STATE OF UTAH
DIVISION OF WATER QUALITY
DEPARTMENT OF ENVIRONMENTAL QUALITY
UTAH WATER QUALITY BOARD
SALT LAKE CITY, UTAH 84114-4870
GROUNDWATER DISCHARGE PERMIT
In compliance with the provisions of the Utah Water Quality Act, Title 19, Chapter 5, Utah Code
Annotated 1953, as amended, the Act,
Energy Fuels Resources (USA) Inc.
225 Union Boulevard, Suite 600
Lakewood, CO 80228
is granted a ground water discharge permit for the operation of a uranium milling and tailings
disposal facility located approximately 6 miles south of Blanding, Utah. The facility is located on
a tract ofland in Sections 28, 29, 32, and 33, Township 37 South, Range 22 East, Salt Lake Base
and Meridian, San Juan County, Utah.
The permit is based on representations made by the Permittee and other information contained in
the administrative record. It is the responsibility of the Permittee to read and understand all
provisions of this Permit.
The milling and tailings disposal facility shall be operated and revised in accordance with
conditions set forth in the Permit and the Utah Ground Water Quality Protection Regulations.
This Ground Water Quality Discharge Permit amends and supersedes all other Ground Water
Discharge permits for this facility issued previously.
Permit Modified on March 19, 2019
This Permit shall become effective_on January 19, 2018.
This Permit shall expire on January 19, 2023.
Signed this J.!j_th day of March, 2019.
i
Table of Contents
PART I. SPECIFIC PERMIT CONDITIONS ................................................................................ 1 A. GROUND WATER CLASSIFICATION....................................................................................... 1 B. BACKGROUND WATER QUALITY ......................................................................................... 1
C. PERMIT LIMITS ..................................................................................................................... 2
1. Ground Water Compliance Limits .................................................................................. 2 2. Tailings Cell Operations .................................................................................................. 2 3. Prohibited Discharges ..................................................................................................... 2 D. DISCHARGE MINIMIZATION AND BEST AVAILABLE TECHNOLOGY STANDARDS .................. 6
1. DMT Design Standards for Existing Tailings Cells 1, 2, and 3 ...................................... 6
2. Existing Tailings Cell Construction Authorized ............................................................. 8 3. Existing Facility DMT Performance Standards .............................................................. 8 4. Best Available Technology Requirements for New Construction ................................ 10 5. BAT Design Standards for Tailings Cell 4A ................................................................ 10
6. BAT Performance Standards for Tailings Cell 4A ....................................................... 13
7. Definition of 11e.(2) Waste ........................................................................................... 13 8. Closed Cell Performance Requirements........................................................................ 13 9. Facility Reclamation Requirements .............................................................................. 14 10. Stormwater Management and Spill Control Requirements ........................................... 14
11. Requirements for Feedstock Material Stored Outside the Feedstock Storage Area ..... 14
12. BAT Design Standards for Tailings Cell 4B ................................................................. 15 13. BAT Performance Standards for Tailings Cell 4B ........................................................ 18 14. BAT Performance Standards for the New Decontamination Pad ................................. 18 E. GROUND WATER COMPLIANCE AND TECHNOLOGY PERFORMANCE MONITORING ............ 19
1. Routine Groundwater Compliance Monitoring ............................................................. 19
2. Groundwater Monitoring: General Monitoring Wells .................................................. 20 3. Groundwater Head Monitoring ..................................................................................... 20 4. Groundwater Monitoring Well Design and Construction Criteria ................................ 21 5. Monitoring Procedures for Wells .................................................................................. 21
6. White Mesa Seep and Spring Monitoring ..................................................................... 21
7. DMT Performance Standard Monitoring ...................................................................... 22 8. BAT Performance Standard Monitoring ....................................................................... 23 9. On-site Chemicals Inventory ......................................................................................... 24 10. Tailings Cell Wastewater Quality Monitoring .............................................................. 24
11. Groundwater Monitoring Modifications ....................................................................... 25
