HomeMy WebLinkAboutDRC-2021-005552 - 0901a06880e6d467Radioactive Material License Application / Federal Cell Facility Page R-1 Appendix R April 9, 2021 Revision 0 APPENDIX R FINANCIAL CLOSURE AND POST-CLOSURE SURETY ANALYSIS APPENDIX R - 2021 FEDERAL CELL FACILITY SURETY QUANTITY CALCULATIONS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 70 71 72 73 74 75 76 77 78 79 A D E F G H I J K L M N O P Q R S T U V W X Z AA AB AC AD AE AF FEDERAL CELL FACILITY DECOMMISSIONING CY COST (NO MU)EXT. TOTAL 31 DISPOSAL OF STORED FEDERAL WASTE This item includes the maximum volume of radioactive waste that is allowed on site that has not been placed to approved disposal specifications. MAXIMUM VOLUMES DEFINED AS: In Rail Cars, Not Unloaded =243 cy Time required to unload waste (cars or containers):10 cy per hour per worker =24 hrs 45.00$ 1,091.69$ In Storage Building =2,184 cy DISPOSAL CALCULATIONS CLSM Required (Based on current Facility operation costs)2,426 cy depleted uranium x 1.87 cy CLSM / cy of depleted uranium =4,537 cy 60.98$ 276,654.49$ PLACEMENT OF SRS DU WASTE Palletized drums will be removed from the storage building, transferred to the Federal Cell using an Extended Reach Forklift (assume forklift available on site) 16 pallets per container at the staging area Palletized drums will be hauled to the cell. Assumed that on-site equipment will be used for transfer to the embankment from storage building. Assumed 4 drums per pallet Assumed number of drums =5,408.00 ea x Assumed number of pallets =1,352.00 ea x Assumed hours per to transfer pallets Labor required is as follows: Assumed hours to remove from storage area Equipment Operators 2 ea x 120 hr =240.00 hr x 59.47$ 14,273.71$ Labor Foreman 1 ea 120 hr =120.00 hr x 67.30$ 8,076.00$ Assumed hours to transfer to Federal Cell Equipment Operators 1 ea x 160 hr =160.00 hr x 59.47$ 9,515.81$ 2020 309,611.70$ 2021 Inflation Factor (TBD):TBD 2021 2022 Inflation Factor (TBD):TBD 2022 2023 Inflation Factor (TBD):TBD 2023 2024 Inflation Factor (TBD):TBD 2024 204 LINER CONSTRUCTION This item includes construction of the liner. The liner design is assumed to be consistent with plan drawings in the Radioactive Material License. Open Embankment Limitation =197,414.00 sf This includes areas for the construction of sideslopes. LINER Based on the current footprint of the Federal Cell Facility conceptual premature closure design, the amount of clay liner to be constructed is as follows. Assume that 8 ft of excavation to design depth is used as fill and clay source for liner/radon barrier; thus minimal haul distance. Assume 11% is overburden. Liner Volume 63,800 sf x 3 ft =7,088.89 cy 2.94$ 20,823.25$ (includes an additional 1 ft thickness for liner protective cover) Remove overburden 7,088.89 cy x 0.11 =779.78 cy 2.99$ 2,331.79$ Liner Area 63,800 sf +0 sf +0 sf =63,800.00 sf 2020 23,155.03$ 2021 Inflation Factor (TBD):TBD 2021 2022 Inflation Factor (TBD):TBD 2022 2023 Inflation Factor (TBD):TBD 2023 2024 Inflation Factor (TBD):TBD 2024 205 SETTLEMENT MONITORING Temporary cover will be placed on area with uncovered waste and will consist of native soil Clean native fill will be required to close the embankments per the Premature Designs--no credit for future waste disposal. Clean Fill Material (Similar to Grade Restoration Backfill) to Construct Premature Closure Embankments to Design Grades Required Fill Material 110,031.00 cy Total Fill Material 110,031.00 cy 2.94$ 323,210.39$ Temporary Cover Volume Federal Cell 23,519 sf x 1 ft =871.07 cy Total Native Soil Volume 871.07 cy Page 1 APPENDIX R - 2021 FEDERAL CELL FACILITY SURETY QUANTITY CALCULATIONS 80 81 82 83 84 85 86 87 88 89 90 91 92 93 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 A D E F G H I J K L M N O P Q R S T U V W X Z AA AB AC AD AE AF Total Temporary Cover 871.07 cy 2.99$ 2,604.79$ Temporary settlement monuments will be installed and monitored for one year prior to cover construction. Assume that surcharging will be required if settlement data is not acceptable for final cover construction. Monuments Required for Federal Cell =4.00 ea All temporary settlement monuments will be surveyed six times. Surveying will be provided by differential GPS using an existing site system, and using a one person crew. The analysis of settlement data for the temporary cover will be performed twice per year. Performance of embankment surveys Estimated cost for a surveyor