Page R-1 Appendix R April 9, 2021
Revision 0
APPENDIX R
FINANCIAL CLOSURE AND POST-CLOSURE SURETY ANALYSIS
APPENDIX R - 2021 FEDERAL CELL FACILITY SURETY
QUANTITY CALCULATIONS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
70
71
72
73
74
75
76
77
78
79
A D E F G H I J K L M N O P Q R S T U V W X Z AA AB AC AD AE AF
FEDERAL CELL FACILITY DECOMMISSIONING CY COST (NO MU)EXT. TOTAL
31 DISPOSAL OF STORED FEDERAL WASTE
This item includes the maximum volume of radioactive waste that is allowed on site that has
not been placed to approved disposal specifications.
MAXIMUM VOLUMES DEFINED AS:
In Rail Cars, Not Unloaded =243 cy
Time required to unload waste (cars or containers):10 cy per hour per worker =24 hrs 45.00$ 1,091.69$
In Storage Building =2,184 cy
DISPOSAL CALCULATIONS
CLSM Required (Based on current Facility operation costs)2,426 cy depleted uranium x 1.87 cy CLSM / cy of depleted uranium =4,537 cy 60.98$ 276,654.49$
PLACEMENT OF SRS DU WASTE
Palletized drums will be removed from the storage building, transferred to the Federal Cell using an Extended Reach Forklift (assume forklift available on site)
16 pallets per container at the staging area
Palletized drums will be hauled to the cell.
Assumed that on-site equipment will be used for transfer to the embankment from storage building.
Assumed 4 drums per pallet
Assumed number of drums =5,408.00 ea x
Assumed number of pallets =1,352.00 ea x
Assumed hours per to transfer pallets
Labor required is as follows:
Assumed hours to remove from storage area
Equipment Operators 2 ea x 120 hr =240.00 hr x 59.47$ 14,273.71$
Labor Foreman 1 ea 120 hr =120.00 hr x 67.30$ 8,076.00$
Assumed hours to transfer to Federal Cell
Equipment Operators 1 ea x 160 hr =160.00 hr x 59.47$ 9,515.81$
2020 309,611.70$
2021 Inflation Factor (TBD):TBD 2021
2022 Inflation Factor (TBD):TBD 2022
2023 Inflation Factor (TBD):TBD 2023
2024 Inflation Factor (TBD):TBD 2024
204 LINER CONSTRUCTION
This item includes construction of the liner. The liner design is assumed to be consistent with plan drawings
in the Radioactive Material License.
Open Embankment Limitation =197,414.00 sf
This includes areas for the construction of sideslopes.
LINER
Based on the current footprint of the Federal Cell Facility conceptual
premature closure design, the amount of clay liner to be constructed is as follows.
Assume that 8 ft of excavation to design depth is used as fill and clay source for liner/radon barrier; thus
minimal haul distance. Assume 11% is overburden.
Liner Volume 63,800 sf x 3 ft =7,088.89 cy 2.94$ 20,823.25$
(includes an additional 1 ft thickness for liner protective cover)
Remove overburden 7,088.89 cy x 0.11 =779.78 cy 2.99$ 2,331.79$
Liner Area 63,800 sf +0 sf +0 sf =63,800.00 sf
2020 23,155.03$
2021 Inflation Factor (TBD):TBD 2021
2022 Inflation Factor (TBD):TBD 2022
2023 Inflation Factor (TBD):TBD 2023
2024 Inflation Factor (TBD):TBD 2024
205 SETTLEMENT MONITORING
Temporary cover will be placed on area with uncovered waste and will consist of native soil
Clean native fill will be required to close the embankments per the Premature Designs--no credit for future waste disposal.
Clean Fill Material (Similar to Grade Restoration Backfill) to Construct Premature Closure Embankments to Design Grades
Required Fill Material 110,031.00 cy
Total Fill Material 110,031.00 cy 2.94$ 323,210.39$
Temporary Cover Volume
Federal Cell 23,519 sf x 1 ft =871.07 cy
Total Native Soil Volume 871.07 cy
Page 1
APPENDIX R - 2021 FEDERAL CELL FACILITY SURETY
QUANTITY CALCULATIONS
80
81
82
83
84
85
86
87
88
89
90
91
92
93
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
A D E F G H I J K L M N O P Q R S T U V W X Z AA AB AC AD AE AF
Total Temporary Cover 871.07 cy 2.99$ 2,604.79$
Temporary settlement monuments will be installed and monitored for one year prior to cover construction.
Assume that surcharging will be required if settlement data is not acceptable for final cover construction.
Monuments Required for Federal Cell =4.00 ea
All temporary settlement monuments will be surveyed six times.
Surveying will be provided by differential GPS using an existing site system, and using a one person crew.
The analysis of settlement data for the temporary cover will be performed twice per year.