12. BAT Performance Standard Monitoring ....................................................................... 25 F. REPORTING REQUIREMENTS .............................................................................................. 27 1. Routine Groundwater Monitoring Reports ................................................................... 27 2. Routine DMT Performance Standard Monitoring Report ............................................. 28
3. Routine BAT Performance Standard Monitoring Reports ............................................ 28
4. DMT and BAT Performance Upset Reports ................................................................. 28 5. Other Information .......................................................................................................... 28 6. Groundwater Monitoring Well As-Built Reports .......................................................... 29 7. White Mesa Seeps and Springs Monitoring Reports .................................................... 29 8. Chemicals Inventory Report .......................................................................................... 30
9. Tailings Cell Wastewater Quality Reports .................................................................... 30 10. Revised Hydrogeologic Report ..................................................................................... 30 11. Annual Slimes Drain Recovery Head Report................................................................ 31 12. Decontamination Pads Annual Inspection Report ........................................................ 31
G. OUT OF COMPLIANCE STATUS ........................................................................................... 32
ii
1. Accelerated Monitoring Status ...................................................................................... 32
2. Violation of Permit Limits ............................................................................................ 32 3. Failure to Maintain DMT or BAT Required by Permit................................................. 32 4. Facility Out of Compliance Status ................................................................................ 33 H. COMPLIANCE SCHEDULE REQUIREMENTS. ......................................................................... 34
1. Slimes Drain Compliance Plan. .................................................................................... 34
2. Installation of New Groundwater Monitoring Wells .................................................... 34 3. Background Groundwater Quality Report for MW-38, MW-39, MW-40 .................... 34 3. Revised Groundwater Quality Assurance Plan to Include Dissolved Oxygen ………..35 PART II. REPORTING REQUIREMENTS ................................................................................ 36
A. REPRESENTATIVE SAMPLING. ............................................................................................ 36
B. ANALYTICAL PROCEDURES. ............................................................................................... 36 C. PENALTIES FOR TAMPERING. ............................................................................................. 36 D. REPORTING OF MONITORING RESULTS .............................................................................. 36 E. COMPLIANCE SCHEDULES .................................................................................................. 36
F. ADDITIONAL MONITORING BY THE PERMITTEE ................................................................. 36
G. RECORDS CONTENTS ......................................................................................................... 36 H. RETENTION OF RECORDS ................................................................................................... 37 I. NOTICE OF NONCOMPLIANCE REPORTING.......................................................................... 37 J. OTHER NONCOMPLIANCE REPORTING ............................................................................... 37
K. INSPECTION AND ENTRY .................................................................................................... 37
PART III. COMPLIANCE RESPONSIBILITIES ....................................................................... 38 A. DUTY TO COMPLY .............................................................................................................. 38 B. PENALTIES FOR VIOLATIONS OF PERMIT CONDITIONS ....................................................... 38 C. NEED TO HALT OR REDUCE ACTIVITY NOT A DEFENSE ..................................................... 38
D. DUTY TO MITIGATE ........................................................................................................... 38
E. PROPER OPERATION AND MAINTENANCE .......................................................................... 38 PART IV. GENERAL REQUIREMENTS .................................................................................. 39 A. PLANNED CHANGES ........................................................................................................... 39 B. ANTICIPATED NONCOMPLIANCE ........................................................................................ 39
C. PERMIT ACTIONS ............................................................................................................... 39
D. DUTY TO REAPPLY ............................................................................................................. 39 E. DUTY TO PROVIDE INFORMATION ...................................................................................... 39 F. OTHER INFORMATION ........................................................................................................ 39 G. SIGNATORY REQUIREMENTS .............................................................................................. 39