includes all overhead costs 1 day per quarter (One Surveyor)1 days x 4 qtr =4.00 day 1,378.63$ 5,514.53$ Purchase of monuments 4 Ea 34.50$ 138.00$ Placement of monuments included as incidental cost of temporary cover placement Bi-annual engineering review (based on 4 hours)2 events 4 hr/event =8.00 hr 174.00$ 1,392.00$ Rate for an independent engineer is $174/hr Assume that temporary cover is placed immediately after completion of waste placement and that settlement monitoring begins immediately. Assume preparation and stockpiling of cover clay and rock materials during one year of monitoring keeps the construction contractor occupied, reducing the scope of multiple mobilizations. Assume a supplemental mobilization event to relocate surcharged material and complete final cover construction. 2020 332,859.71$ 2021 Inflation Factor (TBD):TBD 2021 2022 Inflation Factor (TBD):TBD 2022 2023 Inflation Factor (TBD):TBD 2023 2024 Inflation Factor (TBD):TBD 2024 Page 2 APPENDIX R - 2021 FEDERAL CELL FACILITY SURETY QUANTITY CALCULATIONS 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 A D E F G H I J K L M N O P Q R S T U V W X Z AA AB AC AD AE AF 207 COVER CONSTRUCTION This item includes the construction of the final cover, roads around the embankments, drainage structures around the embankments, and permanent fencing. The final cover design is assumed to be consistent with approved plan drawings listed in Groundwater Quality Discharge Permit UGW450005. Reclamation of the pits, used for erosion barrier and filter material, is covered under a bond with the BLM. The final cover area funded is based on the area listed in the premature closure plan. This includes cover that extends past the edges of the waste that is needed to meet the design slopes. At the time of closure a temporary cover will be placed. Upon completion of settlement monitoring and surcharging, the remainder of the cover will be placed. Costs for placement of Temporary Cover are accounted for within Item 205. A conceptual embankment design is shown below. All cover calculations are based on this drawing. The costs reflect use of an approved Rock Armor Cover. TOP SLOPE Assume uniform cover design; construct cover (to the ditch centerline) in accordance with the premature closure plan; Assume 11% of mined volume is overburden. Note that open cell area limitation during operations will not be exceeded in accordance with the Radioactive Material License. Radon Barrier 5E-08 Radon Barrier Volume 23,519 sf x 1 ft =871.07 cy 2.99$ 2,604.79$ Remove Overburden 2,587 cy x 0.11 =284.57 cy 2.99$ 850.96$ Floculant Addition & Blending Applied at a rate of 3.5 lbs STPP per 50 cf radon barrier clay.2,587 cy 69,849 cf x 0.07 =4,889 lbs 2.10$ 10,267.80$ Mix and Place (conservatively use unburdened soil placement unit cost)=2,587.00 cy 2.41$ 6,234.67$ Radon Barrier 1E-06 Radon Barrier Volume 23,519 sf x 1 ft =871.07 cy 2.99$ 2,604.79$ Remove Overburden 2,587 cy x 0.11 =284.57 cy 2.99$ 850.96$ Bankrun Borrow =1,307.00 cy 3.59$ 4,692.55$ Gravel =131.00 cy 7.47$ 978.58$ Clay Loam =1,611.00 cy 2.99$ 4,817.41$ Blended Surface Placement =871.00 cy 2.41$ 2099.11 SIDE SLOPE Radon Barrier 5E-08 Radon Barrier Volume 23,315 sf x 1 ft =863.52 cy 2.99$ 2,582.20$ Remove Overburden 864 cy x 0.11 =95.04 cy 2.99$ 284.20$ Floculant Addition & Blending Applied at a rate of 3.5 lbs STPP per 50 cf radon barrier clay.864 cy 23,328 cf x 0.07 =1,633 lbs incl incl Mix Clay and Deflocculant =864.00 cy 2.10$ 1,814.40$ Place and Grade Mixed Radon Barrier Clay =864.00 cy 2.41$ 2,082.24$ Radon Barrier 1E-06 Radon Barrier Volume 23,315 sf x 1 ft =863.52 cy 2.99$ 2,582.20$ Remove Overburden 864 cy x 0.11 =95.04 cy 2.99$ 284.20$ Bankrun BorrowClay Loam (frost protection)211,956 sf x 1.5 ft =11,775.33 cy 2.99$ 35,212.03$ GravelFilter Zone 211,956 sf x 1.00 ft =7,850.22 cy 68.10$ 534,576.81$ Side Rock 211,956 sf x 1.5 ft =11,775.33 cy 138.21$ 1,627,520.16$ ROAD AROUND EMBANKMENT Length of roads calculated using AutoCAD Width of area for grading (road prep) calculated using AutoCad Average width of road calculated using AutoCad Roadbase 27600 lf 15 ft w x 1 ft =15,333.33 cy 2.99$ 45,851.59$ DRAINAGE Clay Backfill (compacted)=8,688.89 cy 2.99$ 25,982.57$ Grading =8,688.89 cy 2.41$ 20,940.22$ Assume spread 9 feet wide at 1 foot thick =78,200.00 ft Erosion Material (rock)=3,867.00 cy 7.47$ 28,886.71$ FENCES Construction of new fence =2,000.00 lf 22.35$ 44,702.05$ 