05E-16 '2.00E-12 5.00E-13 7.81E-15 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 3/16/1987 5.31E-16 5.00E-12 1.25E-12 1.30E-16 8.00E-14 .2.00E-14 7.74E-17 2.00E-12 5.00E-13 3.80E-14 4.00E-12 1.00E-12 Not Analvzed Not Applicable Not Applicable 5/11/1987 4.06E-16 5.00E-12 1.25E-12 6,63E-17 8.00E-14 2.00E-14 1.34E-16 2.0QE-12 5.00E-13 1.lOE-14 4.00E-12 l,OOE-12 Not Analyzed Not Applicable Not Applicable 9/9/1987 2.74E-16 5.00E-12 1.25E-12 2.38E-16 8.00E-14 2.00E-14 1.38E-16 2.00E-12 5.00E-13 1.04E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/2/1987 3.73E-16 5.00E-12 1.25E-12 3.llE-16 8.00E-14 2.00E-14 1.83E-16 2.00E-12 5.00E-13 1.17E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/16/1988 2.78E-15 5.00E-12 1.25E-12 2,31E-17 8.00E-14 2.00E-14 l.20E-16 2.00E-12 5.00E-13 3.55E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 5/18/1988 4.63E-16 5.00E-12 l,25E-12 1.49E-16 8.00E-14 2.00E-14 2.30E-16 2.00E-12 5.00E-13 1.18E-14 4.00E-12 l .OOE-12 Not Analyzed Not Applicable Not Applicable 8/15/1988 8.0GE-16 5.00E-12 1.25E-12 8.69E-16 8.00E-14 2.00E-14 1.SOE-16 2.00E-12 S.OOE-13 1.42E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 11/14/1988 4.34E-16 5.00E-12 1.25E-12 6.76E-16 8.00E-14 2.00E-14 1.57E-16 2.00E-12 5.00E-13 2.25E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/13/1989 5.BOE-16 5.00E-12 1.25E-12 2.85E-16 8.00E-14 2.00E-14 1.55E-16 2,00E-12 5.00E-13 2.80E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 5/15/1989 5,0GE-16 5.00E-12 1.25E-12 2.28E-16 8.00E-14 2.00E-14 1.63E-16 2.00E-12 S.OOE-13 6.05E-15 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 8/14/1989 4.71E-16 5.00E-12 l.25E-12 9,60E-16 8.00E-14 2.00E-14 l.26E-15 2.00E-12 5.00E-13 6.65E-15 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 11/13/1989 1.14E-15 5.00E-12 1.25E-12 4.08E-16 8.00E-14 2.00E-14 4.18E-16 2.00E-12 S.OOE-13 l.59E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 2/12/1990 1.09E-15 5.00E-12 1.25E-12 3.25E-16 8.00E-14 2.00E-14 3.74E-16 2.00E-12 5.00E-13 l.98E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 5/14/1990 9.32E-16 5.00E-12 1.25E-12 5.27E-16 8.00E-14 2.00E-14 3.97E-16 2.00E-12 S.OOE-13 l.69E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 8/13/1990 1.66E-16 5.00E-12 1.25E-12 5.49E-16 8,00E-14 2.00E-14 4.75E-17 2.00E-12 5.00E-13 l.27E-15 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 11/12/1990 6.0SE-16 5.00E-12. 1.25E-12 2.64E-16 8.00E-14 2.00E-14 1.93E=16 2.00E-12 5.00E-13 2.25E-14 4.00E-12 l,OOE-12 Not Analyzed Not Apolicable Not Applicable 2/11/1991 8.72E-17 5.00E-12 1.25E-12 7.00E-18 8.00E-14 2.00E-14 3.33E-17 2.00E-12 S.OOE-13 3.49E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 5/13/1991 1.16E-16 5.00E-12 1.25E-12 3.86E-16 8.00E-14 2.00E-14 2.80E-16 2.00E-12 S.OOE-13 l.50E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 8/12/1991 9.02E-17 5.00E-12 1.25E-12 8.82E-17 8.00E-14 2.00E-14 7.65E-17 2.00E-12 5.00E-13 l.58E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 11/11/1991 4.BlE-17 5.00E-12 1.25E-12 3.82E-17 8.00E-14 2.00E-14 2.54E-17 2.00E-12 5.00E-13 l.45E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 2/10/1992 1.54E-16 5.00E-12 l_.25E-12 6.82E-17 8.00E-14 2.00E-14 1.40E-17 2.0QE-12 5.00E,13 3.41E-14 4.00E-12 1,00E-12 Not Analyzed Not Applicable Not Applicable 5/11/1992 2.38E-16 5.00E-12 1.25E-12 7.63E-17 8.00E-14 2.00E-14 3.07E-17 2.00E-12 5.00E-13 1.27E-14 4.00E-12 l.OOE-12 Not A/lalyzed l\lot Applicable Not Applicable 8/10/1992 1.0lE-16 5.00E-12 1.25E-12 7.07E-17 8.00E-14 2.00E-14 2.SOE-17 2.00E-12 S.OOE-13 1.41E-14 4,00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/9/1992 5.20E-17 5.00Ec12 1.25E-12 3,6SE-17 8,00E-14 2.00E-14 1.78E-17 2.00E-12 5.00E-13 l.71E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/9/1993 2.39E-16 5.00E-12 1.25E-12 2.97E-17 8.00E-14 2.00E-14 6.31E-17 2.00E-12 5.00E-13 3A1E-14 4.00E-12 l.OOE-12 Not Analyzed l\lot Aoolicable Not Apolicable 5/10/1993 1.00E-16 5.00E-12 1.25E-12 7.llE-17 8.00E-14 2.00E-14 3.19E-17 2.00E-12 5.00E-13 1.34E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 8/10/1993 1.90E-16 5.00E-12 1.2SE-12 l.OOE-16 8.00E-14 2.00E-14 1.00E-16 2.00E-12 5.00E-13 1.80E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/8/1993 1.00E-16 S.OOE-12 1.25E-12 1.00E-16 8.00E-14 2.00E-14 1.00E-16 2.00E.-12 5.00E-_13 1.49E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 2/7/1994 2.23E-16 5.00E-12 1.25E-12 1.00E-16 8.00E-14 2.00E-14 1.84E-16 2.00E-12 5.00E-13 2.19E-14 4,00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 5/9/1994 2.16E-16 5.00E-12 1.25E-12 7.20E-17 8.00E-14 2.00E-14 9.89E-17 2.00E-12 5.00E-13 1,37E-14 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable Date Effluent 9E-14 uCi/ml BHV-2U Effluent 2E-14 uCi/ml BHV-2T230 Effluent 9E-15 uCi/ml BHV-2R Effluent 6E-13 uCi/ml BHV-2PB Effluent 4e-15 uCi/ml BHV-2T232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= Limit= AIARAGoal= 2.25E-14 uCi/ml AIARA Goal= SE-15 uCi/ml AIARAGoal= 2.ZSE-13 uCi/ml AIARA Goal= 1.SE-13 uCi/ml AIARAGoal= lE-15 uCi/ml Pre 1994 MPC SE-UuCi/ml Pre 1994 MPC BE-14 uCi/ml Pre 1994 MPC 2E-UuCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable limit= Limit= limit= Limit= Limit= Pre 1994 AIARA 1.25E-U uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable GOAL= AIARAGOAL= ALARA GOAL= ALARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA cone EFC EFCA Cone EFC EFCA 8/9/1994 9.29E-17 5.00E-12 1.25E-12 2.96E-16 8.00E-14 2.00E-14 3.04E-16 2.00E-12 5.00E-13 l.00E-16 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/7/1994 9.21E-17 5.00E-12 1.25E-12 2,35E-16 8.00E-14 2.00E-14 1.00E-16 2.00E-12 5.00E-13 1.00E-16 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/7/1995 1.18E-16 9.00E-14 2.25E-14 9.70E-17 2.00E-14 5.00E-15 9.70E-17 9.00E-13 2.25E-13 7.42E-15 6.00E-13 1.50E-13 Not Analvzed Not Aoplicabl.e Not Aoolicable 5/9/1995 9.40E-17 9.00E-14 2.25E-14 1.20E-16 2.00E-14 5.00E-15 3.S0E-16 9.00E-13 2.25E-13 3.90E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 8/9/1995 8.90E-17 9.00E-14 2.25E-14 9.67E-17 2.00E-14 5.00E-15 1.35E-16 9.00E-13 2.25E-13 2.38E-16 6.00E-13 1,50E-13 Not Analyzed Not Applicable Not Applicable 11/11/1995 2.83E-15 9.00E-14 2.25E-14 4.09E-16 2.00E-14 5.00E-15 5.23E-16 9.00E-13 2.25E-13 6.77E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 2/5/1996 1.75E-15 9.00E-14 2..25E-14 8.66E-16 2.00E-14 5.00E-15 4.86E-16 9.00E-13 2.25E-13 3.SOE-15 6.00E-13 l.S0E-13 Not Analyzed Not Applicable Not Aoplicable 5/6/1996 1.40E-16 9.00E-14 2.25E-14 1.lSE-16 2,00E-14 5.00E-15 l.OOE-16 9.00E-13 2.25E-13 6.85E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 8/5/1996 1.43E-16 9.00E-14 .2.25E-14 2.78E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 5.83E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 11/6/1996 1.45E-16 9.00E-14 2.25E-14 l.57E-16 2.00E-14 5.00E-15 l.00E-16 9.00E-13 2.25E,13 1.19E-14 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 2/6/1997 1.00E-16 9.00E-14 2.25E-14 l.00E-16 2,00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 5.84E-16 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 5/5/1997 l.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 3.89E-15 6.00E-13 l.50E-13 Not Analyzed Not Aoolicable Not Aoolicabie 8/11/1997 1.00E-16 9.00E-14 2.25E-14 l.09E-16 2,00E-14 S.00E-15 l.00E-16 9.00E-13 2.25E-13 5.69E-15 6.00E-13 l.S0E-13 Not Analyzed Not Applicable Not Applicable 1/5/1998 2.55E-16 9.00E-14 2.25E-14 1.07E-16 2.00E-14 5.00E-15 S.00E-17 9.00E-13 2.25E-13 S.llE-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Aoplicable 4/28/1998 1.20E-16 9.00E-14 2.25E-14 l.71E-16 2.00E-14 5.00E-15 1.28E-16 9.00E-13 2.25E-13 6.40E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/31/1998 1.47E-16 9.00E-14 2.25E-14 4.24E-16 2.00E-14 5.00E-15 3.39E-16 9.00E-13 2.25E-13 4.S0E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Aoplicable 9/28/1998 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 4.26E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/28/1998 .2.54E·16 9.00E-14 2.25E-14 2.15E-16 2.00E-14 5.00E-15 1.38E-16 9.00E-13 2.25E-13 6.SSE-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/29/1999 1.07E-16 9.00E-14 2.2.SE-14 1.00E-16 2.00E-14 5.00E-15 l.00E-16 9.00E-13 2.25E-13 7.61E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 7/3/1999 .2.46E-16 9.00E-14 2.2.SE-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 6.95E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 9/27/1999 2.81E-16 9.00E-14 2.25E-14 1.41E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 7.35E-15 6.00E-13 l.50E-13 Not Analvzed Not Applicable Not Aoplicable 12/28/1999 5.20E-16 9.00E-14 2.25E-14 2.G0E-16 2.00E-14 5.00E-15 2.0lE-16 9.00E-13 2.25E-13 7.00E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/27/2000 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E,13 2.25E-13 7.12E·15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/26/2000 1.l0E-16 9.00E-14 2.25E-14 l.00E-16 2.00E-14 5.00E-15 1.16E-16 9.00E-13 2.25E-13 5.07E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 9/26/2000 1.00E-16 9.0QE-14 USE-14 l.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 5.31E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 12/26/2000 1.26E-16 9.00E-14 .2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 9.45E-15 6.00E-13 1.50E-13 Not Analyzed Not Aoolicable Not Aoolicable 3/26/2001 l.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.ZSE-13 6.95E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/2/2001 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 6.SGE-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/24/2001 1.00E-16 9.00E-14 2.25E-14 l.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 6.lGE-15 6.00E-13 1.S0E-13 Not Analyzed Not Aoplicable Not Aoolicable 12/31/2001 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-J.3 2.2.SE-13 2.20E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 4/1/2002 1.00E-16 9.00E-14 2.25E-14 l.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 9.95E-15 6.00E-13 1.S0E-13 Not Analvzed Not Applicable Not Applicable 7/1/2002 1.25E-16 9.00E-14 2.25E-14 1.43E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 8.25E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/30/2002 l.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-J3 2.25E-13 3.69E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 12/30/2002 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 6.91E-15 6.00E-13 l.50E-13 Not Analvzed Not Applicable Not Aoplicable 3/31/2003 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 6.16E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Aoolicable 6/30/2003 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 5.27E-15 6.00E-13 1.S0E-13 Not Analyzed Not Appli_cable NotApplicable 9/29/2003 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 7.23E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/29/2003 l.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 7.80E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/29/2004 1.00E-16 9.00E-14 2.2.SE-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 2.04E-14 6.00E-13 1,50E-13 Not Analyzed Not Applicable Not Applicable 6/27/2004 1.00E-16 9.00E-14 2.25E-14 l.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 3.09E-15 6.00E-13 1.S0E-13 Not Analvzed Not Aoolicable Not Aoplicable 9/27/2004 1.00E-16 9.00E-14 2.25E-14 l.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.73E-14 6.00E-13 1.S0E-13 Not Analyzed_ NotApplicable Not Applicable 12/27/2004 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.30E-14 6,00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/28/2005 1.00E-16 9.00E-14 2.25E-14 1,00E-16 2.00E-14 5.00E-15 1.00E-J.6 9.00E-13 2.25E-13 8.SSE-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 6/29/2005 1.00E-16 9.00E-14 .2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 8.SSE-15 6.00E-13 1.S0E-13 Not Analitzed Not APolicable Not Applicable 9/26/2005 l.OOE-16 9.00E-14 2.25E-14 1.99E-16 2.00E-14 5.00E-15 1.44E-16 9.00E-13 2.25E-13 3.81E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable r,lotAppllcable 1/3/2006 l.29E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 4.0SE-16 9.00E-13 2.2.SE-13 6.58E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 4/3/2006 1.02E-16 9.00E-14 USE-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.0SE-14 6.00E-13 1.S0E-13 Not Analyzed Not APplica hie Not Applicable 7/3/2006 l.OOE-16 9.00E-14 2.25E-14 l.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25f·13 1.l0E-14 6.00E-13 1.50E-13 Not Analyzed Not Aoplicable Not Aoplicable 10/2/2006 l.30E-16 9.00E-14 .2.25E-14 l.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.68E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 1/1/2007 1.24E-16 9.0QE-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.38E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 4/2/2007 l.40E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.63E-14 6.00E-13 1.S0E-13 Not Analvzed Not Apolicable Not Aoplicable 7/2/2007 1.04E-16 9.00E-14 2.25E-14 l.00E-16 2,00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.36E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable Date Effluent 9E-14 uCi/ml BHV-2U Effluent 2E-14 uCi/ml BHV-2T230 Effluent 9E-15 uCi/ml BHV-2R Effluent 6E-13 uCi/ml BHV-2PB Effluent 4e-15 uCi/ml BHV-2T232 Concentration Concentration Concentration Concentration Concentration limit= Limit= limit= Limit= limit= AIARAGoal= 2.25E-14 uCi/ml AIARA Goal= SE-15 uCi/ml AIARAGoal= 2.25E-13 uCi/ml AIARA Goal= 1.SE-13 uCi/ml AIARAGoal= lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC 2E-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable Umlt= Limit= Limit= Limit= Limit= Pre 1994 AIARA 1.25E-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable GOAL= AIARAGOAL= ALARAGOAL= AIARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 9/30/2007 1.00E-16 9.00_Ecl.4 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 8.24E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/31/2007 1.91E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00_E-13 2.25E-13 1,18E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/30/2008 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 6.49E-15 6.00E-13 1.50E-13 Not Analyzed Not Aoolicable Not Applicable 6/30/2008 1.29E-16 9.00E-14 2.ZSE-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 4.82E-15 6.00E-13 1.50E-13 Not Analyzed_ Not Applicable Not Applicable 9/30/2008 2.73E-16 9.00Ec14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 8,30E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 12/31/2008 5.71E-16 9.00E-14 2.25E-14 1.61E-16 2.00E-14 5.00E-15 1.25E-16 9.00E-13 2.25E-13 2.04E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Aoplicable 3/15/2009 3.96E-16 9.00E-14 _2.25E-14 l .38E-16 2.00E-14 5.00E-15 1.07Ecl.6 9.00E-13 2.25E-13 4.81E-15 6.00E-13 l.S0E-13 Not Analyzed Not Aoolicable Not Aoolicable 6/15/2009 1.24E-17 9.00E-14 2.25E-14 4,64E-17 2.00E-14 5.00E-15 S.llE-17 9.00E-13 2.25E-13 4.58E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/15/2009 2.43E-16 9.00E-14 _2.25E-14 5.28E-17 2,00E-14 5.00E-15 4.84E-17 9.00E-13 2.25E-13 1.19E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/15/2009 S.72E-16 9.00E-14 2.25E-14 2.94E-17 2.00E-14 5.00E-15 2.57E-17 9.00E-13 2.25E-13 6.70E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 3/31/2010 5.47E-16 9.00E-14 2.25E-14 l.42E-17 2.00E-14 5.00E-15 4.66E-17 9.00E-13 2.25E-13 8.24E-15 6.00E-13 1,50E-13 Not Analyzed Not Applicable Not Aoplicable 6/30/2010 3.58E-16 9.00E-14 2.25E-14 6.64E-17 2,00E-14 5.00E-15 9.90E-17 9.00E-13 2.25E-13 2.0lE-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 9/30/2010 2.91E-16 9.00E-14 2.25E-14 4.48E-17 2.00E-14 5.00E-15 5.72E-17 9.00E-13 2.ZSE-13 l.0BE-15 6.00E-13 l.50E-13 Not Analyzed Not Aoolicable Not Applicable 12/31/2010 S.73E-16 9.00E-14 2.25E-14 7.24E-17 2.00E-14 5.00E-15 6.76E-17 9.00E-13 2.25E-13 1.35E-14 6.00E-13 1.50E-13 Not Analyzed Not Aoolicable Not Applicable 4/4/2011 3.79E-16 9.00E-14 2.ZSE-14 4.0lE-17 2.00E-14 5.00E-15 9.llE-17 9.00E-13 2.25E-13 1.06E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/4/2011 3.07E-16 9.00E-14 2.25E-14 8.54E-17 2.00E-14 5.00E-15 9.21E-17 9.00E-13 2.ZSE-13 7.21E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 10/3/2011 1.17E-16 9.00E-14 2.ZSE-14 3.04E-17 2.00E-14 5.00E-15 2.SlE-17 9.00E-13 2.25E-13 1.03E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 1/3/2012 3.65E-16 9.00E-14 2.ZSE-14 2.72E-17 2.00E-14 5.00E-15 4.54E-17 9.00E-13 2.25E-13 1.58E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 4/3/2012 4.22E-16 9.00E-14 2.25E-14 1.lSE-16 2.00E-14 5.00E-15 2.77E-16 9.00E-13 2.25E-13 l.58E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/2/2012 3.39E-16 9.00E-14 2.25E-14 l.56E-16 2.00E-14 5.00E-15 1.74Ecl.6 9.00E-13 2.25E-13 8.60E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 10/1/2012 3.13E-16 9.00E-14 2.25E-14 4.13E-17 2.00E-14 5.00E-15 3.04E-17 9.00E-13 2.25E-13 l.03E-14 6.00E-13 1.50E-13 Not Analvzed Not Applicable Not Aopllcable 12/31/2012 2.76E-16 9.00E-14 2..25E.-14 5.41E-17 2.00E-14 5.00E-15 7.0SE-17 9.00E-13 2.25E-13 1.48E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/25/2013 3.38_E-16 9.00E-14 .2.25E-14 3.94E-17 2.00E-14 5.00E-15 8.32E-17 9.00E-13 2.25E-13 1.42E-14 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 7/2/2013 4.06E-16 9.00E-14 2.25E-14 4.89E-17 2.00E-14 5.00E-15 8.06E-17 !!.00E-13-.2.ZSE-13 4.93E-15 6.00E-13 1.50E-13 Not Analyzed Not APPiicabie Not Applicable 9/30/2013 l.76E-16 9.00E-14 2.25E-14 2.52E-17 2.00E-14 5.00E-15 6.13E-17 9.00E-13 2.25E-13 4.90E-15 6.00E-13 1.50E-13 Not Analvzed Not Applicable Not Aoolicable 12/30/2013 6.20E-16 9.00E-14 .2.25E-14 4.19E-17 2,00E-14 5.00E-15 3.72E-17 9.00E-13 2.25E-13 2.50E-14 6.00E-13 1,50E-13 Not Analyzed Not Applicable Not Applicable 3/31/2014 4.63E-16 9.00E-14 2.25E-14 4.97E-17 2.00E-14 5.00E-15 l.lSE-16 9.00E-13 2.25E-13 1.49E-14 6,00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/30/2014 3.04E-16 9.00E-14 :Z.25E-14 7.92E-17 2.00E-14 5.00E-15 l.82E-16 9.00E-13 2.25E-13 1.21E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/30/2014 4.89E-16 9.00E-14 2.25E-14 6.0lE-17 2.00E-14 5.00E-15 4.47E-17 9.00E-13 2.25E-13 l.l0E-14 6.00E-13 1.50E-13 9.35E-18 4.00E-15 l.00E-15 12/29/2014 1.00E-16 9.00E-14 2.25E-14 4.00E-17 2.00E-14 5.00E-15 3.00E-17 9.00E-13 2.25E-13 2.20E-14 6.00E-13 1.50E-13 4.00E-18 4.00E-15 1.00E-15 3/30/2015 5.00E-16 !l.O0E-14 2.25E-14 2.00E-17 2.00E-14 5.00E-15 3.00E-17 9.00E-13 2.25E-13 2.30E-14 6,00E-13 1.50E-13 4.00E-18 4.00E-15 l.OOE-15 6/29/2015 1.00E-16 9.00E-14 2.25E-14 4.00E-17 2.00E-14 5.00E-15 l.00E-16 9.00E-13 2.25E·13 1.40E-14 6.00E-13 1.50E-13 8.00E-18 4.00E-15 l.00E-15 9/28/2015 5.00E-16 9.00E-14 2.25E-14 9.00E-17 2.00E-14 5.00E-15 l.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 l.50E-13 6.00E-18 4.00E-15 1.00E-15 12/28/2015 1.00E-16 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5.00E-15 3.00E-16 9.00E-13 2.25E-13 2.20E-14 6.00E-13 l.50E-13 3.00E-18 4.00E-15 l .00E-15 3/28/2016 7.00E-16 9.00E-14 2.25E-14 6.00E-18 2.00E-14 5.00E-15 8.00E-17 9.00E-13 2.25E-13 1.50E-14 6.00E-13 1.50E-13 4.00E-18 4.00E-15 1.00E-15 6/27/2016 2.00E-16 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 3.00E-16 9.00E-13 2.25E-13 1.30E-14 6.00E-13 1.S0E-13 4.00E-18 4.00E-15 1.00E-15 9/27/2016 4.20E-16 9.00E-14 2.25E-14 6.90E-17 2.00E-14 5.00E-15 8.l0E-17 9.00E-13 2.25E-13 l.00E-14 6.00E-13 1.50E-13 5.Z0E-17 4.00E-15 1.00E-15 12/27/2016 4.l0E-16 9.00E-14 2.25E-14 l.90E-17 2.00E-14 5.00E-15 5.00E-17 9.00Ec-13 2.25E-13 2.l0E-14 6.00E-13 1.50E-13 2.20E-18 4.00E-15 1.00E-15 3/27/2017 1.l0E-15 9.00E-14 2.25E-14 4.00E-17 2,00E-14 5.00E-15 4.00E-16 9.00E-13 2.25E-13 1.50E-14 6.00E-13 1.50E-13 5.00E-18 4.00E-15 1.00E-15 6/26/2017 2.00E-17 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 l.00E-14 6.00E-13 1.50E-13 9.00E-18 4.00E-15 l.00E-15 9/25/2017 2.00E-16 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5.00E-15 5.00E-17 9.00E-13 2.25E-13 l.30E-14 6.00E-13 1,50E-13 4.00E-18 4.00E-15 1.00E-15 12/26/2017 6.00E-16 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 5.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.50E-13 9.00E-18 4.00E-15 1.00E-15 3/26/2018 6.70E-17 9.00E-14 2.25E-14 l.40E-17 2.00E-14 5.00E-15 4.00E-17 9.00E-13 2._25E-13 1.20E-14 6.00E-13 1.50E-13 5.30E-18 4.00E-15 l.00E-15 6/25/2018 3.80E-16 9.00E-14 2.25E-14 4.60E-17 2.00E-14 5.00E-15 1.20E-16 9.00E-13 2.25E-13 l.30E-14 6.00E-13 l.50E-13 1.S0E-17 4.00E-15 1.00E-15 9/24/2018 1.00E-16 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5.00E-15 3.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.50E-13 7.00E-18 4.00E-15 l.00E-15 12/31/2018 5.00E-16 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5.00E-15 1.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.50E-13 4.00E-18 4.00E-15 1.00E-15 4/1/2019 4.00E-17 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 8.00E-17 9.00E-13 2.25E-13 1.00E-14 6,00E-13 1.S0E-13 2.00E-18 4.00E-15 1.00E-15 7/1/2019 3.00E-17 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 8.00E-15 6.00E-13 1.S0E-13 9.00E-18 4.00E-15 l.00E-15 9/30/2019 2.00E-16 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 3.00E-16 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.50E-13 9.00E-18 4.00E-15 1.00E-15 1/6/2020 2.00E-17 9.00E-14 2.ZSE-14 1.00E-17 2.00E-14 5.00E-15 4.00E-17 9.00E-13 2.25E-13 8.00E-15 6.00E-13 l.50E-13 5.00E-18 4.00E-15 1.00E-15 3/30/2020 2.00E-17 , 9.00E-14 2.25E-14 1.00E-17 2.00E-14 5.00E-15 3.00E-17 9.00E-13 2.25E-13 8.00E-15 6.00E-13 l.50E-13 7.00E-18 4.00E-15 1.00E-15 6/30/2020 3.00E-16 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5.00E-15 8.00E-17 9.00E-13 2.25E-13 6.00E-15 6.00E-13 1,50E-13 7.00E-18 4.00E-15 1.00E-15 Date Effluent 9E-14 uCi/ml BHV-ZU Effluent ZE-14 uCi/ml BHV-2T230 Effluent 9E-15 uCi/ml BHV-2R Effluent 6E-13 uCi/ml BHV-2PB Effluent 41!-15 uCi/ml BHV-ZTZ32 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= Limit= AlARAGoal = 2.2SE-14 uCilml AIARA Goal= SE-15 uCi/ml AIARAGoal= 2.2SE-13 uCi/ml AIARA Goal= 1.SE-13 uCi/ml AlARAGoal = lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC BE-14 uCi/ml Pre 1994 MPC ZE-12 uCl/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable ~lmlt= limit= Limit= limit= Limit= Pre 1994 AlARA 1.ZSE-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable GOAL= AlARAGOAL= AIARAGOAL= AlARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 10/12/2020 4.00E-17 9.00E-14 .2.25E-14 2.00E-17 2.00E-14 5.00E-15 3.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 l.00£-17 4.00E-15 1.00E-15 1/4/2021 1.00E-16 9.00E-14 .2.25E-14 l.00E-17 2.00E-14 5.00E-15 3.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 9.00E-18 4.00E-15 1.00E-15 4/5/2021 2.00E-17 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5.00E-15 7.00E-17 9.00E-13 2.25E-13 2.00E-15 6.00E-13 1.S0E-13 4.00E-18 4.00E-15 l.00E-15 6/28/2021 3.00E-17 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 l.00E-17 4.00E-15 l.OOE=l5 10/4/2021 2.00E-17 9.00E-14 Z.25E-14 Z.00E-17 Z.00E-14 5.00E-15 2.00E-17 9.00E-13 .2.25E-13 1.00E-14 6.00E-13 1.S0E-13 4.00E-18 4.00E-15 1.00E-15 1/4/2022 1.00E-17 9.00E-14 2.25E-14 4.00E-17 2.00E-14 5.00E-15 5.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 5.00E-18 4.00E-15 1.00E-15 4/4/2022 l.OOE-16 9.0QE-14 ,l...25E-14 Z.00E-17 Z.00E-14 5.00E-15 3.00E-17 9.00E-13 2.25E-13 l.00E-14 6.00E-13 1.S0E-13 6.00E-18 4.00E-15 1.00E-15 7/5/2022 9.00E-17 9.00E-14 2.25E-14 Z.00E-17 Z.O0E-14 5.00E-15 8.00E-17 9.00E-13 2.25E-13 l.OOE-14 6.00E-13 1.S0E-13 4.00E-18 4.00E-15 l.OOE-15 10/3/2022 'J..00E-17 . 9.00E-14 2.25E-14 4.00E-18 Z.00E-14 5.00E-15 7.00E-18 9.00E-13 2.25E-13 7.00E-15 6.00E-13 1.S0E-13 2.00E-18 4.00E-15 1.00E,-15 1/3/2023 5.00E-17 9.00E-14 2.25E-14 3.00E-17 Z.00E-14 5.00E-15 2.00E-17 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.S0E-13 2.00E-18 4.00E-15 1.00E-15 4/3/2023 9.00E-18 9.00E-14 2.25E-14 8.00E-18 2.00E-14 5.00E-15 3.00E-17 9.00E-13 2.25E-13 6.00E-15 6,00E-13 1.S0E-13 2.00E-18 4.00E-15 1.00E-15 7/3/2023 2.00E-17 9.00E-14 2.25E-14 4.00E-17 Z.00E-14 5.00E-15 3.00E-16 9.00E-13 2.25E-13 6.00E-15 6.00E-13 1.S0E-13 8.0DE-18 4.00E-15 1.00E-15 + C ii> ::::, 2· 3 z Ill c ii + -i ::::,- 0 .... 2· 3 iZ.> w 0 t :::a Ill a. c· 3 I N N 0) + r m Ill a. iZ.> _. 0 + -i ::::,-0 .... c· 3 iZ.> w N 0 0 m I _. co _. 0 0 m I _. "'1 _. 0 0 m I _. 0) (Log Scale) _. 0 0 m I _. (.]1 0 0 m I _. ~ _. 0 0 m I _. w 0 0 m I _. N ~~rn1 1111111111.I WlkilEH lll m 111111111111111 Sep-85 -, 1 1 1 1 1 1 1 11 1A 1 "1 r :... Sep-86 Sep-87 - Sep-88 Sep-89 Sep-90 Sep-91 Sep-92 Sep-93 Sep-94 Sep-95 Sep-96 Sep-97 Sep-98 Sep-99 Sep-00 Sep-01 Sep-02 Sep-03 Sep-04 Sep-05 Sep-06 Sep-07 Sep-08 Sep-09 Sep-10 Sep-11 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 • ~ll ! I *TI e: Cl~ ...,.-L! " ~ !lo lll ~ ~ -~~,~ ~ If + ~l :n. ~ ijffl l""""'Fi-+-1 ' ~ ~ w I ra,1 :i 00 Al I .... l . : ' ~ ~, A '\+-.....i ~ ~ -'II-.. I IB' tw#l -lS+llTI 1 I uttt ~ Ll ...,, ~ ~ r ' Tffi 1-K"" ~ ~ I.I ]~ mm . illf: mi. ~ OJ :I: ~ N ;:o SU C. o· :::I C n C: CD (") 0 :::I n CD :::I -Al -o· :::I 0 -C (") ' 3 -- Sep-81 Sep-82 Sep-83 Sep-84 Sep-85 Sep-86 Sep-87 Sep-88 Sep-89 Sep-90 Sep-91 Sep-92 Sep-93 Sep-94 Sep-95 Sep-96 Sep-97 Sep-98 Sep-99 Sep-00 Sep-01 Sep-02 Sep-03 Sep-04 Sep-05 Sep-06 Sep-07 Sep-08 Sep-09 Sep-10 Sep-11 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 ...... 6 0 m I ...... ---J ' - - - - - - . -. - - - - - - ~ p - ...... ...... 6 6 0 0 m m I I ...... ...... 0) 01 . ' . I IT~~~. n . I II • l I I I 1· J " ''" I ...---~ I II . '' ,-.:... ~ I ~ .. l1 •1 ·~ ~~ I I◄ -t . . • ~ I J .=-t: I~ !'"'I" t ~ I I I ~ . "--1~r lk:: -~ ...... I ~ I ' ' l ! ';. I~ I H ,_ ;-.1i1 l ' . . ◄t$~ I . ◄ ""'-· ] .:El'· ' I I r-r-~ I ,.! I I I ' 1: CJ I , 11 II I I ' 1 11 I • I I Ill I I (Log ~cale) ...... ...... ...... 0 6 6 0 0 0 0 0 m m m m I I I I ...... ...... ...... ...... ~ w N ...... ' ' "tl "tl )>m -,-,,=I: ID ID )>i: ..a. ..a. ;;o ID :g :g ► a .i:,. .i:,. G) (") ►S::o o '"ti !!!.::::, ~(")II ~ ► C !'J a 3 N -, G) -• UI ~ o -m -• 111 II • 0 -.... ::::, II gi .i:,., ~ I C -· ..... (")3 N N _, -• U'l c .._ .. m c-,3 II I -· -CD ~3 m C -.!. (") .i:,. :::::: C 3 Q 3 DJ :I: ~ N C sil ::, C: 3 I z D) -C: !. 0 0 ::, n Cl) ::, -sil -s· ::, Ch -C: 0 ' 3 - Sep-81 Sep-82 Sep-83 Sep-84 Sep-85 Sep-86 Sep-87 Sep-88 Sep-89 Sep-90 Sep-91 Sep-92 Sep-93 Sep-94 Sep-95 Sep-96 Sep-97 Sep-98 Sep-99 Sep-00 Sep-01 Sep-02 Sep-03 Sep-04 Sep-05 Sep-06 Sep-07 Sep-08 Sep-09 Sep-10 Sep-11 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 ....>. 6 0 m I ....>. co ....>. ....>. 6 0 0 0 m m I I ....>. ....>. -...J CJ) ~Log Scale)-. ....>. 0 0 6 0 0 0 m m m I I I ....>. ....>. ....>. en J,. (,.) ....>. ....>. 6 0 0 0 m m I I ....>. ....>. N ....>. "ti )> m ;p -::::i: .... )> i: (0 ;o (1) (0 )> ::I .s:,. .... :s: G) (") "ti g 0 _::I (") II o r (1) .... UI ::I 3 m .... -·~ii -;;-UI g- 00 C: ::I m 9. r .:... 3 §' ""--· C: .... C') II :::.: N 3 r;n .... .s:,. C: C') 3 OJ :::c ~ N --t :::r 0 :::::!. C: 3 I N w 0 0 0 :::, (") Cl) :::, r+ DJ !:!': 0 :::, en -C: 0 :::::: 3 - Sep-81 Sep-82 Sep-83 Sep-84 Sep-85 Sep-86 Sep-87 Sep-88 Sep-89 Sep-90 Sep-91 Sep-92 Sep-93 Sep-94 Sep-95 Sep-96 Sep-97 Sep-98 Sep-99 Sep-00 Sep-01 Sep-02 Sep-03 Sep-04 Sep-05 Sep-06 Sep-07 Sep-08 Sep-09 Sep-10 Sep-11 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 ...... ...... a a 0 0 m m I I ...... ...... -.J 0) ' ' 1m~ ~ Q I 1 ... ·~ I ' ' - ~ i. ◄• ,. ' ' ,_ I ' +::: -... b ► ..... I 't;::,. -. =--.--:;, - ~ -~ ~· - .......... ---- - -I~ • t::: IA• i\~ ~ I ~ic:::,~ I ........ 1 .. U.. r::l. I ~ I , -n I ~ I ' I I ,Iii I' ---I l ..... I fR=! I ~I r--, o j I ...... (Log :5-cale) ...... a 0 a 0 0 0 m m m I I I ...... ...... ...... CJ1 .i,. w . ' ' . _ ...... ...... ...... a 0 0 0 m m I I ...... ...... N ...... ' i...- "tJ "tJ )> m -,-,r ::::i: CD CD )>-_.. _.. :::IJ C <D <D )>~ <D <D r+ ,s:,. ,s:,. Ci) (") ►S:o o r "tJ !!!.. :::, )> (") II n :::IJ r CD ► 3-· !'J a Ci) -· ~ iiJ 2 -;i;n g: jj N ~ :::, ui ':"c C: m """o 3 I N -· -· ~c --r+ w o 3 11 c ::::-co 0 3 m -• -I -.... 3 w -C (") ~ OJ :::c ~ N :;.tJ II,) C. -· C 3 I N N 0) (") 0 :::J (') CD :::J -~ -o· :::J tn -C (") :::: 3 -- -E :::: (.) ~ -,n C 0 .:. cu ... ... C Cl) c., C 0 (.) 0 """ N I "Cl cu Cl) ..J N > ::c m ._ I ii-das ~i-das oi-das -6~-das e~-das -H-das ~ g~-das -g~-das -v~-das -£ ~-das u-das -~ ~-das -O ~-das -50-das -eo-das -Lo-das . go-das -9Q-das vo-das £0-das -io-das ~o-das -oo-das -55-das -e5-das L6-das -95-das -95-das i,,5-das -£6-das i5-das . ~5-das 05-das 59-das ee-das Le-das • gg-das . gg-das 1 .. ~ t -ve-das i.. £e-das •1~ • -ie-das f--U--l-..L...L..IL...L.._.__.......__ ........... _._....__--+, u...u....J...J.......,,....__--!-1, .J.,J....l..._,__,_...__.___µJu...u'-'---'-------'--4,.J..J..LIL....L...L-'--'----!-, ~ g-das ..-..- I UJ 0 0 N ..-I w 0 0 ..- ("I) ..-I w 0 0 ..- ""'" ..-I w 0 0 (a1e:::rs 607) LO ..-I w 0 0 ..- (!) ..-I w 0 0 I'-..-I w 0 0 ..- Sep-14 Dec-14 Mar-15 Jun-15 Sep-15 Dec-15 Mar-16 Jun-16 Sep-16 Dec-16 Mar-17 Jun-17 Sep-17 Dec-17 Mar-18 Jun-18 Sep-18 Dec-18 Mar-19 Jun-19 Sep-19 Dec-19 Mar-20 Jun-20 Sep-20 Dec-20 Mar-21 Jun-21 Sep-21 Dec-21 Mar-22 Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 0 0 0 0 0 0 m m m I I I ...... ...... ...... CXl --.J 0) ' ' ;~, : I I i I : " I~ I'. ~ I I { i I I } I II I ' I I I ' I I I I I I I I I I ~ I I I II i '1 ~ I . I l ~ i Ill QI 0 0 m I ...... 01 ' I ...... 0 0 m I ...... .t,. I I ' I I I I I I I I I I I II I I I I 1111 0 0 m I ...... w I i I I I I I I I I ' I I I I 1 I I I i I I I : I I I H " ! n 0 0 m I ...... N ' I i : i I i I : I I ! i i I I I I I I I 0 0 m I ...... ...... ' I ' I I l ' ' I ' I I I I I I ' I I I I I I I ii: I') I j i I I ! 1 i I .{log Scale). 6 6 6 0 0 0 m m m I I I _.. 0 0 0 <D CXl ' ' I- ' I I I l Ii I' ,I Ii I! I ! I I I I ii: I I I i I I I I I I I I I t 0 0 m I 0 --.J ' I I l I I I l ' I I i I I I I I I I I I I I I l l I l I I I I I ! 0 0 m I 0 0) . I I l ; 1 l I I I I I I I I I I 0 0 m I 0 01 . . ' I ' I ' ' II ' " II II II I' ! ! : I I I I ...... 0 0 m b .t,. ' I I I ! I I I I I : ...... 0 0 m I 0 w I I 1 I I I : : l i ! I I I ! : I I ' ...... 0 0 m I 0 N I I I I I I I I I ' I I ' I I I I I 0 0 m I 0 ...... ' ' I I I I I l I I I i i ' i I I I I : I ! I I ...... 0 0 m + 0 0 I I I I II i I I I I i i I I I 1: I If ► m r-3i )> C: ;:a ('I) ►a e>n 0 O Ill ::J ii 2 .... ::J 0 iii r:r1 ~ .... 0 UI ::J C: r- (") -· -·3 [~ ~ r;n .... UI C: Q 3 CD :I: ~ N -4 :::r 0 :::!. C: 3 I N w N (") 0 ::::s (') (I) ::::s r+ -, I» =-0 ::::s t/1 -C: (") :::::: 3 - TAB3 BHV-3 AIR SAMPLING GRAPHS AND DATA TABLE Date Effluent 9E•14 uCi/ml BHV-3U Effluent 2E-14 uCi/ml BHV-3T230 Effluent 9E-13 uCi/ml BHV-3R Effluent 6E-13 uCi/ml BHV-3PB Concentration Concentration Concentration Concentration Limit= limit= Limit= Limit= AIARAGoal= 2.25E-14 uCi/ml ALARA Goal= SE-15 uCi/ml ALARAGoal = 2.25E·13 uCl/ml ALARA Goal= 1.SE-13 uCi/ml Pre 1994 MPC SE•12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC 2E-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Limit= limit= Limit= limit= Pre 1994 AIARA 1.2SE•l2 uCi/ml Pre 1994 AIARA SE•l3uCl/ml Pre 1994 ALARA lE-12 uCi/ml GOAL= GOAL= GOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 9/28/1981 1.74E-15 5.00E-12 1.25E-12 9.02E-16 8.00E-14 2.00E-14 2.87E-16 2.00E-12 5.00E-13 1.54E-14 4.00E-12 1.00E-12 12/14/1981 1.59E-15 S.00E-12 1.25E-12 5.03E-16 8.00E-14 2.00E-14 1.30E-16 2.00E-12 5.00E-13 2.25E-14 4.00E-12 1.00E-12 3/29/1982 3.76E-16 5.00E-12 1.25E-12 5.25E-16 8.00E-14 2.00E-14 4.08E-16 2.00E-12 5.00E-13 1.96E-14 4.00E-12 1.00E-12 6/30/1982 3.83E-16 5.00E-12 1.25E-12 2.16E-16 8.00E-14 2.00E-14 1.41E-15 2.00E-12 5.00E-13 2.40E-14 4.00E-12 1.00E-12 9/27/1982 S.95E-16 5.00E-12 1.25E-12 1.44E-15 8.00E-14 2.00E-14 5.36E-16 2.00E-12 S.00E-13 l.43E-14 4,00E-12 1.00E-12 1/3/1983 2.0SE-16 5.00E-12 1.2SE-12 1.23E-16 8.00E-14 2.00E-14 1.l0E-16 2.00E-12 5.00E-13 3.0lE-14 4.00E-12 l.00E-12 4/4/1983 1.00E-16 5.00E-12 1.2SE-12 6.94E-17 8.00E-14 2.00E-14 6.llE-17 2.00E-12 5.00E-13 l.39E-14 4.00E-12 l .00E-12 6/30/1983 3.06E-16 5.00E-12 1.25E-12 9.59E-17 8.00E-14 2.00E-14 2.08.Ecl.6 2.00E-12 5.00E-13 1.70E-14 4.00E-12 1.00E-12 10/3/1983 1.91E-16 5.00E-12 1.25E-12 3.05E-16 8.00E-14 2.00E-14 2.79E-16 2.00E-12 5.00E-13 l.76E-14 4.00E-12 l .00E-12 1/3/1984 3.0lE-16 5.00E-12 1.25E-12 9.51E-17 8.00E-14 2.00E-14 1.00E-16 2.00E-12 5.00E-13 9.17E-15 4.00E-12 1.00E-12 4/2/1984 8.22E-16 5.00E-12 1.2SE-12 7.52E-16 8.00E-14 2.00E-14 5.20E-17 2.00E-12 5.00E-13 3.47E-14 4.00E-12 1.00E-12 7/2/1984 5.29E-16 5.00E-12 1.25E-12 6.18E-16 8.00E-14 2.00E-14 1.40E-16 2.00E-12 5.00E,13 1.32E-14 4.00E-12 1.00E-12 10/1/1984 1.74E-16 5.00E-12 1.25E-12 7.l0E-17 8.00E-14 2.00E-14 1.00E-16 2.00E-12 5.00E-13 1.08E-14 4.00E-12 l.00E-12 1/2/1985 1.00E-17 5.00E-12 1.25E-12 7.l0E-17 8.00E-14 2.00E-14 7.80E-17 2.00E-12 5.00E-13 2.73E-14 4.00E-12 1.00E-12 4/1/1985 l.00E-16 5.00E-12 1.25E-12 2.76E-16 8.00E-14 2.00E-14 4.l0E-17 2.00E-12 5.00E-13 l.12E-14 4.00E-12 1.00E-12 7/1/1985 1.04E-16 5.00E-12 1.25E-12 1.00E-16 8.00E-14 2.00E-14 l.00E-16 2.00E-12 5.00E-13 l.64E-14 4.00E-12 l.00E-12 9/30/1985 1.00E-16 5.00E-12 1.25E-12 1.00E-15 8.00E-14 2.00E-14 1.00E-16 2.00E-12 5.00E-13 1.73E-14 4.00E-12 l,00E-12 1/2/1986 1.03E-15 5.00E-12 1.25E-12 3.17E-16 8.00E-14 2.00E-14 1.25E-16 2.00E-12 5.00E-13 l.21E-17 4.00E-12 l.00E-12 4/1/1986 8.04E-16 5.00E-12 1.25E-12 l.93E-17 8.00E-14 2.00E-14 1.54E-16 2.00E-12 5.00E-13 l.69E-14 4.00E-12 l.00E-12 6/30/1986 4.29E-16 5.00E-12 1.25E-12 1.77E-16 8.00E-14 2.00E-14 }..83E-16 2.00E-12 5.00E-13 1.97E-14 4.00E-12 l .00E-12 10/27/1986 6.45E-16 5.00E-12 1.25E-12 9.89E-17 8.00E-14 2.00E-14 4.16E-15 2.00E-12 5.00E-13 l.64E-14 4.00E-12 l.00E-12 12/15/1986 1.31E-16 5.00E-12 1.25E-12 0.00E+00 8.00E-14 2.00E-14 4.16E-17 2.00E-12 5.00E-13 4.60E-15 4.00E-12 l.00E-12 3/16/1987 2.0lE-16 5.00E-12 l.25E-12 l.20E-16 8.00E-14 2.00E-14 5.73E-17 2.00E-12 5.00E-13 1.60E-14 4.00E-12 1.00E-12 5/11/1987 2.16E-16 5.00E-12 l.25E-12 1.96E-16 8.00E-14 2.00E-14 7.38E-17 2.00E-12 5.00E-13 1.59E-14 4,00E-12 1,00E-12 9/9/1987 2.41E-16 5.00E-12 1.25E-12 2.18E-16 8.00E-14 2.00E-14 3.52E-17 2.00E-12 5.00E-13 l.46E-14 4.00E-12 l.00E-12 11/2/1987 2.44E-16 5.00E-12 1.25E-12 2.32E-16 8.00E-14 2.00E-14 2.37E-17 2.00E-12 5.00E-13 2.48E-14 4.00E-12 1.00E-12 2/16/1988 8.0SE-16 5.00E-12 1.25E-12 2.55E-16 8.00E-14 2.00E-14 3.42E-16 2.00E-12 5.00E-13 5,61E-14 4,00E-12 1.00E-12 5/18/1988 1.14E-16 5.00E-12 1.25E-12 4.14E-17 8.00E-14 2.00E-14 'l.00E-16 2.00E-12 5.00E-13 1,20E-14 4.00E-12 1.00E-12 8/15/1988 2.08E-16 S.00E-12 1.25E-12 3.06E-16 8,00E-14 2.00E-14 9.65E-17 2.00E-12 5.00E-13 l.36E-14 4,00E-12 l.00E-12 11/14/1988 4.21E-16 5.00E-12 1.25E-12 2.93E-16 8.00E-14 2.00E-14 1.09E-16 2.00E-12 5.00E-13 2.48E-14 4.00E-12 l.00E-12 2/13/1989 4.45E-16 5.00E-12 1.25E-12 4.78E-17 8.00E-14 2,00E-14 2.47E-17 2.00E-12 5.00E-13 3.34E-14 4,00E-12 l.00E-12 5/15/1989 1.05E-16 5.00E-12 1.25E-12 l.00E-16 8.00E-14 2.00E-14 2.45E-17 2.00E-12 5.00E-13 6.56E-15 4.00E-12 1.00E-12 8/14/1989 1.31E-16 5.00E-12 1.25E-12 5.85E-17 8.00E-14 2.00E-14 3.97E-17 2.00E-12 5.00E-13 6.75E-15 4.00E-12 l.00E-12 11/13/1989 1.67E-16 5.00E-12 1.25E-12 3.87E-17 8.00E-14 2.00E-14 8.03E-17 2.00E-12 5.00E-13 1.69E-14 4.00E-12 l.00E-12 2/12/1990 4.43E-16 5.00E-12 1.25E-12 l.00E-16 8.00E-14 2.00E-14 3.50E-17 2.00E-12 5.00E-13 2.37E-14 4.00E-12 l.00E-12 5/14/1990 3.84E-16 5.00E-12 1.25E-12 2.54E-16 8.00E-14 2.00E-14 1.02E-16 2.00E-12 5.00E-13 l.68E-14 4.00E-12 l.00E-12 8/13/1990 7.27E-17 5.00E-12 1.25E-12 2,87E-16 8.00E-14 2.00E-14 1.21E-17 2.00E·12 5.Q0E-13 7.86E-15 4.00E-12 1.00E-12 11/12/1990 1.84E-16 5.00E-12 1.25E-12 1.34E-16 8.00E-14 2.00E-14 8.53E-17 2.00E-12 5.00E-13 2.0lE-14 4.00E-12 1.00E-12 2/11/1991 4.66E-17 5.00E-12 l.25E-12 8.48E-16 8.00E-14 2.00E-14 1.94E-17 2.00E-12 5.00E-13 3.69E-14 4.00E-12 1.00E-12 5/13/1991 5.05E-17 5.00E-12 l.25E-12 7.40E-17 8.00E-14 2.00E-14 7.00E-18 2.00E-12 5.00E-13 1.50E-14 4.00E-12 1.00E-12 8/12/1991 7.14E-17 5.00E-12 l.25E-12 6.22E-17 B.00E-14 2.00E-14 7.95E•17 2.00E-12 S.00E-13 l.77E-14 4.00E-12 1.00E-12 11/11/1991 1.41E-17 5.00E-12 l.25E-12 2.19E-18 8.00E-14 2.00E-14 2.75E-17 2.00E-12 5.00E-13 l.18E-14 4.00E-12 1.00E-12 2/10/1992 8.12E-17 5.00E-12 l.25E-12 2.35E-17 8.00E-14 2.00E-14 2.76E-18 2.00E•12 5.00E-13 3.57E-14 4.00E-12 1.00E-12 5/11/1992 9.lBE-17 5.00E-12 1.25E-12 5.80E-17 8.00E-14 2.00E-14 3.36E-17 .2.00E-12 5.00E-13 1.28E-14 4.00E-12 l.00E-12 8/10/1992 2.00E-18 5.00E-12 1.25E-12 4.19E-17 8.00E-14 2.00E-14 2.00E-18 2.00E-12 5.00E-13 1.59E-14 4.00E-12 1.00E-12 11/9/1992 4.00E-17 5.00E-12 1.25E-12 2.68E-17 8.00E-14 2.00E-14 1.07E-17 2.00E-12 5.00E-13 1.81E-14 4.00E-12 1.00E-12 2/9/1993 7.94E-17 5.00E-12 1.25E-12 1.00E-16 8.00E-14 2.00E-14 1.09E-16 2.00E-12 5.00E-13_ 2.69E-14 4.00E-12 1.00E-12 5/10/1993 1.60E-17 5.00E-12 1.25E-12 5.07E-17 8.00E-14 2.00E-14 7.64E-17 2.00E-12 5.00E-13 l,26E-14 4.00E-12 l.00E-12 8/10/1993 6.00E-17 S.00E-12 1.25E-12 6.00E-18 8.00E-14 2.00E-14 1.00E-16 2.00E-12 5.00E-13 1.S0E-14 4.00E-12 l.00E-12 11/8/1993 l.OOE-16 5.00E-12 1.25E-12 l.00E-16 8.00E-14 2.00E-14 1.00E-16 2.00E-12 5.00E-13 2,lOE-14 4.0DE-12 l.00E-12 2/7/1994 1.61E-16 S.00E-12 l.25E-12 l.00E-16 8.00E·14 2.00E-14 2,22E-16 2.00E-12 5.00E-13 2.23E-14 4.DDE-12 l.00E-12 5/9/1994 2.77E-16 5.00E-12 1.25E-12 2.80E-17 8.00E-14 2.00E-14 8.37E-18 2.00E-12 5.0DE-13 1.40E-14 4.00E-12 l.D0E-12 Date Effluent 9E-14 uCl/ml BHV-3U Effluent 2E-14 uCi/ml BHV-3T230 Effluent 9E·13 uCl/ml BHV-3R Effluent 6E-13 uCi/ml BHV-3PB Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= AIARAGoal = 2.25E-14 uCi/ml AIARA Goal= SE-15 uCi/ml AIARAGoal= 2.25E-13 uCl/ml ALARA Goal= 1.SE-13 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC BE-14 uCi/ml Pre 1994 MPC 2E-12 uCl/ml Pre 1994 MPC 4E-12 uCi/ml Limit= limit= Limit= Limit= pre 1994 AIARA 1.25E-12 uCl/ml Pre 1994 AIARA SE-13 uCl/ml Pre 1994 ALARA lE-12 uCi/ml GOAL= GOAL= GOAL= Cone EFC ~FCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 8/9/1994 7.39E-17 S.00E-12 l.25E-12 L00E-16 8.00E-14 l.00E-14 1.14E-16 2.00E-12 S.00E-13 l,00E-16 4.00E-12 1.00E-12 11/7/1994 9.0SE-17 5.00E-12 1.25E-12 1.00E-16 8.00E-14 2.00E-14 1.00E-16 2.00E-12 S.00E-13 l.00E-16 4.00E-12 l.00E-12 2/7/1995 7.99E-17 9.00E-14 2.25E-14 9.60E-17 2.00E-14 S.00E-15 9.60E-17 9.00E-13 2.25E-13 9.0SE-15 6.00E-13 1.50E-13 5/9/1995 9.40E-17 9.00E-14 2.25E-14 9.80E-17 2.00E-14 5.00E-15 8.60E-17 9.00E-13 2.25E-13 2.88E-15 6.00E-13 1.50E-13 8/9/1995 7.30E-17 9.00E-14 ;l..25E-14 9.20E-17 2.00E-14 5.00E-15 4.40E-17 9.00E-13 2.25E-13 l.96E-15 6.00E-13 l ,50E-13 11/11/1995 3.16E-16 9.00E-14 2.25E-14 l.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25E-13 l.91E-14 6.00E-13 1.50E-13 2/5/1996 3.41E-16 9.00E-14 2.25E-14 l.26E-16 2.00E-14 5.00E-15 1.18E-16 9.00E-13 2.25£-13 2.69E-14 6.00E-13 l.50E-13 5/6/1996 1.31E-16 9.00E-14 ;1..25£-14 l.39E-16 2.00E-14 5.00E-15 1.82£-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1,50E-13 8/5/1996 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 l.31E-14 6.00E-13 1.50E-13 11/6/1996 3.16E-16 9.00E-14 2.25E-14 l.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25E-13 1.91E-14 6.0DE-13 l.50E-13 2/6/1997 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.18E-16 9.00E-13 2.25E-13 2.69E-14 6.0DE-13 1.50E-13 5/5/1997 1.31E-16 9.00E-14 2.25E-14 1.39E-16 2.00E-14 5,00E-15 1.82E-16 9.00E-13 2.2SE-13 l.53E-14 6.00E-13 1.50E-13 8/11/1997 3.00E-16 9.D0E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25£-13 1.31£-14 6.00E-13 1.50£-13 1/5/1998 3.16£-16 9.00E-14 2,25£-14 1.31£-16 2.00E-14 5.00E-15 6.58£-17 9.00E-13 2.25E-13 l.91E-14 6.D0E-13 1.50E-13 4/28/1998 3.41£-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.18£-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 l.S0E-13 7/31/1998 l.31E-16 9.00E-14 2.25E-14 1.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.25E-13 l.53E-14 6.00E-13 1.50E-13 9/28/1998 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 1.50E-13 12/28/1998 3.16E-l.6 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25E-13 1.91E-14 6.00E-13 1.S0E-13 3/29/1999 3.41£-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 l.18E-16 9.00E-13 2.25E--13 2.69E-14 6.00E-13 1.S0E-13 7/3/1999 1.31£-16 9.00E-14 2.25E-14 1.39E-16 2.00E-14 5.00E-15 1.82E-16 9.0DE-13 2.25E-13 1.53E-14 6.00E-13 1.50E-13 9/27/1999 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 1.S0E-13 12/28/1999 3.lGE-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25E-13 l.91E-14 6.00E-13 1.S0E-13 3/28/2000 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2,00E-14 5.00E-15 l.18E-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 1.50E-13 6/26/2000 1.31E-16 9.00E-14 2.25E-14 l.39E-16 2.00E-14 5.00E-15 l.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 l.50E-13 9/26/2000 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 l .50E-13 12/26/2000 3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25£-13 1.91E-14 6.00E-13 1.S0E-13 3/26/2001 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2,00E-14 5.00E-15 l.18E-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 1.S0E-13 7/2/2001 l.31E-16 9.00E-14 2.25Ec14 1.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1.S0E-13 9/24/2001 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2,00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 1.50E-13 12/31/2001 3.16E-16 9.00E-14 2.25E-14 l.31E·16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25E-13 1.91E-14 6.00E-13 1.50E-13 4/1/2002 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.18E-16 9.00E-13 2..25E-13 2.69E-14 6.00E-13 1.50E-13 7/1/2002 l.31E-16 9.00E-14 2.25E-14 l.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1.50E-13 9/30/2002 3.00E-16 9.00E-111 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 1.50E-13 12/30/2002 3.16E-16 9.00E-14 2.25E-14 l.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25E-13 1.91E-14 6.00E-13 1.50E-13 3/31/2003 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 l.18E-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 1.50E-13 6/30/2003 1.31E-16 9.00E-14 2.25E-14 1.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1.50E-13 9/29/2003 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.0DE-13 2.25E-13 l ,31E-14 6.00E-13 1.50E-13 12/29/2003 3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25E-13 1.91E-14 6.00E-13 1.50E-13 3/29/2004 3.41E-16 9.00E-14 2,25E-14 2.26E-16 2.00E-14 5.00E-15 1.18E-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 1.50E-13 6/27/2004 1.31E-16. 9.00E-14 2.25E-14 1.39E-16 2.00E-14 5,00E-15 1.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1.50E-13 9/27/2004 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 1.50E-13 12/27/2004 3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2..25E.-13 1.91E-14 6.00E-13 1.50E-13 3/28/2005 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.18E-16 9.00E-13. 2.25E-13 2.69E-14 6.00E-13 1.50E-13 6/29/2005 l.31E-16 9.00E-14 2.25E-14 1.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1.50E-13 9/26/2005 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 l.31E-14 6.00E-13 1.50E-13 1/3/2006 3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5,00E-15 6.58E-17 9.00E-13 2.25E-13 1.91E·14 6.00E-13 1.50E-13 4/3/2006 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.18E-16 9.00E-13 2,25E-13 2 69E-14 6.00E-13 l.50E-13 7/3/2006 1.31E-16 9.00E-14 2.25E-14 1.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.25Ecl3 l .53E-14 6.00E-13 1.SOE-13 10/2/2006 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E·13 1.31E-14 6.00E-13 1.50E-13 1/1/2006 3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25E-13 1.91E·14 6.00E-13 l.S0E-13 4/2/2007 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.18E-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 1.50E-13 7/2/2007 l.31E-16 9.00E-14 2.25E-14 1.39E-16 2.00E-14 5.00E-15 l.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1.50E-13 Date Effluent 9E-14 uCi/ml BHV-3U Effluent ZE-14 uCi/ml BHV-3T230 Effluent 9E-13 uCi/ml BHV-3R Effluent 6E-13 uCi/ml BHV-3PB Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= AIARAGoal = 2.ZSE-14 uCi/ml AIARA Goal= SE-15 uCi/ml AIARAGoal= 2.ZSE-13 uCi/ml AIARA Goal= l.SE-13 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC ZE-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Limit= Limit= Limit= Limit= Pre 1994 AIARA 1.ZSE-12 uCi/ml Pre 1994 AIARA SE-13 uCi/ml Pre 1994 AIARA lE-12 uCi/ml GOAL= GOAL= GOAL= Cone EFC _EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 9/30/2007 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 l.31E-14 6.00E-13 1.50E-13 12/31/2007 3.16E-16 9.00E-14 2.25E-14 l.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25E-13 l.91E-14 6.00E-13 l.50E-13 3/31/2008 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 S.00E-15 l.18E-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 l.50E-13 6/30/2008 1.31E-16 9.00E-14 2.25E-14 l.39E-16 2.00E-14 5,00E-15 1.82£-16 9.00E-13 1.25E-13 l.53E-14 6.00E-13 l.S0E-13 9/30/2008 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 l.31E-14 6.00E-13 1.50E-13 12/31/2008 3.16E-16 9.00E-14 2.25E-14 l.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25E-13 l.91E-14 6.00E-13 l.50E-13 3/15/2009 3.41E-16 9.00E-14 ;2.25E-14 2.26E-16 2.00E-14 S.00E-15 1.lSE-16 9.00Ec13 1.25E-13 2.69E-14 6.00E-13 l.S0E-13 6/15/2009 1.31E-16 9.00E-14 '2,25E-14 l.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.25E-13 l.53E-14 6.00E-13 1.50E-13 9/15/2009 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 S.00E-15 3.99E-16 9.00E-13 2.25E-13 l.31E-14 6.00E-13 l.50E-13 12/15/2009 3.16E-16 9.00E-14 .2.25E-14 l.31E-16 2.00E-14 .S.00E-15 6.58E-17 9.00E-13 2.25E-13 l.91E-14 6,00E-13 l.50E-13 3/31/2010 3.41E-16 9.00E-14 2.25E-14 .2.26E-16 2.00E-14 5.00E-15 1.lSE-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 1.S0E-13 6/30/2010 1.31E-16 9.00E-14 2.25E-14 1.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.25E-13 l.53E-14 6.00E-13 l.S0E-13 9/30/2010 3.00E-16 9.00E-14 .2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 l.31E-14 6.00E-13 l.50E-13 12/31/2010 3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25E-13 l.91E-14 6.00E-13 1.50E-13 4/4/2011 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5,00E-15 1.lSE-16 9.00E-13 2.2SE-13 2.69E-14 6.00E-13 l.50E-13 7/4/2011 1.31E-16 9.00E-14 2.25E-14 l.39E-16 2.00E-14 S.00E-15 1.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1.50E-13 10/3/2011 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 1.50E-13 1/3/2012 3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 S.00E-15 6.58E-17 9.00E-13 2.25E-13 l.91E-14 6,00E-13 1.S0E-13 4/3/2012 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2 00E-14 S.00E-15 1.lSE-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 l.S0E-13 7/2/2012 .l.31E-16 9.00E-14 2.25E-14 l.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 .2.25E-13 l.53E-14 6.00E-13 l.S0E-13 10/1/2012 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 J.25E-13 l.31E-14 6,00E-13 1.S0E-13 12/31/2012 3.16E-16 9.00E-14 2.25E-14 l.31E-16 2.00E-14 S.00E-15 6.SSE-17 9.00E-13 2.25E-13 l.91E-14 6.00E-13 l .50E-13 3/25/2013 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.lSE-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 1.50E-13 7/2/2013 1.31E-16 9.00E-14 2.25E-14 l.39E-16 2.00E-14 5.00E-15 l.82E-16 9.00E-13 2.2SE-13 1.53E-14 6.00E-13 1.S0E-13 9/30/2013 3.00E-16 9.00E-14 2.25Ec14 3.43E-16 2.00E-14 S.00E-15 3.99E-16 9.00E-13 2.25E-13 l.31E-14 6.00E-13 1.50E-13 12/30/2013 3.16E-16 9.00E-14 '2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.SSE-17 9.00E-13 .2.25E-13 1.91E-14 6,00E-13 l.50E-13 3/31/2014 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.18E-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 1.50E-13 6/30/2014 1.31£-16 9.00E-14 2.25f-14 l.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.25E-13 l.53E-14 6.00E-13 1.50E-13 9/30/2014 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 S.00E-15 3.99E-16 9.00E-13 .2.25E-13 l.31E-14 6.00E-13 l .50E-13 12/29/2014 ,3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 :Z.25E-13 1.91E-14 6.00E-13 1,50E-13 3/30/2015 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 S.00E-15 1.lSE-16 9.00E-13 .. 2.25E-13 2.69E-14 6.00E-13 1.50E-13 6/29/2015 l.31E-16 9.00E-14 2.25E-14 l.39E-16 2.00E-14 .S.00E-15 1.82E-16 9.00E-13 .2.25E-13 1.53E-14 6.00E-13 1.50E-13 9/28/2015 ,3.00E-16 9.00E-14 2.25E-14 3.43E-16 2,00E-14 S.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 1.S0E-13 12/28/2015 3.16E-16 9.00E-14 2.25E-14 l.31E-16 2.00E-14 S.00E-15 6.58E-17 9.00E-13 2,25E-13 1.91E-14 6.00E-13 1.50E-13 3/28/2016 3.41E-16 9.00E-14 ;1..25E-14 2.26E-16 2.00E-14 5.00E-15 l.18E-16 9.00E-13 USE-13 2.69E-14 6.00E-13 1.S0E-13 6/27/2016 1.31E-16 9.00E-14 2.25E-14 l.39E-16 2.00E-14 S.00E-15 1.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1.S0E-13 9/27/2016 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 1.S0E-13 12/27/2016 .3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 1.25£-13 1.91E-14 6.00E-13 l.S0E-13 3/27/2017 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.lSE-16 .9.00E-13 2.25E-13 2.69E-14 6.00E-13 1.S0E-13 6/26/2017 1.31E-16 9.00E-14 ,2.25E-14 l.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1.S0E-13 9/25/2017 '3.00E-16 9.00E-14 \2.25E-14 3.43E-16 2.00E-14 S.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 1.50E-13 12/26/2017 3.16E-16 9.00E-14 2.25E-14 l.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 2.25E-13 1,91E-14 6.00E-13 1.50E-13 3/26/2018 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.lSE-16 9.00E-13 2.25E-13 2.69E-14 6,00E-13 1.S0E-13 6/25/2018 1.31E-16 9.00E-14 '2.25E-14 l.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 ,2,25E-13 1.53E-14 6.00E-13 1.S0E-13 9/24/2018 3.00E-16 9.00E-14 ,1.25E-14 3.43E-16 2,00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 1.50E-13 12/31/2018 3.16E-16 9.00E-14 .2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.58E-17 9.00E-13 .2.25E-13 1.91E-14 6.00E-13 1.50E-13 4/1/2019 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.18E-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 l.S0E-13 7/1/2019 'l,31E-16 9.00E-14 2.25E-14 1.39E-16 2.00E-14 S.00E-15 l.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1.S0E-13 9/30/2019 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 '2.25E-13 1.31E-14 6.00E-13 1.50E-13 Date Effluent 9E-14 uCl/ml BHV-3U Effluent ZE-14 uCi/ml BHV-3T230 Effluent 9E-13 uCi/ml BHV-3R Effluent 6E-13 uCi/ml BHV-3PB Concentration Concentration Concentration Concentration Umit= Limit= Limit= Limit= AIARAGoal= 2.ZSE-14 uCi/ml AIARA Goal= SE-15 uCi/ml AIARAGoal = 2.ZSE-13 uCi/ml ,AIARA Goal = 1.SE-13 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC ZE-12 uCl/ml Pre 1994 MPC 4E-12 uCi/ml limit= Limit= Limit= Limit= Pre 1994 AIARA 1.ZSE-12 uCi/ml Pre 1994 AIARA SE-13 uCi/ml Pre 1994 ALARA lE-12 uCi/ml 'GOAL= GOAL= GOAL= .Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 1/6/2020 3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 S.00E-15 6.SSE-17 '9.00E-13 2.ZSE-13 1.91E-14 6.00E-13 l ,S0E-13 3/30/2020 3.41E-16 9.00E-14 2.ZSE-14 2.26E-16 2.00E-14 5,00E-15 1.18E-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 1.S0E-13 6/30/2020 l.31E-16 9.00E-14 2.25E-14 l.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.ZSE-13 1.53E-14 6.00E-13 1.S0E-13 10/12/2020 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 B.OOE-13 2.25E-13 1.31E-14 6.00E-13 1.S0E-13 1/4/2021 3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.SSE-17 9.00E-13 2.25E-13 1.91E-14 6.00E-13 l.S0E-13 4/5/2021 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.lBE-16 9.00E-13 2.ZSE-13 2.69E·14 6.00E-13 1.S0E-13 6/28/2021 1.31E-16 9.00E-14 2.25E-14 l.39E-16 2.00E-14 5.00E-15 1.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1.S0E-13 10/4/2021 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 1.S0E-13 1/4/2022 '3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.SSE-17 9.00E-13 2.25E-13 1.91E-14 6.00E-13 1.S0E-13 4/4/2022 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.18E-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 1.S0E-13 7/5/2022 .1.31E-16 9.00E-14 2.ZSE-14 1.39E-16 2.00E-14 5,00E-15 1.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 1.S0E-13 10/3/2022 3.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 3.99E-16 9.00E-13 2.25E-13 1.31E-14 6.00E-13 1.S0E-13 1/3/2023 3.16E-16 9.00E-14 2.25E-14 1.31E-16 2.00E-14 5.00E-15 6.SSE-17 9.00E-13 2.25E-13 1.91E-14 6.00E-13 l.S0E-13 4/3/2023 3.41E-16 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 l.18E-16 9.00E-13 2.25E-13 2.69E-14 6.00E-13 l.S0E-13 7/3/2023 1.31E-16 9.00E-14 2.25E-14 1.39E-16 2.00E-14 5,00E-15 1.82E-16 9.00E-13 2.25E-13 1.53E-14 6.00E-13 l.S0E-13 _,_ _,_ _,_ 6 6 6 0 0 0 m m m I I I _,_ _,_ _,_ CX) -.J 0) Sep-81 Sep-82 Sep-83 Sep-84 Sep-85 Sep-86 Sep-87 + Sep-88 Sep-89 C Sep-90 -, Dl ::, Sep-91 C 3 Sep-92 z Sep-93 Dl -C Sep-94 -, ~ Sep-95 + Sep-96 -I Sep-97 ::::,- 0 Sep-98 ~-C Sep-99 3 I Sep-00 N w 0 Sep-01 + Sep-02 Sep-03 ;;a Dl Sep-04 a. C Sep-05 3 I Sep-06 N N 0) Sep-07 + Sep-08 Sep-09 r CD Sep-10 Dl a. Sep-11 I N _,_ 0 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 (Log Scale) _,_ _,_ 0 6 0 0 m m I I _,_ _,_ 01 .I:>, _,_ 6 0 m I _,_ w _,_ 6 0 m I _,_ N DJ :::c ~ w :::0 D> C. 0 ::::, C (') C. Cl) 0 0 ::::, (') Cl) ::::, -DJ !:!': 0 ::::, 0 -C 0 :::.: 3 - -E :-::=: (.) ::::, -u, C: 0 ~ ca ... -C: Cl) (.) C: 0 (.) ~ ::::, -ca z I E ::::, C: ~ ::) M > :::c CXl ..-..- I w 0 ~ ..- N C") ..-..- I I w w 0 0 ~ ~ ..-..- ,~ 1t:b.. 15,.._j 1-P=+ 1c:: i=-+ 1t:~ 5,... 1----~ 1~ 1~ 1 t::!=,. 1C~ 1~~ ~ ◄-~ ◄ ,_ 1-1~ 1Et 1 I ◄~ 1 l 1tr ~~ 1~ 1t:c:=-+ 1~~ t::F,+ 1ci:: 1 . 1 I 1?f='+ I -~I -~n-" ~ ~ -I ~~~ It-..... ,1 I I ~~ ◄ ,. I ... t::,► -~ .....--~ t. ,ii, I I I -s:t" LO <D ..-..-..- I I I w w w 0 0 0 0 0 ~ ""'(a1e:)s 607f ..- 'I . - 11 T ' I I I • -• I I t-..- I w 0 ~ ..- .. <X) ..-I w 0 ~ ..- z;z;-das ~z;-das oz;-das 6~-das e~-das L~-das g~-das g~-das v~-das £~-das z;~-das ~ ~-das o~-das 50-das eo-das Lo-das 90-das so-das vo-das so-das z:o-das ~o-das oo-das 55-das 95-das L6-das 95-das 95-das p,5-das s5-das z:5-das ~5-das 05-das 59-das ee-das Le-das 99-das 99-das ve-das rn-das z:9-das ~9-das E :::: (.) ::::, -ti) C: 0 +::l E -C: Q) CJ C: 0 (.) 0 M N I E ::::, 'i: 0 .c: 1- M > :c m T"" T"" I UJ 0 ~ T"" N (") T"" T"" I I UJ UJ 0 0 ~ ~ T"" T"" ~ - ]I ., -11 JJt s;f" LO T"" T"" I I UJ UJ 0 0 0 0 --ie1eos 607f - I ~rs: ~~ .1•~ • . ' I 1•1 ' ., l•~g: l•~s: ·~ l•~s: I•~~ l•~g: ~ l•j.~ I~~ I•~ l•I ' I• ' I• ' I• ' I• l•r--6,. 1•J~ •i-+,. I -r I I 11 '1el• . ,-- ~~ ~·· . .~ . ' .. I I 1, ~ :----', I -- J__I 'I rr -r co T"" I UJ 0 ~ T"" I ' r-- T"" I UJ 0 ~ T"" - - - - - - r 1-- r - 1-- - - 1-- 1-- - - 1-- co T"" I UJ 0 ~ T"" ii-des ~i-des oi-des 6~-des B~-des L~-des g~-des g~-des v~-des £~-des i~-des ~ ~-des o~-des 50-des eo-des Lo-des eo-des go-des vo-des £0-des io-des ~o-des oo-des 55-des 95-des L6-des 95-des 95-des p,5-des £6-des i5-des ~5-des 05-des 59-des 99-des Le-des 99-des 99-des ve-des £e-des ie-des ~9-des ->. 0 0 m I ->. 00 ->. 0 0 m I ->. ~ ->. 0 0 m I ->. 0) :-(Log Scale)-... 0 0 0 0 m m I I ->. ->. C.11 .:,.. 0 0 m I ->. w 0 0 m I ->. N 0 0 m I ->. ->. Sep-81 +----.--..--,rTTT1rt----r-1mTTTI1r=:::;:;+-;-nrrrrt----i.-----.-rrrmt--r--rirrnm---i-r""TTTT1rn--.---TTnm Sep-82 Sep-83 Sep-84 · Sep-85 · Sep-86 - Sep-87 Sep-88 · •·, .'', Sep-89 -. ♦.=i::t Sep-90 Sep-91 - Sep-92 - Sep-93 - Sep-94 - Sep-95 - Sep-96 - Sep-97 -, Sep-98 · Sep-99 -, Sep-00 · Sep-01 _, Sep-02 Sep-03 Sep-04 · Sep-05 Sep-06 - Sep-07 · Sep-08 Sep-09 Sep-1 0 • Sep-11 Sep-12 Sep-13 - Sep-14 - Sep-15 - Sep-16 · Sep-17 ·· Sep-18 ·· Sep-19 - Sep-20 -, Sep-21 - Sep-22 - TT n:n: l,o. L Joa j ~ I uJ I ~ h 1 ,, ~ m I . I 11 ' II · . JI ,..+-I" ...- "tl "tl )>m ...... r-:::i: CD CD )> -..., ..., Al c: ~~)>gi ,,:,. ""Gl o )>:S::o o 1 1J lll :::, ~ n jj g )> 3c: !'> a G) -· ~ iiJ g 7i' r;n g-ii II.)~:::, u, r;n C: C: m .... n 3 I N -· -· ..... C: ....... r+ c.J C") 3 11 C: -· -0 3 ~ :::.: -~ 3 (.,) C: Q 3 CD :::c -;:: w ,, I» C. C: 3 I N N a, C') 0 :::I (') CD :::I -"'I I» ::t o :::I U) -C: C') ::::,: 3 - - ti) C: 0 ~ l! -C: Cl) (,) C: 0 (.) 0 "'"" N I "C ns Cl) ..J M > :::c al ..... ..... I w 0 ~ ..... IP"" ' N C') ..... ..... I I w w 0 0 ~ ~ ..... ..... -~--~/ ... ~~ ~~ ~~ ~ ~-~ ~~ ~~ ~ i.::;I ~~ ~.~ i.:::~ ~~ t<::c.. tr:::~ tr:::~ tr:::~ to:;t.,. tr:::~ tr:::~ tr:::~ ~~ ~~ =~ -, ~·~ -= ►~.,. J·1~ .... ~ -... ~ ~ I ,~ I -I~ ~ oc : ~ ~ ►- ' -q-..... I w 0 0 (a1e::is 607) -' I . ' IJ') (0 ..... ..... I I w w 0 0 ~ ~ ..... ..... - - - . - T ' I'-..... I w 0 ~ ..... zz-das ~z-das oz-das 6~-das g~-das L~-das g~-das g~-das v~-das £~-das z~-das ~ ~-das o~-das 60-das ao-das Lo-das go-das go-das vo-das £0-das zo-das ~o-das oo-das 55-das 95-das L6-das 95-das 95-das t;,5-das £6-das z5-das ~5-das 05-das 59-das gg-das La-das gg-das gg-das va-das £a-das zg-das ~g-das TAB4 BHV-4 AIR SAMPLING GRAPHS AND DATA TABLE Date Effluent 9E-14 uCi/ml BHV-4U Effluent 2E-14 uCi/ml BHV-4T230 Effluent 9E·l3 uCi/ml BHV-4R Effluent 6E-13 uCi/ml BHV-4PB Effluent 4e-15 uCi/ml BHV-4T232 Concentration Concentration Concentration Concentration Concentration Limit= limit= limit= Limit= Limit= At.ARA Goal= 2.25E-14 uCi/ml ALARA Goal= SE-15 uCi/ml AlARAGoal= 2.25E-13 uCi/ml ALARA Goal= 1.SE-13 uCi/ml AlARAGoal = lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC BE-14 uCi/ml Pre 1994 MPC 2E-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable limit= Limit= Limit= Limit= Limit= Pre 1994 1.25E-12 uCi/ml Pre 1994 ALARA SE-13 uCi/ml Pre 1994 lE-12 uCi/ml pre 1994 Not Applicable ALARAGOAL= GOAL= ALARA GOAL= ALARAGOAL= Co.nc EFC EFCA Cone EFC EFCA Cone EFC EFCA cone EFC EFCA Cone EFC EFCA 9/28/1981 5.20E-15 5.00E-12 1.25E-12 2.93E-15 8.00E-14 2.00E-14 2.74E-15 2.00E-12 5.00E-13 l.84E-14 4,00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 12/14/1981 4.53E-15 5.00E-12 1.25E-12 1.78E-15 8.00E-14 2.00E-14 2.29E-15 2.00E-12 5.00E-13 2.54E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 3/29/1982 1.06E-15 5.00E-12 1.25E-12 1.42E-14 8.00E-14 2.00E-14 1.07E-15 2.00E-12 5.00E-13 2.31E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 6/30/1982 6.03E-15 5.00.E-12 1.25E-12 1.57E-14 8.00E-14 2.00E-14 2.62E-15 2.00E-12 5.00E-13 2.25E-14 4.00E-12 l.00E-12 Not Analyzed Not Aoplicable Not Applicable 9/27/1982 1.26E-14 5.00E-12 1.25E-12 7.58E-16 8.00E-14 2.00E-14 5.35E-15 2.00E-12 5.00E-13 2.68E-14 4.00E-12 l.00E-12 Not Analvzed Not Aoolicable Not Applicable 1/3/1983 4.33E-15 5.00E-12 1.25E-12 6.52E-16 8.00E-14 2.00E-14 6.04E-16 2.00E-12 5.00E-13 2.57E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 4/4/1983 1.25E-15 5.00E-12 1.25.E-U 7.17E-16 8.00E-14 2.00E-14 6.76E-16 2.00E-12 5.00E-13 2.00E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 6/30/1983 3.73E-16 5.00E-12 1.25E-12 9.43E-16 8.00E-14 2.00E-14 4.13E-16 2.00E-12 5.00E-13 1.Z0E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 10/3/1983 2.54E-16 5.00E-12 1.25E-12 1.51E·16 8.00E-14 2.00E-14 2.65E-16 2,00EcU 5.00E-13 2.50E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 1/3/1984 2.76E-15 5.00E-12 1.25E·U 1.G0E-16 8.00E-14 2.00E-14 1.05E-16 2.00E-12 5.00E-13 1,59E-16 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 4/2/1984 4.27E-16 5.00E-12 1.25E-12 2.33E-16 8.00E-14 2.00E-14 6.28E-16 2.00E-12 5.00E-13 3.67E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 7/2/1984 2.57E-15 5.00E-12 1.25E-12 1.36E-16 8.00E-14 2.00E-14 1.llk16 2.00E-12 5.00E-13 1.58E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 10/1/1984 4.lSE-16 5.00E-12 1.25.E-U 3.54E-16 8.00E-14 2.00E-14 1.l0E-17 2.00E-12 5.00E-13 9.83E-15 4.00E-12 1,00E-12 !'lot Analyzed Not Applicable Not Applicable 1/2/1985 5.30E-17 5.00E-12 1.25E-12 3.55E-17 8.00E-14 2.00E-14 7.00E-18 2.00E-12 5.00E-13 2.57E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 4/1/1985 1.00E-16 5.00E-12 1.25E-12 6.00E-16 8.00E-14 2.00E-14 4.35E-17 2.00E-12 5.00E-13 5.02E-15 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 7/1/1985 9.36E-16 5.00E-12 1.25E-12 2.33E-16 8.00E-14 2.00E-14 2.36E-16 2.00E-12 5.00E-13. 7.48E-15 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 9/30/1985 l.46E-15 5.00E-12 1.25E-12 7.69E-16 8.00E-14 2.00E-14 5.38E-16 2.00E-12 5.00E-13 7.86E-15 4.00E-12 1.00E-12 Not Analvzed Not Applicable Not Applicable 1/2/1986 8.40E-15 5.00E-12 1.25E-12 7.60E-16 8.00E-14 2.00E-14 2.99E-16 2.00E-12 5.00E-13 2.12E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 4/1/1986 5.79E-15 5.00E-12 1.25E-12 5.80E-16 8.00E-14 2.00E-14 1.34E-15 2.00E-12 5.00E-13 1.33E-14 4.00E-12 1.00E-12 Not Analyzed Not Aoolicable Not Aoplicable 6/30/1986 5.19E-15 5.00E-12 1.25E-12 7.83E-16 8.00E-14 2.00E-14 2.20E-15 2.00E-12 5.00E-13 7,14E-16 4,00E-12 1,00E-12 Not Analyzed Not Applicable Not Applicable 10/27/1986 4.G0E-15 5.00E-12 1.25E-12 4.67E-16 8.00E-14 2.00E-14 2.37E-15 2.00E-12 5.00E-13 1,13E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 12/15/1986 2.75E-15 5.00E-12 1.25E-12 5.90E-16 8.00E-14 2.00E-14 9.39E-16 2.00E-12 5.00E-13 1.20E-14 4.00E-12 1.00E-12 Not Analvzed Not APPiicabie Not Applicable 3/16/1987 4.64E-15 5.00E-12 1.25E-12 1.18E-15 8.00E-14 2.00E-14 4.97E-16 2.00E-12 5.00E-13 5.89E-14 4,00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 5/11/1987 4.35E-15 5.00E-12 1.25E-12 1.23E-14 8.0QE-14 2.00E-14 1.13E-15 2.00E-12 5.00E-13 2.21E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 9/9/1987 6.39E-15 5.00E-12 1.25E-12 1.50E-14 8.00E-14 2.00E-14 2.26E-15 2.00E-12 5.00E-13 l.57E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Aoolicable 11/2/1987 6.72E-15 5.00E-12 1.25E-12 4.53E-16 8.00E-14 2.00E-14 2.20E-15 2.00E-12 5.00E-13 2.55E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/16/1988 1.91E-15 5.00E-12 1.25E-12 l.35E-14 8.00E-14 2.00E-14 4.42E-16 2.00E-12 5.00E-13 4.44E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 5/18/1988 1.78E-14 5.00E-12 1.25E-12 4.39E-14 8.00E-14 2.00E-14 4.92E·16 2.00E-12 5.00E-13 1.38E-14 4.00E-12 1.00E-12 Not Analyzed Not APPiicabie Not APolicable 8/15/1988 7.56E-15 5.00E-12 1.25E-12 3.31E-14 8.00E-14 2.00E-14 1.SlE-15 2.00E-12 5.00E-13 1.97E-14 4,00E-12 l,00E-12 Not Analyzed Not Applicable Not Applicable 11/14/1988 1.47E-14 5.00E-12 1.25E-12 l.56E-15 8.00E-14 2.00E-14 2.57E-15 2.00E-12 5.00E-13 2.12E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/13/1989 2.47E-15 5.00E-12 1.25E-12 3.14E-15 8.00E-14 2.00E-14 6.94E-16 2.00E-12 5.00E-13 2.12E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 5/15/1989 2.S0E-16 5.00E-12 1.25E-12 7.68E-15 8.00E-14 2.00E-14 9.03E-16 2.00E-12 5.00E-13 8,05E-15 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 8/14/1989 6.50E-15 5.00E-12 1.25E-12 4.72E-15 8.00E-14 2.00E-14 2.35E-15 2.00E-12 5.00E-13 9.95E-15 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 11/13/1989 9.63E-15 5.00E-12 1.25E-12 4.05E-15 8.00E-14 2.00E-14 4.03E-15 2.00E-12 5.00E-13 1.99E-14 4.00E-12 1.00E-12 Not Analvz.ed Not Applicable Not Applicable 2/12/1990 8.92E-15 5.00E-12 1.25E-12 3.56E-15 8.00E-14 2.00E-14 2.89E-15 2.00E-12 5.00E-13 2.69E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 5/14/1990 8.90E-15 5.00E-12 l.25E-12 3.58E-15 8.00E-14 2.00E-14 2.33E-15 2.00E-12 5.00E-13 2.09E-14 4,00E-12 1.00E-12 Not Analvzed Not Applicable Not Applicable 8/13/1990 l.92E-15 5.00Ec12 1.25E-12 l.87E-15 8.00E-14 2.00E-14 5.06E-16 2.00E-12 5.00E-13 8.86E-15 4.00E-12 l.00E-12 Not Analvzed Not Aoplicable Not Aoplicable 11/12/1990 2.91E-15 5.00E-12 1.25E-12 2.25E-17 8.00E-14 2.00E-14 1.0SE-15 2.00E-12 5.00E-13 2.19E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 2/11/1991 1.67E-16 5.00E-12 1.25E-12 7.89E-16 8.00E-14 2.00E-14 6.38E-17 2,00Ecl2 5.00E-13 4.19E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 5/13/1991 1.87E-16 S.00E-12 1.2SE-U 2.61E-15 8.00E-14 2.00E-14 3.54E-16 2.00E-12 5.00E-13 1.40E-14 4.00E-12 l.00E-12 Not Analvzed Not Applicable Not APPiicabie 8/12/1991 4.85E-16 5.00E-12 1.25E-12 4.38E-16 8.00E-14 2.00E-14 1.27E-16 2.00E-12 5.00E-13 2.20E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 11/11/1991 l.77E-16 5.00E-12 1.25E-12 1.46E-16 8.00E-14 2.00E-14 3.76E-17 2,00E-12 5.00E-13 1.lSE-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/10/1992 1.83E·16 ·s.00Ec12 1.2SE-12 1.95E-15 8.00E-14 2.00E-14 1.33E-16 2.00E-12 5.00E-13 3.35E-14 4.00E-12 1.00E-12 Not Analvzed Not Applicable Not Applicable 5/11/1992 /l.40E-16 5.00E-12 1.25E-12 2.56E-16 8.00E-14 2.00E-14 4.04E-16 2.00E-12 5.00E-13 1.41E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Aoolicable 8/10/1992 9.09E-17 5.00E-12 1.25E-12 1.15E-16 8.00E-14 2.00E-14 4.S0E-17 2.00E-12 S.OOE-13 1.57E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/9/1992 2.07E-16 5.00E-12 l.25E-12 1.00E-16 8.00E-14 2.00E-14 3.62E-17 2.00E-12 5.00E-13 2.24E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 2/9/1993 l.73E-16 5.00.E.-12 1.25E-12 2.76E-17 8.00E-14 2.00E-14 2.89E-17 2.00E-12 5.00E-13 3.08E-14 4.00E-12 1.00E-12 Not Analvzed Not Apolicable Not Aoolicable 5/10/1993 2.70E-17 5.00E-12 1.25E-12 2.50E-17 8.00E-14 2.00E-14 8.74E-17 2.00E-12 5.00E-13 1.25E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 8/10/1993 9.00E-17 5.00E-12 1.25E-12 l.76E-16 8.00E-14 2.00E-14 0.OOE+oo 2.00E-12 5.00E-13 1.50E-14 4.00E-12 1.00E-12 Not Analyzed Not Aoolicable Not Aoolicable 11/8/1993 l.00E-16 5.00E-12 1.25E-12 1.00E-16 8.00E-14 2.00E-14 6.00E-17 2.00E-12 5.00E-13 1.75E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not J\pplicable 2/7/1994 1.l0E-16 5.00E-12 1.25E-12 3.38E-16 8.00E-14 2.00E-14 2.21E·16 2.00E-12 5.00E-13 3.08E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 5/9/1994 ,3.S0E-16 S.OOE-12 1.25E-12 2.82E-16 8.00E-14 2.00E-14 3.46E-16 2.00E-12 5.00E-13 1.73E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 8/9/1994 3.85E-16 5.00E-12 l.25E-12 3.53E-16 8.00E-14 2.00E-14 1.00E-16 2.00E-12 5.00E-13 1.00E-16 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not APPiicabie Date Effluent 9E-14 uCi/ml BHV-4U Effluent 2E-14 uCi/ml BHV-4T230 Effluent , !IE-13 uCi/ml BHV-4R Effluent 6E-13 uCi/ml BHV-4PB Effluent 4e-15 uCi/ml BHV-4T23Z Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= Limit= AIARAGoal= Z.25E-14 uCi/ml AIARA Goal= SE-15 uCi/ml AIARAGoal= 2.ZSE-13 uCi/ml AIARA Goal= 1.SE-13 uCi/ml AIARAGoal = lE-15 uCl/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC ZE-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable Limit= Limit= Limit= Limit= Limit= Pre 1994 1.ZSE-12 uCi/ml Pre 1994 AIARA SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable AIARAGOAL= GOAL= ALARA GOAL= AIARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 11/7/1994 6.21E-17 5.00E-12 1.25E-l2 9.70E-17 8.00E-14 2.00E-14 L96E-16 2.00E-12 5.00Ec-13 l.OOE-16 4,00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 2/7/1995 3.70E-16 .· 9.00E-14 2..25E-14 9.80E-17 2.00E-14 5.00E-15 9.70E-17 9.00E-13 2.25E-13 8.84E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 5/9/1995 9.40E-17 9.00E-14 2.25E-14 2.86E-16 2.00E-14 5.00E-15 l.90E-16 9.00E-13 2.25E-13 2.90E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 8/9/1995 1.45E-16 9.00E-14 2.25E-14 2.31E-15 2.00E-14 5.00E-15 7.lOE-17 9.00E-13 2.25E-13 2.70E-15 6.00E-13 l.50E-13 Not Analvzed Not Applicable Not Applicable 11/11/1995 1.43E-14 9.00E-14 2.25E-14 5.70E-15 2.00E-14 5.00E-15 2.61E-15 9.00E-13 2..25E-13 5.60E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 2/5/1996 1.19E-14 9.00E-14 2.25E-14 3.80E-16 2.00E-14 5.00E-15 6.lOE-15 9.00E-13 2.25E-13 6.48E-15 6,00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 5/6/1996 4.55E-16 9.00E-14 2.25E-14 3.57E-15 2.00E-14 5.00E-15 2.84E-16 9.00E-13 2.25E-13 7.68E-15 6.00E-13 l.50E-13 Not Analyzed Not Apolicable i:,lot Applicable 8/5/1996 7.78E-16 9.00E-14 2.25E-14 3.SlE-15 2.00E-14 5.00E-15 1.69E-16 9.00E-13 2.25Ec13 4.90E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable .Not Applicable 11/6/1996 1.36E-15 9.00E-14 2.25E-14 l.OOE-16 2.00E-14 5.00E-15 4.21E-16 9.00E-13 2.25E-13 l.lOE-14 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 2/6/1997 1.00E-16 9.00E-14 2.25E-14 l.40E-16 2.00E-14 5.00E-15 1.03E-16 9.00E-13 2.25E-13 6.76E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 5/5/1997 1.00E-16 9.00E-14 2.25E-14 4.00E-16 2.00E-14 5.00E-15 2.24E-16 9.00E-13 2.25E-13 4.55E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 8/11/1997 4.74E-16 9.00E-14 2.25E-14 9.07E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 5.55E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 1/5/1998 8.31E-16 9.00E-14 .2.25E-14 4.82E-16 2.00E-14 5.00E-15 'l.77E-16 9.00E-13 2.25E-13 5.28E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 4/28/1998 3.32E-16 9.00E-14 2.25E-14 4.43E-15 2.00E-14 5.00E-15 1.ZlE-16 9.00E-13 2.25Ec13 7.43E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 7/31/1998 4.60E-16 9.00E-14 .2.25E-14 9.02E-16 2.00E-14 5.00E-15 3.54E-16 9.00E-13 2.25E-13 6.91E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 9/28/1998 4.08E-16 9.00E-14 2.25E-14 4.93E-16 2.00E-14 5.00E-15 2.53E-16 9.00E-13 2.25E-13 4.52E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 12/28/1998 7.72E-16 9.00E-14 2.25E-14 3.75E-16 2,00E-14 5.00E-15 3.43E-16 9.00E-13 2.25E-13 6.73E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 3/29/1999 5.llE-16 . 9.00E-14 2.25E-14 4.70E-16 2.00E-14 5.00E-15 3.70E-16 9.00E-13 2.25E-13 8.96E-15 6.00E-13 l.50E-13 Not Analvzed lllotApplicable Not Applicable 7/3/1999 5.90E-16 9.00E-14 2.25E-14 9.89E-16 2.00E-14 5.00E-15 1.28E-16 9.00E-13 2.25E-13 6.40E-15 6.00E-13 l.SOE-13 Not Analyzed Not Applicable Not Applicable 9/27/1999 1.70E-15 9.00E-14 2.25E-14 7.50E-16 2.00E-14 5.00E-15 4.61E-16 9.00E-13 2.25E-13 7.86E-15 6,00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 12/28/1999 1.03E-15 9.00E-14 2.25E-14 7.SOE-16 2.00E-14 5.00E-15 2.43E-16 9.00E-13 2.25E-13 6.42E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable .3/27/2000 1.00E-16 9.00E-14 2.25E-14 2.13E-16 2.00E-14 5.00E-15 2.20E-16 9.00E-13 2.25E-13 5.61E-15 6.00E-13 l.50E-13 Not Analvzed Not Applicable Not Applicable 6/26/2000 1.75E-16 9.00E-14 2.25E-14 3.08E-16 2.00E-14 5.00E-15 l.llE-16 9.00E-13 2.25E-13 3,92E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 9/26/2000 3.65E-16 . 9.00E-14 2.25E-14 2.0lE-16 2.00E-14 5.00E-15 2.24E-16 9.00E-13 2.25E-13 7.79E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 12/26/2000 2.27E-16 9.00E-14 2.25E-14 l.OOE-16 2.00E-14 5.00E-15 4.35E-16 9.00E-13 2.25E-13 8.45E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 3/26/2001 1.45E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 l.OOE-16 9.00E-13 2.25E-13 6.37E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/2/2001 1.00E-16 9.00E-14 2.25E-14 l.05E-16 2.00E-14 5.00E-15 1.00E-16 . 