H. PENALTIES FOR FALSIFICATION OF REPORTS ..................................................................... 40
I. AVAILABILITY OF REPORTS ............................................................................................... 40 J. PROPERTY RIGHTS ............................................................................................................. 40 K. SEVERABILITY ................................................................................................................... 40 L. TRANSFERS ........................................................................................................................ 40
M. STATE LAWS ...................................................................................................................... 41
N. REOPENER PROVISIONS ...................................................................................................... 41
iii
List of Tables
Table 1. Ground Water Classification ............................................................................................ 1 Table 2. Groundwater Compliance Limits...................................................................................... 3 Table 3. DMT Engineering Design and Specifications .................................................................. 6 Table 4. Feedstock Storage Area Coordinates ................................................................................ 9
Table 5. Approved Tailings Cell 4A Engineering Design and Specifications ............................. 10
Table 6. Approved Tailings Cell 4B Engineering Design and Specifications .............................. 15 Table 7. Groundwater Monitoring Reporting Schedule ............................................................... 27
Part I.A Permit No. UGW370004
1
PART I. SPECIFIC PERMIT CONDITIONS
A. GROUND WATER CLASSIFICATION - the groundwater classification of the shallow aquifer under the tailings facility has been determined on a well-by-well basis, as defined in Table 1,
below:
Table 1. Ground Water Classification
Class II Groundwater Class III Groundwater Average TDS (mg/L) Average TDS (mg/L) DUSA Data DUSA Data
Well ID N(1) Average Concentration(2) Standard Deviation(2) Well ID N(1) Average Concentration(2) Standard Deviation(2) MW-1(3) 77 1,273 93 MW-2 77 3,050 252 MW-5 82 2,058 170 MW-12 61 3,894 241
MW-11 71 1,844 178 MW-14 51 3,592 176
MW-30 42 1601 100 MW-15 47 3,857 243
MW-17 22 4,444 321
MW-18(3) 18 2,605 297 MW-19(3) 22 2,457 900 MW-20(4) 23 5,192 475
MW-22(4) 23 7,633 656
MW-3A 40 5,684 184
MW-23 33 3,419 408
MW-24 32 4,080 268
MW-25(5) 46 2,763 97
MW-26(6) 60 3,106 231
MW-27(7) 45 1,067 56
MW-28 32 3,633 101 MW-29 40 4,332 118 MW-31(7) 90 1,395 138
MW-32(8) 32 3,703 166
MW-35 24 3,725 354
MW-36 21 4,344 154
MW-37 21 3,881 108
Footnotes:
1) N = Number of Samples 2) Based on historic total dissolved solids (TDS) data provided by the Permittee for period between October, 1979 and September 2016. This data was obtained from the Permittee’s background groundwater quality reports.. 3) Background concentrations of uranium in well MW-18 (55.1 µg/L) and thallium in MW-19 (2.1 µg/L) exceed the GWQS, 30 µg/L and 2.0 µg/L, respectively. Therefore these wells have been classified as Class III groundwater rather than Class II groundwater. 4) Wells MW-1, MW-18, MW-19, MW-20, MW-22, and TW4-24 are not point of compliance monitoring wells, but instead are general monitoring wells as per Part I.E.2. Average concentrations and standard deviations for wells MW-20 and MW-22 were provided by the Permittee for the period between June, 2008 and February, 2010. This data was obtained from the Permittee’s Background Groundwater Quality Report for wells MW-20 and MW-22 dated June, 2010. 5) Background concentration of manganese in well MW-25 (1,806 µg/L) exceeds the GWQS, therefore well MW-25 has been classified as Class III groundwater rather than Class II groundwater. 6) Well MW-26 was originally named TW4-15 and was installed as part of the chloroform contaminant investigation at the facility. Under this Permit, MW-26 is defined as a Point of Compliance (POC) well for the tailings cells (see Part I.E.1). 7) Background concentrations of uranium in well MW-27 (34 µg/L) and selenium in MW-31 (71 µg/L) exceed the GWQS, therefore these wells have been classified as Class III groundwater rather than Class II groundwater. 8) Well MW-32 was originally named TW4-17 and was installed as part of the chloroform contaminant investigation at the facility. Under this Permit it is included as a POC well for the tailings cells in Part I.E.1. B. BACKGROUND WATER QUALITY - based on groundwater samples collected through June 2007 for existing wells (MW-1, MW-2, MW-3, MW-5, MW-11, MW-12, MW-14, MW-15, MW-17,
Part I.B & I.C Permit No. UGW370004
2
MW-18, MW-19, MW-26, and MW-32) and through December 2007 for new wells (MW-3A, MW-23, MW 24, MW-25, MW-27, MW-28, MW-29, MW-30 and MW-31), the upper boundary of background groundwater quality is determined on a well-by-well basis, pursuant to
Environmental Protection Agency (EPA) guidance, and documented in the Permittee’s
background groundwater quality reports dated October 2007, April 30, 2008, and May 1, 2014.