Performance of embankment surveys
Estimated cost for a surveyor includes all overhead costs
1 day per quarter (One Surveyor)1 days x 4 qtr =4.00 day 1,378.63$ 5,514.53$
Purchase of monuments 4 Ea 34.50$ 138.00$
Placement of monuments included as incidental cost of temporary cover placement
Bi-annual engineering review (based on 4 hours)2 events 4 hr/event =8.00 hr 174.00$ 1,392.00$
Rate for an independent engineer is $174/hr
Assume that temporary cover is placed immediately after completion of waste placement and that settlement
monitoring begins immediately. Assume preparation and stockpiling of cover clay and rock materials during
one year of monitoring keeps the construction contractor occupied, reducing the scope of multiple mobilizations.
Assume a supplemental mobilization event to relocate surcharged material and complete final cover construction.
2020 332,859.71$
2021 Inflation Factor (TBD):TBD 2021
2022 Inflation Factor (TBD):TBD 2022
2023 Inflation Factor (TBD):TBD 2023
2024 Inflation Factor (TBD):TBD 2024
Page 2
APPENDIX R - 2021 FEDERAL CELL FACILITY SURETY
QUANTITY CALCULATIONS
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
A D E F G H I J K L M N O P Q R S T U V W X Z AA AB AC AD AE AF
207 COVER CONSTRUCTION
This item includes the construction of the final cover, roads around the embankments, drainage
structures around the embankments, and permanent fencing. The final cover design is
assumed to be consistent with approved plan drawings listed in Groundwater Quality Discharge Permit UGW450005.
Reclamation of the pits, used for erosion barrier and filter material, is covered under a bond with the BLM.
The final cover area funded is based on the area listed in the premature closure plan.
This includes cover that extends past the edges of the waste that is needed to meet the design slopes.
At the time of closure a temporary cover will be placed. Upon completion of settlement monitoring
and surcharging, the remainder of the cover will be placed. Costs for placement of Temporary Cover
are accounted for within Item 205. A conceptual embankment design is shown below. All cover calculations
are based on this drawing. The costs reflect use of an approved Rock Armor Cover.
TOP SLOPE
Assume uniform cover design; construct cover (to the ditch centerline) in accordance with the premature closure plan; Assume 11% of mined volume is overburden.
Note that open cell area limitation during operations will not be exceeded in accordance with the Radioactive Material License.
Radon Barrier 5E-08
Radon Barrier Volume 23,519 sf x 1 ft =871.07 cy 2.99$ 2,604.79$
Remove Overburden 2,587 cy x 0.11 =284.57 cy 2.99$ 850.96$
Floculant Addition & Blending
Applied at a rate of 3.5 lbs STPP per 50 cf radon barrier clay.2,587 cy
69,849 cf x 0.07 =4,889 lbs 2.10$ 10,267.80$
Mix and Place (conservatively use unburdened soil placement unit cost)=2,587.00 cy 2.41$ 6,234.67$
Radon Barrier 1E-06
Radon Barrier Volume 23,519 sf x 1 ft =871.07 cy 2.99$ 2,604.79$
Remove Overburden 2,587 cy x 0.11 =284.57 cy 2.99$ 850.96$
Bankrun Borrow =1,307.00 cy 3.59$ 4,692.55$
Gravel =131.00 cy 7.47$ 978.58$
Clay Loam =1,611.00 cy 2.99$ 4,817.41$
Blended Surface Placement =871.00 cy 2.41$ 2099.11
SIDE SLOPE
Radon Barrier 5E-08
Radon Barrier Volume 23,315 sf x 1 ft =863.52 cy 2.99$ 2,582.20$
Remove Overburden 864 cy x 0.11 =95.04 cy 2.99$ 284.20$
Floculant Addition & Blending
Applied at a rate of 3.5 lbs STPP per 50 cf radon barrier clay.864 cy
23,328 cf x 0.07 =1,633 lbs incl incl
Mix Clay and Deflocculant =864.00 cy 2.10$ 1,814.40$
Place and Grade Mixed Radon Barrier Clay =864.00 cy 2.41$ 2,082.24$
Radon Barrier 1E-06
Radon Barrier Volume 23,315 sf x 1 ft =863.52 cy 2.99$ 2,582.20$
Remove Overburden 864 cy x 0.11 =95.04 cy 2.99$ 284.20$
Bankrun BorrowClay Loam (frost protection)211,956 sf x 1.5 ft =11,775.33 cy 2.99$ 35,212.03$
GravelFilter Zone 211,956 sf x 1.00 ft =7,850.22 cy 68.10$ 534,576.81$
Side Rock 211,956 sf x 1.5 ft =11,775.33 cy 138.21$ 1,627,520.16$
ROAD AROUND EMBANKMENT
Length of roads calculated using AutoCAD
Width of area for grading (road prep) calculated using AutoCad
Average width of road calculated using AutoCad
Roadbase 27600 lf 15 ft w x 1 ft =15,333.33 cy 2.99$ 45,851.59$
DRAINAGE
Clay Backfill (compacted)=8,688.89 cy 2.99$ 25,982.57$
Grading =8,688.89 cy 2.41$ 20,940.22$
Assume spread 9 feet wide at 1 foot thick =78,200.00 ft
Erosion Material (rock)=3,867.00 cy 7.47$ 28,886.71$
FENCES
Construction of new fence =2,000.00 lf 22.35$ 44,702.05$
2020 2,409,303.19$
2021 Inflation Factor (TBD):TBD 2021
2022 Inflation Factor (TBD):TBD 2022
2023 Inflation Factor (TBD):TBD 2023
2024 Inflation Factor (TBD):TBD 2024
211 SETTLEMENT MONITORING
Initial Aerial Survey to provide As-Found information for closure of the site =1.00 ea 24,150.00$ 24,150.00$
Assume half the cost of survey cost for initial survey of site within property lines
Performance of embankment surveys
1 eight-hour days per quarter (One Surveyor)1 daysx 4 qtr x 8 hr =32.00 hr 132.25$ 4,232.00$
Bi-annual Engineering Review
The analysis of settlement data for the temporary cover will be performed twice per year.
