Loading...
HomeMy WebLinkAboutDRC-2021-005534 - 0901a06880e6d3f8Radioactive Material License Application / Federal Cell Facility Page J-1 Appendix J April 9, 2021 Revision 0 APPENDIX J COVER / LINER CONSTRUCTION ESTIMATES Radioactive Material License Application / Federal Cell Facility Page J-2 Appendix J April 9, 2021 Revision 0 TABLE J-1 PHASE 1 MATERIAL ESTIMATES VOLUME (cy) UNIT COST SUBTOTAL LINER Clay Liner 7,089 $ 2.94 $ 20,823 CLEAN FILL MATERIAL Unit 3 Material Fill above DU 110,031 $ 2.94 $ 323,210 TOP SLOPE Radon Barrier (clay) 1x10-6 Clay Layer Mine, Stockpile and Place 871 $ 2.99 $ 2,605 Remove Overburden 285 $ 2.99 $ 851 5x10-8 Clay Layer Mine, Stockpile, Amend Place 871 $ 2.99 $ 2,605 Remove Overburden 285 $ 2.99 $ 851 Top Slope Frost Protection Layer (bankrun) 1,307 $ 3.59 $ 4,693 Evaporative Zone (clay/loam) 1,611 $ 2.99 $ 4,817 Gravel Augment 131 $ 7.47 $ 979 $ 17,400 SIDE SLOPE Radon Barrier (clay) 1x10-6 Clay Layer Mine, Stockpile and Place 864 $ 2.99 $ 2,582 Remove Overburden 95 $ 2.99 $ 284 5x10-8 Clay Layer Mine, Stockpile, Amend Place 864 $ 2.99 $ 2,582 Remove Overburden 95 $ 2.99 $ 284 Rock Cover SS Frost Protection Layer (Clay) 11,775 $ 2.99 $ 35,212 Filter Zone 7,850 $ 68.10 $ 534,577 Side Rock 11,775 $138.21 $ 1,627,520 $ 2,203,042 DITCH Clay Backfille (compacted) 8,689 $ 2.99 $ 25,983 Grading 8,689 $ 2.41 $ 20,940 Erosion Materials (rock) 3,867 $ 7.47 $ 28,887 INSPECTION ROAD AND FENCE Inspection Road base 15,333 $ 2.99 $ 45,852 Fence 2,000 $ 22.35 $ 44,702 SUBTOTAL $ 2,730,839 SG&A Overhead Costs (working conditions) 5.50% $ 150,196 Contingency 10% $ 273,084 Engineering and Redesign 2.25% $ 61,444 Profit 10% $ 273,084 Management Fee and Legal Expenses 4% $ 109,243 DEQ Oversight 4% $ 109,243 TOTAL $ 3,707,113 Cost per Square Foot (waste footprint) $ 158 Radioactive Material License Application / Federal Cell Facility Page J-3 Appendix J April 9, 2021 Revision 0 TABLE J-2 FULL DESIGN MATERIAL ESTIMATES VOLUME (cy) UNIT COST SUBTOTAL LINER Clay Liner 415,776 $ 2.94 $ 1,221,322 CLEAN FILL MATERIAL Unit 3 Material Fill above DU 6,453,522 $ 2.94 $ 18,956,889 TOP SLOPE Radon Barrier (clay) 1x10-6 Clay Layer Mine, Stockpile and Place 51,090 $ 2.99 $ 152,776 Remove Overburden 16,691 $ 2.99 $ 49,910 5x10-8 Clay Layer Mine, Stockpile, Amend Place 51,090 $ 2.99 $ 152,776 Remove Overburden 16,691 $ 2.99 $ 49,910 Top Slope Frost Protection Layer (bankrun) 76,635 $ 3.59 $ 275,145 Evaporative Zone (clay/loam) 51,090 $ 2.99 $ 152,776 Gravel Augment 7,683 $ 7.47 $ 57,395 $ 890,688 SIDE SLOPE Radon Barrier (clay) 1x10-6 Clay Layer Mine, Stockpile and Place 40,535 $ 2.99 $ 121,213 Remove Overburden 51,090 $ 2.99 $ 152,776 5x10-8 Clay Layer Mine, Stockpile, Amend Place 40,535 $ 2.99 $ 121,213 Remove Overburden 51,090 $ 2.99 $ 152,776 Rock Cover SS Frost Protection Layer (Clay) 60,803 $ 2.99 $ 181,819 Filter Zone 40,535 $ 68.10 $ 2,760,321 Side Rock 60,803 $ 138.21 $ 8,403,802 $ 11,893,919 DITCH Clay Backfille (compacted) 509,620 $ 2.99 $ 1,523,926 Grading 509,620 $ 2.41 $ 1,228,183 Erosion Materials (rock) 226,807 $ 7.47 $ 1,694,259 INSPECTION ROAD AND FENCE Inspection Road base 7,219,609 $ 2.99 $ 21,588,948 Fence 3,337 $ 22.35 $ 74,585 SUBTOTAL $ 59,072,720 SG&A Overhead Costs (working conditions) 5.50% $ 3,249,000 Contingency 10% $ 5,907,272 Engineering and Redesign 2.25% $ 1,329,136 Profit 10% $ 5,907,272 Management Fee and Legal Expenses 4% $ 2,362,909 DEQ Oversight 4% $ 2,362,909 TOTAL $ 80,191,218 Cost per Square Foot (waste footprint) $ 58