2020 2,409,303.19$ 2021 Inflation Factor (TBD):TBD 2021 2022 Inflation Factor (TBD):TBD 2022 2023 Inflation Factor (TBD):TBD 2023 2024 Inflation Factor (TBD):TBD 2024 211 SETTLEMENT MONITORING Initial Aerial Survey to provide As-Found information for closure of the site =1.00 ea 24,150.00$ 24,150.00$ Assume half the cost of survey cost for initial survey of site within property lines Performance of embankment surveys 1 eight-hour days per quarter (One Surveyor)1 daysx 4 qtr x 8 hr =32.00 hr 132.25$ 4,232.00$ Bi-annual Engineering Review The analysis of settlement data for the temporary cover will be performed twice per year. 3 events =3.00 events 174.00$ 522.00$ . Page 3 APPENDIX R - 2021 FEDERAL CELL FACILITY SURETY QUANTITY CALCULATIONS 192 193 194 195 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 A D E F G H I J K L M N O P Q R S T U V W X Z AA AB AC AD AE AF 2020 28,904.00$ 2021 Inflation Factor (TBD):TBD 2021 2022 Inflation Factor (TBD):TBD 2022 2023 Inflation Factor (TBD):TBD 2023 2024 Inflation Factor (TBD):TBD 2024 SUB TOTAL 3,103,833.63$ 300 SG&A OVERHEAD COSTS (WORKING CONDITIONS) Assume 5.5% of direct cost 5.5%170,710.85$ 301 MOBILIZATIONMOBILIZATION, OVERHEAD, AND TOOLS & EQUIPMENT Forecast is developed using "Unit Prices" that include 15% addition for "Mobilization, Overhead, and Tools & Equipment " (MTE)INCL INCL This addition is based on company/industry experience. 302 CONTINGENCY Assume 10% of direct cost 10%310,383.36$ 303 ENGINEERING AND REDESIGN Includes re-engineering required to address partial filling of cell 2.25%69,836.26$ Includes QA/QC and Final Closure Report 304 PROFIT Assume 10% of direct cost.10%310,383.36$ This addition is based on company/industry experience. 305 MANAGEMENT FEE AND LEGAL EXPENSES Assume 4% of direct costs 4%124,153.35$ 306 DEQ OVERSIGHT OF PROJECT Assume 4% of direct costs 4%124,153.35$ 320 FACILITY STEWARDSHIP TRANSFER Assumes 2 inspectors for 2,000 hours/year for 5 years 5 years x 2000 hrs/year 2 inspectors =20,000.00 man-hrs 174.00$ 3,480,000.00$ 4,213,454.16$ FEDERAL CELL FACILITY PREMATURE CLOSURE SURETY BOND VALUE 7,693,454.16$ 400 ROUTINE PERPETUAL SURVEILLANCE This item includes annual environmental sampling and the annual inspections and maintenance that will be performed on the Surety area and off-site features that may have been impacted by operations. The required principle is based on an annual 2% interest rate to generate sufficient interest to fund annual surveillances and maintenance. Annual monitoring activities from Section 400 of LLRW (conducted annually post closure for LLRW from years 1 to 100) Conducted annually for Federal Cell perpetually (activity/year)9,903.87$ Radiological water samples from Section 401 of LLRW (conducted annually post closure for Licensed area perimeter wells from years 1 to 100) Well monitoring for 100 years post-closure will also enclose the Federal Cell Facility and not duplicated here (activity/year) Embankment Survey from Section 402 of LLRW (conducted annually post closure for the LLRW from years 1 to 5) Assumed conducted annual for the Federal Cell perpetually (activity/year)10,773.67$ Radiological air samples from Section 403 of LLRW (conducted annually post closure for Licensed area fence line perimeter year 1) Air monitoring perimter will also enclose the Federal Cell Facility and not duplicated here (activity/year) Radiological soil samples from Section 404 of LLRW (conducted annually post closure for Licensed area fence line perimeter year 1) Soil monitoring perimter will also enclose the Federal Cell Facility and not duplicated here (activity/year) Annual gamma monitoring activities from Section 406 of LLRW (conducted annually post closure for LLRW from year 1) Conducted annually for Federal Cell perpetually (activity/year)2,750.00$ Annual radon gas monitoring activities from Section 407 of LLRW (conducted annually post closure for LLRW from year 1) Conducted annually for Federal Cell perpetually (activity/year)3,472.00$ Annual Routine Surveillance 26,899.54$ Page 4 APPENDIX R - 2021 FEDERAL CELL FACILITY SURETY QUANTITY CALCULATIONS 260 261 262 A D E F G H I J K L M N O P Q R S T U V W X Z AA AB AC AD AE AF Principle required to generate sufficient interest to fund annual surveillances based on an annual 2% interest rate (URS, 2015 - basis for Utah Code 19-3-106.2)1,344,976.85$ FEDERAL CELL FACILITY PERPETUAL CARE SURETY BOND VALUE 1,344,976.85$ Page 5