9.00E-13 2.25E-13 6.99E-15 6.00E-13 l.SOE-13 Not Analyzed Not Applicable Not Applicable 9/24/2001 1.91E-16 9.00E-14 2.25E-14 l.OOE-16 2.00E-14 5.00E-15 2.0lE-16 9.00E-13 2.25E-13 8,04E-15 6.00E-13 1.SOE-13 Not Analyzed Not_Applicable NotApplicable 12/31/2001 '1.38E-16 9.00E-14 2.25E-14 2.05E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.83E-15 6.00E-13 l.SOE-13 Not Analyzed Not Applicable Not Applicable 4/1/2002 2.20E-16 9.00E-14 2.25E-14 3.38E-16 2.00E-14 5.00E-15 1.26E-16 9.00E-13 2.25E-13 7.48E-15 6.00E-13 l.50E-13 Not Analyzed Not Apolicable Not Applicable 7/1/2002 1.97E-16 9.00E-14 2.25E-14 4.lOE-16 2.00E-14 5.00E-15 l.OOE-16 9.00E-13 2.25E-13 7.40E-15 6.00E-13 1.50E-13 Not Analvzed Not Applicable Not Applicable 9/30/2002 2.30E-16 9.00E-14 2.25E-14 2.42E-16 2.00E-14 S.OOE-15 1.56E-16 9.00E-13 2.25Ecl3 4.21E-15 6.00E-13 l,SOE-13 Not Analyzed Not Applicable Not Applicable 12/30/2002 l.OOE-16 9.00E-14 2.25E-14 l.92E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 9.42E-15 6.00E-13 l.SOE-13 Not Analyzed Not Applicable .Not Applicable 3/31/2003 '2.SOE-16 9.00E-14 2.25E-14 1.69E-16 2.00E-14 5.00E-15 1.29E-16 9.00E-13 2.25E-13 4.55E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 6/30/2003 t.OOE-16 9.00E-14 2.25E-14 2.87E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 4,20E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/29/2003 t.OOE-16 9.00E-14 2.25E-14 8.53E-16 2.00E-14 5,00E-15 3.32E-16 9.00E-13 2.25E-13 8.69E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/29/2003 1.02E-16 9.00E-14 2.25E-14 l.OOE-16 2.00E-14 5.00E-15 l.49E-15 9.00E-13 2.25E-13 9.45E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 3/29/2004 1.00E-16 9.00E-14 2.25E-14 1.26E-16 2.00E-14 5.00E-15 l.OOE-16 9.00E-13 2.25E-13 2.0DE-15 6.00E-13 l.5DE-13 Not Analyzed Not Applicable Not Applicable 6/27/2D04 t.OOE-16 9.00E-14 2.25E-14 2.53E-16 2,00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 3.23E-15 6.00E-13 l,SOE-13 Not Analyzed Not Applicable Not Applicable 9/27/2004 :1.00E-16 9.00E-14 2.25E-14 l.15E-16 2.00E-14 S.OOE-15 1.00E-16 9.00E-13 2.25E-13 9.68E-15 6.00E-13 1.SOE-13 Not Analvzed Not Applicable Not Applicable 12/27/2004 '1.00E-16 9.00E-14 2.25E-14 2,30E-16 2.00E-14 5.00E-15 l.OOE-16 9.00E-13 2..ZSE-13 1.37E-14 6.00E-13 l.SOE-13 Not Analyzed Not Applicable Not Applicable 3/28/2005 t.OOE-16 9.00E-14 2.25E-14 2.66E-16 2.00E-14 5.00E-15 3.15E-16 9.00E-13 2.25E-13 9,22E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 6/29/2005 t.47E-16 9.00E-14 2.25E-14 1.45E-15 2.00E-14 5.00E-15 1.42E-16 9.00E-13 2.25E-13 9.34E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/26/2005 :2.0lE-16 9.00E-14 2.25E-14 2,06E-16 2.00E-14 5.00E-15 4.80E-16 9.00E-13 2.25Ec13 2.12E-14 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 1/3/2006 4.54E-16 9.00E-14 2.25E-14 1.24E-16 2.00E-14 5.00E-15 l.OOE-16 9.00E-13 2.2SE-13 3,60E-14 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 4/3/2006 1.99E-16 9.00E-14 2.25E-14 1.32E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 8.36E-15 6.00E-13 l.50E-13 Not Analvzed Not Applicable Not Applicable 7/3/2006 2.76E-16 9.00E-14 2.25E-14 2.63E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.03E-14 6.00E-13 1,50E-13 Not Analvzed Not Applicable Not Applicable 10/2/2006 4.97E-16 9.00E-14 2.25E-14 2.37E-16 2.00E-14 5.00E-15 l.OOE-16 9.00E-13 2.25E-13 1.60E-14 6.00E-13 1,50E-13 Not Analyzed Not Applicable Not Applicable 1/1/2007 6.46E-16 9.00E-14 2.25E-14 2.81E-16 2.00E-14 5.00E-15 l.OOE-16 9.00E-13 2.25E-13 2.lOE-14 6.00E-13 l.SOE-13 Not Analyzed Not Applicable Not Aoolicable 4/2/2007 7.08E-16 9.00E-14 Q..25.E-14 3.20E-16 2.00E-14 5.00E-15 l.OOE-16 9.00E-13 USEc-13 l.54E-14 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 7/2/2007 9.41E-16 9.00£-14 2..ZSE-1.4 1.46E-16 2.00E-14 5.00E-15 1.99E-16 9.00E-13 2.25E-13 2,56E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/30/2007 3.30E-16 9.00E-14 2.25E-14 S.50E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.ZSE-13 7,57E-15 6,00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 12/31/2007 1.42E-15 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 9.93E-15 6.00E-13 1.SOE-13 Not Analvzed Not Applicable Not Applicable Date Effluent 9E-14 uCi/ml BHV-4U Effluent ZE-14 uCi/ml BHV-4TZ30 Effluent 9E-13 uCi/ml BHV-4R Effluent 6E-13 uCi/ml BHV-4PB Effluent 4e-15 uCi/ml BHV-4T232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= Limit= ALARAGoal = Z.ZSE-14 uCi/ml ALARA Goal= SE-15 uCi/ml ALARAGoal= 2.ZSE-13 uCi/ml ALARA Goal= 1.SE-13 uCi/ml ALARAGoal= lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC ZE-12 uCi/ml Pre 1994 MPC 4E-1Z uCi/ml Pre 1994 MPC Not Applicable Limit= Limit= Limit= Limit= limit= Pre 1994 1.ZSE-12 uCi/ml Pre 1994 ALARA SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable ALARAGOAL= GOAL= ALARA GOAL= ALARAGOAL= tone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 3/31/2008 1.25E-16 9.00E-14 2.25E-14 7.72E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 4.09E-15 6.00E-13 1.50E-13 Not Analy,zed N_ot Applicable N_ot Applicable 6/30/2008 1.28E-15 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 3.61E-16 9.00E-13 2.ZSE-13 1.18E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/30/2008 2.72E-15 9.00E-14 2.25E-14 1.27E-15 2.00E-14 5.00E-15 7.66E-16 9.00E-13 2.25E-13 1.lOE-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/31/2008 2.88E-15 9.00E-14 2.ZSE-14 1.l0E-15 2.00E-14 5.00E-15 6.56E-16 9.00E-13 2.25E-13 1.38E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/15/2009 1.56E-15 9.00E-14 2.25E-14 4.57E-16 2.00E-14 5.00E-15 2.99E-16 9.00E-13 2.25E-13 4.97E-15 6.00E-13 1.S0E-13 Not Analvzed Not Applicable Not Aoolicable 6/15/2009 5.67E-17 9.00E-14 2.ZSE-14 2.17E-16 2.00E-14 5.00E-15 1.5.lE-16 9.00Ec13 .2 . .ZSE-13 4.47E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/15/2009 4.05E-15 9.00E-L4 2.25Ec14 1.45E-15 2.00E-14 5.00E-15 2.52E-16 9.00E-13 2.25E-13 1.24E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/15/2009 6.SOE-15 9.00E-14 2.25E-14 ' 3.48E-16 2.00E-14 5.00E-15 1.33E-16 9.00E-13 2.25E-13 7.60E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Aoolicable 3/31/2010 6.0lE-15 9.00E-14 2.25E-14 1.26E-16 2.00E-14 5.00E-15 l.34E-16 9.00E-13 2.25E-13 1.19E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/30/2010 2.33E-15 9.00E-14 2.ZSE-14 7.29E-16 2.00E-14 5.00E-15 2.66E-16 9.00E-13 2.25E-13 3.27E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/30/2010 4.77E-15 9.00E-14 2.ZSE-14 1.80E-15 2.00E-14 5.00E-15 8.23E-16 9.00E-13 2.ZSE-13 5.llE-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Aoolicable 12/31/2010 3.93E-15 9.00E-14 2.25E-14 3.90E-16 2.00E-14 5.00E-15 2.56E-16 9.00E-13 2.25E-13 1.13E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 4/4/2011 1.29E-15 9.00E-14 2.25E-14 1.40E-16 2.00E-14 5.00E-15 1.58E-16 9.00E-13 2.25E-13 1.llE-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/4/2011 3.30E-15 9.00E-14 2.25E-14 5.44E-16 2.00E-14 5.00E-15 4.lBE-16 9.00E-13 2.25E-13 8.26E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 10/3/2011 1.32E-15 9.00E-14 2.25E-14 7.89E-16 2.00E-14 5.00E-15 l . .28E-16 9.00E-13 2.ZSE-13 1.18E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 1/3/2012 1.04E-15 9.00E-14 2.25Ec14 3.25E-16 2.00E-14 5.00E-15 2.28E-16 9.00E-13 2.25E-13 1.14E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 4/3/2012 2.SlE-15 9.00E-14 2.25E-14 5.02E-16 2.00E-14 5.00E-15 2.27E-16 9.00E-13 2.25E-13 1.03E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Aoolicable 7/2/2012 2.62E-15 9.00E-14 2.ZSE-14 1.23E-15 2.00E-14 5.00E-15 2.97E-16 9.00E-13 2.25E-13 9.27E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 10/1/2012 4.0SE-15 9.00E-14 2.25E-14 8.33E-16 2.00E-14 5.00E-15 5.43E-16 9.00E-13 2.25E-13 1.21E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Aoplicable 12/31/2012 2.32E-15 9.00E-14 2.25E-14 5.89E-16 2.00E-14 5.00E-15 3.75E-16 9.00E-13 2.ZSE-13 1.56E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/25/2013 3.04E-15 9.00E-14 2 . .ZSE-14 4.99E-16 2.00E-14 5.00E-15 2.79E-16 9.00E-13 2.25E-13 2.13E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/2/2013 2.SOE-15 9.00E-14 2.25E-14 3.62E-16 2.00E-14 5.00E-15 2.40E-16 9.00E-13 2.25E-13 4.93E-15 6.00E-13 1.50E-13 Not Analvzed Not Aoolicable Not Aoolicable 9/30/2013 2.98E-15 9.00E-14 2.25E-14 4.49E-16 2.00E-14 5.00E-15 1.54E-16 9.00E-13 2.25E-13 7.49E-15 6.00E-13 1.50E-13 Not Analyzed Not l\ppJicable Not Applicable 12/30/2013 3.BBE-15 9.00E-14 225E-14 1.03E-16 2.00E-14 5.00E-15 4.47E-17 9.00E-13 2.25E-13 2.93E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 3/31/2014 4.69E-15 9.00E-14 2.25E-14 l.37E-16 2.00E-14 5.00E-15 3.53E-16 9.00E-13 2.25E-13 1.08E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/30/2014 4.16E-15 9.00E-14 2.25E-14 6.96E-16 2.00E-14 5.00E-15 1.77E-15 9.00E-13 2.25E-13 1.06E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/30/2014 6.56E-15 9.00E-14 2.ZSE-14 2.73E-16 2.00E-14 5.00E-15 2.77E-16 ,9.00E-13 2.25E-13 1.llE-14 6.00E-13 1.50E-13 1.0lE-17 4.00E-15 1.00E-15 12/29/2014 2.00E-16 9.00E-14 2.ZSE-14 4.00E-17 2.00E-14 5.00E-15 4.00E-17 9.00E-13 2.25E-13 1.90E-14 6.00E-13 1.50E-13 1.00E-17 4.00E-15 1.00E-15 3/30/2015 5.90E-15 9.00E-14 2.25E-14 7.00E-17 2.00E-14 S.00E-15 1.00E-16 9.00E-13 2.25E-13 2.80E-14 6.00E-13 1.50E-13 5.00E-19 4.00E-15 1.00E-15 6/29/2015 1.SOE-15 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 1.20E-14 6.00E-13 1.S0E-13 1.00E-17 4.00E-15 1.00E-15 9/28/2015 5.00E-15 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.ZSE-13 7.00E-15 6.00E-13 1.50E-13 7.00E-18 4.00E-15 1.00E-15 12/28/2015 4.SOE-16 9.00E-14 2.25E-14 7.00E-17 2.00E-14 5.00E-15 6.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.50E-13 8.00E-19 4.00E-15 1.00E-15 3/28/2016 5.00E-16 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5.00E-15 5.00E-17 9.00E-13 2.25E-13 1.70E-14 6.00E-13 1.50E-13 2.00E-18 4.00E-15 1.00E-15 6/27/2016 2.90E-15 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5.00E-15 4.00E-16 9.00E-13 2.ZSE-13 8.80E-15 6.00E-13 1.50E-13 S.OOE-18 4.00E-15 1.00E-15 9/27/2016 6.20E-15 9.00E-14 2.25E-14 4.40E-16 2.00E-14 5.00E-15 2.20E-15 9.00E-13 2.25E-13 3.40E-16 6.00E-13 1.S0E-13 7.lOE-18 4.00E-15 1.00E-15 12/27/2016 4.lOE-15 9.00E-14 2.25E-14 3.00E-16 2.00E-14 5.00E-15 4.SOE-16 9.00E-13 2.25E-13 2.20E-14 6.00E-13 1.S0E-13 4.SOE-18 4.00E-15 1.00E-15 3/27/2017 2.60E-15 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 3.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.50E-13 1.00E-18 4.00E-15 1.00E-15 6/26/2017 2.00E-16 9.00E-14 2.25E-14 9.00E-17 2.00E-14 5.00E-15 8.00E-17 9.00E-13 2.25E-13 1.lOE-14 6.00E-13 1.50E-13 1.00E-17 4.00E-15 1.00E-15 9/25/2017 2.SOE-15 9.00E-14 2.25E-14 3.00E-16 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 l.60E-14 6.00E-13 1.S0E-13 4.00E-18 4.00E-15 1.00E-15 12/26/2017 1.00E-14 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 2.20E-14 6.00E-13 1.S0E-13 2.00E-17 4.00E-15 1.00E-15 3/26/2018 6.SOE-16 9.00E-14 2.25E-14 1.20E-16 2.00E-14 5.00E-15 5.70E-17 9.00E-13 2.25E-13 1.40E-14 6.00E-13 1.S0E-13 4.00E-18 4.00E-15 1.00E-15 6/25/2018 1.SOE-15 9.00E-14 2.25E-14 8.20E-17 2.00E-14 5.00E-15 3.70E-17 9.00E-13 2.25E-13 l .lOE-14 6.00E-13 1.S0E-13 1.20E-17 4.00E-15 1.00E-15 9/24/2018 2.20E-15 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.50E-13 1.00E-17 II.OOE-15 1.00E-15 12/31/2018 3.40E-15 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 4.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.S0E-13 6.00E-18 4.00E-15 1.00E-15 4/1/2019 1.00E-16 9.00E-14 2.25E-14 9.00E-17 2.00E-14 5.00E-15 8.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 4.00E-18 4.00E-15 1.00E-15 7/1/2019 6.00E-17 9.00E-14 2.25E-14 7.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.50E-13 a.OOE-18 4.00E-15 1.00E-15 9/30/2019 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 9.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.50E-13 3.00E-18 4.00E-15 1.00E-15 1/6/2020 4.00E-17 9.00E-14 2.25E-14 6.00E-17 2.00E-14 5.00E-15 4.00E-17 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.50E-13 3.00E-18 4.00E-15 1.00E-15 3/30/2020 1.00E-16 9.00E-14 2.25E-14 9.00E-17 2.00E-14 5.00E-15 1.l0E-15 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.50E-13 '1.00E-18 4.00E-15 1.00E-15 Date Effluent 9E-14 uCi/ml BHV-4U Effluent 2E-14 uCi/ml BHV-4T230 Effluent 9E-13 uCi/ml BHV-4R Effluent 6E-13 uCi/ml BHV-4PB Effluent 4e-15 uCi/ml BHV-4T232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= Limit= ALARAGoal = 2,25E-14 uCi/ml A LARA Goal= SE-15 uCi/ml ALARA Goal= 2.25E-13 uCi/ml ALARAGoal= 1.SE-13 uCi/ml ALARAGoal= lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC BE-14 uCi/ml Pre 1994 MPC 2E-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable Limit= Limit= Limit= Limit= Limit= l>re 1994 1.25E-12 uCi/ml Pre 1994 ALARA SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable ALARAGOAL= GOAL= ALARA GOAL= ALARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 6/30/2020 2.l0E-15 9.00E-14 2.25E-14 2.00E-16 2,00E-14 S.00E-15 1.00E-16 9.00E-13 2.25E-13 7.00E-15 6,00E-13 1,S0E-13 S.00E-18 4.00E-15 l.00E-15 10/12/2020 l.40E-15 9.00E-14 2.2SE-14 2.00E-16 2.00E-14 S.00E-15 1.00E-16 9.00E-13 2.2SE-13 1.00E-14 6.00E-13 1.S0E-13 9.00E-18 4.00E-15 l.00E-15 1/4/2021 6.00E-16 9.00E-14 2.2SE-14 6.00E-17 2.00E-14 S.00E-15 8.00E-17 9.00E-13 2.2SE-13 2.00E-14 6.00E-13 1.S0E-13 S.00E-18 4.00E-15 1.00E-15 4/5/2021 1.00E-16 9.00E-14 2.2SE-14 1.00E-16 2.00E-14 S,00E-15 S.00E-16 9.00E-13 2.2SE-13 4.00E-15 6.00E-13 l.S0E-13 4.00E-18 4.00E-15 1.00E-15 6/28/2021 5.00E-17 9.00E-14 2.2SE-14 7.00E-17 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.2SE-13 1.00E-14 6.00E-13 l.S0E-13 8.00E-18 4.00E-15 l.00E-15 10/4/2021 6.00E-17 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 3.00E-16 9.00E-13 2.2SE-13 2.00E-14 6.00E-13 LS0E-13 7.00E-18 4.00E-15 l.00E-15 1/4/2022 6.00E-17 9.00E-14 2.25E-14 4.00E-17 2.00E-14 5,00E-15 8.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.S0E-13 S.00E-18 4.00E-15 1.00E-15 4/4/2022 1.00E-16 9.00E-14 2.2SE-14 1.00E-16 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.S0E-13 3.00E-18 4.00E-15 1.00E-15 7/5/2022 8.00E-17 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5.00E-15 4.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 S.00E-18 4.00E-15 l.00E-15 10/3/2022 7.00E-17 9.00E-14 2.25E-14 4,00E-17 2.00E-14 5,00E-15 3.00E-17 9.00E-13 2.25E-13 8.00E-15 6.00E-13 1.S0E-13 2.00E-18 4.00E-15 l.00E-15 1/3/2023 7.00E-16 9.00E-14 2.25E-14 8.00E-17 2.00E-14 5,00E-15 1.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 2.00E-18 4.00E-15 l.00E-15 4/3/2023 S.00E-17 9.00E-14 2.25E-14 2,00E-16 2.00E-14 5.00E-15 7.00E-16 9.00E-13 2.25E-13 8.00E-15 6.00E-13 1,S0E-13 4.00E-18 4.00E-15 1.00E-15 7/3/2023 3.00E-17 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 8.00E-15 6,00E-13 1,S0E-13 4.00E-18 4.00E-15 1.00E-15 Sep-81 Sep-82 Sep-83 Sep-84 Sep-85 Sep-86 Sep-87 + Sep-88 Sep-89 C Sep-90 -, !l) Sep-91 ::::, c:: Sep-92 3 z Sep-93 !l) ..... Sep-94 c:: -, ~ Sep-95 + Sep-96 Sep-97 -I Sep-98 ::::,- 0 Sep-99 ~-c:: 3 Sep-00 I N w Sep-01 0 Sep-02 + Sep-03 Sep-04 ::0 !l) Sep-05 a. c:: Sep-06 3 I Sep-07 N N O> Sep-08 + Sep-09 Sep-10 r Sep-11 Cl) !l) a. Sep-12 I N ....>. Sep-13 0 Sep-14 + Sep-15 -I Sep-16 ::::,-Sep-17 0 ~-c:: Sep-18 3 I Sep-19 N w N Sep-20 Sep-21 Sep-22 (Log Scale) ....,. ....,. ....,. ....>. ....,. 6 6 0 6 6 0 0 0 0 0 m m m m m I I I I I ....,. ....,. ....,. ....>. ....,. 00 --..J O> (}1 J:>. -' -I JI lj -~ll -· 7 ; ; I I ~~ -·-·': '' 1 ; ,~- ,. ·-. ' 'f ,,__ ~ -... • I .,.. I I l --11 ~ ... ~ ._ I.;., -'t '' -... __ i i-..._ I ' . -~ : I I ~ ~ ~ I ---t::,e -,. I 'I I I F--it,-.,_.._ .,;~' • I .:2i. -• I I .... = I ~:-... I . I...,, I -...-..i--. .. -►~• !ii! -I I -., I ' ~ I ,, • -I -◄ ... ! ~ . ~ .. -'--1•1 . ~ , ... i.::u~ . ◄ ... : ~ .. -===i~:::--=:r:::::• ~.. ~ ◄~~! ~ I I . ~~ ~--~--~-· ►i==. -~~ • i-1 _ -= ~ II -· t::+ ~ r---~~ -·-~,...~~ . I ~►- -T ......... 1 ·-~~ I ~ -I ..;t ~ ..... i 1 I ·:: ---.... ... .... l ... .._ -W:: 1 J -e,-'":!,. J ......... I ~ ~.,,....II , . ~~=---I :+ ""1, ---~-=l,, 45:,,,► ! ......... •-~ ~~n-~::::=1,.~ , , al! r , 1 1 ~ I I 1 ·· .: , ~ ........ r---... ...... ~ ~ ..... ---ro~ ' I ~ ~ 1• I II - , " J ,..... " :-1 ~·- l ~ •o:::: ,_..,. ·-...... ~i. -~!.A~ "" • I .._. .-=1:=lt..,,.LL. ~ I .... • ~ .~.. I I I I ~ I◄• ~ ◄~~µ,I ·~ ---i I ---. ◄'-~ I l.--J ;-, ► I◄ • ....,. 6 0 m I ....,. w ....,. 6 0 m I ....,. N III :::c t ;:;a D) C. 0 ::s C: (") C. CD C') 0 ::s (") CD ::s -iiJ C!: 0 ::s en -C: C') ::::: 3 - -E :::: 0 :, -u, C 0 ~ ns ... -C G) C.) C 0 0 I! :, -ns z I E :, C I! :::> i ::c Ill ' ..-N CV) ..-..-..- I I I UJ UJ UJ 0 0 0 ~ ~ ~ ..-..-..- I I I ' ll I ◄rii I! ) ,.,.....-1 I 1 1 II ~ ~· ~N t--+-ll ◄lk...-L: I 111 " . 1 1 ! I r I T I ~ I I I I I I l1 ~!~ ◄ ~~ J..-,........ ~ ,. I • 1, I k::1 -I I '' ~ ' -' -•:--► ~ ~ ► -. N---; --,r=" ... ~ t<=I-\+.__ ~ ~ ► II ·~ ITT -~ I~ I -' 'I I I I --I ~ I I I J I ◄ -, ~ I -~ -... .- Ii I I -I ' .. ..,_.._, I I ' "' ' f!J~ ~ I -' I" I ll I I I I ..-r""' .. i" I I 1 11 1 I II ,_ ' -, - '<t LO (0 ..-..-..- I I I UJ UJ UJ 0 0 0 0 ~ ~ (e1e:>s 607) ..-..- - - - - - - - - - - - - - - - - I'-..-I UJ 0 ~ ..- zz-des ~z-des oz-des 6~-des 8~-des L~-des g~-des ~a-des v~-des £~-des z~-des ~ ~-des o~-des 50-des so-des Lo-des go-des go-des vo-des £a-des zo-des ~a-des oo-des 55-des 95-des L6-des 95-des 95-des 175-des £5-des z5-des ~5-des 05-des 59-des es-des Le-des 99-des gg-des vs-des £a-des ze-des ~e-des ....,. 0 0 rn I ....,. ~ ....,. 0 0 rn I ....,. 0) 0 0 rn I ....,. 01 (Log :5-cale) 0 0 rn I ....,. ,l:r,. ....,. 0 0 rn I ....,. w ....,. 0 0 rn I ....,. N ....,. 0 0 rn I ....,. ....,. ~:~~~~i 1 11111111 1111 ~ Ti 1111 11 1 .. 1 1111 1111 11111111 1 1 1 111111 I Sep-83 - Sep-84 Sep-85 - Sep-86 - Sep-87 - Sep-88 - Sep-89 Sep-90 - Sep-91 Sep-92 Sep-93 Sep-94 Sep-95 Sep-96 Sep-97 Sep-98 Sep-99 Sep-00 - Sep-01 Sep-02 Sep-03 Sep-04 Sep-05 Sep-06 Sep-07 Sep-08 Sep-09 Sep-10 Sep-11 Sep-12 Sep-13 Sep-14 - Sep-15 Sep-16 Sep-17 - Sep-18 Sep-19 - Sep-20 - Sep-21 ~ ---. I"' ll 11"' I I rl7T""'-~ Ii I jl I ... ~ 11+,ffil . 1111l:r·1 rir 'f= 11 I w ~ ~ t: I ~ mm '~ .-Pf ~ ~ ~ ~ ll I -_uI 1--...-T" ~ Sep-22 -1 ttffH+lL1 I 111111 1 I 1 11 11 111 I 11111111 I I 1 111 11 1 I 111 11111 "tJ )> m iiP ""=I: ...,l>c CO ;;!:J Ill co )> ::J ,l:r,. G'); 35: 0 O "tJ !!!. ::J (") II 0 r Ill -· U'I ::J ~-~~ -;;-U'l 5" 00 C: ::J m 9. r .!.. 3 §" ,1:r,. __ _ C: ,+ (") II :::: "' 3 r;n .... ,l:r,. C: (") 3 [JJ :I: ~ .l=lr,, -I :r 0 ::::!. C: 3 I N w 0 (") 0 ::::s (") Cl) ::::s -siJ !:!': 0 ::::s u, -C: (") ::::: 3 - - u, C: 0 -:.::; C'G I.. -C: Cl) (.) C: 0 (J U) N N I E ::::, "C C'G 0::: i ::z:: m ..... ..... I w 0 ~ ..... --.... i- ' N (") ..... ..... I I w w 0 0 ~ ~ ..... ..... ~ T I I I Ill ~ r-:::::1 ' ~ i! -l I I . ◄ l ◄ ~~ LJI;. ~J IJ_ II I I_· I ~- I~, I I 1 I 1· i I ·1 :...-4F'..,lt ~i1 :::=-. I◄-=:::: ~ -j1 ~ ~ ·'i! ....... -·~ ...... !---_......... 4ic::c ,,... I ~ I ◄j l -, ... ~ ,..,:::::=,. 111,,-~ -1; -.~ '"~ • . I ◄ ~· ·~ J. I 1 ... .-" --__.... II I_:_ -I I ...... ◄K ~ 11 ... -.... -+-I I I ~-..., "► ,. -I .1:::::> ~ i ' • ~ ·r~ ' ' I '<:I" LO (0 ..... ..... ..... I I I w w w 0 0 0 0 0 ~ 'ia1eos 607f ..... I .. ' I'-..... I w 0 ~ ..... - . - - - - - - - . - - - CX) ..... I w 0 ~ ..... zz-das ~z-das oz-das 6~-das s~-das L~-das g~-das g~-das v~-das £~-das z~-das ~ ~-das o~-das 50-das so-das Lo-das eo-das go-das vo-das £0-das zo-das ~o-das oo-das 55-das 95-das L6-das 95-das 95-das 175-das £5-das z5-das ~5-das 05-das 59-das 99-das Ls-das 99-das 99-das vs-das rn-das zs-das ~g-das -E :::: (.) :::, -,,, C: 0 :.:; f! -C: a, (.) C: 0 (.) 0 -N I "'C ca a, ...J ;t J: m ..-..-I UJ 0 ~ ..- N C') ..-..-I I UJ UJ 0 0 ~ ~ ..-..- I }~ ..--' ) ► ._I r---. ► l~ -I ~ J. ◄ t<::; b l """" I ' ... "~I 1; ~""""' i ....... •t ' "'.i I I ~.+ ... -◄ ~l 19" ...... ......._. +:::: ► r,-- i ~ ~ '...!. ,-◄ I .:::,► ~ ~ .~• . ' ::,► .1 • 1•1-:= t I I :~ 1 .. ' -~ 1,I"" ,_._ ~ ----,____, l~ ""t i+J:. ' --.:. -I ~,::;;..:_ ........ ,.. -I ~ ;::,+ ,;;f" ..-I UJ 0 0 (a1e::i5 607) -- I I I - ID ..-I UJ 0 0 ..- co ..-I UJ 0 ~ ..- - - - . - - - - - - - - - - - - r---..-I UJ 0 ~ ..- zz-das ~z-das oz-das s~-das g~-das L~-das g~-das g~-das v~-das £~-das z~-das ~ ~-das o~-das so-das ao-das Lo-das 90-das so-das vo-das £0-das zo-das ~o-das oo-das ss-das as-das Ls-das gs-das 96-das vs-das £s-das zs-das ~s-das os-das sa-das gg-das La-das gg-das gg-das p,g-das £a-das zg-das ~g-das Sep-14 Dec-14 Mar-15 Jun-15 Sep-15 Dec-15 Mar-16 Jun-16 Sep-16 Dec-16 Mar-17 Jun-17 Sep-17 Dec-17 Mar-18 Jun-18 Sep-18 Dec-18 Mar-19 Jun-19 Sep-19 Dec-19 Mar-20 Jun-20 Sep-20 Dec-20 Mar-21 Jun-21 Sep-21 Dec-21 Mar-22 Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 ....>. 0 0 m I ....>. co . - - - - - - - - . . . . - - - . - - . - . - - ....>. 0 0 m I ....>. 00 ' ~ O• - ---~ ~ < i..----- r---- -~~ i-:- ~ "" ► '/ v ...... ~ r--I'- .... •k ... ◄1(1 "' ~ ( I I I ◄ ► 1.---' ► :---.. ...._N~ i\ \ I,' ,( J ........ J 1/ / '\ / D ► ~ ~ ~► ◄► ....>. (Log ?,Cale) ....>. 0 0 0 0 0 0 m m m I I I ....>. ....>. ....>. --..J 0) CJ1 ' ' ' ► ► ' ► • ► >· 1 ....>. ....>. 0 0 0 0 m m I I ....>. ....>. .i:,.. <,) ' )>m ~~ ::0 CD ►a Gl n 0 O Ill ::J ii g ... ::J ..... O ji! m ,... I -• ... 0 u, ::J C: r-n -· -· 3 3 ;:;: -II .s:,. r;n ... u, C: D 3 to ::c t ..... :::r 0 ::::!. C: 3 I N w N 0 0 :::I (") Cl) :::I -DI ct 0 :::I tn -C: 0 ::::: 3 - TABS BHV-5 AIR SAMPLING GRAPHS AND DATA TABLE Date Effluent 9E-14 uCi/ml BHV-5U Effluent 2E-14 uCi/ml BHV-5T230 Effluent 9E-13 uCi/ml BHV-5R Effluent 6E-13 uCi/ml BHV-5PB Effluent 4e-15 uCi/ml BHV-5T232 Concentration Concentration Concentration Concentration Concentration limit= limit= Limit= limit= Limit= AlARAGoal= 2.25E-14 uCi/ml ALARA Goal= SE-15 uCi/ml ALARA Goal= 2.25E-13 uCi/ml ALARA Goal= 1.SE-13 uCi/ml ALARAGoal = lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC BE-14 uCi/ml ,Pre 1994 MPC 2E-UuCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable limit= limit= limit= limit= limit= Pre 1994 1.ZSE-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 ALARA lE-12 uCi/ml Pre 1994 Not Applicable ALARAGOAL= ALARAGOAL= GOAL= ALARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 9/28/1981 2.44E-15 5.00E-12 1.25E-12 l.53E-15 8.00E-14 2,00E-14 7.54E-16 2.00E-12 S.00E-13 l.69E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Apolicable 12/14/1981 4.84E-15 S.00E-12 1.25E-12 2.78E-15 8.00E-14 2,00E-14 1.84E-15 2.00E-12 S.00E-13 l.53E-14 4.00E-12 1.00E-12 Not.Analyzed Not Applicable Not AppUcable 3/29/1982 1.04E-15 5.00E-12 1.2SE-12 2,62E-15 8.00E-14 2.00E-14 1.llE-15 2.00E-12 S.00E-13 2.98E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 6/30/1982 3.61E-15 S.00E-12 1.25E-12 7.61E-15 8.00E-14 2.00E-14 1.39E-15 2.00E-12 5.00E-13 l.80E-15 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 9/27/1982 1.71E-14 5.00E-12 l.2.5.E-12 9.46E-15 8.00E-14 2.00E-14 3.80E-15 2.00E-12 5.00E-13 2.35E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 1/3/1983 l.90E-14 5.00E-12 1.25E-12 5.77E-15 8.00E-14 2.00E-14 9.34E-17 2.00E-12 5.00E-13 4.32E-14 4.00E-12 1.00E-12 Not Analvzed Not Aoolicable Not Apolicable 4/4/1983 5.00E-12 1.25E-12 2.33E-15 8.00E-14 2.00E-14 5.93E-16 2.00E-12 5.00E-13 3.0lE-14 4.00E-12 l.00E-12 Not Analvzed Not Aoplicable Not Aoolicable 6/30/1983 7.62E-16 5.00E-12 1.25E-12 3.25E-15 8.00E-14 2.00E-14 6.28E-15 2.00E-12 S.00E-13 2.69E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 10/3/1983 4.86E-16 5.00E-12 1.25E-12 1,lOE-15 8.00E-14 2.00E-14 3.63E-16 2.00E-12 5.00E-13 2.0SE-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 1/3/1984 6.96E-15 5.00E-12 1.25E-12 9.69E-16 8.00E-14 2.00E-14 9.60E-16 2.00E-12 5.00E-13 l.83E-14 4.00E-12 l.00E-12 Not Analyzed Not Aoplicable Not APolicable 4/2/1984 l.64E-15 5.00E-12 1.25E-12 1.34E-15 8.00E-14 2.00E-14 3.88E-15 2.00E-12 5.00E-13 4.67E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 7/2/1984 1.12E-15 5.00E-12 l.2.SE-12 1,92E-15 8.00E-14 2,00E-14 3.31E-15 2.00E-12 5.00E-13 2.21E·l4 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 10/1/1984 1.llE-15 5.00E-12 1.25E-12 3.13E·16 8.00E-14 2.00E-14 4.21E-16 2.00E-12 S.00E-13 l.57E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Aoplicable 1/2/1985 7.32E-16 5.00E-12 1.25E-12 6.71E-16 8.00E-14 2.00E-14 ll.94E-16 2.00E-12 '5.00E-13 2.42E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 4/1/1985 2.36E-16 5.00E-12 l.25E-12 5.43E-16 8.00E-14 2,00E-14 2.71E-16 2.00E-12 S.00E-13 l.25E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 7/1/1985 7.58E-16 5.00E-12 l.25E-12 4.00E-16 8.00E-14 2.00E-14 6.90E-16 2.00E-12 S.00E-13 2.15E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Aopllcable 9/30/1985 7.47E-15 5.00E-12 1.25E-12 1.16E-15 8.00E-14 2.00E-14 2.19E-15 2.00E-12 5_.00E-13 9.20E-15 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 1/2/1986 1.75E-14 5.00E-12 1.25E-12 7,24E-15 8.00E-14 2.00E-14 3.83E-15 2.00E-12 5.00E-13 l.13E-16 4.00E-12 l.00E-12 Not Analyzed Not Aoplicable Not Aoplicable 4/1/1986 2.99E-14 5.00E-12 1 .. 25E-12 7.64E-15 8.00E-14 2 00E-14 1.51E-14 2.00E-12 S.00E-13 2.22E·14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 6/30/1986 2.23E-14 5.00E-12 1.25E-12 5.19E-15 8.00E-14 2,00E-14 1.0SE-14 2.00E-12 5.00E-13 2.16E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Apolicable 10/27/1986 2.33E•14 S.00E-12 1.25E-12 7.78E-15 8.00E-14 2.00E-14 1.60E-14 2.00E-12 5.00E-13 2,02E-14 4,00E-12 l.00E-12 Not Analyzed !'lot AppJJcable Not Applicable 12/15/1986 3.40E-14 5.00E-12 1.25E-12 5.35E·l5 8.00E-14 2.00E-14 l.47E-14 2.00E-12 S.00E-13 2.82E-14 4.00E-12 L00E-12 Not Analyzed Not Applicable Not Applicable 3/16/1987 2.06E-14 5.00E-12 1.2SE-12 4.S0E-15 8,00E-14 2.00E-14 6.74E-15 2.00E-12 5.00E-13 7.29E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 5/11/1987 2.50E-14 5.00E-12 1.25.E-12 8.54E-15 8.00E-14 2.00E-14 8.15E-15 2.00E-12 5.00E-13 3.28E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 9/9/1987 2.65E-14 5.00E-12 1.25E-12 6.62E-15 8.00E-14 2.00E-14 9.34E-15 2.00E-12 5.00E-13 2,77E-14 4.00E-12 1.00E-12 Not Analyzed Not APolicable Not Applicable 11/2/1987 l .B0E-14 5.00E-12 l.2SE-12 7.09E-15 8.00E-14 2.00E-14 7.20E-15 2.00E-12 5.00E-13 1.77E-14 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/16/1988 l.0lE-14 S.00E-12 1.25E-12 2.98E-15 8,00E-14 2,00E-14 3.93E-15 2.00E-12 5.00E-13 3.36E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 5/18/1988 l.78E-14 5.00E-12 l.25E-12 8.14E-15 8.00E-14 2.00E-14 7.43E-15 2.00E-12 5.00E-13 2.12E-14 4.00E-12 1.00E-12 Not Analyzed Not Apolicable Not Aoollcable 8/15/1988 l.79E-14 5.00E-12 1.25E-12 1.49E-14 8.00E-14 2.00E-14 5.34E-15 2.00E-12 5.00E-13 2.4SE-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 11/14/1988 4.46E-14 5.00E-12 l.25E-12 l.39E-14 8.00E-14 2.00E-14 l.17E-14 2.00E-12 5.00E-13 3.43E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 2/13/1989 1.67E-14 5.00E-12 1.25E-12 5,54E-15 8.00E-14 2.00E-14 7.20E-15 2.00E-12 S.00E-13 5.02E-14 4.00E-12 1.00E-12 Not Analyzed Not Apolicable Not Aoolicable 5/15/1989 2.03E-14 5.00E-12 1.25E·l2 7.05E-15 8.00E-14 2.00E-14 9.56E-16 2.00E-12 5.00E-13 l,43E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 8/14/1989 2.SlE-15 5.00E-12 l ,25E-12 3.78E-15 8.00E-14 2.00E-14 9.26E-15 2.00E-12 5.00E-13 l.50E-14 4.00E-12 l.00E-12 Not Analvzed Not Applicable Not Applicable 11/13/1989 5.38E-14 5.00E-12 1.25E-12 8.0lE-15 8.00E-14 2.00E-14 l.SlE-14 2.00E-12 5.00E-13 4,09E-14 4,00E-12 l.00E-12 Not Analvzed Not Applicable Not Applicable 2/12/1990 4.48E-14 5.00E-12 1.25E-12 l.48E-14 8.00E-14 2.00E-14 1.28E-14 2.00E-12 S.00E-13 3.88E-14 4.00E-12 l.00E-12 Not Analyzed !'lot Aoolicable Not Aoplicable 5/14/1990 2.18E-14 5.00E-12 l.25E-12 l .70E-14 8.00E-14 2.00E-14 l.59E-14 2.00E-12 5.00E-13 3.49E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 8/13/1990 9.53E-15 5.00E-12 1.25E-12 l.70E-14 8.00E-14 2.00E-14 3.27E-15 2.00E-12 5.00E-13 l.27E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 11/12/1990 1.llE-14 5.00E-12 1.25E-12 5.27E-15 8.00E-14 2.00E-14 5.38E-15 2.00E-12 5.00E-13 l.56E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 2/11/1991 6.35E-16 5.00E-12 1.25E-12 3,13E-16 8.00E-14 2.00E-14 .2.31E-16 2.00E-12 .5.00E-13 3.89E-14 4.00E-12 l.0DE-12 Not Analyzed Not Applicable Not Aopllcable 5/13/1991 l.22E-15 5.00E=12 1.25E-12 6.14E-15 8.00E-14 2.00E-14 4.41E-15 2.00E-12 S.00E-13 2.S0E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 8/12/1991 7.84E-16 5.00E-12 1.25E-12 1.43E-15 8.00E-14 2.00E-14 4.47E-16 2.00E-12 5.00E-13 l,84E-14 4.00E-12 l.00E-12 Not Analyzed Not Aoplicable Not Aoolicable 11/11/1991 5.37E-16 5.00E-12 1.25E-12 4.20E-16 8.00E-14 2.00E-14 l.37E-16 2.00E-12 5.00E-13 l,27E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 2/10/1992 3.54E-16 5.00E-12 1.25E-12 l,18E-16 8.00E-14 2.00E-14 4.08E-17 2.00E-12 5.00E-13 3.69E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 5/11/1992 4.71E·16 5.00E-12 1.25E-12 9.58E-16 8.00E-14 2.00E-14 8.31E-17 2.00E-12 5.00E-13 l.43E-14 4.00E-12 1.00E-12 Not Analyzed Not APPiicabie Not AnPlicable 8/10/1992 5.32E·15 5.00E-12 1.25E-12 3.36E-16 8.00E-14 2.00E-14 l.65E-16 2.00E-12 5.00E-13 l.59E-14 4.00E-12 l.00E-12 Not Analyzed NotApplicable Not Applicable 11/9/1992 3.66E·16 5.00E-12 l ,25E-12 2.25E-16 8.00E-14 2,00E-14 l.08E-16 2.00E-12 5.00E-13 2.24E-14 4.00E-12 l ,00E-12 Not Analyzed Not Applicable Not Applicable 2/9/1993 2.05E-16 5.00E-12 1.25E-12 9.14E-17 8.00E-14 2.00E-14 6.31E-17 2.00E-12 5.00E-13 3.41E-14 4.00E-12 1.00E-12 Not Analyzed Not APPiicabie Not Aoplicable 5/10/1993 4.80E-16 S.00E-12 l.25E-12 8.25E-16 8.00E-14 2.00E-14 l.26E-15 2.00E-12 S.00E-13 l.83E-14 4.00E-12 l.00E-12 Not Analyzed Not Apolicable Not Applicable 8/10/1993 8.30E-16 5.00E-12 1.25E-12 l.90E-16 8.00E-14 2,00E-14 2.10E-16 2.00E-12. 5.00E-13 1.70E-14 4.00E-12 l ,O0E-12 Not Analvzed Not Applicable Not Applicable 11/8/1993 2.70E-16 5.00E-12 1.25E-12 8.00E-17 8.00E-14 2.00E-14 7.00E-17 2.00E-12 S.00E-13 2.34E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 2/7/1994 3.18E-16 5.00E-12 1.25E-12 1.00E-16 8.00E-14 2.00E-14 5.lBE-16 2.00E-12 5.00E-13 3.64E-14 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 5/9/1994 1.80E-15 5.00E-12 l.25E-12 9.78E-16 8.00E-14 2.00E-14 l.l0E-15 2.00E-12 5.00E-13 8.30E-15 4.00E-12 l.00E-12 Not Analyzed Not Applicable Not Applicable 8/9/1994 2.67E-15 5.00E-12 1.25E-12 1.llE-15 8.00E-14 2.00E-14 4.95E-16 2.00E-12 S.00E-13 1.00E-16 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable Date Effluent 9E-14 uCi/ml BHV-SU Effluent ZE-14 uCi/ml BHV-ST230 Effluent 9E-13 uCi/ml BHV-SR Effluent 6E-13 uCi/ml BHV-SPB Effluent 4e-15 uCi/ml BHV-ST232 Concentration Concentration Concentration Concentration Concentration limit= limit= limit= limit= Limit= AIARAGoal = 2.ZSE-14 u(l/ml ALARA Goal= SE-15 uCi/ml AIARA Goal= 2.25E-13 uCi/ml AIARA Goal= l.SE-13 uCi/ml AIARAGoal = lE-15 uCi/ml ~re 1994 MPC SE-12 uCi/ml Pre 1994 MPC BE-14 uCi/ml Pre 1994 MPC 2E-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable Limit= Limit= Limit= Limit= Limit= Pre 1994 l.25E-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 AIARA lE-12 uCi/ml Pre 1994 Not Applicable AIARAGOAL= AIARAGOAL= GOAL= AIARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 11/7/1994 .9.21E-17 5.00E-12 1.25E-12 1.59E-15 8.00E-14 2.00E-14 1.66E-15 2.00E-12 S.00E-13 1.00E-16 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/7/1995 1.SlE-15 9.00E-14 2.25E-14 9.50E-16 2.00E-14 5.00E-15 9.70E-17 9.00E-13 2.25E-13 9.35E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 5/9/1995 2.21E-16 9.00E-14 2.25E-14 8.56E-16 2.00E-14 5.00E-15 3.06E-15 9.00E-13 2.25E-13 4.34E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 8/9/1995 1.66E-16 9.00E=14 2.25E-.14 1.67E-15 2.00E-14 .5.00E-15 3.90E-15 9.00E-13 2.25E-13 5.G0E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 11/11/1995 2.04E-14 9.00E-14 2.25E-14 6.70E-15 2.00E-14 5.00E-15 7.65E-15 9.00E-13 2.25E-13 4.47E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 2/5/1996 4.S0E-14 9.00E-14 2.25E-14 3.58E-14 2.00E-14 5.00E-15 2.39E-14 9.00E-13 2.25E-13 7.30E-15 6,00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 5/6/1996 'l.76E-15 9,00E-14 2.25E-14 3.57E-15 2.00E-14 .5.00E-15 9.55E-16 9.00E-13 2.25E-13 7.54E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 8/5/1996 .2.37E-15 9.00E-14 2.25E-14 8.18E-15 2.00E-14 .5.00E-15 7.46E-16 9,00E-13 2.25E-13 5.75E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 11/6/1996 3.53E-15 9.00E,14 2.25E-14 5.31E-15 2.00E-14 5.00E-15 9.39E-16 9.00E-13 2.25E-13 1.21E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 2/6/1997 1.84E-16 9.00E-14 2.25E-14 2.0lE-16 2.00E-14 5.00E-15 l,87E-16 9,00E-13 2.25E-13 6.14E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 5/5/1997 5.75E-16 9.00E-14 2.25E-14 7.24E-16 2.00E-14 5.00E-15 6.07E-16 9.00E-13 2.25E-13 4.75E-15 6,00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 8/11/1997 1.21E-15 9.00E-14 2.25E-14 7.39E-16 2.00E-14 5.00E-15 5.0SE-16 9.00E-13 2.25E-13 4.92E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 1/5/1998 9.89E-16 9.00E-14 2.25E-14 1.92E-15 2.00E-14 .5.00E-15 6.21E-16 9.00E-13 2.25E-13 4.68E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 4/28/1998 2.84E-15 9.00E-14 2.25E-14 2.38E-15 2.00E-14 .5.00E-15 1.72E-15 9.00E-13 2.25E-13 7.35E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/31/1998 7.49E-16 9.00E-14 225E-14 1.49E-15 2,00E-14 5.00E-15 8.34E-16 9.00E-13 2.25E-13 7.0lE-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/28/1998 1.07E-15 9,00E-14 2.25E-14 9.20E-16 2.00E-14 5.00E-15 6.32E-16 9.00E-13 2.25E-13 3.95E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 12/28/1998 8.51E-15 9.00E-14 2.25E-14 4.58E-15 2.00E-14 5.00E-15 4.58E-15 9.00E-13 2.25E-13 1.43E-14 6,00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 3/29/1999 3.75E-15 9.00E-14 2.25E-14 2.45E-15 2.00E-14 S.00E-15 2.39E-15 9.00E-13 2.25E-13 8.46E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 7/3/1999 1.53E-15 9.00E-14 2.25E-14 8.65E-16 2.00E-14 5.00E-15 6.52E-16 9.00E-13 2.25E-13 7.20E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 9/27/1999 05.83E-15 9.00E-14 2.25E-14 3.52E-15 2.00E-14 5.00E-15 2.55E-15 9.00E-13 2.25E-13 8.22E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 12/28/1999 9.48E-15 9.00E-14 2.25E-14 6.20E-15 2.00E-14 S.00E-15 3.96E-15 9.00Ecl3 2.25E-13 7.56E-15 6,00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 3/27/2000 2.06E-15 9.00Ecl4 2.25E-14 1.27E-15 2.00E-14 5.00E-15 l.09E-15 9.00E-13 2.25E-13 7.72E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 6/26/2000 1.S0E-15 9.00E-14 2.25E-14 1.24E-15 2.00E-14 .5.00E-15 1.0lE-15 9.00E-13 2.25E-13 4.36E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 9/26/2000 1.04E-15 9.00E-14 2.25E-14 5.45E-16 2.00E-14 5.00E-15 6.0lE-16 9.00E-13 2.25E-13 7.67E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 12/26/2000 1.48E-15 9.00E-14 2.25E-14 7.56E-16 2.00E-14 S,00E-15 6.84E-16 9.00E-13 2.25E-13 7.00E-15 6,00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/26/2001 4.27E-16 9.00E-14 2.25E-14 2.19E-16 2.00E-14 .5.00E-15 1.89E-16 9.00E-13 2.25E-13 6.13E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 7/2/2001 4.52E-16 9.00E-14 2.25E-14 4.02E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 7.48E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 9/24/2001 4.65E-16 9.00E-14 2.25E-14 2.06E-16 2.00E-14 5.00E-15 2.02E-16 9.00E-13 2,25E-13 6.98E-15 6.00E-13 LS0E-13 Not Analyzed Not Applicable Not Applicable 12/31/2001 7.40E-16 9.00E-14 2.25E-14 3.SlE-16 2.00E-14 5.00E-15 3.64E-16 9.00E-13 2.25E-l3 4~72E-15 6,00E-13 1.S0E-13 Not Analyzed Not Applica.ble N.ot APPiicabie 4/1/2002 1.26E-15 9.00E-14 2.25E-14 7.53E-16 2.00E-14 5.00E-15 7.19E-16 9.00E-13 2.25E-13 9.65E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 7/1/2002 1.02E-15 9.00E-14 2.25E-14 1.03E-15 2,00E-14 5.00E-15 3.39E-16 9.00E-13 2.25E-13 7.20E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 9/30/2002 .5.82E-16 9.00E-14 2.25E-14 9.28E-16 2.00E-14 5.00E-15 3.14E-16 9.00E-13 2.25E-13 4.48E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 12/30/2002 1.00E-16 9.00E-14 2.25E-14 7.67E-16 2.00E-14 5.00E-15 3.48E-16 9.00E-13 2.25E-13 9.56E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 3/31/2003 1.13E-15 9.00E-14 2.25E-14 7.41E-16 2.00E-14 5.00E-15 4.41E-16 9.00E-13 2.25E-13 6.68E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/30/2003 4.35E-16 9.00E-14 2.25E-14 5.08E-16 2.00E-14 5.00E-15 2.SlE-16 9.00E-13 2.25E-13 1.34E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 9/29/2003 1.SlE-16 9.00E-14 2.25E-14 1.02E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 7.28E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/29/2003 :1.52E-16 9.00E-14 2.25E-14 1.54E-16 2.00E-14 5.00E-15 1.SlE-16 9.00E-13 2.25E-13 7.02E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 3/29/2004 1.00E-16 9.00E-14 2.25E-14 1.12E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 8.82E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 6/27/2004 1.18E-16 9.00E-14 2.25E-14 3.llE-16 2.00E-14 5.00E-15 1.25E-16 9.00E-13 2.25E-13 2.47E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 9/27/2004 1.16E-16 9.00E-14 2.25E-14 1.72E-16 2.00E-14 5.00E-15 1.18E-16 9.00E-13 2.25E-13 l.l0E-14 6.00E-13 1.50E·l3 Not Analyzed Not Applicable Not Applicable 12/27/2004 1.14E-16 9.00E-14 2.25E-14 1.06E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.59E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 3/28/2005 1.00E-16 9.00E-14 2.25E-14 2.04E-16 2,00E-14 5.00E-15 l.83E-16 9.00Ec13 2.ZSE-13 8.57E-15 6.00E-13 1.S0E-13 Not AnaJyzed Not Applicable Not Applicable 6/29/2005 1.83E-16 9.00E-14 2.25E-14 3.81E-16 2.00E-14 5.00E-15 3.09E-16 9.00E-13 2.25E-13 1.06E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 9/26/2005 2.87E-16 9.00E-14 2.25E-14 8.21E-16 2.00E-14 5.00E-15 3.71E-14 9.00E-13 2.25E-13 6.28E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 1/3/2006 8.74E-16 9.00E-14 2.25E-14 3.79E-16 2.00E-14 5.00E-15 1.31E-16 9.00E-13 2.25E-13 4.32E-14 6,00E-13 l.S0E-13 Not Analyzed Not Applicable Not Applicable 4/3/2006 5,22E-16 9.00E-14 2.25E-14 6.66E-16 2.00E-14 5.00E-15 1.llE-16 9.00E-13 2.25E-13 9.34E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 7/3/2006 3.08E-16 9.00E-14 2.25E-14 1.lOE-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.25E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 10/2/2006 9.14E-16 9.00E-14 2.25E-14 4.95E-16 2.00E-14 5.00E-15 l.86E-16 9.00E-13 2.25E-13 1.67E-14 6.00E-13 l.50E-13 Not AnaJyzed N,;,t Applicable Not APPiicabie 1/1/2007 9.49E-16 9,00E,-14 2,25.E-L4 6.81E-16 2.00E-14 5.00E-15 2.02E-16 9.00E-13 2.25E-13 1,31E-14 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 4/2/2007 1.08E-15 9.00E-14 2.25E-14 8.22E-16 2.00E-14 5.00E-15 2.26E-16 9.00E-13 2.25E-13 1,64E-14 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 7/2/2007 1.54E-15 9.00E-14 2.25E-14 8.16E-16 2.00E-14 5.00E-15 4.76E-16 9.00E-13 2.25E-13 2.12E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 9/30/2007 4.90E-16 9.00E-14 2.25E-14 2.37E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 6.65E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 12/31/2007 1.46E-15 9.00E-14 2.25E-14 5.67E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.02E-14 6,00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable Date Effluent 9E-14 uCi/ml BHV-SU Effluent ZE-14 uCi/ml BHV-5TZ30 Effluent 9E-13 uCi/ml BHV-SR Effluent 6E-13 uCi/ml BHV-SPB Effluent 4e-15 uCi/ml BHV-5T232 Concentration Concentration Concentration Concentration Concentration limit= limit= limit= limit= limit= AIARAGoal= 2.25E•14 uCi/ml ALARA Goal= SE-15 uCi/ml AIARAGoal= 2.25E-13 uCi/ml AIARA Goal= 1.SE-13 uCi/ml AIARAGoal= lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC BE-14 uCi/ml Pre 1994 MPC ZE-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable limit= limit= limit= limit= limit= Pre 1994 1.ZSE-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 AIARA lE-12 uCi/ml Pre 1994 Not Applicable AIARAGOAL= AIARAGOAL= GOAL= AIARAGOAL= Cone EFC . EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 3_/31/2008 .3.16E-16 9.00E-14 2.25E-14 6.17E-16 2.00E-14 5.00E-15 3.71E-16 9.00E-13 2.25E-13 4.82E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/30/2008 3.13E-15 9.00E-14 2.25E-14 1.55E-15 2.00E-14 5.00E-15 9.27E-16 9.00E-13 2.25E-13 7.40E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/30/2008 7.08E-15 9.00E-14 2.25E-14 3.41E-15 2.00E-14 5.00E-15 2.SZE-15 9.00E-13 2.25E-13 l.lSE-14 6.00E-13 LSOE-13 Not Analyzed Not Applicable Not Applicable 12/31/2008 7.22E-15 9.00E-14 .2.25E-14 2,82E-15 2.00E-14 5.00E-15 3.03E-15 9.00E-13 2.25E-13 1.59E-14 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 3/15/2009 4.13E-15 9.00E-14 2.25E-14 1.39E-15 2.00E-14 5.00E-15 1.41E-15 9.00E-13 2.25E-13 4.66E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/15/2009 2.31E-16 9.00E-14 2.25E-14 7.79E-16 2.00E-14 5.00E-15 6.37E-16 9.00E-13 2.25E-13 4.18E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/15/2009 3.lOE-15 9.00E-14 2.25E-14 9.20E-16 2.00E-14 5.00E-15 6.36E-16 9.00E-13 2.25E-13 1.21E-14 6.00E-13 l.50E-13 Not Analvzed Not Aoolicable Not Applicable 12/15/2009 5.77E-15 9.00E-14 2.25£-14 3.13E-16 2.00E-14 5.00E-15 l.92E:.16 9.00E-13 2.25E.,J.3 2.48E-15 6.00E-13 L50E,13 Not Analyzed Not Applicable Not Applicable 3/31/2010 4.78E-15 9.00E-14 2.25E-14 3.73E-16 2.00E-14 5.00E-15 4.19E-16 9.00E-13 2.25E-13 l.30E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/30/2010 4.35E-15 9.00E-14 2.25E-14 7-84E-16 2.00E-14 5.00E-15 1.0SE-15 9.00E-13 2.25E-13 4.40E-15 6.00E-13 l .50E-13 Not Analyzed Not Applicable Not Applicable 9/30/2010 3.57E-15 9.00E-14 2.25E-14 1.14E-15 2.00E-14 5,00E-15 7.97E-16 9.00E-13 2.25E-13 3.78E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Aoolicable 12/31/2010 8.52E-15 9.00E-14 2.25E-14 1.45E-15 2.00E-14 5.00E-15 1.29E-15 9.00E-13 2.25E-13 1.33E-14 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 4/4/2011 3.ZOE-15 9.00E-14 2.25E-14 8.89E-16 2.00E-14 5.00E-15 1.lOE-15 9.00E-13 2.25E-13 1.48E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/4/2011 6.98E-15 9.00E-14 2.25E-14 2,03E-15 2.00E-14 5.00E-15 2.52.E-15 9.00E-13 2.25E-13 1.08E-14 6,00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 10/3/2011 3.llE-15 9.00E-14 2.25E-14 1.14E-15 2.00E-14 5.00E-15 5.75E-16 9.00E-13 2.25E-13 1.41E-14 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 1/3/2012 ii.44E-15 9.00E-14 2.25E-14 2.14E-15 2.00E-14 5.00E-15 1.53E-15 9.00E-13 2.25E-13 2.05E-14 6.00E-13 1.50E-13 Not Analyzed Not Aoolicable Not Aoolicable 4/3/2012 S.52E-15 9.00E-14 2.25E-14 3.24E-15 2.00E-14 5.00E-15 1.79E-15 9.00E-13 2.25E-13 1.55E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/2/2012 5.87E-15 9.00E-14 2.25E-14' 3.06E-15 2.00E-14 5.00E-15 1.21E-15 9.00E-13 ·2.25E-13 1.llE-14 6.00E-13 1.50E-13 Not Analyzed ' Not Applicable Not Applicable 10/1/2012 6.73E-15 • 9.00E-14 2.25E-14 2.59E-15 2.00E-14 5.00E-15 2.43E-15 9.00E-13 2.25E-13 1.30E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/31/2012 4.SOE-15 9.00E-14 2.25E-14 1.62E-15 2.00E-14 5.00E-15 l.79E-15 9.00E-13 2.25E-13 1.74E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/25/2013 6.66E-15 9.00E-14 2.25E-14 1.48E-15 2.00E-14 5.00E-15 1.12E-.15 9.00E-13 2.25E-.13 1.80E-14 6.00E-13 1.SOE-13 Not Analyzed NotAppltcabl.e. Not Appli_cable 7/2/2013 7.35E-15 9.00E-14 2.25E-14 1.72E-15 2.00E-14 5.00E-15 2.02E-15 9.00E-13 2.25E-13 6.67E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 9/30/2013 2.78E-15 9.00E-14 2.25E-14 6.92E-16 2.00E-14 5.00E-15 3.29E-16 9.00E-13 2.25E-13 6.62E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/30/2013 6.70E-15 9.00E-14 2.25E-14 3.93E-16 2.00E-14 5.00E-15 2.53E-16 9.00E-13 2.25E-13 2.78E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/31/2014 4.74E-15 9.00E-14 2.25E-14 1.42E-15 2.00E-14 5.00E-15 3.48E-15 9.00E-13 2.25E-13 1.50E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/30/2014 8.18£-15 9.00E-14 2.25E-14 1.34E-15 2.00E-14 5.00E-15 L76E-.15 9.00E-13 2.25E-.13 1.42E-14 6.00E-13 1.50E-13 Not Analyzed Not AppJica.ble Not Applicable 9/30/2014 1.32E-14 9.00E-14 2.25E-14 7.76E-16 2.00E-14 5.00E-15 1.04E-15 9.00E-13 2.25E-13 1.23E-14 6.00E-13 1.50E-13 4.66E-17 4.00E-15 1.00E-15 12/29/2014 8.00E-16 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 3.00E-16 9.00E-13 2.25E-13 2.lOE-14 6.00E-13 1.SOE-13 8.00E-18 4.00E-15 1.00E-15 3/30/2015 1.00E-14 9.00E-14 2.25E-14 5.00E-16 2.00E-14 5.00E-15 2.lOE-15 9.00E-13 2.25E-13 3.lOE-14 6.00E-13 1.50E-13 3.00E-18 4.00E-15 1.00E-15 6/29/2015 4.60E-15 9.00E-14 2.25E-14 8.00E-16 2.00E-14 5.00E-15 3.70E-15 9.00E-13 2.25E-13 1.40E-14 6,00E-13 1.50E-13 2.00E-17 4.00E-15 1.00E-15 9/28/2015 1.20E-14 9.00E-14 2.25E-14 4.00E-16 2.00E-14 5.00E-15 9.80E-16 9.00E-13 2.25E-13 1.20E-14 6.00E-13 1.SOE-13 1.00E-17 4.00E-15 1.00E-15 12/28/2015 7.40E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.90E-16 9.00E-13 2.25E-13 2.20E-14 6.00E-13 1.SOE-13 2.00E-17 4.00E-15 1.00E-15 3/28/2016 1.40E-15 9.00E-14 2.25E-14 6,00E-16 2,00E-14 5.00E-15 6.20E-15 9.00E-13 2.25E-13 2.30E-14 6,00E-13 1.50E-13 6.00E-17 4.00E-15 1.00E-15 6/27/2016 3.90E-15 9.00E-14 2.25E-14 4.00E-16 2.00E-14 5.00E-15 6.00E-16 9.00E-13 2.25E-13 1.50E-14 6.00E-13 1.50E-13 3.00E-18 4.00E-15 1.00E-15 9/27/2016 7.lOE-15 9.00E-14 2.25Ea14 7.60E-16 2,00E-14 5.00E-15 1.lOE-15 9.QOE-13 2.25E-_13 2.90E-16 6.00E-13 1.50E-13 3.00E-17 4.00E-15 1.00E-15 12/27/2016 5.lOE-15 9.00E-1.4 2.15~14 6.60E-16 2.00E-14 5.00E-15 9.60Ec16 9.00E-13 2,25Ec:13 2.lOE-14 6.00E-13 1.50~13 1.30E-17 4.00E-15 l.OOE-15 3/27/2017 7.80E-15 9.00E-14 2.25E-14 3.00E-16 2.00E-14 5.00E-15 2.lOE-15 9.00E-13 2.25E-13 1.50E-14 6.00E-13 1.50E-13 2.00E-17 4.00E-15 1.00E-15 6/26/2017 8.00E-16 9.00E-14 2.25E-14 3.00E-16 2.00E-14 5.00E-15 1.00E-15 9.00E-13 2.25E-13 L30E-14 6.00E-13 1.50E-13 6.00E-18 4.00E-15 1.00E-15 9/25/2017 2.70E-15 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 1.60E-14 6.00E-13 1.50E-13 4.00E-18 4.00E-15 1.00E-15 12/26/2017 1.40E-14 9.00E-14 2.25E-14 4.00E-16 2.00E-14 5.00E-15 3.00E-16 9.00E-13 2.25E-13 1.60E-14 6.00E-13 1.50E-13 1.00E-17 4.00E-15 1.00E-15 3/26/2018 '7.lOE-16 9.00E-14 2.ZSE-14 1.70E-16 2.00E-14 5.00E-15 1.SOE-16 9.00E-13 2.25E-13 l.40E-14 6.00E-13 1.50E-13 2.00E-17 4.00E-15 1.00E-15 6/25/2018 2.60E-15 9.00E-14 2.25E-14 2.40E-16 2.00E-14 5.00E-15 S.90E-16 9.00E-13 2.25E-13 1.20E-14 6.00E-13 1.50E-13 9.40E-18 4.00E-15 1.00E-15 9/24/2018 2.20E-15 9.00E-14 2.25E-14 3.00E-16 2.00E-14 5.00E-15 'l.OOE-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1,50E-13 8.00E-18 4.00E-15 1.00E-15 12/31/2018 6.00E-15 9.00E-14 2.25E-14 3.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.50E-13 9.00E-18 4.00E-15 1.00E-15 4/1/2019 2.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.50E-13 3.00E-18 4.00E-15 1.00E-15 7/1/2019 2.00E-16 9.00E-14 2.25E-14 7.00E-16 2,00E-14 5.00E-15 S.OOE-16 9.00E-13 2.25E-13 1.00E-14 6,00E-13 1.50E-13 7.00E-18 4.00E-15 1.00E-15 9/30/2019 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 6.00E-16 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.SOE-13 6.00E-18 4.00E-15 1.00E-15 1/6/2020 4.00E-16 9.00E-1.4 2,25E-14 3.00E-16 2.00E-14 5.00E-15 4.00E.-16 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.50E-13 7.00E-18 4.00E-15 .1.00E-15 3/30/2020 2.00E-16 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.50E-13 2.00E-18 4.00E.-ts 1.00~15 6/30/2020 2.80E-15 9.00E-14 2.25E-14 4.00E-16 2,00E-14 5.00E-15 5.00E-16 9.00E-13 2.25E-13 6.00E-15 6.00E-13 1.50E-13 2.00E-17 4.00E-15 1.00E-15 10/12/2020 1.80E-15 9.00E-14 2.25E-14 8.00E-16 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.50E-13 8.00E-18 4.00E-15 1.00E-15 1/4/2021 7.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.50E-13 5.00E-18 4.00E-15 1.00E-15 4/5/2021 2.QOE-16 9.00E-14 2,25E-14 1.00E-16 2,00E-14 5.QOE-15 3_.00E-16 9.00E-13 2.25E-13 5.00E-15 6,00E-13 l ,50E-13 5.00E-18 4.00E-15 1.00E-15 Date Effluent 9E-14 uCi/ml BHV-SU Effluent 2E-14 uCi/ml BHV-ST230 Effluent 9E-13 uCi/ml BHV-SR Effluent 6E-13 uCi/ml BHV-SPB Effluent 4e-15 uCi/ml BHV-ST232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= limit= Limit= ALARAGoal= 2.ZSE-14 uCi/ml ALARA Goal= SE-15 uCi/ml ALARA Goal= 2.2SE-13 uCi/ml ALARA Goal= l.SE-13 uCi/ml ALARAGoal = lE-15 uCi/ml Pre1994MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC 2E-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable Limit= Limit= Limit= Limit= Limit= Pre 1994 1.ZSE-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 ALARA lE-12 uCi/ml Pre 1994 Not Applicable ALARAGOAL= ALARAGOAL= GOAL= ALARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 6/28/2021 2.00E-16 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 6.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.SOE-13 1.00E-17 4.00E-15 1.00E-15 10/4/2021 2.00E-16 9.00E-14 2.25E-14 1.00E-16 2,00E-14 S.OOE-15 2.00E-16 9,0QE-13 . 2.25E-13 2.00E-14 6.00E-13 1.SOE-13 9.00E-18 4.00E-15 1.00E-15 1/4/2022 1.00E-16 9.00E-14 2.25E-14 9.00E-17 2.00E-14 5.00E-15 9.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 l.SOE-13 7.00E-18 4.00E-15 1.00E-15 4/4/2022 2.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 4.00E-16 9.00E-13 2.25E-13 2.00E-14 6.00E-13 l,SOE-13 4.00E-18 4.00E-15 1.00E-15 7/5/2022 3.00E-16 9.00E-14 2.25E-14 9.00E-16 2.00E-14 5.00E-15 1.20E-15 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1,SOE-13 2.00E-17 4.00E-15 1.00E-15 10/3/2022 2.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 5.00E-17 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.SOE-13 5.00E-18 4.00E-15 1.00E-15 1/3/2023 7.00E-.16 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5,00E-15 8.00E,17 9.00E-13 2.25E,13 1.00E-14 6.00E-13 l.SOE-13 2.00E-18 4.00E-15 1.00E-15 4/3/2023 5.00E-17 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 1.20E-15 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.SOE-13 4.00E-18 4.00E-15 1.00E-15 7/3/2023 1.00E-16 9.00E-14 '. 2.25E-14 4.00E-16 2.00E-14 5,00E-15 4.00E-15 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.SOE-13 7.00E-18 4.00E-15 1.00E-15 Sep-81 Sep-82 Sep-83 Sep-84 Sep-85 Sep-86 Sep-87 + Sep-88 Sep-89 C Sep-90 -, QI Sep-91 ::::, 2· Sep-92 3 z Sep-93 QI 2" Sep-94 -, ~ Sep-95 + Sep-96 Sep-97 -i Sep-98 ~ 0 -, Sep-99 2· 3 Sep-00 I N w Sep-01 0 Sep-02 + Sep-03 Sep-04 ::0 QI Sep-05 Q. 2· Sep-06 3 I Sep-07 N N Ol Sep-08 + Sep-09 Sep-10 j"" Sep-11 CD QI Q. Sep-12 I N ...... Sep-13 0 Sep-14 + Sep-15 -i Sep-16 ~ Sep-17 0 -, 2· Sep-18 3 I Sep-19 N w N Sep-20 Sep-21 Sep-22 (Log Scale) ...... ...... ...... ...... ...... ...... 0 0 0 0 0 0 0 0 0 0 0 0 m m m m m m I I I I I I ...... ...... ...... ...... ...... ...... (X) ---.I O') u, ~ w , .. .., I ~,---.1 I I ..,.,. j -;_, r ., • !'.'rr !:"' ~~ •-r -Ill, ' . ~ .,~ I,~ A~' I • f __ '1...--~ r-, ~ -41~• ~ i:11 :""' ' 1 1 ' 1_., -l -~~-c_::::;.~ I -e:'."' -I -• ' i!=. ~-._1 I _ ,...,_ -==~~H T 11111,---~ . " R ,. I I - I ..; ~ • I "~ -~r .. 1· -. - -I ~I I ~ .. I ~ ~ ~ ·~ ~ --l~r~ _ • ~ r'r· I -. .. -I I ~• =~ I ~· -~--'~ ;--r-" 1"" : oc__ -m F-: rt ~ r i:---• -11 _~~~~n ·-r I<\._ -,ri-' ,-..., _' I" .. ---I • ~ I r .a I ~ --T 'I .. ~ -~~~ ~, ~ ,1 ~~ _,i -r'!\ ~ (Ii -: I![ .. ---...,--'-:•~ -'L .....--• LI.L!J I p r ◄ ' ·~~ ~, ,---,-,-, -, ::±: l--J..i • ~nnm=-~~ · 1 ~ ,,r •-T .S c.!S ,;,,-1-I f!'.._ n11mr--'--:::~ r---~ • ~ ~ -~ r ll~~=--, ~~---r-- ...... 0 0 m I ...... N Cl :I: -:=: (J'I ;a I» C. o· j r:: (') C. CD 0 0 j (') CD j -D1 -o· j 0 -r:: 0 :::: 3 -- -rRI .' 8 ,.. -• I I,.- -"' I [ J. l J J iJ l l L' _. l J r:: =--~ 1◄ lJ .LJ t"l]I -'I" ,, 11 ·r==:r-r J J. I ~ -E :::: 0 ::::, -ti) C: 0 .::. ~ -C: Cl) CJ C: 0 0 ~ ::::, -C'G z I E ::::, C: ~ ::J II) > :I: Ill ..... N C") ..... ..... ..... ' ' ' w w w 0 0 0 0 C! 0 ..... ..... ..... I I I r t:==- •~rr I I I ) ....... I , ~ I ~ I .. I·~ I I I-I I,. k l ~I I I . ' ' . ·~1 I ~i.. I -L liri I .. ' -.., ;:r7 I . "' I l ~ I 11,._:;: :"'4 " ._ ,_.,_ D --' T l I c ~I !~ ~+, ~_;:;i I l I I . .../-..-i--, ..... I -l ~ .. l" t, , .... r-..i. l I. I I I I IT Ill t I ~ - CT ' -ll 11 I I Liff• i1' I b I I ~~:.. •· i....-H~ ' I J ...... ---~ I~~~ t . . u ' ,. I ,, I~ I ,. ' -., ' ' '<t LO (0 ..... ..... ..... ' ' I w w w 0 0 0 0 C! C! (e1e~s 607) ..... ..... - - - I- I- - - - - - -- ,__ - - --- I- I'--..... ' w 0 C! ..... zz-des ~z-des oz-des 6~-des s~-des L~-des g~-des g~-des v~-des £~-des z~-des ~ ~-des o~-des 50-des so-des Lo-des go-des go-des vo-des £0-des zo-des ~o-des oo-des 55-des s5-des L6-des 95-des 95-des 175-des £6-des z5-des ~5-des 05-des 6s-des ss-des Ls-des gs-des gs-des vs-des £s-des zs-des ~s-des Sep-81 Sep-82 Sep-83 Sep-84 Sep-85 Sep-86 Sep-87 Sep-88 Sep-89 Sep-90 Sep-91 Sep-92 Sep-93 Sep-94 Sep-95 Sep-96 Sep-97 Sep-98 Sep-99 Sep-00 Sep-01 Sep-02 Sep-03 Sep-04 Sep-05 Sep-06 Sep-07 Sep-08 Sep-09 Sep-10 Sep-11 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 ...... 0 0 m I ...... -.J . . - - . - . . -. ' I I I 11 ...... ...... 0 0 0 0 m m I I ..... ...... 0) 01 . I . I I i ..-i 1--...... r--•.~ . I . I T r-"1 1 -..... -I ~ -T ,~ 1~ -~E """ ~ , I ,-::: ► ~ ::. ~ :;::::-~ ~r◄ ... ◄ !C I ~ . . I f ~ ~ I-+- ~ .... I t: ~ -I I ~ , I ' I H • ~'r1' ◄ ~r-• -i=--., L---i~ ___,__ I ' r . >-11 1 (Log :5cale) 0 0 m I ..... ~ ~ I ~ • ,◄ ~~ •• it' -~ ◄ !C ' p I D ' . - I ... ' ~ f-+ ..... I ~~ • ~t ... ...... ...... ...... 0 0 0 0 0 0 m m m I I I ...... ...... ..... w N ..... I "'tl ►m ;~~ ...., ::0 CD :g )> a .i:,. G) (') :S::o o "'ti m ::::, (') ii g r U1 ::I -·m-3 , iil -·...a. .... -UI -• II C: g ~De '-3 ~~;:.: fl II -· "-> 3 r;n ..... .,:,. C: Q 3 a, :I: < I U'I -4 :::T 0 :::!. C: 3 I N c.., 0 (') 0 ::::, n (I) ::::, -D1 ~ 0 ::::, ti) -C: (') :::: 3 - -E ::: 0 :::s -rn r::: 0 -:.:::; f! -r::: Cl) CJ r::: 0 0 <D N N I E :::s "C C'CI a:: It) > :::c m ..---..---I UJ 0 0 ..--- ~ ....--i-""' N (") ..---..---I I UJ UJ 0 0 ~ ~ ..---..--- ' I I I I ' . ~'.~ i-' -----... b ~-~ ◄~ l~I I I • ◄K --◄~. I I "' -., .. I _j_J....-A '. 11 11 ~ • ~ ..... ~w r,..._,~ '"•::i--+-I I -:--.i ½i ' I . ,.I_ 1 :.+-~ .. l ..... --. t::::=,, ... ► ,.._,._ ... I .... ,_ ~ -...,,,....~~ T I • I ~ 'i' I I . ! . • I -.,k_ 4~1 I I I ~ . ., II ~II . . . I . -R. I • I .~ ~c =-• ~ $ '~~ ~,._,_. I I Jl. ...... II:'! I i I I I I II I D II I I ' ' 'St LO CD ..---..---..---I I I UJ UJ UJ 0 0 0 0 ~ 0 (a1eos 607) ..---..--- I '~~ - - - . - - . - . - . . - - . - - - - . - - - - - - - - - - - - - t--..---I UJ 0 ~ ..--- ii-das ~i-das oi-das 6~-das e~-das L~-das g~-das g~-das v~-das £~-das i~-das ~ ~-das o~-das so-das eo-das Lo-das go-das go-das vo-das rn-das w-das ~o-das oo-das ss-das es-das Ls-das 95-das 95-das 175-das £5-das is-das ~5-das os-das se-das ee-das Le-das gg-das gg-das ve-das £e-das ie-das ~e-das Sep-81 Sep-82 Sep-83 Sep-84 Sep-85 Sep-86 Sep-87 Sep-88 Sep-89 Sep-90 Sep-91 Sep-92 Sep-93 Sep-94 Sep-95 Sep-96 Sep-97 Sep-98 Sep-99 Sep-00 Sep-01 Sep-02 Sep-03 Sep-04 Sep-05 Sep-06 Sep-07 Sep-08 Sep-09 Sep-10 Sep-11 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 ....>. 6 0 m I ....>. ---1 - - - - - - - ....>. 6 0 m I ....>. (j) J ....>. 6 0 m I ....>. 01 l ... I - T -I T (Log Scale) 0 0 m I ....>. .i:,,. I «: bl. .. ~ I Ti.-~~ ~~ I I • "'"-'~ .~ ~ I ;,,. rr ..G ~1 1 ..,).-+-"" ~~: .......... •• i.~ l◄k ·~ 11 ,Iii I◄ ~ II .:;::,i, I ~I • ~ I ◄ J, i. .. ,I I I· I!::+ I l.o.' r.: ·~ -~ H1 ....._ iP. l -'. T ' ..o!P 1, 1 ~· ~ I C 1 ~► It. I Ii T ll ~ 1,. "---~ ~ • ....>. ....>. ....>. 6 6 6 0 0 0 m m m I I I ....>. ....>. ....>. (,.) N ....>. -o -o ► m iil iil •:!! ........ ► C: u:,u:,::1:1 (11 co co ►::::i .s,. .s,. G> 0 ►S:o o ' "tJ Ill ::::J ~o ii i;: ►C:"""~ G>3 U1 -. -•m lll 0 .... I ~ Ill II """ 0 -.s,.w ::::i li m e:, .... ' C') -· m """::::: 3 .!.. ~ 3 ;::;: N C')-11 c: ::::: en Q ~ i;r, -.... 3 w C: Q 3 DJ :::c ~ UI r Cl) D> C. I N ~ 0 C') 0 :I (") Cl) :I -~ D> =-0 :I en -C: C') ::.: 3 - Sep-14 Dec-14 Mar-15 Jun-15 Sep-15 Dec-15 Mar-16 Jun-16 Sep-16 Dec-16 Mar-17 Jun-17 Sep-17 Dec-17 Mar-18 Jun-18 Sep-18 Dec-18 Mar-19 Jun-19 Sep-19 Dec-19 Mar-20 Jun-20 Sep-20 Dec-20 Mar-21 Jun-21 Sep-21 Dec-21 Mar-22 Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 -->. 0 0 m I -->. CXl -->. 0 0 m I -->. -...J . ~~ V" i,.,1'11 1,}' I '" :-- R • ~ "i--i.-,__ L---.-·~ :::i-I ~ c;i~ b ► J~ J . ..,"' L> ·( ~~r ""' I◄ ◄K _...L---v· ~ 1,lt ·~~ • ~ II ,I( I [>• y j,,11' ·Kl 1'1~ /\ n -->. :->-(Log Scale):->--->. 0 0 0 0 0 0 0 0 m m m m I I I I -->. -->. -->. -->. CJ) CJ1 .i:,. w ' Pl• -->. -->. 0 0 0 0 m m I I -->. -->. N -->. ' )> m r :::i: )> i: ::c (I) )> a G>o 0 0 Ill :::, ii i;i .... :::, O !:t' m ~ ~ o· (II :::, e r (")-· -· 3 3 ;::;: -II .i:,. m I .... c.n C (") ::::.: 3 to :::c ~ en --t :::r 0 ::::!. C 3 I N (.) N 0 0 ::::, (") (I) ::::, -D1 !:!'; 0 ::::, tn -C 0 :::::: 3 - TAB6 BHV-6 AIR SAMPLING GRAPHS AND DATA TABLE Date Effluent 9E-14 uCi/ml BHV-&U Effluent 2E-14 uCi/ml BHV-6T230 Effluent 9E-13 uCi/ml BHV-6R Effluent 6E-13 uCi/ml BHV-6PB Effluent 4e-15 uCi/ml BHV-6T232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= Limit= AIARAGoal= 2.25E-14 uCi/ml AIARA Goal= SE-15 uCi/ml AIARA Goal= 2.2SE-13 uCi/ml AIARA Goal= 1.SE-13 uCifml AIARAGoal = lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC 2E-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable Limit= Limit= Limit= Limit= Limit= Pre 1994 1.2SE-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable AIARAGOAL= AIARAGOAL= AIARAGOAL= AIARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 9/28/1981 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2,00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 12/14/1981 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 3/29/1982 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4,00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 6/30/1982 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1,00E-12 Not An_alyzed Not Applicable Not Applicable 9/27/1982 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 1/3/1983 5.QOE-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 4/4/1983 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1,00E-12 Not Analyzed Not Applicable Not Applicable 6/30/1983 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Ai:mlicable 10/3/1983 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 ' 5.00E-13 4.00E-12 1.00E-12 Not Analyzed. Not.Applicable Not AppJicable 1/3/1984 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 4/2/1984 5.00Ecl.2 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 7/2/1984 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 10/1/1984 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 1/2/1985 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 4/1/1985 5.00E,12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 7/1/1985 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 9/30/1985 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 1/2/1986 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 4/1/1986 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 6/30/1986 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 10/27/1986 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 12/15/1986 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 3/16/1987 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 5/11/1987 5.00Ecl2 l.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 9/9/1987 S.OOE-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.0QE-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/2/1987 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 S.OOE-13 4.00E-12 1.00E-12 Not Analyzed_ Not Apolicable Not Applicable 2/16/1988 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 S.OOE-13 4.00E-12 1.00E-12 Not Analyzed Not Applicabl_e Not Applicable S/18/1988 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 'S.OOE-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 8/15/1988 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 S.OOE-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/14/1988 5.00E-12 l.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not APPiicabie 2/13/1989 '. 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Appli_cable 5/15/1989 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 8/14/1989 5_.00E,12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 S.OOE-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/13/1989 ' 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 2/12/1990 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 5/14/1990 5.00E-12 l.25E-12 8.00E-14 2.00E-14 2.00E-12 S.OOE-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 8/13/1990 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E.-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/12/1990 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/11/1991 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 05.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 5/13/1991 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 ,S.OOE-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 8/12/1991 S.OOE-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/11/1991 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/10/1992 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not APolicable Not Applicable 5/11/1992 5.00E-12 1.25E-12 8,00E-14 2.00E-14 2,00E-12 '5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not AooU_ca_ble. Not.APplicable 8/10/1992 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/9/1992 5.00E-12 1.25E-12. 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/9/1993 5.00E-12 1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 5/10/1993 5.00E-12 1.25E-12 8,00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Jllot Applicable 8/10/1993 5.00E,12 1.25E-12 8,00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/8/1993 5.00E-12 1.25E-12 8.00E-14 2.00E-14 ·2 .. 00E-12. 5.0QE-13 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not Applicable 2/7/1994 5.00E-12 U5E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 l.OOE-12 Not Analyzed Not Applicable Not AppliGable 5/9/1994 ,5.00E-12 '1.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not AppliGable Date Effluent 9E-14 uCi/ml BHV-6U Effluent 2E-14 uCi/ml BHV-6T230 Effluent 9E-13 uCi/ml BHV-6R Effluent 6E-13 uCi/ml BHV-6PB Effluent 4e-15 uCi/ml BHV-6T232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= Limit= AIARAGoal= 2.25E-14 uCi/ml AIARA Goal= SE-15 uCi/ml AIARAGoal = 2.25E-13 uCi/ml ALARA Goal= 1.SE-13 uCi/ml AIARAGoal= lE-15 uCi/ml Pre 1994MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC 2E-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable Limit= Limit= Limit= Limit= Limit= Pre 1994 1.25E-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable AIARAGOAL= AIARAGOAL= ALARA GOAL= AIARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 8/9/1994 5.00E-12 l.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 11/7/1994 5.00E-12 l.25E-12 8.00E-14 2.00E-14 2.00E-12 5.00E-13 4.00E-12 1.00E-12 Not Analyzed Not Applicable Not Applicable 2/7/1995 9.00Ec14 2.25E-14 2.00E-14 5.00E-15 9.00E-13 2,25E,13 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not.ApplicabJe 5/9/1995 9.00E-14 2.25E-14 2.00E-14 5.00E-15 9.00E-13 2.25E-13 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 8/9/1995 9.00E-14 2.25E-14 2.00E-14 5.00E-15 9.00E-13 2.25E-13 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 11/11/1995 9.00E-14 2.25E-14 2,00E-14 5.00E-15 9.00E-13 2.25E-13 6.00E-13 1.S0E-13 Not Analyzed Not Applicable NotAppJicabJe 2/5/1996 9.00E-14 2.25E-14 2.00E-14 5.00E-15 9.00E-13 2.2SE-13 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 5/6/1996 9.00E-14 2.25E-14 2.00E-14 5.00E-15 9.00E-13 2.25E-13 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 8/5/1996 9.00E-14 2.25E-14 2.00E-14 5.00E-15 9.00E-13 2.25E-13 6.00E-13 1.50E-13 Not Analyzed Not.Applicable Not Applicable 11/6/1996 9.00E-14 2.25E-14 2.00E-14 5.00E-15 9.00E-13 2.2SE-13 6.00E-13 1.S0E-13 Not Analyzed Not Applicable ·Not Applicable 2/6/1997 9.00E-14 2.25E-14 2,00E-14 5.00E-15 9.00E-13 2.2SE-13 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 5/5/1997 9.00E-14 2.25E-14 2.00E-14 5,00E-15 9.00E-13 2.25E-13 6,00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 8/11/1997 9.00E-14 2.25E-14 2.00E-14 5.00E-15 9.00E-13 2.25E-13 6,00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 1/5/1998 9.00E-14 2.25E-14 2.00E-14 5.00E-15 9.00E-13 2.25E-13 6,00E-13 1,S0E-13 Not Analyzed Not AppJi.cabte Not Applicable 4/28/1998 9.00E-14 2.25E-14 2.00E-14 5.00E-15 9.00E-13 2.25E-13 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/31/1998 9.00E-14 2.25E-14 2.00E-14 5.00E-15 9.00E-13 2.25E-13 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/28/1998 9.00E-14 2.25E-14 2.00E-14 5,00E-15 9.00E-13 2.25E-13 6,00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/28/1998 9.00E-14 2.25E-14 2.00E-14 S.00E-15 9.00E-13 2.25E-13 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/29/1999 9.00E-14 2.2SE-14 2.00E-14 5.00E-15 9.00E-13 2.25E-13 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 7/3/1999 9.00E-14 2.25E-14 2.00E-14 5.00E-15 9.00E-13 2.25E-13 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 9/27/1999 3.03E-15 9.00E-14 2.25E-14 1,37E-15 2.00E-14 5,00E-15 8.72E-16 9.00E-13 2.25E-13 7.55E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/28/1999 S.0lE-15 9.0()E-14 2.25E-14 2.89E-15 2.00E-14 5.00E-15 1,31E-15 9.00E-13 2.25_E-13 8.lOE-15 6.00E-13 1.50E-13 Not Analyzed · Not Applicable Not Applicable 3/30/2000 7.46E-16 9.00E-14 2.25E-14 S.25E-16 2.00E-14 5.00E-15 3.00E-16 9.00E-13 2.25E-13 7.83E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 6/26/2000 5.40E-16 9.00E-14 2.25E-14 3.53E-16 2,00E-14 5.00E-15 6.llE-16 9.00E-13 2.25E-13 4,83E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/25/2000 3.75E-16 9.00E-14 2.25E-14 L23E-16 2.00E-14 5.00E-15 1.91E-16 9.00E-13 '2.25E-13 6.41E-15 6,00E-13 1,50E-13 Not Analyzed Not Applicable Not Applicable 12/26/2000 5.21E-16 9.00E-14 2.25E-14 3.39E-16 2.00E-14 5.00E-15 3.28E-17 9.00E-13 2.25E-13 8.57E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 3/26/2001 1.42E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 6.15E-15 6.00E-13 1.50E-13 Not Analyzed Not APPiicabie Not Applicable 7/2/2001 1.81E-16 9.00E-14 2.25E-14 1,66E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 6.95E-15 6,00E-13 1,50E-13 Not Analyzed Not Applicable Not Applicable 9/24/2001 3.0SE-16 9.00E-14 2.25E-14 1.0lE-16 2.00E-14 5.00E-15 1 .. 77E-16 9.00E-13 2.25E-13 8.59E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/31/2001 3.31E-16 9.00E-14 2.25E-14 1.25E-16 2.00E-14 5.00E-15 1.09E-16 9.00E-13 2.25E-13 3.14E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 4/1/2002 4.77E-16 9.00E-14 2.25E-14 2.94E-16 2.00E-14 5.00E-15 1.96E-16 9.00E-13 2.2SE-13 8.61E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/1/2002 3.68E-16 9.00E-14 2.2SE-14 4.41E-16 2.00E-14 5.00E-15 L76E-16 9.00E-13 2.2SE,13 8.20E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not J;lpplicable 9/30/2002 3.67E-16 9.00E-14 2.25E-14 5.60E-16 2,00E-14 5.00E-15 1.S0E-16 9.00E-13 2.25E-13 5.55E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/30/2002 1.00E-16 9.00E-14 2.25E-14 3.43E-16 2.00E-14 5.00E-15 1.67E-16 9.00E-13 2.25E-13 1.35E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/31/2003 1.98E-16 9.00E-14 2.25E-14 1.68E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.2SE-13 7.77E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not.Applicable 6/30/2003 1.18E-16 9.00E-14 2.2SE-14 1.15E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 .2.25E-13 5.92E-15 6,00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/29/2003 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5,00E-15 1.00E-16 9.00E-13 2.25E-13 8.30E-15 6,00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/29/2003 1.00E-16 9.00E-14 2.25E-14 1.36E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 6.66E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/29/2004 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 8.17E-15 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 6/27/2004 1.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.2SE-13 3,55E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/27/2004 1.00E-16 9.00E-14 .2.25E-14 1.38E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 l.22E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/27/2004 1.05E-16 9.00E-14 2.25E-14 1.72E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.52E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 3/28/2005 1.00E-16 9.00E-14 2.2SE-14 1.00E-16 2.00E-14 .5.00E-15 1.00E-16 9.00E-13 2.25E-13 9.34E-15 6,00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 6/29/2005 1.28E-16 9.00E-14 2.25E-14 1.0lE-16 2.00E-14 S.00E-15 1.00E-16 9.00E-13 2.25E-13 9.85E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 9/26/2005 1.98E-16 9.0_0E-14 2..25E-14 5.98E-16 2.00E-14 5.00E-15 3.5SE-16 9.00E-13 2.25E-13 1.71E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 1/3/2006 7.67E-16 9.00E-14 2.25E-14 2.88E-16 2,00E-14 .5.00E-15 3.60E-15 9.00E-13 2.25E-13 4.85E-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 4/3/2006 2.92E-16 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.llE-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 7/3/2006 3.25E-16 9.00E-14 2.25E-14 2.36E-16 2.00E-14 5.00E-15 1.0SE-16 9.00E-13 2.25E-13 1.lOE-14 6.00E-13 1.S0E-13 Not Analyzed Not Applicable Not Applicable 10/2/2006 5.03E-16 9.00E-14 2.25E-14 1.49E-16 2.00E-14 .5.00E-15 1.19E-16 9.00E-13 2.2SE-13 2.13E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 1/1/2007 8.31E-16 9.00E-14 2.25E-14 2.49E-16 2,00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1,70E-14 6.00E-13 1,50E-13 Not Analyzed Not Applicable Not Applicable 4/2/2007 5.36E-16 9.00E-14 2.25E-14 3.15E-16 2.00E-14 S.00E-15 1.00E-16 9.00E-13 2.25E-13 1.43E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/2/2007 1.0SE-15 9.00E-14 2.25E-14 2.18E-16 2,00E-14 5.00E-15 1.54E-16 9.00E-13 2.25E-13 2.04E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable Date Effluent 9E-14 uCi/ml BHV-6U Effluent 2E-14 uCi/ml BHV-6T230 Effluent 9E-13 uCi/ml BHV-6R Effluent 6E-13 uCi/ml BHV-6PB Effluent 4e-15 uCi/ml BHV-6T232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= Limit= ALARAGoal= 2.ZSE-14 uCi/ml ALARA Goal= SE-15 uCi/ml ALARA Goal= 2.ZSE-13 uCi/ml ALARA Goal= 1.SE-13 uCi/ml ALARAGoal = lE-15 uCl/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC ZE-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable Limit= Limit= Limit= Limit= Limit= Pre 1994 1.ZSE-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable ALARAGOAL= ALARAGOAL= ALARA GOAL= ALARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 9/30/2007 3.92E-16 ,9.00E-14 2.25E-14 1.02E-16 2.00E-14 S.OOE-15 1.00E-16 9.00E-13 2.25E-13 6.38E-15 6.00E-13 LSOE-13 Not Analyzed Not Applicable Not Applicable 12/31/2007 2.92E-15 9.00E-14 2.25E-14 1.55E-15 2.00E-14 5.00E-15 3.16E-16 9.00E-13 2.25E-13 9.19E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/31/2008 4.34E-16 9.00E-14 L25E-14 3.51E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2 .. 25E-13 5.99E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applica.ble 6/3102008 1.88E-15 9.00E-14 2.25E-14 9.00E-16 2.00E-14 5.00E-15 4.04E-16 9.00E-13 2.25E-13 7.41E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 9/30/2008 4.82E-15 .9.00E-14 2.25E-14 2,lOE-15 2.00E-14 5.00E-15 1.27E-15 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/31/2008 4.80E-15 9.00E-14 '2.25E-14 1.70E-15 2.00E-14 5.00E-15 1.25E-15 9.00E-13 2.25E-13 1.49E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 3/15/2009 2.77E-15 9.00E-14 2.25E-14 1.0lE-15 2.00E-14 5.00E-15 7.82E-16 9.00E-13 2.25E-13 6.46E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/15/2009 1.41E-16 9.00E-14 ,2.25E-14 2,67E-16 2.00E-14 5.00E-15 l ,81E-16 9.00E-13 2.25E-13 5.76E-15 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 9/15/2009 4.87E-15 9.00E-14 2.25E-14 4.32E-16 2.00E-14 5.00E-15 2.23E-16 9.00E-13 2.25E·l3 8.98E-15 6.00E-13 l,50E-13 Not An_alvzed Not Applicable Not Applicable 12/15/2009 9.24E-15 9.00E-14 2.25E-14 2.26E-16 2.00E-14 5.00E-15 1.15E-16 9.00E-13 2.25E-13 6.44E-15 6.00E-13 1.50E-13 Not Analyzed ·· Not Applicable Not Aoplicable 3/31/2010 9.63E-15 9.00E-14 2.25E-14 1.82E-16 2.00E-14 5.00E-15 2.06E-16 9.00E-13 2.25E-13 1.37E-14 6.00E-13 l,50E-13 Not Analyzed Not Applicable Not Applicable 6/30/2010 3.62E-15 9.00E-14 2.25E-14 3,94E-16 2.00E-14 5.00E-15 4.89E-16 9.00E-13 2.25E-13 4.30E-15 6.00E-13 1.50E·l3 Not Analyzed Not Applicable Not Applicable 9/30/2010 5.42E-15 9.00E-14 ·2.25E-14 1.08E-15 2.00E-14 5.00E-15 5.68E-16 9.00E-13 2.25E-13 3.98E-15 6,00E-13 1,50E-13 Not Analyzed Not Applicable Not Applicable 12/31/2010 1.24E-14 9.00Ecl4 2.25E-14 1.21E-15 2.00E-14 5,00E-15 1.00E-15 9.00E-13 2,25E-13 1.53E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 4/4/2011 2.70E-15 9.00E-14 2.25E-14 4.62E-16 2.00E-14 5.00E-15 6.SlE-16 9.00E-13 2.25E-13 1.29E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 7/4/2011 3.0lE-15 9.00E-14 2.25E-14 7.07E-16 2.00E-14 5.00E-15 5.75E-16 9.00E-13 2.25E-13 7,97E-15 6.00E-13 1,50E-13 Not Analyzed Not Applicable Not Applicable 10/3/2011 2.0SE-15 9.00E-14 2.25E-14 6,12E-16 2.00E-14 5.00E-15 1.88E-16 9.00E-13 2.25E-13 9.93E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 1/3/2012 3.14E-15 9.00E-14 2.25E-14 1.09E-15 2.00E-14 5.00E-15 7.65E-16 9.00E-13 2.25E-13 1.89E-14 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 4/3/2012 4.41E-15 9.00E-14 ,2.25E-14 1.82E-15 2.00E-14 5.00E-15 4.00E-16 9.0QE-13 2.25E-13 l.50E-14 6.00E-13 1.SOE-13 Not Analyzed Not Applicable ' Not Applicable 7/2/2012 6.42E-15 9.00E-14 2.25E-14 2.25E-15 2.00E-14 5.00E-15 S.llE-16 9.00E-13 2.25E-13 9.54E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable . Not Applicable 10/1/2012 6.63E-15 9.00E-14 2.25E-14 1.31E-15 2.00E-14 5.00E-15 1.22E-15 9.00E-13 2.25E-13 1.34E-14 6.00E-13 l ,50E-13 Not Analyzed Not Applicable Not Applicable 12/31/2012 3.83E-15 9.00E-14 2.25E-14 1.18E-15 2.00E-14 5.00E-15 9.30E-16 9.00E-13 2.25E-13 l.60E-14 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 3/25/2013 4.S2E-15 9.00E-14 2.25E-14 7.93E-16 2.00E-14 5.00E-15 4.91E-16 9.00E-13 2.25E-13 1.70E-14 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 7/2/2013 5.91E-15 9.00E-14 2.25E-14 6.74E-16 2,00E-14 5.00E-15 7.85E-16 9.00E-13 2.25E-13 5.18E-15 6.00E-13 1.SOE-13 Not Analyzed Not Applicable Not Applicable 9/30/2013 2.68E-15 9.00E-14 2.25E-14 3.97E-16 2,00E-14 5.00E-15 1.04E-16 9.00E-13 2.25E-13 6,13E-15 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 12/30/2013 1.60E-14 9.00E-14 2.25E-14 2.48E-16 2.00E-14 5.00E-15 1.05E-16 9.00E-13 2.25E-13 2.67E-14 6.00E-13 l.50E-13 Not Analyzed Not Applicable Not Applicable 3/31/2014 8.92E-15 9.00E-14 2.25£-14 7.68E-16 2,00E-14 5.00E-15 l.50E-15 9.00E-13 2.25E-13 1.61E-14 6.00E-13 1.50E-13 Not Analyzed Not Applicable Not Applicable 6/30/2014 8.29E-15 9.00E-14 2.25E-14 5.35E-16 2.00E-14 5.00E-15 6.72E-16 9.00E-13 2.25E-13 1.20E-14 6.00E-13 l.SOE-13 Not An_alvzed N_ot Applicable Not Applicable 9/30/2014 1.20E-14 9.00E-14 2.25E-14 5.54E-16 2.00E-14 5.00E-15 6.18E-16 9.00E-13 2.25E-13 l,38E-14 6.00E-13 1.SOE-13 1.00E-16 4.00E-15 1.00E-15 12/29/2014 5.00E-16 9.00E-14 2.2SE-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 2.30E-14 6.00E-13 1.50E-13 8.00E-18 4.00E-15 1.00E-15 3/30/2015 2.80E-14 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 4.00E-16 9.00E-13 2.25E-13 2.80E-14 6.00E-13 1.50E-13 1.00E-18 4.00E-15 1.00E-15 6/29/2015 5.30E-15 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 5.00E-16 9.00E-13 2.25E-13 1.70E-14 6.00E-13 l.50E-13 1.00E-17 4.00E-15 1.00E-15 9/28/2015 l.OOE-14 9,00.E-14 2.25.E-.14 2.00E-16 2.00E-14 5.00E-15 3..00E-16 9.00E-13 2.25E-13 1,lOE-14 6,00E-13 1.50E-13 2.00E-18 4.00E-15 1.00E-15 12/28/2015 8.40E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.50E-13 6.00E-18 4.00E-15 1.00E-15 3/28/2016 7.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 9.00E-16 9.00E-13 2.25E-13 1.70E-14 6.00E-13 1.50E-13 1.00E-17 4.00E-15 1.00E-15 6/27/2016 1.20E-14 9.00E-14 2.25E-14 1.00E-16 .2.00E-14 5.00E-15 6.00E-15 9.00E-13 2.25E-13 2.lOE-14 6.00E-13 1.50E-13 4.00E-18 4.00E-15 1.00E-15 9/27/2016 6.90E-15 9.00E-14 2.25E-14 4.00E-16 2.00E-14 5.00E-15 7.20E-16 9.00E-13 2.25E-13 3,20E-15 6.00E-13 1.50E-13 l.20E-17 4.00E-15 1.00E-15 12/27/2016 8.90E-15 9.00E-14 2.25E-14 3.30E-16 2.00E-14 5.00E-15 4.80E-16 9.00E-13 2.25E-13 2.lOE-14 6.00E-13 1.50E-13 9.SOE-18 4.00E-15 1.00E-15 3/27/2017 8.lOE-15 9.00E-14 2.25E-14 7.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.50E-14 6.00E-13 1.50E-13 3.00E-18 4.00E-15 1.00E-15 6/26/2017 2.30E-15 9 .. 00E-14 2.ZSE-14 7.00E-17 2.00E-14 5.00E-15 2.00Ea16 9.0QE-13 2.25E-13 1,lOE-14 6,00E-13 1.50E-13 8.00E-18 4.00E-15 1.00E-15 9/25/2017 3.SOE-15 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 l.90E-14 6.00E-13 1.50E-13 1.00E-17 4.00E-15 1.00E-15 12/26/2017 1.40E-14 9.00E-14 2.25E-14 4.00E-16 Z.OOE-14 5.00E-15 1.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.50E-13 1.00E-17 4.00E-15 1.00E-15 3/26/2018 1.20E-15 9.00E-14 2.25E-14 1.lOE-16 2.00E-14 5.00E-15 1.lOE-16 9.00E-13 2.25E-13 1.50E-14 6,00E-13 1.50E-13 9.00E-18 4.00E-15 1.00E-15 6/25/2018 3.00E-15 9.00E-14 2.25E-14 9.70E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 l.ZOE-14 6.00E-13 l.SOE-13 1.40E-17 4.00E-15 1.00E-15 9/24/2018 3.lOE-15 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 5.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 l.SOE-13 1.00E-17 4.00E-15 '1.00E-15 12/31/2018 7.90E-15 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 3.00E-17 9.00E-13 .2.25E-13 2.00E-14 6.00E-13 l.SOE-13 3.00E-18 4.00E-15 1.00E-15 4/1/2019 2.00E-16 9.00E-14 2.25E-14 1.00E-16 2,00E-14 5.00E-15 1.00E-16 9.00E-13 .2.25E-13 1.00E-14 6.00E-13 1.50E-13 2.00E-18 4.00E-15 1.00E-15 7/1/2019 9.00E-17 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 2.30E-15 9.00E-13 2.25E-13 9.00E-15 6.00E-13 l.50E-13 3.00E-18 4.00E-15 il.OOE-15 9/30/2019 7.00E-17 9.00E-14 2.25E-14 8.00E-17 2.00E-14 5.00E-15 5.00E-17 9.00E-13 2.25E-13 8.00E-15 6.00E-13 l.50E-13 4.00E-18 4.00E-15 1.00E-15 1/6/2020 2.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 S.OOE-15 1.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.SOE-13 4.00E-18 4.00E-15 '1.00E-15 3/30/2020 2.00E-16 9.00E-14 2.25E-14 5.00E-17 2,00E-14 5.00E-15 8.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.SOE-13 3.00E-19 4.00E-15 1.00E-15 Date Effluent 9E-14 uCi/ml BHV-6U Effluent ZE-14 uCi/ml BHV-6T230 Effluent 9E-13 uCi/ml BHV-6R Effluent 6E-13 uCi/ml BHV-6PB Effluent 4e-15 uCi/ml BHV-6T232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= Limit= Limit= ALARA Goal= 2.ZSE-14 uCi/ml ALARA Goal= SE-15 uCi/ml ALARAGoal = 2.ZSE-13 uCi/ml ALARA Goal= 1.SE-13 uCi/ml ALARAGoal = lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC BE-14 uCi/ml Pre 1994 MPC ZE-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable Limit= Limit= Limit= limit= Limit= Pre 1994 l.ZSE-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable ALARAGOAL= ALARAGOAL= ALARA GOAL= ALARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cooc EFC EFCA 6/30/2020 2.20E-15 9.00E-14 2.25E-14 5.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 4.20E-14 6.00E-13 1.S0E-13 2.00E-17 4.00E-15 1.00E-15 10/12/2020 2.20E-15 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 9.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 6.00E-18 4.00E-15 1.00E-15 1/4/2021 6.00E-16 9.00E-14 2.25E-14 9.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.S0E-13 5.00E-18 4.00E-15 1.00E-15 4/5/2021 9.00E-17 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 5.00E-17 9.00E-13 2.25E-13 4.00E-15 6.00E-13 1,S0E-13 1.00E-18 4.00E-15 1.00E-15 6/28/2021 1.00E-16 9.00E-14 2.25E-14 9.00E-17 2,00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 1.00E-17 4.00E-15 1.00E-15 10/4/2021 2.00E-16 9.00E-14 2.25E-14 4.00E-17 2.00E-14 5.00E-15 4.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.S0E-13 8.00E-18 4.00E-15 1.00E-15 1/4/2022 5.00E-17 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5.00E-15 4.