3 events =3.00 events 174.00$ 522.00$
.
Page 3
APPENDIX R - 2021 FEDERAL CELL FACILITY SURETY
QUANTITY CALCULATIONS
192
193
194
195
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
A D E F G H I J K L M N O P Q R S T U V W X Z AA AB AC AD AE AF
2020 28,904.00$
2021 Inflation Factor (TBD):TBD 2021
2022 Inflation Factor (TBD):TBD 2022
2023 Inflation Factor (TBD):TBD 2023
2024 Inflation Factor (TBD):TBD 2024
SUB TOTAL 3,103,833.63$
300 SG&A OVERHEAD COSTS (WORKING CONDITIONS)
Assume 5.5% of direct cost 5.5%170,710.85$
301 MOBILIZATIONMOBILIZATION, OVERHEAD, AND TOOLS & EQUIPMENT
Forecast is developed using "Unit Prices" that include 15% addition for "Mobilization, Overhead, and Tools & Equipment " (MTE)INCL INCL
This addition is based on company/industry experience.
302 CONTINGENCY
Assume 10% of direct cost 10%310,383.36$
303 ENGINEERING AND REDESIGN
Includes re-engineering required to address partial filling of cell 2.25%69,836.26$
Includes QA/QC and Final Closure Report
304 PROFIT
Assume 10% of direct cost.10%310,383.36$
This addition is based on company/industry experience.
305 MANAGEMENT FEE AND LEGAL EXPENSES
Assume 4% of direct costs 4%124,153.35$
306 DEQ OVERSIGHT OF PROJECT
Assume 4% of direct costs 4%124,153.35$
320 FACILITY STEWARDSHIP TRANSFER
Assumes 2 inspectors for 2,000 hours/year for 5 years 5 years x 2000 hrs/year 2 inspectors =20,000.00 man-hrs 174.00$ 3,480,000.00$ 4,213,454.16$
FEDERAL CELL FACILITY PREMATURE CLOSURE SURETY BOND VALUE 7,693,454.16$
400 ROUTINE PERPETUAL SURVEILLANCE
This item includes annual environmental sampling and the annual inspections and maintenance that will be performed on the Surety area and off-site features that may have been impacted by operations.
The required principle is based on an annual 2% interest rate to generate sufficient interest to fund annual surveillances and maintenance.
Annual monitoring activities from Section 400 of LLRW (conducted annually post closure for LLRW from years 1 to 100)
Conducted annually for Federal Cell perpetually (activity/year)9,903.87$
Radiological water samples from Section 401 of LLRW (conducted annually post closure for Licensed area perimeter wells from years 1 to 100)
Well monitoring for 100 years post-closure will also enclose the Federal Cell Facility and not duplicated here (activity/year)
Embankment Survey from Section 402 of LLRW (conducted annually post closure for the LLRW from years 1 to 5)
Assumed conducted annual for the Federal Cell perpetually (activity/year)10,773.67$
Radiological air samples from Section 403 of LLRW (conducted annually post closure for Licensed area fence line perimeter year 1)
Air monitoring perimter will also enclose the Federal Cell Facility and not duplicated here (activity/year)
Radiological soil samples from Section 404 of LLRW (conducted annually post closure for Licensed area fence line perimeter year 1)
Soil monitoring perimter will also enclose the Federal Cell Facility and not duplicated here (activity/year)
Annual gamma monitoring activities from Section 406 of LLRW (conducted annually post closure for LLRW from year 1)
Conducted annually for Federal Cell perpetually (activity/year)2,750.00$
Annual radon gas monitoring activities from Section 407 of LLRW (conducted annually post closure for LLRW from year 1)
Conducted annually for Federal Cell perpetually (activity/year)3,472.00$
Annual Routine Surveillance 26,899.54$
Page 4
APPENDIX R - 2021 FEDERAL CELL FACILITY SURETY
QUANTITY CALCULATIONS
260
261
262
A D E F G H I J K L M N O P Q R S T U V W X Z AA AB AC AD AE AF
Principle required to generate sufficient interest to fund annual surveillances based on an annual 2% interest rate (URS, 2015 - basis for Utah Code 19-3-106.2)1,344,976.85$
FEDERAL CELL FACILITY PERPETUAL CARE SURETY BOND VALUE 1,344,976.85$
Page 5