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.S0E-13 3.00E-18 4.00E-15 1.00E-15 4/4/2022 1.00E-16 9.00E-14 2.25E-14 6.00E-17 2.00E-14 5.00E-15 7.00E-17 9.00E-13 2.25E-13 1,00E-14 6.00E-13 1.S0E-13 S.00E-18 4.00E-15 1.00E-15 7/5/2022 1.00E-16 9.00E-14 2.25E-14 7.00E-17 2.00E-14 5.00E-15 8.00E-17 9.00E-13 2.25E-13 8.00E-15 6.00E-13 1,S0E-13 1.00E-17 4.00E-15 1.00E-15 10/3/2022 1.00E-16 9.00E-14 2.25E-14 6.00E-17 2.00E-14 5.00E-15 7.00E-17 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.S0E-13 4.00E-18 4.00E-15 1.00E-15 1/3/2023 1.00E-15 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 1.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 2.00E-18 4.00E-15 1.00E-15 4/3/2023 3.00E-17 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5,00E-15 5.00E-17 9.00E-13 2.25E-13 8.00E-15 6.00E-13 1.S0E-13 4.00E-18 4.00E-15 1.00E-15 7/3/2023 6.00E-17 9.00E-14 2.25E-14 2,00E-16 2,00E-14 5.00E-15 1.00E-15 9.00E-13 2.25E-13 8.00E-15 6,00E-13 1,S0E-13 1.00E-17 4.00E-15 1.00E-15 -->--->-m m I I -->--->- (0 ()) 9/28/1981 4/4/1983 10/1/1984 4/1/1986 9/9/1987 + 2/13/1989 8/13/1990 C -, Q) ::J 2/10/1992 C 3 z 8/10/1993 Q) -C -, 2/7/1995 ~ + 8/5/1996 4/28/1998 -l :::r 0 9/27/1999 :::::!. C 3 I 3/26/2001 N (,.) 0 9/30/2002 + 3/29/2004 :;a Q) 9/26/2005 a. C 3 4/2/2007 I N N 0) 9/30/2008 + 3/31/2010 r 10/3/2011 CD Q) a. I 3/25/2013 N -->- 0 9/30/2014 + 3/28/2016 -l 9/25/2017 :::r 0 :::::!. C 4/1/2019 3 I N ~ 10/12/2020 4/4/2022 (Log Scale) -->--->--->--->--->-m m m m m I I I I I -->--->--->--->--->- "'-I 0) 01 .i:,. (,.) ' ' .... ◄~ I -I~ :.. -~ ,. ~ 1~'--. ~ -I l .......... ~~~ .. ~~ ~ ... ~ I r ...-i-.L ~• I ~ r::...~• ~I ._ -... ---1.~ Li,.. J,. ~ ~ , I,. I~ i:. ... _"-l...l.ll L. I L..... ~ " l "l ■c., I I~' ~· I ~ ,pi; -_~ ...... , ~ ~ ~---1,-1-~•~•~~· 1 w l ◄~t......,_,~~- 1·-1 1 .t7 - I l ~- ' . ~ ~ " • "..,. I I 41 ~ I~ . --i.-::~ ~ .. l l "-... ..., - t;::+ U I" -, I I.!: .._......,..n"T"P .... II ..,.._ ·~~~ I ' I ' ,~ I l!:;:=::l=~I ,~ 1 1 I I[ .. ;: ''°"" 11 .....--t !,.,<t-ffi . •~:-,,.. ' I IJ • I ~ I I I I 11 1 -->-m I -->- N DJ :::c ~ en :;ti I» C. 0 ::I C: (") C. Cl) (") 0 ::I (") Cl) ::I r+ iiJ C!': 0 ::I tn -C: (") :::: 3 - 9/28/1981 4/4/1983 10/1/1984 4/1/1986 9/9/1987 2/13/1989 8/13/1990 2/10/1992 8/10/1993 2/7/1995 8/5/1996 4/28/1998 9/27/1999 3/26/2001 9/30/2002 3/29/2004 9/26/2005 4/2/2007 9/30/2008 3/31/2010 10/3/2011 3/25/2013 9/30/2014 3/28/2016 9/25/2017 4/1/2019 10/12/2020 4/4/2022 ....>. 6 0 m I ....>. -..J ------- -- -- - - --- - - - - ------ ---- ....>. 6 0 m I ....>. O') ~ ? ► ........ - - 7 . "--,,. i-,"-4► ....>. 6 0 m I ....>. (J1 ◄~! ·--. ~;,41 j ·.: ~~ . • II I I I ! I ' (Log :5cale) 0 0 m I ....>. .j:>,. ' ,.___ A I ., .I ~ ~ ~.J ◄ • --~ I I ) __.-y .~ ' I ' . <r1"- I I-~· . ~ .... 11 I .. ....>. ....>. ....>. 6 6 6 0 0 0 m m m I I I ....>. ....>. ....>. (,) I'-) ....>. ' ' 1J 1J )>m iil iil ~:B ........ ;:a ls :g :g ►a .r,,. .r,,. G) (") ►S:o o 1 1J Ill ::I ~(")ii i;i ► c: "" a G) §!. ~ Dl g -;;-r;n g -.... ::I II g: .r,,.' ...I, I C: -• · .... 0 3 "' "' -· -· Cll c -r+ m 0 3 11 ~:::,: -CD "'3 m C -!ii, (") .r,,. ::::.: C ~ Q 3 m :::c ~ en C DJ :::I C: 3 I z II) r+ C: DJ C") 0 :::I n C'D :::I r+ DJ =-0 :::I en -C: C") :::.: 3 - 9/28/1981 4/4/1983 10/1/1984 4/1/1986 9/9/1987 2/13/1989 8/13/1990 2/10/1992 8/10/1993 2/7/1995 8/5/1996 4/28/1998 9/27/1999 3/26/2001 9/30/2002 3/29/2004 9/26/2005 4/2/2007 9/30/2008 3/31/2010 10/3/2011 3/25/2013 9/30/2014 3/28/2016 9/25/2017 4/1/2019 10/12/2020 4/4/2022 ...... 6 0 m I ...... -..J - : - - - - - -- -- -- --------- ---- -- -- ---- -- - - --- - - -I lo..e' L,..m L....,, H=R I I I ...... 6 0 m I ...... en 14 .~:... ~N~ ,~ ~~~ ~: J • Pie ◄!!: i-..~ I .. ~ 1 .... I<-' ... r .:: t=l I I >M ~~L ' ii !,~ I ~ • .~ ...... (Log :5cale) ...... 6 0 6 0 0 0 m m m I I I ...... ...... ...... 01 J>. (,.) ' ._ .....__. - I ~ b• 11 1!.. lh i.r~ ' ...... ...... 6 0 0 0 m m I I ...... ...... N ...... ' ,, )> m ;;p -:::i: .... )> i:: co ;o Cl) co )>:::, ""' -s:: G) (") ,, g 0 _:::, (") II 0 r n, .... UI :::, 3 m --· .!.i. DJ 7i' UI 5° 00 C :::, m 9. r .!.,. 3 §' ""' -.... C ,.. (') II :::::.: N 3 r;n .... ""' C (") 3 OJ ::c -:=: en -I :::r 0 ::!. C: 3 I N w 0 ("') 0 :J (') (I) :J -D1 =:::!: 0 :J tn -C: ("') :::: 3 - 9/28/1981 9/27/1982 10/3/1983 10/1/1984 9/30/1985 10/27/1986 9/9/1987 8/15/1988 8/14/1989 8/13/1990 8/12/1991 8/10/1992 8/10/1993 8/9/1994 8/9/1995 8/5/1996 8/11/1997 9/28/1998 9/27/1999 9/25/2000 9/24/2001 9/30/2002 9/29/2003 9/27/2004 9/26/2005 10/2/2006 9/30/2007 9/30/2008 9/15/2009 9/30/2010 10/3/2011 10/1/2012 9/30/2013 9/30/2014 9/28/2015 9/27/2016 9/25/2017 9/24/2018 9/30/2019 10/12/2020 10/4/2021 10/3/2022 ....>. C) 0 m I ....>. ---.J ----------------. -. -. . -- . : . -- . - - -- --. . . . . . - . . . . . . . . . . --. . . . . . . . ....>. ....>. C) C) 0 0 m m I I ....>. ....>. 0) CJ1 '~ ,.._,_ ~ CJ. I " ► ~ ,-.. I I I ~ I+:::: • ,._ -~ ~ ... ~ ► --I I tt ~I n-~ l I I ~ [ I ·-~ -I--' ~· I I I I ► I r:::=,. ' I I I J.+.1 tt ,, I I I ~ ► • I ► I f Ii ti I ii I I I I i i (Log :5-cale) ....>. ....>. 0 C) C) 0 0 0 m m m I I I ....>. ....>. ....>. .i:,.. (,) I'-) ----- ' ~ ' ....>. C) 0 m I ....>. ....>. "tJ "tJ :l>-m cil cil • :Ii .......... > C: <O <O ::0 Cl) co co >:::1 ........ G'); > S: 0 O •,:J DI ::, ~o jj g >3C:!'>;a G> -·~DI g -;;-r;n g ii i')~ ::I CJI r;n C: C: m ..... o 3 I N -■ -■ ...a. C: ....... r+ w o 3 11 C: ::::.:-co 0 3 m -•-I [ ~ C: Q 3 CD :::I: ~ 0) :-0 OJ a. C: 3 I N N 0) 0 0 ::::s C') (D :::I -"'I OJ ~ 0 ::::s tn -C: 0 ::::.: 3 - 9/28/1981 9/27/1982 10/3/1983 10/1/1984 9/30/1985 10/27/1986 9/9/1987 8/15/1988 8/14/1989 8/13/1990 8/12/1991 8/10/1992 8/10/1993 8/9/1994 8/9/1995 8/5/1996 8/11/1997 9/28/1998 9/27/1999 9/25/2000 9/24/2001 9/30/2002 9/29/2003 9/27/2004 9/26/2005 10/2/2006 9/30/2007 9/30/2008 9/15/2009 9/30/2010 10/3/2011 10/1/2012 9/30/2013 9/30/2014 9/28/2015 9/27/2016 9/25/2017 9/24/2018 9/30/2019 10/12/2020 10/4/2021 10/3/2022 ...... 6 0 m I ...... --.J ----------------- - ---- ----- ----------- ---------------------------------------------------------- - -- --- -- -- ...... ...... 6 6 0 0 m m I I ...... ...... 0) c.n ' (Log ?,Cale) 0 0 m I ...... .i:,.. ' ◄ ~. .,. ..,_ --t-, .i l:' ~ J ◄ ◄~ 1 .. .,, ~ r--+;-- IE" II ~~ ◄~- ~ ~I ◄ •• ..... I!"• I◄'~ ~ ~ K► ~· I◄ ,_ ~p ...... ...... ...... 6 6 6 0 0 0 m m m I I I ...... ...... ...... (,) N ...... ' ' ""ti ""ti > m iil iil r-:!! """_., )> C co co :;o (I) co co >:::i ........ G) ~ >:S::o o ' ""ti DI :::, $:j C">jj g > c: .... a ""3 ui -, ,., -• m DI 0 ,... I !::!: DI II """0 -.,._w :::, II m C 1 _., I C') -• m """::::3 .!..~3 ;:;: N C')-11 C :::: a, 0 3 m -• -I -.... 3 c.., -C C') :::: 3 DJ :c 'f= a, r Cl) D) C. I N ..a. 0 0 0 :::s (") Cl) :::s -~ !:!': 0 :::s tn -C 0 :::: 3 - Sep-14 Dec-14 Mar-15 Jun-15 Sep-15 Dec-15 Mar-16 Jun-16 Sep-16 Dec-16 Mar-17 Jun-17 Sep-17 Dec-17 Mar-18 Jun-18 Sep-18 Dec-18 Mar-19 Jun-19 Sep-19 Dec-19 Mar-20 Jun-20 Sep-20 Dec-20 Mar-21 Jun-21 Sep-21 Dec-21 Mar-22 Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 ->. 6 0 m I ->. co .. ->. ->. 6 6 0 0 m m I I ->. ->. (X) -.J ' ' i---!---I,,, 1---'--' I,,, ~ I k r---,t,., • ·K ~r r r-h~ ► ~ ·~ ~ ~ ~ ◄K" I' ► • ~ ----I \ ~► i--_L.,O r--,-..._ v· v J..,!J k t--... j ·K :,1 I Ii' ~ ,/ '\ f'l~ ->. (Log .§cale) ->. ->. 6 6 6 6 0 0 0 0 m m m m I I I I ->. ->. ->. ->. 0) u, ~ (,.) ' ' ' ' I • ->. ->. 6 6 0 0 m m I I ->. ->. I\J ->. ' )> m r-3l )> C: ;;o (I) ► a G)o 0 O Ill ::J -0 II II> .... ::J o ;ff r:r1 ~ .... 0 UI ::J ~c: -· 3 3 ;:;: -II "" m ' .... UI C: Q 3 DJ :c ~ O') -I :::r 0 :::!. C: 3 I N w N C') 0 ::::J (") Cl) ::::J r+ ii] ct. 0 ::::J tn -C: C') ::::.: 3 - TAB7 BHV-7 AIR SAMPLING GRAPHS AND DATA TABLE Date Effluent 9E-14 uCi/ml BHV-7U Effluent 2E-14 uCi/ml BHV-7T230 'Effluent 9E-13 uCi/ml BHV-7R Effluent 6E-13 uCi/ml BHV-7PB Effluent 4e-15 uCi/ml BHV-7T232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= limit= Limit= AIARAGoal= 2.25E-14 uCi/ml ALARA Goal= SE-15 uCi/ml AIARAGC!_al = 2.25E-13 uCilml ALARA Goal= 1.SE-13 uCi/ml AIARAGoal= lE-15 uCl/ml Pre 1994MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC 2E-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable SE-15 Limit= Limit= Limit= Limit= Limit= Pre 1994 1,25E-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable AIARAGOAL= AIARAGOAL= AIARAGOAL= AIARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 12/29/2014 NS 9.00E-14 2.25E-14 NS 2.00E-14 5.00E-15 NS 9.00E-13 2.25E-13 NS 6.00E-13 1.50E-13 NS 4.00E-15 1.00E-15 3/30/2015 6.00E-15 9.00E-14 2.25E-14 8.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 2.50E-14 6.00E-13 1.S0E-13 7.00E-18 4.00E-15 1.00E-15 6/29/2015 1.40E-15 9.00E-14 2.25E-14 4.00E-16 2.00E-14 5.00E-15 1.30E-15 9.00E-13 2.25E-13 1.70E-14 6.00E-13 1.S0E-13 1.00E-17 4.00E-15 1,00E-15 9/28/2015 4.20E-15 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 4.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 6.00E-18 4.00E-15 1.00E-15 12/28/2015 3.60E-16 9.00E-14 2.25E-14 7.00E-17 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 .2.00E-14 6.00E-13 1.S0E-13 3.00E-18 4.00E-15 1.00E-15 3/28/2016 8.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-15 9.00E-13 2.25E-13 1.70E-14 6.00E-13 1.S0E-13 5.00E-18 4.00E-15 1.00E-15 6/27/2016 l.S0E-15 9.00E-14 2.25E-14 9.00E-17 '2.00E-14 5.00E-15 9.00E-16 9.00E-13 ' 2.25E-13 l.50E-14 6.00E-13 1.S0E-13 3.00E-18 4.00E-15 1.00E-15 9/27/2016 2.60E-15 9.00E-14 2.25E-14 1.70E-16 2.00E-14 5.00E-15 4.l0E-16 9.00E-13 . 2.25E-13 2.80E-15 6.00E-13 1.S0E-13 5.S0E-18 4.00E-15 1.00E-15 12/27/2016 1.60E-15 9.00E-14 2.25E-14 1.20E-16 2.00E-14 5.00E-15 2.50E-16 9.00E-13 ,2.25E-13 l.50E-14 6.00E-13 1.50E-13 4.S0E-18 4.00E-15 1.00E-15 3/27/2017 3.30E-15 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.40E-15 9.00E-13 2.25E-13 l.40E-14 6.00E-13 1.S0E-13 3.00E-18 4.00E-15 )..00E-15 6/26/2017 3.40E-15 9.00E-14 2.25E-14 4.00E-16 2.00E-14 5.00E-15 1.S0E-15 9.00E-13 2.25E-13 1.40E-14 6.00E-13 1.S0E-13 2.00E-17 4.00E-15 1.00E-15 9/25/2017 1.20E-15 9.00E-14 2.25E-14 6.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.90E-14 6.00E-13 1.50E-13 4.00E-18 4.00E-15 1.00E-15 12/26/2017 4.60E-15 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 2.lOE-14 6.00E-13 1.S0E-13 1.00E-17 4.00E-15 ~.00E-15 3/26/2018 4.l0E-16 9.00E-14 2.25E-14 1.20E-16 2.00E-14 5.00E-15 2.60E-16 9.00E-13 2.25E-13 l.80E-14 6.00E-13 1.S0E-13 8.70E-18 4.00E-15 1.00E-15 6/25/2018 1.60E-15 9.00E-14 2.25E-14 2.20E-16 2.00E-14 5,00E-15 4.30E-16 9.00E-13 2.25E-13 1.20E-14 6.00E-13 1.S0E-13 1.70E-17 4.00E-15 1.00E-15 9/24/2018 1.00E-15 9.00E-14 2.25E-14 2,00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.50E-13 1.00E-17 4.00E-15 1.00E-15 12/31/2018 1.90E-15 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 2.00E-17 9.00E-13 2.25E-13 l.00E-14 6.00E-13 1.50E-13 5.00E-18 4.00E-15 1.00E-15 4/1/2019 8.00E-17 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5.00E-15 6.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.50E-13 3.00E-18 4.00E-15 1.00E-15 7/1/2019 2.00E-16 9.00E-14 2.25E-14 5.00E-16 2.00E-14 5.00E-15 1.S0E-15 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.50E-13 1.00E-17 4.00E-15 1.00E-15 9/30/2019 2.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5,00E-15 3.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1,50E-13 7.00E-18 4.00E-15 ~.00E-15 1/6/2020 1.00E-16 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.50E-13 2.00E-18 4.00E-15 1.00E-15 3/30/2020 1.00E-16 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 l,00E-14 6.00E-13 l.50E-13 3.00E-18 4.00E-15 1.00E-15 6/30/2020 l.20E-15 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 1.00E-15 9.00E-13 '2.25E-13 1.00E-14 6.00E-13 1.50E-13 3.00E-18 4.00E-15 'l.00E-15 10/12/2020 5.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 7.00E-15 6.00E-13 1.50E-13 8.00E-18 4.00E-15 1.00E-15 1/4/2021 2.00E-16 9.00E-14 2.25E-14 4.00E-17 2.00E-14 5.00E-15 8.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.S0E-13 5.00E-18 4.00E-15 1.00E-15 4/5/2021 1.00E-16 9.00E-14 2.25E-14 7.00E-17 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 3.00E-15 6.00E-13 1.S0E-13 3.00E-18 4.00E-15 1.00E-15 6/28/2021 3.00E-16 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 8.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 1.00E-17 4.00E-15 ~.00E-15 10/4/2021 9.00E-17 9.00E-14 2.25E-14 6.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1,50E-13 6.00E-18 4.00E-15 1.00E-15 1/4/2022 4.00E-17 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5,00E-15 4.00E-17 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.S0E-13 6.00E-18 4.00E-15 ~.00E-15 4/4/2022 1.00E-16 9.00E-14 2.25E-14 8.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.50E-13 S.00E-18 4.00E-15 1.00E-15 7/5/2022 5.00E-16 9.00E-14 2.25E-14 7.00E-16 2.00E-14 5.00E-15 1.S0E-15 9.00E-13 ,2.25E-13 1.00E-14 6.00E-13 1.50E-13 1.00E-17 4.00E-15 1.00E-15 10/3/2022 7.00E-17 9.00E-14 2.25E-14 1.00E-17 2.00E-14 5.00E-15 3.00E-17 9.00E-13 . 2.25E-13 1.00E-14 6.00E-13 1.50E-13 2.00E-18 4.00E-15 1.00E-15 1/3/2023 3.00E-16 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 4.00E-17 9.00E-13 2.25E-13 9.00E-15 6.00E-13 1.50E-13 2.00E-18 4.00E-15 'J..00E-15 4/3/2023 3.00E-17 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5,00E-15 1.00E-16 9.00E-13 2.25E-13 8.00E-15 6.00E-13 1.50E-13 3.00E-18 4.00E-15 1.00E-15 7/3/2023 2.00E-16 9.00E-14 2.25E-14 8.00E-16 2.00E-14 5.00E-15 6.40E-15 9.00E-13 2.25E-13 l.00E-14 6.00E-13 l.50E-13 1.00E-17 4.00E-15 l.00E-15 _,., _,., _,., 6 6 6 0 0 0 m m m I I I _,., _,., _,., a, '-1 0) 12/29/2014 3/29/2015 6/29/2015 9/29/2015 12/29/2015 3/29/2016 t 6/29/2016 9/29/2016 C .., ~ 12/29/2016 C: 3 3/29/2017 z Q) 6/29/2017 r+ C: .., Q!.. 9/29/2017 t 12/29/2017 3/29/2018 -l ::::,-6/29/2018 0 ::::i. C: 9/29/2018 3 I ~ 12/29/2018 0 3/29/2019 t 6/29/2019 :::a 9/29/2019 Ill 0. c:· 12/29/2019 3 I 3/29/2020 "' "' 0) 6/29/2020 t 9/29/2020 r 12/29/2020 CD Ill 3/29/2021 0. I "' _,., 6/29/2021 0 9/29/2021 t 12/29/2021 -l 3/29/2022 ::::,- 0 .., c:· 6/29/2022 3 N 9/29/2022 w "' 12/29/2022 3/29/2023 6/29/2023 (Log Scale) _,., _,., _,., 6 0 6 0 0 0 m m m I I I _,., _. _,., 01 .t>, w _. 0 0 m I _. N m :I: < I ..... :::c DJ C. er ::::, C: (') a: ~ (") 0 ::::, (') ~ ::::, -~ -er ::::, tn -C: (") ::::::: 3 -- Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 Feb-16 Apr-16 Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Dec-18 Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21 Apr-21 Jun-21 Aug-21 Oct-21 Dec-21 Feb-22 Apr-22 Jun-22 Aug-22 Oct-22 Dec-22 Feb-23 Apr-23 Jun-23 ....>. ....>. ....>. (Log =8,cale) ....>. ....>. ....>. C) C) C) 0 C) C) C) 0 0 0 0 0 0 0 m m m m m m m I I I I I I I ....>. ....>. ....>. ....>. ....>. ....>. ....>. -.J CJ) 0, .i::,. w N ....>. ' ~ II UL I ' I ' .:::v I 'r--. L----1--'· 4"1 'f.- ~ "' -:, : ( "--/r : <l -L. ••• J_t::-.. k -f t'--7 ~ _c--' __,_...,..,--' ~~ -V ~---,-. . ~ ~ ~ _A( • ~I/ k> V ·<~I ~N I~ _____ :.- r------- . 1....---:::::.• '1lt --1 "tJ "tJ )> m iil iil ~3i ........ :::1:di :g :g )> a .s:,. .s:,.G)C') )>3!:o o 1 1J lll :, ~n ;g )>C:!-J ;:!. 3 N -, G) -· en ~ g -;;-r;n o· -.... :J II g: .s:,.' _a, I C: -• • .... C') 3 N N -, -· en c: -r+ m n 3 n !Ji.:::,: -CD N 3 m C: -!Ji. C') .s:,. ::::.:: C: 3 Q 3 llJ :c -:=: ...... C "'I I» ::::s C: 3 I z I» -C: "'I I» C') 0 ::::s (") CD ::::s -iil ct. 0 ::::s tn -C: C') :::.: 3 - Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 Feb-16 Apr-16 Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Dec-18 Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21 Apr-21 Jun-21 Aug-21 Oct-21 Dec-21 Feb-22 Apr-22 Jun-22 Aug-22 Oct-22 Dec-22 Feb-23 Apr-23 Jun-23 ...... 6 0 m I ...... --.,J ' - - - - - - - - - - :r~:::: ' - ...... 6 0 m I ...... 0) ' ,, r-----1,__ L,,,,k' j)• I•~ • V ..__,___ i"--, l----"""'!:::a• I•~ R ► / ,,:'.~, ----:--. L--r:,.► _,,,,. ~ ◄~( ·~ V ~ ,( 1' n. [> v u• ·k "':.. ~ r--- r-1--, i---L :: ~· I--- 1--......... f", • I -....... r--r--:- ...... (Log :8,cale) ...... ...... 6 0 6 6 0 0 0 0 m m m m I I I I ...... ...... ...... ...... 01 J:,. w N ' ...... 6 0 m I ...... ...... "ti )> m ., r ::::i: CD )> -..... :::0 C: :g )> ~ .a:,. -s: G) (") -c g o _::::, (") II n r CD -· u,::::, 3 r;n ~ ;:;:..a.~ II u, o· 00 C: ::::, m Q r .!.,. 3 §" .a:,. __ _ C: -(") II ::::.:: N 3 m ' ..... .a:,. C: (") 3 m :::c ~ ....... ~ ::r 0 ::::!. C: 3 I N w 0 C') 0 ::::I C, (I) ::::I r+ ii1 C!': 0 ::::I 0 -C: C') :::::.: 3 - Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 Feb-16 Apr-16 Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Dec-18 Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21 Apr-21 Jun-21 Aug-21 Oct-21 Dec-21 Feb-22 Apr-22 Jun-22 Aug-22 Oct-22 Dec-22 Feb-23 Apr-23 Jun-23 ....>. 6 0 rn I ....>. -.,J ' - - - - - - - - - - - - - - - - - - ....>. 6 0 rn I ....>. (j) ...__ r---- )-- •k ........... ·r /~I,' ~ .......... ~ i.- _ .... ......- ~ ~ ~v vi;. ·< >"'L,, I'-,~ ,~ t------- ----l,,) ~ K ~ .............. ~ ----~ I◄ ~ ~ .......... 1, -_ .... V •i( : j ~ ------i-.... ,.. \ ~--~ ~ -,__ I ....>. (Log :5-cale) ....>. ....>. 6 0 6 6 0 0 0 0 rn rn rn rn I I I I ....>. ....>. ....>. ....>. 01 ~ w N I t,. • [l ~ • -~ 1-,-,_ ....>. 6 0 rn I ....>. ....>. "tl "tl )>m ...... r-::i: (1) (1) )> -........ Al c: CD CD )>~ CD CD .+ ,I:,. ,I:,. G) (") l>S:o o '"ti Ill :::, t n "u g )> !: N :::, 3 . ,+ G) -·~DI g -;r;n g UN ~:, <.n r;n C: !: m .... n 3 I N -· -· ...... c: -..r+ c.> (') 3 11 C: ::.:-cg n 3 m -•-I -.... 3 c., C: Q 3 OJ :::c ~ ..... :::0 D> C. C: 3 I N N en 0 0 :::s (") Cl) :::s -... D> !:!': 0 :::s VI -C: 0 :::: 3 - Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 Feb-16 Apr-16 Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Dec-18 Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21 Apr-21 Jun-21 Aug-21 Oct-21 Dec-21 Feb-22 Apr-22 Jun-22 Aug-22 Oct-22 Dec-22 Feb-23 Apr-23 Jun-23 ...... 6 0 m I ...... -...J - - - - - - ...... ...... 6 6 0 0 m m I I ...... ...... CJ) 01 (Log :5-cale) 0 0 m I ...... ~ lt K u ◄K~ t---.► • ' \ • 1). I•~ I t>► J.,.!,.. ~ ·~ 1-. I\► •• v► • I ...... ...... ...... 6 6 6 0 0 0 m m m I I I ...... ...... ...... (,J N ...... ' "ti "ti )> m iii iii r 3l ....,....,►c <O <O ::IJ (I) <0 <0 ►::::i .s,. .s,. G) ~ )> ~ 0 0 r "ti !!!. ::::i ~(") II i;l )> C: ..... :I 3 ..... G) -· gi iii Q ,.... I 0-: Ill II """' 0 -.s,.w ::::i 11 m e r _., I (") -• m """'::::3 .!..~3 ;::;: !\J C')-II C :::: en Q ~ r;n -..... 3 w -C Q 3 m :I: ~ ..... r CD DJ a. I N -a. 0 C') 0 :::, n CD :::, -""I DJ -o· :::, en -s:::: (") ::::::: 3 - Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 Feb-16 Apr-16 Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Dec-18 Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21 Apr-21 Jun-21 Aug-21 Oct-21 Dec-21 Feb-22 Apr-22 Jun-22 Aug-22 Oct-22 Dec-22 Feb-23 Apr-23 Jun-23 ...... 6 0 m I ...... (0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ...... 6 0 m I ...... 00 ...... 6 0 m I ...... --.J I ► [,'I / < ► I ◄ \ \ j I ◄ .... >· I("' ► > /' I .... ► ,,~ .,, .~ \ ·~ ' }~ I ...... .... ► I/ ◄ ► ◄v ,; ,,. \ ~ l'r-. ;->(Log Scale);..,. ...... ...... ...... 0 0 6 6 6 0 0 0 0 0 m m m m m I I I I I ...... ...... ...... ...... ...... CJ) 0, ~ (,.) N ►m ~~ ;;a (D )> :a G>o 0 0 Ill ::I -n II ID .... ::I . r+ 0 ., m !!l. ~ er CJ'I ::I f> !:: -· 3 [::;= .i:,. m I .... CJ'I C Q 3 CII :::c ~ ...... -I ::r 0 ::::!. C: 3 I N c.., N (") 0 ::::, (") (I) ::::, -D1 !:!': 0 ::::, UJ -C: (") :::::: 3 - TAB 8 BHV-8 AIR SAMPLING GRAPHS AND DATA TABLE Date Effluent 9E-14 uCi/ml BHV-BU Effluent 2E-14 uCi/ml BHV-8T230 Effluent 9E-13 uCi/ml BHV-BR Effluent 6E-13 uCi/ml BHV-SPB Effluent 4e-15 uCi/ml BHV-8T232 Concentration Concentration Concentration Concentration Concentration Limit= Limit= Limit= limit= Limit= AIARAGoal= 2.25E-14 uCi/ml AIARAGoal = SE-15 uCi/ml AIARAGoal= 2.25E-13 uCi/ml AIARAGoal = 1.SE-13 uCi/ml AIARAGoal= lE-15 uCi/ml Pre 1994 MPC SE-12 uCi/ml Pre 1994 MPC SE-14 uCi/ml Pre 1994 MPC ZE-12 uCi/ml Pre 1994 MPC 4E-12 uCi/ml Pre 1994 MPC Not Applicable limit= Limit= Limit= limit= Limit= Pre 1994 1.ZSE-12 uCi/ml Pre 1994 SE-13 uCi/ml Pre 1994 lE-12 uCi/ml Pre 1994 Not Applicable /1,IARAGOAL= AIARAGOAL= AIARAGOAL= AIARAGOAL= Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA Cone EFC EFCA 12/29/2014 4.00E-16 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 7.00E-17 9.00E-13 2.25E-13 9.90E-15 6.00E-13 1.50E-13 9.00E-18 4.00E-15 1.00E-15 3/30/2015 1.S0E-15 9.00E-14 2.25E-14 4.00E-17 2.00E-14 5.00E-15 4.00E-17 9.00E-13 2.25E-13 9.40E-15 6.00E-13 1.50E-13 1.00E-16 4.00E-15 1.00E-15 6/29/2015 S.00E-16 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 5.00E-16 9.00E-13 2.25E-13 9.00E-15 6,00E-13 1.S0E-13 7.00E-18 4.00E-15 1.00E-15 9/28/2015 1.S0E-15 9.00E-14 2.25E-14 4.00E-17 2.00E-14 5.00E-15 4.00E-16 9.00E-13 2.25E-13 8.00E-15 6.00E-13 1.50E-13 3.00E-18 4.00E-15 1.00E-15 12/28/2015 2.l0E-16 9.00E-14 2.25E-14 9.00E-17 2.00E-14 5.00E-15 9.00E-16 9.00E-13 2.25E-13 2.00E-14 6.00E-13 1.50E-13 4.00E-18 4.00E-15 1.00E-15 3/28/2016 2.00E-16 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5,00E-15 3.00E-16 9.00E-13 '2.25E-13 1.60E-14 6.00E-13 1.50E-13 2.00E-18 4.00E-15 1.00E-15 6/27/2016 l.l0E-15 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 1.90E-15 9.00E-13 2.25E-13 1.lOE-14 6.00E-13 1.50E-13 2.00E-18 4.00E-15 '1.00E-15 9/27/2016 1.20E-15 9.00E-14 2.25E-14 8.40E-17 2.00E-14 5.00E-15 3.30E-16 9.00E-13 2.25E-13 7.60E-15 6.00E-13 1.S0E-13 4.70E-18 4.00E-15 1.00E-15 12/27/2016 1.20E-15 9.00E-14 2.25E-14 6.00E-17 2.00E-14 5,00E-15 8.S0E-17 9.00E-13 2.25E-13 1.40E-14 6.00E-13 1.50E-13 3.20E-18 4.00E-15 1.00E-15 3/27/2017 /!,00E-16 9.00E-14 2.25E-14 9.00E-17 2.00E-14 5.00E-15 1.30E-15 9.00E-13 2.25E-13 8,70E-15 6.00E-13 1.50E-13 1.00E-18 4.00E-15 1.00E-15 6/26/2017 'l.00E-16 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5.00E-15 4.00E-16 9.00E-13 2.25E-13 7.80E-15 6.00E-13 1.50E-13 5.00E-19 4.00E-15 1.00E-15 9/25/2017 6.00E-16 9.00E-14 2.25E-14 8.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 1.20E-14 6.00E-13 1,S0E-13 2.00E-18 4.00E-15 1.00E-15 12/26/2017 2.90E-15 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5.00E-15 5.00E-17 9.00E-13 2,25E-13 l.70E-14 6.00E-13 1.50E-13 7.00E-18 4.00E-15 1.00E-15 3/26/2018 2.30E-16 9.00E-14 2.25E-14 5.80E·17 2.00E-14 5.00E-15 8.30E-17 9.00E-13 2.25E-13 1.30E-14 6.00E-13 1.50E·l3 5.l0E-18 4.00E-15 1.00E-15 6/25/2018 ~.40E-16 9.00E-14 2.25E-14 1.20E-16 2.00E-14 5.00E-15 3.00E-16 9.00E-13 2.25E-13 8.80E-15 6.00E-13 1.S0E-13 8.S0E-18 4.00E-15 1.00E-15 9/24/2018 6.00E-16 9.00E-14 2.25E-14 9.00E-17 2.00E-14 5.00E-15 6.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1,S0E-13 6.00E-18 4.00E-15 1.00E-15 12/31/2018 '1.50E-15 9.00E-14 2.25E-14 7.00E-17 2.00E-14 5.00E-15 3.00E-17 9.00E-13 2.25E-13 1.00E-14 6.00E-13 1.S0E-13 3.00E-18 4.00E-15 1.00E-15 4/1/2019 8.00E-17 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5,00E-15 2.00E-16 9.00E-13 ,2.25E-13 1.00E-14 6.00E-13 1.S0E-13 2.00E-18 4.00E-15 1.00E-15 7/1/2019 8.00E-17 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 6.00E-16 9.00E-13 2.25E-13 7.00E-15 6.00E-13 1.S0E-13 4.00E-18 4.00E-15 1.00E-15 9/30/2019 1.00E-16 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 1.l0E-15 9.00E-13 .2.25E-13 1.00E-14 6.00E-13 1.50E-13 9.00E-18 4.00E-15 1.00E-15 1/6/2020 4.00E-17 9.00E-14 2.25E-14. 4.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 .2.25E-13 7.00E-15 6.00E-13 1.S0E-13 2.00E-18 4.00E-15 1.00E-15 3/30/2020 6.00E-17 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5.00E-15 8.00E-17 '9.00E-13 2.25E-13 l.00E-14 6.00E-13 l.50E-13 2.00E-18 4.00E-15 1.00E-15 6/30/2020 1.S0E-15 9.00E-14 2.25E-14 1.00E-16 2.00E-14 5.00E-15 8.00E-16 9.00E-13 '2.25E-13 7.00E-15 6.00E-13 1.50E·l3 7.00E-18 4.00E-15 1.00E-15 10/12/2020 2.00E-16 9.00E-14 2.25E-14 4.00E-17 2.00E-14 5.00E-15 S.00E-17 9.00E-13 '2.25E-13 1.00E-14 6.00E-13 1.50E-13 4.00E-18 4.00E-15 1.00E-15 1/4/2021 3.00E-16 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 4.00E-17 9.00E-13 2.25E-13 2.lOE-14 6.00E-13 1.S0E-13 4.00E-18 4.00E-15 1.00E-15 4/5/2021 6.00E-17 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 2.00E-15 6.00E-13 1.50E-13 7.00E-18 4.00E-15 1.00E-15 6/28/2021 .9.00E-17 9.00E-14 2.25E-14 1 00E-16 2.00E-14 5.00E-15 5.00E-16 9.00E-13 ,2.25E-13 1.00E-14 6.00E-13 l.S0E-13 1.00E-17 4.00E-15 1.00E-15 10/4/2021 3.00E-17 9.00E-14 2.25E-14 3.00E-17 2.00E-14 5.00E-15 6.00E-17 9.00E-13 ,2.25E-13 2.00E-14 6.00E-13 l.S0E-13 5.00E-18 4.00E-15 '1.00E-15 1/4/2022 6.00E-17 9.00E-14 2.25E-14 8.00E-17 2.00E-14 5.00E-15 2.00E-16 9.00E-13 2.25E-13 2.00E-14 6.00E-13 l.S0E-13 5.00E-18 4.00E-15 1.00E-15 4/22/2022 1.00E-16 9.00E-14 2.25E-14 4.00E-17 2.00E-14 5.00E-15 1.00E-16 9.00E-13 2.25E-13 l.00E-14 6.00E-13 1.S0E-13 3.00E-18 4.00E-15 •1.00E-15 7/5/2022 1.00E-16 9.00E-14 2.25E-14 6.00E-17 2.00E-14 5.00E-15 3.00E-16 9.00E-13 2.25E-13 1.00E-14 6.00E-13 l.S0E-13 4.00E-18 4.00E-15 1.00E-15 10/3/2022 5.00E-17 9.00E-14 2.25E-14 2.00E-17 2.00E-14 5.00E-15 2.00E-17 9.00E-13 ,2.25E-13 1.00E-14 6.00E-13 l.S0E-13 4.00E-18 4.00E-15 1.00E-15 1/3/2023 8.00E-16 9.00E-14 2.25E-14 5.00E-17 2.00E-14 5,00E-15 9.00E-17 9.00E-13 ,2.25E-13 1.00E-14 6.00E-13 1.S0E-13 9.00E-19 4.00E-15 1.00E-15 4/3/2023 3.00E-17 9.00E-14 2.25E-14 6.00E-17 2.00E-14 5.00E-15 4.00E-16 9.00E-13 2.25E-13 8.00E-15 6.00E-13 l.50E-13 3.00E-18 4.00E-15 1.00E-15 7/3/2023 8.00E-17 9.00E-14 2.25E-14 2.00E-16 2.00E-14 5.00E-15 2.50E-15 9.00E-13 ,2.25E-13 8.00E-15 6.00E-13 1.S0E-13 7.00E-18 4.00E-15 1.00E-15 12/29/2014 2/28/2015 4/30/2015 6/30/2015 8/31/2015 10/31/2015 12/31/2015 2/29/2016 4/30/2016 t 6/30/2016 8/31/2016 C 10/31/2016 -, Ql 12/31/2016 ::J C 2/28/2017 3 z 4/30/2017 Ql 6/30/2017 -C -, 8/31/2017 ~ 10/31/2017 t 12/31/2017 2/28/2018 -I 4/30/2018 ::J" 6/30/2018 0 :::::!. C 8/31/2018 3 10/31/2018 I N (,) 12/31/2018 0 2/28/2019 t 4/30/2019 6/30/2019 ;;a 8/31/2019 Ql 10/31/2019 a. C 12/31/2019 3 I 2/29/2020 N N 4/30/2020 O> 6/30/2020 t 8/31/2020 10/31/2020 r 12/31/2020 CD Ql 2/28/2021 a. I 4/30/2021 N ....>. 0 6/30/2021 8/31/2021 t 10/31/2021 12/31/2021 -I 2/28/2022 ::J" 0 4/30/2022 :::::!. C 6/30/2022 3 I 8/31/2022 N (,) 10/31/2022 N 12/31/2022 2/28/2023 4/30/2023 6/30/2023 (Log Scale) ....>. ....>. ....>. ....>. ....>. ....>. 6 6 6 6 0 6 0 0 0 0 0 0 Ill Ill Ill Ill Ill Ill I I I I I I ....>. ....>. ....>. ....>. ....>. ....>. <O co -..,J O> CJ1 .l>,. ---~,1~~~ v-~,,1 , I -~ ~~~ r--.. [::>e ' L--I ► --IC~ 1.)-~.. 1, I ◄(' ◄~--◄, '.:)i. \ "~~ _ ... "I<: I "-. ) ~ ~ ~ "'· / ,,,:..-------1 V ,( ◄< "'-~~ ..... ........... ...... ..... ·~ ,_ • I i· ~ '~ ~--► V VV 1,/i ' r--j► > V ~ t---..... ;;;,t .,~ ~v i.---_ .... I ◄, ◄ K ,..A~ r-----..~ ~~ VK ............ r,~ V .......... ,_~ ◄ ~~ 1 ............... ~ ~ ~ ---' ~ 1~-.... ~ ~ r---...... ........... ~ C>► "~ V Li~ ~~ .~ / / ( .~ l◄I :::::. I ......... -- '\_ I◄ k ~ ~"I'-~ I◄ J. b ...._ --~~ 1• J ► ► I • ► -,,i..-~~ I ,.... ,,.. ◄v,,, ) ( v i----I◄ ·~ ,k'. )~~ I'---I ► .......... ...... ........ 1 r--,."":::: "D ► ) .,.... I◄ -II ,,, L---L-----::,...i..- -' 1 ~ ~11 ·K ~ \ \ ', 1,,,,..,,1........ L---► \ "~ ~ r--......... •K _ .... ~ ~ r-........,. ...... ..... -~ ► ,....:::o I'\ ,,. .. -i....--i.--- ◄~ < ◄~~ ~~ I) ( f K. V ► ),• ► P► ► .,, 1 ~~•L--,..)► .~~-" ► ,,_,,,,v-:::::: i'- 'l ~ D ► ► ............... ~ i><r---. Ir---....._ ◄ I( I ~~ ...... ~ I◄ '-i,. If' 1 I r-.....,_ I 1r----......... ....>. 6 0 Ill I ....>. (,) CD ::I: ~ 00 :::0 D> a. 0 ::I C: (') a. ff) 0 0 ::I (') ff) ::I -Al !:!':. 0 ::I tn -C: 0 ::::::.: 3 - Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 Feb-16 Apr-16 Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Dec-18 Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21 Apr-21 Jun-21 Aug-21 Oct-21 Dec-21 Feb-22 Apr-22 Jun-22 Aug-22 Oct-22 Dec-22 Feb-23 Apr-23 Jun-23 -' 6 0 m I -' -..J -' 6 0 m I -' 0) -' (Log ?,Cale) -' 6 0 6 0 0 0 m m m I I I -' -' -' 0, .i:,.. (,) -' -' 6 6 0 0 m m I I -' -' N -' "IJ "tl )>m ...... I""" :::i: (I) (I)►-........ ::tJ i :8 :8 ►a .,.. .,.. G) C') ►3'::o o I""" "ti Ill ::I ~n jj g ►C:!'J a 3 N -. G) -· UI ~ g -; r;n o· -.... ::I II ~,!>,.I""" ....a. I C -· · .... 0 3 N N -· -· Ul c -..+ m 0 3 n !ii,::::,: -CD N 3 m C -!ii, C') .,.. ::::.:: C §. Q 3 Cl] :::c ~ 00 C iiJ :, C: 3 I z D> -C: iiJ (") 0 :, (") CD :, -iiJ =::::!': 0 :, tn -C: (") :::: 3 - Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 Feb-16 Apr-16 Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Dec-18 Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21 Apr-21 Jun-21 Aug-21 Oct-21 Dec-21 Feb-22 Apr-22 Jun-22 Aug-22 Oct-22 Dec-22 Feb-23 Apr-23 Jun-23 ->. 0 0 m I ->. -.,J - . - ·< - - - - - - - - - - - - - - - - - -.~ - - - - - - - - - - K ->. 0 0 m I ->. en ' ~ v- ' I I(~~ ~~ ~ ,.. ... ..... I • I ◄ t ~ ◄ ~ ~ ~ ◄' if I◄ ► ~ )~-- ...... ,.. l ~, ► ~ V I \ ~~ ~~ ► --~ 1(1,,' t--., t ~ < v ) j'-.'l I I Ii'-..... ->. (Log :5cale) ->. ->. 0 0 0 0 0 0 0 0 m m m m I I I I ->. ->. ->. ->. 01 """ (.,) N ' ->. 0 0 m I ->. ->. -o ►m ., r :::i: (I)►-.... :,J 16 :g ►a ~ G) C") S: 0 O "0 Ill :::, n -;j n C: (JI ~ 3 m ~ ;:;: .!a. a II UI 0° 0CI C :::, m Q r !.. 3 3" ~--· C r+ C") II ::::,: N 3 m I .... ~ C C") :::: 3 OJ :::c < I 00 -i ::::r 0 ::::!. C: 3 I N w 0 (") 0 :J n (I) :J -si1 -er :J u, -C: (") :::: 3 - Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 Feb-16 Apr-16 Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Dec-18 Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21 Apr-21 Jun-21 Aug-21 Oct-21 Dec-21 Feb-22 Apr-22 Jun-22 Aug-22 Oct-22 Dec-22 Feb-23 Apr-23 Jun-23 .... 6 0 m I .... -.J - -- - - - - - - - . - . . . - . - - - - - - - - - - - - .k{ I ' ~ )~ / ,K:1 ~ ◄ ,. ',~ ◄•1- K -... ..... .... 6 0 m I .... O') r------► I ◄' ' ,.::: ,,"I 1-- ...... .... ........ _I_ V r----1-- 1--'~ i--" V ........ 1:: [>► --. ~ ':--r, v ----.-- r---r----,: ~ _ .... l...-- ~ r---...._ 1_ ::>► l---:-- 2 • [::::, --- 'l ,....~ I ~ .... (Log ~cale) .... 6 0 6 0 0 0 m m m I I I .... .... .... (J1 .i:,. c.> I b I ~ l ~ ............... .... .... 6 6 0 0 m m I I .... .... N .... j -u -u )> m .., .., r-:::i: n, n, )> -........ ::ti C: co co )>~ co co r+ .i:,. .i:,. G') (") ►3!:o o ' "lJ Ill ::::, ~C1 jj &l )> C: N ::::, 3 . r+ G') -· ti iil g 7i' r;n g: UN~::::, <11 r;n C: C: m .... n 3 1 "'-· -· ~c --r+ w n 3 11 c:::::.:-co C1 3 m -•-I -.... 3 w C: (") ::::.: 3 OJ ::I: ~ 00 :::ti m a. C: 3 I N N C7> C') 0 ::::, C, C'D ::::, -., m -o· ::::, u, -C: C') :::.: 3 - Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 Feb-16 Apr-16 Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Dec-18 Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21 Apr-21 Jun-21 Aug-21 Oct-21 Dec-21 Feb-22 Apr-22 Jun-22 Aug-22 Oct-22 Dec-22 Feb-23 Apr-23 Jun-23 -" C> 0 m I -" -.J - - - - - - - - - - - - - - - - - - - - - - -" -" C> C> 0 0 m m I I -" -" 0) CJ'I ' •K (Log :5-cale) 0 0 m I -" .i:,. ! I• ~. V ~ [> ~ V I ◄ I ► ◄ ~ I• D. ~'- ""-r-. I'\. v· • • -" -" -" C> C> C> 0 0 0 m m m I I I -" -" -" w N -" . ,::,,::,)>m .,.,r ::::i: CD CD )> -........ ::ti c (0 (0 )>~ co (0 ,+ ........ G') C') ►s:o o r "lJ Ill ::J ~n jj i;i ► c: .... a ,..,.3 ui ., ,., -· m Ill 0 rt--I !:!: Ill II ..., 0 -W ::J II fri C r _., I C') -• m .... ::::3 .!..~3 ;::;: I\J C') -II C :::: a, Q ~ r;n -.... 3 c..., -C Q 3 OJ :::c ~ 00 r CD D) C. I N -0 0 0 :::, (') CD :::, -"'I D) !:!'; 0 :::, tn -C: 0 ::::..: 3 - Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 Feb-16 Apr-16 Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Dec-18 Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21 Apr-21 Jun-21 Aug-21 Oct-21 Dec-21 Feb-22 Apr-22 Jun-22 Aug-22 Oct-22 Dec-22 Feb-23 Apr-23 Jun-23 ...... 6 0 m I ...... co - ,k - - - - . - - - . . - - - - . . - - - - - . ...... ...... 6 6 0 0 m m I I ...... ...... 00 -.J -- ~ J--- v ◄ (' \ I/~ .v ~l's ~ V v~ ~ ~ ts-" e ~ J~ !I /' 4 '\. ~~ n ~~ ~ "'" I} ,1, ·~ ~ ~ • I•~ ~ ~ I ' \ • V v L-<• I'--~ ~" ~ ~Log Scale);-.. ...... 0 0 6 0 0 0 m m m I I I ...... ...... ...... 0) u, ~ ' I ' r--1-I I L--J..-I-• ...... ...... 6 0 0 0 m m I I ...... ...... (,.) N ' ►m •:B )> C: :;u CD ►a G) C') 0 O Ill :I -0 II CD .... :I i:, 5" r:n ~ .... 0 (n :I C: r-C') -• -·3 [7i .i:,. r;n .... (n C: Q 3 III :I: ~ 00 ~ :::r 0 ::::!. C: 3 I N w N 0 0 ::s C') ff) ::s -.., D> ct 0 ::s en -C: 0 :::: 3 ATTACHMENTC BHV AIR SAMPLING LABORATORY RESULTS AND QA/QC HIGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: Quarterly Air Analysis SAMPLE ID: BHV-1 REPORT DATE: May 12, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23040176-001 natu IE-17 Quarterly Air Analysis 2022 230111 IE-17 Air Volume in mLs 225Ra 9E-17 l.22E+ll 210pb SE-15 232111 2E-18 +LLD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA 3E-18 2E-17 2E-15 IE-18 *Effluent Concentration from the NEW 10 CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for 111orium-230, 111orium-232 Week for Radium-226 Day for Lead-210 MDCµCi/mL NIA 3E-18 5E-18 3E-16 2E-18 L.L.D.+ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration IE-16 9E-14 2E-02 IE-16 3E-14 5E-02 IE-16 9E-13 IE-02 2E-15 6E-13 IE+00 NIA 6E-15 3E-02 Page 19 of32 IDGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: 2nd Quarterly Air Analysis 2023 SAMPLE ID: BHV-1 REPORT DATE: August 11, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23O7O164-OO1 ""U 7E-17 Quarterly Air Analysis 2023 230Th 2E-16 Air Volume in rnLs 226Ra l.7E-15 l.22E+l l 210pb 8E-15 232To 8E-18 +ILD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA 4E-17 3E-16 2E-15 2E-18 *Effluent Concenlration from Lhe NEW IO CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-23O, Thorium-232 Week for Radium-226 Day for Lead-210 MDCµCi/mL NIA 3E-18 6E-18 3E-16 2E-18 L.L.D.+ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration lE-16 9E-14 7E-O2 IE-16 3E-14 7E-Ol lE-16 9E-13 l.9E-Ol 2E-15 6E-13 IE+OO NIA 6E-15 IE-O1 Page 19 of4O IDGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: Quarterly Air Analysis SAMPLE ID: BHV-2 REPORT DATE: May 12, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23040176-002 ""U 9E-18 Quarterly Air Analysis 2022 230Th 8E-18 Air Volume in mLs 226Ra 3E-17 l.23E+I I 210pb 6E-15 232To 2E-18 +LLD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA 2E-18 7E-18 2E-15 IE-18 *Efnuenl Concentration from the NEW IO CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-230, Thorium-232 Week for Radium-226 Day for Lead-210 MDCµCi/mL NIA 3E-18 SE-18 3E-16 2E-18 L.L.D.♦ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration lE-16 9E-14 IE-02 lE-16 3E-14 3E-02 JE-16 9E-13 3E-03 2E-15 6E-13 IE+00 NIA 6E-15 3E-02 Page 20 of32 IDGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: 2nd Quarterly Air Analysis 2023 SAMPLE ID: BHV-2 REPORT DATE: August 11, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23O7O164-OO2 ""U 2E-17 Quarterly Air Analysis 2023 230Th 4E-17 Air Volume in mLs 226Ra 3E-16 l.22E+l l 210pb 6E-15 232Th SE-18 +LLD's are from NRC Reg. Guide 4. 14 Counting Precision µCi/mL NIA SE-18 6E-17 2E-15 2E-18 *Effluenl Concentration from the NEW 10 CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-23O, Thorium-232 Week for Radium-226 Day forLead-21O MDCµCi/mL NIA 2E-l8 4E-18 2E-16 2E-18 L.L.D.+ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration IE-16 9E-14 3E-O2 IE-16 3E-14 IE-O1 IE-16 9E-13 3E-O2 2E-15 6E-13 IE+OO NIA 6E-15 lE-O1 Page 20 of 40 IDGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: Quarterly Air Analysis SAMPLE ID: BHV-4 REPORT DATE: May 12, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23040176-003 ""U SE-17 Quarterly Air Analysis 2022 23°'fh 2E-l6 Air Volume in rnLs 226J<a ?E-16 l.22E+ll 210pb 8E-15 232TJi 4E-18 +LLD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA 4E-17 lE-16 2E-15 2E-18 *Efnuent Concentration from the NEW 10 CFR Part 20 -Appendix B -Table 2 Year for Natural U raniurn Year for Thorium-230, Thorium-232 Week for Radium-226 Day for Lead-210 MDCµCi/mL NIA 3E-18 SE-18 3E-16 2E-18 L.L.D.♦ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration lE-16 9E-14 SE-02 lE-16 3E-14 ?E-01 lE-16 9E-13 8E-02 2E-15 6E-13 IE+00 NIA 6E-15 6E-02 Page 21 of 32 HIGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: 2nd Quarterly Air Analysis 2023 SAMPLE ID: BHV-4 REPORT DATE: August 11, 2023 Quarterillate Sampled Concentration Radionuclide Air Volume µCi/mL C23O7O164-OO3 naiu 3E-17 Quarterly Air Analysis 2023 230111 3E-17 Air Volume in mLs 226Ra 2E-16 l.21E+l 1 210pb 8E-15 232111 4E-18 +LLD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA SE-18 4E-17 3E-15 2E-18 *Efnuent Concentration from the NEW 10 CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for 111orium-23O, Thorium-232 Week for Radium-226 Day for Lead-21O MDCµCi/mL NIA 2E-18 SE-18 3E-16 2E-18 L.L.D! Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration JE-16 9E-14 3E-O2 lE-16 3E-14 lE-O1 IE-16 9E-13 2E-O2 2E-15 6E-13 IE+OO NIA 6E-15 7E-O2 Page 21 of 40 HIGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: Quarterly Air Analysis SAMPLE ID: BHV-5 REPORT DATE: May 12, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23O4O176-OO4 ""U 5E-17 Quarterly Air Analysis 2022 230Tb 2E-16 Air Volume in mLs 226Ra l.2E-15 l.24E+l l 2l°J>b IE-14 232Th 4E-18 +LLD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA 4E-17 2E-16 3E-15 2E-18 *Effluent Concenlralion from lhe NEW 10 CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-23O, Thorium-232 Week for Radium-226 Day for Lead-21O MDCµCi/mL NIA 3E-18 5E-18 3E-16 2E-18 L.L.D.+ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration IE-16 9E-14 5E-O2 IE-16 3E-14 8E-O1 IE-16 9E-13 1.3E-O1 2E-15 6E-13 2E+OO NIA 6E-15 6E-O2 Page 22 of 32 IDGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: 2nd Quarterly Air Analysis 2023 SAMPLE ID: BHV-5 REPORT DATE: August 11, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23O7O164-OO4 "'"U lE-16 Quanerly Air Analysis 2023 230Th 4E-16 Air Volume in mLs 226Ra 4.OE-15 l.21E+l l 210pb 9E-15 232Th 7E-18 +LLD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA BE-17 BE-16 3E-15 2E-18 *Effluem Concentration from the NEW IO CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-23O, Thorium-232 Week for Radium-226 Day for Lead-21O MDCµCi/mL NIA 3E-18 4E-18 3E-16 2E-18 L.L.D.+ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration IE-16 9E-14 IE-O1 IE-16 3E-14 IE+OO IE-16 9E-13 4.SE-O1 2E-15 6E-13 IE+OO NIA 6E-15 IE-O1 Page 22 of 40 HIGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: Quarterly Air Analysis SAMPLE ID: BHV-6 REPORT DATE: May 12, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23O4O176-OO5 nalu 3E-17 Quarterly Air Analysis 2022 210Th 2E-17 Air Volume in mLs 226R_a 5E-17 l.22E+ll 210pb 8E-15 212Th 4E-18 +LLD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA 4E-18 lE-17 3E-15 2E-18 *Effluent Concentration from the NEW IO CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-23O, Thorium-232 Week for Radium-226 Day for Lead-21O MDCµCi/mL NIA 3E-18 5E-18 3E-16 3E-18 L.L.D.+ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration lE-16 9E-14 3E-O2 lE-16 3E-14 7E-O2 lE-16 9E-13 5E-O3 2E-15 6E-13 IE+OO NIA 6E-15 6E-O2 Page 23 of 32 ffiGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: 2nd Quarterly Air Analysis 2023 SAMPLE ID: BHV-6 REPORT DATE: August 11, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23070164-005 ""U 6E-17 Quarterly Air Analysis 2023 230Th 2E-16 Air Volume in mLs 226Ra I.OE-IS l.22E+l l 210pb 8E-15 232Th IE-17 +LLD's are from NRC Reg. Guide 4. 14 Counting Precision µCi/mL NIA 3E-17 2E-16 2E-15 2E-18 *Efnuent Concenlralion from Lhe NEW JO CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-230, Thorium-232 Week for Radium-226 Day forl..ead-210 MDCµCi/mL NIA 2E-18 SE-18 3E-16 2E-18 L.L.D.+ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration IE-16 9E-14 6E-02 IE-16 3E-14 6E-0l IE-16 9E-13 1.IE-01 2E-15 6E-13 IE+00 NIA 6E-15 2E-0I Page 23 of 40 IDGH VOLUME Affi SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: Quarterly Air Analysis SAMPLEID: BHV-7 REPORT DATE: May 12, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23O4O176-OO6 natu 3E-17 Quarterly Air Analysis 2022 230Th 2E-17 Air Volume in mLs 226Ra IE-16 l.22E+I I 210pb SE-15 232'fh 3E-18 +LLD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA SE-18 2E-17 2E-15 2E-18 *Effluenl Concenlralion from the NEW IO CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-23O, Thorium-232 Week for Radium-226 Day for Lead-210 MDCµCi/mL NIA 4E-18 9E-18 4E-16 3E-18 L.L.D! Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration IE-16 9E-14 3E-O2 IE-16 3E-14 8E-O2 IE-16 9E-13 IE-O2 2E-15 6E-13 IE+OO NIA 6E-15 6E-O2 Page 24 of 32 IDGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: 2nd Quarterly Air Analysis 2023 SAMPLE ID: BHV-7 REPORT DATE: August 11, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23070164-006 nalu 2E-16 Quarterly Air Analysis 2023 230Tb 8E-16 Air Volume in mLs 226J<a 6.4E-15 l.22E+ll 210pb IE-14 232Tb IE-17 +ILD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA 2E-16 l.2E-15 3E-15 3E-18 *Effluent Concentration from the NEW IO CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-230, Thorium-232 Week for Radium-226 Day for Lead-210 MDCµCi/mL NIA 9E-18 4E-18 3E-16 5E-18 L.L.D.+ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration IE-16 9E-14 2E-01 IE-16 3E-14 3E+OO IE-16 9E-13 7.2E-01 2E-15 6E-13 2E+OO NIA 6E-15 2E-01 Page 24 of40 HIGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: Quarterly Air Analysis SAMPLE ID: BHV-8 REPORT DATE: May 12, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23O4O176-OO7 nalu 3E-17 Quarterly Air Analysis 2022 230Th 6E-17 Air Volume in mLs 226Ra 4E-16 l.23E+l l 210pb 8E-15 232Th 3E-18 +LLD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA IE-17 8E-17 2E-15 2E-18 *Eflluenl Concenlration from the NEW 10 CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-23O, Thorium-232 Week for Radium-226 Day for Lead-2 I 0 MDCµCi/mL NIA 4E-18 9E-18 4E-16 3E-18 L.L.D.+ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration IE-16 9E-14 3E-O2 IE-16 3E-14 2E-Ol IE-16 9E-13 5E-O2 2E-15 6E-13 IE+OO NIA 6E-15 5E-O2 Page 25 of 32 IDGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: 2nd Quarterly Air Analysis 2023 SAMPLE ID: BHV-8 REPORT DATE: August 11, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23070164-007 natu 8E-17 Quarterly Air Analysis 2023 230Th 2E-16 Air Volume in mLs 226R_a 2.SE-15 l.21E+ll 210pb 8E-15 232Th 7E-18 +LLD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA SE-17 SE-16 2E-15 3E-18 *Effluenl Concenlralion from Lhe NEW 10 CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-230, Thorium-232 Week for Radium-226 Day for Lead-210 MDCµCi/mL NIA 3E-18 6E-18 3E-16 2E-18 L.L.D.+ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration lE-16 9E-14 9E-02 lE-16 3E-14 8E-0l lE-16 9E-13 2.8E-01 2E-15 6E-13 lE+00 NIA 6E-15 lE-01 Page 25 of40 HIGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: Quarterly Air Analysis SAMPLE ID: Blanks REPORT DATE: May 12, 2023 Quarter/Date Sampled Concentration Radionuclide Air Volume µCi/mL C23O4O176-OO8 natu 8.9E-1O Quarterly Air Analysis 2022 230Th 2.9E-1O Air Volume in mLs 226Ra -3E-IO 1.OOE+O3 210pb -IE-O8 232Th -IE-1O +LLD's are from NRC Reg. Guide 4.14 Counting Precision µCi/mL NIA 4.IE-1O 7.IE-1O 1.IE-O8 2.4E-1O *Effluent Concentration from the NEW IO CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-23O, Thorium-232 Week for Radium-226 Day for Lead-21O MDCµCi/mL NIA 7.4E-IO l.2E-O9 2.OE-O8 6. IE-1O L.L.D.+ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration IE-16 9E-14 9.9E+O5 IE-16 3E-14 9.6E+O5 lE-16 9E-13 -3E+O4 2E-15 6E-13 -2E+O6 NIA 6E-15 -2E+O6 Page 26 of32 IDGH VOLUME AIR SAMPLING REPORT CLIENT: Energy Fuels Resources (USA) Inc PROJECT: 2nd Quarterly Air Analysis 2023 SAMPLE ID: Blanks REPORT DATE: August 11, 2023 Quarterillate Sampled Concentration Radionuclide Air Volume µCi/mL C23O7O164-OO8 natu 3.9E-10 Quarterly Air Analysis 2023 230Th 8.7E-10 Air Volume in mLs. 226R_a 4.9E-1O 1.OOE+O3 210pb -4E-O9 232Tb 1.6E-1O +LLD's are from NRC Reg. Guide4.14 Counting Precision µCi/mL NIA 4.2E-1O 4.lE-1O 4.9E-O9 l.9E-10 *Effluent Concentration from the NEW IO CFR Part 20 -Appendix B -Table 2 Year for Natural Uranium Year for Thorium-23O, Thorium-232 Week for Radium-226 Day for Lead-21O MDCµCi/mL NIA 4.9E-IO 6.SE-10 8.4E-O9 3.4E-10 L.L.D.+ Effluent Cone.* % Effluent µCi/mL µCi/mL Concentration lE-16 9E-14 4.3E+O5 lE-16 3E-14 2.9E+O6 lE-16 9E-13 5.5E+O4 2E-15 6E-13 -6E+O5 NIA 6E-15 2.7E+O6 Page 26 of4O EN:RGY L ~ .. !JI •~•••· )>.;1 1(-~ Trust our People. Trust our Data. www energylab com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 ANALYTICAL SUMMARY REPORT May 15, 2023 Energy Fuels Resources (USA) Inc 225 Union Blvd Ste 600 Lakewood, CO 80228-1826 Work Order: C23040176 Project Name: 1st Quarter Air 2023 Quote ID: C16290 Energy Laboratories, Inc. Casper WY received the following 8 samples for Energy Fuels Resources (USA) Inc on 4/10/2023 for analysis. Lab ID Client Sample ID Collect Date Receive Date Matrix Test C23040176-001 BHV-1 04/03/23 0:00 04/10/23 Filter Composite of two or more samples Client Provided Field Parameters Metals, Total Digestion, Total Metals, Radiochemistry Radiochemistry Air Filter Compliance Calculations RAD-AIR, Routine Radiological Reports RAD Alternate Unit Reporting Air Filters Lead 210 Radium 226 Thorium, Isotopic C23040176-002 BHV-2 04/03/23 0:00 04/10/23 Filter Same As Above C23040176-003 BHV-4 04/03/23 0:00 04/10/23 Filter Same As Above C23040176-004 BHV-5 04/03/23 0:00 04/10/23 Filter Same As Above C23040176-005 BHV-6 04/03/23 0:00 04/10/23 Filter Same As Above C23040176-006 BHV-7 04/03/23 0:00 04/10/23 Filter Same As Above C23040176-007 BHV-8 04/03/23 0:00 04/10/23 Filter Same As Above C23040176-008 Blanks 04/03/23 0:00 04/10/23 Filter Same As Above The analyses presented in this report were performed by Energy Laboratories, Inc., 2393 Salt Creek Hwy., Casper, WY 82601, unless otherwise noted. Any exceptions or problems with the analyses are noted in the report package. Any issues encountered during sample receipt are documented in the Work Order Receipt Checklist. The results as reported relate only to the item(s) submitted for testing. This report shall be used or copied only in its entirety. Energy Laboratories, Inc. is not responsible for the consequences arising from the use of a partial report. If you have any questions regarding these test results, please contact your Project Manager . Report Approved By: ~ uo~ Ashley L. Wilson /'l 1 11:P. Lu· II_ Digitally signed by PrajectManager Date: 2023.05.15 15:55:19-06:00 Page 1 of 32 EN:RGY , .t..f_~\ ,~ .... rt1;::;,1L;, Trust our People. Trust our Data. www.energylab com Billings, MT 800. 735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686. 7175 • Helena, MT 877.472.0711 CLIENT: Project: Work Order: Energy Fuels Resources (USA) Inc 1st Quarter Air 2023 C23040176 Air filters were collected from 1/03/2023 to 4/03/2023. ORIGINAL SAMPLE SUBMITTAL(S) All original sample submittals have been returned with the data package. SAMPLE TEMPERATURE COMPLIANCE: 4°C (±2°C) Report Date: 05/15/23 CASE NARRATIVE Temperature of samples received may not be considered properly preserved by accepted standards. Samples that are hand delivered immediately after collection shall be considered acceptable if there is evidence that the chilling process has begun. GROSS ALPHA ANALYSIS Method 900.0 for gross alpha and gross beta is intended as a drinking water method for low TDS waters. Data provided by this method for non potable waters should be viewed as inconsistent. RADON IN AIR ANALYSIS The desired exposure time is 48 hours (2 days). The time delay in returning the canister to the laboratory for processing should be as short as possible to avoid excessive decay. Maximum recommended delay between end of exposure to beginning of counting should not exceed 8 days. SOIUSOLID SAMPLES All samples reported on an as received basis unless otherwise indicated. ATRAZINE, SIMAZINE AND PCB ANALYSIS Data for PCBs, Atrazine and Simazine are reported from EPA 525.2. PCB data reported by ELI reflects the results for seven individual Aroclors. When the results for all seven are ND (not detected), the sample meets EPA compliance criteria for PCB monitoring. SUBCONTRACTING ANALYSIS Subcontracting of sample analyses to an outside laboratory may be required. If so, ENERGY LABORATORIES will utilize its branch laboratories or qualified contract laboratories for this service. Any such laboratories will be indicated within the Laboratory Analytical Report. BRANCH LABORATORY LOCATIONS eli-b -Energy Laboratories, Inc. -Billings, MT eli-g -Energy Laboratories, Inc. -Gillette, WY eli-h -Energy Laboratories, Inc. -Helena, MT ISO 17025 DISCLAIMER: The results of this Analytical Report relate only to the items submitted for analysis. ENERGY LABORATORIES, INC. -CASPER,WY certifies that certain method selections contained in this report meet requirements as set forth by the above accrediting authorities. Some results requested by the client may not be covered under these certifications. All analysis data to be submitted for regulatory enforcement should be certified in the sample state of origin. Please verify ELi's certification coverage by visiting www.energylab.com ELI appreciates the opportunity to provide you with this analytical service. For additional information and services visit our web page www.energylab.com. Tests associated with analyst identified as ELI-B were subcontracted to Energy Laboratories, 1120 S. 27th St., Billings, MT, EPA Number MT00005. Page 2 of 32 El'ERGY l.Af'l, ,::;,;..r!,Plt ~--:, Trust our People. Trust our Data. ww1•,.energylab com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-001 Client Sample ID: BHV-1 Analyses Result Units CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.22E+08 L METALS, IN AIR Uranium ND mg/L Uranium, Activity uCi/mL RADIONUCLIDES -IN AIR Lead 210 7.8E-15 uCi/mL Lead 210 precision(±) 2.3E-15 uCi/mL Lead 210 MDC 2.9E-16 uCi/mL Radium 226 9.3E-17 uCi/mL Radium 226 precision (±) 1.8E-17 uCi/mL Radium 226 MDC 5.2E-18 uCi/mL Thorium 230 1.4E-17 uCi/mL Thorium 230 precision (±) 2.7E-18 uCi/mL Thorium 230 MDC 2.7E-18 uCi/mL Thorium 232 2.1E-18 uCi/mL Thorium 232 precision (±) 1.3E-18 uCi/mL Thorium 232 MDC 1.8E-18 uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 955 pCi/Filter Lead 210 precision(±) 286 pCi/Filter Lead 210 MDC 35.6 pCi/Filter Radium 226 11.3 pCi/Filter Radium 226 precision (±) 2.3 pCi/Filter Radium 226 MDC 0.64 pCi/Filter Thorium 230 1.7 pCi/Filter Thorium 230 precision (±) 0.32 pCi/Filter Thorium 230 MDC 0.33 pCi/Filter Thorium 232 0.26 pCi/Filter Thorium 232 precision (±) 0.16 pCi/Filter Thorium 232 MDC 0.22 pCi/Filter Uranium, Activity 1.7 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, EFF Day 6.0E-13 uCilmL Lead 210, LLD 2.0E-15 uCilmL Radium 226, EFF Week 9.0E-13 uCilmL Radium 226, LLD 1.0E-16 uCilmL Thorium 230, EFF Year 3.0E-14 uCilmL Thorium 230, LLD 1.0E-16 uCilmL Thorium 232, EFF Year 6.0E-15 uCilmL Thorium 232, LLD uCilmL Report RL -Analyte Reporting Limit Definitions: QCL -Quality Control Limit Qualifiers RL 1.5E-10 1.0E-16 0.20 MCU Report Date: 05/15/23 Collection Date: 04/03/23 DateReceived: 04/10/23 Matrix: Filter QCL Method Analysis Date/ By FIELD 04110123 15:321 meh SW6020 05104123 19:14 / eli-b SW6020 05104123 19: 14 I eli-b E909.0 05102123 18:13 I sec E909.0 05102123 18:13 I sec E909.0 05102123 18: 13 I sec E903.0 05102/23 16:12 / kdk E903.0 05/02/23 16:12 I kdk E903.0 05/02123 16: 12 I kdk A7500-U C 05/01123 11 :39 I sec A7500-U C 05/01123 11 :39 I sec A7500-U C 05101123 11 :39 / sec A7500-U C 05101 /23 11 :39 / sec A7500-U C 05/01123 11 :39 / sec A7500-U C 05101 /23 11 :39 / sec RADCALC 05109/23 12:37 I dmf RADCALC 05/09123 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05109123 12:37 / dmf RADCALC 05109123 12:37 I dmf RADCALC 05109123 12:37 / dmf RADCALC 05109/23 12:37 / dmf RADCALC 05109/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05109/23 12:37 / dmf RADCALC 05109/23 12:37 / dmf RADCALC 05109123 12:37 / dmf RADCALC 05109/23 12:37 / dmf RADCALC 05/11123 14:55 / dmf RADCALC 05111123 14:55 / dmf RADCALC 05111 /23 14:55 / dmf RADCALC 05111 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11/23 14:551 dmf RADCALC 05/11123 14:551 dmf RADCALC 05/11/23 14:55 / dmf MCL -Maximum Contaminant Level ND -Nol detected at the Reporting Limit (RL) Page 3 of 32 El'ERGY .._f-, J.=in!C",RI• • Trust our People. Trust our Data. www.energylab.com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-001 Client Sample ID: BHV-1 Analyses Result Units RADIOCHEMISTRY AIR FILTER COMPLIANCE Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 9.0E-14 uCi/mL 1.0E-16 uCi/mL Qualifiers RL MCU Report Date: 05/15/23 Collection Date: 04/03/23 Date Received: 04/10/23 Matrix: Filter QCL Method Analysis Date / By RADCALC RADCALC 05/11 /23 14:55 / dmf 05/11 /23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 4 of 32 EN:RGY ' ;,S •)~•~,, I ,;JI(-C, Trust our People. Trust our Data. www.energylab com Billings, MT 800. 735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-002 Client Sample ID: BHV-2 Analyses Result Units Qualifiers CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.23E+08 METALS, IN AIR Uranium ND Uranium, Activity RADIONUCLIDES -IN AIR Lead 210 5.BE-15 Lead 210 precision (±) 1.7E-15 Lead 210 MDC 2.5E-16 Radium 226 2.9E-17 Radium 226 precision (±) 6.7E-18 Radium 226 MDC 4.9E-18 Thorium 230 8.3E-18 Thorium 230 precision (±) 1.6E-18 Thorium 230 MDC 2.7E-18 Thorium 232 1.6E-18 Thorium 232 precision (±) 1.4E-18 Thorium 232 MDC 2.2E-18 RADIONUCLIDES -IN AIR -PER FILTER Lead 210 716 Lead 210 precision(±) 215 Lead 210 MDC 31.2 Radium 226 3.6 Radium 226 precision (±) 0.82 Radium 226 MDC 0.60 Thorium 230 1.0 Thorium 230 precision (±) 0.19 Thorium 230 MDC 0.33 Thorium 232 0.19 Thorium 232 precision (±) 0.17 Thorium 232 MDC 0.27 Uranium, Activity 1.1 RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, EFF Day Lead 210, LLD Radium 226, EFF Week Radium 226, LLD Thorium 230, EFF Year Thorium 230, LLD Thorium 232, EFF Year Thorium 232, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 6.0E-13 2.0E-15 9.0E-13 1.0E-16 3.0E-14 1.0E-16 6.0E-15 L mg/L uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL U -Not detected at Minimum Detectable Concentration (MDC) u u RL 1.5E-10 1.0E-16 0.20 MCU Report Date: 05/15/23 Collection Date: 04/03/23 DateReceived: 04/10/23 Matrix: Filter QCL Method Analysis Date / By FIELD 04/10/23 15:32 / meh SW6020 05/04/23 19:20 / eli-b SW6020 05/04/23 19:20 / eli-b E909.0 05/02/23 18:34 / sec E909.0 05/02/23 18:34 / sec E909.0 05/02/23 18:34 / sec E903.0 05/02/23 16:12 / kdk E903.0 05/02/23 16:12 / kdk E903.0 05/02/23 16:12 / kdk A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 5 of 32 EN:RGY L •-'•f -11--J.:.•r .~1F •, Trust our People. Trust our Data. www energylab com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-002 Client Sample ID: BHV-2 Analyses Result Units RADIOCHEMISTRY AIR FILTER COMPLIANCE Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 9.0E-14 uCi/mL 1.0E-16 uCi/mL Qualifiers RL MCU Report Date: 05/15/23 Collection Date: 04/03/23 DateReceived: 04/10/23 Matrix: Filter QCL Method Analysis Date I By RADCALC RADCALC 05/11 /23 14:55 / dmf 05/11 /23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 6 of 32 EN:RGY l t,8• )rJ,:-•-'1\:>lf-S Trust our People. Trust our Data. www,energylab com Billings, MT 800. 735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686. 7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-003 Client Sample ID: BHV-4 Analyses Result Units CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.22E+08 L METALS, IN AIR Uranium ND mg/L Uranium, Activity uCi/mL RADIONUCLIDES -IN AIR Lead 210 7.6E-15 uCi/mL Lead 210 precision (±) 2.3E-15 uCi/mL Lead 210 MDC 2.9E-16 uCi/mL Radium 226 7.1E-16 uCi/mL Radium 226 precision (±) 1.3E-16 uCi/mL Radium 226 MDC 5.1 E-18 uCi/mL Thorium 230 2.1E-16 uCi/mL Thorium 230 precision (±) 4.0E-17 uCi/mL Thorium 230 MDC 2.7E-18 uCi/mL Thorium 232 3.5E-18 uCi/mL Thorium 232 precision (±) 1.9E-18 uCi/mL Thorium 232 MDC 2.2E-1 B uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 928 pCi/Filter Lead 210 precision(±) 278 pCi/Filter Lead 210 MDC 35.2 pCi/Filter Radium 226 87.0 pCi/Filter Radium 226 precision (±) 16.4 pCi/Filter Radium 226 MDC 0.62 pCi/Filter Thorium 230 25.9 pCi/Filter Thorium 230 precision (±) 4.9 pCi/Filter Thorium 230 MDC 0.33 pCi/Filter Thorium 232 0.43 pCi/Filter Thorium 232 precision (±) 0.23 pCi/Filter Thorium 232 MDC 0.27 pCi/Filter Uranium, Activity 5.7 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, EFF Day 6.0E-13 uCi/mL Lead 210, LLD 2.0E-15 uCi/mL Radium 226, EFF Week 9.0E-13 uCi/mL Radium 226, LLD 1.0E-16 uCi/mL Thorium 230, EFF Year 3.0E-14 uCi/mL Thorium 230, LLD 1.0E-16 uCi/mL Thorium 232, EFF Year 6.0E-15 uCi/mL Thorium 232, LLD uCi/mL Report RL -Analyte Reporting Limit Definitions: QCL -Quality Control Limit Qualifiers RL 1.5E-10 1.0E-16 0.20 MCL/ Report Date: 05/15/23 Collection Date: 04/03/23 Date Received: 04/10/23 Matrix: Filter QCL Method Analysis Date / By FIELD 04/10/23 15:32 / meh SW6020 05/04/23 19:26 / eli-b SW6020 05/04/23 19:26 / eli-b E909.0 05/02/23 18:59 / sec E909.0 05/02/23 18:59 / sec E909.0 05/02/23 18:59 / sec E903.0 05/02/23 16:12 / kdk E903.0 05/02/23 16:12 / kdk E903.0 05/02/23 16:12 / kdk A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01/2311 :39 / sec A7500-U C 05/01 /23 11 :39 / sec RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 7 of 32 EI\ERGY 1 ~--!,-};--~·• t < ,:-:;1F 2 Trust our People. Trust our Data. www.energylab com Billings, MT 800. 735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-003 Client Sample ID: BHV-4 Analyses Result Units RADIOCHEMISTRY AIR FILTER COMPLIANCE Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 9.0E-14 uCi/mL 1.0E-16 uCi/mL Qualifiers RL MCU Report Date: 05/15/23 Collection Date: 04/03/23 Date Received: 04/10/23 Matrix: Filter QCL Method Analysis Date / By RADCALC RADCALC 05/11 /23 14:55 / dmf 05/11 /23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 8 of 32 EI\ERGY .l..,f;_ )Wµ l r1:...,>1[ • Trust our People. Trust our Data. www energylab com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-004 Client Sample ID: BHV-5 Analyses Result Units CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.24E+08 L METALS, IN AIR Uranium ND mg/L Uranium, Activity uCi/mL RADIONUCLIDES -IN AIR Lead 210 1.1E-14 uCi/mL Lead 210 precision(±) 3.2E-15 uCi/mL Lead 210 MDC 3.3E-16 uCi/mL Radium 226 1.2E-15 uCilmL Radium 226 precision (±) 2.3E-16 uCilmL Radium 226 MDC 4.9E-18 uCi/mL Thorium 230 2.4E-16 uCi/mL Thorium 230 precision (±) 4.5E-17 uCilmL Thorium 230 MDC 3.0E-18 uCi/mL Thorium 232 3.9E-18 uCi/mL Thorium 232 precision (±) 1.9E-18 uCi/mL Thorium 232 MDC 2.0E-18 uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 1310 pCi/Filter Lead 210 precision(±) 391 pCi/Filter Lead 210 MDC 41.2 pCi/Filter Radium 226 148 pCi/Filter Radium 226 precision (±) 27.9 pCi/Filter Radium 226 MDC 0.60 pCi/Filter Thorium 230 29.1 pCi/Filter Thorium 230 precision (±) 5.5 pCi/Filter Thorium 230 MDC 0.37 pCi/Filter Thorium 232 0.48 pCi/Filter Thorium 232 precision (±) 0.24 pCi/Filter Thorium 232 MDC 0.25 pCi/Filter Uranium, Activity 5.9 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, EFF Day 6.0E-13 uCilmL Lead 210, LLD 2.0E-15 uCilmL Radium 226, EFF Week 9.0E-13 uCi/mL Radium 226, LLD 1.0E-16 uCi/mL Thorium 230, EFF Year 3.0E-14 uCi/mL Thorium 230, LLD 1.0E-16 uCilmL Thorium 232, EFF Year 6.0E-15 uCi/mL Thorium 232, LLD uCi/mL Report RL -Analyte Reporting Limit Definitions: QCL -Quality Control Limit Qualifiers RL 1.5E-10 1.0E-16 0.20 MCU Report Date: 05/15/23 Collection Date: 04/03/23 Date Received: 04/10/23 Matrix: Filter QCL Method Analysis Date / By FIELD 04/10/23 15:32 / meh SW6020 05/04/23 19:32 / eli-b SW6020 05/04/23 19:32 / eli-b E909.0 05/02/23 19:20 / sec E909.0 05/02/23 19:20 / sec E909.0 05/02/23 19:20 / sec E903.0 05102/23 16:12 / kdk E903.0 05102/23 16:12 I kdk E903.0 05102123 16:12 I kdk A7500-U C 05101123 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01/23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 I dmf RADCALC 05/09/23 12:37 I dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/11123 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 9 of 32 EI\ERGY L J;.('Jr,.;,:, ..11:."1L .. "'.. Trust our People. Trust our Data. www energylab com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686. 7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-004 Client Sample ID: BHV-5 Analyses Result Units RADIOCHEMISTRY AIR FILTER COMPLIANCE Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 9.0E-14 uCi/mL 1.0E-16 uCi/mL Qualifiers RL MCU Report Date: 05/15/23 Collection Date: 04/03/23 DateReceived: 04/10/23 Matrix: Filter QCL Method Analysis Date I By RADCALC RADCALC 05/11 /23 14:55 / dmf 05/11 /23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 10 of 32 EN:RGY 'Afl-):...,:.,f •Pre::; Trust our People. Trust our Data. www energylab com Billings, MT 800. 735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686. 7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-005 Client Sample ID: BHV-6 Analyses Result Units CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.22E+08 L METALS, IN AIR Uranium ND mg/L Uranium, Activity uCi/mL RADIONUCLIDES -IN AIR Lead 210 8.4E-15 uCi/mL Lead 210 precision(±) 2.5E-15 uCi/mL Lead 210 MDC 3.0E-16 uCi/mL Radium 226 4.5E-17 uCi/mL Radium 226 precision(±) 9.?E-18 uCi/mL Radium 226 MDC 5.2E-18 uCi/mL Thorium 230 2.0E-17 uCi/mL Thorium 230 precision (±) 3.8E-18 uCi/mL Thorium 230 MDC 2.?E-18 uCi/mL Thorium 232 3.6E-18 uCi/mL Thorium 232 precision (±) 2.1E-18 uCi/mL Thorium 232 MDC 2.?E-18 uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 1030 pCi/Filter Lead 210 precision (±) 308 pCi/Filter Lead 210 MDC 36.9 pCi/Filter Radium 226 5.5 pCi/Filter Radium 226 precision (±) 1.2 pCi/Filter Radium 226 MDC 0.64 pCi/Filter Thorium 230 2.5 pCi/Filter Thorium 230 precision (±) 0.47 pCi/Filter Thorium 230 MDC 0.33 pCi/Filter Thorium 232 0.44 pCi/Filter Thorium 232 precision (±) 0.25 pCi/Filter Thorium 232 MDC 0.32 pCi/Filter Uranium, Activity 3.2 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, EFF Day 6.0E-13 uCi/mL Lead 210, LLD 2.0E-15 uCi/mL Radium 226, EFF Week 9.0E-13 uCi/mL Radium 226, LLD 1.0E-16 uCi/mL Thorium 230, EFF Year 3.0E-14 uCi/mL Thorium 230, LLD 1.0E-16 uCi/mL Thorium 232, EFF Year 6.0E-15 uCi/mL Thorium 232, LLD uCi/mL Report RL -Analyte Reporting Limit Definitions: QCL -Quality Control Limit Qualifiers RL 1.5E-10 1.0E-16 0.20 MCU Report Date: 05/15/23 Collection Date: 04/03/23 DateReceived: 04/10/23 Matrix: Filter QCL Method Analysis Date / By FIELD 04/10/23 15:32 / meh SW6020 05/04/23 19:50 I eli-b SW6020 05/04/23 19:50 I eli-b E909.0 05/02/23 19:35 / sec E909.0 05/02/23 19:35 / sec E909.0 05/02/23 19:35 I sec E903.0 05/02/23 16:12 / kdk E903.0 05/02/23 16:12 / kdk E903.0 05/02/23 16:12 / kdk A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01/23 11 :39 / sec A7500-U C 05/01 /23 11 :39 I sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/11 /23 14:55 I dmf RADCALC 05/11 /23 14:55 I dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 I dmf RADCALC 05/11/23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 11 of 32 EN:RGY ... ,~.-,;--... • •• ~,t ~ Trust our People. Trust our Data. www.energylab com Billings, MT 800. 735.4489 • Casper, WV 888.235.0515 Gillette, WV 866.686.7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-005 Client Sample ID: BHV-6 Analyses Result Units RADIOCHEMISTRY AIR FILTER COMPLIANCE Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 9.0E-14 uCi/mL 1.0E-16 uCi/mL Qualifiers RL MCU Report Date: 05/15/23 Collection Date: 04/03/23 Date Received: 04/10/23 Matrix: Filter QCL Method Analysis Date / By RADCALC RADCALC 05/11 /23 14:55 / dmf 05/11 /23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 12 of 32 EN:RGY _ .... I] ")~~h• ~,,::.1i-s Trust our People. Trust our Data. www.energyl;;b com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 LABO RA TORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-006 Client Sample ID: BHV-7 Analyses Result Units CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.22E+08 L METALS, IN AIR Uranium ND mg/L Uranium, Activity uCi/mL RADIONUCLIDES -IN AIR Lead 210 7.7E-15 uCi/mL Lead 210 precision(±) 2.3E-15 uCi/mL Lead 210 MDC 4.1E-16 uCi/mL Radium 226 1.1E-16 uCi/mL Radium 226 precision (±) 2.4E-17 uCilmL Radium 226 MDC 9.1E-18 uCi/mL Thorium 230 2.4E-17 uCi/mL Thorium 230 precision (±) 4.6E-18 uCi/mL Thorium 230 MDC 3.7E-18 uCi/mL Thorium 232 3.5E-18 uCi/mL Thorium 232 precision (±) 2.3E-18 uCi/mL Thorium 232 MDC 3.0E-18 uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 943 pCi/Filter Lead 210 precision(±) 283 pCi/Filter Lead 210 MDC 50.7 pCi/Filter Radium 226 13.9 pCi/Filter Radium 226 precision (±) 2.9 pCi/Filter Radium 226 MDC 1.1 pCi/Filter Thorium 230 3.0 pCi/Filter Thorium 230 precision (±) 0.57 pCi/Filter Thorium 230 MDC 0.45 pCi/Filter Thorium 232 0.42 pCi/Filter Thorium 232 precision (±) 0.28 pCi/Filter Thorium 232 MDC 0.37 pCi/Filter Uranium, Activity 3.7 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, EFF Day 6.0E-13 uCi/mL Lead 210, LLD 2.0E-15 uCi/mL Radium 226, EFF Week 9.0E-13 uCi/mL Radium 226, LLD 1.0E-16 uCi/mL Thorium 230, EFF Year 3.0E-14 uCi/mL Thorium 230, LLD 1.0E-16 uCi/mL Thorium 232, EFF Year 6.0E-15 uCi/mL Thorium 232, LLD uCi/mL Report RL -Analyte Reporting Limit Definitions: QCL -Quality Control Limit Qualifiers RL 1.5E-10 1.0E-16 0.20 MCU Report Date: 05/15/23 Collection Date: 04/03/23 DateReceived: 04/10/23 Matrix: Filter QCL Method Analysis Date / By FIELD 04/10/23 15:32 / meh SW6020 05/04/23 19:56 / eli-b SW6020 05/04/23 19:56 / eli-b E909.0 05/02/23 19:54 / sec E909.0 05/02/23 19:54 / sec E909.0 05/02/23 19:54 / sec E903.0 05/02/23 22:14 / kdk E903.0 05/02/23 22:14 / kdk E903.0 05/02/23 22:14 / kdk A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05101123 11 :39 / sec A7500-U C 05/01/23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 I dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 I dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 13 of32 EI\ERGY .:.nr~.~~.~ -,~11-:-:: Trust our People. Trust our Data. www encrgylab com Billings, MT 800.735.4489 • Casper, WV 888.235.0515 Gillette, WV 866.686. 7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-006 Client Sample ID: BHV-7 Analyses Result Units RADIOCHEMISTRY AIR FILTER COMPLIANCE Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 9.0E-14 uCi/mL 1.0E-16 uCi/mL Qualifiers RL MCU Report Date: 05/15/23 Collection Date: 04/03/23 DateReceived: 04/10/23 Matrix: Filter QCL Method Analysis Date I By RADCALC RADCALC 05/11 /23 14:55 / dmf 05/11/2314:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 14 of 32 EN:RGY • .,f,-(")~._.l,)411E_•J Trust our People. Trust our Data. www.energylab com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-007 Client Sample ID: BHV-8 Analyses Result Units Qualifiers CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.23E+08 METALS, IN AIR Uranium ND Uranium, Activity RADIONUCLIDES -IN AIR Lead 210 7.9E-15 Lead 210 precision (±) 2.4E-15 Lead 210 MDC 4.2E-16 Radium 226 4.1E-16 Radium 226 precision (±) 7.BE-17 Radium 226 MDC 9.5E-18 Thorium 230 6.2E-17 Thorium 230 precision (±) 1.2E-17 Thorium 230 MDC 3.6E-18 Thorium 232 2.9E-18 Thorium 232 precision (±) 2.2E-18 Thorium 232 MDC 3.3E-18 RADIONUCLIDES -IN AIR -PER FILTER Lead 210 966 Lead 210 precision(±) 290 Lead 210 MDC 51.1 Radium 226 50.1 Radium 226 precision (±) 9.6 Radium 226 MDC 1.2 Thorium 230 7.7 Thorium 230 precision (±) 1.5 Thorium 230 MDC 0.44 Thorium 232 0.35 Thorium 232 precision (±) 0.27 Thorium 232 MDC 0.40 Uranium, Activity 3.2 RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, EFF Day Lead 210, LLD Radium 226, EFF Week Radium 226, LLD Thorium 230, EFF Year Thorium 230, LLD Thorium 232, EFF Year Thorium 232, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 6.0E-13 2.0E-15 9.0E-13 1.0E-16 3.0E-14 1.0E-16 6.0E-15 L mg/L uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL U -Not detected at Minimum Detectable Concentration (MDC) u u RL 1.5E-10 1.0E-16 0.20 MCU Report Date: 05/15/23 Collection Date: 04/03/23 DateReceived: 04/10/23 Matrix: Filter QCL Method Analysis Date / By FIELD 04/10/23 15:32 / meh SW6020 05/04/23 20:02 I eli-b SW6020 05/04/23 20:02 I eli-b E909.0 05/02/23 20:29 I sec E909.0 05/02/23 20:29 I sec E909.0 05/02/23 20:29 I sec E903.0 05/02/23 22:14 / kdk E903.0 05/02/23 22:14 / kdk E903.0 05/02/23 22:14 / kdk A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01/23 11 :39 / sec A7500-U C 05/01/23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 15 of 32 El'ERGY l ,:_._f'"l()l:;l,•.• •O!{:..:., Trust our People. Trust our Data. www.energylab.com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-007 Client Sample ID: BHV-8 Analyses Result Units RADIOCHEMISTRY AIR FILTER COMPLIANCE Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 9.0E-14 uCi/mL 1.0E-16 uCi/mL Qualifiers RL MCU Report Date: 05/15/23 Collection Date: 04/03/23 DateReceived: 04/10/23 Matrix: Filter QCL Method Analysis Date / By RADCALC RADCALC 05/11 /23 14:55 / dmf 05/11 /23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 16 of 32 EN:RGY :.(°1• Jl-<',...Tt ,:::..11;: =,, Trust our People. Trust our Data. www.energylab com Billings, MT 800. 735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-008 Client Sample ID: Blanks Analyses Result Units Qualifiers CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.00 L METALS, IN AIR Uranium 0.0013 mg/L Uranium, Activity 8.9E-10 uCi/mL RADIONUCLIDES -IN AIR Lead 210 -1.2E-08 uCi/mL Lead 210 precision(±) 1.1E-08 uCi/mL Lead 210 MDC 2.0E-08 uCi/mL Radium 226 -3.1E-10 uCi/mL Radium 226 precision (±) 7.1E-10 uCi/mL Radium 226 MDC 1.2E-09 uCi/mL Thorium 230 2.9E-10 uCi/mL Thorium 230 precision (±) 4.1E-10 uCi/mL Thorium 230 MDC 7.4E-10 uCi/mL Thorium 232 -1.5E-10 uCi/mL Thorium 232 precision (±) 2.4E-10 uCi/mL Thorium 232 MDC 6.1 E-10 uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 -12.0 pCi/Filter Lead 210 precision(±) 11.4 pCi/Filter Lead 210 MDC 19.5 pCi/Filter Radium 226 -0.31 pCi/Filter Radium 226 precision (±) 0.71 pCi/Filter Radium 226 MDC 1.2 pCi/Filter Thorium 230 0.29 pCi/Filter Thorium 230 precision (±) 0.41 pCi/Filter Thorium 230 MDC 0.74 pCi/Filter Thorium 232 -0.15 pCi/Filter Thorium 232 precision (±) 0.24 pCi/Filter Thorium 232 MDC 0.61 pCi/Filter Uranium, Activity 0.89 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, EFF Day Lead 210, LLD Radium 226, EFF Week Radium 226, LLD Thorium 230, EFF Year Thorium 230, LLD Thorium 232, EFF Year Thorium 232, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 6.0E-13 uCi/mL 2.0E-15 uCi/mL 9.0E-13 uCi/mL 1.0E-16 uCi/mL 3.0E-14 uCi/mL 1.0E-16 uCi/mL 6.0E-15 uCi/mL uCi/ml U -Not detected at Minimum Detectable Concentration (MDC) u u u u u u u u MCU RL QCL 0.000095 6.4E-11 0.20 Report Date: 05/15/23 Collection Date: 04/03/23 DateReceived: 04/10/23 Matrix: Filter Method Analysis Date I By FIELD 04/10/23 15:32 / meh SW6020 05/04/23 20:08 / eli-b SW6020 05/04/23 20:08 I eli-b E909.0 05/02/23 21 :04 / sec E909.0 05/02/23 21 :04 / sec E909.0 05/02/23 21 :04 / sec E903.0 05/02/23 22:14 / kdk E903.0 05/02/23 22:14 / kdk E903.0 05/02/23 22:14 / kdk A750D-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec A7500-U C 05/01 /23 11 :39 / sec RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/09/23 12:37 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11 /23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf RADCALC 05/11/23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 17 of 32 Er\ERGY _ .:. 13,-! ;-,. ~·-. ~ ,-~ r,;-l -= Trust our People. Trust our Data. www energylab com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 1st Quarter Air 2023 Lab ID: C23040176-008 Client Sample ID: Blanks Analyses Result Units RADIOCHEMISTRY AIR FILTER COMPLIANCE Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 9.0E-14 uCi/mL 1.0E-16 uCi/mL Qualifiers RL MCU Report Date: 05/15/23 Collection Date: 04/03/23 DateReceived: 04/10/23 Matrix: Filter QCL Method Analysis Date / By RADCALC RADCALC 05/11 /23 14:55 / dmf 05/11 /23 14:55 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 18 of32 EI\ERGY l. ••R•-.JP .::.• ~~•E C, Trust our People. Trust our Data. www.energylab com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 QA/QC Summary Report Client: Energy Fuels Resources (USA) Inc Prepared by Billings, MT Branch Work Order: C23040176 Report Date: 05/08/23 Analyte Method: SW6020 Lab ID: ICSA Uranium Lab ID: ICSAB Uranium Lab ID: QCS Uranium Method: SW6020 Lab ID: MB-178181 Uranium Lab ID: LCS-17B181 Uranium Lab ID: B23041897-001ADIL Uranium Lab ID: B23041897-001AMS Uranium Lab ID: B23041897-001AMSD Uranium Qualifiers: RL -Analyte Reporting Limit Count Result Units RL %REC Low Limit High Limit RPD RPDLimit Qual Interference Check Sample A 0.0000242 mg/L 0,00030 Interference Check Sample AB 0.0000252 mg/L 0.00030 Initial Calibration Verification Standard 0.0493 mg/L 0.00030 Method Blank 0.00004 mg/L 0.00001 Laboratory Control Sample 0.0920 mg/L 0.000050 Serial Dilution 1.50E-10 mg/L Sample Matrix Spike 0.0471 mg/L Sample Matrix Spike Duplicate 1.5E-10 0.000052 0.0487 mg/L 0.000052 99 92 94 97 Analytical Run: ICPMS207-B_230504A 05/04/23 16:16 05/04/23 16:22 05/04/23 15:33 90 110 Batch: 178181 Run: ICPMS207-B_230504A 05/04/23 18:07 Run: ICPMS207-B_230504A 05/04/23 18:25 85 115 Run: ICPMS207-B_230504A 05/04/23 18:43 0 0 20 Run: ICPMS207-B_230504A 05/04/23 18:49 75 125 Run: ICPMS207-B_230504A 05/04/23 18:55 75 125 3.4 20 ND -Not detected at the Reporting Limit (RL) Page 27 of32 El'J:RGY L -L•c•~.,~__.·,.:.,'--' L S Trust our People. Trust our Data. www energylab com Billings, MT 800. 735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 QA/QC Summary Report Client: Energy Fuels Resources (USA) Inc Prepared by Casper, WY Branch Work Order: C23040176 Report Date: 05/11/23 Analyte Method: A7500-U C Lab ID: MB-70425 Thorium 230 Thorium 230 precision (±) Thorium 230 MDC Thorium 232 Thorium 232 precision (±) Thorium 232 MDC Lab ID: LCS-70425 Thorium 230 Thorium 230 precision (±) Thorium 230 MDC Lab ID: C23040176-007 ADU P Thorium 230 Thorium 230 precision (±) Thorium 230 MDC Thorium 232 Thorium 232 precision (±) Thorium 232 MDC -The RER result for Th230 is 0.19. Count Result Units 6 Method Blank 0.2 pCi/L 0.2 pCi/L 0.3 pCi/L 0.05 pCi/L 0.1 pCi/L 0.3 pCi/L 3 Laboratory Control Sample 91.4 pCi/L 17.4 pCi/L 0.646 pCi/L 6 Sample Duplicate 5.77E-08 pCi/L 1.10E-08 pCi/L 5.52E-09 pCi/L 3.80E-09 pCi/L 2.84E-09 pCi/L 4.21 E-09 pCi/L RL %REC Low Limit High Limit RPO RPDLimit Qual Run: EGG-ORTEC_ALL_230426A Run: EGG-ORTEC_ALL_230426A 91 70 130 Run: EGG-ORTEC_ALL_230426A 7.9 28 Batch: 70425 05/01 /23 11 :39 u u 05/01/23 11 :39 05/02/23 12:42 20 20 UR -Duplicate RPD for Th232 is outside of the acceptance range for this analysis. However, the RER is less than or equal to the limit of 2, the RER result is 0.28. Qualifiers: RL -Analyte Reporting Limit ND -Not detected at the Reporting Limit (RL) R -Relative Percent Difference (RPO) exceeds advisory limit U -Not detected at Minimum Detectable Concentration (MDC) Page 28 of 32 EN:RGY L .:..'3 ~)W,.'.1.-t....,,I ,1tl_ ~ Trust our People. Trust our Data. www energylab com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 QA/QC Summary Report Client: Energy Fuels Resources (USA) Inc Prepared by Casper, WY Branch Work Order: C23040176 Report Date: 05/11/23 Analyte Method: E903.0 Lab ID: LCS-70425 Radium 226 Radium 226 precision (±) Radium 226 MDC Lab ID: MB-70425 Radium 226 Radium 226 precision (±) Radium 226 MDC Lab ID: C23040176-006ADU P Radium 226 Radium 226 precision (±) Radium 226 MDC -The RER result is 0.26. Qualifiers: RL -Analyte Reporting Limit Count Result Units 3 Laboratory Control Sample 49.7 pCi/L 9.43 pCi/L 0.631 pCi/L 3 Method Blank -0.5 pCi/L 0.4 pCi/L 0.7 pCi/L 3 Sample Duplicate 1.08E-07 pCi/L 2.27E-08 pCi/L 9.87E-09 pCi/L U -Not detected at Minimum Detectable Concentration (MDC) RL %REC Low Limit High Limit Run: G5000W_230426B 100 70 130 Run:G5000W_230426B Run:G5000W_230426B ND -Not detected at the Reporting Limit (RL) RPD RPDLimit Qual 4.9 Batch: 70425 05/02/23 16: 12 05/02/23 16:12 u 05/02/23 22: 14 20 Page 29 of32 EN:RGY .._ ~~ 1:1 ;:) I., HT f ) • .J I.. ::_"":. Trust our People. Trust our Data. www energylab com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686, 7175 • Helena, MT 877.472.0711 QA/QC Summary Report Client: Energy Fuels Resources (USA) Inc Prepared by Casper, WY Branch Work Order: C23040176 Report Date: 05/11/23 Analyte Method: E909.0 Lab ID: LCS-70425 Lead 210 Lead 210 precision(±) Lead 210 MDC Lab ID: MB-70425 Lead 210 Lead 210 precision (±) Lead 210 MDC Lab ID: C23040176-008ADUP Lead 210 Lead 210 precision (±) Lead 210 MDC Count Result Units 3 Laboratory Control Sample 141 pCi/L 43.7 pCi/L 16.9 pCi/L 3 Method Blank -2 pCi/L 3 pCi/L 5 pCi/L 3 Sample Duplicate -7.82 pCi/L 11.6 pCi/L 19.7 pCi/L RL %REC Low Limit High Limit RPO RPDLimit Qual Run: TRICARB LSC_230426A 86 60 130 Run: TRICARB LSC_230426A Run: TRICARB LSC_230426A 42 Batch: 70425 05/02/23 09:26 05/02/23 10:53 u 05/03/23 09:27 20 UR -Duplicate RPO is outside of the acceptance range for this analysis. However, the RER is less than or equal to the limit of 2, the RER result is 0.26. Qualifiers: RL -Analyte Reporting Limit ND -Not detected at the Reporting Limit (RL) R -Relative Percent Difference (RPO) exceeds advisory limit U -Not detected at Minimum Detectable Concentration (MDC) Page 30 of32 EN:RGY l .-. :, L • f, ,.•, ' t ••-'I~ ' ~-Trust our People. Trust our Data. ~ www energylab com Work Order Receipt Checklist Energy Fuels Resources (USA) Inc Login completed by: Manford E. Hurley Reviewed by: mstephens Reviewed Date: 4/11/2023 Shipping container/cooler in good condition? Custody seals intact on all shipping container(s)/cooler(s)? Custody seals intact on all sample bottles? Chain of custody present? Chain of custody signed when relinquished and received? Chain of custody agrees with sample labels? Samples in proper container/bottle? Sample containers intact? Sufficient sample volume for indicated test? All samples received within holding time? (Exclude analyses that are considered field parameters such as pH, DO, Res Cl, Sulfite, Ferrous Iron, etc,) Temp Blank received in all shipping container(s)/cooler(s)? Container/Temp Blank temperature: Containers requiring zero headspace have no headspace or bubble that is <6mm (1/4"). Water -pH acceptable upon receipt? Yes It'.[ Yes It'.[ Yes □ Yes It'.[ Yeslt'.f Yes It'.[ Yeslt'.f Yeslt'.f Yes It'.[ Yes It'.[ Yes □ 14.4°C No Ice Yes □ Yes □ ---------------------------------------------------------- Standard Reporting Procedures: Billings, MT 800. 735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 C23040176 Date Received: 4/10/2023 Received by: jdj No □ No 0 No 0 No 0 No 0 No 0 No 0 No □ No □ No 0 No It'.[ No 0 No □ Carrier name: UPS Not Present D Not Present D Not Present 0 Not Applicable 0 No VOA vials submitted 0 Not Applicable 0 =====-------· Lab measurement of analytes considered field parameters that require analysis within 15 minutes of sampling such as pH, Dissolved Oxygen and Residual Chlorine, are qualified as being analyzed outside of recommended holding time. Solid/soil samples are reported on a wet weight basis (as received) unless specifically indicated. If moisture corrected, data units are typically noted as -dry. For agricultural and mining soil parameters/characteristics, all samples are dried and ground prior to sample analysis. The reference date for Radon analysis is the sample collection date. The reference date for all other Radiochemical analyses is the analysis date. Radiochemical precision results represent a 2-sigma Total Measurement Uncertainty. Contact and Corrective Action Comments: None Page 31 of 32 Sheet 1 of 1 - 'RGYFUELS RESOURCES {_230Lf0/76 CHAIN OF CUSTODY Samples Shipped to: ..,.E..,..ne __ r-gy~L_a..,..bo_ra__,ti,...,·e,....s ________ Contact: Tanner Holliday 2393 Salt Creek Hwy. Ph: 435 678 2221 Casper WY, 82601 lholliday@energyf uels.com Chain of Custody/Sampling Analysis Request Project Samplers Name Samplers Signature 1st Quarter Air 2023 Tanner Holliday l ,,u.,,,< JJJ/~ . , nme Sample ID Date Collected Collected Laboratorv Analvsis Reauested BHV-1 1/3/2023 -4/3/2023 NA U-NAT, TH-230, Ra-226, Pb-210, TH-2.32 BHV-2 1/3/2023 -4/312023 NA U-NAT. TH-230, Ra-226, Pb-210, TH-232 BHV-4 1/3/2023 -4/312023 NA U-NAT, TH-230, Ra-226, Pb-210, TH-232 BHV-5 113/2023 -4/312023 NA U-NAT, TH-230, Ra-226, Pb-210, TH-232 BHV-6 113/2023 • 413/2023 NA U-NAT, TH-230, Ra-226, Pb-210, TH-232 BHV-7 1/3/2023 -4/3/2023 NA U-NAT. TH-230, Ra-226, Pb-210, TH-232 BHV-8 1/3/2023 -4/3/2023 NA U-NAT, TH-230, Ra-226, Pb-210, TH-232 Blanks 1/3/2023 -4/3/2023 NA U-NAT, TH-230, Ra-226, Pb-210, TH-232 Comments: Please send report to Kathy Weinel at kweinel@energyfuels.com FILTERS are NOT source or by-product material, source or processed ore, or 11e2. Relinquished By:(Signature) anner Holliday Daternme Received By:(Signature) 4/4/2023 1100 Daternme Date/Time //c:>/>.) ~·n Page 32 of32 Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2015 BHV-1 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 LIH LIH LIH Ta Ta Pa , Qa Qs Qs Total Week Filter Start Stop Start Stop Total Starting Stopping I Average Wkly Avg. Wkly. Avg. Wkly.Avg Act.Flow Std Flow Std. Flow Std T:-,.r.-~ t , .• ~ -Net Loading Percent # Number Date Date Time T1111e Time Manometer Manometer Manometer Temp. Temp Pressure (SCFM) Volume '.h l~·,:r ·;, .. 'rl1, Weight Onstrearn (min) (in H10) (in H,O) (in H20) (°C) (K) (mmHg) (m'/min) (m'/min) (ff/min) (m') CJl·l Ci) (mg) (mg/m') (%) 1 A0007379 1/3/2023 1/9/2023 356,66 498.97 8538,6 4.0 3.5 3.8 0.3 273.4 621.46 I 04 0.92 32 63 7889.7 4.4040 4.4246 20.6 0.0026 84.7 2 A0007371 1/9/2023 1/16/2023 498.97 666.59 10057.2 4.0 4.0 4.0 2.2 275.4 619.13 1.08 0.95 33.50 9541.0 4.3330 4.3758 42.8 0,0045 99.8 3 A0007363 1/16/2023 1/24/2023 666 59 858.69 11526 0 4,0 4,0 4,0 -4.0 269 2 615.4 7 I 07 0.96 33.79 11027.6 4,3840 4.4306 46,6 0_0042 114 3 4 A0007355 1/24/2023 1/30/2023 858,69 1003.67 8698.8 4,0 4.0 4.0 -4.6 268.5 619.13 1,06 0,96 33.93 8357.9 4.4041 4,4475 43.4 0,0052 86,3 5 A0007347 1/30/2023 2/6/2023 I 003.67 1171.34 10060,2 4,0 4.0 4.0 -1.7 271,5 621.62 1.07 0,96 33,81 9632 4 4,3399 4,3943 54.4 0.0056 99,8 6 A0007339 2/6/2023 2/13/2023 1171.34 1339,14 10068,0 4.0 4,0 4.0 -0.1 273 I 621.44 1.07 0.95 33 71 9609 5 4.3618 4.4133 51,5 0,0054 99.9 7 A0007331 2/13/2023 2/20/2023 1339.14 1506.73 I 0055.4 4.0 3.0 3.5 -3.6 269.5 616.81 ].00 0.90 31.65 9012.3 4.3826 4.4481 65.5 0.0073 99.8 8 A0007323 2/20/2023 2/27/2023 1506.73 1678.52 10307.4 40 4,0 4,0 1,3 274,5 613,92 LOS 0.95 33.41 9752_7 4.3185 4.4229 I 04.4 0.0107 102.3 9 A0007310 2/27/2023 3/6/2023 1678.52 1842.43 9834.6 4.0 4.5 4.3 1 0 274 1 613.63 1.11 0.98 34A4 9591.3 4.3907 4.4935 102.8 0.0107 97.6 10 A0007307 3/6/2023 3/13/2023 1842.43 2013.57 10268.4 4,0 4.0 4.0 5.0 278.2 617.35 1 08 0.94 33 28 9677.3 4,3492 4.4260 76,8 0,0079 101 9 II A0007899 3/13/2023 3/20/2023 2013.57 2181.07 10050.0 4.0 3.5 3.8 3.7 276.8 6 I 8.24 1,05 0.92 32.34 9203,8 4.5847 4.6336 48.9 0.0053 99,7 12 A000789J 3/20/2023 3/27/2023 2181.07 2346.61 9932 4 4,0 4.0 4,0 0,6 273_7 615,75 1,08 0.95 33 51 9424 6 4.5850 4,6113 26.3 0,0028 98,5 13 A0007883 3/27/2023 4/3/2023 2346.61 2512.71 9966.0 4,0 4.0 4.0 5,0 278,2 617.35 1.08 0.94 33.28 9392.0 4.6069 4.7154 108.5 0.0116 98,9 Totals I ' 129363.0 ' 13.86 12.27 433.29 122112.1 57.444 58.237 792.5 0.0838 Averages 9951 0 4,0 3,9 3,9 0.4 273.5 617.78938 I 07 0,94 33 33 9393.2 4.419 4.480 61.0 0.0064 98,7 Comments: Insert weekly flow check values in yellow columns ,_,:.;, i3]';e column values are calculated, =i Green columns are calculated averages from the met station Jnsfrt [ill«•"-o!!!!!l'4l~to 015 e columns. =i Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-2 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 LIH LIH LIH Ta Ta Pa Qa Qs Qs Total Week Filte1 Start Stop Start Stop Total Starting Stopping Average Wkly.A,·g. Wkly.Avg. Wkly. Avg Act Flow Std. Flow Std Flow1 Std. -1, -: Net Loading Percent # Number Date Date Time Time Time Manometer Manometer Manometer Temp Temp. Pressure (SCFM) Volume Wej_ght ,,: 1/1 Weight Onstream (min) (in H,O) (in H,O) (in H20) (°C) (K) (mmHg) (m'/min) (m'/min) (ft'/min) (m') 00 {g} (Q!g) (mg/m') -('ill 1 A0007378 t /3/2023 1/9/2023 12449.8 12592.06 8535.6 4.0 3.5 3.8 0.3 273.4 621.46 1.04 0.92 32.63 7886.9 4.3915 4 4156 24 1 0,0031 84.7 2 A0007370 1/9/2023 1/16/2023 12592.06 12759.74 10060.8 4.0 4.0 4.0 2.2 275.4 619.13 1.08 0,95 33.50 9544.4 4.3590 4.4138 54.8 0.0057 99.8 3 A0007362 1/16/2023 1/24/2023 12759.74 12952 24 11550,0 40 40 40 -4 0 269.2 615.4 7 1.07 0,96 33.79 11050.6 4.3738 4.4065 32.7 0.0030 114.6 4 A0007354 1/24/2023 1/30/2023 12952.24 13096.7 8667.6 4.0 4.0 4.0 -4.6 268.5 619.13 1.06 0_96 33,93 8328.0 4.3888 4.4126 23.8 0.0029 86.0 5 A0007346 1/30/2023 2/6/2023 13096.7 13264.49 I 0067.4 40 4,0 4,0 -1.7 271,5 621,62 1 07 0,96 33.81 9639,3 4.3586 4.3890 30.4 0.0032 99.9 6 A0007338 2/6/2023 2/13/2023 13264.49 13432.24 10065.0 4.0 45 43 -0 I 273.1 621.44 1 IO 0.98 34.73 9898.0 4,3643 4.4502 85 9 0,0087 99,9 7 A0007330 2/13/2023 2/20/2023 13432.24 13599.82 10054.8 4.0 4.0 4.0 -3.6 269.5 616.81 1.07 0.96 33.80 9624.3 4.4134 4.4947 81 3 0.0084 99.8 8 A0007322 2/20/2023 2/27/2023 13599.82 13769.06 IO 154.4 4,0 3 5 3.8 1.3 274.5 613.92 1,05 0.92 32.37 9307.2 4.3282 4.4315 103.3 0.01 II 100.7 9 A0007312 2/27/2023 3/6/2023 13769.06 13935.58 9991-2 40 45 43 1.0 274.1 613.63 1.11 0_98 34.44 9744.1 4.3595 4.5060 146.5 0.0150 99.1 10 A0007306 3/6/2023 3/13/2023 13935.58 14104.26 10120.8 4.0 4.0 4.0 5,0 278.2 617,35 1 08 0 94 33 28 9538,2 4 3529 4 4981 145.2 0 0152 100 4 11 A0007898 3/13/2023 3/20/2013 14104.26 14272.57 10098.6 4.0 4,0 4.0 3.7 276.8 618.24 1.08 0,95 33,39 9547.1 4.5793 4.6419 62.6 0,0066 100 2 12 A0007890 3/20/2023 3/27/2023 14272,57 14439 04 9988,2 40 4.0 4.0 06 273.7 615.75 1.08 0.95 33.51 9477 6 4.5919 4.6134 21.5 0.0023 99.1 13 A0007882 3/27/2023 4/3/2023 14439.04 14605.77 10003.8 4.0 3.5 3.8 5.0 278.2 617.35 1,05 0,91 32.24 9132.5 4,6188 4.8316 212,8 0.0233 99.2 Totals 129358.2 13.92 12.33 435.43 122718.1 57.480 58,505 1024,9 0,1084 Averages 9950.6 4.0 4.0 4.0 0.4 273.5 617.78938 1.07 0.95 33.49 9439.9 4.422 4,500 78 8 0,0083 98,7 Comments: Insert weekly flow check values in yellow columns ---:3 Blue col;;;;;,, ~alues are calculated. Green columns are calculated averages from the met station. ~.fdlttwciiiJ!lv:llucs lnlo omnao coliiliiii$; I Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-4 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 IIH IIH IIH I Ta ' Ta Pa Qa Qs Q " Tomi Week Filter Start Stop Start Stop Total Starting Stopping Average Wkly.Avg, Wkly, Avg. Wkly Avg Act. Flow Std. Flow Std. ;,owl ··-slJ( TJTn,:e i' I• -Net Loading Percent # Number Date Date Time Tune Time Manometer Manometer Manometer Temp Temp. Pressure (SCFM) Yohuiid ~'lll8ffl "."-••/ti Weight Onstream {min) (in. H20) (in H20) (in.H20) (OC) (K) (mmHg) (m'/min) (m'/min) (fl'/min) (ni'), (g) (~ {!rig) (mg/m') (%) I A007377 1/3/2023 1/9/2023 46851.56 46993.85 8537.4 4.0 3.5 3.8 0.3 273.4 621.46 1.04 0,92 32.63 7888.6 4.3975 4.4117 14.2 0.0018 84.7 2 A0007369 1/9/2023 1/16/2023 46993,85 47161 51 10059 6 4.0 4.0 40 22 2754 619.13 1.08 0,95 33 50 9543 2 4.3765 4.4183 418 0 0044 99 8 3 A0007361 1/16/2023 1/24/2023 47161.51 47353.03 11491,2 4.0 4.0 4.0 -4.0 269.2 615.47 1.07 0.96 33.79 10994.3 4.3884 4.4170 28.6 0,0026 114.0 4 A0007353 1/24/2023 1/30/2023 47353.03 47497.89 86916 4.0 3.5 3,8 -4,6 268.5 619,13 1,03 0,93 32 87 8089.7 4 3708 4.4070 36.2 0,0045 86,2 5 A0007345 1/30/2023 2/6/2023 47497.89 47665.66 10066,2 4.0 4.0 4.0 -1.7 271.5 621.62 1.07 0.96 33.81 9638.2 4.3316 4.3730 41.4 0.0043 99.9 6 A0007337 2/6/2023 2/13/2023 47665.66 47833.51 10071.0 4.0 4.0 4.0 -0.1 273.1 621.44 1.07 0.95 33.71 9612.3 4.3879 4.4508 62.9 0.0065 99.9 7 A0007329 2/13/2023 2/20/2023 47833 51 48001 16 10059 0 4.0 3 5 3.8 -3,6 269.5 616.81 I 03 0 93 32.75 9327 0 4 4082 4 4588 50,6 0 0054 99.8 8 A0007321 2/20/2023 2/27/2023 48001.16 48170.73 10174.2 4.0 3.0 3.5 1.3 274.5 613.92 1.01 0.89 31.29 9013.9 4.3274 4.4650 137.6 0.0153 100.9 9 A0007312 2/27/2023 3/6/2023 48 I 70. 73 48336 86 9967.8 4.0 4.5 4,3 1.0 274.1 613.63 I.II 0.98 34.44 9721,3 4.3527 4.458 t 105.4 0,0108 98 9 10 A0007305 3/6/2023 3/13/2023 48336.86 48506.02 10149,6 4.0 3.5 3.8 5.0 278.2 617.35 1.05 0.91 32.24 9266.0 4.3650 4.4496 84.6 0.0091 100.7 II A0007897 3/13/2023 3/20/2013 48506,02 48676 62 10236 0 4.0 4.0 4,0 3.7 276.8 618.24 1.08 0 95 33 39 9677.0 4 5925 4 6449 52.4 0,0054 101.5 12 A0007889 3/20/2023 3/27/2023 48676.62 48840.8 9850.8 4.0 4.0 4.0 0,6 273.7 615.75 1,08 0 95 33.51 934 7.2 4.5890 4.6060 17.0 0.0018 97.7 13 A0007881 3/27/2023 4/3/2023 48840,8 49007 09 9977.4 4.0 4.5 43 5.0 278,2 617.35 1,12 0 97 34.29 9688.0 4 6180 4 7340 116 0 00120 99.0 Totals 129331.8 13.82 12.24 432.21 121806.6 57.506 58.294 788 7 0.0840 Averages 9948 6 4,0 3 8 39 04 273 5 617.78938 1.06 0 94 33 25 9369 7 4 424 4.484 60 7 0,0065 98 7 Comments: Insert weekly flow check values in yellow columns t Blue column values are lilili:,1lllllttl __] Green columns are calculated averages from the met station '"-"""' 11u,t,wo,ont ,\'lllues 011(1 omn...,,:a]wn11$. Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-5 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1,25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 LIH LIH LIH Ta Ta Pa Qa Qs ' Qs I Total ~ Week Filter Start Stop Start Stop Total Starting Stopping Average Wkly.Avg. Wkly. Avg1 Wkly AYg. Act. Flow Std. Flow Std. Flow Std. T • ·~ II'. Net Loading Percent u Number Date Date Time Tune Time Manometer Manometer Manometer Temp. Temp. Pressure (SCFM) Volume ,.._ .. ~·'itl.t ··'t..·.~t,· Weight Onstream (min) (in H,0) (in H,0) (in H20) (OC) (K) (mmHg) (m'/min) (m'/min) (ft'/min) (m') Ci!) Cl;) (mg) (mg/m') (%) 1 A0007376 1/3/2023 1/9/2023 40171.07 403 I 3.35 8536.8 4.0 4.0 4.0 0.3 273.4 621.46 1.07 0.95 33.69 8142,.8 4.4137 4.4443 30.6 0,0038 84.7 2 A0007368 1/9/2023 1/16/2023 40313,35 40481.01 10059,6 4.0 4.0 4.0 2.2 275.4 619.13 1.08 0.95 33.50 9543.2 4.3777 4.4331 55.4 0.0058 99.8 3 A0007360 1/16/2023 1/24/2023 40481,01 40672.51 11490,0 4.0 4.0 4.0 -4.0 269.2 615.4 7 1.07 0.96 33.79 10993.1 4 3906 4.4531 62.5 0.0057 I 14.0 4 A0007352 1/24/2023 1/30/2023 40672.51 40817.36 8691.0 4.0 4,0 4.0 -4,6 268.5 619.13 1.06 0.96 33,93 8350.5 4.3814 4.43 I 0 49.6 0.0059 86.2 5 A0007344 1/30/2023 2/6/2023 40817,36 40985 15 10067.4 4,0 4,0 4.0 -1.7 2715 62162 107 0,96 33,81 9639,3 4 3588 4.4313 72.5 0.0075 99,9 6 A0007336 2/6/2023 2/13/2023 40985, 15 41152,98 10069,8 4,0 4,5 4.3 -0.1 273.1 621.44 1.10 0.98 34,73 9902,7 4.3713 4.4345 63-2 0.0064 99.9 7 A0007328 2/13/2023 2/20/2023 41152,98 41320.66 10060.8 4.0 4.5 4.3 -3,6 269.5 616 81 I.IO 0,99 34,83 9922,l 4,3910 4 4883 97,3 0.0098 99 8 8 A0007320 2/20/2023 2/27/2023 41320.66 41490.2 10172.4 4.0 3.5 3.8 1.3 274.5 613,92 I.OS 0,92 32.37 9323 7 4.3480 4.5467 198 7 0.0213 100,9 9 A0007313 2/27/2023 3/6/2023 41490.2 41656.36 9969 6 4,0 4.5 4.3 1.0 274.1 613.63 I.II 0,98 34.44 9723.0 4.3689 4.4760 107.1 0.0110 98.9 10 A0007304 3/6/2023 3/13/2023 41656,36 41825 51 10149,0 4.0 4.0 4.0 5 0 278 2 617,35 I 08 0.94 33.28 9564.8 4.3718 4.4645 92,7 0 0097 100 7 11 A0007896 3/13/2023 3/20/2023 41825.51 41996.04 10231.8 4.0 3.5 3.8 3.7 276.8 618.24 1.05 0.92 32-34 9370.3 4.5739 4.6483 74.4 0 0079 101.5 12 A0007888 3/20/2023 3/27/2023 41996 04 42160,31 9856.2 4.0 4.0 4.0 0.6 273.7 615.75 1.08 0.95 33.51 9352.3 4 6203 4 6662 45.9 0 0049 97 8 13 A0007880 3/27/2023 4/3/2023 42160,31 42326.59 9976.8 4.0 4.5 4.3 5.0 278.2 6 I 7.35 1.12 0.97 34.29 9687.4 4-6270 4-7860 159.0 0,0164 99.0 I Totals 129331.2 14.02 12.42 438.51 123515.3 57,594 58,703 1108.9 0.1162 Averages 9948.6 4.0 4.1 4.0 0.4 273.5 617.78938 1.08 0.96 33.73 9501.2 4.430 4.516 85.3 0.0089 98,7 Comments: Insert weekly flow check values in yellow columns ____J Biiic'column values are calculated. =i Green columns are calculated averages from the met station, Insert ffiu,r wciij11 \'11luos-in10 oran1e c(IJUmns. I I Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-6 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 L\H L\H llfl Ta Ta Pa Qa Qs ,~, Total Week Filter Start Stop Start Stop Total Starting Stopping ~~era~ Wkly. Avg. Wkly. Avg. Wkly.Avg. Act. Flow Std. Flow s1a mow Std. TllfC ,;,,•· Net I Loading Po/,Cent # Number Date Dale Time Time Time Manometer Manometer &lanom111ar Temp. Temp. Pressure £S~f.M) Volume Wc:ighr ·t ,i:},, Weight 0ns1ream (min) (in H20) (in H20) 1 (ih, li',0) (OC) (K) (mmHg) (m,/min) (m,/min) (fi"ltnin) (m,) C!!l w (Il!S) j , (mg/111°) ~%) I A0007375 1/3/2023 1/9/2023 13483-46 13625.73 8536.2 4.0 3.5 3.8 0.3 273.4 621.46 1.04 0.92 32.63 7887.5 4.3260 4.3510 25.0 0.0032 84.7 2 A0007367 1/9/2023 1/16/2023 13625.73 13793.38 10059.0 4.0 4.0 4.0 22 275.4 619.13 1.08 0.95 33.50 9542 7 4.3621 4.4165 54.4 0.0057 99.8 3 A0007359 1/16/2023 1/24/2023 13793 38 13984 91 11491.8 4.0 3.0 3,5 -4,0 269.2 615.47 1.00 0.90 31.64 10295.1 4.3852 4.4 145 29,3 0.0028 114.0 4 A0007351 1/24/2023 1/30/2023 13984.91 14129.88 8698.2 4.0 4.0 4.0 -4.6 268.5 619.13 1.06 0.96 33_93 8357.4 4.3777 4.4269 49.2 0.0059 86.3 5 A0007343 1/30/2023 2/6/2023 1412988 14297 54 10059 6 40 4.0 4.0 -1.7 2715 621.62 1.07 0.96 33 81 9631.9 4.3592 4 4286 69.4 0.0072 99.8 6 A0007335 2/6/2023 2/13/2023 14297.54 14465.38 10070.4 4.0 4.0 4.0 -0,1 273.1 62 I .44 1.07 0.95 33.71 9611.8 4.3850 4.4541 69,1 0,0072 99.9 7 A0007327 2/13/2023 2/20/2023 14465.38 14633.01 10057.8 4.0 4.5 4.3 -3.6 269.5 616.81 1.10 0.99 34.83 9919.1 4.4102 4.5033 93.1 0.0094 99.8 8 A0007319 2/20/2023 2/27/2023 14633.01 14802.6 10175.4 4.0 4.0 4.0 1.3 274.5 613.92 1.08 0.95 33.41 9627.8 4.3645 4.5272 162.7 0.0169 100.9 9 A0007314 2/27/2023 3/6/2023 14802.6 14968.67 9964.2 4.0 4.5 4.3 1.0 274.1 613.63 1.11 0.98 34.44 9717.7 4.3511 4.4576 106.5 0.0110 98.9 JO A0007303 3/6/2023 3/13/2023 14968 67 1513785 10150.8 40 4.0 4.0 50 278 2 617.35 1.08 0.94 33.28 9566.5 4.3892 4.4745 85.3 0.0089 100.7 II A0007895 3/13/2023 3/20/2023 15137.85 15308 55 10242.0 4.0 4,0 40 3 7 276.8 618.24 1.08 0 95 33 39 9682.7 4 5953 4 6558 60.5 0 0062 101 6 12 A0007887 3/20/2023 3/27/2023 15308.55 15472.61 9843.6 4.0 3.5 3.8 0.6 273.7 615.75 1.04 0.92 32.46 9048.0 4 6139 4.6492 35.3 0.0039 97.7 13 A0007879 3/27/2023 4/3/2023 15472.6 I 15638,92 9978.6 4.0 4,0 4.0 5,0 278 2 617.35 1.08 0,94 33 28 9403.9 4.6157 4.7289 113.2 0.0120 99.0 Totals 129327,6 13.89 12.30 434 32 122292.0 57 535 58.488 953.0 0.1003 Averages 9948.3 4.0 3.9 4.0 0.4 273_5 617.78938 1.07 0.95 33.41 9407.1 4,426 4.499 73.3 0.0077 98,7 Comments: Insert weekly flow check values in yellow co1umnst ,......._j Bliiecolumn values are calculate<!. 0 =:=J Green columns are calculated averages from the met station. IIIS<i:t i!i1cr we1i!J1 ,'ilucs ,nro omn11c aolmnn"' I Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-7 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 D.H D.H D.H Ta Ta Pa Qa Qs ~} '1"01Jjl Week filte, Start Stop Start Stop Total Staiting Stopping I Average Wkly Avg Wkly. Avg Wkly. Avg Act. Flow Std. Flow -S1d.,FloW Sid T:• f rti •~· Net Lofldi"!l P~oont # Number Date Date Time Tune Time Manometer Manometel Manometer Temp, Temp. Pressure (SCFM) ·V11lum~ ·-.,1,111 :; ·,n Weight <Dllli.~111 _(min) (in H10) (in H10) (in, H20) (°C) (!9 (mmHg) (m'/min), (m'/min) I (ff/min), ~ f(m',): 00 (g) (mg} .(nig/m·i ~%) I A0007374 1/3/2023 1/9/2023 14807.44 14949.74 8538.0 4.0 3.5 3,8 0,3 273.4 621.46 1.04 0.92 32 63 7889.1 4.3137 4.3420 28 3 0.0036 84.7 2 A0007366 1/9/2023 1/16/2023 14949 74 15117 39 10059.0 40 4.0 4,0 2,2 275.4 619.13 1,08 0 95 33 50 9542 7 4 3840 4 4433 59 3 0,0062 99 8 3 A0007358 1/16/2023 1/24/2023 15117,39 15309.44 11523.0 4,0 4,0 4,0 -4,0 269 2 615 47 1.07 0 96 33 79 11024.7 4,3593 4 4203 61 0 0.0055 114 3 4 A0007350 1/24/2023 1/30/2023 15309.44 15454.39 8697.0 4.0 4.0 4.0 -4 .. 6 268.5 619.13 1.06 0.96 33_93 8356.2 4.3135 4.3680 54.5 0.0065 86.3 5 A0007342 1/30/2023 2/6/2023 15454 39 15622.07 10060.8 4.0 4.0 40 -1 7 271 5 621.62 1.07 0 96 33 81 9633 0 4 3532 4.4303 77 1 0,0080 99 8 6 A0007334 2/6/2023 2/13/2023 15622.07 15789.91 10070.4 4.0 4.0 4.0 -0,1 273.1 621.44 1.07 0.95 33.71 9611.8 4,4099 4.4944 84.5 0.0088 99.9 7 A0007326 2/13/2023 2/20/2023 15789 91 15957,52 10056 6 40 4,0 40 -3.6 269.5 616.81 1.07 0 96 33,80 9626 0 4 4087 4.4916 82.9 0,0086 99.8 8 A0007318 2/20/2023 2/27/2023 15957.52 16130.05 10351.8 4.0 3.5 3 8 1 3 274.5 613.92 1.05 0.92 32 37 9488.1 4 3650 4.5411 176,1 0.0186 102.7 9 A0007315 2/27/2023 3/6/2023 16130,05 1629321 9789,6 4.0 4.0 40 1 0 274.1 613.63 1.08 0,95 33 43 9266.4 4.3683 4.4 794 I ll.I 0.0120 97.1 10 A0007302 3/6/2023 3/13/2023 1629321 1646445 10274.4 40 4.0 40 5.0 278 2 617.35 1.08 0 94 33 28 9683 0 4 3676 4.4619 94 3 0.0097 101 9 11 A0007894 3/13/2023 3/20/2023 16464.45 16631.62 10030.2 4.0 3.5 3,8 3,7 276.8 618.24 1.05 0,92 32.34 9185.6 4.5678 4.6444 76.6 0.0083 99.5 12 A0007886 3/20/2023 3/27/2023 16631.62 16797,34 9943.2 4.0 4.0 4.0 0.6 273.7 615.75 1.08 0.95 33.51 9434.9 4.6203 4.6620 41.7 0.0044 98.6 13 A0007878 3/27/2023 4/3/2023 1679734 16963 49 9969.0 4.0 4,0 40 5.0 278.2 617.35 1.08 0.94 33.28 9394,8 4.6197 4 7484 128.7 0.0137 98 9 Totals 129363.0 I r r· 13 86 12.27 433.39 122136 4 57 451 58 527 1076 1 0.1140 Averages 9951.0 4.0 3,9 3,9 0.4 273.S 617.78938 1.07 0,94 33.34 9395.1 4.419 4,502 82.8 0.0088 98.7 Comments: l_nsert wee1Z1ycflow check ,,aJues 'inJyellow COiumn~ :::j Blue column values are calculated Green columns are calculated averages from the met station ,~ mtcr ,\\:c1@J/1 \'~IIIIS'JOlll !lrn!lll,l!.C(ll!lntnS. _J AOOO Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-8 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7 /30/14 Orifice SIN: 8091779 LIH LIH AH Ta Ta Pa Qa fstct~1J Qs I Totaf7 I Week Filter Start Stop Stai1 Stop Total Starting Stopping Average Wkly. Avg. Wkly. Avg Wkly Avg. Act.Flow Std Flow Std. Tate "1rc1:-· Net Loading P,_i:ff~i1l # Number Date Date Time Time Time Manometer Manometer Manometer Temp. Temp. Pressure (SCFM) Volume \Vl:Jghl ·~ .,)",\. Weight Ons1ream ,, (min) (incH,O) (in0 H20) (in H20) (°C) (K) (mmHg) (m'/min) (m'/min) (ft'/min) (m') l_g) l&.l (mg) (mg/m') (~J 1 A0007373 1/3/2023 1/9/2023 38089,55 38231.87 8539.2 4.0 3 5 3.8 03 273.4 621.46 1.04 0.92 32,63 7890,2 4.3357 4,3510 15.3 0.0019 84.7 2 A0007365 1/9/2023 1/16/2023 3823 I ,87 38399,5 I 0057.8 4.0 4.0 4.0 2.2 275,4 619.13 1.08 0,95 33,50 954 LS 4.3900 4.434 I 44 I 0 0046 99,8 3 A0007357 1/16/2023 1/24/2023 38399.5 38593.62 I 1647.2 4.0 4.0 4.0 -4.0 269.2 615.4 7 1.07 0.96 33.79 11143 5 4.3574 4.3850 27 6 0.0025 115.5 4 A0007349 1/24/2023 1/30/2023 38593.62 38736.54 8575,2 4.0 4.0 4.0 -4.6 268.5 619.13 1.06 0.96 33,93 8239.2 4.3359 4.3808 44.9 0.0054 85.1 5 A0007341 1/30/2023 2/6/2023 38736,54 38904.21 10060.2 4,0 40 4.0 -1.7 271.5 621.62 1.07 0.96 33,81 9632.4 4.3768 4.4218 45.0 0.0047 99.8 6 A0007333 2/6/2023 2/13/2023 38904.2 I 39072.05 10070.4 4,0 40 4.0 -0,1 273,I 621.44 1.07 0,95 33.71 9611 .8 4,3759 4.4388 62,9 0,0065 99 9 7 A0007325 2/13/2023 2/20/2023 39072.05 39239.62 10054 2 4.0 4.0 4.0 -3 6 269.5 616 81 1.07 0.96 33.80 9623.7 4.3356 4.3967 61.l 0.0063 99.7 8 A0007317 2/20/2023 2/27/2023 39239,62 39411,79 I 0330 2 4.0 40 4,0 1,3 274,5 613,92 1 08 0,95 33.4 I 9774,2 4,3397 4.4929 153,2 0,0157 102,5 9 A0007316 2/27/2023 3/6/2023 39411.79 39575.32 9811.8 4,0 4.5 4.3 1.0 274.1 613,63 1.11 0,98 34.44 9569,1 4,3658 4.4640 98 2 0 0103 97,3 10 A000730 I 3/612023 3113/2023 39575,32 39746,67 10281 0 40 40 4,0 5,0 278 2 617 35 1.08 0.94 33,28 9689,2 4,3839 4.4 743 90 4 0 0093 102.0 11 A0007893 3/13/2023 3/20/2023 39746.67 39913,88 10032 6 40 40 4.0 3,7 276 8 618.24 1.08 0,95 33.39 9484.7 4.5939 4,6580 64.1 0.0068 99,5 12 A0007885 3120/2023 3/27/2023 39913.88 40079.52 9938.4 4.0 3.5 3.8 0,6 273.7 615.75 1.04 0.92 32.46 9135.2 4.6339 4.6637 29.8 0.0033 98.6 13 A0007877 3/27/2023 41312023 40079.52 40245.62 9966,0 4,0 45 4.3 5,0 278.2 6 I 7.35 1 12 0.97 34.29 9676.9 4.5920 4,7125 120.5 0.0125 98,9 -Totals 129364 2 13.96 12.36 436.45 123011 8 57.417 58,274 857 I 0 0898 Averages 9951.1 4.0 4.0 4,0 0.4 273.5 617.78938 1.07 0.95 33.57 9462.4 4.417 4.483 65.9 0.0069 98.7 Comments: Jnsert weekly flow check values In yellow columns I Blue column values are calculated. =i Green columns are calculated averages from the met station lo.el'I @rer wcigllt ,'alltl:$ tllto olnn,l\o,, •11•. , J Blanks Period: January 3, 2023 -April 3, 2023 Week Start Stop Net # Filter Number Date Date 1 A0007372 03-Jan-23 09-Jan-23 4.3450 2 A0007364 09-Jan-23 16-Jan-23 4.3707 3 A0007356 16-Jan-23 24-Jan-23 4.3651 4 A0007348 24-Jan-23 30-Jan-23 4.3069 5 A0007340 30-Jan-23 06-Feb-23 4.3619 6 A0007332 06-Feb-23 13-Feb-23 4.3797 7 A0007324 13-Feb-23 20-Feb-23 4.3003 8 A0007309 20-Feb-23 27-Feb-23 4.3742 9 A0007308 27-Feb-23 06-Mar-23 4.3575 10 A0007900 06-Mar-23 13-Mar-23 4.5984 11 A0007892 13-Mar-23 20-Mar-23 4.5971 12 A0007884 20-Mar-23 27-Mar-23 4.6323 13 A0007876 27-Mar-23 03-Apr-23 4.6069 Totals EN:RGY -• ~ )!:.> ... ' CJ!;./ I:.~ Trust our People. Trust our Data. www energylab com Billings, MT 406.252.6325 • Casper, WY 307 .235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 ANALYTICAL SUMMARY REPORT August 11, 2023 Energy Fuels Resources (USA) Inc 225 Union Blvd Ste 600 Lakewood, CO 80228-1826 Work Order: C23070164 Quote ID: C16290 Project Name: 2nd Quarterly Air Analysis 2023 Energy Laboratories, Inc. Casper WY received the following 8 samples for Energy Fuels Resources (USA) Inc on 7/7/2023 for analysis. Lab ID Client Sample ID Collect Date Receive Date Matrix Test C23070164-001 BHV-1 07/03/23 0:00 07/07/23 Filter Composite of two or more samples Client Provided Field Parameters Metals, Total Digestion, Total Metals, Radiochemistry Radiochemistry Air Filter Compliance Calculations RAD-AIR, Routine Radiological Reports RAD Alternate Unit Reporting Air Filters Lead 210 Radium 226 Thorium, Isotopic C23070164-002 BHV-2 07/03/23 0:00 07/07/23 Filter Same As Above C23070164-003 BHV-4 07/03/23 0:00 07/07/23 Filter Same As Above C23070164-004 BHV-5 07/03/23 0:00 07/07/23 Filter Same As Above C23070164-005 BHV-6 07/03/23 0:00 07/07/23 Filter Same As Above C23070164-006 BHV-7 07/03/23 0:00 07/07/23 Filter Same As Above C23070164-007 BHV-8 07/03/23 0:00 07/07/23 Filter Same As Above C23070164-008 Blanks 07/03/23 0:00 07/07/23 Filter Same As Above The analyses presented in this report were performed by Energy Laboratories, Inc., 2393 Salt Creek Hwy., Casper, WY 82601, unless otherwise noted. Any exceptions or problems with the analyses are noted in the report package. Any issues encountered during sample receipt are documented in the Work Order Receipt Checklist. The results as reported relate only to the item(s) submitted for testing. This report shall be used or copied only in its entirety. Energy Laboratories, Inc. is not responsible for the consequences arising from the use of a partial report. If you have any questions regarding these test results, please contact your Project Manager . Report Approved By: J • .. ll -Digitally signed by WUU~ Ashley L. Wilson ProjeclManager Date: 2023.08.1116:21:12-06:00 Page 1 of 40 EI\ERGY -~-.o,_,,.; ,i1J=='1ES ~-Trust our People. Trust our Data. ~ www.energylab.com Billings, MT 800.735.4489 • Casper, WY 888.235.0515 Gillette, WY 866.686.7175 • Helena, MT 877.472.0711 CLIENT: Project: Work Order: Energy Fuels Resources (USA) Inc 2nd Quarterly Air Analysis 2023 C23070164 Air filters were collected from 4/03/2023 to 7/03/2023. ORIGINAL SAMPLE SUBMITTAL(S) All original sample submittals have been returned with the data package. SAMPLE TEMPERATURE COMPLIANCE: 4°C (±2°C) Report Date: 08/11/23 CASE NARRATIVE Temperature of samples received may not be considered properly preserved by accepted standards. Samples that are hand delivered immediately after collection shall be considered acceptable if there is evidence that the chilling process has begun. GROSS ALPHA ANALYSIS Method 900.0 for gross alpha and gross beta is intended as a drinking water method for low TDS waters. Data provided by this method for non potable waters should be viewed as inconsistent. RADON IN AIR ANALYSIS The desired exposure time is 48 hours (2 days). The time delay in returning the canister to the laboratory for processing should be as short as possible to avoid excessive decay. Maximum recommended delay between end of exposure to beginning of counting should not exceed 8 days. SOIL/SOLID SAMPLES All samples reported on an as received basis unless otherwise indicated. ATRAZINE, SIMAZINE AND PCB ANALYSIS Data for PCBs, Atrazine and Simazine are reported from EPA 525.2. PCB data reported by ELI reflects the results for seven individual Aroclors. When the results for all seven are ND (not detected), the sample meets EPA compliance criteria for PCB monitoring. SUBCONTRACTING ANALYSIS Subcontracting of sample analyses to an outside laboratory may be required. If so, ENERGY LABORATORIES will utilize its branch laboratories or qualified contract laboratories for this service. Any such laboratories will be indicated within the Laboratory Analytical Report. BRANCH LABORATORY LOCATIONS eli-b -Energy Laboratories, Inc. -Billings, MT eli-g -Energy Laboratories, Inc. -Gillette, WY eli-h -Energy Laboratories, Inc. -Helena, MT ISO 17025 DISCLAIMER: The results of this Analytical Report relate only to the items submitted for analysis. ENERGY LABORATORIES, INC. -CASPER.WY certifies that certain method selections contained in this report meet requirements as set forth by the above accrediting authorities. Some results requested by the client may not be covered under these certifications. All analysis data to be submitted for regulatory enforcement should be certified in the sample state of origin. Please verify ELi's certification coverage by visiting www.energylab.com ELI appreciates the opportunity to provide you with this analytical service. For additional information and services visit our web page www.energylab.com. Tests associated with analyst identified as ELI-B were subcontracted to Energy Laboratories, 1120 S. 27th St., Billings, MT, EPA Number MT00005. Page 2 of 40 EN:RGY -....... _, ....... 7()~ t_ :- Trust our People. Trust our Data. www.energylab com Billings, MT 406.252.6325 • Casper, WY 307 .235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-001 Client Sample ID: BHV-1 Analyses Result Units CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.22E+08 L METALS, IN AIR Uranium ND mg/L Uranium, Activity ND uCi/mL RADIONUCLIDES -IN AIR Lead 210 8.2E-15 uCi/mL Lead 21 O precision (±) 2.5E-15 uCi/mL Lead 210 MDC 2.7E-16 uCi/mL Radium 226 1.7E-15 uCi/mL Radium 226 precision (±) 3.2E-16 uCi/mL Radium 226 MDC 5.6E-18 uCi/mL Thorium 230 2.1E-16 uCi/mL Thorium 230 precision (±) 4.0E-17 uCi/mL Thorium 230 MDC 2.7E-18 uCi/mL Thorium 232 8.4E-18 uCi/mL Thorium 232 precision (±) 1.6E-18 uCi/mL Thorium 232 MDC 1.6E-18 uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 1000 pCi/Filter Lead 210 precision(±) 301 pCi/Filter Lead 210 MDC 32.8 pCi/Filter Radium 226 209 pCi/Filter Radium 226 precision (±) 39.2 pCi/Filter Radium 226 MDC 0.68 pCi/Filter Thorium 230 25.7 pCi/Filter Thorium 230 precision (±) 4.9 pCi/Filter Thorium 230 MDC 0.33 pCi/Filter Thorium 232 1.0 pCi/Filter Thorium 232 precision (±) 0.19 pCi/Filter Thorium 232 MDC 0.19 pCi/Filter Uranium, Activity 8.1 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, % of EFF 1.4E+OO % Lead 210, EFF Day 6.0E-13 uCi/mL Lead 210, LLD 2.0E-15 uCi/mL Radium 226, % of EFF 1.9E-01 % Radium 226, EFF Week 9.0E-13 uCi/mL Radium 226, LLD 1.0E-16 uCi/mL Thorium 230, % of EFF 7.0E-01 % Thorium 230, EFF Year 3.0E-14 uCi/mL Report RL -Analyte Reporting Limit Definitions: QCL -Quality Control Limit Qualifiers RL 1.5E-10 1.0E-16 0.20 MCU Report Date: 08/11/23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter QCL Method Analysis Date / By FIELD 07/17/23 10:43 / haw SW6020 07/21/2301 :14 / eli-b SW6020 07/21/2301 :14 / eli-b E909.0 07/25/23 19:34 / sec E909.0 07 /25/23 19:34 / sec E909.0 07/25/23 19:34 / sec E903.0 07/26/23 13:57 / kdk E903.0 07/26/23 13:57 / kdk E903.0 07/26/23 13:57 / kdk A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 3 of 40 EI\ERGY • I ..J•--.1 ,. •",I~ f ~ Trust our People. Trust our Data. www.energylab com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-001 Client Sample ID: BHV-1 Analyses Result RADIOCHEMISTRY AIR FILTER COMPLIANCE Thorium 230, LLD Thorium 232, % of EFF Thorium 232, EFF Year Thorium 232, LLD Uranium Natural, % of EFF Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 1.0E-16 1.4E-01 6.0E-15 7.0E-02 9.0E-14 1.0E-16 Units uCi/mL % uCi/mL uCi/mL % uCi/mL uCi/mL Qualifiers MCU RL QCL Report Date: 08/11/23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter Method Analysis Date I By RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11123 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 4 of40 EN:RGY • ,.,,. • <_Jf--. :,1 ;hl,1 c: Trust our People. Trust our Data. www energylab com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307 .686.7175 • Helena , MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-002 Client Sample ID: BHV-2 Analyses Result Units CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.22E+08 L METALS, IN AIR Uranium ND mg/L Uranium, Activity ND uCi/mL RADIONUCLIDES -IN AIR Lead 210 6.1E-15 uCi/mL Lead 21 O precision (±) 1.8E-15 uCi/mL Lead 210 MDC 2.3E-16 uCi/mL Radium 226 2.9E-16 uCi/mL Radium 226 precision (±) 5.6E-17 uCi/mL Radium 226 MDC 4.3E-18 uCi/mL Thorium 230 4.0E-17 uCi/mL Thorium 230 precision (±) 7.6E-18 uCi/mL Thorium 230 MDC 2.4E-18 uCi/mL Thorium 232 8.3E-18 uCi/mL Thorium 232 precision (±) 1.6E-18 uCilmL Thorium 232 MDC 2.0E-18 uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 739 pCi/Filter Lead 210 precision(±) 221 pCi/Filter Lead 210 MDC 28.4 pCi/Filter Radium 226 35.9 pCi/Filter Radium 226 precision (±) 6.8 pCi/Filter Radium 226 MDC 0.53 pCi/Filter Thorium 230 4.9 pCi/Filter Thorium 230 precision (±) 0.93 pCi/Filter Thorium 230 MDC 0.30 pCi/Filter Thorium 232 1.0 pCi/Filter Thorium 232 precision (±) 0.19 pCi/Filter Thorium 232 MDC 0.24 pCi/Filter Uranium, Activity 2.9 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, % of EFF 1.0E+OO % Lead 210, EFF Day 6.0E-13 uCilmL Lead 210, LLD 2.0E-15 uCi/mL Radium 226, % of EFF 3.0E-02 % Radium 226, EFF Week 9.0E-13 uCi/mL Radium 226, LLD 1.0E-16 uCilmL Thorium 230, % of EFF 1.3E-01 % Thorium 230, EFF Year 3.0E-14 uCilmL Report RL -Analyte Reporting Limit Definitions: QCL -Quality Control Limit Qualifiers RL 1.5E-10 1.0E-16 0.20 MCL/ Report Date: 08/11 /23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter QCL Method Analysis Date / By FIELD 07 /17123 10:43 / haw SW6020 07/21/2301 :32 / eli-b SW6020 07/21/2301 :32 / eli-b E909.0 07 /25123 19:49 / sec E909.0 07/25/23 19:49 / sec E909.0 07/25123 19:49 / sec E903.0 07/26/23 13:58 / kdk E903.0 07/26/23 13:58 / kdk E903.0 07 /26/23 13:58 I kdk A7500-U C 07/24/23 12:08 I sec A7500-U C 07/24/23 12:08 I sec A7500-U C 07/24123 12:08 I sec A7500-U C 07/24/23 12:08 I sec A7500-U C 07/24123 12:08 I sec A7500-U C 07/24/23 12:08 I sec RADCALC 08/01/23 14:07 I dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08101/23 14:07 I dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08101/23 14:07 I dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08111123 14:20 I dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 5 of 40 EI\ERGY ~ -:_,nr. ~ "":",_-,r.:; 11_ ":::- Trust our People. Trust our Data. www.energylab com Billings, MT 406.252.6325 • Casper, WY 307 .235.0515 Gillette, WY 307 .686.7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-002 Client Sample ID: BHV-2 Analyses Result RADIOCHEMISTRY AIR FILTER COMPLIANCE Thorium 230, LLD Thorium 232, % of EFF Thorium 232, EFF Year Thorium 232, LLD Uranium Natural, % of EFF Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 1.0E-16 1.4E-01 6.0E-15 3.0E-02 9.0E-14 1.0E-16 Units uCi/mL % uCi/mL uCi/mL % uCi/mL uCi/mL Qualifiers MCU RL QCL Report Date: 08/11 /23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter Method Analysis Date / By RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11 /23 14:20 I dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 6 of 40 EN:RGY _ •• ,::1r_),..:; ..... --c~1-',c ~. Trust our People. Trust our Data. 1•1ww energylab corn Billings, MT 406.252.6325 • Casper, WY 307 .235.0515 Gillette, WY 307 .686. 7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-003 Client Sample ID: BHV-4 Analyses Result Units CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.21 E+08 L METALS, IN AIR Uranium ND mg/L Uranium, Activity ND uCi/mL RADIONUCLIDES -IN AIR Lead 210 8.4E-15 uCi/mL Lead 21 0 precision (±) 2.5E-15 uCi/mL Lead 210 MDC 2.7E-16 uCi/mL Radium 226 2.1E-16 uCi/mL Radium 226 precision (±) 3.9E-17 uCi/mL Radium 226 MDC 5.3E-18 uCi/mL Thorium 230 2.9E-17 uCi/mL Thorium 230 precision (±) 5.5E-18 uCi/mL Thorium 230 MDC 2.4E-18 uCi/mL Thorium 232 3.9E-18 uCi/mL Thorium 232 precision (±) 1.9E-18 uCi/mL Thorium 232 MDC 2.2E-18 uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 1010 pCi/Filter Lead 210 precision(±) 303 pCi/Filter Lead 210 MDC 33.0 pCi/Filter Radium 226 24.9 pCi/Filter Radium 226 precision (±) 4.8 pCi/Filter Radium 226 MDC 0.64 pCi/Filter Thorium 230 3.5 pCi/Filter Thorium 230 precision (±) 0.66 pCi/Filter Thorium 230 MDC 0.29 pCi/Filter Thorium 232 0.48 pCi/Filter Thorium 232 precision (±) 0.23 pCi/Filter Thorium 232 MDC 0.26 pCi/Filter Uranium, Activity 3.3 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, % of EFF 1.4E+00 % Lead 210, EFF Day 6.0E-13 uCi/mL Lead 210, LLD 2.0E-15 uCi/mL Radium 226, % of EFF 2.0E-02 % Radium 226, EFF Week 9.0E-13 uCi/mL Radium 226, LLD 1.0E-16 uCi/mL Thorium 230, % of EFF 1.0E-01 % Thorium 230, EFF Year 3.0E-14 uCi/mL Report RL -Analyte Reporting Limit Definitions: QCL -Quality Control Limit Qualifiers RL 1.5E-10 1.0E-16 0.20 MCU Report Date: 08/11/23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter QCL Method Analysis Date/ By FIELD 07/17/23 10:43 / haw SW6020 07/21/23 13:17 / eli-b SW6020 07/21/23 13:17 / eli-b E909.0 07/25/23 20:08 I sec E909.0 07/25/23 20:08 I sec E909.0 07/25/23 20:08 I sec E903.0 07/26/23 13:58 / kdk E903.0 07/26/23 13:58 / kdk E903.0 07/26/23 13:58 / kdk A7500-U C 07 /24/23 12:08 / sec A7500-U C 07/24/23 12:08 I sec A7500-U C 07/24/23 12:08 I sec A7500-U C 07/24/23 12:08 I sec A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec RADCALC 08/01/23 14:07 / dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01/23 14:07 I dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01/23 14:07 I dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 I dmf RADCALC 08/01/23 14:07 I dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01/23 14:07 I dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 7 of40 El'ERGY • r_1,-Jr .... .:. ror-t-=:--:; Trust our People. Trust our Data. www.energylab.com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-003 Client Sample ID: BHV-4 Analyses Result RADIOCHEMISTRY AIR FILTER COMPLIANCE Thorium 230, LLD Thorium 232, % of EFF Thorium 232, EFF Year Thorium 232, LLD Uranium Natural, % of EFF Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 1.0E-16 7.0E-02 6.0E-15 3.0E-02 9.0E-14 1.0E-16 Units uCi/mL % uCi/mL uCi/mL % uCi/mL uCi/mL Qualifiers MCU RL QCL Report Date: 08/11 /23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter Method Analysis Date / By RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 8 of 40 EN:RGY ... ,~-4 .:)N.o.11..)µ,;;::::,. Trust our People. Trust our Data. www.energylab com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-004 Client Sample ID: BHV-5 Analyses Result Units CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.21 E+08 L METALS, IN AIR Uranium 1.9E-10 mg/L Uranium, Activity 1.3E-16 uCi/mL RADIONUCLIDES -IN AIR Lead 210 8.8E-15 uCi/mL Lead 21 O precision (±) 2.6E-15 uCi/mL Lead 210 MDC 2.8E-16 uCi/mL Radium 226 4.0E-15 uCi/mL Radium 226 precision (±) 7.5E-16 uCi/mL Radium 226 MDC 4.2E-18 uCi/mL Thorium 230 4.4E-16 uCi/mL Thorium 230 precision (±) 8.3E-17 uCi/mL Thorium 230 MDC 2.5E-18 uCi/mL Thorium 232 6.6E-18 uCi/mL Thorium 232 precision (±) 2.4E-18 uCi/mL Thorium 232 MDC 1.8E-18 uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 1070 pCi/Filter Lead 210 precision(±) 319 pCi/Filter Lead 210 MDC 33.4 pCi/Filter Radium 226 488 pCi/Filter Radium 226 precision (±) 91.5 pCi/Filter Radium 226 MDC 0.51 pCi/Filter Thorium 230 52.9 pCi/Filter Thorium 230 precision (±) 10.1 pCi/Filter Thorium 230 MDC 0.31 pCi/Filter Thorium 232 0.80 pCi/Filter Thorium 232 precision (±) 0.30 pCi/Filter Thorium 232 MDC 0.22 pCi/Filter Uranium, Activity 15.7 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, % of EFF 1.5E+OO % Lead 210, EFF Day 6.0E-13 uCi/mL Lead 210, LLD 2.0E-15 uCi/mL Radium 226, % of EFF 4.5E-01 % Radium 226, EFF Week 9.0E-13 uCi/mL Radium 226, LLD 1.0E-16 uCi/mL Thorium 230, % of EFF 1.5E+OO % Thorium 230, EFF Year 3.0E-14 uCi/mL Report RL -Analyte Reporting Limit Definitions: QCL -Quality Control Limit Qualifiers RL 1.5E-10 1.0E-16 0.20 MCL/ Report Date: 08/11/23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter QCL Method Analysis Date/ By FIELD 07/17/23 10:43 / haw SW6020 07 /21 /23 01 :44 / eli-b SW6020 07/21/23 01:44 / eli-b E909.0 07/25/23 20:39 / sec E909.0 07/25/23 20:39 / sec E909.0 07/25/23 20:39 / sec E903.0 07/26/23 20:07 I kdk E903.0 07/26/23 20:07 I kdk E903.0 07/26/23 20:07 I kdk A7500-U C 07 /24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec RADCALC 08/01/23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 9 of40 EN:RGY L .,!. 1 ,<_) ,-, ~•• T • ,,-1t "- Trust our People. Trust our Data. www energylab.com Billings, MT 406.252.6325 • Casper, WY 307 .235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 LABO RA TORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-004 Client Sample ID: BHV-5 Analyses Result RADIOCHEMISTRY AIR FILTER COMPLIANCE Thorium 230, LLD Thorium 232, % of EFF Thorium 232, EFF Year Thorium 232, LLD Uranium Natural, % of EFF Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 1.0E-16 1.1 E-01 6.0E-15 1.4E-01 9.0E-14 1.0E-16 Units uCi/mL % uCi/mL uCi/mL % uCi/mL uCi/mL Qualifiers MCL/ RL QCL Report Date: 08/11/23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter Method Analysis Date / By RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 10 of40 E"-1:RGY -.-~ _r...,,t.,•~T •'),~ I:..~ Trust our People. Trust our Data. www.energylab com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-005 Client Sample ID: BHV-6 Analyses Result Units CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.22E+08 L METALS, IN AIR Uranium ND mg/L Uranium, Activity ND uCi/mL RADIONUCLIDES -IN AIR Lead 210 7.7E-15 uCi/mL Lead 210 precision(±) 2.3E-15 uCi/mL Lead 210 MDC 2.6E-16 uCi/mL Radium 226 1.0E-15 uCi/mL Radium 226 precision (±) 1.9E-16 uCi/mL Radium 226 MDC 4.6E-18 uCi/mL Thorium 230 1.7E-16 uCi/mL Thorium 230 precision (±) 3.2E-17 uCi/mL Thorium 230 MDC 2.3E-18 uCi/mL Thorium 232 9.8E-18 uCi/mL Thorium 232 precision (±) 1.9E-18 uCi/mL Thorium 232 MDC 2.3E-18 uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 940 pCi/Filter Lead 210 precision(±) 281 pCi/Filter Lead 210 MDC 31.6 pCi/Filter Radium 226 122 pCi/Filter Radium 226 precision (±) 23.0 pCi/Filter Radium 226 MDC 0.56 pCi/Filter Thorium 230 20.7 pCi/Filter Thorium 230 precision (±) 3.9 pCi/Filter Thorium 230 MDC 0.28 pCi/Filter Thorium 232 1.2 pCi/Filter Thorium 232 precision (±) 0.23 pCi/Filter Thorium 232 MDC 0.28 pCi/Filter Uranium, Activity 6.8 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, % of EFF 1.3E+OO % Lead 210, EFF Day 6.0E-13 uCi/mL Lead 210, LLD 2.0E-15 uCi/mL Radium 226, % of EFF 1.1 E-01 % Radium 226, EFF Week 9.0E-13 uCi/mL Radium 226, LLD 1.0E-16 uCi/mL Thorium 230, % of EFF 5.7E-01 % Thorium 230, EFF Year 3.0E-14 uCi/mL Report RL -Analyte Reporting Limit Definitions: QCL -Quality Control Limit Qualifiers RL 1.5E-10 1.0E-16 0.20 MCU Report Date: 08/11/23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter QCL Method Analysis Date I By FIELD 07 /17 /23 10:43 / haw SW6020 07/21/2301 :50 / eli-b SW6020 07/21/2301 :50 / eli-b E909.0 07/25/23 20:53 / sec E909.0 07/25/23 20:53 / sec E909.0 07/25/23 20:53 / sec E903.0 07/26/23 20:07 I kdk E903.0 07/26/23 20:07 I kdk E903.0 07/26/23 20:07 I kdk A7500-U C 07/24/23 12:07 / sec A7500-U C 07/24/23 12:07 I sec A7500-U C 07/24/23 12:07 / sec A7500-U C 07/24/23 12:07 / sec A7500-U C 07/24/23 12:07 / sec A7500-U C 07/24/23 12:07 I sec RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 11 of 40 El'ERGY l .,:._ :.l.:J;~•..:.T(._)/~IF°,:: Trust our People. Trust our Data. www energylab com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-005 Client Sample ID: BHV-6 Analyses Result RADIOCHEMISTRY AIR FILTER COMPLIANCE Thorium 230, LLD Thorium 232, % of EFF Thorium 232, EFF Year Thorium 232, LLD Uranium Natural, % of EFF Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 1.0E-16 1.6E-01 6.0E-15 6.0E-02 9.0E-14 1.0E-16 Units uCi/mL % uCi/mL uCi/mL % uCi/mL uCi/mL Qualifiers MCU RL QCL Report Date: 08/11 /23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter Method Analysis Date / By RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11/23 14:20 I dmf RADCALC 08/11/23 14:20 I dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11 /23 14:20 I dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 12 of 40 EN=RGY • ...,.~._)R.i~Tci,..., r: :-- Trust our People. Trust our Data. www.energylab com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-006 Client Sample ID: BHV-7 Analyses Result Units CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.22E+08 L METALS, IN AIR Uranium 3.2E-10 mg/L Uranium, Activity 2.2E-16 uCi/mL RADIONUCLIDES -IN AIR Lead 21 O 1.2E-14 uCi/mL Lead 210 precision (±) 3.5E-15 uCi/mL Lead 210 MDC 3.2E-16 uCi/mL Radium 226 6.4E-15 uCi/mL Radium 226 precision (±) 1.2E-15 uCi/mL Radium 226 MDC 3.9E-18 uCi/mL Thorium 230 8.3E-16 uCi/mL Thorium 230 precision (±) 1.6E-16 uCi/mL Thorium 230 MDC 8.9E-18 uCi/mL Thorium 232 1.4E-17 uCi/mL Thorium 232 precision (±) 2.6E-18 uCi/mL Thorium 232 MDC 4.7E-18 uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 1420 pCi/Filter Lead 210 precision (±) 424 pCi/Filter Lead 210 MDC 38.5 pCi/Filter Radium 226 784 pCi/Filter Radium 226 precision (±) 147 pCi/Filter Radium 226 MDC 0.48 pCi/Filter Thorium 230 101 pCi/Filter Thorium 230 precision (±) 19.2 pCi/Filter Thorium 230 MDC 1.1 pCi/Filter Thorium 232 1.7 pCi/Filter Thorium 232 precision (±) 0.32 pCi/Filter Thorium 232 MDC 0.57 pCi/Filter Uranium, Activity 26.6 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, % of EFF 1.9E+OO % Lead 210, EFF Day 6.0E-13 uCi/mL Lead 210, LLD 2.0E-15 uCi/mL Radium 226, % of EFF 7.2E-01 % Radium 226, EFF Week 9.0E-13 uCi/mL Radium 226, LLD 1.0E-16 uCi/mL Thorium 230, % of EFF 2.8E+OO % Thorium 230, EFF Year 3.0E-14 uCi/mL Report RL -Analyte Reporting Limit Definitions: QCL -Quality Control Limit Qualifiers RL 1.5E-10 1.0E-16 0.20 MCU Report Date: 08/11/23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter QCL Method Analysis Date / By FIELD 07/17/2310:43 / haw SW6020 07/21/23 01:56 / eli-b SW6020 07/21/23 01:56 / eli-b E909.0 07/25/23 21 :08 / sec E909.0 07/25/23 21 :08 / sec E909.0 07/25/2321 :08 I sec E903.0 07/26/23 20:07 I kdk E903.0 07/26/23 20:07 I kdk E903.0 07/26/23 20:07 I kdk A7500-U C 07 /24/23 12:07 / sec A7500-U C 07 /24/23 12:07 / sec A7500-U C 07/24/23 12:07 / sec A7500-U C 07/24/23 12:07 / sec A7500-U C 07/24/23 12:07 / sec A7500-U C 07/24/23 12:07 / sec RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11/2314:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 13 of 40 El'ERGY •• ,~_.,-,, •• ~,.Jr-,.:_-, - Trust our People. Trust our Data. www.energylab com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-006 Client Sample ID: BHV-7 Analyses Result RADIOCHEMISTRY AIR FILTER COMPLIANCE Thorium 230, LLD Thorium 232, % of EFF Thorium 232, EFF Year Thorium 232, LLD Uranium Natural, % of EFF Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 1.0E-16 2.3E-01 6.0E-15 2.4E-01 9.0E-14 1.0E-16 Units uCi/mL % uCi/mL uCi/mL % uCi/mL uCi/mL Qualifiers MCU RL QCL Report Date: 08/11/23 Collection Date: 07 /03/23 DateReceived: 07/07/23 Matrix: Filter Method Analysis Date / By RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 14 of 40 EN:RGY ~ .:....-3;,,,~.,.::---,;11__-. Trust our People. Trust our Data. www energylab.com Billings, MT 406.252.6325 • Casper, WY 307 .235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-007 Client Sample ID: BHV-8 Analyses Result Units CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.21 E+08 L METALS, IN AIR Uranium ND mg/L Uranium, Activity ND uCi/mL RADIONUCLIDES -IN AIR Lead 210 8.1 E-15 uCi/mL Lead 210 precision (±) 2.4E-15 uCi/mL Lead 210 MDC 2.7E-16 uCi/mL Radium 226 2.5E-15 uCi/mL Radium 226 precision (±) 4.8E-16 uCi/mL Radium 226 MDC 5.7E-18 uCi/mL Thorium 230 2.4E-16 uCi/mL Thorium 230 precision (±) 4.6E-17 uCi/mL Thorium 230 MDC 3.1E-18 uCi/mL Thorium 232 6.7E-18 uCi/mL Thorium 232 precision (±) 2.8E-18 uCi/mL Thorium 232 MDC 2.3E-18 uCi/mL RADIONUCLIDES -IN AIR -PER FILTER Lead 210 982 pCi/Filter Lead 210 precision (±) 294 pCi/Filter Lead 210 MDC 32.3 pCi/Filter Radium 226 308 pCi/Filter Radium 226 precision (±) 57.8 pCi/Filter Radium 226 MDC 0.69 pCi/Filter Thorium 230 29.3 pCi/Filter Thorium 230 precision (±) 5.6 pCi/Filter Thorium 230 MDC 0.38 pCi/Filter Thorium 232 0.82 pCi/Filter Thorium 232 precision (±) 0.34 pCi/Filter Thorium 232 MDC 0.28 pCi/Filter Uranium, Activity 9.5 pCi/Filter RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, % of EFF 1.3E+OO % Lead 210, EFF Day 6.0E-13 uCi/mL Lead 210, LLD 2.0E-15 uCi/mL Radium 226, % of EFF 2.8E-01 % Radium 226, EFF Week 9.0E-13 uCi/mL Radium 226, LLD 1.0E-16 uCi/mL Thorium 230, % of EFF 8.1 E-01 % Thorium 230, EFF Year 3.0E-14 uCi/mL Report RL -Analyte Reporting Limit Definitions: QCL -Quality Control Limit Qualifiers RL 1.5E-10 1.0E-16 0.20 MCU Report Date: 08/11/23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter QCL Method Analysis Date / By FIELD 07/17/23 10:43 / haw SW6020 07/21/23 02:02 / eli-b SW6020 07/21/23 02:02 / eli-b E909.0 07/25/23 21 :19 / sec E909.0 07/25/23 21 :19 / sec E909.0 07/25/2321 :19 / sec E903.0 07/26/23 20:07 I kdk E903.0 07/26/23 20:07 I kdk E903.0 07/26/23 20:07 I kdk A7500-U C 07/24/23 12:07 / sec A7500-U C 07/24/23 12:07 / sec A7500-U C 07/24/23 12:07 / sec A7500-U C 07/24/23 12:07 I sec A7500-U C 07/24/23 12:07 / sec A7500-U C 07/24/23 12:07 I sec RADCALC 08/01 /23 14:07 / dmf RADCALC 08101/23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01123 14:07 / dmf RADCALC 08101 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08101/23 14:07 / dmf RADCALC 08101/23 14:07 / dmf RADCALC 08/01/23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/11123 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 15 of 40 E"-1:RGY .:,. I L. ,'.. r ( 1,~ -,:;_ Trust our People. Trust our Data. www energylab com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-007 Client Sample ID: BHV-8 Analyses Result RADIOCHEMISTRY AIR FILTER COMPLIANCE Thorium 230, LLD Thorium 232, % of EFF Thorium 232, EFF Year Thorium 232, LLD Uranium Natural, % of EFF Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 1.0E-16 1.1 E-01 6.0E-15 9.0E-02 9.0E-14 1.0E-16 Units uCi/mL % uCi/mL uCi/mL % uCi/mL uCi/mL Qualifiers MCU RL QCL Report Date: 08/11 /23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter Method Analysis Date / By RADCALC 08/11/23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11/23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 16 of 40 El'ERGY _ -:-Jc,:..-.r.T:::,.; L"-: Trust our People. Trust our Data. www energylab com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686. 7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-008 Client Sample ID: Blanks Analyses Result Units Qualifiers CLIENT PROVIDED FIELD PARAMETERS Air Filtering Volume 1.00 L METALS, IN AIR Uranium 0.00057 Uranium, Activity 3.9E-10 RADIONUCLIDES -IN AIR Lead 21 o -3.6E-09 Lead 210 precision (±) 4.9E-09 Lead 210 MDC 8.4E-09 Radium 226 4.9E-10 Radium 226 precision (±) 4.1E-10 Radium 226 MDC 6.SE-10 Thorium 230 8.7E-10 Thorium 230 precision (±) 4.2E-10 Thorium 230 MDC 4.9E-10 Thorium 232 1.6E-10 Thorium 232 precision (±) 1.9E-10 Thorium 232 MDC 3.4E-10 RADIONUCLIDES -IN AIR -PER FILTER Lead 210 -3.6 Lead 210 precision (±) 4.9 Lead 210 MDC 8.4 Radium 226 0.49 Radium 226 precision (±) 0.41 Radium 226 MDC 0.65 Thorium 230 0.87 Thorium 230 precision (±) 0.42 Thorium 230 MDC 0.49 Thorium 232 0.16 Thorium 232 precision (±) 0.19 Thorium 232 MDC 0.34 Uranium, Activity 0.39 RADIOCHEMISTRY AIR FILTER COMPLIANCE Lead 210, % of EFF Lead 210, EFF Day Lead 210, LLD Radium 226, % of EFF Radium 226, EFF Week Radium 226, LLD Thorium 230, % of EFF Thorium 230, EFF Year Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit -6.0E+05 6.0E-13 2.0E-15 5.5E+04 9.0E-13 1.0E-16 2.9E+06 3.0E-14 mg/L uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL uCi/mL pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter pCi/Filter % uCi/mL uCi/mL % uCi/mL uCi/mL % uCi/mL U -Not detected at Minimum Detectable Concentration (MDC) u u u u u u MCU RL QCL 0.000050 3.4E-11 0.20 Report Date: 08/11 /23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter Method Analysis Date/ By FIELD 07/17/23 10:43 / haw SW6020 07/21/23 02:08 / eli-b SW6020 07/21/23 02:08 / eli-b E909.0 07/25/2321 :34 / sec E909.0 07/25/23 21 :34 / sec E909.0 07/25/2321 :34 / sec E903.0 07/26/23 20:07 I kdk E903.0 07/26/23 20:07 I kdk E903.0 07/26/23 20:07 I kdk A7500-U C 07/24/23 12:08 I sec A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 / sec A7500-U C 07/24/23 12:08 I sec A7500-U C 07/24/23 12:08 I sec RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01/23 14:07 I dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01 /23 14:07 I dmf RADCALC 08/01/23 14:07 I dmf RADCALC 08/01/23 14:07 I dmf RADCALC 08/01/23 14:07 I dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01 /23 14:07 / dmf RADCALC 08/01/23 14:07 I dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11 /23 14:20 / dmf RADCALC 08/11/23 14:20 I dmf RADCALC 08/11 /23 14:20 I dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 17 of 40 El'\ERGY _ ~• .J _,p;:1 "('"J;....J l :- Trust our People. Trust our Data. ( www energylab com J -------~ Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 LABORATORY ANALYTICAL REPORT Prepared by Casper, WY Branch Client: Energy Fuels Resources (USA) Inc Project: 2nd Quarterly Air Analysis 2023 Lab ID: C23070164-008 Client Sample ID: Blanks Analyses Result RADIOCHEMISTRY AIR FILTER COMPLIANCE Thorium 230, LLD Thorium 232, % of EFF Thorium 232, EFF Year Thorium 232, LLD Uranium Natural, % of EFF Uranium Natural, EFF Year Uranium Natural, LLD Report Definitions: RL -Analyte Reporting Limit QCL -Quality Control Limit 1.0E-16 2.7E+06 6.0E-15 4.3E+05 9.0E-14 1.0E-16 Units uCi/mL % uCi/mL uCi/mL % uCi/mL uCi/mL Qualifiers MCU RL QCL Report Date: 08/11/23 Collection Date: 07/03/23 DateReceived: 07/07/23 Matrix: Filter Method Analysis Date I By RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11/23 14:20 I dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11 /23 14:20 I dmf RADCALC 08/11 /23 14:20 I dmf MCL -Maximum Contaminant Level ND -Not detected at the Reporting Limit (RL) Page 18 of 40 E"-ERGY _ • ._~}(,JH•~• _,1>1!:.:~ Trust our People. Trust our Data. www energylab.com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 QA/QC Summary Report Client: Energy Fuels Resources (USA) Inc Prepared by Billings, MT Branch Work Order: C23070164 Report Date: 07/21/23 Analyte Count Result Units RL %REC Low Limit High Limit RPD RPDLimit Qual Method: SW6020 Analytical Run: ICPMS207-B_230720A Lab ID: ICSA Interference Check Sample A 07 /20/23 11 : 58 Uranium 0.0000217 mg/L 0.00030 Lab ID: ICSAB Interference Check Sample AB 07/20/23 12:04 Uranium 0.0000207 mg/L 0.00030 Lab ID: QCS Initial Calibration Verification Standard 07/21/23 03:47 Uranium 0.0485 mg/L 0.00030 97 90 110 Method: SW6020 Batch: 180925 Lab ID: MB-180925 Method Blank Run: ICPMS207-B_230720A 07/21/23 00:19 Uranium 0.00004 mg/L 0.00001 Lab ID: LCS-180925 Laboratory Control Sample Run: ICPMS207-B_230720A 07/21/23 00:25 Uranium 0.0925 mg/L 0.000050 92 85 115 Lab ID: B23071357-001ADI L Serial Dilution Run: ICPMS207-B_230720A 07/21/23 00:43 Uranium 1.30E-10 mg/L 1.5E-10 0 0 20 N Lab ID: B23071357-001AMS Sample Matrix Spike Run: ICPMS207-B_230720A 07/21/23 00:49 Uranium 0.0531 mg/L 0.000052 106 75 125 Lab ID: B23071357-001 AMSD Sample Matrix Spike Duplicate Run: ICPMS207-B_230720A 07/21/23 00:55 Uranium 0.0521 mg/L 0.000052 104 75 125 1.9 20 Method: SW6020 Analytical Run: ICPMS207-B_230721A Lab ID: ICSA Interference Check Sample A 07/21/23 12:28 Uranium 0.0000216 mg/L 0.00030 Lab ID: ICSAB Interference Check Sample AB 07/21/23 12:34 Uranium 0.0000212 mg/L 0.00030 Lab ID: QCS Initial Calibration Verification Standard 07/21/2311 :36 Uranium 0.0485 mg/L 0.00030 97 90 110 Method: SW6020 Batch: 180925 Lab ID: MB-180925 Method Blank Run: ICPMS207-B_230721A 07/21/23 13:11 Uranium 0.00005 mg/L 0.00001 Qualifiers: RL -Analyte Reporting Limit ND -Not detected at the Reporting Limit (RL) N -Analyte concentration was not sufficiently high to calculate a Relative Percent Difference (RPO) for the serial dilution test Page 27 of40 El'ERGY _ .... :::!-:Jt-,. ~ :_,, .. ~ Trust our People. Trust our Data. www energylab com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 QA/QC Summary Report Client: Energy Fuels Resources (USA) Inc Prepared by Casper, WY Branch Work Order: C23070164 Report Date: 08/11 /23 Analyte Method: A7500-U C Lab ID: MB-71183 Thorium 230 Thorium 230 precision (±) Thorium 230 MDC Thorium 232 Thorium 232 precision (±) Thorium 232 MDC Lab ID: LCS-71183 Thorium 230 Thorium 230 precision (±) Thorium 230 MDC Lab ID: C23070164-002ADUP Thorium 230 Thorium 230 precision (±) Thorium 230 MDC Thorium 232 Thorium 232 precision (±) Thorium 232 MDC Count Result Units 6 Method Blank 0.3 pCi/L 0.2 pCi/L 0.2 pCi/L -0.1 pCi/L 0.1 pCi/L 0.3 pCi/L 3 Laboratory Control Sample 103 pCi/L 19.6 pCi/L 0.580 pCi/L 6 Sample Duplicate 5.43E-08 pCi/L 1.03E-08 pCi/L 3.26E-09 pCi/L 1.07E-08 pCi/L 2.04E-09 pCi/L 3.24E-09 pCi/L RL %REC Low Limit High Limit RPD RPDLimit Qual 103 Run: EGG-ORTEC_ALL_230718D Run: EGG-ORTEC _ALL_230718D 70 130 Run: EGG-ORTEC_ALL_230718D 30 26 Batch: 71183 07/24/23 12:07 u 07/24/23 12:07 07/24/23 12:08 20 R 20 R -Duplicate RPO is outside of the acceptance range for this analysis. However, the RER is less than or equal to the limit of 2, the RER result for Th230 is 1.11 and Th232 is 0.95. Qualifiers: RL -Analyte Reporting Limit ND -Not detected at the Reporting Limit (RL) R -Relative Percent Difference (RPO) exceeds advisory limit U -Not detected at Minimum Detectable Concentration (MDC) Page 28 of40 El'ERGY -~\dl.)r;•\lJf4 =..":"> Trust our People. Trust our Data. www.energylab com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 QA/QC Summary Report Client: Energy Fuels Resources (USA) Inc Prepared by Casper, WY Branch Work Order: C23070164 Report Date: 08/11/23 Analyte Method: E903.0 Lab ID: LCS-71183 Radium 226 Radium 226 precision (±) Radium 226 MDC Lab ID: MB-71183 Radium 226 Radium 226 precision (±) Radium 226 MDC Lab ID: C23070164-001ADUP Radium 226 Radium 226 precision (±) Radium 226 MDC -The RER result is 0.2. Qualifiers: RL -Analyte Reporting Limit Count Result Units 3 Laboratory Control Sample 49.6 pCi/L 9.39 pCi/L 0.587 pCi/L 3 Method Blank 0.3 pCi/L 0.3 pCi/L 0.5 pCi/L 3 Sample Duplicate 203 pCi/L 38.1 pCi/L 0.635 pCi/L R -Relative Percent Difference (RPO) exceeds advisory limit RL %REC Low Limit High Limit Run: G5000W_230718A 99 70 130 Run: G5000W_230718A Run:G5000W_230718A ND -Not detected at the Reporting Limit (RL) RPD RPDLimit Qual 200 Batch: 71183 07/26/23 13:57 07/26/23 13:57 u 07/26/23 13:57 20 R U -Not detected at Minimum Detectable Concentration (MDC) Page 29 of 40 EN:RGY ~••.,~{"")f,, •• T,_, •I _:_ Trust our People. Trust our Data. www energylab com Billings, MT 406.252.6325 • Casper, WY 307.235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 QA/QC Summary Report Client: Energy Fuels Resources (USA) Inc Prepared by Casper, WY Branch Work Order: C23070164 Report Date: 08/11 /23 Analyte Method: E909.0 Lab ID: LCS-71183 Lead 210 Lead 210 precision(±) Lead 210 MDC Lab ID: MB-71183 Lead 210 Lead 210 precision(±) Lead 210 MDC Lab ID: C23070164-003ADU P Lead 210 Lead 21 O precision (±) Lead 210 MDC -The RER result is 0.21 . Qualifiers: RL -Analyte Reporting Limit Count Result Units 3 Laboratory Control Sample 161 pCi/L 49.0 pCi/L 15.3 pCi/L 3 Method Blank -1 pCi/L 3 pCi/L 4 pCi/L 3 Sample Duplicate 7.60E-06 pCi/L 2.27E-06 pCi/L 2.59E-07 pCi/L U -Not detected at Minimum Detectable Concentration (MDC) RL %REC Low Limit High Limit RPD RPDLimit Qual 98 Run: PACKARD 3100TR_230718A 60 130 Run: PACKARD 3100TR_230718A Run: PACKARD 3100TR_230718A 9.6 ND -Not detected at the Reporting Limit (RL) Batch: 71183 07 /25/23 11 :39 07/25/23 12:44 u 07/25/23 20:23 20 Page 30 of40 EI\ERGY I •,1=,'.'1_1,_."' ~_)l-t.:.~? ~-Trust our People. Trust our Data. ~ www energylab com Work Order Receipt Checklist Energy Fuels Resources (USA) Inc Login completed by: Hannah R. Johnson Reviewed by: mstephens Reviewed Date: 7/11/2023 Shipping container/cooler in good condition? Custody seals intact on all shipping container(s)/cooler(s)? Custody seals intact on all sample bottles? Chain of custody present? Chain of custody signed when relinquished and received? Chain of custody agrees with sample labels? Samples in proper container/bottle? Sample containers intact? Sufficient sample volume for indicated test? All samples received within holding time? (Exclude analyses that are considered field parameters such as pH, DO, Res Cl, Sulfite, Ferrous Iron, etc.) Temp Blank received in all shipping container(s)/cooler(s)? Container/Temp Blank temperature: Containers requiring zero headspace have no headspace or bubble that is <6mm (1/4"). Water -pH acceptable upon receipt? Standard Reporting Procedures: Yes0 Yes □ Yes □ Yes0 Yes0 Yes 0 Yes 0 Yes0 Yes 0 Yes0 Yes □ 18.B'C No Ice Yes □ Yes □ Billings, MT 406.252.6325 • Casper, WY 307 .235.0515 Gillette, WY 307.686.7175 • Helena, MT 406.442.0711 C23070164 Date Received: 7/7/2023 Received by: gah Carrier name: UPS No □ No □ No □ No □ No □ No 0 No □ No □ No □ No □ No 0 No □ No □ Not Present D Not Present 0 Not Present 0 Not Applicable D No VOA vials submitted 0 Not Applicable 0 Lab measurement of analytes considered field parameters that require analysis within 15 minutes of sampling such as pH, Dissolved Oxygen and Residual Chlorine, are qualified as being analyzed outside of recommended holding time. Solid/soil samples are reported on a wet weight basis (as received) unless specifically indicated. If moisture corrected, data units are typically noted as -dry. For agricultural and mining soil parameters/characteristics, all samples are dried and ground prior to sample analysis. The reference date for Radon analysis is the sample collection date. The reference date for all other Radiochemical analyses is the analysis date. Radiochemical precision results represent a 2-sigma Total Measurement Uncertainty. Contact and Corrective Action Comments: None Page 31 of 40 ~ERGYFUELS RESOURCES Sheet 1 of 1 Quote# 16290-V1 CHAIN OF CUSTODY Samples Shipped to: ..,,E.,,,ne,.,,r"',!gy._La,.....,,.bo_ra...,ti...,·e,.,.s ________ Contact: Tanner Holliday 2393 Salt Creek Hwy. Ph: 435 678 2221 Casper WY. 82601 lholliday@energyfuels.com Chain of Custody/Sampling Analysis Request p . ct rOJ8 $ amp ers N ame s amp'ers s· t 1gna ure 2nd Quarter Air 2023 Tanner Holliday b~ )fr1,1~/ , Time Sample ID Date Collected Collected Laboratory Analysis ReQuested BHV-1 4/3/2023-7/3/2023 NA U-NAT, TH-230, Ra-226, Pb-210, TH-232 BHV-2 4/3/2023 -7/3/2023 NA U-NAT. TH-230, Ra-226, Pb-210, TH-232 BHV-4 4/3/2023 -7/3/2023 NA U-NAT, TH-230, Ra-226, Pb-210, TH-232 BHV-5 4/3/2023 -7/3/2023 NA U-NAT, TH-230, Ra-226, Pb-210, TH-232 BHV-6 4/3/2023 -7/3/2023 NA U-NAT, TH-230, Ra-226, Pb-210, TH-232 BHV-7 4/3/2023 -7/3/2023 NA U-NAT, TH-230, Ra-226, Pb-210, TH-232 BHV-8 4/3/2023 -7/3/2023 NA U-NAT. TH-230, Ra-226, Pb-210, TH-232 Blanks 4/3/2023 -7/3/2023 NA U-NAT. TH-230, Ra-226, Pb-210, TH-232 QUOTE # 16290-V1 Comments: Please send report to Kathy Weinel at kweinel@energyfuels.com FILTERS are NOT source or by-product material. source or orocessed ore, or 11 e2. Relinquished By:(Signature) Date/Time Received By:(Signature) Tanner Holliday 7/512023 ' 1100 Date/Time Page 32 of40 Energy Fuels Resources -White Mesa Mill BHV-1 Period: April 3, 2023 -July 3, 2023 Jlll AK All r. Week Filter Start Stop Slalt Stop TOllll S1n11111~ Stopping A ....... Wklf AVjl. II Number Date Dote Time Time n,..., Maoomctcr Manometer ~ Taft!P. (ln.H10) (in.H10) {Iii. R,PJ (°(:J I A000787S 4/3/2023 4/10/1023 2512.71 2681.97 10155.6 4.0 4.0 4.0 5.7 2 A0007867 4/10/2023 4117/2023 2681.97 2849.84 I0072.2 4.0 4.0 4.0 11.R 3 A0007859 4117/2023 412412023 2849.84 3018.6 10125.6 4.0 4.5 4.3 9.6 4 A0007851 4/241:!023 5/l/2023 3018.6 3185.52 10015.2 4.0 4.0 4.0 12.8 s A000784-3 51112023 51812023 3185.52 3353.36 10070.4 4.0 4.0 4.0 14.7 6 A000783S S/812023 5/1512023 33.53.36 3521.1 10100.4 4.0 3.5 3.8 14.7 7 A0007827 5/1512023 5122/2023 3521.7 3689.94 10094.4 4.0 4.0 4.0 15.9 8 A0007819 512212023 513012023 3689.94 3882.21 U536.2 4.0 4.5 4.3 17.4 9 A000781 I 5/3012023 615/2023 3882.21 4024.76 8553.0 4.0 4.0 4.0 17.7 JO A0007803 6/512023 6/1212023 4024.76 41.92.97 10092.6 4.0 4.0 4.0 18'.4 II A0008195 611212023 6/1912023 4192.97 4360.54 10054.2 4.0 4.0 4.0 17.8 12 A0008187 6/1912023 6126/2023 4360.54 4528.18 10058.4 4.0 4..5 4.3 21.4 13 A0008179 612612023 71312023 4528.18 4692.19 9840.6 4.0 4..5 4.3 23.S Totals ]30768 8 Avera es 10059.1 4.0 4.1 4.1 JS.5 Commenm: 3n/202Z Power wu round ,off, wua•t pluggNI ln from th~ pnviou1 week.. lnierl wcckly Dow check va!UC9 m yellow c-oiun-. ~ eio.cotumn ..iu.-™ Oroc,n <<>lilmM lhul.lulllloid ~lip flOin die, met ....... ~ l _-Ii\ • ,... ',. ' :,1:"' -••• f 11r I ,•, -' Calibration Date: 8/3/2022 Calibration Slope & Intercept: m= 1.25772 Orifice SIN: 8091779 Tt l'• Q,i Qo Qt Wll\<.A ')\lit~•. A•ta Ac&.flow, ,¥!low 'Sid.,..,.. T4 ,._ (IIQ'MI CIC (nlmHliJ (Ill' ..... ) '(111"/lul) (l't'lmui) 278.9 617.83 1.08 0.94 33.25 2115.0 617.U I.ID 0.93 32.89 282.7 616 97 1.13 0.96 34.00 286.0 617.86 LIO 0.93 32.83 287.8 616.23 1.10 0.93 32.68 287.9 618.31 1.07 0.90 31.71 289.1 621.18 1,10 0,93 32.74 290.5 617.47 1.14 0.95 33.55 290.8 617.09 I.II 0.92 32.53 291.6 617 80 I.II 0.92 32.SI 290.9 617.86 I.II 0.92 32.55 294.6 618.74 1.15 0.94 33.JS 296.7 618.79 I.IS 0.94 33.2.l 14.43 12.11 427.110 288.6 617.99154 I.II 0.93 32.91 Tll!III Sid. Vol-{Ila') 9562.1 9379.2 4.5878 9747.9 4.6009 9310.7 4.6061 9319.1 4.5949 9068 8 4.6243 9358.9 4.6318 10958.4 4.6161 7879.0 4.5365 92.90.5 4.5344 9265.9 4.5496 9497.9 4-1445 9259.5 4..5815 121897.9 59.615 9376,8 4.586 First Monitoring Quarter 01 Up<la11:xl: 7/30114 0.0174 99.9 4.8115 210.6 0.0216 100,S 4,7671 161.0 0,0173 99.4 4.8188 223.9 0.0240 99.9 4.8316 207.3 0.0229 100.2 4.7182 86.4 0.0092 100.1 48470 B0.9 0.0211 114.4 4.7054 16a 9 0.0214 84.9 4.7740 239.6 0.025R 100.1 4.7070 157.4 0.0170 99,7 4..1889 244,4 0.0257 99.R 48386 257.1 0.0278 97.6 57,511 2662.5 0.2838 4.793 204.8 0.0218 99.8 0 'St -0 M M Q) Cl ca a.. Energy Fuels Resources -White Mesa Mill BHV-2 Period: April 3, 2023 -July 3, 2023 t.ll rut All Week Filter Su,n Stop Start Stop Tl!_MI Stl\rtuq; Stopping A....., # Nwnbar Date Dote Timci Time limo M1111omet11r Monomdl!r ~ ( I (in.R,O) (in. H,Ol (Ill.Hi()) I J\0007874 413no23 4/IOn023 14605.77 14775.11 10160.4 4.0 4.0 4.0 2 A0007866 4/10/2023 4/17/2023 1477S. ll 14942.8R 10066.2 4.0 4.0 4.0 3 A00078SO 4111no23 4/24/2023 14942.88 ISi 11.69 10128.6 4.0 4.5 4.3 4 J\0007850 4n4no23 s11no23 15111.69 152.78.68 10019.4 4.0 4.5 4,3 s A0007842 5/1/2023 5/8/2023 15278.68 15445.5 10009.2 4.0 4.0 4,0 6 J\0007834 5/812023 5/15/2023 15445,5 15614.12 IOI 17.2 4.0 4.0 4.0 7 A0007826 S/15/2023 5/22/2023 15614.12 15781.48 10041.6 4.0 4.0 4.0 8 A00078l8 5/22/2023 5/30/2023 15781.48 15974.S2 11582.4 4.0 4.0 4.0 9 J\0007810 s13ono23 6/Sn023 15974.S2 16117.15 8557.8 4.0 4.0 4.0 10 A0007802 6/5no23 6/12/2023 16117.L5 16284.9 1006S.O 4.0 4.0 4.0 11 A0008194 6/12/2023 6/19/2023 16284.9 16452.94 10082.4 4.0 4.0 4.0 12 A0008!86 6119/2023 6/26/2023 16452.94 16620.-44 10050.0 4.0 4.5 4.3 13 A0008178 612.6/2023 713/2023 16620.-44 16784.56 9847.2 4.0 4.0 4.0 Totals 130727.4 Avc:rn •cs 10056.0 4,0 4.1 4,1 Commeats: IDson. W(!"IJlr.l)' no~ CNJCk: VallJCII in )'cllow coh.111111&. :J Bliaooiiiiii..;i. .. ~ t'ln,c,, 1;>"11!11.,. IW 1111!,;,,,-.,,i uv-fn'lnl llio m,;t t1"8lq!I, I • .. ~I ~ I . ~ .. ;,;:,:, ~ . •L! - Calibration Date: 8/3/2022 Calibration Slope & lntercq,l: m= 1.25772 Orifice SIN: 8091779 ,. T■ ... ()ii Q,o Wkly II.Vil,-\Vldy.Av,. Wtt,,!\v11-N#..Plow 'w."'1llt $4."""'- fccnp Tamp, ~ = l·q OQ (mlnHRr ,.,.._) '(•hnh\l 5.7 278.9 617.83 1.08 0.94 33.25 11.8 285.0 617.73 1.10 0.93 32.89 9.6 2R2.7 616.97 1,13 0,96 34.00 12.8 286.0 617.88 1.13 0.96 33.83 14.7 287.8 616,23 1.10 0.93 32.68 14.7 287.9 618.31 1.10 0.93 32.73 IS.9 289.1 621.18 I.ID 0.93 32.74 17.4 290,5 617.47 1.11 0,92 32.56 17.7 290.8 617.09 I.II 0.92 32.53 18.4 291.6 617.80 I.II 0.92 32,51 17.8 290.9 617.116 1.11 0,92 32.55 21 ,4 294.6 618.74 I.IS 0.94 33.35 23.5 296.7 618.79 1.12 0.91 32.25 14.43 12.12 427.86 15_5 28~_6 617.99154 LI I 0.91 32.91 'fQlal 8lol. voic-. (Ill") 9566.7 9373.6 4,6039 9750,8 4.5872 4.9770 9597.2 4.6083 4.9024 9262.S 4.6228 $.0044 9377.4 4.6216 5.0134 9309,9 4.6287 4.7897 10678.3 4.6048 48389 7883.5 4.5290 4.7112 9265.1 4.5358 4 8391 9291.9 4.5387 4.7916 9490.0 4.5437 5.0887 8992.8 4.5838 4.9758 121839,5 59.599 63,804 9372.3 4.S85 4.908 ......... (ll!lfqa') 0.0S28 0.0183 389.8 0.0400 294.1 0.0306 381.6 0.0412 391.8 0.0418 161.0 0.0173 234.I 0.0219 182.2 0.0231 303.3 0.0327 252.9 0.0272 545.0 0.0574 392..0 0.1)436 4204.6 0.-4480 323.4 0.0345 ,"'-at en.o- t,4.) 100.R 99.9 100.s 99.4 99,3 100.4 99.6 114.9 84,9 99.9 1000 99.7 97,7 '19 8 0 st 0 ;,; Q) Cl "' 0.. Energy Fuels Resources -White Mesa Mill BHV-4 Period: April 3. 2023 -July 3. 2023 LI.II ~H .AH l'• Weck filler Start Stop Start Stop T.W Startlog Slopping ,.;~ Wkly., ... ~ Number Date Dale Time Time n-M1111omate1 Mmomotc, ~ l'uu,p. C•m> (in.11,0) (ill. 1-120) ll,,tbOI 1•<"1 I A0007873 41312023 4/10/2023 49007.09 49176.22 10147.8 4.0 4.5 4.3 5.7 2 A000786S 411012023 4/1712023 49176.22 49344.22 10080.0 4.0 4.0 4.0 I 1.8 3 A0007857 4/1712023 4/24/2023 49344.22 49512.94 10123.2 4,0 4.5 4.3 9.6 4 A0007849 4/2412023 5/112023 49512.94 49679.78 10010.4 4.0 4.0 4.0 12.8 5 A0007841 5/112023 5/812023 4!1679.78 49847.24 10047.6 4.0 4.0 4.0 14.7 6 A0007833 5/8/2021 5/1512023 49847.24 5001:S.86 10117.2 4.0 4.0 4,0 14.7 7 A0007825 511512023 5/22/2023 50015.86 50183.12 10035.6 4.0 3.5 3.8 15.9 8 A0007817 5/2212023 513012023 50183.12 50376.25 11587.8 4.0 4.5 4,3 17,4 9 A0007809 5/30/2023 615/2023 50376.25 50518.92 8560.2 4.0 4.0 4.0 17.7 JO A0007RDI 6/5/2023 6/1212023 sos 18.92 50686.71 10067.4 4.0 4.0 4.0 18 4 11 A0008l93 6/1212023 6/1912023 50686.71 50854.64 10075.8 4.0 4.0 4.0 17.8 12 A0008l85 6/19/2023 6/26/2023 50854.64 51022.19 10053.0 4.0 3..S 3.R 21.4 13 A0003177 612612023 71312023 511122..19 51186.75 9873.6 4.0 4.0 4.0 23.5 Tolals 130779.6 Avera es 10060.0 4.0 4.0 4.0 15.5 Comrnt!nts: In~ wc.."Ckly now check values in ycUo~ -cilcullted. ----=:J _ q,lu ___ lJIIO<I•~ tnud\o< .... ~ •1-7l'. I ! ,".'' • l.,:1 ,t { ~ ..... ' . .-1· ' Calibration Date: 8/3/2022 Calibration Slope & lnten:ept: m= J.2S772 OruiceS/N: 8091779 'ra Pa Qa Ci)a °' :w1111.~~ Wkly." ..... . A4n.., 14d,l'lew Sld.lW1 ~ ~~ tscrt.11 ln,111H1tl CIIL'lailal (111'/elllll tll'lma) 278.9 617.83 1.12 0.97 34.26 285.0 617.73 J.10 0.93 32.Bn 282.7 616.97 1.13 0.96 34.00 2K6.0 617.88 1.10 0.93 32.83 287.8 616.23 1.10 0.93 32,68 287.9 618.31 1.10 0,93 32.73 289.l 621.18 1.07 0.90 31.72 290.5 617.47 1.14 0.95 33,55 290.8 617.09 J.11 0.92 32.53 291.6 617.80 I.I I 0.92 32..SI 290.9 617.86 I.II 0.92 32.SS 294.6 618.74 1.08 0.89 31.35 296.7 618.79 1.12 0.91 32.25 J ··~.-~.!'-: ~ 14.36 12.06 425.84 288.6 617.99154 I.ID 0.93 32.76 'roial $14. W,....,, (ii,!) 9844.6 QJ86..5 4.5821 4.7600 9745.6 4.5983 4.8223 9306.2 4.5992 4.699K 9298,0 4.6426 4.8639 9377.4 4.6111 4.8295 9013,1 4.5920 4.7078 I 10074 4.598R 4.7825 7885.7 4.5200 4.6453 9267..l 4.5392 4.6914 9285.8 4.5586 ◄.6634 8924.7 4.5531 4.7100 9016,9 4.5649 4.7211 121359.3 59.535 61.765 9335.3 4.580 4.751 1rst Monitonng uarter 2014 Updatod: 7/30/14 lollllla l'arclmt I a,._,. (llljpr'J )' 0.0298 100.7 177.9 0.0190 100,0 224.0 0.0230 L00.4 100.6 0.0108 99.3 221 .3 0.0238 99.7 2184 0,0233 100.4 115.8 0 0128 99.6 183.7 0.0167 115,0 125.3 0,0159 84,9 152.2 0.0164 99.9 104.8 O.OJJ3 100.0 156.9 0.0176 99.7 156.2 0.0173 98.0 2230.0 OJ.376 171.S 0.0183 99.8 0 "'" ._ 0 .,., (") Q) Ol ro c.. Ent:JID' Fuels Resoun;es -White Mesa Mill BHV-5 Period: April 3, 2023 -July 3, 2023 6H 6H l1H f• Week Filler Slllrt Slop Start Stop T9jal S11u1m1t Stopping A"""" WJ<ly, ""J;. ~ Number Date Date Time Time Tfrae Mm,omerer Munommer ~ -rcmr, (aaift) (in.H,0) (in.H20) ('Cl> I A0007872 4/3/2023 4/10/2023 42326.59 42495.74 10149.0 4.0 4.5 4.3 5.7 2 A0007864 4/10/2023 4/17/2023 42495.74 42663.75 10080.6 4,0 4.0 4.0 11.8 3 A0007856 4/17/202] 4124/2023 42663.75 42832.46 !0122.6 4.0 4.5 4.3 9.6 4 A0007848 4/24/2023 5/112023 42832.46 4299Q-~ 10010.4 40 4.0 4.0 12.8 5 A0007840 5/112023 5/812023 42999.3 43166.75 10047.0 4.0 4.0 4.0 14.7 6 A00078l2 S/812023 5/15/2023 4.3166..75 43335.38 10117.8 4.0 4.0 4.0 14. 7 7 A0007824 5/1512023 5/22/2023 43335.38 43502.65 10036.2 4.0 4.0 4.0 15.9 8 A0007816 5/22/2023 5/30/2023 43502.65 43695.73 11584.8 4.0 4.0 4.0 17.4 9 A0007808 5/3012023 615/2023 43695.73 43838 44 8562,6 4,0 4,0 4.0 17.7 10 A0008200 6/5/2023 6/12/2023 43838.44 44006.24 10068,0 4.0 4.0 4.0 18.4 II A0008192 6/1212023 6/19/2023 44006.24 44174.17 10075.8 4.0 4.0 4.0 17 8 12 A0008184 6/19/2023 6/26/2023 44174.17 44341.7 100S1.8 4.0 3.5 3.8 21.4 rJ A0008176 6/26/2023 7/3/2023 44341.7 44506.25 9873.0 4.0 4.0 4.0 23.5 Tot.els 130779.6 ---· Aver.mes 10060.0 4.0 4.0 4.0 15.5 Con1mt-n•.t! hlSC'n w«ld)' flow check values il1 yellow cohmms. liiiie~~llan•ml.-,1 '_] ('.....,,•co,IWt~ _, OAlc~ l•<nl-fro!U tbc GIOI illlf!tl!! Calibration Date: 8/3/2022 Calibration Slope & lntcn;cpt: m= 1.25772 Orifice SIN: 8091779 'h Pa QI QI Qt Wli!:Y.AVII< \\'llir, A•-, "~ .... :1111. Plow:, &IIIFIQ.lit. T .... ·"-=); (K} {1nmlllll (m','allll) ( .... /1!!.)D}i 278.9 617.83 1.12 0.97 34.26 285.0 617.73 1.10 0.93 32.89 282.7 616.97 1.13 0.96 34.00 286.0 617.88 1.10 0,93 32.83 287.8 616.23 1.10 0.93 32.68 287.9 618.31 1.10 0.9.J 32.73 289.1 621.18 1.10 0.93 32.74 290.5 617.47 I.II 0.92 32.56 290.8 617.09 I.II 0.92 32.53 291.6 617.80 I.II 0.92 32.51 290.9 617.86 1,11 0.92 32.55 294.6 618.74 I.OR 0.89 31.35 296.7 618.79 1.12 0.91 32.25 14.36 12.06 425.88 288.6 617.99154 1.10 0.93 32.76 -Mom~n,gQ=2014 h= Updated: 7/30/14 T•l N !'lilt ...... ~I ,¥oltmlo W-W,.,, Onelrwm , .. ., , .... , frn,w), ('4) 9845.8 4.5954 4.8888 293.4 0.0298 100.7 9387.0 4.5918 4.7869 195.1 0.0208 100.0 Q745.0 4.5827 4.8680 ZRS.3 0.0293 100.4 9306.2 4.6059 4.7237 117 8 0,0127 99.] 9297,4 4.6030 4.8020 199.0 0.0214 99.7 9378,0 4.6162 4.7850 168 8 0.0180 100.4 9304.9 4.6077 4.7230 115,3 0.0124 99.6 10680.5 4.6348 4.7735 138.7 0.0130 114.9 7887.9 4.5307 4.6637 133.0 0.0169 84.9 Q267.9 4.5745 4.7233 148_8 0.0161 99,9 9285.B 4.5638 4.6792 115.4 0.0124 100.0 8923.7 4.5560 4.7091 153.l 0.0172 99.7 9016 .. 3 4.5562 4.7404 11142 ll.0204 97.9 121326.4 59.619 61.867 2247.9 0.2402 9332.8 4.586 4.759 172.9 0.0185 99.8 I 0 '<I" -0 CD ('") Q) Cl "' 0.. Energy Fuels Resoun:cs -White Mesa Mill BHV-6 Period: April 3, 2023 -July 3, 2023 IUl AH AH To Week Filter Start Stop Start Slop Toul Slmting StoppiniJ ... ,..,.., Wtl(, I••& H Number o-Date Time Time 't1""1 Manometer Manomelci ,.._..., t .. ,,p.-cmm (in. H,Ol (in.H,O) '(1111. 111')) ' ('{') I /\0007871 4/3/2023 4/10/2023 1S638.92 15808.09 10150,2 4.0 4.5 4.3 5.7 2 A00078b3 4/l0/21Jn 4111ao23 15808.09 15976.04 10077.0 4.0 4.0 4.0 11.8 3 A00078S5 4/17/2023 4/24/2023 15976.04 16144.73 10121.4 4.0 4.5 4.3 9.6 4 A0007847 4/24/2023 5/1/2023 16144.73 16311.58 10011.0 4,0 4,0 4.0 12.8 5 A0007839 5/1/2023 5/8/2023 16311.58 16479.06 10048,8 4,0 4.0 4.0 14.7 6 A0007831 5/812023 S/15/2023 16479.06 16647.66 10116.0 4.0 4.0 4.0 14.7 7 A0007823 5/15/2023 5/2212023 16647.66 16814.95 10037.4 4.0 4,0 4.0 15.9 8 A0007815 5/2212023 5/30/2023 16814.95 17008.07 I 1S87.2 4.0 4.0 4.0 17.4 9 A0007807 5/30/2023 6/5/2023 17008.07 17150.7 8557.8 4,0 4.0 4.0 17.7 10 A0008199 6/512023 6/12/2023 17150.7 1731846 l0065.6 4.0 4.0 4.0 18.4 II A0008191 6/1212023 6/19/2023 17318.46 17486.49 10081.8 4,0 4.0 4,0 17.8 12 A0008183 6/1912023 6126/2023 17486.49 17653.98 10049.4 4.0 4,5 4,3 21 ,4 13 A0008l75 6/2612023 713/2023 17653,98 17818.53 9873.0 4,0 4.0 4,0 23.5 Tolals 130716.6 -~ Avera es 10059.7 4.0 4.1 4,1 15.5 Commenbl: (n,at wcckt} Row check valum in yc-1\ow colurnrua. ~ d111e•~1n;m-- o,-,..,1umm-oalculau,d a-16,,.,. lhnu '1Je """-· .! --::.11 .. •'-.1-''.."!\'.1• -:,•••,1°!':"'-• ~•••:;\T ___ Calibration Dale: 8/3/2022 Calibration Slope & lnlereepl: m= 1.25772 Orifice SIN: 8091779 1'11 Pio °" Qf Qt \VldJ,Avt, Wldy,Av~ Ad.flow •Sed.Pklli' S(d;PJowo 'Jaap. "'-11 tSt"f'M) II!) (mn,Htl (m'(min} (111'/llila) ,.,.,..,) 278.9 617.83 1.12 O-.-Q7 34,26 285.0 617.7.l 1.10 0.93 32..89 282.7 616.97 1.13 0.96 34.00 286.0 617.88 1.10 0.93 32,83 287.R 616.23 1.10 0.93 32..68 2R7.D 618 31 1.10 0.93 32..73 289.1 621,18 1.10 0.93 32,74 290.5 617.47 I.I I 0.92 32.56 290.8 617.09 I.II 0.92 32.53 291.6 617.80 I.II· 0.92 32-51 290.9 617.86 I.II 0.92 32.55 294,6 618.74 1.15 0.94 3).35 296.7 618.79 1.12 0.91 32.25 14.43 12.12 427.87 288.6 617.99154 I.II 0.93 32.91 TGIIJ w. Voluffli: (m'), 911-47.0 9383.7 4.6212 9743.B 4.6079 9306.B 4.6085 9299,1 4,5908 9376.3 4.6098 9306.0 4.6357 10682.7 4.6309 7883.5 4.5425 9265.7 4.583) 9291.3 4,5532 9489.4 4.5417 9016.3 4.5608 12L891.6 59.679 937~.3 4.591 First Momtor1ng Quarter 2014 Updated: 7/30/14 Loedllls ~ 'OIIWIPI ,..,..,'I C" 0.02l!3 100.7 4.8227 201.5 0.0215 100.0 4.8360 228.1 0.0234 100.4 4.7486 140.1 0.0151 99.3 4..8255 234.7 0.0252 99.7 4.7682 158 4 0.0169 100.4 4.7504 114.7 0.0123 99,6 4.7978 166,9 0.0156 115.0 4,6798 137,3 0.0174 R4.9 4.7522 168.9 0.0182 99.9 4.6790 L25.8 o.ons 100.0 4.6959 154..2 0.0162 99.7 4.7242 163.4 0..0181 9.7.9 61.952 2273.0 0.2419 102''-':':[ 4.766 174.8 0.0186 99.8 0 st 0 I'-(') (I) Cl Cll (l_ Energy Fuels Resources -White Mesa Mill BHV-7 Period: April 3, 2023 -July 3, 2023 Lili Ml '1H ., .. Week Filter Start Stoj, Surt Stop T.C!llll S1an111~ Stoppin11 Alli'I\WII Wltl)'.IW!i< # Number Date Date Time Time l'ltlllt Manometer MIIDOIIIOler 1111111!,nlat r...,., .111111). (in.H10) (in. H20) ·{111.HiO). ~) 1 A0007870 4/3/2023 4/I0/2023 16963.49 17132.72 !0153.8 4.0 4.0 4.0 5.7 2 A0007862 4/I0/2023 4117/2023 17132.72 17300.64 10075.2 4.0 4.0 4.0 11.8 3 A00078S4 4/17/2023 4/24/2023 17300.64 17469.37 10123.8 4.0 4.S 4.3 9.6 4 A0007846 4/24/2023 S/1/2023 17469.37 17636.23 10011.6 4.0 4.S 43 12.8 5 A0007838 5/1/2023 S/812023 17636,23 17803.87 10058 4 4.0 4,0 4.0 14,7 6 A0007830 5/8/2023 5l1S12023 17803.87 17972.46 10115.4 4.0 4.0 4.0 14.7 7 A0007822 SltS/2023 512212023 17972.46 18)40.67 10092.6 4.0 4.0 4.0 15.9 8 A00078!4 S/2212023 S/30/2023 18140.67 18332.93 J 153.S.6 4.0 3...S 3.8 17,4 9 A0007806 5/30/2023 61512023 18332.93 18475.52 855S.4 4.0 4.S 4.3 17.7 IO A0008198 615/2023 6/1212023 18475.52 18643.74 10093.2 4.0 4.0 4.0 18A 11 A0008190 6/1212023 6/1912023 18643.74 18811.31 100S4.2 4,0 4.0 4.0 17.8 12 A0008182 6/19/2023 6126/2023 18811.31 18978 85 10052.4 4,0 4.S 4.3 21.4 I] A0008174 6/2612023 7/312023 18978.85 19142.93 9844.8 4.0 4.0 4.0 23.S Tolals 130766.4 ~--Avera cs 100S9,0 4,0 4.1 4.1 IS.S Comments: fnscrt w.c~lr flow check val""" In yellow colurnna. Bll,e,:01-, ......... ~ -u€l 0,_. mluniln ttt <:ak...JI-a,..,,,-e,,o llom Ille mt< ,ojjo(loa. ·l __ 1 ·· .. L:•MS"·'·"t.:-1.' ~ ,-,-,-• • • I ' • • • ~ ~ Calibration Date: 8/312022 Calibration Slope & Intercept: m= 1.25772 Orifice SIN: 8091779 ... "" c» ~ QI •Wkl,.Ava, ,Wllly.i\1'JI. Acll,l'low Sld.11fow .'~now ~ 11...-re I ·~ lnnnll ~ (mlhi!ln) (Ill",.., , .. ~ 278.9 617.83 1.08 0.94 33.25 285.0 617.73 1.10 0.93 32.89 282.7 616.97 1.13 0.96 34.00 286.0 617.88 1.13 0.96 33.83 287 8 616,23 1.10 0.93 32.68 287.9 618 31 1.10 0.93 32.73 289.1 621.18 1.10 0,93 32.74 290.S 617.47 1.07 0.119 31.54 290.8 617.09 1.14 0.95 33.S2 291.6 617,80 I.I I 0.92 32.SI 290.9 617.86 I.II 0.92 32.55 294.6 618,74 I.IS 0.94 33.35 296.7 618.79 1.12 0.91 32.25 14.43 12.11 427.83 288.6 617.99154 I.II 0.93 32,91 AOOO 9560.4 9382.0 4.6104 9746.1 4.6130 9SK9.7 4.S9R2 9308.0 4.6096 937S.8 4.6053 9357.2 4.6130 10302.2 4.5960 8120.4 4.5387 9291.I 4.S776 926S.9 4.5496 9492.2 4.5595 8990.6 4.5819 121781.6 59,630 9367.8 4.587 First Momtormg Quarter 2014 Updated: 7/30/14 to.lllw: 4.8498 239.4 0.0255 100.0 4,8S08 237.8 0.0244 100.4 4.7629 164.7 0.0172 993 4 8484 238 8 0.0257 99.8 4.8166 211.3 0.022S 100.4 4.7631 ISO.I 0.0160 100.I 4.7515 161.S 0.01S7 114.4 4.7460 207.3 0.0255 84.9 4.8122 234.6 0.0252 LOO.I 4.7427 193.1 0.0208 99.7 4.8156 256.I 0.0270 99.7 4.8525 270.6 0.0301 97.7 62,682 3052.2 0,3266 4.822 234,8 0.0251 99.8 0 """ ..... 0 00 C') Cl) Cl ro 0.. En~ Fuels Ri,sources -White Mesa MiU BHV-8 Period: April 3, 2023 -July 3, 2023 .611 .ll.H 411 r• Weck Filter Sim! Slop S1a11 SIOp TOIII St.nni~ Stoppina 4'N9 Wkly.AVj, # Number Dote Dote Time Time ..... Manon><ter Manometer ........ , ..... p. (J,,ln} fin. H,Ol (111.H,O) tlD,Hi,(>). l"QT I A0007869 4/312023 411012023 40245.62 40414.88 10155.6 4.0 4,0 4,0 5.7 2 A0007861 4/1012023 4/1712023 40414.88 40S82.77 10073.4 4.0 4.0 4.0 11.8 3 A00078S3 411712023 4/2412023 40S82.77 40751.S I 10124.4 4.0 4.0 4.0 9.6 4 A0007845 412412023 51112023 40751,51 40918 38 !0012.2 4.0 3.5 3.8 12.8 s A0007837 5/1/2023 S/812023 40918.38 41086.12 10064.4 4.0 4.5 4.3 14.7 6 A0007829 5/B/2023 S/1512023 41086.12 41254.61 10109,4 4.0 4.0 4.0 14,7 7 A0007821 5/1512023 S/2212023 41254.61 41422.84 10093.8 4.0 4.0 4.0 IS.9 8 A0007813 S12212023 5130/2023 41422.84 41615.1 11535.6 4.0 4.0 4.0 17.4 9 A000780S 5/3012023 6/S12023 4161S.I 41757.68 8554.R 4.0 4.0 4.0 17.7 JO A0008197 6/S12023 6/1212023 41757.68 41925.87 10091.4 4,0 4.0 4.0 18.4 11 A0008189 6/12/2023 6/1912023 4192S.87 42093.44 10054.2 4.0 4.0 4,0 17.8 12 A0008182 6/1912023 6/2612023 42093.44 42261,02 10054.8 4.0 4.5 4.3 21.4 13 A0008173 6126/2023 71312023 42261.02 42425.08 9843.6 4.0 4.0 4.0 23.5 Tol81s 130767.6 A.vent es 10059.0 4.0 4.0 4.0 15.S Commeats: lnsert "'"d,:ly flow dicck valuca m yi.:Uo-... colW1DlB. Bhlecobimii..,._.-.ciiiiciiiii.ii 0.-"!>ha-•c <J1k;ui.ol .. .,1pl"ti1nt 1111 rnrr tUt~ I "-·•,n -!.'~' '".f:.4 .i. ' ,'; ··1:,•'•" -~ , Collbmtion Dntc: 8/J/2022 Cnllbmtion Slope & lnu:rc:cpt: m= 1.25772 Orifice SIN: 8091779 'ta r~ °" QI QI \\lldt,AVII, Wkly A~ AA·l'low •Sid. flow ;Sld.FJoo,r, 1'walp. ·-= (JC) (rnml!l(J Im'"-) <-'halnJ 278.9 617.83 1.08 0.94 33.2S 28S.O 617.73 1.10 0.93 32.89 282.7 616.97 1.09 0.93 33.00 286.0 617.88 1.06 0,90 31.80 287.8 616.23 1.14 0.95 33.67 287,9 618.31 1.10 0.93 32.73 289.1 621.18 1.10 0.93 32~74 290.5 617.47 I.II 0.92 32.56 290.8 617.09 I.II 0.92 32.53 291.6 617.80 I.II 0.92 32.51 290.9 6)7.86 I.II 0.92 32.55 294.6 618.74 1.15 0.94 33.35 296.7 618.79 1.12 0.91 12.25 14.36 12,06 425,83 288.6 617.99154 1.10 0.93 32.76 Tciql Sid. VOltallo (nl') 9562.1 9380.] 4.5126 9459.7 4.6 I06 9016.5 4.6025 9S96.1 4.6165 9370.2 4.5888 935K 3 •4.6170 10635.1 4.5328 7880.7 4.S427 9289.4 4.S783 9265.9 4.5534 9494.5 4,5622 R9R9.5 4.5620 121298.5 59.519 9330.7 4.578 First Monitoring Quur1er 2014 Upd111c.d: 7130/14 4.7566 0.0196 99,9 4.7915 180.9 0.0191 100.4 4.7440 141.5 0.0157 99.3 4.8906 274.1 0.0286 99.8 4.8124 223.6 0.0239 100.3 4.7646 147.6 0.0158 IOO.I 4.7030 170.2 0.0160 114.4 4,6881 14S.4 0.0185 84.9 4,8021 223.8 0.0241 100.1 4.7344 l81.0 0.019S 99.7 4.8023 240.1 0Jl25J 99.7 4.!259 263.9 0.0294 97.7 62.274 2754.8 0.29SO 4,790 211.9 0.0227 99.8 0 ..,. ..... 0 a, (') Ql Cl Cll Cl. Blanks Period: April 3, 2023 -July 3, 2023 Week S1art Stop Net # Filter Number Date Date 1 A0007868 03-Apr-23 10-Apr-23 4.6157 2 A0007860 10-ADr-23 17-APr-23 4.5726 3 A0007652 17-Anr-23 24-Apr-23 4.6229 4 A0007844 24-APr-23 01-Mav-23 4.6282 5 A0007836 01-May-33 08-May-23 4.6087 6 A0007828 08-May-23 15-May-23 4.6036 7 A0007820 15-Mav-22 22-Mav-23 4.6267 8 A0007812 22-Mav-23 30-May-23 4.5307 9 A0007804 30-Mav-23 05-Jun-23 4.5445 10 A0008196 05-Jun-23 12-Jun-23 4.5727 11 A0008188 12-Jun-23 19-Jun-23 4.5380 12 A0008180 19-Jun-23 26-Jun-23 4.5743 13 A0008172 26-Jun-23 03-Jul-23 4.5904 Totals Page 40 of40 ATTACHMENTD AIR PARTICULATE LOADING GRAPHS AND SUPPORTING DATA 0 0 0 p I--' 0 0 0 I--' 0 0 0 I--' 0 0 0 I--' 0 0 0 I--' 0 0 0 0 01/05/09 06/05/09 11/05/09 04/05/10 09/05/10 02/05/11 t 07/05/11 OJ 12/05/11 :::c < ~ 05/05/12 )> + 10/05/12 -· ""I OJ 03/05/13 V, :::c ,.. < QJ I 08/05/13 ,.. N -· f 01/05/14 0 ::::s 06/05/14 ""CJ OJ :::c QJ < 11/05/14 ""I .t,. ,.. -· + 04/05/15 n C 09/05/15 - OJ QJ ,.. :::c 02/05/16 tD < u, r-07/05/16 0 f 12/05/16 QJ c.. OJ -· :::c 05/05/17 ::::s < OQ I Cl'l 10/05/17 -f 3 03/05/18 OQ OJ 08/05/18 ....... :::c 3 < I 01/05/19 w -..J -f 06/05/19 11/05/19 OJ :::c < 04/05/20 I 00 09/05/20 02/05/21 07 /05/21 12/05/21 05/05/22 10/05/22 03/05/23 0 0 0 I-' a a I-' a 0 I-' 0 0 I-' 0 0 0 0 0 0 0 01/05/09 06/05/09 11/05/09 04/05/10 09/05/10 02/05/11 07/05/11 12/05/11 05/05/12 10/05/12 a:, 03/05/13 ~ < I 08/05/13 ...... 01/05/14 "'tJ DJ 06/05/14 ""'I rt- 11/05/14 -· n C -t 04/05/15 DJ rt-09/05/15 ti) co r-I 02/05/16 0 < I DJ I-' 07/05/16 a. -· 12/05/16 :::s (1Q 05/05/17 -3 10/05/17 (1Q 03/05/18 ......... 3 08/05/18 w -~ 01/05/19 06/05/19 11/05/19 04/05/20 09/05/20 02/05/21 07/05/21 12/05/21 05/05/22 10/05/22 03/05/23 a ~ I-' a 0 0 0 I-' a I-' a a I-' a a a a a a a 01/05/09 06/05/09 11/05/09 04/05/10 09/05/10 02/05/11 07/05/11 12/05/11 05/05/12 10/05/12 a:, :::c 03/05/13 < I 08/05/13 N 01/05/14 "'ti QJ 06/05/14 ""' r1' -· 11/05/14 n C -04/05/15 QJ + r1' 09/05/15 tD IJJ r-:::c 02/05/16 0 < N QJ 07/05/16 C. 12/05/16 -· ::::J (1Q 05/05/17 -3 10/05/17 (1Q '--03/05/18 3 08/05/18 w --01/05/19 06/05/19 11/05/19 04/05/20 09/05/20 02/05/21 07/05/21 12/05/21 05/05/22 10/05/22 03/05/23 0 0 0 !=' I-' 0 0 0 I-' 0 0 0 I-' 0 0 0 I-' 0 0 0 I-' 0 0 0 0 01/05/09 _1 06/05/09 11/05/09 04/05/10 09/05/10 02/05/11 07/05/11 12/05/11 05/05/12 10/05/12 m 03/05/13 ::I: < 08/05/13 I .,:::i. 01/05/14 "'ti 0J 06/05/14 ""I ,.... -· 11/05/14 n C 04/05/15 - + 0J ,.... 09/05/15 tD OJ r-:::c < 02/05/16 0 .J:,. 0J 07/05/16 Q. -· 12/05/16 ::::J (1Q 05/05/17 -10/05/17 3 (1Q 03/05/18 --.... 3 08/05/18 -w --01/05/19 06/05/19 11/05/19 04/05/20 09/05/20 02/05/21 07/05/21 12/05/21 05/05/22 10/05/22 03/05/23 0 !=' I-' 0 0 0 0 I-' 0 I-' 0 0 I-' 0 0 0 0 0 0 0 01/05/09 06/05/09 11/05/09 04/05/10 09/05/10 02/05/11 07/05/11 12/05/11 05/05/12 10/05/12 m 03/05/13 :::c < 08/05/13 I u, 01/05/14 "'tJ DJ 06/05/14 I ~ ,.... -· 11/05/14 n C - + 04/05/15 DJ ,.... 09/05/15 t1) OJ r-I 02/05/16 0 < I DJ V, 07/05/16 0. 12/05/16 -· ::::J (1Q 05/05/17 -3 10/05/17 (1Q 03/05/18 ....... 3 08/05/18 w -01/05/19 06/05/19 11/05/19 04/05/20 09/05/20 02/05/21 07/05/21 12/05/21 05/05/22 10/05/22 03/05/23 0 0 0 I-' 0 0 I-' 0 0 I-' 0 0 I-' 0 0 0 0 0 0 0 01/05/09 06/05/09 11/05/09 04/05/10 09/05/10 02/05/11 07/05/11 12/05/11 05/05/12 10/05/12 D::J :::c 03/05/13 < I 08/05/13 en 01/05/14 "'tJ DJ 06/05/14 ""I ,.. -· 11/05/14 n C -f 04/05/15 DJ ,.. 09/05/15 n, CJ r-I 02/05/16 0 < I DJ O'I 07/05/16 0. -· 12/05/16 ::::, OQ 05/05/17 -3 10/05/17 OQ 03/05/18 ....... 3 08/05/18 w -., 01/05/19 06/05/19 11/05/19 04/05/20 09/05/20 02/05/21 07 /05/21 12/05/21 05/05/22 10/05/22 03/05/23 0 0 0 0 0 !=' I-' I-' I-' I-' 01/05/15 04/05/15 07/05/15 10/05/15 01/05/16 04/05/16 07/05/16 10/05/16 01/05/17 04/05/17 a:, 07/05/17 :::c < 10/05/17 I ...... 01/05/18 "'tJ QJ 04/05/18 '"""' r-1' -· 07/05/18 n C -f 10/05/18 QJ r-1' 01/05/19 tD CJ I r-< 04/05/19 0 I -.J QJ 07/05/19 a. -· 10/05/19 ::::s (1Q 01/05/20 -3 04/05/20 (1Q ....... 07/05/20 3 w 10/05/20 - 01/05/21 04/05/21 07 /05/21 10/05/21 01/05/22 04/05/22 07/05/22 10/05/22 01/05/23 04/05/23 0 0 0 0 0 0 0 0 0 0 j..... I-' I-' I-' I-' 09/29/14 12/29/14 i I ► 03/29/15 06/29/15 09/29/15 12/29/15 03/29/16 06/29/16 09/29/16 12/29/16 g:, 03/29/17 ::I: < 06/29/17 I 00 09/29/17 "'tJ GI 12/29/17 ""I " -· 03/29/18 n C 06/29/18 - + GI " 09/29/18 tD CJ r-I 12/29/18 0 < I GI 00 03/29/19 a. -· 06/29/19 :::s 09/29/19 OQ -12/29/19 3 OQ 03/29/20 ....... 3 06/29/20 w -09/29/20 12/29/20 03/29/21 06/29/21 09/29/21 12/29/21 03/29/22 06/29/22 09/29/22 12/29/22 03/29/23 06/29/23 Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2015 BHV-1 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 LIH LIH LIH Ta Ta Pa Qa Qs Qs ' Total Week Filter Start Stop Start Stop Total Starting Stopping A,·erage Wkly. AYg, Wkly.Avg. Wkly. Avg. Act Flow Std Flow Std. Flow Std. I Gross Net Loading Percent # Number Date Date Time Tune Time Manometer Manometer Manometer Temp. Temp Pressure (SCFM) Volume ,.t, Wclgll1 Weight Onstrearn (min) (in H20) (in H20) (in H20) ("C) (K) (mmHll) (m'lmin) (m'/min) (fr/min) (m') (g), (g) (mg) (mg/m') (%) I A0007379 1/3/2023 1/9/2023 356_66 498.97 8538,6 4.0 3.5 3.8 03 273.4 621 46 1.04 0.92 32.63 7889.7 4.4040 4.4246 20.6 0.0026 84.7 2 A000737I 1/9/2023 1116/2023 498,97 666.59 10057.2 4.0 4.0 4.0 2.2 275.4 619 13 1,08 0_95 33.50 9541.0 4.3330 4_3758 42.8 0.0045 99,8 3 A0007363 1/16/2023 1/24/2023 666.59 858.69 11526.0 40 4.0 4.0 -4,0 269.2 615.47 1.07 0.96 33 79 11027 6 4 3840 4 4306 466 0.0042 114,3 4 A0007355 1/24/2023 1/30/2023 858_69 1003.67 8698.8 4.0 4.0 4.0 -4.6 268.5 619.13 1.06 0,96 33 93 8357,9 4.4041 4.4475 43.4 0.0052 86.3 5 A0007347 1/30/2023 2/6/2023 1003 67 1171,34 10060 2 40 4.0 4.0 -1 7 271.5 621.62 1.07 0.96 33 81 9632.4 4.3399 4.3943 54.4 0.0056 99.8 6 A0007339 2/6/2023 2/13/2023 1171.34 1339.14 10068.0 4.0 4.0 4.0 -0.1 273.1 62144 I 07 0,95 33 71 9609,5 4.3618 4.4 I 33 51.5 0.0054 99.9 7 A000733 I 2/13/2023 2/20/2023 1339.14 1506.73 I 0055.4 4.0 3.0 3.5 -3.6 269.5 616.81 1.00 0.90 31.65 90123 4.3826 4.4481 65_5 0.0073 99.8 8 A0007323 2/20/2023 2/27/2023 1506 73 1678.52 I 0307 4 40 40 4.0 1.3 274.5 613.92 1.08 0.95 33.41 9752.7 43185 4 4229 104 4 0 0107 102,3 9 A00073l0 2/27/2023 3/6/2023 1678.52 1842.43 9834 6 4.0 4.5 4.3 1.0 274-1 613.63 I.I I 0.98 34.44 9591.3 4.3907 4.4935 102_8 0.0107 97.6 10 A0007307 3/6/2023 3/13/2023 1842.43 2013.57 10268 4 40 40 40 50 278.2 617 35 I 08 0.94 33.28 9677.3 4.3492 4.4260 76 8 0 0079 101.9 11 A0007899 3/13/2023 3/20/2023 2013_57 2181.07 10050.0 4.0 3.5 3.8 3.7 276.8 618,24 I.OS 0.92 32.34 9203.8 4 5847 4 6336 48.9 0.0053 99 7 12 A0007891 3/20/2023 3/27/2023 218107 2346.61 9932.4 40 40 40 0.6 273.7 615.75 I 08 0.95 33.51 9424,6 4.5850 4.6113 26.3 0.0028 98.5 13 A0007883 3/27/2023 4/3/2023 2346.61 2512.71 9966 0 4.0 4.0 4.0 5.0 278.2 617.35 1.08 0.94 33 28 9392,0 4.6069 4.7154 108.5 0.0116 98 9 Totals 129363.0 ; 13.86 12.27 433.29 122112.1 57.444 58.237 792.5 0 0838 Averages 9951.0 4.0 3.9 39 0.4 273,5 61778938 1 07 0.94 33 33 9393.2 4.419 4 480 61 .0 00064 98 7 Comments: Insert weekly flow check vaJu'esi"ti yellow columns Blue cohunn values are calc:'tlated. :J Green columns are calculated a\'erages from the met station. I~ lilier waie t YIIIUe« inlb CH'IIIIJ:e tniumns: · Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-2 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 LI.H LI.H I Av:ge Ta Ta Pa Qa Qs Q• Total . Week Filter Start Stop Start Stop Total Starting Stopping Wkly Avg Wkly Avg, Wkly. Avg, Act. Flow Std Flow Std Flow Std. Tn~ ('ft-~. Net l;oadliJg Pe~wif t # Number Date Date Time Time Time Manometer Manometer Manometer Temp Temp. Pressure ,«;_OPM)i Volume \Veigbl ••~ t~ll Weight QriJ;trellrft' (min) (in H,0) (in H,0) (in H2O) (°C) (K) (mmHg) (m'/min) (m'/min) (ll~fmi~,. (m') @ cg} (mg) {n1¥m') ·(%) 1 A0007378 1/3/2023 1/9/2023 12449_8 12592,06 8535,6 4,0 3.5 3,8 0.3 273.4 621.46 1.04 0.92 32.63 7886,9 4,3915 4.4156 24.1 0.0031 84.7 2 A0007370 1/9/2023 1/16/2023 12592 06 12759.74 10060.8 4.0 40 40 2.2 275.4 619.13 1.08 0.95 33 50 9544.4 4,3590 4.4138 54.8 0,0057 99,8 3 A0007362 1/16/2023 1/24/2023 12759.74 12952.24 11550.0 4.0 4.0 4,0 -4,0 269 2 615.4 7 I 07 0.96 33 79 11050 6 4,3738 4.4065 32 7 0,0030 114 6 4 A0007354 1/24/2023 1/30/2023 12952.24 13096.7 8667.6 4.0 4.0 4.0 -4.6 268.5 619.13 1.06 0.96 33.93 8328.0 4.3888 4.4126 23.8 0,0029 86.0 5 A0007346 1/30/2023 2/6/2023 13096.7 13264.49 10067.4 4.0 4.0 4.0 -1.7 271 5 621.62 1.07 0.96 33 81 9639.3 4.3586 4.3890 304 0,0032 99.9 6 A0007338 2/6/2023 2/13/2023 13264.49 13432.24 10065,0 4.0 4,5 4.3 -0.1 273.1 621.44 1.10 0.98 34.73 9898.0 4.3643 4.4502 85.9 0,0087 99,9 7 A0007330 2/13/2023 2/20/2023 13432 24 13599.82 10054,8 4.0 4.0 4.0 -3,6 269.5 616.81 1.07 0.96 33.80 9624.3 4.4134 4.4947 813 0,0084 99.8 8 A0007322 2/20/2023 2/27/2023 13599.82 13769.06 10154.4 4.0 3.5 3.8 1.3 274.5 613.92 1.05 0.92 32.37 9307.2 4,3282 4.43 I 5 103.3 0,0111 100.7 9 A0007312 2/27/2023 3/6/2023 13769.06 13935.58 9991.2 4.0 4.5 4.3 1.0 274.1 613.63 I.I I 0.98 34.44 9744.1 4.3595 4.5060 146.5 0.0150 99.1 10 A0007306 3/6/2023 3/13/2023 13935.58 14104.26 10120.8 4.0 4.0 4.0 50 278_2 617.35 1.08 0.94 33 28 9538.2 4.3529 4.4981 145.2 0.0152 100 4 11 A0007898 3/13/2023 3/20/2013 14104.26 14272.57 10098.6 4.0 4.0 4.0 3.7 276.8 618,24 1.08 0.95 33.39 9547.1 4,5793 4.6419 62.6 0.0066 100.2 12 A0007890 3/20/2023 3/27/2023 14272.57 14439.04 9988.2 4.0 4.0 4,0 06 273 7 615,75 1.08 0.95 33 51 9477 6 4,5919 4.6134 21 5 0,0023 99.1 13 A0007882 3/27/2023 4/3/2023 14439.04 14605.77 I 0003.8 4.0 3.5 3.8 5.0 278.2 617.35 1 05 0.91 32.24 9132 5 4,6188 4.8316 212.8 0.0233 99.2 Totals 129358.2 13.92 12.33 435.43 122718.1 57.480 58.505 1024.9 0.1084 Averages 9950.6 4.0 40 40 04 273 5 617 78938 1.07 0.95 33.49 9439,9 4.422 4_500 78.8 0,0083 98.7 Comments: Insert weekly flow check values in yellow columns. ":j Blue column values are calculated Green columns are calculated averages from the met station ln11ert lifn,r,wi,lJlh~ ,·alucs·mto ornnll.O aolumns· Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 I BHV-4 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 IIH IIH IIH Ta Ta Pa Qa I Q• Qs 1 ~ Total Week Filter Stan Stop Stan Stop Total Starting Stopping Average Wkly Avg Wkly Avg. Wkly Avg, Act. Flow Std. Flow Std. Flow Std. Tan: .;, . Net Loading Percent # Number Date Date Time Time Time Manometer jvfanometer Manometer Temp. Temp. Pressure (SCFM) Volwne Weight ·.•·. ~i" ,1 Weight Onstream (min) (in H20) (in H,O) (in.H20), (°C) (K) (mmHg) (m'lmin) , (m'/min) (ft'/min) (m') (8) (g), (m_s) , (mglm') (%) 1 A007377 1/312023 119/2023 46851.56 46993.85 8537.4 4.0 3,5 3.8 03 2734 621.46 1.04 0.92 32.63 7888.6 4.3975 4.4117 14.2 0.0018 84.7 2 A0007369 1/9/2023 1/16/2023 46993.85 47161.51 10059,6 4.0 4.0 4,0 2.2 275 4 619.13 1 08 0,95 33.50 9543.2 4.3765 4.4183 41.8 0.0044 99.8 3 A0007361 1/16/2023 1/24/2023 47161.51 47353.03 I 1491.2 40 4.0 4.0 -4.0 269.2 615.47 1.07 0.96 33.79 10994.3 4.3884 4.4170 28.6 0.0026 114.0 4 A0007353 1124/2023 1/30/2023 47353.03 47497.89 8691 6 4.0 3 5 3.8 -4.6 268.5 619, 13 1.03 0,93 32 87 8089.7 4 3708 4 4070 36,2 0,0045 86,2 5 A0007345 1130/2023 2/612023 47497.89 47665.66 10066.2 4.0 4.0 4.0 •1.7 271.5 621 .62 1.07 0.96 33.81 9638-2 4.3316 4.3730 41.4 0,0043 99.9 6 A0007337 2/6/2023 2/1312023 47665,66 47833.5 I 10071.0 4.0 40 4,0 -0. 1 273, I 621.44 I 07 0,95 33.71 9612 3 4.3879 4.4508 62.9 0.0065 99 9 7 A0007329 2113/2023 2/20/2023 47833.51 48001.16 10059,0 4.0 3.5 3,8 ·3.6 269.5 616.81 1 03 0,93 32.75 9327.0 4.4082 4.4588 50,6 0.0054 99.8 8 A0007321 212012023 2/2712023 48001, 16 48170 73 10174,2 4,0 30 3 5 1.3 274 5 613.92 I 01 0,89 31 29 9013 9 4,3274 4.4650 137.6 0.0153 100.9 9 A0007312 212712023 316/2023 48170.73 48336.86 9967.8 4.0 4.5 4.3 1,0 274.1 613.63 1.11 0,98 34.44 9721.3 4.3527 4.4581 105.4 0,0108 98,9 10 A0007305 31612023 3/13/2023 48336,86 48506.02 10149.6 40 3 5 3 8 5.0 278.2 617.35 1.05 0.91 32.24 9266.0 4.3650 4.4496 84.6 0 0091 100.7 11 A0007897 3/1312023 3120/2013 48506,02 48676.62 10236,0 40 4.0 4.0 3,7 276,8 618.24 I 08 0.95 33 39 9677.0 4.5925 4.6449 52.4 0.0054 101 5 12 A0007889 3/20/2023 3/27/2023 48676 62 48840,8 9850,8 40 4.0 4.0 0.6 273.7 615.75 1.08 0.95 33.51 9347.2 4.5890 4,6060 11 o 0.0018 97.7 13 A000788 l 3/27/2023 4/3/2023 48840.8 49007.09 9977.4 4.0 4.5 4.3 50 278 2 617,35 1,12 0,97 34.29 9688.0 4.6180 4.7340 116,0 0.0120 99.0 Totals 129331,8 13.82 12.24 432.21 121806,6 57,506 58 294 788,7 00840 Averages 9948,6 40 3.8 39 0.4 273,5 617,78938 1.06 0,94 33 25 9369,7 4.424 4.484 60.7 0.0065 98.7 Comments: lnseri weekly flow check values in yellow columns t Blue~~\;aiues are cal~ulateci: -,~---. -' .. ---, _J Green columns are ca1cu1ated averages from the met station. 12am l'lllcr w,;uii!l1 ,,1! ,1. mto oranljC columns; I Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-5 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 D.H D.H D.H Ta T• I Pa Qa Qs ,, Qs Total Week Filter Stait Stop Stait Stop Total Starting Stopping Average Wkly Avg. Wkly Avg Wkly. Mg. Act. Flow Std Flow Std. Flow Std. 1';110: ~·· . ~ Net Loading Percent # Number Date Date Time Tune Time Manometer Manometer Manometer Temp. Temp Pressure (SCFM) Volume •Wc,jll)lt ~ .. ,'!', !l Weight Onstream (min) (in. H20) (in. H20) (in. H20) c·ci (K) (mmHg) (m'/min) (m'/min) (ft'/min) (m·') (11} (I;) (m_g} (mgim•') (ro} 1 A0007376 1/3/2023 1/9/2023 40171,07 40313.35 8536.8 4.0 4.0 4,0 0,3 273.4 621.46 1.07 0,95 33,69 8142,8 4.4137 4.4443 30,6 0.0038 84.7 2 A0007368 I /9/2023 1/16/2023 40313,35 40481 ,01 10059 6 4.0 4.0 4.0 2.2 275.4 619 13 ]08 0,95 33 50 9543,2 4 3777 4.4331 55.4 0.0058 99 8 3 A0007360 1/16/2023 1124/2023 40481.01 40672.51 11490.0 4.0 4.0 4.0 -4.0 269.2 615.47 1.07 0.96 33,79 10993.1 4 3906 4,453] 62.5 0,0057 114.0 4 A0007352 1124/2023 1/30/2023 40672.5 I 40817.36 8691.0 4.0 4,0 40 -4,6 268.5 619.13 1.06 0,96 33.93 8350,5 4,3814 4.4310 49,6 0,0059 86.2 5 A0007344 1/30/2023 216/2023 40817,36 40985,15 10067.4 4,0 4.0 4.0 -1,7 271 5 621.62 1.07 0.96 33.81 9639,3 4 3588 4.4313 72.5 0.0075 99 9 6 A0007336 2/6/2023 2/13/2023 40985.15 41152.98 10069.8 4.0 4.5 4.3 -OJ 273.1 621.44 1.10 0.98 34.73 9902, 7 4.3713 4.4345 63.2 0.0064 99_9 7 A0007328 2113/2023 2/20/2023 41152.98 41320.66 10060.8 4,0 4.5 43 -3,6 269 5 616.81 1.10 0.99 34 83 9922, I 4 3910 4 4883 97.3 0 0098 99 8 8 A0007320 2/20/2023 2/27/2023 41320.66 41490.2 10172.4 4.0 3.5 3.8 1.3 274.5 613.92 1.05 0.92 32.37 9323. 7 4,3480 4.5467 198.7 0.0213 100,9 9 A00073l3 2/27/2023 3/6/2023 41490.2 41656.36 9969 6 4.0 4.5 4.3 1.0 274.1 613.63 1,11 0,98 34.44 9723,0 4,3689 4.4760 107,1 0.0110 98 9 10 A0007304 3/6/2023 3113/2023 41656,36 41825 51 10149.0 4.0 4.0 4.0 5 0 278 2 617.35 1,08 0.94 33 28 9564.8 4.3718 4.4645 92.7 0.0097 100.7 11 A0007896 3/13/2023 3/2012023 41825.51 41996.04 10231.8 4.0 3.5 3.8 3.7 276.8 618.24 1.05 0.92 32.34 9370.3 4.5739 4,6483 74.4 0,0079 101.5 12 A0007888 3/20/2023 3/27/2023 41996.04 42160.31 9856.2 4.0 4.0 4.0 0.6 273.7 615.75 1.08 0,95 33.51 9352.3 4.6203 4.6662 45.9 0.0049 97.8 13 A0007880 3/2712023 4/3/2023 42160,31 42326,59 9976 8 4.0 4,5 4.3 5.0 278.2 617,35 1.12 0,97 34,29 9687,4 4,6270 4,7860 159.0 0.0164 99,0 Totals 129331.2 I I 14.02 12 42 438.51 123515.3 57 594 58 703 1108 9 0 I 162 Averages 9948.6 4.0 4,1 4.0 0.4 273.5 617.78938 1.08 0.96 33,73 9501,2 4.430 4.516 85,3 0.0089 98,7 Comments: ~nsert weekly _flo~chec~ values in yellow columnsg --' Blue column values,are calculated. =:J Green columns are calculated averages from the met station, IIISlll'I fill,:r. we_ullu \'llWCS into omn1:c aolumn.s. _J Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-6 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 LIH LIH LIH Ta Ta Pa Qa Qs Qs Total Week Filter Start Stop Start Stop Total Starting Stopping Average Wkly, Avg. Wkly. Avg. Wkly. Avg. Act. Flow Std. Flow Std Flow Std. True .·Ii .. Net Loading Percent # Number Date Date Time Time Time Manometer Manometer Manometer Temp, Temp. Pressure (SCFM) Volume Wcil,\hl .1w·. i·~ 1,1 Weight Onstream ___i'!!!!D_ (in H,O) (in H20) (in. H20) ("C) _w (mmHg) (m,/min) (m,/min) (ft'/min) (m,) jg) f.gl (mg) I (mg/m,) (%) I A0007375 1/3/2023 1/9/2023 13483 46 13625.73 8536 2 4.0 3,5 3,8 0,3 273.4 621.46 1.04 092 32.63 7887_5 4 3260 4 3510 25 0 0,0032 84,7 2 A0007367 1/9/2023 1/16/2023 13625,73 13793.38 10059.0 4.0 4,0 4,0 2,2 275.4 619.13 1.08 0.95 33.50 9542.7 4.3621 4.4165 54.4 0,0057 99,8 3 A0007359 1/16/2023 1/24/2023 13793.38 13984,91 11491.8 4.0 3,0 3,5 -4.0 269.2 615.47 1.00 0,90 31.64 10295.1 4.3852 4.4145 29.3 0.0028 114.0 4 A000735I 1/24/2023 1/30/2023 13984.91 14129.88 8698.2 4.0 4,0 4,0 -4 6 268,5 619 13 1.06 0,96 33 93 8357.4 4.3777 4.4269 49 2 0,0059 86.3 5 A0007343 1/30/2023 2/6/2023 14129.88 14297.54 l0059.6 4_0 4 .. 0 4.0 -1.7 271.5 62 1.62 1,07 0,96 33,81 9631.9 4,3592 4,4286 69,4 0.0072 99,8 6 A0007335 2/6/2023 2/13/2023 14297.54 14465.38 10070.4 4.0 4.0 4,0 -0.1 273.1 621.44 1.07 0.95 33.71 9611.8 4.3850 4.4541 69.1 0.0072 99.9 7 A0007327 2/13/2023 2/20/2023 14465.38 14633,01 10057.8 4.0 45 4.3 -3 6 269,5 616 81 1,10 0,99 34 83 9919,1 4.4102 4,5033 93 .. 1 0,0094 99,8 8 A0007319 2/20/2023 2/27/2023 14633.01 14802.6 10175.4 4.0 4,0 4.0 1.3 274.5 613.92 1,08 0,95 33-41 9627.8 4.3645 4.5272 162,7 0.0169 100.9 9 A00073l4 2/27/2023 3/6/2023 14802.6 14968,67 9964.2 4.0 4,5 4,3 1.0 274.1 613.63 1.1 I 0.98 34.44 9717.7 4.3511 4.4576 106.5 0.0110 98,9 10 A0007303 3/6/2023 3/13/2023 14968.67 15137.85 10150.8 4.0 4,0 4.0 5.0 278.2 617.35 1.08 0.94 33 28 9566.5 4.3892 4.4 745 85.3 0.0089 100.7 11 A0007895 3/13/2023 3/20/2023 15137.85 15308.55 10242.0 4.0 4,0 4.0 3.7 276.8 618.24 1.08 0.95 33.39 9682.7 4.5953 4.6558 60.5 0.0062 101 .6 12 A0007887 3/20/2023 3/27/2023 15308,55 15472,61 9843.6 4,0 3 5 3.8 0,6 273.7 615 _75 1.04 0.92 32 46 9048.0 4 6139 4.6492 35.3 0 0039 97.7 13 A0007879 3/27/2023 4/3/2023 15472.61 15638.92 9978.6 4.0 4,0 4.0 5,0 278.2 617.35 1.08 0.94 33.28 9403.9 4.6157 4.7289 113.2 0.0120 99.0 Totals 129327.6 I 13.89 12.30 434.32 122292.0 57.535 58.488 953.0 0.1003 Averages 9948.3 4.0 3,9 4.0 0.4 273.5 617.78938 1.07 0.95 33 41 9407.1 4.426 4 499 73 3 0.0077 98,7 Comments: Insert weekly flow check values in yellow columns -,.I.II j3lue column values are calculated =..J Green columns are calculated a,erages from the met station~ Im fllel' \\'Cis/!I \'11111~ lntoOfflllg<',, lltf.-1· :::J Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-7 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 LIH LIH LIH Ta Ta Pa Qa Qs Qs Total Week Filte, Start Stop Start Stop Total Starting Stopping Average Wkly AYg, Wkly Avg. Wkly A,•g. Act. Flow Std. Flow Std. Flow Std. -,~'!'.:. ,~,4:~.l; Net L(llidmg,1 Pcrcen~ # Number Date Date Time Tune Time Manometet Manometer Manometer Temp Temp. Pressure I (m'lmin)[ (SCFM) Volume "'.'· '.}J•. ';/1,•r-·1• Weight r<lJ/41r~,"!fm (min) (in.H20) (in H20) (in. H20) (OC) (Kl (mmHg) (m'/min) (ft'lmin) , (m") (l!) (g) (m_g) .. (n,ifi~>'l (;¾)" 1 A0007374 11312023 1/9/2023 14807.44 14949,74 8538,0 4.0 3,5 3,8 0.3 273 4 621.46 1,04 0,92 32,63 7889,1 4,3137 4.3420 28.3 0,0036 84.7 2 A0007366 11912023 1116/2023 14949.74 15117,39 10059,0 4.0 40 4.0 2,2 275.4 619.13 I 08 0,95 33,50 9542.7 4,3840 4.4433 59,3 0 0062 99.8 3 A0007358 Ill 612023 1124/2023 15117.39 15309.44 11523.0 4.0 4.0 4.0 -4.0 269.2 6 I 5.4 7 1.07 0.96 33.79 11024.7 4.3593 4.4203 61.0 0.0055 114.3 4 A0007350 1124/2023 1/3012023 15309.44 15454.39 8697.0 4.0 40 4.0 -4.6 268,5 619_!3 I 06 0.96 33,93 8356.2 4.3135 4,3680 54,5 0,0065 86 3 5 A0007342 1130/2023 2/6/2023 15454.39 15622.07 10060.8 4.0 4.0 4.0 -1.7 271.5 621.62 1.07 0.96 33,81 9633.0 4.3532 4.4303 77.1 0.0080 99,8 6 A0007334 216/2023 2/1312023 15622.07 15789.91 10070.4 4.0 4.0 4.0 .0.1 273.1 621.44 l.07 0,95 33,71 961L8 4.4099 4.4944 84.5 0.0088 99.9 7 A0007326 2113/2023 2120/2023 15789,91 15957 52 10056 6 4,0 4.0 40 -3 6 269,5 616 81 I 07 0.96 33,80 9626.0 4,4087 4.4916 82.9 0 0086 99 8 8 A0007318 2/2012023 2127/2023 15957,52 1613005 10351 8 40 3 5 38 1 3 274,5 613 92 1.05 0.92 32,37 9488.1 4.3650 4,5411 176.1 0.0186 102.7 9 A00073l5 2127/2023 3/612023 16130.05 16293.21 9789.6 4.0 4.0 4.0 1.0 274.1 613.63 1.08 0.95 33.43 9266.4 4.3683 4.4794 111.1 0.0120 97.1 10 A0007302 31612023 3/1312023 16293.21 16464.45 10274 4 4.0 4.0 4,0 5,0 278,2 617,35 1 08 0,94 33,28 9683,0 4,3676 4.4619 94,3 0 0097 101.9 11 A0007894 3/1312023 3120/2023 16464.45 16631.62 I 0030.2 4,0 3,5 3.8 3.7 276.8 618.24 1.05 0,92 32,34 9185.6 4.5678 4,6444 76.6 0 0083 99 5 12 A0007886 3/2012023 3127/2023 16631.62 16797.34 9943.2 4.0 4.0 4.0 0.6 273.7 615.75 1.08 0,95 33,51 9434,9 4,6203 4,6620 41.7 0,0044 98 6 13 A0007878 3/2712023 413/2023 16797,34 16963.49 9969.0 4.0 4.0 4.0 5.0 278.2 617 35 1 08 0.94 33,28 9394.8 4.6197 4.7484 128.7 0.0137 98.9 Totals 129363.0 7 13.86 12.27 433.39 122136.4 57 451 58.527 1076.1 0 1140 Averages 9951,0 40 3.9 3 9 04 273 5 6 I 7 78938 I 07 0,94 33.34 9395, 1 4 419 4 502 82,8 0 0088 98 7 Comments: Insert weekly flow check values in yellow columns ----1- 1Blue column values are calculated =:J Green columns are calculated averages from the met station !~ 'Tiller weiij11 -, • .i• .,.; m12 l)f]llllrle colpmns I AOOO r Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-8 Period: January 3, 2023 -April 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0 01955 Updated: 7/30/14 Orifice SIN: 8091779 ~ Ll.H Ll.H ~ .. -Ta Ta Pa Qa Qs Qs Total - Week Filter Start Stop Start Stop Total I Starting I Stopping kvunfg• Wkly. Avg_ Wkly. Avg. Wkly. Avg. Act.Flow Std. Flow Std. Flow Std. 1'nro •l ·, Net Loading Pe.rt.int # Number Date Date Time Tune Time I Manomete1 rvlanometer ,fv\nnq.~1cte~ Temp Temp. Pressure (SCFM) Volume \\'eighr Wci!ll1r Weight 0nS~Jn (!,1iii) (in H20) (in H20) ,(in 8~0) (°C) (K) (mm Hg_) (m'/min) (m'/min) , (ff/min) (m') (g) Ci?,) ' (IJ!g) (mg/m') 7 dii 1 A0007373 1/3/2023 1/9/2023 38089.55 38231.87 8539.2 4.0 3.5 3.8 0.3 273.4 621.46 1.04 0.92 32.63 7890.2 43357 4.3510 15.3 0.0019 84.7 2 A0007365 ]/9/2023 1/16/2023 38231.87 38399.5 10057.8 40 4.0 4.0 2.2 275 4 619 13 1.08 0.95 33.50 9541.5 4.3900 4.4341 44.1 0.0046 99.8 3 A0007357 1/16/2023 1/24/2023 38399.5 38593.62 11647.2 4.0 4.0 4.0 -4.0 269.2 615.47 1.07 0.96 33.79 11143.5 4.3574 4.3850 27.6 0.0025 115.5 4 A0007349 1/24/2023 1/30/2023 38593,62 38736.54 8575 2 40 4.0 4.0 -4 6 268 5 619.13 1.06 0,96 33,93 8239 2 4.3359 4.3808 44 9 0.0054 85.1 5 A0007341 1/30/2023 2/6/2023 38736.54 38904.21 10060.2 4.0 4,0 4.0 -1.7 271 5 621.62 1.07 0.96 33.81 9632.4 4.3768 4.4218 45.0 0,0047 99.8 6 A0007333 2/6/2023 2/13/2023 38904.21 39072_05 10070.4 4.0 4.0 4.0 -0.1 273_] 621.44 1.07 0.95 33.71 9611.8 4_3759 4.4388 62.9 0.0065 99_9 7 A0007325 2/13/2023 2/20/2023 39072,05 39239,62 10054 2 4.0 4.0 4,0 -3 6 269.5 616 81 1.07 0,96 33,80 9623. 7 4,3356 4.3967 61.l 0,0063 99 7 8 A0007317 2/20/2023 2/27/2023 39239,62 39411.79 10330.2 4.0 4.0 4.0 1.3 274.5 613 92 I 08 0,95 33.41 9774.2 4.3397 4.4929 153.2 0.0157 102,5 9 A0007316 2/27/2023 3/6/2023 39411.79 39575.32 981 LS 4_0 4.5 4.3 1.0 2Rl 613.63 111 0,98 34.44 9569.1 4.3658 4.4640 98_2 0.0103 97.3 10 A0007301 3/6/2023 3/13/2023 39575.32 39746,67 10281 0 40 40 40 5 0 278 2 617 35 1 08 0,94 33,28 9689,2 4,3839 4,4743 90 4 0,0093 102.0 11 A0007893 3/13/2023 3/20/2023 39746,67 39913,88 10032,6 4.0 4.0 4.0 3 7 276 8 618,24 1.08 0,95 33.39 9484.7 4,5939 4.6580 64.1 0,0068 99,5 12 A0007885 3/20/2023 3/27/2023 39913.88 40079.52 9938.4 4.0 3.5 3.8 0.6 273.7 615.75 1.04 0.92 32.46 9135.2 4.6339 4.6637 29.8 0.0033 98.6 13 A0007877 3/27/2023 4/3/2023 40079,52 40245.62 9966 0 40 4.5 4.3 5.0 278 2 617.35 1.12 0,97 34.29 9676 9 4.5920 4.7125 120.5 0.0125 98.9 -·1 , ~ I 'I Totals 129364 2 13 96 12.36 436 45 123011 8 57.417 58.274 857.1 0,0898 Averages 9951 1 40 4.0 4.0 0.4 273 5 617.78938 1.07 0.95 33.57 9462 4 4.417 4.483 65.9 0.0069 98.7 Comments: Insert weekly flow check values in yellow columns =1 ,Blue column values are calculated. Green columns are calculated averages from the met station. I Insert llllCI' WCtfUll '"'""""mle> l)flUIIIC QO]umns .. ] I Blanks Period: January 3, 2023 -April 3, 2023 Week Start Stop Net # Filter Number Date Date 1 A0007372 03-Jan-23 09-Jan-23 4.3450 2 A0007364 09-Jan-23 16-Jan-23 4.3707 3 A0007356 16-Jan-23 24-Jan-23 4.3651 4 A0007348 24-Jan-23 30-Jan-23 4.3069 5 A0007340 30-Jan-23 06-Feb-23 4.3619 6 A0007332 06-Feb-23 13-Feb-23 4.3797 7 A0007324 13-Feb-23 20-Feb-23 4.3003 8 A0007309 20-Feb-23 27-Feb-23 4.3742 9 A0007308 27-Feb-23 06-Mar-23 4.3575 10 A0007900 06-Mar-23 13-Mar-23 4.5984 11 A0007892 13-Mar-23 20-Mar-23 4.5971 12 A0007884 20-Mar-23 27-Mar-23 4.6323 13 A0007876 27-Mar-23 03-Apr-23 4.6069 Totals Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2015 BHV-1 Period: April 3, 2023 -July 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 IIH IIH IIH Ta Ta I Pa Qa Qs Qs Total ~ 1 ~-9:l!IJ.~lb I Week Filter Start Stop Start Stop Total Starting Stopping Average Wkly Avg, Wkly.Avg Wkly, Avg Act. Flow Std. Flow Std. Flow Std. 'fore q~, Net Percent # Number Date Date Time Tnne Time Manometer Manometer Manometer Temp. Temp Pressure (SCFM) Volume Wl!ighl '"eil!id Weight Onstream (min) (in H20) (in H20) (in H20) (°C) (K) (mmHg) (m'/min) (m'/min) (ft'/min) (m') (g), Csl (mg) ·rmg1.n:~·, (%) 1 A0007875 4/3/2023 4/10/2023 2512.71 2681.97 10155.6 4.0 4.0 4.0 5.7 278.9 617.83 1.08 0.94 33,25 9562.1 4,6069 4.9184 31 LS 0.0326 100,8 2 A0007867 4/10/2023 4/17/2023 2681.97 2849.84 I 0072.2 4.0 4.0 4.0 I 1.8 285.0 617.73 1.10 0.93 32,89 9379,2 4.5878 4.7513 163,5 0,0174 99.9 3 A0007859 4/17/2023 4/24/2023 2849 84 3018,6 10125 6 40 45 4,3 96 282,7 616 97 1.13 0,96 34,00 9747 9 4.6009 4.8115 210 6 0.0216 100.5 4 A000785 I 4/24/2023 5/1/2023 3018 6 3185.52 10015.2 4.0 40 4.0 12.8 286.0 617.88 I.IO 0 93 32.83 9310.7 4,6061 4.7671 161.0 0.0173 99.4 5 A0007843 5/1/2023 5/8/2023 3185.52 3353.36 I 0070.4 4.0 4.0 4.0 14.7 287.8 616.23 I 10 0.93 32.68 93191 4.5949 4 8188 223.9 0.0240 99.9 6 A0007835 5/8/2023 5/15/2023 3353.36 3521,7 10100.4 4.0 3.5 3.8 14.7 287.9 618.31 1.07 0.90 31.71 9068,8 4.6243 4.8316 207.3 0.0229 100.2 7 A0007827 5/15/2023 5/22/2023 3521,7 3689 94 I 0094.4 40 40 4.0 15,9 289,1 621.18 I.IO 0.93 32.74 9358,9 4 6318 4.7182 86.4 0 0092 100,1 8 A00078l9 5/22/2023 5/30/2023 3689.94 3882-21 11536.2 4.0 4.5 4.3 17.4 290.5 617.47 1.14 0.95 33,55 I 0958.4 4.6161 4.8470 230.9 0.0211 114.4 9 A00078I I 5/30/2023 6/5/2023 3882.21 4024.76 8553.0 4.0 4.0 4.0 17.7 290.8 617.09 I.I I 0.92 32.53 7879.0 4.5365 4.7054 168.9 0.0214 84,9 10 A0007803 6/5/2023 6/12/2023 4024.76 4192.97 10092 6 4.0 4.0 4.0 18.4 291.6 617.80 I.I I 0,92 32.51 9290.5 4,5344 4.7740 239.6 0.0258 100.1 11 A0008l 95 6/12/2023 6/19/2023 4192.97 4360.54 10054.2 4.0 4.0 4.0 17.8 290.9 617.86 I.I I 0.92 32.55 9265.9 4.5496 4.7070 157.4 0.0170 99.7 12 A0008l87 6/19/2023 6/26/2023 4360 54 4528.18 I 0058 4 40 45 43 21.4 294,6 618 74 I 15 0 94 33 35 9497,9 4 5445 4 7889 244 4 0,0257 99 8 13 A0008l79 6/26/2023 7/3/2023 4528.18 4692.19 9840.6 4.0 4.5 4.3 23.5 296.7 618.79 I.IS 0.94 33.23 9259,5 4.5815 4.8386 257.1 0.0278 97.6 Totals 130768 8 ,. I, 14.43 12, 11 427 80 121897,9 59,615 57.511 2662.5 0 2838 Averages 10059.1 4.0 4.1 4 l 15.5 288,6 617.99154 I.I l 0.93 32.91 9376.8 4.586 4.793 204 8 0.0218 99 8 Comments: 3/7/2022 Power was found off, wasn't plugged in from the previous week. rn~e~ly_!low check~alues in yellow columns, Bhie'col'umn values are caiculat~ ... ,· _j Green columns are calculated averages from the met station, ll115ert ffi1er .\ve,6111 viilues 11110 omna;, columns. ,.....J Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-2 Period: April 3, 2023 -July 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 I LIH LIH LIH Ta Ta Pa Qa Qs Qs Total ' Week Filte, Start Stop Start Stop Total Starting Stopping Average Wkly. Avg Wkly Avg. Wkly Avg, Act Flow Std. Flow Std Flow Std. 'J'l)l'C t»., . Net Loading Pemm~. # Number Date Date Time Time Time Manomete~ Manometer Manometer Temp, Temp_ Pressure (SCFM) Volume WciJ!!II I ;-. 11,• Weight On$th'!llm (min) (in H20) (in H20) (in H20) ('C) (K) (mmHg) (m'/min) (m'/min) (ft'/min) (m') w (JI,) (mg) (mg/m') (,%}' 1 A0007874 4/3/2023 4/10/2023 14605 77 14775.11 IO I 60.4 4.0 4.0 4,0 5.7 278_9 6 I 7.83 1.08 0.94 33,25 9566.7 4.591 I 5.0960 504.9 0.0528 100,8 2 A0007866 4/10/2023 4/17/2023 14775.11 14942.88 10066.2 4.0 4.0 4.0 11.8 285.0 617,73 I.IO 0.93 32,89 9373,6 4,6039 4.7758 171.9 0 0183 99,9 3 A0007850 4/17/2023 4/24/2023 14942_88 I 5111.69 10128 6 4.0 4,5 4.3 9,6 282 7 616.97 I 13 0.96 34.00 9750.8 4.5872 4.9770 389,8 0.0400 100.5 4 A0007850 4/24/2023 5/1/2023 15111 69 15278.68 10019.4 4.0 4.5 4,3 12 8 286_0 617.88 1.13 0.96 33.83 9597.2 4.6083 4.9024 294.1 0.0306 99.4 5 A0007842 5/1/2023 5/8/2023 15278 68 15445 5 10009 2 4.0 4.0 4.0 14.7 287 8 616.23 I.IO 0.93 32.68 9262.5 4.6228 5,0044 381.6 0,0412 99,3 6 A0007834 5/8/2023 5/15/2023 15445,5 15614.12 101 ]7_2 4_0 4.0 4,0 ]4_7 287.9 618.3 I I.IO 0.93 32.73 9377.4 4.6216 5.0134 39L8 0.0418 100.4 7 A0007826 5/15/2023 5/22/2023 15614_]2 15781.48 10041.6 4.0 4.0 4.0 15 9 289.1 621.18 I IO 0.93 32 74 9309 9 4 6287 4.7897 161.0 0,0173 99,6 8 A0007818 5/22/2023 5/30/2023 I 5781.48 15974.52 I 1582.4 4.0 4.0 4.0 17.4 290.5 617.47 I.I I 0.92 32.56 10678 3 4,6048 4,8389 234,1 0,0219 114.9 9 A0007810 5/30/2023 6/5/2023 15974.52 16117.15 8557.8 4.0 4.0 4.0 17.7 290.8 617.09 I.II 0.92 32,53 7883,5 4,5290 4.7112 182.2 0,0231 84.9 10 A0007802 6/5/2023 6/12/2023 16117.15 16284.9 10065.0 4.0 4.0 4,0 18.4 291.6 617,80 111 0.92 32 5 I 9265.1 4,5358 4.8391 303.3 0 0327 99,9 11 A0008194 6/12/2023 6/19/2023 16284.9 16452.94 I 0082.4 4.0 4.0 4.0 17.8 290.9 617.86 I.I I 0.92 32_55 9291.9 4 5387 4,7916 252,9 0.0272 100.0 12 A0008186 6/19/2023 6/26/2023 16452 94 16620 44 10050 0 40 4,5 4.3 21 4 294 6 618.74 I 15 0 94 33,35 9490 0 4 5437 5,0887 545.0 0 0574 99.7 13 A0008178 6/26/2023 7/3/2023 16620.44 16784.56 9847.2 4.0 4_0 4.0 23.5 296.7 618.79 1.12 0 91 32.25 8992.8 4.5838 4.9758 392.0 0.0436 97.7 Totals 130727.4 I 14 43 12.12 427.86 121839,5 59,599 63,804 4204.6 0.4480 Averages I 0056.0 4.0 4.1 4.1 I 5,5 288.6 617.99154 I.II 0 93 32,91 9372 3 4 585 4 908 323.4 0.0345 99,8 Comments: [nsert weekly flow check values in ye11ow columns. _ _I Blue col~~~ are calculated. =i Green columns are calculated a\'erages from the met station lnsen li111,r ,Weti!!t ,i:illll!S mro at:int; columns. I Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-4 Period: April 3, 2023 -July 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 ~ IIH IIH IIH Ta Ta Pa ~ Qa " Qs Qs Total ~ Week Filter Start Stop Start Stop Total Starting Stopping Average Wkly. Avg, Wkly.Avg, Wkly. Avg Act.Flow Std Flow Std. Flow Std. Tr•~~ ' .. I Net Loading Percent # Number Date Date Time Time Time Manometer Manometer Manometer Temp. Temp. Pressure (SCFM) Volume WciglJt Weig/ti Weight Onstream (min) (in H20) (in H20) (in H20) ("C) (K) (mmHg) (m,/min) (m,/min) (ft°/min) (m,) wl Im (mg) (mgim,) (%) 1 A0007873 4/3/2023 4110/2023 49007.09 49176.22 10147.8 4.0 4,5 4.3 5.7 278.9 617.83 1,12 0.97 34.26 9844.6 4.5749 4.8678 292,9 0.0298 100.7 2 A0007865 4/10/2023 4/17/2023 49176 22 4934422 10080 0 4,0 4,0 4.0 11.8 285,0 617.73 1.10 0.93 32,89 9386 5 4 5821 4.7600 177 9 0 0190 100,0 3 A0007857 4117/2023 4/24/2023 49344.22 49512.94 10123.2 4.0 4.5 4.3 9.6 282.7 616.97 1.13 0.96 34.00 9745.6 4.5983 4.8223 224.0 0.0230 100.4 4 A0007849 4/24/2023 5/1/2023 49512 94 49679.78 10010.4 4.0 4.0 4.0 12,8 286.0 617.88 1.10 0.93 32.83 9306.2 4,5992 4.6998 100.6 0.0108 99.3 5 A0007841 5/112023 5/8/2023 49679.78 49847.24 10047.6 4.0 4.0 4.0 14.7 287.8 616.23 1.10 0.93 32.68 9298.0 4.6426 4.8639 221.3 0.0238 99.7 6 A0007833 5/812023 5115/2023 49847.24 50015.86 10117.2 4.0 4.0 4,0 14,7 287.9 618.31 1.10 0 93 32.73 9377.4 46111 4 8295 218.4 0.0233 100.4 7 A0007825 5/15/2023 5/22/2023 50015.86 50183.12 10035.6 4.0 3.5 3.8 15.9 289.1 621.18 1,07 0.90 31.72 9013.1 4.5920 4.7078 115 8 0 0128 99.6 8 A0007817 5/22/2023 5/30/2023 50183.12 50376.25 11587.8 4.0 4.5 4.3 17.4 290.5 617.47 1.14 0.95 33.55 11007.4 4.5988 4. 7825 183.7 0.0167 I 15.0 9 A0007809 5/30/2023 6/5/2023 50376.25 50518,92 8560.2 4,0 4,0 4.0 17,7 290,8 617 09 II I 0,92 32,53 7885,7 4.5200 4 6453 125,3 0 0159 84 9 10 A0007801 6/5/2023 6/12/2023 5051892 50686.71 10067 4 4.0 4.0 4.0 18 4 291.6 617.80 111 0,92 32.51 9267.3 4.5392 4.6914 152 2 0 0164 99 9 11 A0008193 6/12/2023 6/19/2023 50686.71 50854,64 10075,8 4,0 4,0 4,0 17.8 290,9 617 86 111 0.92 32,55 9285,8 4 5586 4 6634 104 8 00113 100 0 12 A0008185 6/19/2023 6/26/2023 50854.64 5 I 022.19 10053.0 4.0 3.5 3.8 21.4 294.6 618.74 1.08 0.89 31.35 8924.7 4.5531 4.7100 156.9 0.0176 99.7 13 A0008177 6/26/2023 7/3/2023 51022.19 51186.75 9873.6 4.0 4.0 4.0 23 5 296.7 618.79 1 12 0.91 32.25 9016.9 4.5649 4 7211 156.2 0.0173 98.0 Totals 130779 6 I 14 36 12 06 425 84 1213593 59 535 61.765 2230,0 0 2376 Averages 10060,0 4.0 4.0 40 15.5 288.6 617.99154 1 10 0.93 32.76 9335.3 4,580 4.751 171.5 0.0183 99.8 Comments: l_!lsert-weeklli!.ow check 1val~..gJ.n yellow columns, __, ~luecolumn values are calculated :::J Green columns are calculated averages from the met station. ln...it filter l~Qlijfit \'11 UCS'IIIIP 01111111.e CO[Untll5, I Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitormg Quarter 2014 BHV-5 Period: April 3, 2023 -July 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 b.H b.H b.H Ta ~ Ta Pa Qa Qs Qs Total ~ Week Filter Start Stop Start Stop Total Starting Stopping Average Wkly. Avg Wkly. Ayg, Wkly Avg, Act.Flow Std. Flow Std. Flow Std. T(U'C 1.: .. Net Loading Percent # Number Date Date Time Tune Time Manomete1 Manometer Manometer Temp. Temp Pressure (SCFM) Volum.e Welgl,r ,.,.·:1, Weight Onstream (min) (in H,O) (in H,O) (in.H20) c•q (Kl (mmHg) (m'/min) (m"/min) (ft'/min) (m') (al f,g) (mg) (mg/m') (%) 1 A0007872 4/3/2023 4/10/2023 42326.59 42495.74 10149.0 4.0 4.5 4,3 5,7 278.9 617.83 1.12 0.97 34,26 9845.8 4,5954 4.8888 293.4 0.0298 100.7 2 A0007864 4/10/2023 4/17/2023 42495.74 42663.75 10080.6 4.0 4.0 4.0 11.8 285.0 617.73 1.10 0,93 32.89 9387.0 4.5918 4.7869 195.1 0.0208 100.0 3 A0007856 4/17/2023 4/24/2023 42663,75 42832.46 10122,6 4.0 4.5 4.3 9,6 282 7 616 97 1,13 0.96 34,00 9745.0 4.5827 4 8680 285.3 0.0293 100.4 4 A0007848 4/24/2023 5/1/2023 42832.46 42999.3 10010.4 4.0 4.0 4.0 12.8 286.0 617.88 1.10 0.93 32.83 9306.2 4,6059 4.7237 117.8 0,0127 99.3 5 A0007840 5/1/2023 5/8/2023 42999.3 43166.75 10047.0 4.0 4.0 4.0 14 7 287.8 616 23 1.10 0.93 32.68 9297.4 4.6030 4.8020 199.0 0 0214 99.7 6 A0007832 5/8/2023 5/15/2023 43166.75 43335.38 10117.8 4.0 4.0 4,0 14.7 287.9 618.31 1.10 0,93 32.73 9378.0 4.6162 4.7850 168.8 0.0180 100.4 7 A0007824 5/15/2023 5/22/2023 43335.38 43502.65 10036.2 4,0 4.0 4,0 15 9 289 1 621 18 1,10 0,93 32,74 9304 9 4,6077 4 7230 115.3 0,0124 99,6 8 A0007816 5/22/2023 5/30/2023 43502,65 43695.73 11584.8 4.0 4.0 4,0 17.4 290.5 617 47 I.II 0.92 32.56 10680.5 4.6348 4.7735 138.7 0.0130 114,9 9 A0007808 5/30/2023 6/5/2023 43695,73 43838.44 8562.6 4.0 4,0 4.0 17.7 290.8 617.09 1.11 0,92 32.53 7887.9 4.5307 4.6637 133.0 0.0169 84,9 10 A0008200 6/5/2023 6/12/2023 43838.44 44006,24 10068.0 4.0 4,0 4.0 18 4 291.6 617.80 1.11 0,92 32,51 9267,9 4.5745 4.7233 148.8 0.0161 99.9 11 A0008192 6/12/2023 6/19/2023 44006-24 44174.17 10075.8 4.0 4.0 4.0 17,8 290.9 617.86 I.I I 0.92 32.55 9285.8 4.5638 4.6792 115.4 0.0124 100,0 12 A0008184 6/19/2023 6/26/2023 44174.17 44341.7 1005 1.8 4.0 3,5 3,8 21 4 294 6 618 74 1.08 0.89 31.35 8923 7 4.5560 4 7091 153.1 0 0172 99.7 13 A0008176 6/26/2023 7/3/2023 44341.7 44506.25 9873.0 4.0 4.0 4.0 23.5 296.7 618 79 1.12 0.91 32.25 90163 4.5562 4.7404 1842 0.0204 97.9 Totals 130779 6 14.36 12.06 425-88 121326.4 59.619 61.867 2247.9 0,2402 Averai,;es 10060.0 4.0 4.0 4,0 15.5 288.6 617.99154 1.10 0.93 32,76 9332 8 4.586 4,759 172.9 0.0185 99.8 Comments: Insert weekly flow check values in yellow columns I Blue colwnn values are calculated. ___j Green columns are calculated averages from the met station lnset1 m1c:r•1~vnlucs intn ar~11n11S ":.....J Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-6 Period: April 3, 2023 -July 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 11H 11H 11H Ta Ta Pa Qa Qs Qs Total I Week Filter Stait Stop Stait Stop Total Staiting Stopping Average Wkly. Avg. Wkly.Avg. Wkly.Avg. Act.Flow Std.Flow Std. Flow Std. Tntc. ,, ' Net Loading 'f!erccnt # Number Date Date Time Time Time Manometer Manometer Manometer Temp. Temp Pressure (SCFM) Volume Weight ··, cig!ll Weight , ®'nf1~1,n (min) (in H20) (in H,O) (in.H2O) (°C) (K) (mmHg) (m'/min) (m'/min) (ft'/min), (m') (JI!) (11) {!I!g) (mg/m') Wo) I A0007871 4/3/2023 4/10/2023 15638.92 15808.09 10150.2 4.0 4.5 4.3 5.7 278.9 617,83 1.12 0.97 34.26 9847.0 4.5929 4.8719 279.0 0.0283 100.7 2 A0007863 4/10/2023 4/17/2023 15808 09 15976.04 10077.0 40 40 4.0 11.8 285.0 617.73 1.10 0.93 32 89 9383.7 4.6212 4.8227 201.5 0.0215 100.0 3 A0007855 4/17/2023 4/24/2023 15976.04 16144.73 10121.4 4.0 4.5 4.3 9.6 282.7 616.97 1.13 0.96 34.00 9743.8 4.6079 4.8360 228.1 0.0234 100.4 4 A0007847 4/24/2023 5/1/2023 16144 73 16311.58 10011 0 40 40 40 12 8 286 0 6 I 7,88 1.10 0.93 32 83 9306.8 4 6085 4.7486 140.1 0.0151 99,3 5 A0007839 5/1/2023 5/8/2023 16311.58 16479.06 10048.8 4.0 4.0 4.0 14.7 287.8 616,23 1,10 0.93 32.68 9299.1 4.5908 4.8255 234,7 0.0252 99.7 6 A0007831 5/8/2023 5/15/2023 16479.06 16647.66 10116.0 4.0 4.0 4.0 14.7 287.9 618,31 1.10 0.93 32.73 9376.3 4.6098 4.7682 158.4 0.0169 100.4 7 A0007823 5/15/2023 5/22/2023 16647.66 16814.95 10037.4 4.0 40 4.0 15.9 289.1 621.18 1.10 0.93 32 74 9306,0 4.6357 4.7504 114.7 0.0123 99.6 8 A0007815 5/22/2023 5/30/2023 16814.95 17008.07 11587.2 4,0 4.0 4,0 17.4 290,5 617.47 1.11 0.92 32 56 10682.7 4.6309 4.7978 166.9 0.0156 I 15.0 9 A0007807 5/30/2023 6/5/2023 17008.07 17150.7 8557,8 4,0 4,0 4,0 17.7 290,8 617,09 1.11 0.92 32.53 7883.5 4.5425 4.6798 137.3 0.0174 84.9 10 A0008199 6/5/2023 6/12/2023 17150.7 17318.46 10065.6 4.0 4.0 4.0 18 4 291.6 617,80 1.1 I 0.92 32 51 9265.7 4.5833 4.7522 168.9 0.0182 99.9 11 A0008191 6/12/2023 6/19/2023 17318.46 17486.49 10081.8 4.0 4.0 4.0 17.8 290,9 617,86 1.11 0.92 32,55 9291,3 4.5532 4.6790 125.8 0.0135 100.0 12 A0008183 6/19/2023 6/26/2023 17486.49 17653.98 10049.4 4.0 4.5 43 21 4 294,6 618,74 1.15 0.94 33.35 9489,4 4,5417 4,6959 154,2 0,0162 99,7 13 A0008175 6/26/2023 7/3/2023 17653.98 17818.53 9873.0 4.0 4.0 4.0 23 5 296.7 618.79 1.12 0.91 32.25 9016.3 4.5608 4.7242 163.4 0.0181 97.9 Totals 130776,6 14 43 12.12 427.87 121891 6 59.679 61.952 2273,0 0.2419 Averages 10059 7 40 4 I 4,1 15 5 288 6 61799154 I.II 0 93 32 91 9376.3 4.59] 4 766 174.8 0.0186 99.8 Comments: lnsert,weekl:i'-flow check val u-es in yellow columnsL I Bliie'co!umn values are calculated. :=] Green columns are calculated averages from the met station .. Insert liltcrwmllht \'alucs inlo or:1n2e calumns. I Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-7 Period: April 3, 2023 -July 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 LiH LiH I Li~I Ta Ta Pa Qa ~ Qs " ·"l'oJl!) Week Filter Start Stop Start Stop Total Starting Stopping ·i>:,,or~e Wkly.Avg. Wkly. Avg. Wkly Avg. Act Flow Stdl mo,~ Std. Flow Std, Tote ·~·· .-.. Net Loading Rernent, # Number Date Date Time Time Time Manometer Manometer l\1i_lll0Mtll'l' Temp, Temp Pressure (SCFM) Voinmg Weighr Weiglit Weight O'ii:sy:~111 (min)~ (in H2Q) (in. H20) liin.F.fl0) (°CJ (K) ' (mmHg) (m'/min) (11)'/min) (ft'/min), {1JJ'\), OJ:) flt) (m_g) (mg/m') w~ 1 A0007870 4/3/2023 4/10/2023 16963.49 17132.72 10153.8 4.0 4.0 4.0 5.7 278.9 617.83 1.08 0.94 33.25 9560.4 4.5767 5.0636 486,9 0,0509 100.7 2 A0007862 4/10/2023 4/17/2023 17132.72 17300,64 10075.2 4.0 4.0 4.0 11.8 285,0 617.73 1.10 0.93 32.89 9382.0 4.6104 4.8498 239 4 0.0255 100,0 3 A0007854 4/17/2023 4/24/2023 17300.64 17469.37 10123.8 4.0 4.5 4.3 9.6 282.7 616.97 1.13 0.96 34.00 9746. I 4.6130 4.8508 237.8 0.0244 100.4 4 A0007846 4/24/2023 5/1/2023 17469,37 17636.23 10011 6 4,0 4,5 4,3 12 8 286,0 617,88 113 0,96 33,83 9589,7 4 5982 4 7629 164,7 0,0172 99.3 5 A0007838 5/1/2023 5/8/2023 17636.23 17803.87 I 0058.4 4,0 4,0 4.0 14.7 287,8 616.23 1.10 0.93 32.68 9308.0 4.6096 4.8484 238,8 0,0257 99.8 6 A0007830 5/8/2023 5/15/2023 17803.87 17972.46 IOI 15.4 4.0 4.0 4.0 14.7 287.9 618.3 I 1.10 0.93 32.73 9375.8 4.6053 4.8166 211.3 0.0225 100.4 7 A0007822 5/15/2023 5/22/2023 17972.46 18140.67 10092.6 4.0 4,0 4.0 15,9 289.1 621.18 1.10 0,93 32.74 9357.2 4.6130 4.7631 150.\ 0 0160 100.1 8 A0007814 5/22/2023 5/30/2023 18140.67 18332.93 11535.6 4.0 3.5 3,8 17 4 290.5 617.47 1.07 0.89 31.54 10302 2 4.5960 4 7575 161,5 0.0157 1144 9 A0007806 5/30/2023 6/5/2023 I 8332.93 184 75.52 8555.4 4.0 4,5 4.3 17.7 290,8 617.09 1.14 0.95 33.52 8 I 20.4 4.5387 4.7460 207.3 0.0255 84.9 10 A0008198 6/5/2023 6/12/2023 18475,52 18643.74 10093.2 4.0 4.0 4.0 18 4 291.6 617.80 I.II 0,92 32.51 9291.1 4.5776 4 8122 234 6 0 0252 JOO.I 11 A0008!90 6/12/2023 6/19/2023 18643.74 18811.31 10054.2 4.0 4,0 4.0 17.8 290,9 617.86 1.11 0.92 32.55 9265.9 4.5496 4 7427 193 I 0.0208 99.7 12 A0008182 6/19/2023 6/26/2023 1881 \,3\ 18978.85 I 0052.4 4,0 4,5 4.3 21.4 294,6 618.74 1.15 0,94 33.35 9492.2 4.5595 4.8156 256.1 0,0270 99,7 13 A0008!74 6/26/2023 7/3/2023 18978 85 19142.93 9844.8 4,0 4,0 4.0 23.5 296,7 618 79 I 12 0 91 32,25 8990.6 4 5819 4.8525 270.6 0,0301 97.7 Totals I " I 30766.4 14.43 12.t t 427.83 121781.6 59 630 62.682 3052.2 0 3266 Averages 10059.0 4.0 4.1 4.1 15.5 288,6 617.99154 111 0 93 32.91 9367.8 4.587 4,822 234,8 0,0251 99.8 Comments: Lnsert weekly flow check values in yellow columns ,..c::::.::::, Blue column values are calculated --.-. ------. ==:J Green columns are calculated averages from the met station~ Jns4;rt liltarwcigh1 \'lll~into Or,Dlg!: aolOmllS, ____J AOOO Energy Fuels Resources -White Mesa Mill Calibration Date: 8/3/2022 First Monitoring Quarter 2014 BHV-8 Period: April 3, 2023 -July 3, 2023 Calibration Slope & Intercept: m= 1.25772 b= -0.01955 Updated: 7/30/14 Orifice SIN: 8091779 LIH LIH LIH 'I Ta Ta Pa Qa Qs I Qs Total r• Percent Week Filter Start Stop Start Stop Total Starting Stopping Average Wkly Avg_ Wkly. Avg. Wkly. A,•g. Act. Flow Std. Flow Std. Flow Std. Tnr.e, 6ross Net Loading # Numb!'! Date Date Time Time Time Manometer Manometer Manometer Temp. Temp. Pressure (SCFM) Volume Wdf!ht Weighl Weight Onstream (min) (in H20) (in H20) (in.H20) (OC) (!() (mmHg) (m'/min) (m'/min) (ft'/min) (m') (g) (g) (m_g) (mg/m') (o/,u 1 A0007869 4/3/2023 4/10/2023 40245.62 40414.88 10155.6 4.0 4.0 4.0 5.7 278.9 617.83 1.08 0.94 33.25 9562.1 4,5798 4.9585 378,7 0,0396 100.7 2 A000786 l 4/10/2023 4/17/2023 40414.88 40582.77 I 0073.4 4.0 40 4.0 11.8 285.0 617.73 1.10 0.93 32.89 9380 3 4,5726 4.7566 184,0 0 0196 99.9 3 A0007853 4/17/2023 4/24/2023 40582,77 40751 .51 IO 124.4 4.0 4.0 4.0 9.6 282.7 616.97 1.09 0.93 33.00 9459.7 4.6106 4.7915 180,9 0,0191 100.4 4 A0007845 4/24/2023 5/1/2023 40751.51 40918.38 10012.2 4.0 3.5 3.8 12.8 286.0 617 88 106 0.90 31.80 9016 5 4,6025 4 7440 141 ,5 0.0157 99 3 5 A0007837 5/1/2023 5/8/2023 40918,38 41086.12 I 0064.4 4.0 45 43 14,7 287,8 616.23 1.14 0,95 33.67 9596_1 4.6165 4.8906 274.1 0,0286 99,8 6 A0007829 5/8/2023 5/15/2023 41086.12 41254.61 IO I 09.4 4.0 4.0 4.0 14.7 287.9 61831 1.10 0.93 32.73 9370.2 4,5888 4.8124 223,6 0.0239 100.3 7 A0007821 5/15/2023 5/22/2023 41254,61 41422,84 10093,8 4,0 4.0 4,0 15,9 289,1 621.18 1.10 0.93 32.74 9358 3 4.6170 4.7646 147.6 0.0158 100.1 8 A00078l3 5/22/2023 5/30/2023 41422.84 41615.1 11535.6 4,0 4.0 4.0 17.4 290,5 617 47 1.11 0,92 32,56 10635,1 4,5328 4.7030 170,2 0.0160 114.4 9 A0007805 5/30/2023 6/5/2023 41615.1 41757.68 8554.8 4.0 4.0 4.0 17.7 290.8 617.09 1.11 0.92 32,53 7880.7 4,5427 4.6881 145.4 0,0185 84.9 10 A0008197 6/5/2023 6/12/2023 41757,68 41925.87 10091.4 4.0 4.0 4.0 18.4 291.6 617.80 I.I I 0.92 32.51 92894 4.5783 4.8021 223,8 0 0241 JOO.I 11 A0008189 6/12/2023 6/19/2023 41925,87 42093.44 I 0054,2 4,0 4,0 4,0 17,8 290,9 617.86 1.11 0,92 32.55 9265.9 4.5534 4.7344 181.0 0,0195 99_7 12 A0008182 6/19/2023 6/26/2023 42093.44 42261,02 10054,8 4,0 4.5 4,3 21 4 294,6 618 74 1.15 0.94 33,35 9494.5 4.5622 4.8023 240.1 0,0253 99 7 13 A0008173 6/26/2023 7/3/2023 42261.02 42425.08 9843.6 4.0 4.0 4.0 23.5 296.7 618.79 1.12 0,91 32.25 8989,5 4_5620 4 8259 263,9 0 0294 97,7 1· 'I ' Totals 130767.6 14.36 12.06 425 83 121298.5 59.519 62 274 2754.8 0 2950 Averages 10059.0 4.0 40 40 15.5 288.6 617 99154 1.10 0.93 32.76 9330. 7 4 578 4 790 21 ].9 0 0227 99 8 Comments: insert weekly flow check values in yellow columns I Slue column values are calculated. =:J Green columns are calculated averages from the met stat10n lnicrt fll!!'f wllii!ht \'ll!u~~ mro OOIIISC c<>111ii'1ns. I l Blanks Period: April 3, 2023 -July 3, 2023 Week Start Stop Net # Filter Number Date Date 1 A0007868 03-Apr-23 10-Apr-23 4.6157 2 A0007860 1 0-Apr-23 17-Apr-23 4.5726 3 A0007852 17-Apr-23 24-Apr-23 4.6229 4 A0007844 24-Apr-23 01-May-23 4.6282 5 A0007836 01-May-33 08-May-23 4.6087 6 A0007828 08-May-23 15-May-23 4.6036 7 A0007820 15-May-22 22-May-23 4.6267 8 A0007812 22-May-23 30-May-23 4.5307 9 A0007804 30-May-23 05-Jun-23 4.5445 10 A0008196 05-Jun-23 12-Jun-23 4.5727 11 A0008188 12-Jun-23 19-Jun-23 4.5380 12 A0008180 19-Jun-23 26-Jun-23 4.5743 13 A0008172 26-Jun-23 03-Jul-23 4.5904 Totals ATTACHMENT E ENVIRONMENTAL GAMMA GRAPHS AND SUPPORTING DATA I White Mesa Mill Ambient Gamma Levels Over Time BHV-1 I 50.00 T""---------------------------------------------------------------------------, 45.00 +---------------------------------------------------------------------------1 40.00 +------------------------------------------------------------------------------1 35,00 30,00 L.. Q) t::'. Cll 25.00 ::J C" --E Q) a::: 20.00 E 15.00 10.00 -i-----------------------------------·11---------------------------t-1---------------i 5.00 -f-•~-1-----,.,....-------------------------+lf----------------f o.oo ,~~ '-'· I 7 ~w,¥ .--, • , r ~-'"' -,,-~w -.• r -✓ _p AcM '. ·-'· ,. -' I I , i I --.• 9130/1981 9130/1984 9130/1987 9/30/1990 9130/1993 9130/1996 9130/1999 9/3012002 913012005 913012008 913012011 9130/2014 9130/2027 9130/2020 Background (BHV-3) Subtracted from BHV-1 ----BHV-1 I White Mesa Mill Ambient Gamma Levels Over Time BHV-21 50.00 ...------------------------------------------------------------, 45.00 ~-------------------------------------------------------------- 40.00 +-------------------------------------------------------------1 35.00 +-------------------------------------------------------------1 30.00 .... Q) t:: ca :::, c-25.00 -... E Q) c::: E 20.00 15.00 +----------------------------------------------------------1 10.00 --------------------------------------------------------------1 5.00 -1-ff'------H-l 0.00 3Q·Sep.g1 3Q.Sep.g9 30.sep.97 30.Sep.05 30-Sep.13 3Q.Sep.2l B,ici(_ground lBI-I_V-3} Subtracted from BHV-2 _.,_BHV-2 I White Mesa Mill Ambient Gamma Levels Over Time BHV-3 I 60.00 SO.OD 40.00 L.. Q) -e co :::J O'" 30.00 --E Q) c::: E 20.00 10.00 0.00 +-------+ ........ ----+--------,,---........ -+---'-----+---'--'---+-...___.___,_ ................. _+-__._-..__-+-__.'--~--+-...____._ __ _.___.'---+----'--_.____.__.....__......__J 30-Sep.gl 30-sep.84 3o.sep.87 3o.sep.90 3o.sep.93 3o.sep.96 3o.sep.99 3o.sep.02 3o.sep.05 30-Sep.OB 30-Sep.ll 30-Sep.14 30-seP-11 3o.Sep.20 --BHV-3 '--Q) t:::: ro :::J I White Mesa Mill Ambient Gamma Levels Over Time BHV-41 50.00 ..-----------------------------------------------------------, 45.00 -------------------------------------------------------1 40.00 -------------------------------------------------------1 35.00 ------------------------------------------------------------1 30.00 +-----------------------------------------------------1 O" 25.00 -----------------------------------------------------1 -E Q) c:: E 20.00 ------------------------------------------------------1 15.00 ------------------------------------------------------------1 10.00 ➔-f"•l-------------------------------------------------------1 5.00 ~ha..\lr- 0.00 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~s ~s ~s ep.81 ep.84 ep.87 ep.90 ep.93 ep.95 ep.99 ep.02 ep.05 ep.08 ep.11 ep.14 ep.17 ep.20 Background (BHV-3) Subtracted from BHV-4 ......_BHV-4 I White Mesa Mill Ambient Gamma Levels Over Time BHV-5 I 50.00 .....------------------------------------------------------~ 45.00 +------------------------------------------------------1 40.00 -----------------------------------------------------------< 35.00 30.00 I,... Q) t:: ro ::J 25.00 O" -E Q) 0:: E 20.00 15.00 10.00 5.00 0.00 .. -.... N .•• ·-• .• -4 ~ ~s ~s ~s ~s ~s ~s ~s ~s ~s ~s ~s ~s ~s ep-81 eP-84 ep-87 ep-90 ep-93 ep-95 ep-99 eP-02 ep-05 ep-08 eP-11 eP-14 ep-17 ep-20 Backoro,md (BH\/.3\ Sc,btrae-ted from RH\/, 5 -+-BHV-5 I White Mesa Mill Ambient Gamma Levels Over Time BHV-6 I SO.OD T""--------------------------------------------------------------------, 45.00 +--------------------------------------------------------------------1 40.00 +-----------------------------------------------------------------1 35.00 30.00 ,._ Q) t ro 25.00 :::, CT --E Q) 0::: 20.00 E 15.00 -t----------------------------------------------------1+----------------l 10.00 +---------------------------------------------------1·+----------------I 5.00 +-------------------------------------------------1 o.oo I !~iii 111r: iwJ'1;, , .. -'I ~~illfai 30-Sep.8J 30-Sep.84 30-Sep.87 3o.sep.90 3o.sep.93 30-Sep.96 30.sep.99 30.sep.02 3o.sep.05 30-sep.os 3o.sep.11 30.sep.14 30-Sep.17 30.sep.20 Background (BHV-3) Subtracted from BHV-6 -BHV-6 I White Mesa Mill Ambient Gamma Levels Over Time BHV-71 50.00 T""-------------------------------------------------------------------, 45.00 +-----------------------------------------------------------------1 40.00 ------------------------------------------------------------------1 35.00 30.00 .... Q) t::'. C\l 25.00 ::::l CT --E Q) 0::: 20.00 E 15.00 10.00 5.00 _ \--1 0.00 ....-= -=, • • • • • ..,,-: -----. • • I ., , .. ,,,........ :::-e ' • , ..... .---. .-=:=-:;:,-e-c ,. . .., 1-SeP-14 l-Mar-15 l-seP-15 l-Mar-15 1-SeP-15 l-Mar-17 l-seP-17 1-Mar-18 1-Sep-18 l-Mar-19 l-SeP-19 l-Mar-20 1-SeP-2o l-Mar-21 1-seP-21 l-Mar-22 l-seP-22 l-Mar-23 Background (BHV-3) Subtracted from BHV-7 -BHV-7 I White Mesa Mill Ambient Gamma Levels Over Time BHV-8 I 50.00 ~------------------------------------------------------------------~ 45.00 +-----------------------------------------------------------------1 40.00 35.00 30.00 .... Q) t::: ro 25.00 :J O" --E Q) 0::: 20.00 E 15.00 -t----------------------------------------------------------------------1 10.00 -t--------·--------------------------------------------------------------1 5.00 +------------------------------------------------------------------ 0,00 ...--1'>8 • • ,..... -I • • • I • • • • • • , • • • • .. I ... • • -. .------• I ::-l l-SeP-14 l-twar-1s l-Sep.lS l-twar-16 l-Sep.16 l•Mar-17 l-SeP-17 l-twa,.l8 l-Sep.l8 l-twar-19 l-Sep.l9 l-twar-20 l-Sep.20 l-twar-21 l-SeP-21 l-twar.22 l-Sep.22 l-twar.23 Background (BHV-3) Subtracted from BHV-8 -BHV-8 White Mesa Mill First Quarter 2023 Environmental Spherical Gamma Monitor Results Mean Total Days Ambient Badge Date Badge at Dose mRem/ mRem/ mRem/ Number Location Date Issued Exchanged WMM Equivalent hour Day Week Control Dose Administration Vault 1/5/2023 4/7/2023 92 36.8 0.02 0.400 2.80 1 V2O5 Control Room 1/5/2023 4/7/2023 92 50.8 0.02 0.552 3.87 2 BHV-6 1/5/2023 4/7/2023 92 34.7 0.02 0.377 2.64 3 Ore Stor. -Barrel Area 1/5/2023 4/7/2023 92 314.6 0.14 3.420 23.94 4 Vanadium Precip.Area 1/5/2023 4/7/2023 92 146.7 0.07 1.595 11.16 5 Yellowcake Drying Area 1/5/2023 4/7/2023 92 323 0.15 3.511 24.58 6 Leach 1/5/2023 4/7/2023 92 1333.7 0.60 14.497 101.48 7 SAG Mill Control Room 1/5/2023 4/7/2023 92 287.5 0.13 3.125 21.88 8 Yellowcake Precip. 1/5/2023 4/7/2023 92 150.8 0.07 1.639 11.47 9 Central Control Room 1/5/2023 4/7/2023 92 127.7 0.06 1.388 9.72 10 Ore pad -decontamination pad 1/5/2023 4/7/2023 92 99.3 0.04 1.079 7.56 11 North East Comer Ore Pad 1/5/2023 4/7/2023 92 221.1 0.10 2.403 16.82 12 Met. Lab 1/5/2023 4/7/2023 92 79.1 0.04 0.860 6.02 13 Filter Press Room 1/5/2023 4/7/2023 92 297.1 0.13 3.229 22.61 14 BHV-1 1/5/2023 4/7/2023 92 36.2 0.02 0.393 2.75 15 BHV-2 1/5/2023 4/7/2023 92 34.4 0.02 0.374 2.62 16 BHV-3 1/5/2023 4/7/2023 92 30.1 0.01 0.327 2.29 17 BHV-4 1/5/2023 4/7/2023 92 33 0.01 0.359 2.51 18 BHV-5 1/5/2023 4/7/2023 92 41.9 0.02 0.455 3.19 19 SAG Mill 1/5/2023 4/7/2023 92 389.7 0.18 4.236 29.65 20 Tails 1/5/2023 4/7/2023 92 75.4 0.03 0.820 5.74 21 CCD 1/5/2023 4/7/2023 92 134.9 0.06 1.466 10.26 22 North SX 1/5/2023 4/7/2023 92 0.00 0.000 0.00 23 Administration Building 1/5/2023 4/7/2023 92 41.8 0.02 0.454 3.18 24 Admin Parking Lot 1/5/2023 4/7/2023 92 71.4 0.03 0.776 5.43 25 Yellowcake Packaging 1/5/2023 4/7/2023 92 1006.5 0.46 10.940 76.58 26 Yellowcake Storage 1/5/2023 4/7/2023 92 731 0.33 7.946 55.62 27 Bucking Room 1/5/2023 4/7/2023 92 0.00 0.000 0.00 28 Mill Lunch Room 1/5/2023 4/7/2023 92 53 0.02 0.576 4.03 29 South SX 1/5/2023 4/7/2023 92 81.6 0.04 0.887 6.21 30 Mtce. Super.'s Office 1/5/2023 4/7/2023 92 51.3 0.02 0.558 3.90 31 Ore Feed Grizzly 1/5/2023 4/7/2023 92 270.9 0.12 2.945 20.61 32 Scalehouse 1/5/2023 4/7/2023 92 201.3 0.09 2.188 15.32 33 Sample Plant (OBS) 1/5/2023 4/7/2023 92 104.9 0.05 1.140 7.98 34 Front Gate 1/5/2023 4/7/2023 92 151.1 0.07 1.642 11.50 45 AF -Barrel Dump Station 1/5/2023 4/7/2023 92 199 0.09 2.163 15.14 46 AF Circuit -South 1/5/2023 4/7/2023 92 54 0.02 0.587 4.11 47 AF Circuit -North 1/5/2023 4/7/2023 92 59.4 0.03 0.646 4.52 51 North Control # I 1/5/2023 4/7/2023 92 38.1 0.02 0.414 2.90 52 North Control # 2 1/5/2023 4/7/2023 92 31.7 0.01 0.345 2.41 CaF2 Barrel Dump Station - 53 Operator Station 1/5/2023 4/7/2023 92 96.4 0.04 1.048 7.33 64 KF Barrel Dump Station 1/5/2023 4/7/2023 92 100.8 0.05 1.096 7.67 70 BHV-7 1/5/2023 4/7/2023 92 38.3 0.02 0.416 2.91 71 BHV-8 1/5/2023 4/7/2023 92 32.6 0.01 0.354 2.48 White Mesa Mill Second Quarter 2023 Environmental Spherical Gamma Monitor Results Mean Total Days Ambient Badge Date Badge at Dose mRem/ mRem/ mRem/ Number Location Date Issued Exchanged WMM Equivalent hour Day Week Control Dose Administration Vault 4/7/2023 7/6/2023 90 31.8 0.01 0.353 2.47 1 V2O5 Control Room 4/7/2023 7/6/2023 90 48.2 0.02 0.536 3.75 2 BHV-6 4/7/2023 7/6/2023 90 31 0.01 0.344 2.41 3 Ore Stor. -Barrel Area 4/7/2023 7/6/2023 90 295 0.14 3.278 22.94 4 Vanadium Precip.Area 4/7/2023 7/6/2023 90 132.1 0.06 1.468 10.27 5 Yellowcake Drying Area 4/7/2023 7/6/2023 90 370 0.17 4.111 28.78 6 Leach 4/7/2023 7/6/2023 90 618.5 0.29 6.872 48.11 7 SAG Mill Control Room 4/7/2023 7/6/2023 90 189.2 0.09 2.102 14.72 8 Yellowcake Precip. 4/7/2023 7/6/2023 90 104.6 0.05 1.162 8.14 9 Central Control Room 4/7/2023 7/6/2023 90 106.3 0.05 1.181 8.27 10 Ore pad -decontamination pad 4/7/2023 7/6/2023 90 87 0.04 0.967 6.77 11 North East Comer Ore Pad 4/7/2023 7/6/2023 90 218.2 0.10 2.424 16.97 12 Met. Lab 4/7/2023 7/6/2023 90 131.7 0.06 1.463 10.24 13 Filter Press Room 4/7/2023 7/6/2023 90 288.7 0.13 3.208 22.45 14 BHV-1 4/7/2023 7/6/2023 90 30.1 0.01 0.334 2.34 15 BHV-2 4/7/2023 7/6/2023 90 30.5 0.01 0.339 2.37 16 BHV-3 4/7/2023 7/6/2023 90 30.2 0.Ql 0.336 2.35 17 BHV-4 4/7/2023 7/6/2023 90 28.3 0.Ql 0.314 2.20 18 BHV-5 4/7/2023 7/6/2023 90 33.5 0.02 0.372 2.61 19 SAG Mill 4/7/2023 7/6/2023 90 215.9 0.10 2.399 16.79 20 Tails 4/7/2023 7/6/2023 90 100.4 0.05 1.116 7.81 21 CCD 4/7/2023 7/6/2023 90 111.1 0.05 1.234 8.64 22 North SX 4/7/2023 7/6/2023 90 226.7 0.10 2.519 17.63 23 Administration Building 4/7/2023 7/6/2023 90 37.2 0.02 0.413 2.89 24 Admin Parking Lot 4/7/2023 7/6/2023 90 71 0.03 0.789 5.52 25 Yellowcake Packaging 4/7/2023 7/6/2023 90 443.7 0.21 4.930 34.51 26 Yellowcake Storage 4/7/2023 7/6/2023 90 686 0.32 7.622 53.36 27 Bucking Room 4/7/2023 7/6/2023 90 118.2 0.05 1.313 9.19 28 Mill Lunch Room 4/7/2023 7/6/2023 90 49.2 0.02 0.547 3.83 29 South SX 4/7/2023 7/6/2023 90 78 0.04 0.867 6.07 30 Mtce. Super.'s Office 4/7/2023 7/6/2023 90 47.5 0.02 0.528 3.69 31 Ore Feed Grizzly 4/7/2023 7/6/2023 90 369.6 0.17 4.107 28.75 32 Scalehouse 4/7/2023 7/6/2023 90 197.6 0.09 2.196 15.37 33 Sample Plant (OBS) 4/7/2023 7/6/2023 90 97.1 0.04 1.079 7.55 34 Front Gate 4/7/2023 7/6/2023 90 161.2 0.07 1.791 12.54 45 AF -Barrel Dump Station 4/7/2023 7/6/2023 90 143 0.07 1.589 11.12 46 AF Circuit -South 4/7/2023 7/6/2023 90 54.7 0.03 0.608 4.25 47 AF Circuit -North 4/7/2023 7/6/2023 90 62.9 0.03 0.699 4.89 51 North Control# 1 4/7/2023 7/6/2023 90 0.00 0.000 0.00 52 North Control# 2 4/7/2023 7/6/2023 90 32.4 0.02 0.360 2.52 CaF2 Barrel Dump Station - 53 Operator Station 4/7/2023 7/6/2023 90 92 0.04 1.022 7.16 64 KF Barrel Dump Station 4/7/2023 7/6/2023 90 105.8 0.05 1.176 8.23 70 BHV-7 4/7/2023 7/6/2023 90 30.9 0.Ql 0.343 2.40 71 BHV-8 4/7/2023 7/6/2023 90 30.9 0.01 0.343 2.40 ATTACHMENT F VEGETATION GRAPHS, DATA TABLE, LABORATORY RESULTS AND QA/QC ...... ...... ...... 0 0 0 0 0 0 m m m I I I 0 0 0 co -.J 0) 8/27/1981 8/27/1982 8/27/1983 8/27/1984 - 8/27/1985 8/27/1986 - 8/27/1987 _; 8/27/1988 - 8/27/1989 _, 8/27/1990 8/27/1991 - 8/27/1992 8/27/1993 - 8/27/1994 _, 8/27/1995 _, 8/27/1996 - 8/27/1997 - 8/27/1998 - 8/27/1999 8/27/2000 - 8/27/2001 - 8/27/2002 - 8/27/2003 8/27/2004 8/27/2005 ~ 8/27/2006 8/27/2007 - 8/27/2008 8/27/2009 8/27/2010 8/27/2011 - 8/27/2012 -, 8/27/2013 - 8/27/2014 - 8/27/2015 _, 8/27/2016 8/27/2017 - 8/27/2018 - 8/27/2019 8/27/2020 8/27/2021 -· 8/27/2022 -· (Log Scale) ...... ...... 0 0 0 0 m m I I 0 0 0, .i:,.. t ' f (/) z z ~ ~ m ...... ...... 0 0 0 0 m m I I 0 0 <,.) N ::0 D) I N N en (") 0 ::s (") Cl) ::s -al !:!: 0 ::s tn ::s ~ cc Cl) ;r -o· ::s -C (") :::::: " cc - ...... ...... ...... C) 6 6 0 0 0 m m m I I I 0 0 0 00 " CJ) 8/27/1981 ' 8/27/1982 - 8/27/1983 8/27/1984 8/27/1985 8/27/1986 8/27/1987 - 8/27/1988 - 8/27/1989 8/27/1990 8/27/1991 8/27/1992 8/27/1993 8/27/1994 8/27/1995 8/27/1996 8/27/1997 8/27/1998 8/27/1999 8/27/2000 8/27/2001 8/27/2002 8/27/2003 8/27/2004 8/27/2005 8/27/2006 8/27/2007 8/27/2008 - 8/27/2009 - 8/27/2010 - 8/27/2011 8/27/2012 8/27/2013 - 8/27/2014 - 8/27/2015 _, 8/27/2016 _! 8/27/2017 8/27/2018 • 8/27/2019 8/27/2020 8/27/2021 8/27/2022 (Log Scale) t , t C/l z z ~ ~ rn ...... 6 0 m I 0 en ...... ...... 6 6 0 0 m m I I 0 0 .i,.. (.J ...... 6 0 m I 0 I\.) "'CJ C" I N -0 0 0 ::::s n (I) ::::s -Al -o· ::::s (/1 ::::s < (I) cc s--o· ::::s -C 0 :::::.: " cc - 0 0 m I 0 CX) ...... 6 0 m I 0 -.J ...... 6 0 m I 0 0) (Log Scale) ...... ...... ...... 6 6 6 6 0 0 0 0 m m m m I I I I 0 0 0 0 01 ~ (.,.) N 4/21/2015 +----+-----l------+------+-----ilh--1 .......... --------, 7/21/2015 10/21/2015 - 1/21/2016 4/21/2016 -, 7/21/2016 - 10/21/2016 - 1/21/2017 - 4/21/2017 - 7/21/2017 - 10/21/2017 - 1/21/2018 - 4/21/2018 - 7/21/2018 - 10/21/2018 - 1/21/2019 - 4/21/2019 - 7/21/2019 10/21/2019 - 1/21/2020 - 4/21/2020 - 7/21/2020 - 10/21/2020 - 1/21/2021 - 4/21/2021 - 7/21/2021 - 10/21/2021 - 1/21/2022 - 4/21/2022 - 7/21/2022 - 10/21/2022 - 1/21/2023 4/21/2023 - f , f en z z ~ :.E m C I z ~ 0 0 :l (') Cl) :l -iiJ !:!: 0 :l UI :l < Cl) cc Cl) -DI -o· :l -C: 0 ::::: " cc - 0 0 m I 0 00 0 0 m I 0 -.J 0 0 m I 0 0) (Log Scale) 0 0 m I 0 U1 0 0 m I 0 .I>,. 0 0 m I 0 c,.) 0 0 m I 0 N 4/21/2015 +------+-----+------I-----------+----------, 7/21/2015 10/21/2015 · 1/21/2016 4/21/2016 · 7/21/2016 · 10/21/2016 · 1/21/2017 4/21/2017 7/21/2017 10/21/2017 1/21/2018 4/21/2018 7/21/2018 .. 10/21/2018 1/21/2019 4/21/2019 · 7/21/2019 - 10/21/2019 - 1/21/2020 4/21/2020 - 7/21/2020 - 10/21/2020 1/21/2021 4/21/2021 .. 7/21/2021 10/21/2021 1/21/2022 4/21/2022 7/21/2022 10/21/2022 1/21/2023 4/21/2023 t T t C/J z z :§: :§: m -I :::c I N w N C') 0 :l (') Cl) :l -iii !:!: 0 :l (II :l ~ (Q Cl) -s» -o· :l -C: C') ::::: " (Q - WHITE MESA MILL FORAGE RADIONUCLIDE DATA NORTHEAST OF MILL SAMPLED SAMPLED Ra-226 OTR DATE VALUE (uCi/Kg) 3rd '81 27-Au~-81 3.90E-04 4th '81 20-Oct-81 1.40E-04 2nd '82 15-Anr-82 UlE-04 3rd '82 01-Jul-82 L60E-04 4th '82 30-Nov-82 267E-06 2nd '83 13-Anr-83 9.36E-05 3rd '83 0l-Jul-83 L12E-04 4th '83 30-Jan-84 1.09E-04 2nd '84 28-Jun-84 J.47E-04 4th '84 14-Nov-84 5.61E-04 2nd '85 27-Mar-85 l.0SE-03 3rd '85 15-Jul-85 8_20E-05 4th '85 09-Oct-85 1.1 SE-04 2nd '86 24-Mar-86 5.72E-04 3rd '86 J0-Jul-86 5.0lE-04 4th '86 18-Dec-86 8_70E-04 2nd '87 20-Anr-87 5.90E-04 3rd '87 05-Jun-87 l.60E-04 4th '87 22-Dec-87 2_10E-04 2nd '88 )9-Anr-88 4.S0E-04 3rd '8Jl 28-Jul-88 3.20E-05 2nd '89 07-Anr-89 5.60E-04 3rd '89 06-Jun-89 l.S0E-04 4th '89 07-Nov-89 6.00E-04 1st '90 17-Anr-90 2..60£-04 2nd '90 20-Jun-90 l.80E-04 3rd '90 17-Oct-90 l.60E-04 1st '91 I0-Anr-91 l .20E-04 2nd'9J 11-Jun-9] 9.l0E-05 3rd '91 20-Nov-91 4.S0E-04 1st '92 22-Anr-92 3.60E-05 2nd '92 10-Jun-92 1.00E-05 3rd '92 J0-Jun-92 7.90E-05 Jst '93 13-Anr-93 3.?0E-05 2nd '93 26-Jun-93 3.00E-05 3rd '93 12-Oct-93 6.60£-05 1st '94 l l-Mav-94 J.80E-04 2nd '94 l 9-Jul-94 l.?IE-05 3rd '94 28-Nov-94 2.40E-04 1st '95 l l-Aor-95 6.70E-05 2nd '95 06-Jul-95 1.S0E-05 3rd '95 15-Nov-95 5.S0E-05 1st '96 23-Aor-96 5.20E-05 2nd '96 * 3 l-Jul-96 3rd '96 14-Nov-96 3.00E-05 1st '97 21-Aor-97 1. IOE-05 3rd '97 05-Seo-97 l.l0E-05 4th '97 20-Nov-97 8.00E-06 1st '98 23-Mar-98 <9 JOE-05 2nd '98 16-Jun-98 J.80E-05 4th '98 05-Nov-98 5.?0E-05 2nd '99 15-Apr-99 2.00E-04 3rd '99 07-Jul-99 6.03E-05 4th '99 02-Dec-99 2.30E-05 2nd '00 21-Aor-00 l .S0E-04 2nd '00 22-Jun-00 l.20E-06 4th '00 21-Dec-00 J.60E-06 1st 'OJ 30-Aor-0J 1.00E-06 2nd 'OJ 14-Jun-01 2.30E-06 4th '01 17-Dec-0J 9.l0E-06 1st '02 07-Mav-02 3.30E-05 2nd '02 07-Jul-02 5.55E-05 4th '02 15-Dec-02 7.75E-05 Ra-226 MDC¥ Pb-210 ERROR LLDuCi/Kg VALUE (uCi/Kg) (5.0E-08) (uCi/Kg) 1.00E-05 5 00E-08 1 l0E-03 1.00E-05 5.00E-08 6.80E-04 U0E-05 1.00E-06 4.90E-04 1.00E-05 5.00E-08 8.00E-04 1.07E-06 1.00E-06 1,08E-04 6.20E-06 8.00E-09 4.97E-04 l.20E-05 6.00E-06 1.84E-04 8.00E-06 4.00E-06 7.80E-04 U0E-05 2.00E-09 3.75E-03 l.99E-04 2.00E-07 7.82E-03 3_00E-05 2_00E-06 3.22E-03 7.00E-06 3.00E-06 7.70E-04 l.00E-05 3.00E-06 5.lOE-04 2_J0E-05 4.00E-06 2.49E-03 U0E-05 3.00E-06 I .57E-03 5.00E-05 3.00E-06 6.S0E-04 ?_00E-05 5.00E-08 I ,50E-03 3_00E-05 5.00E-08 9.S0E-04 4.00E-05 5.00E-08 1.?0E-03 7.00E-05 5.00E-08 1.40E-03 220E-05 5.00E-08 1.50E-04 4.00E-05 ... l. l 0E-03 2.00E-05 ... 2J0E-04 5.00E-05 7.00E-06 2.04E-03 3.00E-05 4.00E-06 3.30E-04 2,00E-05 5.00E-08 3.20E-04 2.00E-05 5.00E-08 3.30E-04 2.00E-05 5.00E-06 3.00E-04 1.60E-05 2.00E-07 1.90E-04 4,00E-05 5.00E-08 l.09E-03 J.00E-05 2,00E-06 1,50E-04 7 00E-06 2.00E-07 7.50E-05 3.50E-05 3.00E-06 7,JOE-04 2.20E-05 3.00E-06 2.80E-04 1.S0E-05 3.00E-06 4.30E-05 2.70E-05 3.00E-06 5.30E-04 4 00E-05 3.00E-05 4.40E-04 l.20E-06 9.00E-08 3.00E-05 U0E-05 !.70E-07 1.70E-04 5.40E-06 l ,60E-07 l.40E-04 l,S0E-06 l.50E-07 5.I0E-05 5.00E-06 l.80E-07 6.70E-05 2,50£-06 l.S0E-07 3.20E-05 2,50E-06 J.S0E-07 l.40E-04 4.70E-07 1.21E-07 4.l0E-05 4.30E-07 l.33E-07 2.I0E-05 l ,20E-06 5.60E-07 J.4.0E-04 9.J0E-05 9.l0E-05 <4.SOE-04 1.20£-06 6.30£-08 4_Q0E-05 I.00E-06 8.20E-08 8.70E-05 3.00E-06 l.20E-07 J_00E-04 l .40E-06 8.30E-08 1.40E-04 l.00E-06 2.30E-07 2.l0E-05 3.00E-06 l.20E-07 l.60E-04 l.00E-07 2.80E-07 l.60E-04 l.l0E-06 3.70E-07 5.l0E-05 I .00E-07 2.40E-07 <1.2E-06 2.00E-07 9.90E-08 3.80E-06 2.40E-06 l.20E-07 3_57E-05 1.80E-06 7.60E-07 4.50E-05 2.81£-06 7-60E-07 531E-05 3.60E-06 7.60E-07 l.29E-04 Pb-2I0 MDC¥ U-NAT U-NAT MDC¥ Th-232 Th-232 MDC¥ ERROR LLDuCi/Kg VALUE ERROR LLD VALUE ERROR LLD (uCi/Kg) (I.0E-06) (uCi/Kg) (uCi/Kg) uCi/Kg (uCi/Kg) (uCi/Kg) uCi/Kg (2.0E-07) (2.0E-07)t I 00E-04 l .00E-06 NS NA NA NS NA NA 8.00E-05 1.00E-06 NS NA NA NS NA NA 7.00E-05 8.00E-05 NS NA NA NS NA NA 1.70E-04 1 00E-07 NS NA NA NS NA NA 9 00E-06 1 00E-05 NS NA NA NS NA NA 9.30E-05 l.O0E-04 NS NA NA NS NA NA U0E-05 1 OOE-06 NS NA NA NS NA NA 6.20E-05 6 00E-05 NS NA NA NS NA NA 1.60E-04 4.00E-08 NS NA NA NS NA NA 3.30E-04 7.00E-08 NS NA NA NS NA NA 1.40E-04 2 00E-05 NS NA NA NS NA NA U0E-04 2 00E-04 NS NA NA NS NA NA 3.00E-05 2.00E-05 NS NA NA NS NA NA l.00E-04 1 00E-05 NS NA NA NS NA NA 1,70E-03 2.00E-04 NS NA NA NS NA NA 3.00E-05 3 00E-06 NS NA NA NS NA NA l.00E-04 I 00E-06 NS NA NA NS NA NA 4 00E-05 I 00E-06 NS NA NA NS NA NA 1.00E-04 I 00E-06 NS NA NA NS NA NA 1.00E-04 I 00E-06 NS NA NA NS NA NA 4 40£-04 1 00E-06 NS NA NA NS NA NA 1 00E-01 ••• NS NA NA NS NA NA 2.00E-05 ••• NS NA NA NS NA NA 7.00E-05 1 40E-05 NS NA NA NS NA NA 2 00E-05 2.20E-05 NS NA NA NS NA NA 2.00E-05 l .00E-06 NS NA NA NS NA NA 2 00E-05 1.00E-06 NS NA NA NS NA NA 2.00E-05 l .00E-06 NS NA NA NS NA NA 2 00E-05 2,00E-07 NS NA NA NS NA NA 5.00E-05 l .00E-06 NS NA NA NS NA NA 2.00E-05 l.00E-05 NS NA NA NS NA NA 2.00E-05 l .00E-06 NS NA NA NS NA NA 7 00E-05 2.00E-05 NS NA NA NS NA NA 3.00E-05 2.00E-05 NS NA NA NS NA NA 3.SOE-05 2.00E-05 NS NA NA NS NA NA 6 00E-05 2.00E-05 NS NA NA NS NA NA 6.00E-05 2.00E-04 NS NA NA NS NA NA 6.J0E-06 4.45E-06 NS NA NA NS NA NA LJ0E-05 8.30£-07 NS NA NA NS NA NA l.30E-05 7.90E-07 NS NA NA NS NA NA 4.S0E-06 7.60E-07 NS NA NA NS NA NA J.00E-05 8.80E-07 NS NA NA NS NA NA 4.S0E-06 I .80E-07 NS NA NA NS NA NA NS NA NA NS NA NA 7_10E-06 9.30E-07 NS NA NA NS NA NA 3-60E-06 6.lOE-07 NS NA NA NS NA NA 7.30E-07 6.66E-07 NS NA NA NS NA NA 4.60E-06 l.l0E-07 NS NA NA NS NA NA 4.S0E-04 4.50E-04 NS NA NA NS NA NA LS0E-06 320E-01 NS NA NA NS NA NA 5.00E-06 4.I0E-07 NS NA NA NS NA NA l.00E-05 6.00E-05 NS NA NA NS NA NA 4 70E-06 420E-07 NS NA NA NS NA NA L0OE-06 l.l0E-06 NS NA NA NS NA NA 8.00E-06 5.90E-07 NS NA NA NS NA NA l.00E-05 1.40E-06 NS NA NA NS NA NA 5.00E-06 1.90E-06 NS NA NA NS NA NA 1.00E-07 2.40E-07 NS NA NA NS NA NA 2_00E-07 5.00E-07 NS NA NA NS NA NA 2-97E-06 6.00E-07 NS NA NA NS NA NA 2 61E-06 1.00E-05 NS NA NA NS NA NA 3 90E-06 1.00E-05 NS NA NA NS NA NA 6_!5E-06 J .00E-05 NS NA NA NS NA NA WHITE MESA MILL FORAGE RADIONUCLIDE DATA NORTHEAST OF MILL SAMPLED SAMPLED Ra-226 QTR. DATE VALUE (uCi/Kg) !st '03 21-Mar-03 9.I0E-06 2nd '03 10-Jun-03 2.50E-05 4th '03 20-Nov-03 5.70E-05 !st '04 08-Aor-04 9.38E-05 2nd '04 12-Jun-04 5.63E-05 4th '04 30-Nov-04 8.41E-05 1st '05 21-Aor-05 5.60E-05 2nd '05 13-Jun-05 9.I0E-06 4th '05 10-Nov-05 6.00E-05 1st '06 03-Aor-06 8,00E-05 2nd '06 16-Jun-06 4.I0E-05 4th '06 28-Nov-06 l.17E-04 1st '07 30-Mar-07 9.70E-05 2nd '07 1-Jun-07 U0E-05 4th '07 23-Nov-07 7.00E-05 1st '08 22-Aor-08 3.60E-06 2nd '08 l 8-Jun-08 3.20E-05 4th'08 12-Dec-08 1.S0E-04 1st '09 28-Anr-09 5.90E-04 2nd '09 l 7-Jun-09 1.90E-05 4th '09 18-Dec-09 l.70E-04 1st '10 13-Mav-l0 2,20E-04 2nd '10 18-Jun-10 6.50E-05 4th '10 20-Dec-10 2.30E-05 2nd '11 23-Jun-11 2.40E-07 3rd '11 27-Jul-11 4,90E-06 4th '11 23-Nov-11 7.20E-06 2nd '12 11-Aor-12 4.40E-05 3rd '12 11-Jun-12 2.20E-05 4th '12 06-Nov-12 3.IOE-05 2nd '1 3 30-Aor-13 1.14E-04 3rd '13 20-Jun-13 8.91E-05 4th '13 14-Nov-13 l.37E-04 2nd '14 16-Aor-14 9.90E-05 3rd '14 10-Jun-14 2.60E-05 4th '14 25-Nov-14 2.98E-05 !st 'I 5 21-Aor-15 7.15E-04 2nd '15 15-Jun-15 l.52E-04 4th '15 23-Nov-15 2.34E-04 2nd '16 14-Aor-16 4.08E-04 2nd '16 14-Jun-16 5.92E-05 4th '16 l l-Nov-16 4.56E-05 2nd '17 13-Apr-17 1.71E-04 2nd '17 l 9-Jun-17 2.40E-05 4th '17 02-Nov-17 8.03E-05 2nd '18 26-Apr-18 9.48E-05 2nd '18 20-Jun-18 I.92E-04 4th '18 02-Nov-18 9,76E-05 2nd '19 25-Apr-l 9 8,0IE-05 2nd '19 06-Jun-19 4.20E-05 Ra-226 MDC¥ Pb-210 Pb-210 ERROR LLD uCi/Kg VALUE ERROR (uCi/Kg) (5.0E-08) (uCi/Kg) (uCi/Kg) U0E-06 3.60E-07 1.13£-05 1.61£-06 U0E-06 3,60E-07 3.26E-06 2.00E-06 3.50E-06 1.50E-07 4.05E-05 5..82£-06 3 70E-06 l.l0E-07 5.88E-05 3.00E-06 3.40E-06 l.80E-07 6.42E-05 5.90E-06 5.50E-06 2.00E-08 2.48E-04 l.40E-05 3.00E-06 l.40E-07 5.80E-05 4.00E-06 I 50E-06 1 80E-07 1.I0E-05 l.20E-05 3.00E-06 I.JOE-JO 1.70E-06 6.40E-07 5 00E-06 5.00E-08 3.40E-04 l.20E-05 3.I0E-06 5.00E-08 1.16E-04 6 I0E-06 4.60E-06 I 90E-07 3.28E-04 9.S0E-06 4.40E-06 l.90E-07 3.40E-04 8.70E-06 I 60E-06 l.90E-07 !.20E-04 6.60E-06 8.20E-06 2.00E-07 5.00E-04 2 00E-05 3 00E-06 5 20E-07 2.30E-04 I 40E-05 3.20E-06 !.80E-06 6.90E-05 3.50E-05 5 20E-06 9 90E-07 3.60E-04 2.90E-05 l.35E-05 1.50E-06 3.40E-04 I 30E-05 1 45E-06 4 90E-07 3.60E-05 I I0E-05 5.90E-06 4.80E-04 l.20E-05 7 20E-06 l.l0E-06 1.90E-04 1.90E-05 3.40E-06 7.60E-07 1.40E-04 l.90E-05 I 70E-06 5.20E-07 l.00E-05 1.S0E-06 l.40E-07 1.B0E-07 <2.9E-06 l.70E-06 6 30E-07 3.20E-07 9,S0E-05 2.l0E-06 7,50E-07 2,90E-07 8.80E-08 430£-07 I 90E-06 3.60E-07 2.I0E-04 2.00E-06 8.40E-07 1.I0E-07 1.30E-04 7.60£-06 4.82E-07 4.63E-08 4.26E-04 3.72E-06 I 74E-06 5,34E-07 2.65E-04 4.41£-06 2 16E-06 1.42E-06 l.42£-04 3.68E-06 3.87E-06 4.7JE-06 5.33E-04 I 45E-05 1.0IE-06 3.91 E-07 1.99E-04 3.14E-06 8.46E-07 9.19E-07 5.60£-05 3.08E-06 1.23E-06 U0E-06 2A6E-04 5.3&E-06 8.0IE-06 3.S0E-06 5.85E-04 127E-05 3.48E-06 2.60E-06 4.49E-04 1.S0E-05 5.79E-06 3.89E-06 9.34£-04 L36E-05 7.26E-06 5 42£-06 l.34E-03 2.16E-05 2.70£-06 4.00E-06 2.61E-04 2.09E-05 2.I0E-06 3.47E-06 2.70E-04 I 43E-05 /5.00E-08) 4.59E-06 4 06E-06 6.l!E-04 1.34E-05 (5.00E-08) 9 69E-07 I 15E-06 7 52E-06 I 72E-06 /5.00E-08) 2.18E-06 2 31E-06 6 13E-04 I !0E-05 /5.00E-08) l.83E-06 I 16E-06 4 53E-04 9 39E-06 (5.00E-08) 4 37E-06 3.52E-06 4 65E-04 I 19E-05 (5 00E-08) 2.96E-06 3 23E-06 4.52E-04 I 04E-05 (5.00E-08) 5 67E-06 3.69E-06 I 07E-04 I 74E-05 (5.00E-08) 1.64E-06 l.36E-06 5.87E-04 3.12E-05 (5 00E-08) MDC¥ U-NAT U-NAT MDC¥ Th-232 Th-232 MDC¥ LLD uCi/Kg VALUE ERROR LLD VALUE ERROR LLD (J.OE-06) (uCi/Kg) (uCi/Kg) uCi/Kg (uCi/Kg) (uCi/Kg) uCi/Kg (2.0E-07) (2.0E-07)t 3.36E-06 NS NA NA NS NA NA 7.38E-08 NS NA NA NS NA NA 8.30£-07 NS NA NA NS NA NA 5.S0E-07 NS NA NA NS NA NA 9.00E-07 NS NA NA NS NA NA 3.00E-07 NS NA NA NS NA NA 6.90E-07 NS NA NA NS NA NA 9.00E-07 NS NA NA NS NA NA 5.50£-10 NS NA NA NS NA NA 1.00E-06 NS NA NA NS NA NA !.00E-06 NS NA NA NS NA NA 9.50E-07 NS NA NA NS NA NA 8.4-07 NS NA NA NS NA NA 9.70E-07 NS NA NA NS NA NA 1.20E-06 NS NA NA NS NA NA I 00E-06 NS NA NA NS NA NA 5.50E-05 NS NA NA NS NA NA 3.90E-05 NS NA NA NS NA NA 1..50E-06 NS NA NA NS NA NA 1.&0E-05 NS NA NA NS NA NA NS NA NA NS NA NA 2.90E-05 NS NA NA NS NA NA 2.90E-0~ NS NA NA NS NA NA 2.30E-06 NS NA NA NS NA NA 2.90E-06 NS NA NA NS NA NA 2.50E-06 NS NA NA NS NA NA 7 20E-07 NS NA NA NS NA NA I .00E-06 NS NA NA NS NA NA 5.90E-06 NS NA NA NS NA NA 6.52E-07 NS NA NA NS NA NA 5.37E-06 NS NA NA NS NA NA 6.17E-06 NS NA NA NS NA NA 2.27E-05 NS NA NA NS NA NA 3.38E-06 NS NA NA NS NA NA 7.l2E-06 NS NA NA NS NA NA 7.4\E-06 NS NA NA NS NA NA 2.51E-05 6.36E-04 2.70E-05 8.62E-06 1.0IE-04 3.06E-06 4.04E-07 3.33E-05 3.l lE-04 1.58E-05 6.45E-06 4.19E-05 2.67E-06 6.78E-07 L37E-05 2.73E-04 l.91E-05 6.3 IE-06 6.67E-06 7.98E-07 7.06E-07 2.93E-05 !.69E-04 l.29E-05 5,76E-06 1.66E-05 1.28E-06 7.67E-0J 4.92E-05 2.lOE-04 5.52E-06 1.70E-06 4.27E-06 8.I0E-07 9.3JE-07 3.81E-05 3.94E-05 5.94E-06 5.02E-06 2.I0E-06 5.45E-07 5,66E-07 O.00E-06) (2,00E-07\ (2.00E-07) 2,l 7E-05 2.38E-04 5.71E-06 2 3 IE-06 1.54E-05 I 59E-06 2.09E-06 (I 00E-06) (2,00E-07) (2.00E-07) 5 42E-06 J.3 IE-04 4.21E-06 1.15E-06 7,18E-06 1.09E-06 6.48E-07 (l.00E-06) (2.00E-07) !2.00E-07) I 58E-05 1.ISE-04 3.99E-06 1 74E-06 !.04E-05 I 02E-06 1.05E-06 (I.00E-06) (2.00E-07) (W0E-07) I 57E-05 3.15E-04 6.25E-06 I .87E-06 3.36E-06 1.4 IE-06 2.88E-06 (I.00E-06) (2.00E-07\ (2.00E-07) 2 37E-05 2,97E-04 6.57E-06 I ,85E-06 l ,92E-05 I 58E-06 1.22E-06 (1.00E-06) (2,00E-07) (2,00E-07) 1.78E-05 7.34E-04 1.64E-05 3.49E-06 6.44E-06 8 OJ E-07 1.90E-06 (1.00E-06) (2.00E-07) (2.00E-07) 4.S0E-05 1.79E-04 7,85E-06 5,53E-06 1.08E-05 I 28E-06 1.68E-06 (l.00E-06) (2.00E-07) (2,00E-07) 4.47E-05 2.29E-04 I 64E-05 2.48E-06 2.43E-05 l.89E-06 1.96E-06 (I.00E-06) (2.00E-07) (2,00E-07) WHITE MESA MILL FORAGE RADIONUCLIDE DATA NORTHEAST OF MILL SAMPLED SAMPLED Ra-226 QTR. DATE VALUE (uCi/Kg) 4th '19 13-Nov-19 4.9JE-04 2nd '20 22-Apr-20 2.30E-04 2nd '20 12-May-20 5 36E-05 4th '20 07-0ct-20 5 60E-05 2nd '21 06-Apr-21 !.06E-04 2nd '21 09-Jun-21 9 36E-05 4th '21 05-0ct-21 1.47E-04 2nd '22 19-Apr-22 8.08E-04 2nd '22 29-Jun-22 5.ISE-05 4th '22 06-0ct-22 9 21E-05 2nd '23 25-Apr-23 !.68E-03 2nd '23 07-Jun-23 6 l lE-05 Ra-226 ERROR (uCi/Kg) 4.77E-06 4.59E-06 l.74E-06 2 44E-06 6 19E-06 2 95E-06 3.40E-06 8.61E-06 2.17E-06 4 03E-06 I 44E-05 3.40E-06 MDC¥ Pb-210 Pb-210 MDC¥ U-NAT U-NAT LLD uCi/Kg VALUE ERROR LLD uCi/Kg VALUE ERROR (5.0E-08) (uCi/Kg) (uCi/Kg) (l.0E-06) (uCi/Kg) (uCi/Kg) 1.73E-06 8,60E-04 I SJE-05 2 41E-05 J.66E-04 4.IOE-06 (5.00E-08) (1.00E-06) l.96E-06 9.BOE-04 4.34E-05 4.48E-OS 2.IOE-04 5 I BE-06 (5.00E-08) (l.OOE-06) !.04E-06 1.70E-04 2.67E-05 7 08E-05 7.35E-05 5.0lE-06 (5.00E-08) (I OOE-06) 3.13E-06 5,90E-05 6.16E-06 I 07E-05 4,02E-05 4.41E-06 (5.00E-08) (1 OOE-06) 2,93E-06 3 73E-04 2.23E-05 2 75E-05 5,SSE-05 3.70E-06 (5.00E-08) (1 OOE-06) 3 82E-06 1 69E-04 1.19E-05 3.16E-05 4.05E-05 2.13E-06 (5.00E-08) (I OOE-06) 2.16E-06 8,42E-04 1.87E-05 3 52E-05 5 54E-05 4.67E-06 (5.00E-08) (1 .00E-06) 3.0lE-06 5.57E-04 1.19E-05 l.98E-05 2,93E-04 7.0IE-06 (5 OOE-08) (l.OOE-06) 3.33E-06 l .46E-04 !.04E-05 2 94E-05 I 73E-05 3.02E-06 (5 OOE-08) (1 OOE-06) 5.83E-06 7.20E-04 1.90E-05 3.60E-05 5,58E-05 3.70E-06 (5.00E-08) (I OOE-06) 3 23E-06 8,98E-04 1.67E-05 2 91E-05 2,BOE-04 6 !9E-06 (5 OOE-08) (l.OOE-06) 4 79E-06 2.72E-04 1.41E-05 3,70E-05 2.87E-05 2 41E-06 (S OOE-08) (1.00E-06) *2nd quarter of 1996 San Juan County, Utah, was declared a disaster area due to drought, no samples were collected during this period MDC¥ Th-232 LLD VALUE uCi/Kg (uCi/Kg) (2.0E-07) l,J 9E-06 I OIE-05 (2.00E-07) I 33E-06 3 07E-05 (2 OOE-07) 3.66E-06 7.54E-06 (2 OOE-07) 3.SIE-06 7.34E-06 (2.00E-07) 3.12E-06 5 81E-06 (2.00E-07) l .77E-06 1 37E-05 (2.00E-07) 4.60E-06 1.16E-OS (2.00E-07) 2.79E-06 5.74E-05 (2.00E-07) 6.95E-6 5.17E-06 (2,00E-07) 3,53E-06 2.70E-05 (2 OOE-7) 1.57E-06 5.25E-05 (2.00E-07 2,92E-06 I I IE-OS (2,00E-07) t NRC Regulatory Guide does not specify a Lower Limit of Detection (LLD) for Thorium 232 in vegetation (or any matrix). The LLD for Thorium 230 was used NS -Not Sampled NA -Not Applicable Th-232 MDC¥ ERROR LLD (uCi/Kg) uCi/Kg (2.0E-07)t !.24E-06 1.68E-06 (2.00E-07) l .78E-06 I OIE-06 (2.00E-07) 8.87E-07 8 15E-07 (2.00E-07) 2.lSE-06 2.69E-6 (2 OOE-07) 8 88E-07 1.19E-6 (2 OOE-07) 2 78E-06 5.32E-6 (2.00E-07) l .45E-06 1.37E-06 (2 OOE-07) 2 29E-06 7 61E-7 (2.00E-07) 2,03E-06 3 OIE-06 (2.00E-07) !.74E-06 l.09E-06 (2 OOE-07) 2.81E-06 I.83E-06 (2 OOE-07) 1 21E-06 1 02E-06 (2.00E-07) ¥ The value in the MDC colwnn is the sample-specific minimwn detectable concentration, The MDC is based on the sample moisture, composition and other sample-specific variables The value in parantheses is the method-specific lower limit of detection (LLD), which is a limit representing the detection capability of the measurement system The LLDs in the data package are referred to as the Reporting limit (RL). (log Scale) _.. _.. _.. _.. _.. _.. _.. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m m m m m m m I I I I I I I 0 0 0 0 0 0 0 CX> ---1 0) 01 ~ w I\.) 01-Aug-81 :e 01-Aug-82 :::c 01-Aug-83 · -t 01-Aug-84 · m 01-Aug-85 3: m 01-Aug-86 en )> 01-Aug-87 · 3: 01-Aug-88 -r 01-Aug-89 · r I 01-Aug-90 z 0 01-Aug-91 :;tJ 01-Aug-92 -t :::c 01-Aug-93 m )> 01-Aug-94 -en -t 01-Aug-95 · 0 01-Aug-96 .,, 01-Aug-97 · !: 01 -Aug-98 • r r 01-Aug-99 · :;tJ "' 01-Aug-00 -C. o· 01-Aug-01 = 01-Aug-02 -C (") 01-Aug-03 • C: 01-Aug-04 · (I) 0 01-Aug-05 0 = 01-Aug-06 (") (I) 01-Aug-07 = -01-Aug-08 ... "' -01-Aug-09 o· 01-Aug-10 = UI -· 01-Aug-11 = 01-Aug-12 < (I) 01-Aug-13 -CQ (I) 01-Aug-14 --"' -01-Aug-15 · o· = 01 -Aug-16 --C 01-Aug-17 -0 01-Aug-18 • ::::::: " 01-Aug-19 · CQ -01-Aug-20 01-Aug-21 ~ 01-Aug-22 It t t t -iC-U;o I I CT D> I Z I I ~ ::; ~ ~ N O O> WHITE MESA MILL FORAGE RADIONUCLIDE DATA NORTHWEST OF MILL SAMPLED SAMPLED Ra-226 QTR DATE VALUE (uCi/Kg) 3rd '81 27-Au~-81 2.73E-03 4th '81 20-Oct-81 2.00E-04 2nd '82 15-Aor-82 I.04E-04 3rd '82 0J-Jul-82 2.00E-05 4th '82 30-Nov-82 2.36E-06 2nd '83 13-Aor-83 8.58E-05 3rd '83 0J-Jul-83 l.l 9E-04 4th '83 30-Jan-84 9.78E-05 2nd '84 28-Jun-84 2.08E-04 4th '84 14-Nov-84 6.0SE-04 2nd '85 27-Mar-85 l.l0E-04 3rd '85 15-Jul-85 6.J0E-05 4th '85 09-Oct-85 l.07E-04 2nd '86 24-Mar-86 8.86E-04 3rd '86 !0-Jul-86 6.66E-04 4th '86 !8-Dec-86 5.20E-04 2nd '87 20-Aor-87 4.J0E-04 3rd '87 05-Jun-87 l.60E-04 4th '87 22-Dec-87 3.60E-04 2nd '88 19-Aor-88 2.60E-04 3rd '88 28-Jul-88 3.I0E-05 2nd '89 07-Aor-89 6.20E-04 3rd '89 06-Jun-89 3.40E-04 4th '89 07-Nov-89 5.I0E-04 !st '90 17-Aor-90 3.60E-04 2nd '90 20-Jun-90 1.70£-04 3rd '90 17-Oct-90 8 80E-05 1st '91 J0-Aor-91 3.00E-04 2nd '91 11-Jun-91 3.I0E-04 3rd '91 20-Nov-91 5.00E-04 1st '92 22-Anr-92 2...00E-05 2nd'92 I0-Jun,-92 6.S0E-06 3rd '92 I 0-Jun-92 l.20E-04 1st '93 13-Anr-93 l.80E-05 2nd '93 26-Jun-93 520£-05 3rd '93 12-Oct-93 5.JOE-05 !st '94 1 I-Mav-94 1.20£-04 2nd'94 !9-Jul-94 3.73£-05 3rd '94 28-Nov-94 2.40E-04 1st '95 11-Aor-95 8.40E-05 2nd '95 06-Jul-95 1.90E-05 3rd '95 15-Nov-95 J .20E-04 1st '96 23-Anr-96 8.30E-05 2nd '96 * 31-Jul-96 3rd '96 14-Nov-96 3.60E-05 1 SI '97 11-Anr-97 3.30E-05 3rd '97 05-Sen-97 5.40E-06 4th '97 20-Nov-97 8.90E-06 1st '98 23-Mar-98 <9.20E-05 2nd '98 I 6-Jun-98 < 6.S0E-08 4th '98 05-Nov-98 4.20E-05 2nd '99 15-Anr-99 6,20E-05 3rd '99 07-Jul-99 5.45E-05 4th '99 02-Dec-99 1.I0E-04 2nd '00 21-Anr-00 3.70E-05 2nd '00 22-Jun-00 2,90E-05 4th '00 21-Dec-00 2.30E-06 I SI '01 30-Aor-01 2,IOE-05 2nd '01 14-Jun-0I U0E-06 4th '01 J 7-Dec-01 3,70E-05 !st '02 07-Mav-02 4.90E-05 2nd '02 07-Jul-02 8.88E-05 Ra-226 MDC¥ Pb-210 ERROR LLD uCi/Kg VALUE (uCi/Kg) (5.0E-08) (uCi/Kg) 5.00E-05 5.00E-08 7.I0E-03 J.00E-05 5.00E-08 830E-04 9_Q0E-06 7.00E-06 6.40E-04 L00E-05 5.00E-08 2.20E-04 9.S0E-07 l.00E-06 8.00E-05 1.36E-05 2.00E-08 3..53E-04 l.l0E-05 5.00E-06 !.58E-04 7.00£-06 2.00E-06 2...16E-03 I.00E-05 3.00E-09 !.60E-03 l.64E-04 2.00E-07 2...58E-03 8.00E-06 3.00E-06 8.63E-04 6.00E-06 2.00E-06 5.40E-04 6,00E-06 2.00E-06 3.80E-04 l.80E-05 2.00E-06 4.40E-03 l.80E-05 3.00E-06 4.78E-03 I.00E-04 3.00E-06 U0E-03 1.00E-04 5.00E-08 1.60£-03 3.00E-05 5_00E-0.8 5..S0E-04 5.00E-05 5.00E-08 J_80E-03 5.00E-05 5_00£-08 1.90£.-03 1.90£-05 5.00E-08 l.60E-04 5.00E-05 ••• 1.70£-03 3.00E-05 ••• 7.40£-04 6.00E-05 7.00E-06 L00E-03 3.00E-05 4.00E-06 4.80E-04 2.00E-05 5.00E-08 320£-04 l.60E-05 5.00E-08 2.90E-04 3.00E-05 5.00E-06 4.J0E-04 3.00E-05 2.00E-07 4.70E-04 4.00E-05 S_00E-08 l .S0E-03 8.00E-06 2.00E-06 9.60E-05 6.00E-06 2....00E-06 120£-04 4.00E-05 3_00E-06 l21E-03 U0E-05 3.00E-06 2 I0E-04 1.90E-05 3.00E-06 1.70£-05 2.30E-05 3.00E-06 7 I0E-04 1.00E-05 3 00E-05 9.80E-04 1.60E-06 8.40E-08 7.80E-05 1.S0E-05 I 70E-07 2.60E-04 6.J0E-06 l.S0E-07 1.20E-04 I .S0E-06 I 40E-07 4.S0E-05 6.80E-06 I 40E-07 I 00E-05 3.30E-06 L90E-07 6.80E-05 2.S0E-06 l.60E-07 8.S0E-05 2,30E-06 I 70E-07 4.40E-05 3.50E-07 L56E-07 3.20E-05 7,20E-07 5 40E-07 3 40E-04 9.20£-05 9.20£-05 <4.60E-04 6,S0E-08 6.S0E-08 <3.20E-07 I.00E-06 1.I0E-07 I.70E-04 I.00E-06 1.00E-07 I 40£-04 l.40E-06 8.30E-08 9.20£-05 3.00E-06 2.20E-07 2.80E-05 I.00E-06 2.40E-07 2,70E-04 1.00E-06 3 30E-07 2 80E-04 J .40E-06 3.70E-07 3.30E-04 ! ,00E-06 I.S0E-07 <7.6E-07 4.00E-08 l 20E-07 1.80E-06 7,67E-07 8 30E-08 6.72E-05 2.40£-06 7.60E-07 1.28E-04 4.32£-06 7.60E-07 8.33E-05 Pb-210 MDC¥ U-NAT U-NAT MDC¥ Th-232 Th-232 MDC¥ ERROR LLD uCi/Kg VALUE ERROR LLD VALUE ERROR LLD (uCi/Kg) (I.0E-06) (uCi/Kg) (uCi/Kg) uCi/Kg (uCi/Kg) (uCi/Kg) uCi/Kg (2.0E-07) (2.0E-07)t 3.00E-04 1.00E-06 NS NA NA NS NA NA 5.00E-05 1.00E-06 NS NA NA NS NA NA 5.00E-05 4.00E-05 NS NA NA NS NA NA 9_00E-05 1.00E-07 NS NA NA NS NA NA J.00E-05 I.00E-05 NS NA NA NS NA NA l.90E-05 1.00E-05 NS NA NA NS NA NA UOE-05 J.00E-05 NS NA NA NS NA NA 3 40E-04 3.00E-04 NS NA NA NS NA NA 7.00E-05 3.00E-08 NS NA NA NS NA NA 1.lOE-04 3.00E-08 NS NA NA NS NA NA 4.20E-05 3.00E-05 NS NA NA NS NA NA S_00E-05 5.00E-05 NS NA NA NS NA NA 3.00E-05 2.00E-05 NS NA NA NS NA NA l.90E-04 3.00E-05 NS NA NA NS NA NA 2.IOE-04 6.00E-05 NS NA NA NS NA NA J.0OE-04 6.00E-05 NS NA NA NS NA NA I.00E-04 I.00E-06 NS NA NA NS NA NA 4.00E-05 l.00E-06 NS NA NA NS NA NA I.0OE-04 I.00E-06 NS NA NA NS NA NA LOOE-04 l.0OE-06 NS NA NA NS NA NA 4.00E-05 l.00E-06 NS NA NA NS NA NA I.0OE-04 ••• NS NA NA NS NA NA 3.00E-05 ••• NS NA NA NS NA NA 7.00E-05 L40E-05 NS NA NA NS NA NA 2.00E-05 2.20E-05 NS NA NA NS NA NA 2.00E-05 l.00E-06 NS NA NA NS NA NA 1.00E-05 l .00E-06 NS NA NA NS NA NA 1.00E-05 l .00E-06 NS NA NA NS NA NA 2.00E-05 2.00E-07 NS NA NA NS NA NA L00E-04 J .00E-06 NS NA NA NS NA NA L40E-05 1.00E-05 NS NA NA NS NA NA 1.00E-05 1.00E-06 NS NA NA NS NA NA 8 00E-05 2.00E-05 NS NA NA NS NA NA 3.00E-05 2.00E-05 NS NA NA NS NA NA 3.60E-05 2.00E-05 NS NA NA NS NA NA 6 00E-05 2.00E-05 NS NA NA NS NA NA I 60E-04 2.00E-04 NS NA NA NS NA NA 7 I0E-06 4,20E-07 NS NA NA NS NA NA U0E-05 8.30E-07 NS NA NA NS NA NA I I0E-05 7.S0E-05 NS NA NA NS NA NA 4.30£-06 7.20E-07 NS NA NA NS NA NA 5.80E-06 7.!0E-07 NS NA NA NS NA NA 6.30E-06 I.80E-07 NS NA NA NS NA NA NS NA NA NS NA NA 5.60E-06 8.40E-07 NS NA NA NS NA NA 4.80E-06 8.40E-07 NS NA NA NS NA NA 9 00E-07 7.83£-07 NS NA NA NS NA NA 6 70E-06 l. l0E-07 NS NA NA NS NA NA 4.60E-04 4.60E-04 NS NA NA NS NA NA 3.20£-07 3.20£-07 NS NA NA NS NA NA 1.00E-05 5.S0E-07 NS NA NA NS NA NA 7.00E-06 l.00E-07 NS NA NA NS NA NA 4.00E-06 4.20E-07 NS NA NA NS NA NA l.00E-06 l.l0E-06 NS NA NA NS NA NA I 00E-05 1.20E-06 NS NA NA NS NA NA 2.00E-05 l.70E-06 NS NA NA NS NA NA 5.00E-05 !.90E-06 NS NA NA NS NA NA NIA 7.60E-07 NS NA NA NS NA NA 3 00E-08 5.90E-07 NS NA NA NS NA NA 2.62E-06 6.00E-07 NS NA NA NS NA NA 5.61E-06 L00E-05 NS NA NA NS NA NA 4.32E-06 1.00E-05 NS NA NA NS NA NA WHITE MESA MILL FORAGE RADIONUCLIDE DATA NORTHWEST OF MILL SAMPLED SAMPLED Ra-226 QTR. DATE VALUE (uCi/Kg) 4th '02 15-Dec-02 I.SOE-04 I st '03 21-Mar-03 5.00E-05 2nd '03 10-Jun-03 5.60E-05 4th '03 20-Nov-03 3.20E-04 1st '04 08-Aor-04 6.29E-05 2nd '04 12-Jun-04 6,51E-05 4th '04 30-Nov-04 7 50E-05 1st '05 21-Aor-05 4 90E-05 2nd '05 13-Jun-05 2.30E-05 4th '05 10-Nov-05 7.40E-05 1st '06 03-Aor-06 1.00E-04 2nd '06 I 6-Jun-06 9.50£-05 4th '06 28-Nov-06 8.13£-05 !st '07 30-Mar-07 4.30£-05 2nd '07 l-Jun-07 5 lOE-05 4th '07 23-Nov-07 7.30E-05 1st '08 22-Aor-08 2.80E-06 2nd '08 18-Jun-08 3.20E-06 4th '08 12-Dec-08 7 30E-05 1st '09 28-Aor-09 5.25E-05 2nd '09 I 7-Jun-09 2.30E-05 4th '09 18-Dec-09 5.50£-05 1st '10 13-Mav-10 1.90E-04 2nd '10 18-Jun-10 2.30E-05 4th '10 20-Dec-10 8.60£-06 2nd 'II 23-Jun-J I 2,JOE-07 3rd '11 28-Jul-l l 4.20£-06 4th 'I I 23-Nov-l l 7.70£-06 2nd '12 11-Aor-12 J.50E-05 3rd '12 l 1-Jµn-12 830E-06 4th'12 06-Nov-12 2.34E-05 2nd'l3 30-Aor-13 9.04£-05 3rd '13 20-Jun-13 2.58E-06 4th '1 3 14-Nov-13 1.43£-04 2nd '14 16-Anr-14 2.53E-05 3rd '14 10-Jun-14 2.53£-05 4th'l4 25-Nov-14 7.4 lE-05 1st '15 21-Aor-15 1.3JE-04 2nd '15 15-Jun-15 2.39£-04 4tb.'l5 23-Nov-15 J.03E-04 2nd '16 14-Aor-16 I .28E-04 2nd '16 ]4-Jun-16 5.9\E-05 4th'16 11-Nov-16 2.66E-04 2nd '17 13-Apr-l 7 3.84£-05 2nd '17 19-Jun-l 7 1.56£-04 4th '17 02-Nov-17 2.24£-04 2nd '18 26-Apr-18 2.63E-04 2nd '18 20-Jun-18 2.13E-04 4th '18 02-Nov-18 1.71£-04 2nd '19 25-Apr-19 4.15E-05 2nd '19 06-Jun-19 1.12£-05 Ra-226 MDC¥ Pb-210 Pb-210 ERROR LLD uCi/Kg VALUE ERROR (uCi/Kg) (5.0E-08) (uCi/Kg) (uCi/Kg) 6.20E-06 7 60E-07 3.16E-04 1.07£-05 3.40E-06 2.71E-06 <4.2e-6 2.00E-06 4.lOE-07 l.88E-04 5.14£-06 8.20E-06 l.70E-07 4-89E-04 l.25E-05 4.lOE-06 2.00E-07 1.94£-05 4.00E-06 3.40£-06 1.30E-07 l.87E-05 3.90E-06 4,60E-06 2.00E-08 4.45E-04 1.40E-05 2,70E-06 UOE-07 1.27E-04 4.80E-06 2.lOE-06 l.SOE-07 4.70E-05 5.lOE-06 3,50E-06 l.20E-10 2.40E-06 8.lOE-08 6.00E-06 .5.00E-08 6..54E-04 ) .50E-05 5.90E-06 5.00E-08 4.48E-04 1.40E-05 4.IOE-06 2.20E-07 3.25E-04 1.12£-06 2.60E-06 !.70E-07 2.64E-04 7,20E-06 3.20E-06 2.30E-07 530E-04 1.40E-06 6.60E-06 5.00E-08 7.00E-04 2.20E-05 2.80E-06 7.20E-07 4.40£-04 2.00E-05 3.30E-06 1.SOE-06 l.40E-04 3,30E-05 3.20E-06 7.40E-07 4.40E-04 2.50E-05 3.60E-06 1.lOE-06 1.90E-04 l.50E-05 J.60E-05 5.20£-07 4.30£-05 l.OOE-05 3.50E-06 3.00E-04 l.lOE-05 6,IOE-06 9 40E-07 5JOE-04 2.40£-05 2.00E-06 7,70£-07 8.30E-05 L80E-05 9.JOE-07 3.90E-07 LIOE-07 6.80£-07 J.20E-07 1.40£-07 <2.2E-06 l.30E-06 5.40E-07 2.70£-07 230£-04 2.50E-06 6,SOE-07 2.JOE-07 <5.8E-08 3.40E-07 9.50£-07 260E-07 <7.0E-07 6.00E-07 5.40£-07 UOE-07 l.40E-04 830£-06 4. lOE-07 7.71£-08 4.59£-04 3 83£-06 1.68£-06 8.58E-07 2.24£-04 4.46£-06 9.59E-07 8.06£-07 l.06E-04 2.30E-06 3.70E-06 2.17E-06 4.65E-04 1 17E-05 6.29£-07 551E-07 5.70£-05 2.21£-06 5.55£-07 5.77E-07 7.68E-05 2.08E-06 1.90£-06 1.53E-06 2.98£-04 6 48E-06 4,21E-06 5 92£-06 6.33E-04 1.17E-05 4.43£-06 3.45£-06 L08E-03 2.02E-05 3.95£-06 4.25£-06 4,78£-04 1.06E-05 4.20E-06 5.79£-06 3,56£-04 I 14E-05 3.97E-06 6.94E-06 1.73£-04 2.02E-05 4.22E-06 2 03E-06 1,28E-03 2 57£-05 (5.00E-08) 2,55E-06 4 35£-06 8,85E-04 1 51E-05 r5.00E-08) L77E-06 8.68E-07 1.15E-04 3. I 8E-06 (5.00E-08) 4, 17E-06 2 OlE-06 9,23E-04 1 34£-05 (5.00E-08) 2 93£-06 7,38E-7 5,85E-04 9.12E-06 (5.00E-08\ 4,85E-06 3.93£-06 6,02E-04 I 28E-05 (5.00E-08) 3 84E-06 3.48£-06 5,54£-04 1.06E-05 (5,00E-08) 4.50E-06 6.02£-06 3,]8£-04 2.29E-05 (5.00E-08) 1 08E-06 1.79£-06 l .4 lE-04 I 72£-05 (5.00E-08) MDC¥ U-NAT U-NAT MDC¥ Th-232 Th-232 MDC¥ LLDuCi/Kg VALUE ERROR LLD VALUE ERROR LLD (l.0E-06) (uCi/Kg) (uCi/Kg) uCi/Kg (uCi/Kg) (uCi/Kg) uCi/Kg (2.0E-07) (2.0E-07)t J.OOE-05 NS NA NA NS NA NA 4.20E-06 NS NA NA NS NA NA 8.20E-08 NS NA NA NS NA NA 8.30E-07 NS NA NA NS NA NA l.OOE-06 NS NA NA NS NA NA 6.SOE-07 NS NA NA NS NA NA 3.00E-07 NS NA NA NS NA NA 6.SOE-07 NS NA NA NS NA NA 7.60E-07 NS NA NA NS NA NA 5.80E-10 NS NA NA NS NA NA l.OOE-06 NS NA NA NS NA NA l.OOE-06 NS NA NA NS NA NA LOOE-05 NS NA NA NS NA NA 8.60E-07 NS NA NA NS NA NA 1.20E-06 NS NA NA NS NA NA 1. lOE-06 NS NA NA NS NA NA 1.00E-06 NS NA NA NS NA NA 5.50E-05 NS NA NA NS NA NA 3.20E-05 NS NA NA NS NA NA UOE-05 NS NA NA NS NA NA l.70E-05 NS NA NA NS NA NA NS NA NA NS NA NA 3.JOE-05 NS NA NA NS NA NA 2.90E-05 NS NA NA NS NA NA LJOE-06 NS NA NA NS NA NA 2.20E-06 NS NA NA NS NA NA 230E-06 NS NA NA NS NA NA 5.80£-07 NS NA NA NS NA NA 1.00E-06 NS NA NA NS NA NA 6 50£-06 NS NA NA NS NA NA 6.18£-07 NS NA NA NS NA NA 4.68£-06 NS NA NA NS NA NA 3.28£-06 NS NA NA NS NA NA 1 80£-05 NS NA NA NS NA NA 4 52E-06 NS NA NA NS NA NA 3 66£-06 NS NA NA NS NA NA 1 06£-05 NS NA NA NS NA NA 1.45E-05 3.35£-04 2.41E-05 1.17E-05 7.35£-06 8.57£-07 7.82E-07 3 25E-05 5,24£-04 2.41£-05 9.70£-06 2.38£-05 2.12E-06 736£-07 I 75E-05 1.51£-04 1.53£-05 7.71£-06 2.30£-05 1.53£-06 4.23E-07 1 86E-05 6.33£-05 8,20£-06 5.95£-06 1.66£-06 4.81E-07 5.40E-07 5.42£-05 3.15£-05 l .90E-06 1.54£-06 2.95£-06 8.26E-07 1.47E-06 4.95£-05 4.33E-04 2.58E-05 8.24E-06 3.87£-06 7.58E-07 J.03E-06 (1.00E-06) (2,00E-07) (2.00E-07) 2.23£-05 6,97£-04 l .21E-05 3,52£-06 6.1 IE-06 9,91E-07 J !5E-06 (1.00E-06) (2.00E-07) (2.00E-07) 6,07£-06 3,29£-04 6.61E-06 1.44£-06 1.58E-05 1.37£-06 5 35£-07 (l.OOE-06) (2.00E-07) (2.00E-07) l.94E-05 3.34£-04 9,09E-06 3.50E-06 l.52E-05 I 35£-06 1.80£-07 (l.OOE-06) (2.00E-07) (2.00E-07) 8.17E-6 4.60E-04 7.74E-06 1.56£-06 5.49E-06 2 l 5E-06 3 47E-6 (l.OOE-06) (2.00E-07) (2.00E-07) 2.33E-05 4,98£-04 9.07£-06 2.43£-06 9.46£-06 l .05E-06 1.07E-6 (l.OOE-06) (2.00E-07) (2.00E-07) 1.55£-05 5.25E-04 1.63£-05 4.23£-06 4.17£-07 7.48E-07 I 45E-6 (1,00E-06) (2,00E-07) (2.00E-07) 3,18£-05 1.55£-04 5.17E-06 2.42E-06 3.05£-05 2 51 E-06 3 89E-06 (I.OOE-06) (2.00E-07) (2 OOE-07) 3.49£-05 4.41£-05 3.41E-06 2.39£-06 1.65£-05 6,68£-06 I 24E-06 (1,00E-06) (2,00E-07) (2 OOE-07) WHITE MESA MILL FORAGE RADIONUCLIDE DATA NORTHWEST OF MILL SAMPLED SAMPLED Ra-226 QTR. DATE VALUE (uCi/Kg) 4th '19 13-Nov-19 6,09E-04 2nd '20 22-Apr-20 3,24E-04 2nd '20 12-May-20 1.23E-04 4th '20 07-Oct-20 2.49E-05 2nd '21 06-Apr-2I 2.06E-04 2nd '21 09-Jun-21 4.82E-05 4th '21 05-Oct-21 1.75E-04 2nd '22 19-Apr-22 2.S0E-04 2nd '22 29-Jun-22 3.87E-05 4th '22 06-Oct-22 5.99E-04 2nd '23 25-Apr-23 9.77E-04 2nd '23 07-Jun-23 2.50E-04 Ra-226 ERROR (uCi/Kg) 6,!6E-06 6 27E-06 2 49E-06 1.65E-06 7,90E-06 2,04E-06 4.30E-06 5. I 7E-06 USE-06 8 45E-06 I 26E-05 5.86E-06 MDC¥ Pb-210 Pb-210 MDC¥ U-NAT U-NAT LLDuCi/Kg VALUE ERROR LLDuCi/Kg VALUE ERROR (5.0E-08) (uCi/Kg) (uCi/Kg) (l.0E-06) (uCi/Kg) (uCi/Kg) 2 42E-06 1 31E-03 I 82E-05 2.46E-05 3 63E-04 629E-06 (5.00E-08) (J.00E-06) 4 65E-06 1 29E-03 4.82E-05 3.SlE-05 2.54E-04 4 97E-06 (5 00E-08) (l.00E-06) 1 14E-06 3 17E-04 2 74E-05 5.38E-05 I 02E-04 7 37E-06 (5.00E-08) (1.00E-06) 2.69E-06 4.54E-05 5.53E-06 J.20E-05 I 9JE-05 3.93E-06 (5.00E-08) (1.00E-06) 3.0IE-06 5 56E-04 2 64E-05 2.98E-05 7 0SE-05 3 44E-06 (5.00E-08) (l.00E-06) 2.17E-06 J.49E-04 I 42E-05 3.90E-05 2.79E-05 3.07E-06 (5,00E-08) (l,00E-06) l.99E-06 5 65E-04 I 39E-05 2.79E-05 7 27E-05 4 40E-06 (5,00E.08) (J.00E-06) 2.52E-06 4.74E-04 1.26E-05 2.26E-05 J.06E-04 3 72E-06 (5.00E-08) (L00E-06) l.37E-06 1 25E-04 8 82E-06 2.40E-05 1 S0E-05 I 56E-06 (5.00E-08) (I.00E-06) 2.74E-06 8.76E-04 1.60E-05 2 62E-05 4.60E-04 I 23E-05 (5,00E-08) (J ,00E-06) 4.53E-06 I 06E-03 I 73£-05 2.37E-05 2 44E-04 6 20E-06 (5.00E-08) (J.00E-06) 5.73E-06 5 13E-04 1 59E-05 3 0!E-06 6 78E-05 4.02E-06 (5.00E-08) (1.00E-06) *2nd quarter of 1996 San Juan County, Utah, was declared a disaster area due to drought, no samples were collected dunng tlus penod MDC¥ Th-232 LLD VALUE uCi/Kg (uCi/Kg) (2.0E-07) 1.43E-06 7,34E-06 (2.00E-07) I.46E-06 4,54E-06 (2.00E-07) 5,58E-06 6,09E-06 (2.00E-07) 7.48E-06 6.28E-06 (2.00E-07) 2.00E-06 4.35E-06 (2.00E-07) 4.13E-06 1.0IE-05 (2.00E-07) 3,68E-06 2,97E-05 (2.00E-07) l.82E-06 2.62E-05 (2.00E-07) 2.19E-06 2.93E-05 (2.00E-07) 6.42E-06 I 76E-04 (2.00E-07) 2,!6E-06 1.03E-04 (2.00E-07) 2-!5E-06 1.0SE-05 (2 00E-07) t NRC Regulatory Guide does not specify a Lower Limit of Detection (LLD) for Thorium 232 in vegetation (or any matrix). The LLD for Thorium 230 was used_ NS = Not Sampled NA= Not Applicable Th-232 MDC¥ ERROR LLD (uCi/Kg) uCi/Kg (2.0E-07)t 1 18E-06 2.0SE-06 (2.00E-07) 7 24E-07 1.26E-06 (2.00E-07) 9,0SE-07 6.61E-07 (2.00E-07) 2.44E-06 5.87E-06 (2.00E-07) 8 63E-07 I 72E-06 (2.00E-07) 1.3JE-06 2 06E-06 (2 00E-07) 2 00E-06 1.74E-06 (2 00E-07) 1.54E-06 8.95E-07 (2,00E-07) 7 24E-06 1 37E-05 (2.00E-07) 4 93E-06 1 72E-06 (2 00E-07) 3.75E-06 1.I0E-06 (2 00E-07) 1.57£-06 2.44E-06 (2.00E-07) ¥ The value in the MDC column is the sample-specific minimum detectable concentration. The MDC is based on the sample moisture, composition and other sample-specific variables The value in parantheses is the method-specific lower limit of detection (LLD), which is a limit representing the detection capability of the measurement system. The LLDs in the data package are referred to as the Reporting limit (RL) (Log Scale) ...... ...... ...... ...... ...... ...... ...... 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m m m m m m m I I I I I I I 0 0 0 0 0 0 0 00 -.J 0) 01 ~ w I\J 01-Aug-81 :e :::c 01-Aug-82 I =i 01-Aug-83 -m 01-Aug-84 s: m 01-Aug-85 en 01-Aug-86 ► s: 01-Aug-87 -r 01-Aug-88 r 01-Aug-89 z 01-Aug-90 0 ;;ti 01-Aug-91 -i :::c 01-Aug-92 :e 01-Aug-93 -m en 01-Aug-94 -i 01-Aug-95 0 .,, 01-Aug-96 s: 01-Aug-97 r 01-Aug-98 r ;;ti 01-Aug-99 D) 01-Aug-00 C. o· 01-Aug-01 :::, C 01-Aug-02 (") 01-Aug-03 a: (D 01-Aug-04 0 01-Aug-05 0 :::, 01-Aug-06 (") (D 01-Aug-07 :::, --, 01-Aug-08 D) -01-Aug-09 5· :::, 01-Aug-10 r.n 01-Aug-11 :::, < 01-Aug-12 (D 01-Aug-13 cc (D -01-Aug-14 D) !:!: 01-Aug-15 0 :::, 01-Aug-16 -01-Aug-17 C 0 01-Aug-18 ::::: ;:,.; 01-Aug-19 cc -01-Aug-20 01-Aug-21 ~ 1 f 01-Aug-22 f T t -tc-u;:o I I CT DJ I Z I I ~ ::; ~ ~ I\J O a, WHITE MESA MILL FORAGE RADIONUCLIDE DATA SOUTHWEST OF MILL SAMPLED SAMPLED Ra-226 OTR. DATE VALUE (uCi/Kg) 3rd '81 27-Aue:-81 9 50E-04 4th '81 20-Oct-81 3.00E-05 2nd '82 15-Anr-82 1.37E-05 3rd '82 0J-Jul-82 3 40E-04 4th '82 30-Nov-82 1.75E-05 2nd'83 ] 3-Anr-83 7 13E-04 3rd '83 OJ-Jul-83 5.39E-05 4th '83 30-Jan-84 6.40E-05 2nd '84 28-Jun-84 8.27£-05 4th '84 14-Nov-84 2.72£-04 2nd '85 27-Mar-85 4_73Ec04 3rd '85 15-Jul-85 6.60E-05 4th '85 09-Oct-85 2.83£-04 2nd '86 24-Mar-86 L57E-04 3rd '86 10-Jul-86 3,78£-04 4th '86 18-Dec-86 2.60£-04 2nd '87 20-Anr-87 4.I0E-04 3rd '87 05-Juo-87 2.90E-04 4.tb '87 22-Dec-87 1.80£-04 2nd '88 19-Anr-88 2.30E-04 3rd 088 28-Jul-88 1.S0E-04 2nd "89 07-Anr-89 3.l0E-04 3rd '89 06-Jun-89 1.30E-04 4th '89 07-Nov-89 4.30E-04 1st '90 17-Anr-90 2.50£-04 2nd '90 20-Juo-90 1.1 0E-04 3rd '90 l 7-Oct-90 6.l0E-05 1st '91 10-Anr-91 3 40E-05 2nd '91 ll-Juo-91 8 00E-05 3rd '91 20-Nov-91 6.50E-05 lst '92 22-Apr-92 1.60E-05 2nd '92 10-Juo-92 J.90E-05 3rd '92 10-Juo-92 l.60E-05 lst '93 l 3-Aor-93 2.60E-05 2nd '93 26-Jun-93 3 00E-05 3rd '93 12-Oct-93 3.lOE-05 1st '94 l l-Mav-94 2.00E-05 2nd '94 19-Jul-94 1.75£-05 3rd '94 28-Nov-94 I 00E-04 1st '95 11-Anr-95 1.70£-05 2nd '95 06-Jul-95 6.40£-06 3rd '95 15-Nov-95 2.30E-05 1st '96 23-Aor-96 4 20£-05 2nd '96 * 31-Jul-96 3rd '96 14-Nov-96 2.JOE-05 I st '97 21-Aor-97 5.50E-06 3rd '97 05-Seo-97 5.30E-06 4th '97 20-Nov-97 2.50E-05 Isl '98 23-Mar-98 <7.90E-05 2nd '98 16-Jun-98 3 60E-07 4th '98 05-Nov-98 4 30£-05 2nd '99 15-Aor-99 2.40E-05 3rd '99 07-Jul-99 2.23E-05 4th '99 02-Dec-99 l.50E-04 2nd '00 21-Aor-00 J.00E-04 2nd '00 22-Jun-00 l.30E-06 4th '00 21-Dec-00 J.20E-06 1st '01 30-Aor-0I L80E-06 2nd 'OJ 14-Jun-0J 2.60E-06 4th 'OJ 17-Dec-0J 2.63E-06 1st '02 07-Mav-02 3.S0E-05 2nd '02 07-Jul-02 4.02E-05 4th '02 15-Dec-02 8.l0E-05 Ra-226 MDC¥ Pb-210 ERROR LLDuCi/Kg VALUE (uCi/Kg) (5.0E-08) (uCi/Kg) 2 00E-05 5,00E-08 LS0E-04 3.00E-06 5.00E-08 J 50E-04 3.00E-06 3.00E-06 3,80E-04 2 00E-05 5.00E-08 3.68E-03 3 00E-06 2.00E-06 7 92E-04 7.30E-05 9.00E-08 2 5JE-03 4 SOE-06 2.00E-06 6 88E-04 7.00E-06 4 00E-06 1,20E-03 6 30E-06 3.00E-09 1.&0E-03 1.48£-04 2.00.E-07 4.70E-03 l.60E-07 3.00E-06 7 07E-04 7.00E-06 4.00E-06 4 90E-04 2.00E-05 7.00E-06 l.S0E-03 1.00E-05 4.00E-06 4.14E-03 J .00E-05 2 00E-06 1.65E-02 2.00E-05 2 00E-06 I 70E-03 7.00E-05 5.00E-08 2.20£-03 4.00E-05 5.00E-08 7.50£-04 3.00E-05 5.00E-08 2.40E-03 5.00E-05 5 00E-08 2.90E-03 3.00E-05 5.00E-08 4.30E-03 4.00E-05 ... 4,20E-03 2.00E-05 ... l .S0E-03 5 00E-05 I 40£-05 3.50E-03 J 00E-05 5 00E-06 2.39E-03 2.00E-05 5.00E-08 6.60E-04 1.40E-05 5.00E-08 6 I0E-04 1.1 0E-05 5.00E-06 2.20E-04 6.00E-06 2,00E-07 l ,20E-04 1.40E-05 5 00E-08 9.I0E-04 7 00E-06 2 00E-06 3,20E-04 l.00E-05 2.00E-07 2.20E-04 1 80E-05 3.00E-06 7,60E-04 2 00E-05 3.00E-06 3,40E-04 1 40E-05 3 00E-06 0.O0E+00 l.60E-05 3.00E-06 4.20E-04 5.00E-06 3.00E-05 3,90E-04 I 70£-06 7.60E-08 l .30E-04 9 00E-06 1.S0E-07 2.60E-04 U0E-06 1.60E-07 1.60E-04 6.00E-07 1.40£-07 4.40E-05 2.20E-06 1.70£-07 6.60E-05 2.20E-06 J.70E-07 !.00E-04 2.00E-06 1.60E-07 1.90E-04 4 20E-07 J.40E-07 33DE-05 3.20£-07 l.26E-07 l.90E-05 9.50E-07 5.90E-0] UOE-04 7.90£-05 7.90E-05 <3.90E-04 1.40£-07 3 30E-08 <1.7E-07 1.00£-06 7.60E-08 2.S0E-04 J.00E-06 L20E-07 l.70E-04 8.60E-07 l.20E-07 230E-04 3.00E-06 2.00E-07 1.70£-05 2.00E-06 1.20E-07 I.IOE-04 1.00E-07 2.40E-07 2.00E-04 9.00E-07 2.40E-07 l.20E-04 1.00E-07 l.70E-07 <8.3.E-07 2.00E-07 9 90E-08 1.10.E-06 4.60E-05 1.20E-07 9.40£-05 2.20E-06 7.60E-07 1.36£-04 234E-06 7 60E-07 7.04£-05 3.90E-06 7.60E-07 2.87.E-04 Pb-210 MDC¥ U-NAT U-NAT MDC¥ Th-232 Th-232 MDC¥ ERROR LLDuCi/Kg VALUE ERROR LLD VALUE ERROR LLD (uCi/Kg) (I.0E-06) (uCi/Kg) (uCi/Kg) uCi/Kg (uCi/Kg) (uCi/Kg) uCi/Kg (2.0E-07) (2.0E-07)t l ,00E-05 L00E-06 NS NA NA NS NA NA 2.00E-05 J.00E-06 NS NA NA NS NA NA 4 00E-05 4 00E-05 NS NA NA NS NA NA 2.70E-04 l.00E-07 NS NA NA NS NA NA 4,00E-06 2.00E-05 NS NA NA NS NA NA 3 00E-04 3.00E-04 NS NA NA NS NA NA 4.30E-05 4 00E-05 NS NA NA NS NA NA 1.00E-04 4.00E-05 NS NA NA NS NA NA 1.00E-04 9 00E-08 NS NA NA NS NA NA 7.20E-04 3.00E-07 NS NA NA NS NA NA 3.60E-05 3 00E-05 NS NA NA NS NA NA 3.00E-05 3-00E-05 NS NA NA NS NA NA 1.00E-04 7 00E-05 NS NA NA NS NA NA 1.80E-04 3 00E-05 NS NA NA NS NA NA 7.00E-04 I 00E-04 NS NA NA NS NA NA 1,00E-04 l.00E-04 NS NA NA NS NA NA I .00E-04 1.00E-06 NS NA NA NS NA NA 5.00E-05 l.00E-06 NS NA NA NS NA NA 1.00E-04 1 00E-06 NS NA NA NS NA NA 1,00E-04 l.00E-06 NS NA NA NS NA NA 2.00E-04 I.O0E-06 NS NA NA NS NA NA l.00E-04 • •• NS NA NA NS NA NA 1.00E-04 • •• NS NA NA NS NA NA 1.40£-04 2.70E-05 NS NA NA NS NA NA 5,00E-05 2.S0E-05 NS NA NA NS NA NA 3.00E-05 I.00E-06 NS NA NA NS NA NA 3.00E-05 I 00E-06 NS NA NA NS NA NA 1.00E-05 I.00E-06 NS NA NA NS NA NA I.00E-05 2.00E-07 NS NA NA NS NA NA 5.00E-05 l.00E-06 NS NA NA NS NA NA 2,00E-05 l.00E-05 NS NA NA NS NA NA 2.00E-05 l.00E-06 NS NA NA NS NA NA 6.00E-05 2.00E-05 NS NA NA NS NA NA 3.00E-05 2.00E-05 NS NA NA NS NA NA 3.00E-05 2.00E-05 NS NA NA NS NA NA 6.00E-05 2.00E-05 NS NA NA NS NA NA 8.00E-05 2,00E-04 NS NA NA NS NA NA 7.80£-06 3.80£-07 NS NA NA NS NA NA l.20E-05 7.40E-07 NS NA NA NS NA NA U0E-05 8.I0E-07 NS NA NA NS NA NA 4.20E-06 7.00E-07 NS NA NA NS NA NA 9.60E-06 8.30£-07 NS NA NA NS NA NA 6.70E-06 J.80E-07 NS NA NA NS NA NA NS NA NA NS NA NA 7.30E-06 8.20E-07 NS NA NA NS NA NA 3_90E-06 7.00E-07 NS NA NA NS NA NA 6.90E-07 6.34E-07 NS NA NA NS NA NA 4_70£-06 l.20£-07 NS NA NA NS NA NA 3.90E-04 3.90E-04 NS NA NA NS NA NA 1.70£-07 l.70E-07 NS NA NA NS NA NA L0OE-05 3.80E-07 NS NA NA NS NA NA 8.00E-06 6...20E-07 NS NA NA NS NA NA 7.00E-06 5.90E-07 NS NA NA NS NA NA L00E-06 l.0OE-06 NS NA NA NS NA NA 7.00E-06 6.lOE-07 NS NA NA NS NA NA J.00E-05 U0E-06 NS NA NA NS NA NA 3.00E-05 l.20E-06 NS NA NA NS NA NA NIA 8.J0E-07 NS NA NA NS NA NA 2.00E-08 5.00E-07 NS NA NA NS NA NA 3.72£-06 6 00E-07 NS NA NA NS NA NA 5.61E-06 1.00E-05 NS NA NA NS NA NA 4.11£-06 l 00E-05 NS NA NA NS NA NA 8.54.E-06 l.00E-05 NS NA NA NS NA NA WHITE MESA MILL FORAGE RADIONUCLIDE DATA SOUTHWEST OF MILL SAMPLED SAMPLED Ra-226 OTR. DATE VALUE (uCi/Kg) 1st '03 21-Mar-03 3.70E-05 2nd '03 10-Jun-03 UOE-05 4th '03 20-Nov-03 l.60E-04 1st '04 08-Aor-04 1.40E-04 2nd '04 12-Jun-04 6.51E-05 4th '04 30-Nov-04 8.40E-OS 1st 'OS 21-Aor-05 J 70E-05 2nd '05 13-Jun-05 1.SOE-05 4th '05 JO-Nov-05 3,80E-05 1st '06 03-Aor-06 1 OOE-04 2nd '06 16-Jun-06 3.40E-OS 4th '06 28-Nov-06 7.31E-OS 1st '07 30-Mar-07 3.00E-05 2nd '07 1-Jun-07 J,lOE-04 4th '07 23-Nov-07 S.60E-OS 1st '08 22-Aor-08 3.20E-OS 2nd '08 18-Jun-08 1.25E-OS 4th '08 12-Dec-08 9,20E-05 1st '09 28-Aor-09 2.60E-OS 2nd '09 17-Jun-09 2.40E-OS 4th '09 18-Dec-09 3.lOE-05 1st '10 13-Mav-10 2,00E-05 2nd '10 18-Jun-10 1.lOE-05 4th '10 20-Dec-10 6.70E-06 2nd '11 23-Jun-l l <1.7E-07 3rd '11 27-Jul-11 1,60E-05 4th '11 23-Nov-1 l 7.80E-07 2nd '12 ll-Aor-12 5.00E-06 3rd '12 l I-Jun-12 1.90E-08 4th '12 06-Nov-12 1-49E-05 2nd '13 30-Aor-13 4.SOE-05 3rd '13 20-Jun-13 l.5JE-05 4th '13 14-Nov-13 l.18E-04 2nd '14 16-Aor-14 4.65E-05 3rd '14 JO-Jun-14 J.23E-05 4th '14 25-Nov-14 J.16.E-04 1st '15 21-Anr-15 2.27E-04 2nd '15 15-Jun-15 3.90.E-05 4th '15 23-Nov-\5 l.83.E-04 2nd'16 14-Anr-]6 1.67E-04 2nd '16 14-Jun-16 2_90E-05 4th '16 l l-Nov-16 8 39E-05 2nd '17 13-Apr-17 3 OSE-05 2nd '17 19-Jun-17 3 98E-05 4th 'l 7 02-Nov-17 9 ?OE-05 2nd '18 26-Apr-18 5 16E-05 2nd '18 20-Jun-18 5 14E-05 4th '18 02-Nov-18 I 04E-04 2nd '19 25-Apr-19 7 27E-06 2nd '19 06-Jun-19 3.54E-05 Ra-226 MDC¥ Pb-210 Pb-210 ERROR LLDuCi/Kg VALUE ERROR (uCi/Kg) (5.0E-08) (uCi/Kg) (uCi/Kg) 2.60E-06 2.41E-06 2-69E-05 2.0lE-06 l.OOE-06 5.20E-07 <LOO.E-07 1 30E-05 UOE-07 L42E-04 6.42£-06 7.70E-06 l.lOE-07 6.JOE-06 2.70.E-06 3.20E-06 LSOE-07 5.27E-05 4.90£-06 5 70E-06 3.00E-08 3.39E-04 1.60E-05 l.60E-06 UOE-07 4.50E-05 3.SOE-06 1.60E-06 1 40E-07 7.00E-05 5.lOE-06 2.JOE-06 8.60E-10 1.20E-06 4.80E-08 6 OOE-06 .5,00E-08 3.30E-04 l.lOE-05 2.SOE-06 5.00E-08 l.37E-04 6.00E-06 3.20E-06 I.60E-07 2.98E-04 8.SOE-06 2.20E-06 1.70E-07 3.20E-04 7.90E-06 4.60E-06 2.3-07 3..20E-04 l.lOE-05 S.20E-06 5.00E-08 6A0E-04 l 90E-05 2.30E-06 720E-07 2,30E-04 LSOE-05 2.20E-06 1.B0E-06 5.00E-05 3.00E-05 4,JOE-06 9.60E-07 4.IDE-04 3.00E-05 2.90E-06 I.40E-06 3.70E-OS 1.50E-06 1.40E-06 3.90E-07 3.SOE-05 7.90.E-06 2.30E-06 2.!0E-04 8.40E-06 2.JOE-06 9 40E-07 5_60E-OS I.SOE-OS UOE-06 6.60E-07 7_80E-05 L60E-05 9.10.E-07 4.80E-07 8 OOE-07 7.90£-07 6.90E-08 1.70E-07 <2.SE-06 1.50.E-06 LOOE-06 2.60E-07 9.S0E-05 1.60.E-06 2.SOE-07 2.30E-07 <S.9.E-07 3.50.E-07 6_00.E-07 3.00E-07 <7.0.E-07 7_00E-07 6-20E-08 UOE-07 <2.5E-07 UOE-06 3.41 E-07 4-25E-08 4.45.E-04 4.01.E-06 1.19E-06 5 39E-07 3.62.E-04 6.30.E-06 1.06E-06 l 96E-06 6.71.E-05 2 93E-06 3.39E-06 2.97E-06 5-92£-04 1 27E-05 1.0SE-06 7 35E-07 2.13.E-04 S.93E-06 4.97E-07 6.97.E-07 2.46.E-OS 1.84E-06 2.2SE-06 1 SJE-06 4.43.E-04 1 04£-05 5.0lE-06 4 08E-06 5 90E-04 l.16E-05 1.88.E-06 2.71E-06 5.29E-04 1 61E-05 6.96E-06 9.64E-06 8,94E-04 1.43E-05 4.!0E-06 3.65E-06 7.99E-04 2 08E-05 J.88E-06 3.85£-06 1.95E-04 2.18E-05 2.71E-06 3.21E-06 1.21E-03 2.15E-05 !5.00E-08) 2.30E-06 4 61E-06 6,14E-04 I 26E-05 !5.00E-08) J.17E-06 !.04E-06 S,2SE-05 2.68E-06 (5.00E-08) 3.12E-06 3 05E-06 6,36E-04 1 14E-05 !5.00E-08) 1,21E-06 8,!0E-07 3.83E-04 8,29E-06 (5.00E-08) 2.?0E-06 4.37E-06 9,22E-05 7 25E-06 (5.00E-08) 3. I 9E-06 3.73E-06 4,03E-04 8.74E-06 (5.00E-08) l.23E-06 2 84E-06 6.61E-OS 1 22E-05 (5.00E-08) l,58E-06 2.25E-06 2,18E-04 1.90E-05 (5.00E-081 MDC¥ U-NAT U-NAT MDC¥ Th-232 Th-232 MDC¥ LLDuCi/Kg VALUE ERROR LLD VALUE ERROR LLD (l.0E-06) (uCi/Kg) (uCi/Kg) uCi/Kg (uCi/Kg) (uCi/Kg) uCi/Kg (2.0E-07) (2.0E-07)t 3 73E-06 NS NA NA NS NA NA !.OOE-07 NS NA NA NS NA NA 5.90E-07 NS NA NA NS NA NA 5 50E-07 NS NA NA NS NA NA 7 60E-07 NS NA NA NS NA NA 3.00E-07 NS NA NA NS NA NA 6.50E-07 NS NA NA NS NA NA 6.90.E-07 NS NA NA NS NA NA 4.30E-10 NS NA NA NS NA NA 1.00.E-06 NS NA NA NS NA NA l.OOE-06 NS NA NA NS NA NA 8_20E-07 NS NA NA NS NA NA 8.40E-07 NS NA NA NS NA NA 1.10.E-06 NS NA NA NS NA NA l .OOE-06 NS NA NA NS NA NA l.OOE-06 NS NA NA NS NA NA 4.80E-03 NS NA NA NS NA NA 4.00E-05 NS NA NA NS NA NA 2.SOE-05 NS NA NA NS NA NA UOE-05 NS NA NA NS NA NA NS NA NA NS NA NA 2.40.E-05 NS NA NA NS NA NA 2.50E-05 NS NA NA NS NA NA UOE-06 NS NA NA NS NA NA 2.SOE-06 NS NA NA NS NA NA 1.70.E-06 NS NA NA NS NA NA S.90E-07 NS NA NA NS NA NA 1.00E-06 NS NA NA NS NA NA 2.20E-06 NS NA NA NS NA NA 8.57E-07 NS NA NA NS NA NA 9.90E-06 NS NA NA NS NA NA 6 24E-06 NS NA NA NS NA NA 1.62E-05 NS NA NA NS NA NA l 31E-OS NS NA NA NS NA NA 4_63E-06 NS NA NA NS NA NA 1.94E-05 NS NA NA NS NA NA l.67E-05 4.33E-04 1.86E-05 5.14E-06 3.31E-05 2.ISE-06 1.14E-06 3 36E-05 7.78E-OS 8.47E-06 6.43E-06 l.08E-OS 1.28.E-06 1.21E-06 2_03E-05 4.88E-04 2.91E-05 9.00E-06 7,92E-06 7 67.E-07 3-20E-07 4.12E-05 2,lOE-04 2.24E-05 l.39E-05 5.58.E-05 5.42E-06 2.lOE-06 5.93E-05 7.04E-05 3.l 7E-06 l.92.E-06 3.70E-06 8.08E-07 1.04E-06 3.78E-05 l,27E-03 4.84E-05 l.lOE-05 7.71E-06 !.08E-06 1.32E-06 Cl .OOE-06) (2.00E-07) (2.00E-071 1 71E-05 8.20E-04 l .28E-05 2.31E-06 2.91E-06 7.40E-07 1.21E-06 (1 .00E-06) (2.00E-07) (2_00E-07) 5.93E-06 1.77E-04 4.52E-06 1.32E-06 !.08E-05 1 12E-06 1.07E-06 Cl ,OOE-06) (2.00E-07) (2.00E-07) 1.72E-05 2 52E-04 7.28E-06 3.25E-06 6.82E-06 1 05E-06 2,llE-06 (l.OOE-06) (2.00E-07) (2.00E-07) 1.5IE-05 4.02E-04 6.92E-06 l.50E-06 4.93E-06 1 99E-06 3.69E-06 (I OOE-06) (2.00E-07) (2_00E-07) 2 08E-05 1 49E-04 4,?IE-06 2.l?E-06 3.18E-06 5.81E-07 7.45E-07 (1.00E-06) (2.00E-07) (2.00E-071 1.33E-05 6.50E-04 1.85E-05 3.65E-06 9.67E-06 I 19E-06 J.61E-06 !LOOE-06) (2.00E-07) (2 OOE-07) 2 95E-OS 1.96E-04 S.S8E-06 1.78E-06 9.27E-06 I 29E-06 1 30E-06 (1.00E-06) (2.00E-071 (2 OOE-071 2.89E-05 7.00E-05 4.74E-06 3.31E-06 2 56E-05 9.31E-06 l.43E-OS (LOOE-06) (2.00E-07) (2 OOE-07) WHITE MESA MILL FORAGE RADIONUCLIDE DATA SOUTHWEST OF MILL SAMPLED SAMPLED Ra-226 OTR. DATE VALUE (uCi/Kg) 4th '19 13-Nov-19 5.12E-05 2nd '20 22-Apr-20 I 12E-05 2nd '20 12-May-20 9 74E-06 4th '20 07-0ct-20 8 59E-05 2nd '21 06-Apr-21 4 85E-05 2nd '21 09-Jun-21 5 31E-05 4th '21 05-0ct-21 2 15E-04 2nd '22 19-Apr-22 I 15E-04 2nd '22 29-Jun-22 5 37E-05 4th '22 06-0ct-22 I 56E-04 2nd '23 25-Apr-23 7 41E-04 2nd '23 07-Jun-23 I 45E-04 Ra-226 MDC¥ ERROR LLDuCi/Kg (uCi/Kg) (5.0E-08) 1.70E-06 I 69E-06 (5.00E-08) 2,81E-06 8.55E-06 (5.00E-08) 9.18E-07 I 80E-06 (5.00E-08) 3.13E-06 4.30E-06 (5.00E-08) 4,92E-06 5 8IE-06 (5.00E-08) 2.ISE-06 l.98E-06 (5.00E-08) 5.14E-06 4 19E-09 (5.00E-08) 3.34E-06 3,05E-06 (5.00E-08) 2.77E-06 3 63E-06 (5.00E-08) 4.84E-06 3,87E-06 (5 OOE-08) 9.54E-06 2 88E-06 (5.00E-06) 3.74E-06 3 62E-06 (5 OOE-06) Pb-210 Pb-210 MDC¥ U-NAT U-NAT VALUE ERROR LLDuCi/Kg VALUE ERROR (uCi/Kg) (uCi/Kg) (l.0E-06) (uCi/Kg) (uCi/Kg) 4.IOE-04 l 12E-05 2,17E-05 3.48E-05 I.99E-06 (l .OOE-06) 7,78E-04 4.16E-05 4.64E-05 I.08E-04 3.30E-06 (l.OOE-06) 5,57E-04 3,36E-05 4,23E-05 4,88E-05 5.30E-06 (I.OOE-06) 2,ISE-04 I.52E-05 I.98E-05 1.12E-04 5.74E-06 O.OOE-06) 7.46E-04 3 3 IE-05 3, I 8E-05 1.83E-04 6.52E-06 (l.OOE-06) 1.78E-04 7 50E-06 1.61E-05 2.19E-05 1.61E-06 (I OOE-06) 5.92E-04 2.07E-05 4,87E-05 8,68E-05 4.04E-06 rJ .OOE-06) 5,07E-04 1,22E-05 l,89E-05 8 61E-05 3,25E-06 (l.OOE-06) I.95E-04 8 38E-06 I 90E-05 I 82E-05 I.44E-06 (l.OOE-06) 7.31E-04 I.37E-05 l.82E-05 I.69E-04 3.90E-06 (1,00E-06) 6.l?E-04 I 52E-05 3 03E-05 I 83E-04 4,61E-06 (l.OOE-06) I.87E-04 7 44E-06 I.56E-05 I 89E-05 l.49E-06 (I OOE-06) *2nd quarter of 1996 San Juan County, Utah, was declared a disaster area due to drought, no samples were collected dunng this penod MDC¥ Th-232 LLD VALUE uCi/Kg (uCi/Kg) (2.0E-07) I.24E-06 4 56E-06 (2.00E-07) 1.77E-06 8.69E-06 (2.00E-07) 5.75E-06 8 46E-06 (2.00E-07) 4.09E-06 2.16E-06 (2.00E-07) 4,71E-06 4 15E-06 (2.00E-07) UOE-06 9.89E-06 (2.00E-07) 2.35E-06 I.98E-05 !2.00E-07) 2.43E-06 I.68E-05 (2.00E-07) I.94E-06 8 50E-06 (2.00E-07) 2.34E-06 5.40E-05 <2.0DE-07) l.24E-06 4 77E-05 (2,00E-07) l.33E-06 5.58E-06 (2.00E-07) t NRC Regulatory Guide does not specify a Lower Limit of Detection (LLD) for Thorium 232 in vegetation (or any matrix). The LLD for Thorium 230 was used. NS = Not Sampled NA= Not Applicable Th-232 MDC¥ ERROR LLD (uCi/Kg) uCi/Kg (2.0E-07)t 8 OOE-07 2.00E-05 (2.00E-07) 9.94E-07 l.OSE-06 (2.00E-071 I 06E-06 l.91E-06 (2.00E-07) 9.79E-07 l.64E-06 (2.00E-07) 1 13E-06 2.87E-06 (2.00E-07) 1.04E-06 1.15E-06 (2.00E-07) 6 85E-06 I.06E-05 (2.00E-07) 1.33E-06 l.25E-06 (2.00E-07) 4 37E-06 I.09E-05 (2.00E-07) 2.65E-06 l.44E-06 (2.00E-07) 2.57E-06 1.1 IE-06 (2..00E-07) 8.48E-07 9.63E-07 /2.00E-07) ¥ The value in the MDC column is the sample-specific minimum detectable concentration. The MDC is based on the sample moisture, composition and other sample-specific variables The value in parantheses is the method-specific lower limit of detection (LLD), which is a limit representing the detection capability of the measurement system. The LLDs in the data package are referred to as the Reporting limit (RL), (Log Scale) ..... ..... ..... ..... ..... ..... ..... ..... ..... 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m m m m m m m m m I I I I I I I I + 0 0 0 0 0 0 0 0 0 00 -.J 0) 01 ~ (,.) N ..... 0 01-Aug-81 :e 01-Apr-82 :I: 01-Dec-82 =i 01 -Aug-83 m 01-Apr-84 s: 01-Dec-84 m 01-Aug-85 en 01-Apr-86 )> 01-Dec-86 s: 01-Aug-87 r 01-Apr-88 r 01-Dec-88 I 01-Aug-89 en 01-Apr-90 0 01-Dec-90 C 01 -Aug-91 -I 01-Apr-92 :I: 01-Dec-92 :e 01-Aug-93 m 01 -Apr-94 en 01-Dec-94 -I 01-Aug-95 0 01-Apr-96 'Tl 01-Dec-96 s: 01-Aug-97 r 01-Apr-98 r 01-Dec-98 :;o 01-Aug-99 D) 01-Apr-00 Q. 01-Dec-00 o· 01-Aug-01 :l C: 01-Apr-02 (") 01-Dec-02 01-Aug-03 Q. 01-Apr-04 C1) 01-Dec-04 0 01-Aug-05 0 :l 01-Apr-06 (") 01-Dec-06 C1) 01-Aug-07 :l -01-Apr-08 -, D) 01-Dec-08 !:!: 01-Aug-09 0 01-Apr-10 :l en 01-Dec-10 01-Aug-11 :l 01-Apr-12 < 01-Dec-12 C1) 01-Aug-13 cc C1) 01-Apr-14 -D) 01-Dec-14 -01-Aug-15 o· 01-Apr-16 :l 01-Dec-16 -C: 01-Aug-17 0 01-Apr-18 :::.: 01-Dec-18 " 01-Aug-19 cc -01-Apr-20 01-Dec-20 01-Aug-21 ~ Ii i t ! 01-Apr-22 01-Dec-22 -I I C" ru I z I I tl:::; ~ ~ "' 00> Company: Address: Contact: Project: Client Sample ID: Sample ID: Matrix: Collect Date: Receive Date: Collector: GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Certificate of Analysis Energy Fuels Resources (USA), Inc. 225 Union Boulevard Suite 600 Lakewood, Colorado 80228 Ms. Kathy Weinel Vegetation Analysis North East 620132001 SOLID 25-APR-23 10:00 28-APR-23 Client Project: Client ID: Report Date: DNMIO0I0l DNMIO0I June 9, 2023 Parameter Qualifier Result Uncertainty MDC RL Units PF DF Analyst Date Time Batch Method Rad Alpha Spec Analysis Alphaspec Th-232, Solid "Dry Weight Corrected" Thorium-232 5 25E-05 +/-2.81E-06 l.83E-06 Alphaspec U, Solid "Dry Weight Corrected" Uranium-233/234 0.000131 +/-2.67E-06 7.00E-07 Uranium-235/236 8 63E-06 +/-7.66E-07 2.0JE-07 Uranium-238 0.000140 +/-2.75E-06 6.66E-07 Rad Gas Flow Proportional Counting GFPC, Pb210, Solid "Dry Weight Corrected" Lead-210 0 000898 +/-1.67E-05 2.91E-05 GFPC, Total Alpha Radium, solid "Dry Weight Corrected" Total Radium 0.00168 +/-1.44E-05 3.23E-06 The following Prep Methods were performed: Method Description GEL Prep Method Laboratory Composite -Dry prep instructions Dry Soil Prep Dry Soil Prep GL-RAD-A-021 The following Analytical Methods were performed: Method Description 2 3 4 DOE EML HASL-300, Th-OJ-RC Modified DOE EML HASL-300, U-02-RC Modified DOE RP280 Modified EPA 903,0 Surrogate/Tracer Recovery Test Thorium-229 Tracer Uranium-232 Tracer Lead Carrier Barium Carrier Notes: Alphaspec Th-232, Solid "Dry Weight Corrected" Alphaspec U, Solid "Dry Weight Corrected" GFPC, Pb210, Solid "Dry Weight Corrected" GFPC, Total Alpha Radium, solid "Dry Weight Corrected" 2 OOE-07 2 OOE-07 2 OOE-07 2.00E-07 1.00E-06 5 OOE-08 Analyst SF! Counting Uncertainty is calculated at the 68% confidence level (I-sigma). Page 18 of 26 SDG: 620132 uCi/kg uCi/kg uCi/kg uCi/kg uCi/kg uCi/kg Date 05/02/23 Result MR2 05/24/23 1351 2427725 MR2 05/22/23 1310 2427724 ST2 05/27/23 1954 2428931 ST2 06/06/23 1912 2428932 Time Prep Batch 2422141 1141 2422592 Analyst Comments Nominal Recovery% 76.4 59 3 94.3 91.4 Acceptable Limits (15%-125%) (15%-125%) (25%-125%) (25%-125%) 2 3 4 Company : Address: Contact: Project: Client Sample ID: Sample ID: GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Certificate of Analysis Energy Fuels Resources (USA), Inc. 225 Union Boulevard Suite 600 Lakewood, Colorado 80228 Ms. Kathy Weinel Vegetation Analysis North East 620132001 Project: Client ID: Report Date: DNMIO0lOl DNMIO0l June 9, 2023 Parameter Qualifier Result Uncertainty MDC RL Units PF DF Analyst Date Time Batch Method Column headers are defined as follows: DF: Dilution Factor DL: Detection Limit MDA: Minimum Detectable Activity MDC: Minimum Detectable Concentration Le/LC: Critical Level PF: Prep Factor RL: Reporting Limit SQL: Sample Quantitation Limit Page 19 of 26 SDG: 620132 GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Certificate of Analysis Company : Address: Energy Fuels Resources (USA), Inc. 225 Union Boulevard Contact: Project: Client Sample ID: Sample ID: Matrix: Collect Date: Receive Date: Collector: Suite 600 Lakewood, Colorado 80228 Ms. Kathy Weinel Vegetation Analysis North East 625368001 SOLID 07-JUN-23 08:20 12-JUN-23 Client Parameter Qualifier Result Uncertainty Rad Alpha Spec Analysis Alphaspec Th-232, Solid "Dry Weight Corrected" Thorium-232 1.1 I E-05 +/-l.2 IE-06 Alphaspec U, Solid "Dry Weight Corrected" Uranium-233/234 l.36E-05 +/-9.88E-07 Uranium-235/236 l.33E-06 +/-4.39E-07 Uranium-238 l .38E-05 +/-9.86E-07 Rad Gas Flow Proportional Counting GFPC, Pb210, Solid "Dry Weight Corrected" Lead-210 0.000272 +/-l.41E-05 GFPC, Total Alpha Radium, solid "Dry Weight Corrected" Total Radium 6.IIE-05 +/-3.40E-06 The following Prep Methods were performed: Method Description Dry Soil Prep Dry Soil Prep GL-RAD-A-021 MDC l.02E-06 9.82E-07 l.IIE-06 8.25E-07 3.70E-05 4.79E-06 GEL Prep Method Laboratory Composite -Dry prep instructions The following Analytical Methods were performed: Method Description 2 3 4 DOE EML HASL-300, Th-01-RC Modified DOE EML HASL-300, U-02-RC Modified DOE RP280 Modified EPA 903.0 Surrogate/Tracer Recovery Test Thorium-229 Tracer Uranium-232 Tracer Lead Carrier Barium Carrier Notes: Alphaspec Th-232, Solid "Dry Weight Corrected" Alphaspec U, Solid "Dry Weight Corrected" GFPC, Pb210, Solid "Dry Weight Corrected" GFPC, Total Alpha Radium, solid "Dry Weight Corrected" RL 2.00E-07 2.00E-07 2.00E-07 2.00E-07 l.00E-06 5.00E-08 Analyst CXCI Counting Uncertainty is calculated at the 68% confidence level (I-sigma). Page 19 of 27 SDG: 625368 Project: Client ID: Report Date: DNMIO0l0l DNMIO0l Units PF DF Analyst Date uCi/kg uCi/kg uCi/kg uCi/kg uCi/kg uCi/kg Date 06/13/23 Result MR2 06/27/23 MR2 06/27/23 ST2 06/28/23 HH3 07/05/23 Time Prep Batch 0808 2442765 2442702 Analyst Comments Nominal Recovery% 66.4 54.1 78 71.6 July 7, 2023 Time Batch Method 1434 2442795 1434 2442797 1735 2444849 1847 2444848 Acceptable Limits (15%-125%) (15%-125%) (25%-125%) (25%-125%) 2 3 4 Company : Address: Contact: Project: Client Sample ID: Sample ID: GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Certificate of Analysis Energy Fuels Resources (USA), Inc. 225 Union Boulevard Suite 600 Lakewood, Colorado 80228 Ms. Kathy Weinel Vegetation Analysis North East 625368001 Project: Client ID: Report Date: DNMIO0l0l DNMIO0l July 7, 2023 Parameter Qualifier Result Uncertainty MDC RL Units PF DF Analyst Date Time Batch Method Column headers are defined as follows: DF: Dilution Factor DL: Detection Limit MDA: Minimum Detectable Activity MDC: Minimum Detectable Concentration Le/LC: Critical Level PF: Prep Factor RL: Reporting Limit SQL: Sample Quantitation Limit Page 20 of 27 SDG: 625368 GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Certificate of Analysis Company: Address: Energy Fuels Resources (USA), Inc. 225 Union Boulevard Contact: Project: Client Sample ID: Sample ID: Matrix: Collect Date: Receive Date: Collector: Suite 600 Lakewood, Colorado 80228 Ms. Kathy Weinel Vegetation Analysis North West 620132002 SOLID 25-APR-23 09:30 28-APR-23 Client Parameter Qualifier Result Uncertainty Rad Alpha Spec Analysis Alphaspec Th-232, Solid "Dry Weight Corrected" Thorium-232 0.000103 +/-3 75E-06 Alphaspec U, Solid "Dry Weight Corrected" Uranium-233/234 0.000114 +/-2.65E-06 Uranium-235/236 8.63E-06 +/-8 22E-07 Uraniwn-238 0.000121 +/-2.73E-06 Rad Gas Flow Proportional Counting GFPC, Pb210, Solid "Dry Weight Corrected" MDC l.lOE-06 9.03E-07 5.79E-07 6.77E-07 Lead-210 0.00106 +/-1.73E-05 2.37E-05 GFPC, Total Alpha Radium, solid "Dry Weight Corrected" Total Radium 0.000977 +/-1.26E-05 4.53E-06 The following Prep Methods were performed: Method Description GEL Prep Method Laboratory Composite -Dry prep instructions Dry Soil Prep Dry Soil Prep GL-RAD-A-021 The following Analytical Methods were performed: Method Description I DOE EML HASL-300, Th-01-RC Modified 2 DOE EML HASL-300, U-02-RC Modified 3 4 DOE RP280 Modified EPA 903 0 Surrogate/Tracer Recovery Test Thorium-229 Tracer Uranium-232 Tracer Lead Carrier Barium Carrier Notes: Alphaspec Th-232, Solid "Dry Weight Corrected" Alphaspec U, Solid "Dry Weight Corrected" GFPC, Pb210, Solid "Dry Weight Corrected" GFPC, Total Alpha Radium, solid "Dry Weight Corrected" RL 2.00E-07 2.00E-07 2 OOE-07 2.00E-07 l.OOE-06 5.00E-08 Analyst SF! Counting Uncertainty is calculated at the 68% confidence level ( I-sigma). Page 20 of 26 SDG: 620132 Project: Client ID: Report Date: DNMIO0I0l DNMIO0l Units PF DF Analyst Date uCi/kg uCi/kg uCi/kg uCi/kg uCi/kg uCi/kg Date 05/02/23 Result MR2 05/24/23 MR2 05/22/23 ST2 05/27/23 ST2 06/06/23 Time Prep Batch 2422141 1141 2422592 Analyst Comments Nominal Recovery% 84.8 59 89.6 66.6 June 9, 2023 Time Batch Method 1351 2427725 1310 2427724 1955 2428931 1912 2428932 Acceptable Limits (15%-125%) (15%-125%) (25%-125%) (25%-125%) 2 3 4 Company : Address: Contact: Project: Client Sample ID: Sample ID: GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Certificate of Analysis Energy Fuels Resources (USA), Inc. 225 Union Boulevard Suite 600 Lakewood, Colorado 80228 Ms. Kathy Weinel Vegetation Analysis North West 620132002 Project: Client ID: Report Date: DNMIO0I0I DNMIO0I June 9, 2023 Parameter Qualifier Result Uncertainty MDC RL Units PF DF Analyst Date Time Batch Method Column headers are defined as follows: DF: Dilution Factor DL: Detection Limit MDA: Minimum Detectable Activity MDC: Minimum Detectable Concentration Le/LC: Critical Level PF: Prep Factor RL: Reporting Limit SQL: Sample Quantitation Limit Page 21 of 26 SDG: 620132 Company : Address: Contact: Project: Client Sample ID: Sample ID: Matrix: Collect Date: Receive Date: Collector: GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Certificate of Analysis Energy Fuels Resources (USA), Inc. 225 Union Boulevard Suite 600 Lakewood, Colorado 80228 Ms. Kathy W einel Vegetation Analysis North West 625368002 SOLID 07-JUN-23 08:35 12-JUN-23 Client Project: Client ID: Report Date: DNMIO0l0l DNMIO0l July 7, 2023 Parameter Qualifier Result Uncertainty MDC RL Units PF DF Analyst Date Time Batch Method Rad Alpha Spec Analysis Alphaspec Th-232, Solid "Dry Weight Corrected" Thorium-232 l.05E-05 +/-1.57E-06 2.44E-06 Alphaspec U, Solid "Dry Weight Corrected" Uranium-233/234 3.25E-05 +/-1.74E-06 l.l lE-06 Uranium-235/236 2.36E-06 +/-5.40E-07 3.38E-07 Uranium-238 3.29E-05 +/-1.74E-06 6.97E-07 Rad Gas Flow Proportional Counting GFPC, Pb210, Solid "Dry Weight Corrected" Lead-210 0.000513 +/-1.59E-05 3.0IE-05 GFPC, Total Alpha Radium, solid "Dry Weight Corrected" Total Radium 0.000250 +/-5.86E-06 5.73E-06 The following Prep Methods were performed: Method Description GEL Prep Method Laboratory Composite -Dry prep instructions Dry Soil Prep Dry Soil Prep GL-RAD-A-021 The following Analytical Methods were performed: Method Description 2 3 4 DOE EML HASL-300, Th-01-RC Modified DOE EML HASL-300, U-02-RC Modified DOE RP280 Modified EPA 903.0 Surrogate/Tracer Recovery Test Thorium-229 Tracer Uranium-232 Tracer Lead Carrier Barium Carrier Notes: Alphaspec Th-232, Solid "Dry Weight Corrected" Alphaspec U, Solid "Dry Weight Corrected" GFPC, Pb210, Solid "Dry Weight Corrected" GFPC, Total Alpha Radium, solid "Dry Weight Corrected" 2.00E-07 2.00E-07 2.00E-07 2.00E-07 l.00E-06 5.00E-08 Analyst CXCI Counting Uncertainty is calculated at the 68% confidence level (I-sigma). Page 21 of 27 SDG: 625368 uCi/kg uCi/kg uCi/kg uCi/kg uCi/kg uCi/kg Date 06/13/23 Result MR2 06/27/23 1438 2442795 MR2 06/27/23 1434 2442797 ST2 06/28/23 1735 2444849 HH3 07/05/23 1847 2444848 Time Prep Batch 2442702 0808 2442765 Analyst Comments Nominal Recovery¾ 41.1 37.8 65.2 94 Acceptable Limits (15%-125%) (15%-125%) (25%-125%) (25%-125%) 2 3 4 Company : Address: Contact: Project: Client Sample ID: Sample ID: GEL LABO RA TORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Certificate of Analysis Energy Fuels Resources (USA), Inc. 225 Union Boulevard Suite 600 Lakewood, Colorado 80228 Ms. Kathy Weinel Vegetation Analysis North West 625368002 Project: Client ID: Report Date: DNMI00101 DNMIO0l July 7, 2023 Parameter Qualifier Result Uncertainty MDC RL Units PF DF Analyst Date Time Batch Method Column headers are defined as follows: DF: Dilution Factor DL: Detection Limit MDA: Minimum Detectable Activity MDC: Minimum Detectable Concentration Le/LC: Critical Level PF: Prep Factor RL: Reporting Limit SQL: Sample Quantitation Limit Page 22 of 27 SDG: 625368 Company : Address: Contact: Project: Client Sample ID: Sample ID: Matrix: Collect Date: Receive Date: Collector: GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Certificate of Analysis Energy Fuels Resources (USA), Inc. 225 Union Boulevard Suite 600 Lakewood, Colorado 80228 Ms. Kathy Weinel Vegetation Analysis South West 620132003 SOLID 25-APR-23 09:00 28-APR-23 Client Project: Client ID: Report Date: DNMIO0IOl DNMIO0l June 9, 2023 Parameter Qualifier Result Uncertainty MDC RL Units PF DF Analyst Date Time Batch Method Rad Alpha Spec Analysis Alphaspec Th-232, Solid "Dry Weight Corrected" Thorium-232 4. 77E-05 +/-2.57E-06 Alphaspec U, Solid "Dry Weight Corrected" Uranium-233/234 8. 72E-05 Uranium-235/236 6. l lE-06 Uranium-238 8.95E-05 Rad Gas Flow Proportional Counting GFPC, Pb210, Solid "Dry Weight Corrected" +l-2.00E-06 +/-5.91E-07 +/-2.02E-06 Lead-2 IO 0.000617 +/-l.52E-05 GFPC, Total Alpha Radium, solid "Dry Weight Corrected" Total Radium 0.000741 +/-9.54E-06 The following Prep Methods were performed: Method Description Dry Soil Prep Dry Soil Prep GL-RAD-A-021 1.1 IE-06 7.28E-07 l.68E-07 3.47E-07 3.03E-05 2.88E-06 GEL Prep Method Laboratory Composite -Dry prep instructions The following Analytical Methods were performed: Method Description 2 3 4 DOE EML HASL-300, Th-01-RC Modified DOE EML HASL-300, U-02-RC Modified DOE RP280 Modified EPA 903.0 Surrogate/Tracer Recovery Test Thoriurn-229 Tracer Uranium-232 Tracer Lead Carrier Barium Carrier Notes: Alphaspec Th-232, Solid "Dry Weight Corrected" Alphaspec U, Solid "Dry Weight Corrected" GFPC, Pb2 l 0, Solid "Dry Weight Corrected" GFPC, Total Alpha Radium, solid "Dry Weight Corrected" 2.00E-07 2.00E-07 2 00E-07 2.00E-07 l.00E-06 5.00E-08 Analyst SF! Counting Uncertainty is calculated at the 68% confidence level (I-sigma). Page 22 of 26 SDG: 620132 uCi/kg uCi/kg uCi/kg uCi/kg uCi/kg uCi/kg Date 05/02/23 Result MR2 05/24/23 1351 2427725 MR2 05/22/23 1310 2427724 ST2 05/27/23 1955 2428931 ST2 06/06/23 1912 2428932 Time Prep Batch 1141 2422592 2422141 Analyst Comments Nominal Recovery% 83.2 77.3 89 1 91 7 Acceptable Limits (15%-125%) (15%-125%) (25%-125%) (25%-125%) 2 3 4 Company: Address: Contact: Project: Client Sample ID: Sample ID: GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Certificate of Analysis Energy Fuels Resources (USA), Inc. 225 Union Boulevard Suite 600 Lakewood, Colorado 80228 Ms. Kathy Weinel Vegetation Analysis South West 620132003 Project: Client ID: Report Date: DNMIO0IOl DNMIO0l June 9, 2023 Parameter Qualifier Result Uncertainty MDC RL Units PF DF Analyst Date Time Batch Method Column headers are de.fined as follows: DF: Dilution Factor DL: Detection Limit MDA: Minimum Detectable Activity MDC: Minimum Detectable Concentration Le/LC: Critical Level PF: Prep Factor RL: Reporting Limit SQL: Sample Quantitation Limit Page 23 of 26 SDG: 62 0132 GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Certificate of Analysis Company : Address: Energy Fuels Resources (USA), Inc. 225 Union Boulevard Contact: Project: Client Sample ID: Sample ID: Matrix: Collect Date: Receive Date: Collector: Suite 600 Lakewood, Colorado 80228 Ms. Kathy Weinel Vegetation Analysis South West 625368003 SOLID 07-JUN-23 07:50 09-JUN-23 Client Parameter Qualifier Result Uncertainty Rad Alpha Spec Analysis Alphaspec Th-232, Solid "Dry Weight Corrected" Thorium-232 5.58E-06 +/-8.48E-07 Alphaspec U, Solid "Dry Weight Corrected" Uranium-233/234 8.73E-06 +/-6.24E-07 Uranium-235/236 7.89E-07 +/-2.29E-07 Uranium-238 9.37E-06 +/-6.40E-07 Rad Gas Flow Proportional Counting GFPC, Pb210, Solid "Dry Weight Corrected" Lead-210 0.000187 +/-7.44E-06 GFPC, Total Alpha Radium, solid "Dry Weight Corrected" Total Radium 0.000145 +/-3.74E-06 The following Prep Methods were performed: Method Description MDC 9.63E-07 5.23E-07 4.03E-07 4.08E-07 l .56E-05 3.62E-06 GEL Prep Method Laboratory Composite. Dry prep instructions Dry Soil Prep Dry Soil Prep GL-RAD-A-021 The following Analytical Methods were performed: Method Description 2 3 4 DOE EML HASL-300, Th-OJ-RC Modified DOE EML HASL-300, U-02-RC Modified DOE RP280 Modified EPA 903.0 Surrogate/Tracer Recovery Test Thorium-229 Tracer Uranium-232 Tracer Lead Carrier Barium Carrier Notes: Alphaspec Th-232, Solid "Dry Weight Corrected" Alphaspcc U, Solid "Dry Weight Corrected" GFPC, Pb210, Solid "Dry Weight Corrected" GFPC, Total Alpha Radium, solid "Dry Weight Corrected" RL 2.00E-07 2.00E-07 2.00E-07 2.00E-07 J.00E-06 5.00E-08 Analyst LC2 Counting Uncertainty is calculated at the 68% confidence level (I-sigma). Page 23 of 27 SDG: 625368 Report Date: July 7, 2023 Project: DNMIO0!Ol DNMIO0l Client ID: Units uCi/kg uCi/kg uCi/kg uCi/kg uCi/kg uCi/kg Date 06/12/23 Result PF DF Analyst Date Time Batch Method MR2 06/27/23 1438 2442795 MR2 06/27/23 1434 2442797 2 ST2 06/28/23 I 735 2444849 3 HH3 07/05/23 1847 2444848 4 Time Prep Batch 2442258 1120 2442380 Analyst Comments Nominal Recovery¾ 68.7 76.9 116 JOI Acceptable Limits (15%-125%) (15%-125%) (25%-125%) (25%-125%) Company : Address: Contact: Project: Client Sample ID: Sample ID: GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Certificate of Analysis Energy Fuels Resources (USA), Inc. 225 Union Boulevard Suite 600 Lakewood, Colorado 80228 Ms. Kathy Weinel Vegetation Analysis South West 625368003 Project: Client ID: Report Date: DNMIO0l0l DNMIO0l July 7, 2023 Parameter Qualifier Result Uncertainty MDC RL Units PF DF Analyst Date Time Batch Method Column headers are defined as follows: DF: Dilution Factor DL: Detection Limit MDA: Minimum Detectable Activity MDC: Minimum Detectable Concentration Le/LC: Critical Level PF: Prep Factor RL: Reporting Limit SQL: Sample Quantitation Limit Page 24 of 27 SDG: 625368 [ijij! I Laboratories LLc a member of The GEL Group INC PO 501: 00712 Chari eSton SC 2s,417 2D40 S:woQ, Road Ct,aneston SC 29407 P 34'., 55G 8171 F 84J IGG 1178 June 09, 2023 Ms. Kathy Weinel Energy Fuels Resources (USA), Inc. 225 Union Boulevard Suite 600 Lakewood, Colorado 80228 Re: Vegetation Analysis Work Order: 620132 Dear Ms. Weinel: GEL Laboratories, LLC (GEL) appreciates the opportunity to provide the enclosed analytical results for the sample(s) we received on April 28, 2023. This original data report has been prepared and reviewed in accordance with GEL's standard operating procedures. Test results for NELAP or ISO 17025 accredited tests are verified to meet the requirements of those standards, with any exceptions noted. The results reported relate only to the items tested and to the sample as received by the laboratory. These results may not be reproduced except as full reports without approval by the laboratory. Copies of GEL 's accreditations and certifications can be found on our website at www.gel.com. Our policy is to provide high quality, personalized analytical services to enable you to meet your analytical needs on time every time. We trust that you will find everything in order and to your satisfaction. If you have any questions, please do not hesitate to call me at (843) 556-8171, ext. 4289. Purchase Order: DW16138 Enclosures Sincerely, Julie Robinson Project Manager II II I I II I Ill I 111111111111111 ge l.com Energy Fuels Resources (USA), Inc. Vegetation Analysis SDG: 620132 Case Narrative Page 1 of 26 SDG: 620132 June 09, 2023 Laboratory Identification: GEL Laboratories LLC 2040 Savage Road Charleston, South Carolina 29407 (843) 556-8171 Summary: Receipt Narrative for Energy Fuels Resources (USA), Inc. SDG: 620132 ample receipt: The samples arrived at GEL Laboratories LLC, Charleston, South Carolina on April 28, 2023 for analysis. The samples were delivered with proper chain of custody documentation and signatures. All sample containers arrived without any visible signs of tampering or breakage. There are no additional comments concerning sample receipt. Sample Identification: The laboratory received the following samples: Laboratory ID Client ID 620132001 North East 620132002 North West 620132003 South West Case Narrative: Sample analyses were conducted using methodology as outlined in GEL's Standard Operating Procedures. Any technical or administrative problems during analysis, data review, and reduction are contained in the analytical case narratives in the enclosed data package. The enclosed data package contains the following sections: Case Narrative, Chain of Custody, Cooler Receipt Checklist, Data Package Qualifier Definitions and data from the following fractions: Radiochemistry. Page 2 of 26 SDG: 620132 Julie Robinson Project Manager Chain of Custody and Supporting Documentation Page 3 of 26 SDG: 620132 Sheet 1 of 1 CHAIN OF CUSTODY Samples Shipped to: _G_e_l _La __ b_o_ra_t_or_ie_s _________ Contact: Tanner Holliday 2040 Savage Road Ph: 435 678 2221 Charleston, SC 29407 tholliday@energyfuels.com Chain of Custody/Sampling Analysis Request p . ro1ect s amp ers N ame s amp ers s· t 1gna ure Early Spring Vegetation be(OUC, )i//Ly 2023 Tanner Holliday Time Sample ID Date Collected Collected Laboratory Analysis Requested North East 4/25/2023 1000 Ra 226, U-Nat, Th-232, PB 210 North West 4/25/2023 930 Ra 226, U-Nat, Th-232, PB 210 South West 4/25/2023 900 Ra 226, U-Nat, Th-232, PB 210 Weights: North East 3000+ G North West 3000+ G South West 3000+ G * Please use caution when handling samples. Some plants have thorns. Comments: Please send report to Kathy Weinel at kweinel@energyfuels.com Relinquished By:(Sig~ur ,:Ja/WI(_, . Tanner Holliday Relinquished By:(Signature) Page 4 of 26 SDG: 620132 Date/Time Rec 4/25/2023 1130 Date/Time Receive Date/Time 1/lff/c..3 ICXXJ Date/Time tsrn,! I Laborato1ies U.!.: SAMPLE RECEIPT & REVIEW FORM Client: T) £\/\ _j\) l SDG/AR/COC/\l'urk Order: ( -') ,'..'.:) \ ~~L- Rctch ·cd Bv:~ 1 w 011lc Received: YI ·2--Cl, l 1-'J- '.,J -I r CU' c~.,bk: FedEx Express FedEx Ground UPS Field Services Courier Other Carrier and Tracking Number \L \ ~ 1 \./ 4\/ l":l90.!.7 9 r1q JU ~ ~. V \ ~ I• I ,, 0 •rr Net Counts> IOOcpm on somples not marked "radioactive", contact the Radiation Sofety Group for funhcr investigation Suspccl<tl Hazard lnfomrntiun ,., ;,-z X Hazord Class Shipped: UNfl: A)Sltipl)Cd as a DOT Hazardous? lfUN29IO, ls the Radioactive Shipment Survey Compliant? Yes_ No_ B) Did the client designate the samples are to be I., COC nolallon or radJOOtllvc sticl:crs on conto.inors cqu.il client designation. rr:ctivtd os radioac1ive? ' -C) Did the RSO classify the samples as )</ Maximum Net Counts Observed* (Observed Counts • Area Background Counts): ~\1 _),R/Hr nidloa<:llve1 Classifi•d as: Rud I Rad 2 Rad 3 ~~ COC 1101:uion or ha.zard lobe ls oo containers cqunl client desigrunlon. DI Did the client dcstl!IID!C s:unnles-.u'e hazardous? X If D or Eis yes, ~lec1 Hazards below. PCB's Flammable Foreign Soil RCRA Asbestos Beryllium Other: E) Did the RSO idcntifv DO&sible hazards? Sample Receipt Criteria "' < ::, Comments/Qualifi•rs (Required for Non-Confom1ing lt•ms) -:. z z Shipping contaim:r~ re~ch·cd imac1 and Circle Applicublc: Sc~k broken Dama:cd conlainl!'r L:aking com111ncr 01h,i (d<.cribc) 1 scaled? Chain of custody documents included Circ-lr Applic~bJc.: Clien1 con111t'ttd ;mt! pro,,drd COC COC crtul~d upon reci:ipl 2 with shipment~ -Preservarion Method: Wet Ice Ice Packs Dryice~ Other: TEi\lP:~ l 3 Samples requiring cold preservation *all temperatures are recorded in Celsius with.in (0 < 6 di:J!. C)?* \ n ri ,. Daily check performed and passed on IR Temperature Dc,1ce Serini tt: I U ~ -o.f_ I 4 temperature gun? Secondary Temperature Device Serial ff (If Applicable): C",rdc Applicable: Sea Is broken 0;;:m:J_i,ed conlain~r Leaking con1aU'ler 01hcr (dc.<crib<) 5 s~mple containers intact and sealed? Samples requiring chemical preservation Sumplc IO's ond Con1>mcrs Af(mcd: 6 J nl proper pH1 If Prcsm·,1lon ,ddl/d, 1.(111; tr Yes, are Encores or Soil Kits p1escm forsolids? Yes_ No_ NA_(lf yes, take to VOA Freezer) Do any ,amples require Volatile l)o liquid VOA viols con!ain acid preservation1 Yes_ No_ NA_(lrunknown. select No) 7 Analysis? V Ate liquid VOA vi.ils free ofheadspace? Yes_ No_ Ni>._ ~niplc: ID's and conl.ii.ners affected: !D's and lcsts affected: 8 Sample,; receiveu within holding time? SamplcTI)s<inCOC m.1tch 1u son l:Er,:md-conlllin~ml. 9 boules1 Dale & time on COC match date & time Cin:.lc Applicable: No dates on container.; No 1imcs on conLaincrs COC missing info Other ( describe) 10 on bottles? Number ofcuntainers n:ceived match Cu,k Applicable: No container count on COC Other (describe) 11 number indicated on COC? ' 12 Arc sample containers idcmifiable as GEL prm•idcd bv u\f<: of OEL lobds~ COC form is properly signed in Cm:le Appli,-:iblc: Nol rclinquishc=d Other (describe) 13 rc:linquishe<l/rccdved sections? Comm<nts (Use Continuation Form if needed) /~ . I I PM (or Pl\1AJ rcv1i:w: lnllials ~I/\J D:itt• 4/tC\ /1..,1 Pagc__J_ or_~_ (/ I , Pa e 5 of 26 SDG: 620132 g GL-CHL-SR-001 Rev 7 GEL Laboratories LLC -Login Review Report GEL Work Order/SDG: 620132 Client SDG: 620132 Early Spring Vegetation 2023 Project Manager: Project Name: Purchase Order: Package Level: EDD Format: Julie Robinson DNMI00101 Vegetation Analysis DW16138 LEVEL3 EIM_DNMI Collect GELID Client Sample ID Client Sample Desc. Date& Time 620132001 North East 620132002 North West 620132003 South West Client Sample ID -001 North East -002 North West -003 South West Page 6 of 26 Status Tests/Methods REVW GFPC, Pb210, Solid REVW Laboratory Composite -Dry prep instructions 25-APR-23 10:00 25-APR-23 09:30 25-APR-23 09:00 Product Reference REVW GFPC, Total Alpha Radium, solid Ra226 REVW Alphaspec Th-232, Solid REVW Alphaspec U, Solid U-Natural REVW GFPC, Total Alpha Radium, solid Ra226 REVW Alphaspec Th-232, Solid REVW Laboratory Composite -Dry prep instructions REVW Alphaspec U, Solid U-Natural REVW GFPC, Pb210, Solid REVW Laboratory Composite -Dry prep instructions REVW GFPC, Total Alpha Radium, solid Ra226 REVW Alphaspec U, Solid U-Natural REVW GFPC, Pb210, Solid REVW Alphaspec Th-232, Solid SDG: 620132 Work Order Due Date: 30-MAY-23 Package Due Date: EDD Due Date: Due Date: JAR1 Receive Time #of Date & Time Zone Cont. 28-APR-23 10:00 -2 28-APR-23 10:00 -2 28-APR-23 10:00 -2 Fax Date PM Comments 29-MAY-23 29-MAY-23 30-MAY-23 Lab Matrix VEGETATION VEGETATION VEGETATION Please use caution when Client Matrix handling samples.Some plants have thorns. Please use caution when Client Matrix handling samples.Some plants have thorns. Please use caution when Client Matrix handling samples.Some plants have thorns. Report Date: 09-JUN-23 Work Order: 620132 Page 1 of 3 Collector: C Prelogin #: 202207152907 Project Workdef ID: 1310529 SDG Status: Closed Logged by: Fax Days to Due Date Process 21 21 21 Aux Data SOLID SOLID SOLID CofC# Prelog Lab Field Group QC QC Receive Codes GEL Laboratories LLC -Login Review Report Product: LABCOMP _S Workdef ID: 1310628 Method: In Product Group? No Product Description: Laboratory Composite -Dry prep instructions Samples: 001, 002, 003 Parmname Check: All parmnames scheduled properly CAS# Parmname Product: GFC_ PBS Workdef ID: 1310600 In Product Group? No Method: DOE RP280 Modified Product Description: GFPC, Pb210, Solid Samples: 001, 002, 003 Parmname Check: All parmnames scheduled properly CAS# Parmname 14255-04-0 Lead-210 Product: GFCTORAS Workdef ID: 1310679 In Product Group? No Method: EPA 903.0 Product Description: GFPC, Total Alpha Radium, solid Samples: 001, 002, 003 Parmname Check: All parmnames scheduled properly CAS# Parmname Total Radium Product: ASP_ THS Workdef ID: 1370540 In Product Group? No Method: DOE EML HASL-300, Th-01-RC Modified Product Description: Alphaspec Th-232, Solid Samples: 001, 002, 003 Parmname Check: All parmnames scheduled properly CAS# Parmname 7440-29-1 Thorium-232 Page 7 of 26 SDG: 620132 Group Name: Client RDL or PQL& Unit Group Name: Client RDL or PQL & Unit .000001 Group Name: Client RDL or PQL & Unit .00000005 Group Name: Client RDL or PQL & Unit .0000002 Reporting Units Reporting Units uCi/kg Reporting Units uCi/kg Reporting Units uCi/kg Group Reference: Report Date: 09-JUN-23 Work Order: 620132 Page 2 of 3 Path: Rad Soil Prep SPRP Product Reference: Moisture Correction: "As Received" Parm Included Included Custom Function in Sample? in QC? List? Group Reference: Path: Standard (Dry) Product Reference: No Moisture Correction: "Dry Weight Corrected" Parm Included Included Custom Function in Sample? in QC? List? REG y y Yes Group Reference: Path: Standard (Dry) Product Reference: Ra226 Moisture Correction: "Dry Weight Corrected" Parm Included Included Custom Function in Sample? in QC? List? REG y y Yes Group Reference: Path: Standard (Dry) Product Reference: Moisture Correction: "Dry Weight Corrected" Parm Included Included Custom Function in Sample? in QC? List? REG y y Yes GEL Laboratories LLC -Login Review Report Product: ASP _UUS Workdef ID: 1370669 In Product Group? No Method: DOE EML HASL-300, U-02-RC Modified Product Description: Alphaspec U, Solid Samples: 001, 002, 003 Parmname Check: All parmnames scheduled properly CAS# Parmname 13968-55-3/13966-2 Uranium-233/234 15117-96-1/13982-7 Uranium-235/236 7440-61-1 Contingent Tests Uranium-238 Action Product Name Login Requirements: Requirement Description LOGIN: Are these vegetation sample? Login Reminder? Group Name: Client RDL or Reporting PQL & Unit Units -- .0000002 uCi/kg .0000002 uCi/kg .0000002 uCi/kg Samples Include? Comments Report Date: 09-JUN-23 Work Order: 620132 Page 3 of 3 Group Reference: Path: Standard (Dry) Product Reference: U-Natural Moisture Correction: "Dry Weight Corrected" Parm Included Included Custom Function in Sample? in QC? List? REG REG REG y y y y y y Yes y N FOR VEGETATION: After logging in, make sure ii is DRY in sample inquiry. FOR VEGETATION: After logging in, make sure ii is DRY in sample inquiry. Peer Review by: ___________ _ Work Order (SDG#), PO# Checked? -----C of C signed in receiver location? ------ Page 8 of 26 SDG: 620132 Laboratory Certifications Page 9 of 26 SDG: 620132 List of current GEL Certifications as of 09 June 2023 State Certi.fication Alabama 42200 Alaska 17-018 Alaska Drinking Water SC00012 Arkansas 88-0651 CLIA 42D0904046 California 2940 Colorado SC00012 Connecticut PH-0169 DoD ELAP/ ISO 17025 A2LA 2567.01 Florida NELAP E87156 Foreign Soils Permit P330-15-00283, P330-l 5-00253 Georgia SC00012 Georgia SDWA 967 Hawaii SC00012 Idaho SC00012 Illinois NELAP 200029 Indiana C-SC-01 Kansas NELAP E-10332 Kentucky SDWA 90129 Kentucky Wastewater 90129 Louisiana Drinking Water LA024 Louisiana NELAP 03046 (AI33904) Maine 2019020 Maryland 270 Massachusetts M-SC012 Massachusetts PF AS Approv Letter Michigan 9976 Mississippi SC00012 Nebraska NE-OS-26-13 Nevada SC000122023-4 New Hampshire NELAP 2054 New Jersey NELAP SC002 New Mexico SC00012 New York NELAP 11501 North Carolina 233 North Carolina SDWA 45709 North Dakota R-158 Oklahoma 2022-160 Pennsylvania NELAP 68-00485 Puerto Rico SC00012 S. Carolina Radiochem 10120002 Sanitation Districts ofL 9255651 South Carolina Chemistry 10120001 Tennessee TN 02934 Texas NELAP Tl 04 704235-22-20 UtahNELAP SC000122022-37 Vermont VT87156 Virginia NELAP 460202 Washington C780 Page 10 of 26 SDG: 620132 Product: Alphaspec U, Solid Radiochemistry Technical Case Narrative Energy Fuels Resources SDG #: 620132 Analytical Method: DOE EML HASL-300, U-02-RC Modified Analvtical Procedure: GL-RAD-A-011 REV# 28 Analytical Batch: 2427724 Preparation Method: Dry Soil Prep Preparation Procedure: GL-RAD-A-021 REV# 24 Preparation Batch: 2422592 Composite Preparation Method: GEL Prep Method Composite Preparation Procedure: GL-RAD-A-026 REV# 18 Composite Preparation Batch: 2422141 The following samples were analyzed using the above methods and analytical procedure(s). Client Sample Identification North East North West South West Method Blank (MB) GEL Sample ID# 620132001 620132002 620132003 1205402304 1205402305 1205402306 620132002(North West) Sample Duplicate (DUP) Laboratory Control Sample (LCS) The samples in this SDG were analyzed on a "dry weight" basis. Data Summary: All sample data provided in this report met the acceptance criteria specified in the analytical methods and procedures for initial calibration, continuing calibration, instrument controls and process controls where applicable, with the following exceptions. Oualitv Control <OC) Information Duplication Criteria between QC Sample and Duplicate Sample The Sample and the Duplicate, (See Below), did not meet the relative percent difference requirement; however, they do meet the relative error ratio requirement with the value listed below. Sample Analyte Value 1205402305 (North WestDUP) Uranium-233/234 RPD 21.9* (0.00%-20.00%) RER 2.67 (0-3) Uranium-238 RPD 20.7* (0.00%-20.00%) RER 2.54 (0-3) RDLMet The blank (See Below) did not meet the detection limit due to keeping the blank volume consistent with the other sample aliquots. Page 11 of 26 SDG: 620132 Sample Analyte Value 1205402304 (MB) Uranium-233/234 Result -0.0000000382 < MDA 0.000000456 > RDL 0.0000002 uCi/kg Uranium-235/236 Result 0.0000000806 < MDA 0.000000386 > RDL 0.0000002 uCi/kg Uranium-238 Result 0.000000293 < MDA 0.00000036 > RDL 0.0000002 uCi/kg Product: Alphaspec Th-232, Solid Analvtical Method: DOE EML HASL-300, Th-01-RC Modified Analytical Procedure: GL-RAD-A-038 REV# 18 Analytical Batch: 2427725 Preparation Method: Dry Soil Prep Preparation Procedure.: GL-RAD-A-021 REV# 24 Preparation Batch: 2422592 omposite .Preparation Method: GEL Prep Method Composite Preparation Procedure: GL-RAD-A-026 REV# 18 Composite_Preparation Batch: 2422141 The following samples were analyzed using the above methods and analytical procedure(s). Client Sample Identification North East North West South West Method Blank (MB) GEL Sample ID# 620132001 620132002 620132003 1205402307 1205402308 1205402309 62013200l(North East) Sample Duplicate (DUP) Laboratory Control Sample (LCS) The samples in this SDG were analyzed on a "dry weight" basis. Data Summary: All sample data provided in this report met the acceptance criteria specified in the analytical methods and procedures for initial calibration, continuing calibration, instrument controls and process controls where applicable, with the following exceptions. Qualify Control (QC) Information RDLMet The blank (See Below) did not meet the detection limit due to keeping the blank volume consistent with the other sample aliquots. Sample Analyte Value 1205402307 (MB) Thorium-232 Result 0.000000335 < MDA 0.00000107 > RDL 0.0000002 uCi/kg Page 12 of 26 SDG: 620132 Product: Dry Weight Preparation Method: Dry Soil Prep Preparation Procedure: GL-RAD-A-021 REV# 24 Preparation Batch: 2422592 Composite Preparation Method: GEL Prep Method Composite Prevaration Procedure: GL-RAD-A-026 REV# 18 Composite Preparation Batch: 2422141 The following samples were analyzed using the above methods and analytical procedure(s). GEL Sample ID# 620132001 620132002 620132003 Client Sample Identification North East North West South West The samples in this SDG were analyzed on an "as received" basis. Data Summary: There are no exceptions, anomalies or deviations from the specified methods. All sample data provided in this report met the acceptance criteria specified in the analytical methods and procedures for initial calibration, continuing calibration, instrument controls and process controls where applicable. Product: GFPC, Pb210, Solid Analytical Method: DOE RP280 Modified nalvtical Procedure: GL-RAD-A-018 REV# 16 Analytical Batch: 2428931 Preparation Method: Dry Soil Prep Preparation Procedure: GL-RAD-A-021 REV# 24 Preparation Batch: 2422592 Composite Preparation Method: GEL Prep Method Composite Preparation Procedure: GL-RAD-A-026 REV# 18 Composite Preparation Batch: 2422141 The following samples were analyzed using the above methods and analytical procedure(s). GEL Sample ID# 620132001 620132002 620132003 1205404787 Client Sample Identification North East North West South West Method Blank (MB) Page 13 of 26 SDG: 620132 1205404788 1205404789 1205404790 62013200l(North East) Sample Duplicate (DUP) 62013200l(North East) Matrix Spike (MS) Laboratory Control Sample (LCS) The samples in this SDG were analyzed on a "dry weight" basis. Data Summary: All sample data provided in this report met the acceptance criteria specified in the analytical methods and procedures for initial calibration, continuing calibration, instrument controls and process controls where applicable, with the following exceptions. Preparation Information Homogenous Matrix Samples were non-homogenous matrix. powder and grass Quality Control (QC) lnformatfon RDLMet The blank (See Below) did not meet the detection limit due to keeping the blank volume consistent with the other sample aliquots. Sample Analyte Value 1205404787 (MB) Lead-210 Result -0.00000699 < MDA 0.0000217 > RDL 0.000001 uCi/kg Miscellaneous Information Additional Comments The matrix spike, 1205404789 (North EastMS), aliquot was reduced to conserve sample volume. Product: GFPC, Total Alpha Radium, solid Analytical Method: EPA 903.0 Analytical Procedure: GL-RAD-A-010 REV# 21 Analytical Batch: 2428932 Preparation Method: Dry Soil Prep Preparation Procedure: GL-RAD-A-021 REV# 24 Preparation Batch: 2422592 Composite Preparation Method: GEL Prep Method Composite Preparation Procedure: GL-RAD-A-026 REV# 18 Com osite Pre aration Batch: 2422141 The following samples were analyzed using the above methods and analytical procedure(s). GEL Sample ID# 620132001 620132002 Client Sample Identification North East North West Page 14 of 26 SDG: 620132 South West Method Blank (MB) Laboratory Control Sample (LCS) 620132003 1205404791 1205404794 1205418367 Laboratory Control Sample Duplicate (LCSD) The samples in this SDG were analyzed on a "dry weight" basis. Data Summary: All sample data provided in this report met the acceptance criteria specified in the analytical methods and procedures for initial calibration, continuing calibration, instrument controls and process controls where applicable, with the following exceptions. Oualitv Control (QC} Information RDLMet The blank (See Below) did not meet the detection limit due to keeping the blank volume consistent with the other sample aliquots. Sample Analyte Value 1205404791 (MB) Total Radium Result-0.00000613 < MDA 0.00000385 > RDL 0.00000005 uCi/kg Technical Information Negative> 3 sigma TPU Sample result was more negative than the three sigma TPU. The background control chart was examined and the detector was determined to be fully functional. Sample Analyte Value 1205404791 (MB) Total Radium Negative Result> 3 sigma value Recounts Sample 1205404791 (MB) was recounted due to a suspected blank false positive. The recount is reported. Product: Laboratory Composite -Dry prep instructions Composite Preparation Method: GEL Prep Method Composite Preparation Procedure: GL-RAD-A-026 REV# 18 Composite Preparation "Batch: 2422141 The following samples were analyzed using the above methods and analytical procedure(s). GEL Sample ID# 620132001 620132002 620132003 North West South West le ldentificati n The samples in this SDG were analyzed on an "as received" basis. Page 15 of 26 SDG: 620132 Data Summary: There are no exceptions, anomalies or deviations from the specified methods. All sample data provided in this report met the acceptance criteria specified in the analytical methods and procedures for initial calibration, continuing calibration, instrument controls and process controls where applicable. Certification Statement Where the analytical method has been performed under NELAP certification, the analysis has met all of the requirements of the NELAC standard unless otherwise noted in the analytical case narrative. Page 16 of 26 SDG: 620132 GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Qualifier Definition Report for DNMIO0l Energy Fuels Resources (USA), Inc. Client SDG: 620132 GEL Work Order: 620132 The Qualifiers in this report are defined as follows: * A quality control analyte recovery is outside of specified acceptance criteria ** Analyte is a surrogate compound U Analyte was analyzed for, but not detected above the CRDL. Review N alidation GEL requires all analytical data to be verified by a qualified data reviewer. In addition, all CLP-like deliverables receive a third level review of the fractional data package. The following data validator verified the information presented in this data report: Signature: J~ ~ Name: Theresa Austin Date: 09 JUN 2023 Title: Analyst Ill -Data Validator Page 17 of 26 SDG: 620132 GEL LABORATORIES LLC 2040 Savage Road Charleston, SC 29407 -(843) 556-8171 -www.gel.com QC Summary Reoort Date: June 9, 2023 Energy Fuels Resources (USA), Ioc. Page 1 of 3 225 Union Boulevard Suite 600 Lakewood, Colorado Contact: Ms. Kathy Weinel Workorder: 620132 Parmname NOM Sam le Units RPO% REC% Ran e Anlst Date Time Rad Alpha Spec Batch 2427724 QC 1205402305 620132002 DUP Uranium-233/234 0.000114 0.000142 uCi/kg 21.9* (0%-20%) MR2 05/22/23 13:10 Uncertainty +/-2.65£-06 +/-3.12£-06 Uranium-235/236 8.63£-06 l.00E-05 uCi/kg 15.1 (0%-20%) Uncertainty +/-8.22£-07 +/-9.27£-07 Uranium-238 0.000121 0.000149 uCi/kg 20.7* (0%-20%) Uncertainty +/-2.73£-06 +/-3.19£-06 QC1205402306 LCS Uranium-233/234 7.13£-05 uCi/kg 05/22/23 13:10 Uncertainty +/-1.82£-06 Uranium-235/236 3.79£-06 uCi/kg Uncertainty +/-4.83£-07 Uranium-238 7.0lE-05 7.IOE-05 uCi/kg 101 (75%-125%) Uncertainty +/-1.81£-06 QC 1205402304 MB Uranium-233/234 u -3.82£-08 uCi/kg 05/22/23 13:10 Uncertainty +/-1.13£-07 Uranium-235/236 u 8.06£-08 uCi/kg Uncertainty +/-1.14£-07 Uranium-238 u 2.93£-07 uCi/kg Uncertainty +/-1.34£-07 Batch 2427725 QC 1205402308 620132001 DUP Thorium-232 5.25£-05 5.24£-05 uCi/kg 0.0635 (0%-20%) MR2 05/24/23 13:51 Uncertainty +/-2.81£-06 +/-2.57£-06 QC1205402309 LCS Thorium-232 0.000132 0.000129 uCi/kg 97.8 (75%-125%) 05/24/23 13:51 Uncertainty +/-3.91£-06 Page 24 of 26 SDG: 620132 GEL LABORATORIES LLC 2040 Savage Road Charleston, SC 29407 -(843) 556-8171 -www.gel.com QC Summary Workorder: 620132 Page 2 of 3 Parmname NOM Sam le Units RPD¾ REC% Ran e Anlst Date Time Rad Alpha Spec Batch 2427725 QC 1205402307 MB Thorium-232 u 3.35E-07 uCi/kg MR2 05/24/23 13:51 Uncertainty +/-3.46E-07 Rad Gas Flow Batch 2428931 QC1205404788 620132001 DUP Lead-210 0.000898 0.000865 uCi/kg 3.75 (0%-20%) ST2 05/27/23 19:54 Uncertainty +/-l .67E-05 +/-1.57E-05 QC1205404790 LCS Lead-210 0.00709 0.00713 uCi/kg 101 (75%-125%) 05/27/23 19:51 Uncertainty +/-0.000116 QC1205404787 MB Lead-210 u -6.99E-06 uCi/kg 05/27 /23 19:55 Uncertainty +/-6.27E-06 QC1205404789 620132001 MS Lead-210 0.0284 0.000898 0.0285 uCi/kg 97.3 (75%-125%) 05/27 /23 19:54 Uncertainty +/-l .67E-05 +/-0.000474 Batch 2428932 QC1205404794 LCS Total Radium 0.00528 0.00515 uCi/kg 97.6 (75%-125%) ST2 06/06/23 17:51 Uncertainty +/-7 .09E-05 QC1205418367 LCSD Total Radium 0.00528 0.00519 uCi/kg 0.752 98.3 (0%-20%) 06/06/23 17:51 Uncertainty +/-6.61E-05 QC1205404791 MB Total Radium u -6.13E-06 uCi/kg 06/08/23 18:38 Uncertainty +/-8.24E-07 Notes: Counting Uncertainty is calculated at the 68% confidence level (I-sigma). The Qualifiers in this report are defined as follows: C Analyte has been confirmed by GC/MS analysis B For General Chemistry and Organic analysis the target analyte was detected in the associated blank. A The TIC is a suspected aldol-condensation product X Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier H Analytical holding time was exceeded Page 25 of 26 SDG: 620132 GEL LABORATORIES LLC 2040 Savage Road Charleston, SC 29407 -(843) 556-8171 -www.gel.com Workorder: 620132 Parmname NOM ** < > UI BD y h R Analyte is a surrogate compound Result is less than value reported Result is greater than value reported Gamma Spectroscopy--Uncertain identification Results are either below the MDC or tracer recovery is low QC Samples were not spiked with this compound Preparation or preservation holding time was exceeded Sample results are rejected QC Summary C Units RPO% REC% Ran e Anlst A D RPD of sample and duplicate evaluated using +I-RL. Concentrations are <5X the RL. Qualifier Not Applicable for Radiochemistry. Results are reported from a diluted aliquot of the sample NIA RPD or %Recovery limits do not apply. ND Analyte concentration is not detected above the detection limit M M if above MDC and less than LLD NJ Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier F Estimated Value M Matrix Related Failure UJ Gamma Spectroscopy--Uncertain identification Q One or more quality control criteria have not been met. Refer to the applicable narrative or DER. K Analyte present. Reported value may be biased high. Actual value is expected to be lower. UL Not considered detected. The associated number is the reported concentration, which may be inaccurate due to a low bias. L Analyte present. Reported value may be biased low. Actual value is expected to be higher. NI See case narrative U Analyte was analyzed for, but not detected above the CRDL. Page 3 of 3 Date Time NIA indicates that spike recovery limits do not apply when sample concentration exceeds spike cone. by a factor of 4 or more or %RPD not applicable. "The Relative Percent Difference (RPD) obtained from the sample duplicate (DUP) is evaluated against the acceptance criteria when the sample is greater than five times (5X) the contract required detection limit (RL). In cases where either the sample or duplicate value is less than 5X the RL, a control limit of +I-the RL is used to evaluate the DUP result. * Indicates that a Quality Control parameter was not within specifications. For PS, PSD, and SDILT results, the values listed are the measured amounts, not final concentrations. Where the analytical method has been performed under NELAP certification, the analysis has met all of the requirements of the NELAC standard unless qualified on the QC Summary. Page 26 of 26 SDG: 620132 (ijij• I Laboratories LLc a member of The GEL Group INC PO Bo,: 30712 Charteston SC 29417 2040 ~;a•,·c,ge Road Charteston SC 29407 P :34'., 55G 8171 F g4$ 76Ci 1 i 18 July 07, 2023 Ms. Kathy W einel Energy Fuels Resources (USA), Inc. 225 Union Boulevard Suite 600 Lakewood, Colorado 80228 Re: Vegetation Analysis Work Order: 625368 Dear Ms. Weinel: GEL Laboratories, LLC (GEL) appreciates the opportunity to provide the enclosed analytical results for the sample(s) we received on June 12, 2023 and June 09, 2023. This original data report has been prepared and reviewed in accordance with GEL's standard operating procedures. Test results for NELAP or ISO 17025 accredited tests are verified to meet the requirements of those standards, with any exceptions noted. The results reported relate only to the items tested and to the sample as received by the laboratory. These results may not be reproduced except as full reports without approval by the laboratory. Copies ofGEL's accreditations and certifications can be found on our website at www.gel.com. Our policy is to provide high quality, personalized analytical services to enable you to meet your analytical needs on time every time. We trust that you will find everything in order and to your satisfaction. If you have any questions, please do not hesitate to call me at (843) 556-8171, ext. 4289. Purchase Order: DW16138 Enclosures Sincerely, Julie Robinson Project Manager 11111111111111 11111111111111 gel.com Energy Fuels Resources (USA), Inc. Vegetation Analysis SDG: 625368 Case Narrative Page 1 of 27 SDG: 625368 July 07, 2023 Laboratory Jdentification: GEL Laboratories LLC 2040 Savage Road Charleston, South Carolina 29407 (843) 556-8171 Summary: Receipt Narrative for Energy Fuels Resources (USA), Inc. SDG: 625368 ample receipt: The samples arrived at GEL Laboratories LLC, Charleston, South Carolina on June 12, 2023 and June 09, 2023 for analysis. The samples were delivered with proper chain of custody documentation and signatures. All sample containers arrived without any visible signs of tampering or breakage. Cooler delivery was delayed, samples received on separate dates. No container count on COC, only one COC received in first cooler delivered. ample Identification: The laboratory received the following samples: Laboratory ID Client ID 625368001 North East 625368002 North West 625368003 South West Case Narrative: Sample analyses were conducted using methodology as outlined in GEL's Standard Operating Procedures. Any technical or administrative problems during analysis, data review, and reduction are contained in the analytical case narratives in the enclosed data package. The enclosed data package contains the following sections: Case Narrative, Chain of Custody, Cooler Receipt Checklist, Data Package Qualifier Definitions and data from the following fractions: Radiochemistry. Page 2 of 27 SDG: 625368 Julie Robinson Project Manager Chain of Custody and Supporting Documentation Page 3 of 27 SDG: 625368 Sheet 1 of 1 CHAIN OF CUSTODY Samples Shipped to: _G_e_l _L_ab_o_r_at_o_ri_es _________ Contact: Tanner Holliday 2040 Savage Road Ph: 435 678 2221 Charleston, SC 29407 tholliday@enerqyfuels.com Chain of Custody/Sampling Analysis Request p . roJect s amp ers N ame s amp ers 1gnature Late Spring Vegetation l7,.U6A' +J✓k/4 2023 Tanner Holliday Time Sample ID Date Collected Collected Laboratory Analysis Requested North East 6/7/2023 820 Ra 226, U-Nat, Th-232, PB 210 North West 6/7/2023 835 Ra 226, U-Nat, Th-232, PB 210 South West 6/7/2023 750 Ra 226, U-Nat, Th-232, PB 210 Weights: North East: 3000 Grams North West: 3000 Grams South East: 3000 Grams * Please use caution when handling samples. Some plants may have thorns. Comments: Please send report to Kathy Weinel at kweinel<@energyfuels.com Page 4 of 27 SDG: 625368 Date/Time Received By: Signature) 6/7/2023 1130 / ~ I Laboratories 1.1 c Client: Received Dy: Carrier and Tracking Number Suspected Ha7Jlrd lnfonnation A)Shi d a.s a DOT Hazardous? BJ Did the client designate the samples arc tu be received J.L'i racJiu;.ictivc? q Did the RSO clussify the samples as ruJiouctive'! D) Did the c\iem c.Jcsi ~utc sam lcs illl: huznn.luus? El Did the RSO identif ossiblc hazards? Swnple Receipt Criteria 1 Shipping containers received intact and sealed? 2 Chain of custody documents included • with shipment? 3 Samples requiring cold preservation within (0 < 6 deo. C)?* 4 Daily check perfonred and passed on !R temperature gun? 5 Sample containers intact and sealed? 6 Samples requiring chemical preservation a\ proper pH? 7 Do any samples require Volatile Analysis? 8 Samples received within holding lime? 9 Sample !D's on COC match lD's on bottles? Date & time on COC match date & time 10 on bottles? 12 Are sntnple contniner.s identifiable as GEL rovidcd b use of GEL labels? 13 COC form is properly signed in rcllnquiihecVreceived sections? Dote Received: blo: Cl FedEx Express FedEx Ground Field Services Courier Olhcr I 2. tis'f4'1l2 !.:,9 J._i.s~ ~ i •tr Net Counts:, I OOcpm un samples not marked ''r.uliuuctive", cuntuct the Radiation Safety Group for further investigation. Hazurd Cla.ss Shipped: LIN#: If UN2910, ls the Rilllioactive Sh,prnenl Survey Compliant? Yes_ No_ RCRA Asbestos Beryllium Other. Comments/Qualifiers (Required ror Non-Conforming Ile ms) Circle Applicnh\c: Scale:: brnkcn Dnmoged container U:oking cnmA.iner Olher (describe) Circle Applicnbh:: Clicnl cnnraclcd end provided CDC CDC crco1cd upon receipl Preservmiua Method: Wet Ice Ice Pack.s Dry ice None Other. •a11 temperatures ,arc rccon.Jell in Cet:,;iu:-i Temperature Dc,·ice Serial#:_,_+---"--=---""-----'" Secondary Temperature Device Seri,~# (Jf AppliCilble): Circle Applicable: Scale; brnken D:unngcd conloiner Leaking cnnlllincr 01..hcr (describe) Sompk Jl)'s and Conroincrs Affcclcd: jf Prc~el"Vilcinn oddcd, lotH: If Yes, are Encores ur Soil Kirs 1m:s<11l fur solids? Yes_ Nn_ N,\_(lfyes, take tu VOA Freezer) Di, liquiJ VOA vials contain acid pre.<crv.nion7 Yes_ Nu_ NA_(Ifunknown, select Nol At• li1111iJ VOA vials free ufhcad.spnce? Yes_ No_ NA_ LD\ and lCSIS affec,ed: lD's and cont,unen; affccteJ: Circle Applicuble: Nu dates on cumainen; No times on cumainen; COC mi,sing info Other (Jc.<cril1<:) Nut rclinquisheJ O<11er(Jescribe) Page 5 of 27 SDG: 625368 M:31 I LatxJralories LLC Currier mid Trackin~ Number Sus11cclcd Jfaz:trd lnfom1ation ~ z. •Ir Ncl CounLc; > l<.X.ll1m on sa:nples ~01 mJk~d "rndioacLive'', contact lhc Radiation SMety Group for further i11\'e~Lig,a1ion A)Ship ~<las ;1 DOT' Hac.irdous? 13) Did the client designate the samples are lO be n:ccivcd a.5 radiouctivc? C) Did the RSO cla.,;sify tile s:unplcs us rat.lioac1iv~? Dl DiJ Lhe client desii:?.nalc snmoles arc hazardous? E) Did the RSO identirv ssiblc hazard,? Sample Rccelpl Criterio Shipping containers rccci\'cd intact and sc:ilcd? 2 Chain of custody doi:urncnts included with shipmem? 3 Samples requiring cold preservation within (0 < 6 de . C)''' 4 Daily check performed :md passed on IR tcmpcr:iture gun? 5 Smnplc comaincrs inlncl and scaled? 6 Snmplcs requiring chemical prcserv~1lion at proper pH"! Do any s:.implcs require Volmilc An:ilysis~ 8 Samples received within holding tinx::'.1 9 Sample ID's on COC match ID's nn bottles? Number of conlaincrs received ma1ch 11 number indicated on COC'J 12 Arc r.ampk comaincrs idemifiablc as GEL rovided hv u.1c of GEL labels? 13 CDC form is propr.:rly signed in relinquished/received sections? Carnn1ent5 ( Use Ctmlfot.llUlon Fom, if ne(:llcil): Page 6 of 27 SDG: 625368 Hazard Class Shipped: UN#: 1r UN.:?9I0, Is the Radln:riive Sh.ipmenL Sur\'C)' Compliant? Yt!S_ No_ OC mmllion or rad:ioac1ivc stickers on ooul£inc~ equal clielll desiJ:1llalian 1 1ax.imum Net Counts Obscr\•cd* (Obscr\'Cd Counts -Area Background Crnmts): Classified as: Rad I Rad Z Rud 3 CCX' nolalioo er haurrl labels on l.l.111Wners equnl cliem dcsi~otion. f D or E is yes. sclcc1 Hazards he:lmv. PCB's Flammilhlc Foreign Soil RCRA Asbeslo!<I Bel')'llium Other: Commcnls/Qualincrs (Rcquin-d fur Nun-Conforming ftcms) Circfc Applicahlc: Sc:ils bru-.cn 0:ima~d conlaiuer U:al.ing cnnt:,incr Other (Jcscrihc I C1tcli: Aprlii.:abh:: Client co111:i.i::1ed :inti f"U\~il C0C Presen•;Hion Method: Wet Ice Ice Packs *all lemj)l,!rnturcs arc recorded i11 Cdsius Tcmpcrnturc Dnice Serial #:~tR2=-2~1 ___ _ SerondaryTempcraturc Dc\"icc Serial# (If Applicable): Circle Applic:ihlc: Seal!> broken D:imagcd i.:n111ai11er U,tking cunr:iincr Other (<lcsi.:ribc) Si!m[llc ID\ aucJ Conlllincrs Affected: Ir Prt:scno.1UU11 aJtlctl, Lm'rl: lf.,Ycs. arc Encores or Soil Kits present for soli1.h? Y(:s_ No_ NA __ (lf )~S. lake 10 VOA C:-n>e7erl Are liquid VOA vials rn~c of heachpa1..·e~ Yi:s_ No_ NA __ S,,mplc io·~ :mi.I c11111.1i11er!> affcc1e<.1: I D's and 1cs1s JJl'cctcd: ID's and contain(:rs affcclcd: Cirde Applic-Jbk: No d.31es on con\;lint!rs No times on conlainers COC missing info 01hi:r (Lft!Scribcl Cir\-lc .•\ppli1.11bt.c: No m 1Irun~rC'QunI on C DI.her (tl~scribcl lL Pi 2,1 GL-CHL-SR-001 Rev 7 GEL Laboratories LLC -Login Review Report GEL Work Order/SDG: 625368 Client SDG: 625368 Late Spring Vegetation 2023 Project Manager: Project Name: Purchase Order: Package Level: EDD Format: Julie Robinson DNMI00101 Vegetation Analysis DW16138 LEVEL3 EIM_DNMI GELID Client Sample ID Client Sample Desc. Collect Date & Time Work Order Due Date: 09-JUL-23 Package Due Date: EDD Due Date: Due Date: JAR1 Receive Time # of Date & Time Zone Cont. 08-JUL-23 08-JUL-23 09-JUL-23 Lab Matrix 625368001 North East 07-JUN-23 08:20 12-JUN-23 09:15 -2 VEGETATION VEGETATION VEGETATION 625368002 North West 625368003 South West Client Sample ID --001 North East --002 North West --003 South West Page 7 of 27 07-JUN-23 08:35 12.JUN-23 09:15 -2 07-JUN-23 07:50 09.JUN-23 09:15 -2 Status Tests/Methods REVW Alphaspec U, Solid REVW GFPC, Pb210, Solid REVW Alphaspec Th-232, Solid REVW Laboratory Composite -Dry prep instructions Product Reference U-Natural REVW GFPC, Total Alpha Radium, solid Ra226 REVW Laboratory Composite -Dry prep instructions REVW GFPC, Pb210, Solid REVW Alphaspec Th-232, Solid REVW Alphaspec U, Solid U-Natural REVW GFPC, Total Alpha Radium, solid Ra226 REVW Alphaspec U, Solid U-Natural REVW Alphaspec Th-232, Solid REVW GFPC, Total Alpha Radium, solid Ra226 REVW GFPC, Pb210, Solid REVW Laboratory Composite -Dry prep instructions SDG: 625368 Fax Date PM Comments Please use caution when Client Matrix handling samples.Some plants have thorns. Please use caution when Client Matrix handling samples.Some plants have thorns. Please use caution when Client Matrix handling samples.Some plants have thorns. Report Date: 07-JUL-23 Work Order: 625368 Page 1 of 3 Collector: C Prelogin #: 202306174601 Project Workdef ID: 1310529 SDG Status: Closed Logged by: Fax Days to Due Date Process 30 30 30 Aux Data SOLID SOLID SOLID CofC# Prelog Lab Field Group QC QC Receive Codes GEL Laboratories LLC -Login Review Report Product: LABCOMP _S Workdef ID: 1310628 Method: In Product Group? No Product Description: Laboratory Composite -Dry prep instructions Samples: 001, 002, 003 Parmname Check: All parmnames scheduled properly CAS# Parmname Product: GFC_ PBS Workdef ID: 1310600 In Product Group? No Method: DOE RP280 Modified Product Description: GFPC, Pb210, Solid Samples: 001, 002, 003 Parmname Check: All parmnames scheduled properly CAS# Parmname 14255-04-0 Lead-210 Product: GFCTORAS WorkdeflD: 1310679 In Product Group? No Method: EPA 903.0 Product Description: GFPC, Total Alpha Radium, solid Samples: 001, 002, 003 Parmname Check: All parmnames scheduled properly CAS# Parmname Total Radium Product: ASP _THS Workdef ID: 1370540 In Product Group? No Method: DOE EML HASL-300, Th-01-RC Modified Product Description: Alphaspec Th-232, Solid Samples: 001, 002, 003 Parmname Check: All parmnames scheduled properly CAS# Parmname 7440-29-1 Thorium-232 Page 8 of 27 SDG: 625368 Group Name: Client RDL or PQL & Unit Group Name: Client RDL or PQL& Unit .000001 Group Name: Client RDL or PQL& Unit .00000005 Group Name: Client RDL or PQL& Unit .0000002 Reporting Units Reporting Units uCi/kg Reporting Units uCi/kg Reporting Units uCi/kg Group Reference: Report Date: 07-JUL-23 Work Order: 625368 Page 2 of 3 Path: Rad Soil Prep SPRP Product Reference: Moisture Correction: "As Received" Parm Included Included Custom Function in Sample? in QC? List? Group Reference: Path: Standard (Dry) Product Reference: No Moisture Correction: "Dry Weight Corrected" Parm Included Included Custom Function in Sample? in QC? List? REG y y Yes Group Reference: Path: Standard (Dry) Product Reference: Ra226 Moisture Correction: "Dry Weight Corrected" Parm Included Included Custom Function in Sample? in QC? List? REG y y Yes Group Reference: Path: Standard (Dry) Product Reference: Moisture Correction: "Dry Weight Corrected" Parm Included Included Custom Function in Sample? in QC? List? REG y y Yes GEL Laboratories LLC -Login Review Report Product: ASP _uus WorkdeflD: 1370669 In Product Group? No Method: DOE EML HASL-300, U-02-RC Modified Product Description: Alphaspec U, Solid Samples: 001, 002, 003 Parmname Check: All parmnames scheduled properly CAS# Parmname 13968-55-3/13966-2 Uranium-233/234 15117-96-1 /13982-7 Uranium-235/236 7440-61-1 Contingent Tests Uranium-238 Action Product Name Login Requirements: Requirement Description LOGIN: Are these vegetation sample? Login Reminder? Group Name: Client RDL or Reporting PQL& Unit Units -- .0000002 uCi/kg .0000002 uCi/kg .0000002 uCi/kg Samples Include? Comments Report Date: 07-JUL-23 Work Order: 625368 Page 3 of 3 Group Reference: Path: Standard (Dry) Product Reference: Li-Natural Moisture Correction: "Dry Weight Corrected" Parm Included Included Custom Function in Sample? in QC? List? REG REG REG y y y y y y Yes y N FOR VEGETATION: After logging in, make sure ii is DRY in sample inquiry. FOR VEGETATION: After logging in, make sure it is DRY in sample inquiry. Peer Review by: ____________ _ Work Order (SDG#), PO# Checked? ____ _ C of C signed in receiver location? _____ _ Page 9 of 27 SDG: 625368 Laboratory Certifications Page 10 of 27 SDG: 625368 List of current GEL Certifications as of 07 July 2023 State Certification Alabama 42200 Alaska 17-018 Alaska Drinking Water SC00012 Arkansas 88-0651 CLIA 42D0904046 California 2940 Colorado SC00012 Connecticut PH-0169 DoD ELAP/ ISOl 7025 A2LA 2567.01 Florida NELAP E87156 Foreign Soils Permit P330-15-00283, P330-15-00253 Georgia SC00012 Georgia SDW A 967 Hawaii SC00012 Idaho SC000J2 Illinois NELAP 200029 Indiana C-SC-01 Kansas NELAP E-10332 Kentucky SDW A 901 29 Kentucky Wastewater 90129 Louisiana Drinking Water LA024 Louisiana NELAP 03046 (AI33904) Maine 2019020 Maryland 270 Massachusetts M-SC012 Massachusetts PF AS Approv Letter Michigan 9976 Mississippi SC000J2 Nebraska NE-OS-26-13 Nevada scooo 122023-4 New Hampshire NELAP 2054 New Jersey NELAP SC002 New Mexico SC000J2 New York NELAP 11501 North Carolina 233 North Carolina SDWA 45709 North Dakota R-158 Oklahoma 2022-160 Pennsylvania NELAP 68-00485 Puerto Rico SC00012 S. Carolina Radiochem 10120002 Sanitation Districts of L 9255651 South Carolina Chemistry 10120001 Tennessee TN 02934 TexasNELAP Tl 04 704235-22-20 UtahNELAP scooo 122022-3 7 Vermont VT87156 Virginia NELAP 460202 Washington C780 Page 11 of 27 SDG: 625368 Radiochemistry Technical Case Narrative Energy Fuels Resources SDG #: 625368 Product: Alphaspec Th-232, Solid Analytical Method: DOE EML HASL-300, Th-01-RC Modified Analytical Procedure: GL-RAD-A-038 REV# 18 Analytical Batch: 2442795 Preparation Method: Dry Soil Prep Preparation Procedure: GL-RAD-A-021 REV# 24 Preparation Batches: 2442380 and 2442765 Composite Preparation Method: GEL Prep Method Compo ite Preparation Procedure: GL-RAD-A-026 REV# 18 Compo itc Preparation Batches: 2442258 and 2442702 The following samples were analyzed using the above methods and analytical procedure(s). Client Sample Identification North East North West South West Method Blank (MB) GEL Sample ID# 625368001 625368002 625368003 1205431510 1205431511 1205431512 62536800l(North East) Sample Duplicate (DUP) Laboratory Control Sample (LCS) The samples in this SDG were analyzed on a "dry weight" basis. Data Summary: All sample data provided in this report met the acceptance criteria specified in the analytical methods and procedures for initial calibration, continuing calibration, instrument controls and process controls where applicable, with the following exceptions. Oualitv Control (QC} Information Duplication Criteria between QC Sample and Duplicate Sample The Sample and the Duplicate, (See Below), did not meet the relative percent difference requirement; however, they do meet the relative error ratio requirement with the value listed below. Sample Analyte Value 1205431511 (North EastDUP) Thorium-232 RPD 23. l * (0.00%-20.00%) RER 1.3 (0-3) RDLMet The blank (See Below) did not meet the detection limit due to keeping the blank volume consistent with the other sample aliquots. Sample Analyte Value Page 12 of 27 SDG: 625368 I 1205431510 (MB) I Thorium-232 1 Result 0.000000816 < MDA 0.0000014 > RDL 0.0000002 uCi/kg I Technical Information Recounts Sample 1205431510 (MB) was recounted and then given additional clean-up steps and recounted again in order to remove suspected interferences. The third count is reported. Product: Alphaspec U, Solid Ana.lytical Method: DOE EML HASL-300, U-02-RC Modified Analytical Procedure: GL-RAD-A-011 REV# 28 Analvtical Batch: 2442797 Preparation Method: Dry Soil Prep Preparation Procedure: GL-RAD-A-021 REV# 24 Pre a a ·on Batche : 2442380 and 2442765 Compo ite Preparation Method: GEL Prep Method Composite Preparation Procedure: GL-RAD-A-026 REV# 18 Composite Preparation Batches: 2442258 and 2442702 The following samples were analyzed using the above methods and analytical procedure(s). GEL Sample ID# 625368001 625368002 625368003 1205431517 1205431518 1205431519 Client Sample Identification North East North West South West Method Blank (MB) 62536800l(North East) Sample Duplicate (DUP) Laboratory Control Sample (LCS) The samples in this SDG were analyzed on a "dry weight" basis. Data Summary: All sample data provided in this report met the acceptance criteria specified in the analytical methods and procedures for initial calibration, continuing calibration, instrument controls and process controls where applicable, with the following exceptions. Quality Control (QC) Information RDLMet The blank (See Below) did not meet the detection limit due to keeping the blank volume consistent with the other sample aliquots. Sample Analyte Value 1205431517 (MB) Uranium-233/234 Result 0.000000105 < MDA 0.000000648 > RDL 0.0000002 uCi/kg Uranium-235/236 Result 0.000000112 < MDA 0.00000043 > RDL 0.0000002 uCi/kg Page 13 of 27 SDG: 625368 I Uranium-238 I Result 0.000000273 < MDA 0.000000436 > RDL 0.0000002 uCi/kg I Product: Dry Weight Preparation Method: Dry Soil Prep Preparation Procedure: GL-RAD-A-021 REV# 24 Preparation Batch: 2442380 Composite Preparation Method: GEL Prep Method Composite Preparation Procedure: GL-RAD-A-026 REV# 18 Composite Preparation Batch: 2442258 The following samples were analyzed using the above methods and analytical procedure(s). GEL Sample ID# 625368003 Client Sample Identification South West The samples in this SDG were analyzed on an "as received" basis. Data Summary: There are no exceptions, anomalies or deviations from the specified methods. All sample data provided in this report met the acceptance criteria specified in the analytical methods and procedures for initial calibration, continuing calibration, instrument controls and process controls where applicable. Product: Dry Weight Preparation Method: Dry Soil Prep Preparation Procedure: GL-RAD-A-021 REV# 24 Preparation Batch: 2442765 Composite Preparation Method: GEL Prep Method Composite Preparation Procedure: GL-RAD-A-026 REV# 18 Composite Preparation Batch: 2442702 The following samples were analyzed using the above methods and analytical procedure(s). GEL Sample ID# 625368001 625368002 Client Sample Identification North East North West The samples in this SDG were analyzed on an "as received" basis. Data Summary: There are no exceptions, anomalies or deviations from the specified methods. All sample data provided in this Page 14 of 27 SDG: 625368 report met the acceptance criteria specified in the analytical methods and procedures for initial calibration, continuing calibration, instrument controls and process controls where applicable. Product: GFPC, Total Alpha Radium, solid Anal tical Method: EPA 903.0 Analytical Procedure: GL-RAD-A-010 REV# 21 Analytical Batch: 2444848 Preparation Method: Dry Soil Prep Preparation Procedure: GL-RAD-A-021 REV# 24 Preparation Batches: 2442380 and 2442765 Composite Preparation Method: GEL Prep Method Composite Preparation Procedure: GL-RAD-A-026 REV# 18 Composite Preparation Batches: 2442258 and 2442702 The following samples were analyzed using the above methods and analytical procedure(s). Client Sample Identification North East North West South West Method Blank (MB) GEL Sample ID# 625368001 625368002 625368003 1205434701 1205434702 1205434703 1205434704 62536800l(North East) Sample Duplicate (DUP) 62536800l(North East) Matrix Spike (MS) Laboratory Control Sample (LCS) The samples in this SDG were analyzed on a "dry weight" basis. Data Summary: All sample data provided in this report met the acceptance criteria specified in the analytical methods and procedures for initial calibration, continuing calibration, instrument controls and process controls where applicable, with the following exceptions. Quality Control {QC} Information RDLMet The blank (See Below) did not meet the detection limit due to keeping the blank volume consistent with the other sample aliquots. Sample Analyte Value 1205434701 (MB) Total Radium Result -0.00000211 < MDA 0.00000333 > RDL 0.00000005 uCi/kg Technical Information Recounts Sample 1205434704 (LCS) was recounted due to low recovery. The recount is reported. Sample 1205434702 (North EastDUP) was recounted to verify sample results. Recount is reported. Page 15 of 27 SDG: 625368 Product: GFPC, Pb210, Solid Anah•tical Method: DOE RP280 Modified Analytical Procedure: GL-RAD-A-018 REV# 16 Anah1:ical Batch: 2444849 Preparation Method: Dry Soil Prep Preparation Procedure: GL-RAD-A-021 REV# 24 Preparation Batches: 2442380 and 2442765 Composite Preparation Method: GEL Prep Method Composite Preparation Procedure: GL-RAD-A-026 REV# 18 Composite Preparation Batches: 2442258 and 2442702 The following samples were analyzed using the above methods and analytical procedure(s). GEL Sample ID# 625368001 625368002 625368003 1205434707 1205434708 1205434709 1205434710 Client Sample Identification North East North West South West Method Blank (MB) 625368002(North West) Sample Duplicate (DUP) 625368002(North West) Matrix Spike (MS) Laboratory Control Sample (LCS) The samples in this SDG were analyzed on a "dry weight" basis. Data Summary: All sample data provided in this report met the acceptance criteria specified in the analytical methods and procedures for initial calibration, continuing calibration, instrument controls and process controls where applicable, with the following exceptions. Quality Control (QC) Information RDLMet The blank (See Below) did not meet the detection limit due to keeping the blank volume consistent with the other sample aliquots. Sample Analyte Value 1205434707 (MB) Lead-210 Result-0.00000782 < MDA 0.0000217 > RDL 0.000001 uCi/kg Certification Statement Page 16 of 27 SDG: 625368 Where the analytical method has been performed under NE LAP certification, the analysis has met all of the requirements of the NELAC standard unless otherwise noted in the analytical case narrative. Page 17 of 27 SDG: 625368 GEL LABORATORIES LLC 2040 Savage Road Charleston SC 29407 -(843) 556-8171 -www.gel.com Qualifier Definition Report for DNMIOOl Energy Fuels Resources (USA), Inc. Client SDG: 625368 GEL Work Order: 625368 The Qualifiers in this report are defined as follows: * A quality control analyte recovery is outside of specified acceptance criteria ** Analyte is a surrogate compound U Analyte was analyzed for, but not detected above the CRDL. Review N alidation GEL requires all analytical data to be verified by a qualified data reviewer. In addition, all CLP-like deliverables receive a third level review of the fractional data package. The following data validator verified the information presented in this data report: Signature: j~ ~ Name: Theresa Austin Date: 07 JUL 2023 Title: Analyst Ill -Data Validator Page 18 of 27 SDG: 625368 GEL LABORATORIES LLC 2040 Savage Road Charleston, SC 29407 -(843) 556-8171 -www.gel.com QC Summary Renort Date: July 7, 2023 Energy Fuels Resources (USA), Inc. Page 1 of 3 225 Union Boulevard Suite 600 Lakewood, Colorado Contact: Ms. Kathy Weinel Workorder: 625368 Parmname NOM C Units RPO% REC% Ran e Anlst Date Time Rad Alpha Spec Batch 2442795 QC120543151 I 625368001 DUP Thorium-232 l.l lE-05 8.82E-06 uCi/kg 23.l * (0%-20%) MR2 06/27/23 14:38 Uncertainty +/-1.21E-06 +/-1.l3E-06 QC120543l512 LCS Thorium-232 0.000132 0.000126 uCi/kg 95.7 (75%-125%) 06/27/23 14:38 Uncertainty +/-3.38E-06 QCJ205431510 MB Thorium-232 u 8.16E-07 uCi/kg 07/01/23 16:03 Uncertainty +/-5.24E-07 Batch 2442797 QC1205431518 625368001 DUP Uranium-233/234 l.36E-05 l.28E-05 uCi/kg 5.83 (0%-20%) MR2 06/27/23 14:34 Uncertainty +/-9.88E-07 +/-8.96E-07 Uranium-235/236 1.33E-06 l.28E-06 uCi/kg 3.29 (0%-100%) Uncertainty +/-4.39E-07 +/-3.49E-07 Uranium-238 1.38E-05 l.30E-05 uCi/kg 5.8 (0%-20%) Uncertainty +/-9.86E-07 +/-9.08E-07 QC1205431519 LCS Uranium-233/234 6.l 7E-05 uCi/kg 06/27/23 14:34 Uncertainty +/-1.6IE-06 Uranium-235/236 3.21E-06 uCi/kg Uncertainty +/-4.45E-07 Uranium-238 6.69E-05 6.75E-05 uCi/kg 101 (75%-125%) Uncertainty +/-1.69E-06 QC1205431517 MB Uranium-233/234 u l.05E-07 uCi/kg 06/27/23 14:34 Uncertainty +/-I. 82E-07 Uranium-235/236 u 1.12E-07 uCi/kg Uncertainty +/-1.3 8E-07 Page 25 of 27 SDG: 625368 GEL LABORATORIES LLC 2040 Savage Road Charleston, SC 29407 -(843) 556-8171 -www.gel.com QC Summary Workorder: 625368 Page 2 of 3 Parmname NOM C Units RPO% REC% Rane Anlst Date Time Rad Alpha Spec Batch 2442797 Uranium-238 u 2.73E-07 uCi/kg MR2 06/27/23 14:34 Uncertainty +/-1.58E-07 Rad Gas Flow Batch 2444848 QC1205434702 625368001 DUP Total Radium 6.l lE-05 7.44E-05 uCi/kg 19.7 (0%-20%) HH3 07 /06/23 19: 15 Uncertainty +/-3.40E-06 +/-2.45E-06 QC 1205434 704 LCS Total Radium 0.00528 0.00616 uCi/kg 117 (75%-125%) 07 /06/23 15 :40 Uncertainty +/-6.53E-05 QC1205434701 MB Total Radium u -2.l IE-06 uCi/kg 07/05/23 18:47 Uncertainty +/-8.83E-07 QC1205434703 625368001 MS Total Radium 0.0220 6.l lE-05 0.0265 uCi/kg 120 (75%-125%) 07/05/23 16:58 Uncertainty +/-3.40E-06 +/-0.000325 Batch 2444849 QC1205434708 625368002 DUP Lead-210 0.000513 0.000531 uCi/kg 3.53 (0%-20%) ST2 06/28/23 17:35 Uncertainty +/-l .59E-05 +/-l.46E-05 QC1205434710 LCS Lead-210 0.00708 0.00673 uCi/kg 95 (75%-125%) 06/28/23 07:06 Uncertainty +/-0.000111 QC1205434707 MB Lead-210 u -7.82E-06 uCi/kg 06/28/23 17:35 Uncertainty +/-6.28E-06 QC1205434709 625368002 MS Lead-210 0.00709 0.000513 0.00694 uCi/kg 90.6 (75%-125%) 06/28/23 07:06 Uncertainty +/-l .59E-05 +/-0.000123 Notes: Counting Uncertainty is calculated at the 68% confidence level (I-sigma). The Qualifiers in this report are defined as follows: C Analyte has been confirmed by GC/MS analysis B For General Chemistry and Organic analysis the target analyte was detected in the associated blank. Page 26 of 27 SDG: 625368 GEL LABORATORIES LLC 2040 Savage Road Charleston, SC 29407 -(843) 556-8171 -www.gel.com QC Summary Workorder: 625368 Parmname NOM Sam le ual QC Units A X H ** < > UI BD y h R The TIC is a suspected aldol-condensation product Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier Analytical holding time was exceeded Analyte is a surrogate compound Result is less than value reported Result is greater than value reported Gamma Spectroscopy--Uncertain identification Results are either below the MDC or tracer recovery is low QC Samples were not spiked with this compound Preparation or preservation holding time was exceeded Sample results are rejected RPD¾ REC% Range Anlst " D RPD of sample and duplicate evaluated using +I-RL. Concentrations are <5X the RL. Qualifier Not Applicable for Radiochemistry. Results are reported from a diluted aliquot of the sample NIA RPD or %Recovery limits do not apply. ND Analyte concentration is not detected above the detection limit M M if above MDC and less than LLD NJ Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier F Estimated Value M Matrix Related Failure UJ Gamma Spectroscopy--Uncertain identification Q One or more quality control criteria have not been met. Refer to the applicable narrative or DER. K Analyte present. Reported value may be biased high. Actual value is expected to be lower. UL Not considered detected. The associated number is the reported concentration, which may be inaccurate due to a low bias. L Analyte present. Reported value may be biased low. Actual value is expected to be higher. N 1 See case narrative U Analyte was analyzed for, but not detected above the CRDL. Page 3 of 3 Date Time NI A indicates that spike recovery limits do not apply when sample concentration exceeds spike cone. by a factor of 4 or more or %RPD not applicable. "The Relative Percent Difference (RPD) obtained from the sample duplicate (DUP) is evaluated against the acceptance criteria when the sample is greater than five times (5X) the contract required detection limit (RL). In cases where either the sample or duplicate value is less than 5X the RL, a control limit of +I-the RL is used to evaluate the DUP result. * Indicates that a Quality Control parameter was not within specifications. For PS, PSD, and SDIL T results, the values listed are the measured amounts, not final concentrations. Where the analytical method has been performed under NELAP certification, the analysis has met all of the requirements of the NELAC standard unless qualified on the QC Summary. Page 27 of 27 SDG: 625368 ATTACHMENT G STACK SAMPLE LABORATORY RESULTS This attachment has been deliberately left blank. ATTACHMENTH SURF ACE WATER GRAPHS AND FIELD DATA SHEETS i' ca c., "' C) 0 ...J - 1.00E-05 1.00E-06 1.00E-07 1.00E-08 •• • -... --c-.._ .. . ·---- 1.00E-09 ■ -■ -.. ---· -''i -.........-.-. 1.00E-10 ,~ --- -' ~ 1.00E-11 R:,'),, \"-Oj ~" "::-."-Oj rd-~ ... Cottonwood Creek Dissolved Radionuclide Concentrations (uCi/ml) T • • • - --• • • - . & --T . & -T ... --... -"" • ... -... .___. -• ... -• & ----..,,....___,.. . .. ti---,t,-■-A ........ ■♦---■-■------ti ·-- ' ' ■-■-••·· ' ~"J ~o., ;rv<:S ----- ... •• ..-.-.- -- --' ~ ~ o.,OJ'),, ~t,;;, "'Vt...'. R,'b ~"Oj rd-<o ~ 1 "" ~"Oj f}'V "" •U-Nat. ■Th-230 • Ra-226 • • - ... -T ---••-- ' ~rf' ~~'V -. -.. ----- ~ ~'); n,'V "cy- G) iii CJ Cl) C) 0 .J - Cottonwood Creek Suspended Radionuclide Concentrations (uCi/ml) 1.00E-06 1.00E-07 - ... 1.00E-08 ... -.... -•• • 1.00E-09 • --=• ---••--• • 1.00E-10 - 1.00E-11 - 1.00E-12 ~<t:) ~" • ~ ~rv' 'f'r::::, ra-~ - -.. ... .-• - 'f.,n:, n}~ i •• -•• • .... • • ■-■-■-■■ ' 'f.,<t:) -:-."<o i-._'V •U-Nat. 'f.,'b ~"c:s • -- • -- ; ~ .- •---·■■-■--■--•••·• ' -fl" ra-ro ~ n}'V ~<o \V "" ■Th-230 -f:,O:, q}'V .. -• ... ••• ... --- ~"'1, ~"Oj -.. -... - & • ------. ... • • ... --- - ~"((;) rv"flj ~~ ~Oj " • Ra-226 ,.. ....... - ----... •• = q}~'1,,r::::, - •• -. -- ~rv,'1,,n:, ~<o ~'1.-ro a, 1.000E+00 1.000E-01 1.000E-02 1.000E-03 1.000E-04 1.000E-05 ~ 1.000E-06 U) Cl _3 1.000E-07 - 1.000E-08 1.000E-09 1.000E-10 1.000E-11 1.000E-12 1.000E-13 - . . . . ~'b ~'l,(J rv"' ~OJ A..~~ -- Westwater Creek Dissolved Radionuclide Concentrations (uCi/ml) -.. a -- ~ ... ---= "~ ~ \"<o ~""' ~~~ "':) ~ c:s-"I:). "t>< {I,,~ ~ "X) ~ <,}"<:::, ~ :{v~ cy? "OJ ~ rv~~ "" "'V • U-Nat. ■Th-230 •Ra-226 rf'rf' "cs-~ -- " n...~"' r>:J~ "r;§ r>:J n,~'l, "B-r,} Westwater Creek Suspended Radionuclide Concentrations (uCi/ml) 1.00E+00 1.00E-01 1.00E-02 1.00E-03 1.00E-04 - 1.00E-05 ~ C'G 1.00E-06 CJ Cl) en 1.00E-07 0 ...J - 1.00E-08 -• Ii 1.00E-09 - 1.00E-10 I .. ' .. 1.00E-11 - 1.00E-12 -.. 1.00E-13 'f,<o 'Vri,'V 'f)O;, ~,I;;:) ,,ri-')..,n:, ~ ,'-0 ,~ ')..'O;, R) ts. ri:, (\\"' ~ q}'V ,\lt ~'v /\,~ ,,<o ~" q}~ ,rvri-4' ~ri,'V 'Vt>< rs-" <:S-n:, ➔" "" "" • U-Nat ■Th 230 • Ra-226 White Mesa Mill -Standard Operating Procedures Book # 11 : Environmental Protection Manual, Section 2.1 Date: 04/14 Revision: EFR-3 Page 5 of5 Attachment A FIELD WATER ANALYSIS SURF ACE WATER WHITE MESA MILL LOCATION (Circle one :Cottonwood Creek Westwater Can on Other (describe) ____ _ pH BUFFER 7.0 __ 7_.o ___ _ BY: -f1I .O·L (Sampler's initials) pH BUFFER 4.0 4.0 -----'------ SPECIFIC CONDUCTIVITY __ _,__;,oc..;:oc..:=:c, _____ -===O=s STEAf.1 DEPTH: pH ofWATER ___________ _ 1 COND µmhos b 15 [( pH Units --------=';;..:•_b......,_ __ _ Temp °C _..._I-I_, ___ _ COND µmhos ~t7.9 pH units fe..70 Temp °C _...cc.3_. '-1_0 ___ _ Comments: ~o \03,, -,"'r.b 2.lOj .Do 103.f> TEMP ------- COND µmhos '-lli.7 :(...,.J.?i Z110 pH units _<.--'-'. 7=:J'---------...:O=..:0 10'\.'0 Temp°C __ 3_.3_._ ___ _ COND µmhos <...16. o lv.rb z1l5 pH units _<o_-7_-t ____ =.0"2) IO'i.J Temp °C --'-3.;_.~_0 ____ _ color. ,--: t (i ' White Mesa Mill -Standard Operating Procedures Date: 04/14 Revision: EFR-3 Page 5 of5 Book # 11: Environmental Protection Manual, Section 2.1 DATE: pH BUFFER 7 .0 Attachment A FIELD WATER ANALYSIS SURF ACE WATER WHITE MESA MILL BY: -ru (Sampler's initials) pH BUFFER 4.0 SPECIFIC CONDUCTIVITY JOOO uMHOs STEA.lv:1 DEPTH: pHofWATER ,.// TEMP _.v"'l"",4- ' 1 COND µmhos JV/A COND µmhos /"'l',1 pH Units l""/4 pH units Temp°C ...v/A Temp°C e//l COND µmhos ,J/A COND µmhos &It pH units 1 pH units ~ Temp°C //i Temp°C /IA Comments: _jJ_ -;;,../ g_L:io;)..:J -Gee (PfAS ~~ A /fin:' 1, Pace Analytical e na1,1ca -------------------------------- CLIENT: Project: Lab Order: 1673 Terra Avenue Sheridan, WY 82801 Energy Fuels (White Mesa) 1st Quarter Surface Water 2023 S2301236 Entire Report Reviewed by: Jessica Gillan, Project Manager Sample Cottonwood Creek was received on January 20, 2023. ph: (307) 672-8945 Date: 3/6/2023 CASE NARRATIVE ReportID:S2301236001 All samples were received and analyzed within recommended holding times, except those noted below in this case narrative. Samples were analyzed using methods outlined in the following references: Standard Methods for the Examination of Water and Wastewater, approved method versions EPA Test Methods for Evaluating Solid Waste, Physical/Chemical Methods, SW-846, online versions EPA methods 40 CFR Parts 136 and 141EPA 600/2-78-054 methods NDEP Mining Methods 40 CFR Part 50, Appendices B, J, L, 0 and FEM EQL-0310-189 10 Compendium Methods Clean Water Act Methods Update Rule for the Analysis of Effluent, current version. ASTM approved and recognized standards ISO approved and recognized standards USDA Handbook 60 Soil Survey Laboratory Manual Ver 4.0 ASA/SSSA 9 Methods of Analysis Part 2, 1982 ASA/SSSA Methods of Analysis Book 5 Part 3, 1996 Other industry approved methods All Quality Control parameters met the acceptance criteria defined by EPA and Pace Analytical except as indicated in this case narrative: Qualifiers by sample S2301236-001 -Radiochemistry/Thorium 230 (Suspended) -Analyte detected in the associated Method Blank LCS-895 -Thorium 230 in Water -Dissolved/Thorium 230 (Dissolved) -Analyte detected in the associated Method Blank LCSD-895 -Thorium 230 in Water -Suspended/Thorium 230 (Suspended) -Analyte detected in the associated Method Blan~ S2301207-037 -Radium 226 in Water -Dissolved/Radium 226 (Dissolved) -Spike Recovery outside accepted recovery limits Page 1 of 2 ~eAnalyticaf'-P_a_ce_A_n_al_yt_ic_al __________________________ _ ( _,,paci 1673 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 Definitions RL Reporting Limit A B C D E G H J L M ND 0 R s u X Qualifiers Value exceeds Maximum Contaminant Level Check MSA specifications Analyte detected in the associated Method Blank Calculated Value Report limit raised due to dilution Value above quantitation range Analyzed at Pace Gillette, WY laboratory Holding times for preparation or analysis exceeded Analyte detected below quantitation limits Analyzed by another laboratory Value exceeds Monthly Ave or MCL or is less than LCL Not Detected at the Reporting Limit Outside the Range of Dilutions RPO outside accepted recovery limits Spike Recovery outside accepted recovery limits Analyte below method detection limit Matrix Effect Date: 3/6/2023 Page 2 of2 '7eAnalytica(_P_a_c_e_A_na_l_yt_ic_a1 __________________________ _ f Jaci 1673 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 Company: ProjectName: Lab ID: Sample Analysis Report Energy Fuels (White Mesa) 6425 S. Highway 191 Blanding, UT 84511 1st Quarter Surface Water 2023 S2301236-001 ClientSample ID: Cottonwood Creek CCC: PWSID: Comments Date Reported 3/6/2023 Report ID: S2301236001 WorkOrder: S2301236 Collection Date: 1/18/2023 10:35:00 AM Date Received: FieldSampler: Matrix: 1/20/2023 TH Water Analyses Result Units Qual RL Method Date Analyzed/lnit General Parameters Total Dissolved Solids (180) 1020 mg/L 10 SM 2540 01/24/2023 1407 AB Metals -Dissolved Uranium 0.0038 mg/L 0.0003 EPA 200.8 01/23/2023 1754 MS Metals -Suspended Uranium 0.0023 mg/L 0.0003 EPA 200.8 02/07/2023 810 MS Radionuclides -Dissolved Radium 226 0.4 pCi/L 0.2 SM 7500 Ra-8 02/17/2023 1139 WN Radium 226 Precision (±) 0.1 pCi/L SM 7500 Ra-8 02/17/2023 1139 WN Thorium 230 ND pCi/L 0.2 ACW10 02/21/2023 1056 AEF Thorium 230 Precision (±) NA pCi/L ACW10 02/21/2023 1056 AEF Thorium 229 Tracer (30-120) 49 % ACW10 02/21/2023 1056 AEF Radionuclides -Suspended Radium 226 1.9 pCi/L 0.2 SM 7500 Ra-8 02/17/2023 1139 WN Radium 226 (Suspended) Precision (±) 0.2 pCi/L SM 7500 Ra-8 02/17/2023 1139 WN Thorium 230 1.0 pCi/L B 0.2 ACW10 02/28/2023 1518 AEF Thorium 230 Precision (±) 0.3 pCi/L B ACW10 02/28/2023 1518 AEF Thorium 229 Tracer (30-120) 89 % ACW10 02/28/2023 1518 AEF Radionuclides -Total Gross Alpha 6.9 pCi/L 5 SM 71108 02/23/2023 1102 AEF Gross Alpha Precision (±) 1.8 pCi/L SM 7110B 02/23/2023 1102 AEF These results apply only to the samples tested. Page 1 of 1 ~AJ/Jlytica( Pace Analytical 1673 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 I ANALYTICAL QC SUMMARY REPORT CLIENT: Energy Fuels (White Mesa) Date: 3/6/2023 Work Order: S2301236 Report ID: S2301236001 Project: 1st Quarter Surface Water 2023 Dissolved Metals by ICPMS EPA 200.8 -Water Sample Type: MBLK Units: mg/L MBLK (01/23/23 14:51) RunNo: 207461 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Uranium ND 0.0003 Dissolved Metals by ICPMS EPA 200.8 -Water Sample Type: LCS Units: mg/L LCS (01 /23/23 14:57) RunNo: 207461 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Uranium 0.102 0.0003 0.1 102 85 -115 Dissolved Metals by ICPMS EPA 200.8 -Water Sample Type: MS Units: mg/L S2301220-001BS (01/23/2315:14) RunNo: 207461 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Uranium 0.629 0.0003 0.6 0.0019 105 70 -130 S2301230-003BS (01/23/23 16:43) RunNo: 207461 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Uranium 0.586 0.001 0.6 ND 97.7 70 -130 Dissolved Metals by ICPMS EPA 200.8 -Water Sample Type: MSD Units: mg/L S2301220-001BMSD (01/23/2315:19) RunNo: 207461 Analyte Result RL Cone %RPO %REC % RPO Limits Qual Uranium 0.597 0.0003 0.629 5.25 99.2 20 S2301230-003BMSD (01/23/23 16:49) RunNo: 207461 Analyte Result RL Cone %RPO %REC % RPO Limits Qual Uranium 0.590 0.001 0.586 0.689 98.4 20 Gross Alpha, Beta by SM 71108 Sample Type: MBLK Units: pCi/L MBLK-752 (02/22/2312:16) Run No: 208243 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Gross Alpha ND 2 Gross Alpha, Beta by SM 711 OB Sample Type: LCS Units: pCi/L LCSA-752 (02/22/2312:16) RunNo: 208243 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Gross Alpha 73 2 64.8 113 85 -134 Gross Alpha, Beta by SM 711 OB Sample Type: MS Units: pCi/L S2212353-002DMSA (02/22/23 12: 16) RunNo: 208243 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Gross Alpha 64 3 64.8 ND 98.5 55 -146 Gross Alpha, Beta by SM 71108 Sample Type: DUP Units: pCi/L S2212353-001 DDUP (02/22/23 12:16) RunNo: 208243 Analyte Result RL Ref Samp %RPO %REC % RPO Limits Qual Gross Alpha ND 2 ND 20 Page 1 of 5 ,?eAna/ytfcaf -P_a_c_e_A_n_al_yt_ic_al __________________________ _ /Jaci 1673 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 ANALYTICAL QC SUMMARY REPORT CLIENT: Work Order: Energy Fuels (White Mesa) S2301236 Project: 1st Quarter Surface Water 2023 Radium 226 in Water -Dissolved MB-2461 (02/17/23 08:22) Analyte Radium 226 (Dissolved) Radium 226 in Water -Dissolved LCS-2461 (02/17 /23 08:22) Analyte Radium 226 (Dissolved) Radium 226 in Water -Dissolved LCSD-2461 (02/17/23 08:22) Analyte Radium 226 (Dissolved) Radium 226 in Water -Dissolved S2301207-037DMS (02/17/23 08:22) Analyte Radium 226 (Dissolved) Radium 226 in Water -Suspended MB-2461 (02/17/23 08:22) Analyte Radium 226 (Suspended) Radium 226 in Water -Suspended LCS-2461 (02/17/23 08:22) Analyte Radium 226 (Suspended) Radium 226 in Water -Suspended LCSD-2461 (02117123 08:22) Analyte Radium 226 (Suspended) Sample Type: MBLK Date: 3/6/2023 Report ID: S2301236001 Units: pCi/L RunNo: 208098 PrepDate: 02/09/23 11 :54 BatchlD: 20407 Result RL Spike Ref Samp ¾REC % Rec Limits Qual ND Sample Type: LCS RunNo: 208098 Result 7.8 Sample Type: LCSD RunNo: 208098 Result 7.7 Sample Type: MS RunNo: 208098 Result 190 0.2 Units: pCi/L PrepDate: 02/09/23 11 :54 RL Spike Ref Samp 0.2 7.74 Units: pCi/L PrepDate: 02/09/23 11 :54 RL Cone ¾RPO 0.2 7.8 0.712 Units: pCi/L Prep Date: 02/09/23 11 :54 RL Spike Ref Samp 0.2 15.5 203 Sample Type: MBLK Units: pCi/L BatchlD: 20407 ¾REC % Rec Limits 100 79 -112 BatchlD: 20407 ¾REC % RPO Limits 99.4 20 BatchlD: 20407 %REC % Rec Limits -84.4 68 -123 RunNo: 208098 PrepDate: 02/09/23 11 :57 Batch ID: 20408 Qual Qual Qual s Result RL Spike Ref Samp %REC % Rec Limits Qual ND 0.2 Sample Type: LCS Units: pCI/L RunNo: 208098 Prep Date: 02109123 11 :57 Batch ID: 20408 Result RL Spike Ref Samp %REC % Rec Limits Qual 7.8 0.2 7.74 100 79 -112 Sample Type: LCSD Units: pCi/L RunNo: 208098 PrepDate: 02109/23 11 :57 BatchlD: 20408 Result Rl Cone ¾RPO %REC % RPO Limits Qual 7.7 0.2 7.8 0.712 99.4 20 Page 2 of 5 ~ Analyf ( Pace Aaalyt;cal e 1ca 1673 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 ANALYTICAL QC SUMMARY REPORT CLIENT: Energy Fuels (White Mesa) Date: 3/6/2023 Work Order: S2301236 Report ID: S2301236001 Project: 1st Quarter Surface Water 2023 Thorium 230 in Water -Dissolved Sample Type: MBLK Units: pCi/L MB-894 (02/20/23 16:25) RunNo: 208173 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Thorium 230 (Dissolved) ND 0.2 MB-895 (02/28/23 11:10) RunNo: 208421 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Thorium 230 (Dissolved) 0.2 0.2 Thorium 230 in Water -Dissolved Sample Type: LCS Units: pCi/L LCS-894 (02/20/23 16:25) Run No: 208173 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Thorium 230 (Dissolved) 13 0.2 12 100 74 -129 LCS-895 (02/28/23 11 :10) RunNo: 208421 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Thorium 230 (Dissolved) 13 0.2 12 103 74 -129 B Thorium 230 in Water -Dissolved Sample Type: LCSD Units: pCi/L LCSD-894 (02/20/23 16:25) RunNo: 208173 Analyte Result RL Cone %RPO %REC % RPO Limits Qual Thorium 230 (Dissolved) 13 0.2 13 4.75 105 20 LCSD-895 (02/28/2311 :10) RunNo: 208421 Analyte Result RL Cone %RPO %REC % RPO Limits Qual Thorium 230 (Dissolved) 13 0.2 13 1.90 101 20 B Thorium 230 in Water -Suspended Sample Type: MBLK Units: pCi/L MB-895 (02/28/23 11: 10) RunNo: 208421 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Thorium 230 (Suspended) 0.2 0.2 MB-W200 (02/28/23 15:18) RunNo: 208421 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Thorium 230 (Suspended) ND 0.2 Thorium 230 in Water -Suspended Sample Type: LCS Units: pCi/L LCS-895 (02/28/23 11 :10) RunNo: 208421 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Thorium 230 (Suspended) 13 0.2 12 103 74 -129 B Thorium 230 in Water -Suspended Sample Type: LCSD Units: pCi/L LCSD-895 (02/28/23 11:10) RunNo: 208421 Analyte Result RL Cone %RPO %REC % RPO Limits Qual Thorium 230 (Suspended) 13 0.2 13 1.90 101 20 B Page 3 of 5 ;2c,Ana/ytlcai' Pace Analytical 1673 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 ANALYTICAL QC SUMMARY REPORT CLIENT: Energy Fuels (White Mesa) Date: 3/6/2023 Work Order: S2301236 Report ID: S2301236001 Project: 1st Quarter Surface Water 2023 Solids By SM 2540 Sample Type: MBLK Units: mg/L DI (01/21/2313:13) Run No: 207452 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Total Dissolved Solids (180) ND 10 DI (01/24/2314:02) Run No: 207625 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Total Dissolved Solids (180) ND 10 Solids By SM 2540 Sample Type: LCS Units: mg/L CONTROL (01/21/2313:16) RunNo: 207452 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Total Dissolved Solids (180) 2540 10 2460 103 90 -110 CONTROL (01/24/23 14:03) RunNo: 207625 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Total Dissolved Solids (180) 2540 10 2460 103 90 -110 Solids By SM 2540 Sample Type: DUP Units: mg/L S2301210-001A (01 /21/23 13:25) RunNo: 207452 Analyte Result RL Ref Samp %RPO %REC % RPO Limits Qual Total Dissolved Solids (180) 710 10 710 0.283 10 S2301233-001A (01/21/23 13:52) RunNo: 207452 Analyte Result RL Ref Samp %RPO %REC % RPO Limits Qual Total Dissolved Solids (180) 190 10 200 3.05 10 S2301256-001A (01/24/23 14:13) RunNo: 207625 Analyte Result RL Ref Samp %RPO %REC % RPO Limits Qual Total Dissolved Solids (180) 20 10 30 8.00 10 S2301260-001A (01/24/23 14:17) RunNo: 207625 Analyte Result RL Ref Samp %RPO %REC % RPO Limits Qual Total Dissolved Solids (180) 1910 10 1900 0.631 10 Page 4 of 5 A allitti 1• Pace Analytical e n 1uCa --------------------------------- 1673 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 ANALYTICAL QC SUMMARY REPORT CLIENT: Energy Fuels (White Mesa) Date: 3/6/2023 Work Order: S2301236 Report ID: S2301236001 Project: 1st Quarter Surface Water 2023 Suspended Natural Uranium Sample Type: MBLK Units: mg/L MBLK (02/07/23 07:40) RunNo: 207801 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Uranium Suspended ND 0.0003 Suspended Natural Uranium Sample Type: LCS Units: mg/L LCS (02/07/23 07:46) RunNo: 207801 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Uranium Suspended 0.0984 0.0003 0.1 98.4 85 -115 Suspended Natural Uranium Sample Type: MS Units: mg/L S2301236-001 CS (02/07/23 08:22) RunNo: 207801 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Uranium Suspended 1.06 0.0003 1.1 0.0023 96.0 70 -130 Suspended Natural Uranium Sample Type: MSD Units: mg/L S2301236-001CMSD (02/07/23 08:27) RunNo: 207801 Analyte Result RL Cone %RPO %REC % RPO Limits Qual Uranium Suspended 1.03 0.0003 1.06 2.28 93.8 20 Suspended Natural Uranium Sample Type: DUP Units: mg/L S2301236-001 CD (02/07/23 08:16) RunNo: 207801 Analyte Result RL Ref Samp %RPO %REC % RPO Limits Qual Uranium Suspended 0.0023 0.0003 0.0023 1.38 20 Page 5 of 5 ,' e,ENERGYFUELSRESOURCES Sheet 1 of 1 CHAIN OF CUSTODY Samples Shipped to: Inter-Mountain Labs/Pace Contact: Tanner Holliday -1-6-73-T-er-ra-A-ve__________ Ph: 435 678 2221 Sheridan, WY 82801 qpalmer@enerqyf uels.com Chain of Custody/Sampling Analysis Request p roject s amp ers N ame s amp ers s· t 1gna ure 1st Quarter Surface 60Af\0C.~ 1/.·J \ Water 2023 Tanner Holliday V Time Sample ID Date Collected Collected Laboratory Analysis Requested Cottonwood Creek 1/18/2023 1035 QUOTE# 1661 (dJD/ c\-::Z.{-w1 Comments: Please send report to Kathy Weinel at kweinel@energyfuels.com Trace Metals are non Filtered non Preserved. Relinquished By:(Signature) oM.VC-1& Relinquished By:(Signature) Datemme Received By:(Signature) 111912023 n .... ;--I 1130 ~1-vl{J1 . Date/Time Received By:(Signature) --o_ l/Cc Ro1 {l-JJ, _ftc.( r-,;.j Date/Time (/d;)/Jj Date/Time !Pace DC#_ Title: ENV-FRM-SHRT-0033 v00_Condition Upon Receipt Form Terra Lab I Jh:.;nlC:.. ~!;. •::~ Effective Date: 05/13/2022 Survey Meter# Model 2241-2; SN 182115 pH strip lot # __ H_C_2_0_3_86 __ 4~------ Thermometer SN# __ 2_7_1_3_0_4_7_5 _____ _ Condition Upon Receipt (Attach to COG) s.ampl e Recejpt 1 Number of ice chests/packages received: .f 411 pf-e ROI? Note as "OTC" if samples are received over the counter, unpackaged e No 2 Temperature of cooler/sam ples. (If more than 8 coolers, please write on back} ;:~~= g~r~=~~=~ ~:gn -=-~·-~ 11 llf------lll------llll------!11~-----!111-------nll--- Acceptable is: 0.1° to 10°c for Bacteria: and 0.1° to 6°C for most other water parameters. Samples may not have had adequate time to cool following collection. Indicate ROI (Received on Ice) for iced samples received on the same day as sampled. in addition to temperature at receipt. Client contact for temperatures outside method criteria must be documented below .. 3 Emission rate of samples for radiochemical analyses < 0.SmR/hr? @ No N/A 4 COC Number (If applicable): 5 Do the number of bottles agree with the COC? 6 Were the samples received intact? (no broken bottles. leaks. etc.) 7 Were the sample custody seals intact? 8 Is the COC properly completed, legible, and signed? §.sw,p.m Verificatjo n. Labeling & Djstributjo_n 1 Were all requested analyses understood and appropriate? 2 Did the bottle labels correspond with the COG information? 3 Samples collected in method-prescribed containers? 4 Sample Preservation: No No No No No No N/A NIA NIA pH at Receipt: Final pH (if added in lab): Preservative/Lot# Date/Time Added: Total Metals ::::::...'7 Diss Metals Nutrient ___ Cyanide Sulfide Phenol SOWA Rads Total Metals Diss Metals Nutrient ___ Cyanide Sulfide Phenol SOWA Rads 5 VOA vials have <6mm headspace? HN03 ________ _ HN03 ________ _ H,so. ________ _ NaOH ZnAcet ________ _ H,so. ________ _ HN03 ________ _ Yes 6 Were all analyses within holding time at the time of receipt? @ 7 Have rush or project due dates been checked and accepted? 8 Do samples require subcontracted analyses? Yes Yes No No No @ ~rvedinmeta.±J If "Yes", which type of subcontracting is required? General Customer-Specified Certified Sample Receipt, Verification, Login, Labeling & Distribution completed by (initials): OJ Set ID: _J_J_1_0_, _~..1_.,.b_---- Disc..c,epancy Docum,e,n1,atLon (use back of sheet for notes on discrepancies) Any items listed above with a response of "No" or do not meet specifications must be resolved. Person Contacted: _______________ Method of Contact: Phone: ___________ _ Initiated By_: __________ Date/Time: __________ _ Email: Problem: Resolution: Qualtrax ID: 70962 Page 1 of 1 ( White Mesa Mill -Standard Operating Procedures Book #1]: Environmental Protection Manual, Section 2.1 Date: 04/14 Revision: EFR-3 Page 5 of5 Attachment A FIELD WATER ANALYSIS SURF ACE WATER WHITE MESA MILL LOCATION (Circle o~nwood Creek estwater Can on Other (describe) ___ _ BY : __ --r,___,;_;_')J....1..., _D-=---L...:....._ __ _ (Sampler's initials) pH BUFFER 7.0 _7---'. O ___ _ .pH BUFFER 4.0 -----'-'--· 0=------ SPECIFIC CONDUCTIVITY _ _,_,I '-"()'-""--____ _,::;=MH=O=s II STEAf.-1 DEPTH: pHofWATER _~7--'-,D=-----S~------ 1 COND µmhos J-81 pH Units ~. qg Temp°C . b1 COND µmh~os~~-7_0 __ _ pH units ~ 7, lO Temp °C _7_. '-_1 ___ _ Comments: -rwr.b I C.0.5 Ob 11>0.o + 08"55 . Le TEMP 7 . b 7 COND µmhos :l. 75 pH units 7.0/ ------- Temp0C 7. '------:::....L-___ _ pHunits ~ 7,/'{ Temp °C -~~--- White Mesa Mill -Standard Operating Procedures Book #I l: Environmental Protection Manual, Section 2.1 Date: 04/14 Revision: EFR-3 Page 5 of5 Attachment A FIELD WATER ANALYSIS SURF ACE WATER WHITE MESA MILL LOCATION (Circle one):Cottomvood Creek (f es~ater Can~ther (describe) ____ _ pH BUFFER 7.0 __ 7_._0 __ _ BY: -r, (Sampler's initials) pH BUFFER 4.0 __ Y-'-._o __ _ SPECIFIC CONDUCTIVITY ----'--'toc..-=o=O ______ -=uMH==-=O=s STE.Alv1 DEPTH: pH of WATER ____ m~i.1~14 ______ _ 1 COND u.mhos =='-----..0<.L.1:1--COND µmhos N/A pH Units ---~~v~'A __ pH units ('1/4 Temp °C /11'64: Temp °C 4A- COND µmhos .l""',(A COND µmhos .,,...../,4 pH units VA-pH units ,0 Temp0C M Temp°C ~ Comments: ,?eAna/yticaf'-P_a_c_e_A_n_al_yt_ic_al __________________________ _ I J aci 1673 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 CLIENT: Project: Lab Order: Energy Fuels (White Mesa) 2nd Quarter Surface Water 2023 S2304374 Entire Report Reviewed by: Jessica Gillan, Project Manager Sample Cottonwood Creek was received on April 28, 2023. Date: 6/2/2023 CASE NARRATIVE ReportID:S2304374001 All samples were received and analyzed within recommended holding times, except those noted below in this case narrative. Samples were analyzed using methods outlined in the following references: Standard Methods for the Examination of Water and Wastewater, approved method versions EPA Test Methods for Evaluating Solid Waste, Physical/Chemical Methods, SW-846, online versions EPA methods 40 CFR Parts 136 and 141 EPA 600/2-78-054 methods NDEP Mining Methods 40 CFR Part 50, Appendices B, J , L, 0 and FEM EQL-0310-189 10 Compendium Methods Clean Water Act Methods Update Rule for the Analysis of Effluent, current version. ASTM approved and recognized standards ISO approved and recognized standards USDA Handbook 60 Soil Survey Laboratory Manual Ver 4.0 ASA/SSSA 9 Methods of Analysis Part 2, 1982 ASA/SSSA Methods of Analysis Book 5 Part 3, 1996 Other industry approved methods All Quality Control parameters met the acceptance criteria defined by EPA and Pace Analytical except as indicated in this case narrative: Qualifiers by sample S2304354-001 -Gross Alpha, Beta by SM 711 OB/Gross Alpha -RPD outside accepted recovery limits Page 1 of2 ,} A 1,11r I Pace Analytical /Jace na1.1ca -------------------------------- 1513 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 Date: 6/2/2023 Definitions RL Reporting Limit Qualifiers Value exceeds Maximum Contaminant Level A Check MSA specifications B Analyte detected in the associated Method Blank C Calculated Value D Report limit raised due to dilution E Value above quantitation range G Analyzed at Pace Gillette, WY laboratory H Holding times for preparation or analysis exceeded J Analyte detected below quantitation limits L Analyzed by another laboratory M Value exceeds Monthly Ave or MCL or is less than LCL ND Not Detected at the Reporting Limit 0 Outside the Range of Dilutions R RPD outside accepted recovery limits S Spike Recovery outside accepted recovery limits U Analyte below method detection limit X Matrix Effect Page 2 of2 $ceAllalytic3J'-P_a_c_e_A_na_lyt_ic_al __________________________ _ 1673 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 I Company: ProjectName: Lab ID: Sample Analysis Report Energy Fuels (White Mesa) 6425 S. Highway 191 Blanding, UT 84511 2nd Quarter Surface Water 2023 S2304374-001 ClientSample ID: Cottonwood Creek COC: PWSID: Comments Date Reported 6/2/2023 Report ID: S2304374001 WorkOrder: S230437 4 CollectionDate: 4/27/2023 9:00:00 AM DateReceived: 4/28/2023 9:32:00 AM FieldSampler: Matrix: Water Analyses Result Units Qual RL Method Date Analyzed/lnit General Parameters Total Dissolved Solids (180) 180 mg/L 10 SM 2540 05/02/2023 1357 JMS Total Suspended Solids 1270 mg/L 5 SM 2540 04/28/2023 1527 JMS Metals -Dissolved Uranium 0.0039 mg/L 0.0003 EPA 200.8 05/03/2023 434 MS Metals -Suspended Uranium 0.0019 mg/L 0.0003 EPA 200.8 05/09/2023 628 MS Radionuclides -Dissolved Radium 226 0.4 pCi/L 0,2 SM 7500 Ra-B 05/18/2023 1453 WN Radium 226 Precision (±) 0.1 pCi/L SM 7500 Ra-B 05/18/2023 1453 WN Thorium 230 ND pCi/L 0.2 ACW10 05/17/2023 1257 AEF Thorium 230 Precision (±) NA pCi/L ACW10 05/17/2023 1257 AEF Thorium 229 Tracer (30-120) 80 % ACW10 05/17/2023 1257 AEF Radionuclides -Suspended Radium 226 1.4 pCi/L 0.2 SM 7500 Ra-8 05/18/2023 1453 WN Radium 226 (Suspended) Precision (±) 0.1 pCi/L SM 7500 Ra-B 05/18/2023 1453 WN Thorium 230 0.9 pCi/L 0.2 ACW10 05/22/2023 824 AEF Thorium 230 Precision (±) 0.2 pCi/L ACW10 05/22/2023 824 AEF Thorium 229 Tracer (30-120) 94 % ACW10 05/22/2023 824 AEF Radionuclides -Total Gross Alpha ND pCi/L 4 SM7110B 05/22/2023 1557 AEF Gross Alpha Precision (±) NA pCi/L SM 71108 05/22/2023 1557 AEF These results apply only to the samples tested. Page 1 of 1 An 1,111 • J' Pace Analytical e a1,IGa --------------------------------- 1673 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 ANALYTICAL QC SUMMARY REPORT CLIENT: Work Order: Energy Fuels (White Mesa) S2304374 Project: 2nd Quarter Surface Water 2023 Dissolved Metals by ICPMS EPA 200.8 -Water MBLK (05/03/23 08:56) Analyte Uranium Dissolved Metals by ICPMS EPA 200.8 -Water LCS (05/03/23 02:06) Analyte Uranium Dissolved Metals by ICPMS EPA 200.8 -Water S2304378-006BS (05/03/23 05:52) Analyte Uranium Dissolved Metals by ICPMS EPA 200.8 -Water S2304378-006BMSD (05/03/23 06:10) Analyte Uranium Gross Alpha, Beta by SM 711 OB MBLK-763 (05/22/23 15:57) Analyte Gross Alpha Gross Alpha, Beta by SM 711 OB LCS A-763 (05/22/23 15:57) Analyte Gross Alpha Gross Alpha, Beta by SM 7110B S2304374-001 DMSA (05/22/23 15:57) Analyte Gross Alpha Gross Alpha, Beta by SM 7110B S2304354-001 EDUP (05/22/23 15:57) Analyte Gross Alpha Sample Type: MBLK RunNo: 210103 Result RL ND 0.0003 Sample Type: LCS RunNo: 210103 Result RL 0.102 0.0003 Sample Type: MS RunNo:210103 Result RL 0.580 0.0003 Sample Type: MSD RunNo: 210103 Result RL 0.602 0.0003 Sample Type: MBLK RunNo: 210638 Result RL ND 2 Sample Type: LCS RunNo: 210638 Result RL 65 2 Sample Type: MS Run No: 210638 Result RL 61 4 Sample Type: DUP RunNo: 210638 Result RL 6 4 Date: 6/2/2023 Report ID: S2304374001 Units: mg/L Spike Ref Samp %REC % Rec Limits Units: mg/L Spike Ref Samp %REC % Rec Limits 0.1 102 85 -115 Units: mg/L Spike Ref Samp %REC % Rec Limits 0.6 0.0026 96.2 70 -130 Units: mg/L Cone %RPO %REC % RPO Limits 0.580 3.84 99.9 20 Units: pCi/L Spike Ref Samp %REC % Rec Limits Units: pCi/L Spike Ref Samp %REC % Rec Limits 64.8 101 85 -134 Units: pCi/L Spike Ref Samp %REC % Rec Limits 64.8 ND 88.1 55 -146 Units: pCi/L Ref Samp %RPO %REC % RPO Limits 4 34.5 20 Page 1 of 5 Qua! Qual Qual Qua! Qua! Qual Qual Qua! R • Pace Analytical aceAnalytical --------------------------- 1673 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 ANALYTICAL QC SUMMARY REPORT CLIENT: Work Order: Energy Fuels (White Mesa) S2304374 Project: 2nd Quarter Surface Water 2023 Radium 226 in Water -Dissolved MB-2485 (05/18/23 11 :01) Analyte Radium 226 (Dissolved) Radium 226 in Water -Dissolved LCS-2485 (05/18/23 11 :01) Analyte Radium 226 (Dissolved) LCS-2485 (05/26/23 08:42) Analyte Radium 226 (Dissolved) Radium 226 in Water -Dissolved LCSD-2485 (05/18/23 11 :01) Analyte Radium 226 (Dissolved) LCSD-2485 (05/26/23 08:42) Analyte Radium 226 (Dissolved) Radium 226 in Water -Dissolved S2304349-002EMS (05/18/23 11 :01) Analyte Radium 226 (Dissolved) Radium 226 in Water -Dissolved S2304349-002EMSD (05/18/23 11 :01) Analyte Radium 226 (Dissolved) Radium 226 in Water -Suspended MB-2485 (05/18/23 11 :01) Analyte Radium 226 (Suspended) Radium 226 in Water -Suspended LCS-2485 (05/18/23 11 :01) Analyte Radium 226 (Suspended) Radium 226 in Water -Suspended LCSD-2485 (05/18/23 11 :01) Analyte Radium 226 (Suspended) Sample Type: MBLK RunNo: 210498 Result ND Sample Type: LCS Run No: 210498 Result 7.8 RunNo: 210805 Result 7.5 Sample Type: LCSD Run No: 210498 Result 8.3 Run No: 210805 Result 8.4 Sample Type: MS RunNo: 210498 Result 14.8 Sample Type: MSD RunNo: 210498 Result 14.6 Sample Type: MBLK RunNo: 210498 Result ND Sample Type: LCS RunNo: 210498 Result 7.8 Sample Type: LCSD RunNo:210498 Result 8.3 Date: 6/2/2023 Report ID: S2304374001 Units: pCi/L Prep Date: 05/10/23 16:33 BatchlD: 20651 RL Spike Ref Samp %REC % Rec Limits 0.2 Units: pCi/L Prep Date: 05/10/23 16:33 BatchlD: 20651 RL Spike Ref Samp %REC % Rec Limits 0.2 7.74 100 79 -112 Prep Date: 05/10/23 16:33 BatchlD: 20651 RL Spike Ref Samp ¾REC % Rec Limits 0.2 7.74 96.7 79 -112 Units: pCi/L Prep Date: 05/10/23 16:33 BatchlD: 20651 RL Cone ¾RPO %REC % RPO Limits 0.2 7.8 6.39 107 20 Prep Date: 05/10/23 16:33 BatchlD: 20651 RL Cone ¾RPO %REC % RPO Limits 0.2 7.5 12.1 109 20 Units: pCi/L PrepDate: 05/10/23 16:33 BatchlD: 20651 RL Spike Ref Samp ¾REC % Rec Limits 0.2 15.5 0.4 92.9 68 -123 Units: pCi/L PrepDate: 05/10/23 16:33 BatchlD: 20651 RL Cone %RPO %REC % RPO Limits 0.2 14.8 1.22 91.7 20 Units: pCi/L PrepDate: 05/10/23 16:34 BatchlD: 20652 RL Spike Ref Samp %REC % Rec Limits 0.2 Units: pCi/L PrepDate: 05/10/23 16:34 BatchlD: 20652 RL Spike Ref Samp %REC % Rec Limits 0.2 7.74 100 79 -112 Units: pCi/L PrepDate: 05/10/23 16:34 BatchlD: 20652 RL Cone %RPO ¾REC % RPO Limits 0.2 7.8 6.39 107 20 Page 2 of 5 Qual Qual Qual Qual Qual Qual Qual Qual Qual Qual An /,.,,. 1• Pace Analytical e a1.1ca -------------------------------- 1613 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 ANALYTICAL QC SUMMARY REPORT CLIENT: Work Order: Energy Fuels (White Mesa) S2304374 Project: 2nd Quarter Surface Water 2023 Thorium 230 in Water -Dissolved MB-903 (05/17/23 08:30) Analyte Thorium 230 (Dissolved) MB-904 (05/22/23 08:24) Analyte Thorium 230 (Dissolved) Thorium 230 in Water -Dissolved LCS-903 (05/17/23 08:30) Analyte Thorium 230 (Dissolved) LCS-904 (05/22/23 08:24) Analyte Thorium 230 (Dissolved) Thorium 230 in Water -Dissolved LCSD-903 (05/17/23 08:30) Analyte Thorium 230 (Dissolved) LCSD-904 (05/22/23 08:24) Analyte Thorium 230 (Dissolved) Sample Type: MBLK Run No: 210519 Result ND RunNo:210610 Result ND Sample Type: LCS RunNo: 210519 Result 14 RunNo:210610 Result 16 Sample Type: LCSD RunNo: 210519 Result 15 RunNo: 21061 O Result 14 RL 0.2 RL 0.2 RL 0.2 RL 0.2 RL 0.2 RL 0.2 Date: 6/2/2023 Report ID: S2304374001 Units: pCI/L Spike Ref Samp %REC % Rec Limits Qual Spike Ref Samp %REC % Rec Limits Qual Units: pCi/L Spike Ref Samp %REC % Rec Limits Qual 12 114 74 -129 Spike Ref Samp %REC % Rec Limits Qual 12 125 74 -129 Units: pCi/L Cone %RPO %REC % RPO Limits Qual 14 3.41 118 20 Cone %RPO %REC % RPO Limits Qual 16 9.88 113 20 Page 3 of 5 ;2c, An /yf ( Pace Aoalyt;oal e a ,ca 1673 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 ANALYTICAL QC SUMMARY REPORT CLIENT: Energy Fuels (White Mesa) Date: 6/2/2023 Work Order: S2304374 Report ID: S2304374001 Project: 2nd Quarter Surface Water 2023 Thorium 230 in Water -Suspended Sample Type: MBLK Units: pCi/L MB-903 (05/17/23 08:30) RunNo:210519 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Thorium 230 (Suspended) ND 0.2 MB-W209 (05/18/23 08:20) RunNo: 210519 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Thorium 230 (Suspended) ND 0.2 MB-904 (05/22/23 08:24) RunNo: 21061 O Analyte Result RL Spike Ref Samp %REC % Rec Limits Qua! Thorium 230 (Suspended) ND 0.2 Thorium 230 in Water -Suspended Sample Type: LCS Units: pCi/L LCS-903 (05/17/23 08:30) RunNo:210519 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qua! Thorium 230 (Suspended) 14 0.2 12 114 74 -129 LCS-904 (05/22/23 08:24) RunNo: 210610 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Thorium 230 (Suspended) 16 0.2 12 125 74 -129 Thorium 230 in Water -Suspended Sample Type: LCSD Units: pCi/L LCSD-903 (05/17/23 08:30) RunNo:210519 Analyte Result RL Cone %RPO %REC % RPO Limits Qual Thorium 230 (Suspended) 15 0.2 14 3.41 118 20 LCSD-904 (05/22/23 08:24) RunNo:210610 Analyte Result RL Cone %RPO %REC % RPO Limits Qual Thorium 230 (Suspended) 14 0.2 16 9.88 113 20 Solids By SM 2540 Sample Type: MBLK Units: mg/L DI (05/02/23 13:51) RunNo: 210094 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Total Dissolved Solids (180) ND 10 Solids By SM 2540 Sample Type: LCS Units: mg/L CONTROL (04/28/2315:21) RunNo: 209961 Analyte Result RL Spike Ref Samp %REC % Rec Limits Qual Total Suspended Solids 900 5 926 97.2 90 -110 Solids By SM 2540 Sample Type: CUP Units: mg/L S2304388-001A (05/02/23 14:03) RunNo: 210094 Analyte Result RL Ref Samp %RPO %REC % RPO Limits Qual Total Dissolved Solids (180) 5260 10 5290 0.569 10 Page 4 of 5 , Pace Analytical aceAnalytical ---------------------------- 1513 Terra Avenue Sheridan, WY 82801 ph: (307) 672-8945 ANALYTICAL QC SUMMARY REPORT CLIENT: Work Order: Energy Fuels (White Mesa) S2304374 Project: 2nd Quarter Surface Water 2023 Suspended Natural Uranium MBLK (05/09/23 04:59) Analyte Uranium Suspended Suspended Natural Uranium LCS (05/09/23 05:05) Analyte Uranium Suspended Suspended Natural Uranium S2304286-001 BS (05/09/23 05:34) Analyte Uranium Suspended Suspended Natural Uranium S2304286-001 BMSD (05/09/23 05:40) Analyte Uranium Suspended Suspended Natural Uranium S2304286-001 BO (05/09/23 05: 16) Analyte Uranium Suspended Sample Type: MBLK RunNo: 210201 Result ND Sample Type: LCS RunNo: 210201 Result 0.100 Sample Type: MS RunNo: 210201 Result 1.11 Sample Type: MSD RunNo: 210201 Result 1.14 Sample Type: DUP RunNo: 210201 Result ND RL 0.0003 RL 0.0003 RL 0.0003 RL 0.0003 RL 0.0003 Date: 6/2/2023 Report ID: S2304374001 Units: mg/L Spike Ref Samp %REC % Rec Limits Units: mg/L Spike Ref Samp %REC % Rec Limits 0.1 100 85 -115 Units: mg/L Spike Ref Samp %REC % Rec Limits 1.1 ND 101 70 -130 Units: mg/L Cone %RPO %REC % RPO Limits 1.11 2.84 104 20 Units: mg/L Ref Samp %RPO %REC % RPO Limits ND 20 Page 5 of 5 Qual Qual Qual Qual Qual J-~· r· •e,FNERGYFUELS RFSOURCFS Sheet 1 of 1 CHAIN OF CUSTODY Samples Shipped to: _ln_t_e_r-_M_o_u_nt_a_in_L_a_b_s/_P_a_c_e ______ Contact: Tanner Holliday 1673 Terra Ave Ph: 435 678 2221 Sheridan, WY 8280 1 gpalmer@energyfuels.com Chain of Custody/Sampling Analysis Request p . roJect s amp ers N ame s ampler~ s ignature 2nd Quarter Surface ,~aM/Jr_#~ Water 2023 Tanner Holliday Time Sample ID Date Collected Collected Laboratory Analysis Requested Cottonwood Creek 4/27/2023 900 QUOTE# 1660, 1661 ( ,Ho'/? , Comments: Please send report to Kathy Weinel at kweinel@energyfuels.com Trace Metals are non Filtered non Preserved . Datemme Received By:(Signature) 4/27/2023 ~ 0; _ 1130 ~ Date/Time Received By:(Signature) Date/Time YIJJIJJ OC/]~ Date/Time ~o.J~'C (207 fcAJ Ji.,v'f,cf b(c l u_(~. 5C,t.( fl,rru v1f (,,,.r (N((:J. C ,,,-IOI, ,Ir',-.) DC#_Title: ENV-FRM-SHRT-0033 v02_Condition Upon Receipt Form Terra Lab Effective Date: 4/24/2023 Survey Meter # Model 2241-2; SN 182119 pH strip lot #_H....;C_2_1..;..03 ___ 3_0 _____ _ Thermometer SN#_2_21_5_1_12_7_2 ______ _ Condition Upon Receipt (Attach to COC) SamP1@ BacalDt 1 Number of ice chests/packages received: 1.. ROI? No Note as "OTC "If samples are received over the counter, unpackaged 2 Temperature of cooler/sam Jes. If more then 9 cooler:;. obtain an addltlon11I CUR form. Temps Observed ("C}:1--:-,,,,....0-;. ~-n----11------1i1------i1----~1-----ll----~1-------t Temps Corrected ("C): . ..,...,---=-o_., J,__...___-,-_ __....,.....,. __ ...,_ ___ ...,_ ___ ...,_ __ ___..__ __ ___..__ ___ _. Acceptable Is: 0.1° to 10°C for Bacteria; and 0. 1' to 6°C for most other water parameters. Samples may not have had adequate time to cool following collect/on. Indicate ROI (Received on Ice) for iced samples received on the same day as sampled, In addition to temperature at receipt. Cfle t contact for tem eratures outside method criteria must be documented below. 3 Emission rate of samples for radiochemical analyses < 0.5mR/hr? e No N/A ~ e,,,(', eea J 6~ J fWi /_ fe .f ..-1; Jf; ar~r-, .... ,...... (,f 4 COC Number (If applicable): 5 Do the number of bottles agree with the COC? 6 Were the samples received intact? (no broken bottles, leaks, etc.) 7 Were the sample custody seals intact? 8 Is the COC properly completed, legible, and signed? samgJe VerlficatJon. Labeling & 01stribut1on 1 Were all requested analyses understood and appropriate? 2 Did the bottle labels correspond with the COC Information? 3 Samples collected in method-prescribed containers? Yes Yes ®> ~ Yes 4 Sample Preservation: pH at Receipt: Final pH (if added in lab): Preservative/Lot# Total Metals ;:::. ' Diss Metals Nutrient __ Cyanide Sulfide Phenol SOWA Rads Total Metals Diss Metals Nutrient __ Cyanide Sulfide Phenol SOWA Rads 5 VOA vials have <6mm headspace? HN03 ______ _ FIitered and preserved in metals Hiso. ______ _ NaOH ZnAcet ______ _ H,so. ______ _ HN03 ______ _ Yes 6 Were all analyses within holding time at the time of receipt? 7 Have rush or project due dates been checked and accepted? 8 Do samples require subcontracted analyses? @ Yes Yes No No @ No No No ~ No No No ~ <@ fo {~1.f. [ePI /Jvl/e,l NIA UI' t.,:p. le;t {nA• NIA ,j'\ .f eale~- Date/Time Added: cm;;;;;;J find preserved in m~ If "Yes", which type of subcontracting is required? General Customer-Specified Certified Sample Receipt, Verification, Login, Labeling & Distribution completed by (initials): DI r Set ID: _J_ 1J]_0_lf_1_7_y...___ pjscrepancy DocumentatJon (use back of sheet for notes on discrepancies) Any items listed above with a response of "No" or do not meet speclflcations must be resolved. Person Contacted: ____________ Method of Contact: Phone: _________ _ Initiated By_: _______ Date/Time: _______ _ Email: Problem: Resolution: Qualtrax ID: 70962 Pace® Analytical Services, LLC Page 1 of 1 ATTACHMENT I SOIL SAMPLE GRAPHS, DATA TABLE, LABORATORY RESULTS AND QA/QC This attachment has been deliberately left blank. ATTACHMENT J RADON MONITORING GRAPHS AND DATA Calculation of Location-Specific Effluent Concentration Limits for Radon Track Etch Monitoring Stations at White Mesa Mill Calculation Methodology For the purpose of evaluating alpha track data and compliance with the effluent concentration limit for radon, two referenced limits are listed in the regulations (10 CFR Part 20 Appendix B, Table 2, which are incorporated by reference into R313-15-302(2)(b)(i)). One limit (lx 10-10 uCi/ml or 0.1 pCi/1) is applicable in instances where radon daughters are present with the radon, and are in 100% equilibrium with the parent Rn-222. The other listed concentration limit (1 x 1 o-s uCi/ml or 10 pCi/1) is applicable when radon daughters are not present. Both limits represent the concentration at which a member of the public would receive a 50 mrem dose assuming 100% (8760 hours) occupancy. At the White Mesa Mill, the assumption of 100% equilibrium of radon progeny with parent Rn- 222 is umealistic given the short half-lives of the nuclides considered and the short travel time to the monitoring locations. Radon emanates from the ground ( or mill tailings) without daughters present, and the daughters grow in over time. It is therefore necessary to evaluate radon daughter equilibrium at each air monitoring station utilizing site-specific wind speed and distance information to derive site-specific Effluent Concentration Limits (ECLs) for each station. Such disequilibrium situations and alternative calculations are anticipated by the regulations and, in particular, R313-15-302(3) provides a means by which the licensee may adjust the effluent concentration values in 10 CFR Part 20 Appendix B, Table 2, which are incorporated by reference into R313-15-302(2)(b )(i), to account for disequilibrium. The regulatory purpose of such an adjustment is to appropriately take into account the actual characteristics of the measured effluents, including radioactive decay equilibrium. An established (EPA, 1986) outdoor equilibrium formula to determine the appropriate Equilibrium Factor for use in calculating the ECL for disequilibrium conditions was used. The EPA expression of the outdoor Equilibrium Factor (EF) is derived by the following equation: EF = 1.0-0.0479exp<-11439l -2.1963exp<-iJ38_6J + 1.2442exp<-1128Al [Where: tis the travel time in minutes (distance/wind speed)] Once the Equilibrium Factor has been determined, the ECL for each air monitoring station is determined by dividing the 0.1 pCi/1 limit (for situations when daughters are present) by the Equilibrium Factor (EF). Results By utilizing the above formula, the appropriate ( equilibrium adjusted) ECLs for the location was calculated. In developing the ECLs, distances and corresponding travel times have been determined by: • assuming a nominal centroid located approximately at the vanadium dryer stack, • calculating average wind speeds appropriate for each direction from the centroid to each monitoring station location, and • using Google Earth to develop the distances. Meteorological data collected at the Mill's Met Station were utilized to compute the average wind speed for different directions. These data are applicable and sufficient for the purpose of these calculations. It should be noted when comparing actual measurement values to the derived ECLs that the derived ECL provides ample protection for members of the public. More specifically, if dose calculations had been performed utilizing current ICRP 65 dose conversion conventions, the ECLs established here would represent approximately 25 mrem for continuous exposure at the monitoring stations. Therefore these values can serve as appropriate ALARA goals, since they yield doses well below the 100 mrem standard for individual members of the public. References United States Environmental Protection Agency (EPA). (1986). Final rule for radon-222 emissions.from licensed uranium mill tailings. Washington, D.C.: Office of Radiation Programs, U.S. Environmental Protection Agency. pCi\L ~ 0 0 0 0 0 0 0 0 ....>. I\J w :i:,. 0, O> --..J 0) 1/2/2013 t 3/29/2013 7t11201 l OJ 10/1/2013 I < 12/24/2013 I w 4/2/2014 er ru 6/27/2014 0 " 9/30/2014 (C a 1/7/2015 C ::J 4/2/2015 C. ..__, 6/29/2015 9/28/2015 1/4/201 + 4/4/201 OJ 10/10/2016 m I < 1/5/2017 :I: I ....>. 3/29/2017 -:=: ~ -7/5/2017 ...I. :::::r OJ 9/29/2017 ::0 ru 1/2/2018 0 " D> (C 4/2/2018 a C. C 7/5/2018 0 ::J C. 10/5/2018 ::::, U> C 1/10/2019 I C'" N --, 4/5/201 9 N ru 0 N -7/2/2019 (1) C. + OJ I < I ....>. () ru 10/8/2021 0 C 1/6/2022 iii" -4/13/2022 (1) C. 7/12/2022 m () 10/5/2022 r pCi\L 9 0 9 0 0 0 0 0 0 ....>. N (,) J:>. CJ'1 a, -.J OJ 1/2/201 + co I 10/1/201 < 12/24/201 I (,) er 4/2/201 Ill 6/27/201 () 7' cc a C 1/7/201 :::::, a. 4/2/201 .__., + 1/4/201 co I 10/10/201 DJ < I N 1/5/2017 ::c ~ 3/29/2017 -:=: -:::::,- co 7/5/2017 N Ill () 9/29/201 7' ::c cc 1/2/2018 -, D) 0 C 4/2/201 a. :::::, a. 7/5/201 0 en C 10/5/2018 ::::, C" -I -, 1/10/2019 N Ill g_ 4/5/2019 N CD a. 7/2/201 N 10/1/2019 1/7/2020 + co I < I N () ~ () C iii" -CD a. m () r pCi\L 0 0 9 0 0 0 0 9 0 _,_ N (,J Jl,. 01 0) --J CX> 1/2/2013 3/29/2013 7/1/2013 10/1/2013 12/24/2013 4/2/2014 6/27/2014 9/30/2014 1/7/2015 4/2/2015 6/29/2015 9/28/2015 1/4/2016 4/4/2016 7/5/2016 10/10/2016 1/5/2017 m 3/29/2017 :::c: + 7/5/2017 < I OJ 9/29/2017 w I 1/2/2018 :;a < I 4/2/2018 (,J m 7/5/2018 Q. 10/5/2018 0 1/10/2019 ::s I 4/5/2019 N 7/2/2019 N N 10/1/2019 1/7/2020 4/1/2020 7/1/2020 10/6/2020 1/6/2021 4/9/2021 7/7/2021 10/8/2021 1/6/2022 4/13/2022 7/12/2022 10/5/2022 1/5/2023 4/6/2023 7/6/2023 pCi\L 0 0 0 0 0 0 0 0 0 ....>. N w :i:,.. 01 0) --..J CX) 1/2/2013 t 3/29/2013 1111201 l ClJ I 10/1/201 < I 12/24/2013 w -O'" Dl (") 6/27/201 ;,--cc a C 1/7/2015 :::J a. 4/2/2015 .__. 6/29/2015 9/28/2015 1/4/2016 4/4/201 . ClJ 7/5/201 I < 10/10/2016 I .i:,.. 1/5/2017 ~ 3/29/2017 Cl -::::r ::c ClJ 7/5/2017 Dl < (") 9/29/201 ;,--I cc 1/2/2018 ~ a C :;o :::J a. D) CJ) C 10/5/2018 a. O'" -0 -, 1/10/2019 Dl ::::s (") 4/5/2019 -CD I a. N N N 11112020 1 I ~ I + ClJ 10/6/2020 I < 1/6/2021 I .i:,.. (") 4/9/2021 Dl 0 7/7/2021 C ru 10/8/2021 -CD 1/6/2022 a. m 4/13/2022 (") r 7/12/2022 10/5/2022 1/5/2023 4/6/2023 7/6/2023 + cc I < I w -CT Ill (') ca a C ::l a. - cc I < I 01 ~ ,.... ~ cc Ill (') ;,--cc -, 0 C ::l a. en C CT ,.... -, Ill (') ,.... CD a. t cc I < I 01 0 Ill n C iii" ,.... CD a. m 0 r 0 0 N 0 0 ~ O> pCi\L ~ co ...... N ~ O> 3;2~~~~1.: I=" r-I I I ~ I 7/1/2011 -I 10/1/201 -, 12/24/2013 1/5/2017 3/29/2017 7/5/2017 9/29/2017 1/2/2018 4/2/2018 7/5/2018 10/5/2018 1/10/2019 4/5/2019 7/2/2019 10/1/2019 7/1/2020 10/6/2020 1/6/2021 4/9/2021 7/7/2021 10/8/2021 1/6/2022 4/13/2022 7/12/2022 10/5/2022 1/5/2023 4/6/2023 7/6/2023 ,, -DJ :c < I en ::a m 0. 0 ::::s I N N N pCi\L 9 0 0 0 9 0 0 0 9 0 ...... I'-) w ~ 01 CJ) -.J 0) <D 1/2/2013 ! I I + 3/29/2013 + 7/1/201 -;-, 10/1/201 CJ 12/24/2013 I < I w 'tT Ill C) 7' 1/7/2015 co a 4/2/2015 C ::::, 6/29/2015 a. .__.. 9/28/2015 1/4/2016 4/4/2016 + 7/5/201 , CJ DJ I 1/5/2017 'F 3/29/2017 :::c CJ) ~ 7/5/2017 ~ -9/29/2011. ::::,-en CJ 1/2/2018 Ill ::a C) 7' 4/2/2018 D> co --, C. 0 7/5/2018 C 0 ::::, 10/5/2018 a. en ::::s C I O" N -ii3 N u N Cl) a. + 10/6/2020 CJ 1/6/2021 I 4/9/2021 < I CJ) 7/7/2021 () 10/8/2021 Ill 0 1/6/2022 C iii 4/13/2022 ct a. 7/12/2022 m () 10/5/2022 r 1/5/2023 pCi\L 0 0 0 !=) ...... 0 N :r,,. 0) (X) ...... N + 1/7/2015 [lJ 4/2/2015 I < I w cr 9/28/201 Q) (') ~ (C 4/4/201 -, 0 C ::J a. ~ 10/10/201 + 1/5/201 3/29/2017 [lJ 7/5/2017 I < 9/29/2017 I --.J ~ -:::,-4/2/2018 [lJ m Q) 7/5/2018 (') :I: ~ (C 10/5/2018 ~ -, 0 C ::J ---.a a. en 4/5/201 _ ::0 C O" Q) -ru C. u CD 0 a. 1/7/?n?n ::::, I t ····---:I\ rr-1 I I !I N 7/1/2020 N [lJ 1n1Rt?n?n N I < I --.J () Q) n C ii> -CD a. m () r 7/12/2022 10/5/2022 pCi\L 9 0 0 0 0 0 0 0 0 ...... N w :i:,. 01 O> -.J CX) 1/7/2015 + CJ I < I w -O" Ill 0 :,-- (0 7/5/201 6 ..... 0 C :::l 10/10/201 a. -1/5/2017 + 3/29/2017 7/5/2017 CJ I 9/29/201 < I CX) 1/2/2018 ~ -:::r CJ OJ Ill 0 :c :,--(0 ~ ..... 0 C :::l 00 a. (/) :::c C O" D) -..... Ill C. 0 10/1/2019 -0 CD a. . ::s I 4/1 /202~ I I .. I j I ·1 I I N + I I N 7/1 /202 i N CJ 10/6/2020 I < I 1/6/2021 CX) () 4/9/2021 Ill 0 C 7/7/2021 ii> -CD 10/8/2021 a. rn () 1/6/2022 r 4/13/2022 7/12/2022 10/5/2022 1/5/2023 White Mesa Mill Radon Sampling Results* BHV-1 BHV-2 BHV-4 BHV-5 BHV-6 BHV-7 BHV-8 BHV-1 Calculated BHV-2 Calculated BHV-3 BHV-4 Calculated BHV-5 Calculated BHV-6 Calculated BHV-7 Calculated BHV-8 Calculated Date (pCi/L) ECL (pCi/L) ECL (pCi/L) (pCi/L) ECL (pCi/L) ECL (pCi/L) ECL (pCi/L) ECL (pCi/L) ECL 01/02/13 0.1 0.71 0 0.34 0.6 0.4 0.5 0 1.43 0.4 0.83 NS 1.12 NS 0.71 03/29/13 0.1 0.71 0 0.34 0.7 0.3 0.5 0.5 1.43 0.1 0.83 NS 1.12 NS 0.71 07/01/13 0 0.71 0 0.34 0.06 0 0.5 0 1.43 0 0.83 NS 1.12 NS 0.71 10/01/13 0.1 0.71 0 0.34 0.07 0 0.5 NA 1.43 0 0.83 NS 1.12 NS 0.71 12/24/13 0.4 0.71 0 0.34 0.07 0.33 0.5 0.43 1.43 0.73 0.83 NS 1.12 NS 0.71 04/02/14 0.2 0.71 0 0.34 0.06 0.04 0.5 0.54 1.43 0.24 0.83 NS 1.12 NS 0.71 06/27/14 0.1 0.71 0 0.34 0.07 0 0.5 0.03 1.43 0.03 0.83 NS 1.12 NS 0.71 09/30/14 0.2 0.71 0.1 0.34 0.1 0.2 0.5 0.3 1.43 0.2 0.83 NS 1.12 NS 0.71 01/07/15 0.1 0.71 0 0.34 0.2 0.3 0.5 0.6 1.43 0.2 0.83 0.2 1.12 0.1 0.71 04/02/15 0.23 0.71 0 0.34 0.07 0.23 0.5 0.43 1.43 0.23 0.83 0.33 1.12 0.03 0.71 06/29/15 0.2 0.71 0.2 0.34 0.2 0.4 0.5 0.4 1.43 0.3 0.83 0.2 1.12 0.2 0.71 09/28/15 0.2 0.71 0.1 0.34 0.3 0.2 0.5 0.6 1.43 0.3 0.83 0 1.12 0.1 0.71 01/04/16 0 0.71 0 0.34 0.2 0.4 0.5 0.7 1.43 0.1 0.83 0.2 1.12 0.1 0.71 04/04/16 0 0.71 0.1 0.34 0.2 0 0.5 0.7 1.43 0.1 0.83 0 1.12 0 0.71 07/05/16 0.1 0.71 0 0.34 0.07 0 0.5 0.23 1.43 0 0.83 0 1.12 0 0.71 I 0/10/16 0.06 0.71 0 0.34 0.35 0.30 0.5 0.38 1.43 0.08 0.83 0.03 1.12 0 0.71 01/05/17 0.14 0.71 0.09 0.34 0.32 0.25 0.5 0.38 1.43 0.19 0.83 0 1.12 0.14 0.71 03/29/17 0.05 0.71 0.27 0.34 0.11 0.21 0.5 0.51 1.43 0.35 0.83 0.13 1.12 0.16 0.71 07/05/17 0.06 0.71 0 0.34 0.16 0.14 0.5 0.25 1.43 0.19 0.83 0.11 1.12 0.11 0.71 09/29/17 0.06 0.71 0 0.34 0.24 0 0.5 0.08 1.43 0 0.83 0.06 1.12 0 0.71 01/02/18 0.17 0.71 0.06 0.34 0.32 0.30 0.5 0.54 1.43 0.27 0.83 0.11 1.12 0.25 0.71 04/02/18 0.08 0.71 0 0.34 0.24 0.25 0.5 0.41 1.43 0.14 0.83 0.14 1.12 0.17 0.71 07/05/18 0.05 0.71 0 0.34 0.11 0.03 0.5 0.24 1.43 0.08 0.83 0.08 1.12 0 0.71 10/05/18 0.13 0.71 0.05 0.34 0.19 0.27 0.5 0.27 1.43 0.22 0.83 0.13 1.12 0.16 0.71 01/10/19 0.13 0.71 0.05 0.34 0.30 0.40 0.5 0.59 1.43 0.21 0.83 0.19 1.12 0.21 0.71 04/05/19 0.00 0.71 0 0.34 0.43 0.11 0.5 0.27 1.43 0 0.83 0 1.12 0 0.71 07/02/19 0.05 0.71 0 0.34 0.19 0.03 0.5 0.19 1.43 0.11 0.83 0 1.12 0 0.71 10/01/19 0.27 0.71 0.14 0.34 0.16 0.43 0.5 0.49 1.43 0.22 0.83 0.43 1.12 0.33 0.71 01/07/20 0.08 0.71 0 0.34 0.30 0.16 0.5 0.32 1.43 0.21 0.83 0.13 1.12 0.16 0.71 04/01/20 0.00 0.71 0 0.34 0.57 0.00 0.5 0.00 1.43 0.00 0.83 0.00 1.12 0.00 0.71 07/01/20 0.13 0.71 0 0.34 0.22 0.21 0.5 0.37 1.43 0.08 0.83 0.08 1.12 0.00 0.71 10/06/20 0.03 0.71 0 0.34 0.24 0.11 0.5 0.17 1.43 0.17 0.83 0.11 1.12 0.06 0.71 01/06/21 0.05 0.71 0.02 0.34 0.41 0.24 0.5 0.59 1.43 0.24 0.83 0.18 1.12 0.21 0.71 04/09/21 0.02 0.71 0.00 0.34 0.22 0.16 0.5 0.32 1.43 0.05 0.83 0.05 1.12 0.10 0.71 07/07/21 0.05 0.71 0.03 0.34 0.11 0.24 0.5 0.24 1.43 0.13 0.83 0.08 1.12 0.03 0.71 10/08/21 0.08 0.71 0.00 0.34 0.16 0.11 0.5 0.22 1.43 0. 19 0.83 0.22 I. 12 0.19 0.71 01/06/22 0.11 0.71 0.14 0.34 0.51 0.33 0.5 0.59 1.43 0.19 0.83 0.06 1.12 0.17 0.71 White Mesa Mill Radon Samplin~ Results* BHV-1 BHV-2 BHV-4 BHV-5 BHV-1 Calculated BHV-2 Calculated BHV-3 BHV-4 Calculated BHV-5 Calculated Date (pCi/L) ECL (pCi/L) ECL (pCi/L) (pCi/L) ECL (pCi/L) ECL 04/13/22 0.29 0.71 0.02 0.34 0.30 0.05 0.5 0.51 1.43 07/12/22 0.08 0.71 0.05 0.34 0.19 0.19 0.5 0.40 1.43 10/05/22 0.10 0.71 0.08 0.34 0.14 0.29 0.5 0.29 1.43 01/05/23 0.08 0.71 0.06 0.34 0.35 0.27 0.5 0.49 1.43 04/06/23 0.00 0.71 0.00 0.34 0.22 0.05 0.5 0.19 1.43 07/06/23 0.03 0.71 0.00 0.34 0.08 0.14 0.5 0.19 1.43 * -Measurements obtained from BHV-3 have been designated as background due to BHV-3's remoteness from the Mill site. The NA -Not Available -the canister was damaged. No data reported. NS -Not Sampled -EFRI installed and began radon sampling at BHV-7 and BHV-8 in the fourth quarter of 2014. BHV-6 BHV-6 Calculated (pCi/L) ECL 0.16 0.83 0.24 0.83 0.18 0.83 0.30 0.83 0.05 0.83 0.03 0.83 BHV-7 BHV-8 BHV-7 Calculated BHV-8 Calculated (pCi/L) ECL (pCi/L) ECL 0.11 1.12 0.16 0.71 0.19 1.12 0.22 0.71 0.18 1.12 0.08 0.71 0.16 1.12 0.30 0.71 0.05 1.12 0.00 0.71 0.14 1.12 0.08 0.71 White Mesa Mill Radon Sampling Quarterly Field Blank Results Field Blank Date (pCi/L) 1/2/2013 2.4 3/29/2013 1.4 7/1/2013 0.7 10/1/2013 0.3 12/24/2013 0.7 4/2/2014 1.6 6/27/2014 1.1 9/30/2014 0.8 1/7/2015 1.4 4/2/2015 1.0 6/29/2015 1.7 9/28/2015 1.5 1/4/2016 1.8 4/4/2016 2.0 7/5/2016 1.1 10/10/2016 1.6 1/5/2017 1.6 3/29/2017 1.1 7/5/2017 0.7 9/29/2017 0.84 1/2/2018 1.6 4/2/2018 1.9 7/5/2018 0.8 10/5/2018 1.0 1/10/2019 1.5 4/5/2019 1.6 7/2/2019 1.1 10/1/2019 1.1 1/7/2020 1.7 4/1/2020 1.2 7/1/2020 0.92 10/6/2020 1.1 1/6/2021 1.8 4/9/2021 1.3 7/7/2021 0.8 10/8/2021 1.3 1/6/2022 1.9 4/13/2022 1.7 7/12/2022 1.1 10/05/22 1.1 White Mesa Mill Radon Sampling Quarterly Field Blank Results Field Blank Date (pCi/L) 01/05/23 1.9 04/06/23 1.3 07/06/23 1.0 rodo nova The global leader in radon measurement Energy Fuels Resouces REPORT NUMBER 6622524:1 REPORT PAGE 1 of 2 REPORT DATE 05/01/2023 PRINT DATE 05/01/2023 OWNID N/A BY Energy Fuels Resouces REPORT RECEIVER(S) gpalmer@energyfuels.com Energy Fuels Resouces RADON MONITORING REPORT Description of the measurement The measurement was performed with a closed alpha-track detector (Rapides"') following the measurement protocols given by AAR5T/AN51. The detector(s) arrived to Radonova Laboratories 04/14/2023. They were measured 04/20/2023. Test data have been given by Energy Fuels Resouces TRANSIT DETECTOR 1: 263094 (5 ± 5 pCi*days/I) Test results TRANSIT DETECTOR 2: 123095 (1 ± 5 pCi*days/I) TRANSIT DETECTOR 3: Property data and address MEASURE SITE ADDRESS 6425 5. Highway 191 BLANDING UT 84511 BUILDING ID DETECTOR MEASUREMENT PERIOD DESCRIPTION/ LOCATION LOCATION TYPE RADON RESULT "O u C. C. i .,, 0 414174-3 [Rapidos®] 01/05/2023 -04/06/2023 903090-9 [Rapidos®] 01/05/2023 -04/06/2023 237774-5 [Rapidos®] 01/05/2023 -04/06/2023 106523-4 [Rapidos"'] 01/05/2023 -04/06/2023 242341-6 [Rapidos"'] 01/05/2023 -04/06/2023 227253-2 [Rapidos®] 01/05/2023 -04/06/2023 334639-2 [Rapidos®J 01/05/2023 -04/06/2023 625182-1 [Rapidos®] 01/05/2023 -04/06/2023 460761-0 [Rapidos®] 01/05/2023 -04/06/2023 314284-1 [Rapidos"'] 01/05/2023 -04/06/2023 Comment to the results ~ Tryggve Ri:innqvist (Electronically signed) N BHV-1-1 BHV-2-1 BHV-4-1 BHV-5-1 BHV-6-1 BHV-7-1 BHV-8-1 BHV-2A-1 Office-1 Black Mesa 1 ;1 Signature Radonova Laboratories Laboratory Measurement Specialist o This report may only be reproduced in full, unless issuing laboratory has given prior written approval. Out-daor Out-door Out-door Out-door Out-daor Out-door Out-door Out-door In-door Out-door 0.19 ± 0.11 pCi/L 0.16 ± 0.09 pCi/L 0.27 ± 0.11 pCi/L 0.41 ± 0.11 pCi/L 0.27 ± 0.11 pCi/L 0.27 ± 0.11 pCi/L 0.19 ± 0.11 pCi/L 0.19 ± 0.11 pCi/L 1.3 ± 0.19 pCi/L 0.22 ± 0.11 pCi/L c,'>N ED,i 0_ > ~ ... £,! \~ l? ("l 2: 7'-.... 1'eor-r"'"" J,,..-c,...Jn.,J4foN Tl--sling ISO,1EC17015 ::;,---------------------------------------------------------:1 DISCLAIMER o Rado nova Inc. makes no warranty of any kind, express or implied, as regard to the use, operation or analysis of any Radonova Inc monitor. Radonova 01 z Inc. specifically disclaims implied warranties of merchantability and fitness for a particular purpose Radon ova Inc, is not responsible for any damage, LJ.J "'I including consequential damages, to persons or property resulting from the use of the monitor or the resulting data, :::, RADONOVA INC. 1 EAST 22nd STREET, SUITE 200 LOMBARD, IL 60148 331.814.2200, help@radonova.com -c, u C. C. 1 LI) 0 st 0 "' N :1 er. 0 Q. LU er. ._,I 0 0 1 rado nova The global leader in radon measurement Measurement method: Closed alpha-track detector REPORT NUMBER 6622524:1 REPORT PAGE 2 of 2 REPORT DATE 05/01/2023 PRINT DATE 05/01/2023 OWNID N/A The radon measurement was performed with a closed alpha-track detector following the quality assurance guidance given in the ANSI/AARST protocols. The detector container is manufactured from electrically conducting plastic. Through a small slit (filter), radon gas enters the detector. The track-detecting material (film) inside the detector is hit by alpha particles generated by the radon entering the container and the decay products formed from it. On the film, the alpha particles make small tracks which are enlarged through chemical etching and later counted in a microscope in order to determine the radon exposure. Transit detectors are used for the return delivery of the high-sensitivity detectors in order to make a more accurate background subtraction. Radonova Laboratories (P.O. Box 6522, SE-751 38 Uppsala, Sweden) is accredited (no. 1489) by SWEDAC to conduct radon-gas measurements using the closed alpha-track detector method. The analysis equipment is checked daily and the detectors are calibrated at regular intervals. NRPP Licenses: 107831 AL, 107830 RT Measured radon concentrations For each detector, the measured value of the radon concentration is provided. For each value an uncertainty associated with the measurement to a 95% confidence level is also provided. For example a measurement result of 4.0 ± 0.5 pCi/L means that the radon concentration is most likely contained in the range 3.5 -4.5 pCi/L. If the start or end date of the measurement has not been provided, the radon concentration cannot be calculated. In such cases, the total exposure in pCi*days/L will be reported. The reported measured values are related to the detectors as received by Radonova Laboratories. Detector deployment is not performed by Radonova Laboratories. Measurement information such as monitoring period (dates) and placement location is provided to Radonova Laboratories by the end user. The presented results apply only to the samples tested. The average transit exposure has been subtracted in the reported radon concentrations. Codes on non-reportable detectors DNR VTW FBD LIL DTO Not Reported -Detector Not Returned Not Reported -Visibly Tampered With Not Reported -Film Broken or Damaged Not Reported -Lost in Lab Not Reported -Detector Too Old Measurement method versions used when the report was created ANSI/AARST MAH-2019, Protocol for Conducting Measurements of Radon and Radon Decay Products in Homes ANSI/AARST MAMF-2017, rev. 1/2021, Protocol for Conducting Measurements of Radon and Radon Decay Products in Multifamily Buildings ANSI/AARST MALB-2014, rev. 1/2021, Prat. for Conducting Measurements of Radon and Radon Decay Products In Schools and Large Buildings Signature on the report With the signature on the report, the person responsible for the radon analysis at Radonova Laboratories hereby certifies that the measurement procedures follows the guidance in accordance with the ANSI/AARST Measurement Protocols and that the demands from SWEDAC are fulfilled. Measurement information displayed in italics on report has been provided by the customer. Certification no: 107831-AL, 107830-RT, NRSB ARL1904, NY ELAP ID: 12042, A«rl".1 rlC• 1-{i,\I Tl..;Lini-; 150,'11:".C 1702; 2---------------------------------------------------------------LJ.J I Vl ::i I 0 z LJ.J Q. a. <( DISCLAIMER Radonova Inc makes no warranty of any kind, express or implied, as regard to the use, operation or analysis of any Radonova Inc. monitor. Radonova Inc. specifically disclaims implied warranties of merchantability and fitness for a particular purpose Radonova Inc. is not responsible for any damage, including consequential damages, to persons or property resulting from the use of the monitor or the resulting data RADONOVA INC. 1 EAST 22nd STREET, SUITE 200 LOMBARD, IL 60148 331.814.2200, help@radonova.com i:::, u Cl. Cl. ~ <Tl n .... a <Tl ~ 1--1 a:; 0 rodonovo The global leader in radon measurement Energy Fuels Resouces REPORT NUMBER 6649457:1 REPORT PAGE 1 of 2 REPORT DATE 07/25/2023 PRINT DATE 07/25/2023 OWNID N/A BY Energy Fuels Resouces REPORT RECEIVER(S) gpalmer@energyfuels.com Energy Fuels Resouces RADON MONITORING REPORT Description of the measurement The measurement was performed with a closed alpha-track detector (Rapidos"') following the measurement protocols given by AARST/ANSI. The detector(s) arrived to Radon ova Laboratories 07/14/2023. They were measured 07/20/2023. Test data have been given by Energy Fuels Resouces TRANSIT DETECTOR 1: 582987 (9 ± 5 pCi"days/I) Test results TRANSIT DETECTOR 2: 805416 (1 ± 5 pCi"days/I) TRANSIT DETECTOR 3: Property data and address MEASURE SITE ADDRESS White Mesa Mill 6425 5. Highway 191 BLANDING UT 84511 BUILDING ID DETECTOR MEASUREMENT PERIOD DESCRIPTION/ LOCATION LOCATION TYPE RADON RESULT 225880-4 [Rapidos®] 04/06/2023-07/06/2023 BHV-1-1 740815-6 [Rapidos®] 04/06/2023-07/06/2023 BHV-2-1 622985-0 [Rapidos"'] 04/06/2023 -07/06/2023 BHV-4-1 669140-6 [Rapidos®] 04/06/2023 -07/06/2023 BHV-5-1 805356-3 [Rapidos®] 04/06/2023 -07/06/2023 BHV-6-1 587462-3 [Rapidos®] 04/06/2023-07/06/2023 BHV-7-1 740291-0 [Rapidos®J 04/06/2023-07/06/2023 BHV-8-1 962516-1 [Rapidos®] 04/06/2023-07/06/2023 BHV-2A-1 650865-9 [Rapidos®] 04/06/2023-07/06/2023 Office-1 390270-7 [Rapidos®] 04/06/2023-07/06/2023 Block Mesa 1 Comment to the results Tryggve Ronnqvist (Electronically signed) Signature Radonova Laboratories Laboratory Measurement Specialist This report may only be reproduced in full, unless issuing laboratory has given prior written approval. Out-door Out-door Out-door Out-door Out-door Out-door Out-door Out-door In-door Out-door 0.11 ± 0.06 pCi/L 0.08 ± 0.06 pCi/L 0.22 ± 0.09 pCi/L 0.27 ± 0.09 pCi/L < 0.11 pCi/L 0.22 ± 0.09 pCi/L 0.16 ± 0.06 pCi/L 0.08 ± 0.06 pCi/L 1.0 ± 0.17 pCi/L 0.08 ± 0.06 pCi/L Accrl-d no I..IIN Tl'51in~ IS0,1EC 11o.'.!;> e;---------------------------------------------------------a:; .,, a ~I ~I ::, DISCLAIMER Radonova Inc makes no warranty of any kind, express or implied, as regard to the use, operation or analysis of any Radonova Inc. monitor. Radonova Inc. specifically disclaims implied warranties of merchantability and fitness for a particular purpose. Radonova Inc. is not responsible for any damage, including consequential damages, to persons or property resulting from the use of the monitor or the resulting data. RADONOVA INC. 1 EAST 22nd STREET, SUITE 200 LOMBARD, IL 60148 331.814.2200, help@radonova.com 'O u a. "!-..., M ..., ,.._ a M rado nova The global leader in radon measurement Measurement method: Closed alpha-track detector REPORT NUMBER 6649457:1 REPORT PAGE 2 of 2 REPORT DATE 07/25/2023 PRINT DATE 07/25/2023 OWNID N/A The radon measurement was performed with a closed alpha-track detector following the quality assurance guidance given in the ANSI/AARST protocols. The detector container is manufactured from electrically conducting plastic. Through a small slit (filter), radon gas enters the detector. The track-detecting material (film) inside the detector is hit by alpha particles generated by the radon entering the container and the decay products formed from it. On the film, the alpha particles make small tracks which are enlarged through chemical etching and later counted in a microscope in order to determine the radon exposure. Transit detectors are used for the return delivery of the high-sensitivity detectors in order to make a more accurate background subtraction. Radonova Laboratories (P.O. Box 6522, SE-751 38 Uppsala, Sweden) is accredited (no. 1489) by SWEDAC to conduct radon-gas measurements using the closed alpha-track detector method. The analysis equipment is checked daily and the detectors are calibrated at regular intervals. NRPP Licenses: 107831 AL, 107830 RT Measured radon concentrations For each detector, the measured value of the radon concentration is provided. For each value an uncertainty associated with the measurement to a 9S% confidence level is also provided. For example a measurement result of 4.0 ± 0.5 pCi/L means that the radon concentration is most likely contained in the range 3.5 -4.5 pCi/L. If the start or end date of the measurement has not been provided, the radon concentration cannot be calculated. In such cases, the total exposure in pci•days/L will be reported. The reported measured values are related to the detectors as received by Radonova Laboratories. Detector deployment is not performed by Radonova Laboratories. Measurement information such as monitoring period (dates) and placement location is provided to Radonova Laboratories by the end user. The presented results apply only to the samples tested. The average transit exposure has been subtracted in the reported radon concentrations. Codes on non-reportable detectors DNR vrw FBD LIL DTO Not Reported -Detector Not Returned Not Reported -Visibly Tampered With Not Reported -Film Broken or Damaged Not Reported -Lost in Lab Not Reported -Detector Too Old Measurement method versions used when the report was created ANSI/AARST MAH-2019, Protocol for Conducting Measurements of Radon and Radon Decay Products in Homes AN5I/AARST MAMF-2017, rev. 1/2021, Protocol for Conducting Measurements of Radon and Radon Decay Products in Multifamily Buildings ANSI/AARST MALB-2014, rev. 1/2021, Prat. for Conducting Measurements of Radon and Radon Decay Products In Schools and Large Buildings Signature on the report With the signature on the report, the person responsible for the radon analysis at Radon ova Laboratories hereby certifies that the measurement procedures fo llows the guidance in accordance with the ANSI/AARST Measurement Protocols and that the demands from SWEDAC are fulfilled. Measurement information displayed in italics on report has been provided by the customer. Certification no: 107831-AL, 107830-RT, NRSB ARL1904, NY ELAP ID: 12042, N .,,-1ED,1C'. ~I ~ ~ 0 o n 7-~ ~ ' ~ .Pt on~~ ~I A1.."Ctl-d nri J~ri') D TC'§tini; ~'-----------------------------------------------------------ISO-JIE-·c_,~_,_, __ LJ.J vi' ::::i Cl z LJ.J ~ ~ q'. DISCLAIMER Radonova Inc. makes no warranty of any kind, express or implied, as regard to the use, operation or analysis of any Radonova Inc. monitor. Radonova Inc. specifically disclaims implied warranties of merchantability and fitness for a particular purpose. Radonova Inc. is not responsible for any damage, including consequential damages, to persons or property resulting from the use of the monitor or the resulting data RADONOVA INC. 1 EAST 22nd STREET, SUITE 200 LOMBARD, IL 60148 331.814.2200, help@radonova.com ATTACHMENTK CELL 2 RADON FLUX DATA Cell2 Radon Flux Measurement Program First Half 2023 Sampling Results April 2023 White Mesa Mill 6425 South Highway 191 Blanding, Utah 84511 Prepared for: Energy Fuels Resources (USA) Inc. 6425 S. Highway 191 P.O. Box 809 Blanding, Utah 84511 Prepared by: Tellco Environmental P.O. Box 3987 Grand Junction, Colorado 81502 TABLE OF CONTENTS Page I. INTRODUCTION ........................................................................................................................... I 2. SITE HISTORY AND DESCRIPTION .......................................................................................... 1 3. REGULATORY REQUIREMENTS FOR THE SITE .................................................................... I 4. SAMPLING METHODOLOGY ..................................................................................................... I 5. FIELD OPERATIONS .................................................................................................................... 2 5.1 Equipment Preparation ....................................................................................................... 2 5.2 Sample Locations, Identification, and Placement.. ........................................................... 2 5.3 Sample Retrieval ............................................................................................................... 3 5.4 Environmental Conditions ................................................................................................ 3 6. SAMPLE ANALYSIS ..................................................................................................................... 3 6.1 Apparatus ........................................................................................................................... 3 6.2 Sample Inspection and Documentation ............................................................................. 4 6.3 Background and Sample Counting .................................................................................... 4 7. QUALITY CONTROL (QC) AND DATA VALIDATION ........................................................... 4 7 .1 Sensitivity .......................................................................................................................... 5 7.2 Precision ............................................................................................................................. 5 7 .3 Accuracy ............................................................................................................................ 5 7 .4 Completeness ..................................................................................................................... 5 8. CALCULATIONS ........................................................................................................................... 5 9. RESULTS ........................................................................................................................................ 6 9.1 Mean Radon Flux ............................................................................................................... 6 9.2 Site Results ......................................................................................................................... 7 References ............................................................................................................................................ 8 Figure 1 ................................................................................................................................................ 9 Appendix A. Charcoal Canister Analyses Support Documents Appendix B. Recount Data Analyses Appendix C. Radon Flux Sample Laboratory Data, Including Blanks Appendix D. Sample Locations Map (Figure 2) i 1. INTRODUCTION During April 4-5, 2023 Tellco Environmental, LLC (Tellco) of Grand Junction, Colorado, provided support to Energy Fuels Resources (USA) Inc. (Energy Fuels) to conduct radon flux measurements on Cell 2 at its White Mesa Mill site. Pursuant to Utah Department of Environmental Quality (UDEQ) requirements, Energy Fuels conducts radon flux measurements for Cell 2 on a semiannual basis. This report presents the radon flux measurements results for Cell 2 that represent the first half of the year 2023. Tellco was contracted to provide canisters and charcoal, laboratory sample analysis, report preparation, and field work oversight. Energy Fuels personnel performed the canister placement and retrieval and support loading and unloading charcoal from the canisters. This report details the procedures employed by Energy Fuels and Tellco to obtain the results presented in Section 9.0 of this report. 2. SITE DESCRIPTION The White Mesa Mill facility is located in San Juan County in southeastern Utah, six miles south of Blanding, Utah. The mill began operations in 1980 for the purpose of extracting uranium and vanadium from feed stocks. Cell 2, which has a total area of approximately 270,624 m2, has been filled and covered. This cell is comprised of one region consisting of a soil cover of varying thickness. There was no standing liquid and were no exposed tailings within Cell 2 during this sampling. 3. REGULATORY REQUIREMENTS FOR CELL 2 Radon emissions from the uranium mill tailings from Cell 2 at this site are regulated by the State of Utah's Division of Waste Management and Radiation Control (DWMRC). In accordance with DWMRC requirements specified in correspondence dated July 23, 2014, Energy Fuels must measure the radon flux on Cell 2 in accordance with 40 CFR 61, Appendix B, Method 115, "Monitoring for Radon-222 Emissions" semiannually. The average annual measured radon flux for Cell 2 shall not exceed a value of 20 picoCuries per meter squared per second (pCi/m2-s). A representative from the Utah Department of Environmental Quality was present on April 5, 2023 during the performance of the Cell 2 radon flux measurements. 4. SAMPLING METHODOLOGY Radon emissions were measured using Large Area Activated Charcoal Canisters (canisters) in conformance with 40 CFR, Part 61, Appendix B, Method 115, Restrictions to Radon Flux Measurements, (EPA, 2022). These are passive gas adsorption sampling devices used to determine the flux rate of radon-222 gas from a surface. The canisters were constructed using a 10-inch diameter PVC end cap containing a bed of 180 grams of activated, granular charcoal. The prepared charcoal was placed in the canisters on a support grid on top of a ½ inch thick layer of foam and secured with a retaining ring under 1 ½ inches of foam (see Figure I, page 9). 1 One hundred sampling locations were distributed throughout the Cell 2, as depicted on the Sample Locations Map (see Figure 2, Appendix D). Each charged canister was placed directly onto the surface (open face down) and exposed to the surface for approximately 24 hours. Radon gas adsorbed onto the charcoal and the subsequent radioactive decay of the entrained radon resulted in radioactive lead-214 and bismuth-214. These radon progeny isotopes emit characteristic gamma photons that can be detected through gamma spectroscopy. The original total activity of the adsorbed radon was calculated from these gamma ray measurements using calibration factors derived from cross-calibration of standard sources containing known total activities of radium-226 with geometry identical to the counted samples and from the principles of radioactive decay. After approximately 24 hours, the exposed charcoal was transferred to a sealed plastic sample container (to prevent sample loss and/or further exposure during transport), identified and labeled, and transported to the Tellco laboratory in Grand Junction, Colorado for analysis. Tellco personnel maintained custody of the samples from collection through lab analysis. Upon completion of on-site activities, the field equipment was alpha and beta-gamma scanned by Energy Fuels Radiation Safety personnel for possible contamination resulting from fieldwork activities. All of the field equipment used was subsequently released for unrestricted use. 5. FIELD OPERATIONS 5.1 Equipment Preparation All charcoal was dried at 110°C before use in the field. Unused charcoal and recycled charcoal were treated the same. 180-gram aliquots of dried charcoal were weighed and placed in sample containers. Proper balance operation was verified daily by checking a standard weight. The balance readout agreed with the known standard weight to within± 0.1 percent. After acceptable balance check, empty containers were individually placed on the balance and the scale was re-zeroed with the container on the balance. Unexposed and dried charcoal was carefully added to the container until the readout registered 180 grams. The lid was immediately placed on the container and sealed with plastic tape. The balance was checked for readout drift between readings. Sealed containers with unexposed charcoal were placed individually in the shielded counting well, with the bottom of the container centered over the detector, and the background count rate was documented. Three five-minute background counts were conducted on ten percent of the containers, selected at random to represent the "batch". If the background counts were too high to achieve an acceptable lower limit of detection (LLD), the entire charcoal batch was labeled non-conforming and recycled through the heating/drying process. 5.2 Sample Locations, Identification, and Placement On April 4, 2023 one hundred sampling locations were spread out throughout the Cell 2 covered region. The approximate sampling locations that were established for previous samplings of Cell 2 were used for the placement of the canisters with similar sample identification numbers (IDs). An individual ID was assigned to each sample point, using a sequential alphanumeric system indicating the charcoal batch and physical location within the region (e.g., H0l...Hl00). This ID was written on an adhesive 2 label and affixed to the top of the canister. The sample ID, date, and time of placement were recorded on the radon flux measurements data sheets for the set of one hundred measurements. Prior to placing a canister at each sample location, the retaining ring, screen, and foam pad of each canister were removed to expose the charcoal support grid. A pre-measured charcoal charge was selected from a batch, opened and distributed evenly across the support grid. The canister was then reassembled and subsequently placed face down on the surface at each sampling location. Care was exercised not to push the device into the soil surface. The canister rim was "sealed" to the surface using a berm oflocal borrow material. Five canisters (blanks) were similarly processed and these canisters were kept inside an airtight plastic bag during the 24-hour testing period. 5.3 Sample Retrieval On April 5, 2023 at the end of the 24-hour testing period, all canisters were retrieved, disassembled and each charcoal sample was individually poured through a funnel into a container. Identification numbers were transferred to the appropriate container, which was sealed and placed in a box for transport. Retrieval date and time were recorded on the same data sheets as the sample placement information. The blank samples were similarly processed. All 100 of the charcoal samples from the Cell 2 covered region were successfully retrieved and containerized during the retrieval and unloading process. Upon completion of on-site activities, the field equipment was alpha and beta-gamma scanned by Energy Fuels Radiation Safety personnel and released for unrestricted use. 5.4 Environmental Conditions Energy Fuels maintains an onsite rain gauge to monitor rainfall at the White Mesa mill site. In accordance with 40 CPR, Part 61, Appendix B, Method 115: • Measurements were not initiated within 24 hours of rainfall at the site. • No rainfall occurred during the 24-hour sampling period after the canisters had been deployed. • None of the canister seals were washed away by rainfall, and none of the canisters were surrounded by water. 6. SAMPLE ANALYSIS 6.1 Apparatus Apparatus used for the analysis: • Single-or multi-channel pulse height analysis system, Ludlum Model 2200 with a Teledyne 3" x 3" sodium iodide, thallium-activated (Nal(Tl)) detector. 3 • Lead shielded counting well approximately 40 cm deep with 5-cm thick lead walls and a 7- cm thick base and 5 cm thick top. • National Institute of Standards and Technology (NIST) traceable aqueous solution radium- 226 absorbed onto 180 grams of activated charcoal. • Ohaus Port-O-Gram balance with 0.1-gram sensitivity. 6.2 Sample Inspection and Documentation Once in the laboratory, the integrity of each charcoal container was verified by visual inspection of the plastic container. Laboratory personnel checked for damaged or unsealed containers and also checked that the data sheet was complete. All 100 of the sample containers and 5 blank containers inspected at the Tellco analytical laboratory were ultimately verified as valid and no damaged or unsealed containers were observed. 6.3 Background and Sample Counting The gamma ray counting system was checked daily, including background and radium-226 source measurements prior to and after each counting session. Based on calibration statistics, using two sources with known radium-226 content, background and source control limits were established for each Ludlum/Teledyne system with shielded counting well (see Appendix A). Gamma ray counting of exposed charcoal samples included the following steps: • The length of count time was determined by the activity of the sample being analyzed, according to a data quality objective of a minimum of 1,000 accrued counts for any given sample. • The sample container was centered on the NaI gamma detector and the shielded well door was closed. • The sample was counted over a determined count length and then the mid-sample count time, date, and gross counts were documented on the radon flux measurements data sheet and used in the calculations. • The above steps were repeated for each exposed charcoal sample. • Approximately 10 percent of the containers counted were selected for recounting. These containers were promptly recounted within a few days following the original count. 7. QUALITY CONTROL (QC) AND DATA VALIDATION Charcoal flux measurement QC samples included the following intra-laboratory analytical frequency objectives: • Blanks, 5 percent, and • Recounts, 10 percent 4 All sample data were subjected to validation protocols that included assessments of sensitivity, precision, accuracy, and completeness. As described below, all Method 115-required data quality objectives (EPA, 2022) were attained. 7.1 Sensitivity A total of five blanks were analyzed by measuring the radon progeny activity in samples subjected to all aspects of the measurement process, excepting exposure to the source region. These blank sample measurements comprised approximately 5 percent of the field measurements. Analysis of the five blank samples measured radon flux rates had an arithmetic average of approximately 0.03 pCi/m2 -s. The lower limit of detection (LLD) for the field blanks was approximately 0.04 pCi/m2-s. 7 .2 Precision Ten recount measurements, distributed throughout the sample set, were performed by replicating analyses of individual field samples (see Appendix B). These recount measurements comprised approximately IO percent of the total number of samples analyzed. The precision of recount measurements, expressed as relative percent difference (RPD), for sample results values that were above I pCi/m2-sec ranged from approximately 3.5 percent to 5.6 percent, with an average of approximately 4.5 percent. This complies with the precision objective of+/-IO percent. 7.3 Accuracy Accuracy of field measurements was assessed daily by counting two laboratory control samples with known Ra-226 content. Accuracy of these lab control sample measurements, expressed as percent bias, ranged from approximately -1.5 percent to + 1.1 percent. The arithmetic average bias of the lab control sample measurements was approximately -0.2 percent (see Appendix A). This complies with the accuracy objective of +/-10 percent bias. 7.4 Completeness All 100 samples from the Cell 2 cover region were verified as valid, representing 100 percent completeness, which complies with the completeness objective of 85 percent. 8. CALCULATIONS Radon flux rates were calculated for charcoal collection samples using calibration factors derived from cross-calibration to sources with known total activity with identical geometry as the charcoal containers. A yield efficiency factor was used to calculate the total activity of the sample charcoal containers. Individual field sample result values presented were not reduced by the results of the field blank analyses. 5 In practice, radon flux rates were calculated by a database computer program. The algorithms utilized by the data base program were as follows: Equation 8.1: pCi Rn-222/m2sec = [Ts* A *b*O.stdl91 ,3)) where: N = net sample count rate, cpm under 220-662 keV peak Ts = sample duration, seconds b = instrument calibration factor, cpm per pCi; values used: 0.1702, for M-01/0-21 and 0.1706, for M-02/0-20 d = decay time, elapsed hours between sample mid-time and count mid-time A = area of the canister, m2 Equation 8.2: Gro ss Sample, cpm Background Sample, cpm --------+---------- SampleCount,t,min Background Count,t,min Error, 2u = 2 x -'---------------------x Sample Concentration Net,cpm Equation 8.3: LLD-2.71 + (4.65){SM -[Ts* A *b*0.51<119 ·75JJ where: 2.71 = constant 4.65 = confidence interval factor Sb = standard deviation of the background count rate Ts = sample duration, seconds b = instrument calibration factor, cpm per pCi; values used: 0.1702, forM-01/0-21 and 0 .1706, for M-02/0-20 d = decay time, elapsed hours between sample mid-time and count mid-time A = area of the canister, m2 9. RESULTS 9.1 Mean Radon Flux Referencing 40 CFR, Part 61, Subpart W, Appendix B, Method 115 -Monitoring for Radon-222 Emissions, Subsection 2.1. 7 -Calculations, "the mean radon flux for each region of the pile and for the total pile shall be calculated and reported as follows: (a) The individual radon flux calculations shall be made as provided in Appendix A EPA 86(1). The mean radon flux for each region of the pile shall be calculated by summing all individual flux measurements for the region and dividing by the total number of flux measurements for the region. 6 (b) The mean radon flux for the total uranium mill tailings pile shall be calculated as follows: A1 Where: J5 = Mean flux for the total pile (pCi/m2-s) Ji = Mean flux measured in region i (pCi/m2 -s) Ai = Area ofregion i (m2) At = Total area of the pile (m2)" 40 CFR 61, Subpart W, Appendix B, Method 115, Subsection 2.1.8, Reporting states "The results of individual flux measurements, the approximate locations on the pile, and the mean radon flux for each region and the mean radon flux for the total stack [pile] shall be included in the emission test report. Any condition or unusual event that occurred during the measurements that could significantly affect the results should be reported." 9.2 Site Results Site Specific Sample Results (reference Appendix C) (a) The mean radon flux for the Cell 2 region at the site is as follows: Cell 2 -Cover Region = 0.6 pCi/m2-s (based on 270,624 m2 area) Note: Reference Appendix C of this report for the entire summary of individual measurement results. (b) Using the data presented above, the calculated mean radon flux for Cell 2 is as follows: Cell 2 = 0.6 pCi/m2-s (0.6)(270,624) = 0.6 270,624 As shown above, the arithmetic mean of the radon flux rate measurements for Cell 2 representing the first half of the year 2023 at Energy Fuels' White Mesa milling facility is well below the U.S. Nuclear Regulatory Commission and EPA regulatory standard of 20 pCi/m2-s. No condition or unusual events were observed during the measurements that could significantly affect the results. Appendix C presents the summary of individual measurement results, including blank sample analysis. Sample locations are depicted on Figure 2, which is included in Appendix D. The map was produced by Tellco. 7 References U. S. Environmental Protection Agency, Radon Flux Measurements on Gardinier and Royster Phosphogypsum Piles Near Tampa and Mulberry, Florida, EPA 520/5-85-029, NTIS #PB86- 161874, January 1986. U. S. Environmental Protection Agency, Title 40, Code of Federal Regulations, July 2022. U. S. Nuclear Regulatory Commission, Radiological Effluent and Environmental Monitoring at Uranium Mills, Regulatory Guide 4.14, April 1980. U. S. Nuclear Regulatory Commission, Title 10, Code of Federal Regulations, Part 40, Appendix A, January 2022. 8 Figure 1 Large Area Activated Charcoal Canisters Diagram 9 l-in Tn•cl Sc.n.1tbtu Pttl.1 l/2-11'. rr,,,~. S.:.rut::.:11!1 Pa:i 1 '2•i11 Tl11,;:,c Cl1.:,rci;,,a, S1.Jp~11J.1I !,':;r..:I I 0-in lia P~CEMC•P Appendix A Charcoal Canister Analyses Support Documents A ENERGY FUELS RESOURCES WHITE MESA MILL, BLANDING, UTAH 2023 RADON FLUX MEASUREMENTS SAMPLING DATES: 04/04/23-04/05/23 ANALYSIS DATES: 04/07/23-04/09/23 SYSTEM COUNT 8kg Counts (1 min. each) I.D. DATE #1 #2 M-01/0-21 4/7/2023 104 129 M-01/D-21 4/7/2023 111 121 M-01/D-21 4/8/2023 107 142 M-01/D-21 4/8/2023 118 124 M-01/D-21 4/9/2023 130 127 M-01/D-21 4/9/2023 127 136 M-01/D-21 4/7/2023 104 129 M-01/D-21 4/7/2023 111 121 M-01/D-21 4/8/2023 107 142 M-01/0-21 4/8/2023 118 124 M-01/D-21 4/9/2023 130 127 M-01/0-21 4/9/2023 127 136 M-02/D-20 4/7/2023 113 103 M-02/D-20 4/7/2023 130 108 M-02/D-20 4/8/2023 124 123 M-02/D-20 4/8/2023 118 111 M-02/D-20 4/9/2023 120 125 M-02/D-20 4/9/2023 108 121 M-02/D-20 4/7/2023 113 103 M-02/D-20 4/7/2023 130 108 M-02/D-20 4/8/2023 124 123 M-02/D-20 4/8/2023 118 111 M-02/D-20 4/9/2023 120 125 M-02/D-20 4/9/2023 108 121 #3 135 127 131 130 126 134 135 127 131 130 126 134 131 114 115 119 130 102 131 114 115 119 130 102 ACCURACY APPRAISAL TABLE CELL 2 APRIL 2023 Source Counts (1 min. each) #1 #2 #3 10204 10252 10152 10066 10249 10257 10164 10188 10291 10019 10216 10125 10308 10271 10083 10092 10081 10138 10248 10076 9952 10220 9944 10245 10276 10153 10239 9968 10115 10196 10267 10264 9946 10002 10114 10115 10171 10178 10212 10269 10231 10286 10402 10300 10187 10364 10270 10307 10329 10182 10220 10367 10344 10313 10257 10326 10217 10396 10251 10100 10198 10223 10227 10233 10186 10196 10374 10204 10278 10240 10366 10241 AVG NET YIELD FOUND SOURCE cpm cpm/pCi pCi ID 10080 0.1702 59224 GS-04 10071 0.1702 59172 GS-04 10088 0.1702 59269 GS-04 9996 0.1702 58731 GS-04 10093 0.1702 59301 GS-04 9971 0.1702 58586 GS-04 9969 0.1702 58574 GS-05 10017 0.1702 58852 GS-05 10096 0.1702 59318 GS-05 9969 0.1702 58572 GS-05 10031 0.1702 58939 GS-05 9945 0.1702 58429 GS-05 10071 0.1706 59035 GS-04 10145 0.1706 59465 GS-04 10176 0.1706 59646 GS-04 10198 0.1706 59775 GS-04 10119 0.1706 59312 GS-04 10231 0.1706 59971 GS-04 10151 0.1706 59502 GS-05 10132 0.1706 59388 GS-05 10095 0.1706 59175 GS-05 10089 0.1706 59138 GS-05 10160 0.1706 59556 GS-05 10172 0.1706 59625 GS-05 AVERAGE PERCENT BIAS FOR ALL ANALYTICAL SESSIONS: KNOWN %BIAS pCi 59300 -0.1% 59300 -0.2% 59300 -0.1% 59300 -1.0% 59300 0.0% 59300 -1.2% 59300 -1.2% 59300 -0.8% 59300 0.0% 59300 -1.2% 59300 -0.6% 59300 -1.5% 59300 -0.4% 59300 0.3% 59300 0.6% 59300 0.8% 59300 0.0% 59300 1.1% 59300 0.3% 59300 0.1% 59300 -0.2% 59300 -0.3% 59300 0.4% 59300 0.5% -0.2% MIN -1.5% MAX 1.1% CHARCOAL CANISTER ANALYSIS SYSTEM SITE LOCATION: . v.J b, ·+e j\,\-t7') M ~ 1 l , 13 t;f1 d ~ qt] .) \.,(T cLIENT: Er1~i, f v-e\s t'--"!ovrces. LY> A) · 1 vie.. Cal~ration Check Log System ID: """'r\-1__,_-_O_\ +-/___..'Q..____~ "'""?-____...\ __ _ Calibration Date: l-+ f O 7 / "2-."~ Due Date: i..J / er, f "1--':f: ' Scaler SIN: ___ 5_, _s_,_~----High Voltage: I I ...., 5 Window: _ _,_4'-'-.4,._2 -Thrshld: __,2=.2=0 __ 0 ?.z.(,-1 . Detector SIN: __.Q_'::\~t_S_3~3'----Source ID/SN: r-c. ~ D't Source Activity: '? '-1 •? l'!--f l ,· Blank Canister Bkgd. Range, cpm: 2 o = __ i_O_O __ to -~'~4~0) __ 3 cr = 06 to liJI Gross Source Range, cpm: 2(5= I O O I ~ to t O 4 / °I 3 a= °}q I 2 to 105?-0 Technician: _ __..Y7""--__ ,--_c_•~8-~ ___ 'y_·_,U. __ All counts times are one mioure. Date By Background Counts (1 min. each) Source Counts 0 min. each) ok? #1 #2 #3 Avg. #1 #2 #3 Avera!!:e YIN 4 ·1 '·2.:~ T7Z,t!, I II]'-\: I '2 .. ..0\ ,-~.:;-11--·J lOJ...Ol.-4 I 01-'7-,,_ ,o t <,2---10-Z..0-_3 --I ➔l-, .~ DU,, 11 I I '".1--\ , .,_7 ' '1---0 100~1,., IOJ-~ 10·1-s1 IO\q \ ·v 1./ r1--i..7, 'fl 'T'JU . 10'7 'JL.f-'2 ... 1·~-, 1'2.,~, I 0\ loL 1n1~g \()•.,a.\ IO Z.l'i " Lf I t, 2--~ TJU I' '2, 12.1..\' J~o 1-'l-b i oo ,u. ,o~,., i 01 "2-, iOl>-0 ...., i.l I i,Jj-1,-"3 lJ 2e,., l"~O i'J.., I:.,.. ep IU ;O~OR I O'J-71 I00H3 \ C, "2,.. "'Z.; -.J Lf /U'Jl"J3 nu-n ... , p,(.p 1--,,4 I 3 .... l-I 000\'1.-root,\ IO l:'l'l") 10104 \_/ 4/,o "'l-~ D-2/4 ;-:l.S-\I'} llU. l \7 \00fo 7, IDl?..i IO'L--;;(2., l 01'-t~ I--/ t.\ 1-012--? ~ IO"'l--I J'J-lnC.. I 0'7 l00'2-I I OOt..o lb ilo\ t008 y , ' YIN: Y = average background and source cpm falls within the control limits. N = average background and source cpm does not fall within the control limits. The acceptable ranges were determined from prior background and source check data. CHARCOAL CANISTER ANALYSIS SYSTEM SITE WCA TfON: w h : ..\:.e ,v\ ~ '2':l M ~ \ I 6 / t'1"1d !· ~ ) u \ -I , CLIENT: t= vtf V:~ '/ h-\ c I> i2-,€s; o <-t .,r cA--, Lu S A-) I i,,.e , Calibration Check Log SystemID: M -0 I / -0 --21 Calibration Date: .i--f / D 7 / "l. 3 Due Date: -Scaler SIN: ~ I S7 '?-High Voltage: i It .'.:'::) Window: 4.42 Thrshld: 2.20 Detector SIN: 0 '--\ I S 3 -~ ,., 7,7--j,,,./ · _,-. 5-r.::t 3 v "'· Source ID/SN: f-(\ / C:r•::r v Source Activity: -:, I· " tL--1 Blank Canister Bkgd. Range, cpm: 2 CJ= ·too to )4°> 3CJ= B 0 to 1 ~ / Gross Source Range, cpm: 2 CJ= Cj 0) 0) ~ to \ 0 4 ~ l 3 CJ= 9 'o0 3 to I D 5 ;i. <e Technician: =v {. -~~>~/'-w~ All counts times are one minute. Date By Backg ound Counts (I min. each) Source Counts (I min. each ok? #1 #2 #3 Av!!,. #1 #2 #3 Average YIN 4/1 1·2:; 'if/£:. I tJLf i~ ;3,; 1·vJ Iv 1-4h' i 170·7 lo '7l--'\S.,_ I ooq-z.., 'I ,_..I.,, 'L-; t:?-U l I I 12-I?...,,-'/ 1'2-0 i 0 '2-"U:> ")V'\44-I O J..£-t i::;' i O I ~(, y ,.,,,, FJ: Z.3 r:nL 101 I '-1..., ~ ~, I ~1,,,~1 102.-i~ i O IS~ in--,-~ { 0'2-7-3 ✓ 4/~ri.; Dl,i.-. I Jg I --z...;a-,~o n ... '-~OIi, g I nl ,~ 1010 v I 00'-13 ...,, 4/1?) ~ Die /40 I -z_; 7 l 'J_{; 1'7 ... .H' j 01.. .l d--J I 02.lD i-f O\OJ '-l lJ? t O I S"""l ...:t i,,//g ·;z...3 Di/,/ I '1--, I~£., ,·~t..;., i3'J.-1 o oo.a.. 1011'-t Iv u ,..,-100,7 '" 4/ lO "2.~ lrl....a-11.--5 1&1 i I If I 1--J O,aq t{ I 0'1.---:2-0 10 I?,-'-\ 101,, ...., 4/ w/').""'2, ~1../.~ l O ·"J--i f'Z-101' 10 "7 lt?1'l.."'2.-1ou·11 lo 1·1 I IO /'2-1 \/ I YIN: Y = average background and source cpm falls within the control limits. N = average background and source cpm does not fall within the control limits. The acceptable ranges were determined from prior background and source check data. CHARCOAL CANISTER ANALYSIS SYSTEM s1rnLOcATJON: \,\) ~ ·; k \½e~,, i'v\; l () B / 4YIJ,~~'J 4 T CLIENT: ~ Vl-l "}J ~, F ~ t· \ ~ ~.!' c;.o .. u·c., s (_ Lt .S A) \ I'\ c.. _ I Calibratjon Check Log System ID: ...:.(v'i __ -v_'·_._2-_/,._...;;0'------"2-_0__ Calibration Date: L-1 / ,0'1 / "1,-7 Due Date: Lf / 0 "1 J 2. tj Scaler SIN: __ "'?_·· _·_1 _s_:-_(p_~·3=-----High Voltage: OJ 5 0 Window: 4.42 Thrshld: 2.20 Detector SIN:_...,()_. _L-...,_\_1_:,c.... ___ 5_-2-___ Source ID/SN: 12-,~"i-:Lf / & 5 -iJ '1 Source Activity: 5~, 3 it, f C-; q 4 to ) 43 3a= 8""l-to jt;""C, Blank Canister Bkgd. Range, cpm: 2 a= to IO 433 Gross Source Range, cpm: 2a= Technician: IC 1'1.'-} to \0°3/ / 3cr= 122 ... {~~~ AlJ coW\lS times are one minute Date By Backiuound Counts (I min.. each) Source Counts (1 min. each) ok? #1 #2 #3 Avg. #1 #2 #3 Average YIN I-th --i--7, l7t/ ,1~ tv:3 I 7,' ii~ 10111 l.;) 1--i r.,: i 0·2-1·2... I 01 '1:i7 ~,:. ➔l-1 , . .,.:,. JLL ,-~ 100 lf4-l /"1 102..,q 11)""1-~ I IO 7.P-. L I 071.1"?-..... , t-1/ri:. 1-?'.2, nL.-\...,.J lT~ I 15" ,~I I0'to-2 I t1 -~()O ,rJ I e,·1 OU'I" " 4/,;,,h;:I. ~u. ·,tR \ 11 I I~ I I i., i l}-.(1_..l.,· ,,-,•.z..,o ~ 0·:?,UT O::S1L ✓ ..J /q 2.-~ ">U.. 1-z..0 I '2--5 \~<7 1--,~ ; 0:-~·2-.q I n1g--:> l 0"2, 2C ' <n-'1(. \!.I J.i/<J , /-7---?, YI<--,~ I --z_/ i 0 ·1--JlO In"' l."1 10·:;i.au tt'J""' 1''.2. 0~41 "' ~ ,.0 "l .3 J)'Jk O)", I 0(il l Vt, I {) 4-' I ('.J'3'4U l04 l"2-lo-J-'J,'l. OT3J '{' c:. 10 "'2."I. ~ ,-,r..e,,. 17--, 11 <., I OS-i l l4. I..:) '".l, i <i) ll')'J '"",:: 10tA4 10'243 ·--1 , YIN: Y = average background and source cpm falls within the control limits. N = average background and source cpm does not fall within the control limits. The acceptable ranges were determined from prior background and source check data. CHARCOAL CANISTER ANALYSIS SYSTEM SITE LOCATION: \vh\.\.e, tV\t1::,&1 M\ l I) 'B /J'H) J~ ~ ) L--\T CLIENT: t=-t'\er'"jy f\A~'<; ~~St.."l--\(~.,> c~sA-) lv"-c;... Calibration Check Log System ID: _,_M_-_0_·2-~/_V_· _-i.._o__ Calibration Date: l:l / ;; 1 / J.:-2 Due Date: Scaler SIN: ___ ~ __ I s_-_(..,,_3 ___ High Voltage: q SO Window: 4.42 Thrshld: ~2=.2=0 __ --i.-i-y/ .· Detector SIN: ___ O_L\-_I_S_3_'2--__ Source ID/SN: ~~ LG-S-OS' Blank Canister Bkgd. Range, cpm: 2 a= --~-4~_ to __ I _4_"3~-3 a= Source Activity: ,;q, 3 -"p (_; B2 to I ~le Gross Source Range, cpm: 2a= 1oo~J...~ to 1041..'3 3a= °>0:i.~ to \05)..3 Technician: _]2--4--=t--~~v=~-",i"-~-"--' AJl counts times are one minute. Date By Background Counts (1 min. each) Source Counts (1 min. each) ok? #1 #2 #3 Avg. #1 #2 #3 Average YIN l-lh h3 ,7/L., · i I '3 I 0'2, ,~; I/ ~ lfn...'57 lO~ ; ~-z.,-, 102~, 'I '1 ,., ''2-".3 r,u,, ~ "2,0 iOA q4-111 i..:r3,11.1 & ; o·~i 10100 I 0"2..,4~ ... , '1'/ p,, '•2-:; ./7L 1 ·J.-u. ;""2-~ I I ~ 11. I IOtO\t-:< I c·-,"7__:~ il"r2-7---i I 07..1\' " u,~ ''7--~ 71,,,w 11 o.· l II I I~ II i., ,o~~·-:,, i ,0 IP,~ I I)'°' L, I O·.z.o~ v "''~ ·;i. 3 ~& ·, 2.o \2..~ l'30 t -"2-5 iO·~-'4 102-oi.f 1n27t3 1020:> "(. 4'/~ '·;i.? fn~; 10~ 1"'2-1 (02.. 1\0 I 0:1. L fO i 03to~ tO.i.4 I f0'Le,--i_ .!..J ~ /I0/2-3 VU-C,s-i O'-'i i Q(:J l04 t ()'4,Q} /O'tSI tOl,2. ,o~7 ''I Lt io"/2-7. I~ \ 1-, ll (p 1:0~ llv inT2;.-, 10·-::z.,-,7 In~ 10101 V ' ~ j YIN: Y = average background and source cprn falls within the control limits. N = average background and source cpm does not fall within the control limits. The acceptable ranges were determined from prior background and source check data. BALANCE OPERATION DAILY CHECK Balance Model: 0 V\O..v\ s '? act-0 -~ra W) s Iv; ' l 3 0 7 Standard Weight (g): _..;:::3;_,_0_D_. _o _______ _ Date Pre-check (g) Post-check (g) O.K. :i:0.1 % ? By 4 /0,/2-3 300.0 300.0 'f~s b/" c;,.. . rq;,_ 4 IO B /-i,3 300 .. 0 "2 O)".). ~ y~s oL~~ I DL~ lf/oq/23 -~DO. O ~00.0 c..1-es Lf /10 J-2, ~ , l> I,, ~----300,0 ~~oo.o '/.£..S I AppendixB Recount Data Analyses B CLIENT: ENERGY FUELS RESOURCES PROJECT: RADON FLUX MEASUREMENTS, WHITE MESA MILL PILE: 2 BATCH: H SURFACE: SOIL AREA: COVER DEPLOYED: 4 4 23 RETRIEVED: 4 FIELD TECHNICIANS: DLC, GP, TH, DL, TB, WH, TL COUNTED BY: DLC COUNTING SYSTEM I.D.: M01/D21, M02/D20 CAL. DUE: 4/07/24 RECOUNT CANISTER ANALYSIS: AIR TEMP MIN: N/A 5 23 CHARCOAL BKG: DATA ENTRY BY: DLC 139 PROJECT NO.: 23004.01 WEATHER: NO RAIN cpm Wt. Out: TARE WEIGHT: 180.0 29.2 g, g, GRID SAMPLE RETRIV ANALYSIS MID-TIME CNT GROSS GROSS RADON ± LLD PRECISION LOCATION I. D. HR MIN HR MIN MO DA YR HR MIN (MIN) COUNTS WT IN pCi/m2 s pCi/m2 s pCi/m2 s % RPD HlO HlO 8 34 8 39 4 8 23 9 32 4 1197 223.5 0.39 0.05 0.04 RECOUNT HlO 8 34 8 39 4 9 23 9 0 4 1104 223.5 0.40 0.06 0.05 2.5% H20 H20 8 4 8 7 4 8 23 9 56 4 1092 211.2 0.33 0.05 0.04 RECOUNT H20 8 4 8 7 4 9 23 9 0 5 1040 211.2 0.20 0 .05 0.05 49 .1% H30 H30 8 27 8 35 4 8 23 10 27 2 1228 220.6 1.17 0.12 0.04 RECOUNT H30 8 27 8 35 4 9 23 9 7 2 1052 220.6 1.13 0 .11 0.05 3.5% H40 H40 8 6 8 8 4 8 23 10 56 5 1127 218.0 0.21 0 .04 0.04 H40 H40 8 6 8 8 4 8 23 9 7 6 1188 218.0 0 .14 0 .04 0.04 40.0% H50 H50 8 13 8 28 4 8 23 11 24 4 1177 215.2 0.38 0 .05 0.04 H50 H50 8 13 8 28 4 8 23 9 14 4 1196 215.2 0.39 0 .05 0.04 2.6% H60 H60 8 16 8 13 4 8 23 11 56 5 1020 215.5 0.16 0 .04 0.04 H60 H60 8 16 8 13 4 8 23 9 14 5 1090 215.5 0.19 0 .04 0.04 17 .1% H70 H70 8 9 8 25 4 8 23 12 25 2 1470 220.6 1.48 0 .15 0.04 H70 H70 8 9 8 25 4 8 23 9 19 2 1430 220.6 1.40 0 .14 0.04 5.6% HBO HBO 8 25 8 18 4 8 23 12 52 5 1199 219.1 0.25 0 .04 0.04 HBO HBO 8 25 8 18 4 8 23 9 21 5 1199 219.1 0,25 0 .04 0.04 0.0% H90 H90 8 31 8 21 4 8 23 13 19 5 1010 214.2 0.16 0 .04 0.04 H90 H90 8 31 8 21 4 8 23 9 28 5 1030 214 .2 0.17 0 .04 0.04 6.1% HlOO HlOO 8 38 8 26 4 8 23 13 47 4 1172 215 .4 0.39 0 .05 0.04 HlOO HlOO 8 38 8 26 4 8 23 9 28 5 1215 215 .4 0.26 0 .04 0.04 40.0% AVERAGE PERCENT PRECISION FOR THE CELL 2 COVER REGION: 16.6% AVERAGE PERCENT PRECISION FOR RESULTS ABOVE 1 pCitm2-sec IN THE CELL 2 COVER REGION: 4.5% Page 1 of 1 Appendix C Radon Flux Sample Laboratory Data (including Blanks) C CLIENT: ENERGY FUELS RESOURCES PROJECT: RADON FLUX MEASUREMENTS, WHITE MESA MILL PILE: 2 BATCH: H SURFACE: SOIL AREA: COVER DEPLOYED: 4 4 23 RETRIEVED: 4 FIELD TECHNICIANS: DLC, GP, TH, DL, TB, WH, TL COUNTED BY: DLC COUNTING SYSTEM I.D.: M01/D21, M02/D20 CAL. DUE: 4/07/24 AIR TEMP MIN: N/A 5 23 CHARCOAL BKG: DATA ENTRY BY: DLC 139 PROJECT NO.: 23004.01 WEATHER: NO RAIN cpm Wt. Out: TARE WEIGHT: 180.0 29.2 GRID SAMPLE DEPLOY RETRIV ANALYSIS MID-TIME CNT GROSS GROSS RADON ± LLD g, g. LOCATION I. D . HR MIN HR MIN MO DA YR HR MIN (MIN) COUNTS WT IN pCi/m' s pCi/m' s pCi/m' s COMMENTS: HOl H02 H03 H04 HOS H06 H07 HOB H09 HlO Hll H12 H13 H14 HlS H16 H17 HlB H19 H20 H21 H22 H23 H24 H25 H26 H27 H28 H29 H30 H31 H32 H33 H34 H35 H36 H37 H38 H39 H40 HOl H02 H03 H04 HOS H06 H07 HOS H09 HlO Hll H12 H13 H14 HlS H16 H17 H18 H19 H20 H21 H22 H23 H24 H25 H26 H27 H28 H29 H30 H31 H32 H33 H34 H35 H36 H37 H38 H39 H40 8 48 8 48 8 47 8 46 8 46 8 45 8 45 8 35 8 35 8 34 8 34 8 33 8 33 8 32 8 31 8 1 8 2 8 2 8 3 8 4 8 21 8 22 8 23 8 24 8 25 8 25 8 25 8 26 8 26 8 27 8 28 8 29 8 29 8 30 8 10 8 9 8 9 8 8 8 7 8 6 8 43 4 8 23 9 8 8 43 4 8 23 9 8 8 42 4 8 23 9 15 8 42 4 8 23 9 15 8 41 4 8 23 9 21 8 41 4 8 23 9 21 8 40 4 8 23 9 26 8 40 4 8 23 9 26 8 40 4 8 23 9 32 8 39 4 8 23 9 32 8 39 4 8 23 9 37 8 38 4 8 23 9 37 8 38 4 8 23 9 42 8 38 4 8 23 9 42 8 37 4 8 23 9 46 8 5 4 8 23 9 46 8 6 4 8 23 9 51 8 6 4 8 23 9 51 8 7 4 8 23 9 56 8 7 4 8 23 9 56 8 32 4 8 23 10 3 8 32 4 8 23 10 2 8 33 4 8 23 10 10 8 33 4 8 23 10 10 8 34 4 8 23 10 16 8 34 4 8 23 10 16 8 34 4 8 23 10 22 8 35 4 8 23 10 22 8 35 4 8 23 10 28 8 35 4 8 23 10 27 8 36 4 8 23 10 33 8 36 4 8 23 10 31 8 36 4 8 23 10 38 8 37 4 8 23 10 37 8 10 4 8 23 10 44 8 9 4 8 23 10 44 8 9 4 8 23 10 50 8 9 4 8 23 10 50 8 8 4 8 23 10 56 8 8 4 8 23 10 56 6 6 6 5 5 5 4 4 5 4 4 4 4 4 3 3 4 4 5 4 6 2 3 6 4 4 4 5 4 2 4 2 4 2 4 5 4 4 5 5 1175 1062 1111 1104 1135 1100 1128 1273 1134 1197 1096 1004 1288 1032 1111 1461 1124 1095 1006 1092 1116 1221 1050 1151 1044 1112 1076 1201 1016 1228 1166 1151 1123 1014 1084 1135 2001 1168 1100 1127 Page 1 of 3 220.1 223.6 219.6 223.4 220.5 218.7 222.4 220.7 219.8 223.5 221.7 222.4 220.0 219.1 217.9 219.6 219.5 218.5 224.7 211.2 221.7 219.8 221.5 216.7 221.8 220.4 216.5 221.5 222.4 220.6 220.7 220.9 222.0 218.6 219.7 212.7 216.9 218.2 214.6 218.0 0.1 0.1 0.1 0.2 0.2 0.2 0.4 0.4 0.2 0.4 0.3 0.3 0.4 0.3 0.6 0.9 0.4 0.3 0.2 0.3 0.1 1.2 0.5 0.1 0.3 0.3 0.3 0.2 0.3 1.2 0.4 1.1 0.3 0.9 0.3 0.2 0.9 0.4 0.2 0.2 0 .04 0 .04 0.04 0 .04 0 .04 0 .04 0.05 0 .05 0 .04 0.05 0 .05 0 ,05 0.05 0 .05 0 .06 0 .09 0.05 0 .05 0 .04 0,05 0 .04 0 .12 0 .06 0 .04 0 .05 0,05 0 .05 0 .04 0 .05 0 .12 0 .05 0 .11 0 .05 0 .09 0 .05 0 .04 0 .09 0 .05 0 .04 0 .04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 CLIENT: ENERGY FUELS RESOURCES PROJECT: RADON FLUX MEASUREMENTS, WHITE MESA MILL PILE: 2 BATCH: H SURFACE: SOIL AREA: COVER DEPLOYED: 4 4 23 RETRIEVED: 4 FIELD TECHNICIANS: DLC, GP, TH, DL, TB, WH, TL COUNTED BY: DLC COUNTING SYSTEM 1.D.: M01/D21, M02/D20 CAL. DUE: 4/07/24 AIR TEMP MIN: N/A 5 23 CHARCOAL BKG: DATA ENTRY BY: DLC 139 PROJECT NO.: 23004.01 WEATHER: NO RAIN cpm Wt. Out: TARE WEIGHT: 180.0 29.2 GRID SAMPLE DEPLOY RETRIV ANALYSIS MID-TIME CNT GROSS GROSS RADON ± LLD g. g. LOCATION I. D . HR MIN HR MIN MO DA YR HR MIN (MIN) COUNTS WT IN pCi/m's pCi/m's pCi/m's COMMENTS: H41 H42 H43 H44 H45 H46 H47 H48 H49 H50 H51 H52 H53 H54 H55 H56 H57 H58 H59 H60 H61 H62 H63 H64 H65 H66 H67 H68 H69 H70 H71 H72 H73 H74 H75 H76 H77 H78 H79 HBO H41 H42 H43 H44 H45 H46 H47 H48 H49 H50 H51 H52 H53 H54 H55 H56 H57 H58 H59 H60 H61 H62 H63 H64 H65 H66 H67 H68 H69 H70 H71 H72 H73 H74 H75 H76 H77 H78 H79 HBO 8 20 8 8 19 8 8 19 8 8 18 8 8 17 8 8 16 8 8 16 8 B 15 B B 15 B B 13 8 8 13 8 8 12 8 8 12 8 8 12 8 8 13 8 8 14 8 8 15 8 8 15 8 8 15 8 8 16 8 8 16 8 8 17 8 8 17 8 8 18 8 8 19 8 8 19 8 8 20 8 8 10 8 8 9 8 8 9 8 8 B B 8 7 8 8 7 8 8 6 8 8 6 8 8 4 8 8 26 8 8 26 8 8 25 8 8 25 8 31 4 8 23 11 1 31 4 8 23 11 1 31 4 8 23 11 7 30 4 8 23 11 6 30 4 8 23 11 14 29 4 8 23 11 14 29 4 8 23 11 19 29 4 8 23 11 19 28 4 8 23 11 24 28 4 8 23 11 24 28 4 8 23 11 30 27 4 8 23 11 30 27 4 8 23 11 36 10 4 8 23 11 36 11 4 8 23 11 42 11 4 8 23 11 42 12 4 8 23 11 48 12 4 8 23 11 49 13 4 8 23 11 55 13 4 8 23 11 56 14 4 8 23 12 2 14 4 8 23 12 2 15 4 8 23 12 7 15 4 8 23 12 8 16 4 8 23 12 14 16 4 8 23 12 15 16 4 8 23 12 21 26 4 8 23 12 19 26 4 8 23 12 25 25 4 8 23 12 25 25 4 8 23 12 29 25 4 8 23 12 30 24 4 8 23 12 35 24 4 8 23 12 35 23 4 8 23 12 40 23 4 8 23 12 41 20 4 8 23 12 48 19 4 8 23 12 48 19 4 8 23 12 52 18 4 8 23 12 52 3 3 6 3 5 5 3 3 5 4 4 4 5 5 5 5 4 5 4 5 4 4 4 5 4 5 4 1 2 2 3 4 4 3 4 6 4 6 5 5 1001 1002 1122 1023 1071 1025 1260 1003 1135 1177 1016 1240 1211 1166 1111 1085 1232 1159 1085 1020 1002 1156 1077 1066 1087 1119 1124 1407 1111 1470 1431 1032 1112 1249 1087 1055 1281 1182 1016 1199 Page 2 of 3 217.3 217.8 222.1 220.0 221.5 221.0 218.6 222.3 222.4 215.2 219.5 221.2 217.7 217.0 216.B 216.5 219.3 215.1 216.9 215.5 213.3 218.2 215. 6 218.6 218.3 216.8 220.7 217.8 212.3 220.6 219. 0 217.9 218.6 220.0 218.8 218.6 216.7 218.9 220.1 219.1 0.5 0.5 0.1 0.5 0.2 0.2 0.7 0.5 0.2 0.4 0.3 0.4 0.3 0.2 0.2 0 .2 0.4 0.2 0.3 0.2 0.3 0.4 0.3 0.2 0.3 0.2 0.4 3.1 1.0 1.5 0.8 0.3 0.3 0.7 0.3 0.1 0.5 0.1 0.2 0.3 0.06 0.06 0.04 0.06 0.04 0.04 0.07 0.06 0.04 0.05 0.05 0.05 0.04 0.04 0.04 0.04 0.05 0.04 0.05 0.04 0.05 0.05 0.05 0.04 0.05 0.04 0.05 0.31 0.10 0.15 0.08 0.05 0.05 0.07 0.05 0.04 0.05 0.04 0.04 0 .04 0.04 0 .04 0.04 0 .04 0 .04 0.04 0.04 0 .04 0.04 0 .04 0 .04 0.04 0 .04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0 .04 0 .04 0 .04 0 .04 0 .04 0 .04 0.04 0 .04 0 .04 0 .04 0 .04 0 .04 0 .04 0.04 0.04 0 .04 0.04 0 .04 CLIENT: ENERGY FUELS RESOURCES PROJECT: RADON FLUX MEASUREMENTS, WHITE MESA MILL PILE: 2 BATCH: H SURFACE: SOIL AREA: COVER DEPLOYED: 4 4 23 RETRIEVED: 4 FIELD TECHNICIANS: DLC, GP, TH, DL, TB, WH, TL COUNTED BY: DLC COUNTING SYSTEM I.D.: M01/D21, M02/D20 CAL. DUE: 4/07/24 AIR TEMP MIN: N/A 5 23 CHARCOAL BKG: DATA ENTRY BY: DLC 139 PROJECT NO.: 23004.01 WEATHER: NO RAIN cpm Wt. Out: TARE WEIGHT: 180.0 29.2 GRID SAMPLE DEPLOY RETRIV ANALYSIS MID-TIME CNT GROSS GROSS RADON ± LLD g. g, LOCATION I. D. HR MIN HR MIN MO DA YR HR MIN (MIN) COUNTS WT IN pCi/m's pCi/m's pCi/m's COMMENTS: H81 H81 8 24 8 18 4 8 23 12 58 5 1164 213. 9 0.2 0.04 0.04 H82 H82 8 24 8 17 4 8 23 12 58 4 1196 217.3 0.4 0.05 0.04 H83 H83 8 23 8 17 4 8 23 13 4 4 1135 216.9 0.4 0.05 0.04 H84 H84 8 23 8 17 4 8 23 13 4 3 1052 217.1 0.5 0.06 0.04 H85 H85 8 46 8 31 4 8 23 13 8 2 1854 214.2 2.0 0.20 0.04 H86 H86 8 2 8 21 4 8 23 13 10 6 1133 220.8 0.1 0.04 0.04 H87 H87 8 3 8 21 4 8 23 13 15 1 1672 218.1 3.8 0.38 0.04 H88 H88 8 3 8 22 4 8 23 13 15 1 1214 218.5 2.7 0.27 0.04 H89 H89 8 30 8 20 4 8 23 13 17 1 1481 224.1 3.4 0.34 0.04 H90 H90 8 31 8 21 4 8 23 13 19 5 1010 214.2 0.2 0.04 0.04 H91 H91 8 32 8 21 4 8 23 13 26 6 1135 216.1 0.1 0.04 0.04 H92 H92 8 33 8 22 4 8 23 13 26 4 1077 217.4 0.3 0.05 0.04 H93 H93 8 34 8 22 4 8 23 13 32 3 1011 216.6 0.5 0.06 0.04 H94 H94 8 34 8 23 4 8 23 13 32 2 1186 217.8 1.2 0.12 0.04 H95 H95 8 35 8 23 4 8 23 13 36 2 1002 219.9 0.9 0.09 0.05 H96 H96 8 36 8 24 4 8 23 13 36 1 1615 221.1 3.8 0.38 0.04 H97 H97 8 37 8 24 4 8 23 13 39 2 1482 216.7 1.5 0.15 0.05 H98 H98 8 41 8 28 4 8 23 13 41 5 1136 218.7 0.2 0.04 0.04 H99 H99 8 39 8 27 4 8 23 13 47 5 1215 218.0 0.3 0.04 0.05 Hl00 Hl00 8 38 8 26 4 8 23 13 47 4 1172 215.4 0.4 0.05 0.04 AVERAGE RADON FLUX RATE FOR THE CELL 2 COVER REGION: 0.6 pCi/m2 s 'li1"""MiN BLANK CANISTER ANALYSIS: 3.8 MAX GRID SAMPLE RETRIV ANALYSIS MID-TIME CNT GROSS GROSS RADON ± LLD LOCATION I . D. HR MIN HR MIN MO DA YR HR MIN (MIN) COUNTS WT IN pCi/m' s pCi/m' s pCi/m' s COMMENTS: H BLANK 1 H BLANK 1 7 45 7 55 4 7 23 13 10 10 1513 213. 7 0.03 0.03 0 .04 CONTROL H BLANK 2 H BLANK 2 7 45 7 55 4 7 23 13 10 10 1487 211. 7 0.02 0.03 0 .04 CONTROL H BLANK 3 H BLANK 3 7 45 7 55 4 7 23 13 22 10 1530 213. 5 0.03 0.03 0 .04 CONTROL H BLANK 4 H BLANK 4 7 45 7 55 4 7 23 13 22 10 1571 212. 0 0.04 0.03 0.04 CONTROL H BLANK 5 H BLANK 5 7 45 7 55 4 7 23 13 35 10 1505 211. 6 0.02 0.03 0 .04 CONTROL AVERAGE BLANK CANISTER ANALYSIS FOR THE CELL 2 COVER REGION: 0.03 E_Ci/m2 s Page 3 of 3 AppendixD Sample Locations Map (Figure 2) D ~CELL 1~ \ 0 0 0 0 0 0 0 0 0 0 0 0 0 I HOl H02 H03 H04 HOS H06 I-IJ7 HOB I-IJ9 HlO Hll H12 H13 0 0 0 0 0 0 0 0 0 0 0 0 0 H21 H22 H23 H24 H25 H26 H27 H28 H29 H30 H31 H32 H33 0 0 0 0 0 0 0 0 0 0 0 H43 H44 1-145 H46 1-147 1-148 1-149 HSO HSl HS2 H53 -CELL2- 0 0 0 0 0 0 0 H74 H73 H72 H71 H70 H69 H68 0 0 0 H86 H85 H84 ~CELL 3~ D ~ 0 0 0 0 H14 HlS H17 H18 0 0 0 0 0 H34 H35 H36 H37 H38 0 0 0 0 0 HS4 HSS H56 HS7 H58 0 0 0 0 0 H67 H66 H65 H64 H63 0 0 0 0 0 H83 H82 H81 1-180 H79 0 0 0 0 H94 H93 H92 H91 0 0 H19 H20 0 0 H39 1-140 0 0 H59 H60 0 0 H62 H61 0 0 • H78 H77 0 0 H90 H89 \ WHITE MESA MILL BLANDING. UTAH APRIL2023 CELL2 FIRST HALF 2023 04/04/23-04/05/23 PREPARED FOR ENERGY FUELS RESOURCES LEGEND HOl 0 -SAMPLE LOCATION ON COVERED AREAS FIGURE 2 N t SCALE IN FEET 200 100 0 200 400 ENVIRONMENTAL, LLC THIS DRAWING IS THE PROPERTY OF TELLCO ENVIRONMENTAL, LLC, AND IS NOTTO BE REPRODUCED, MODIFIED OR USED FOR ANY OTHER PROJECTOR EXTENSION OF THIS PROJECT EXCEPT BY AGREEMENT WITH TELLCO.