C. PERMIT LIMITS - the Permittee shall comply with the following permit limits:
1. Ground Water Compliance Limits - contaminant concentrations measured in each monitoring well listed in Table 2 below shall not exceed the Ground Water Compliance
Limits (GWCL) defined in Table 2, below. Groundwater quality in the wells listed in
Table 2 below must at all times meet all the applicable GWQS and ad hoc GWQS defined in R317-6 even though this permit does not require monitoring for each specific contaminant.
2. Tailings Cell Operations - only 11.e.(2) by-product material authorized by Utah
Radioactive Materials License No. UT-2300478 (hereafter License) shall be discharged
to or disposed of in the tailings ponds.
3. Prohibited Discharges - discharge of other compounds such as paints, used oil, antifreeze, pesticides, or any other contaminant not defined as 11e.(2) material is prohibited.
3
Table 2. Groundwater Compliance Limits (GWCL)
Upgradient Well Down or Lateral Gradient Wells
MW-27 (Class III) MW-2 (Class III) MW-3A (Class III) MW-5 (Class II) MW-11 (Class II) MW-12 (Class III) MW-14 (Class III) MW-15 (Class III) MW-17 (Class III) MW-23 (Class III) MW-24 (Class III) MW-25 (Class III)
Contaminant GWQS (1) GWCL GWCL (6) GWCL GWCL GWCL (7) GWCL GWCL GWCL GWCL GWCL GWCL GWCL
Nutrients (mg/L)
Ammonia (as N) 25 (2) 12.5 12.5 0.6 1.02 6.25 0.6 12.5 0.21 0.26 0.6 7 0.77
Nitrate + Nitrite (as N) 10 5.6 0.12 1.3 2.5 2.5 5 5 0.27 5 (8) 5 5 5
Heavy Metals (µg/L)
Arsenic 50 25 25 25 17 15 25 25 25 25 25 17 25
Beryllium 4 2 2 2 1 1 2 2 2 2 2 2 2
Cadmium 5 2.5 2.5 3.55 2 1.25 7 2.5 2.5 2.5 2.5 6.43 1.5
Chromium 100 50 50 50 25 25 50 50 50 50 50 50 50
Cobalt 730 (5) 365 365 365 182.5 182.5 365 365 365 365 365 365 365
Copper 1,300 650 650 650 325 325 650 650 650 650 650 650 650
Iron 11,000 (5) 5,500 151.6 5,500 2,750 2,750 5,500 5,500 81.7 5,500 5,500 4,162 5,500
Lead 15 7.5 7.5 7.5 4.1 3.75 7.5 7.5 7.5 7.5 7.5 7.5 7.5
Manganese 800 (4) 400 378.76 383 376.74 164.67 2,088.80 2,230.30 400 915.4 550 7,507 1,806
Mercury 2 1 1 1 1 0.5 1 1 1 1 1 1 1 Molybdenum 40 (2) 20 20 20 10 10 20 25 30 20 20 20 20
Nickel 100 (3) 50 60 105 44.1 46.2 60 50 97 50 50 50 50
Selenium 50 25 26.6 109.58 12.5 12.5 39 25 128.7 25 25 25 25
Silver 100 50 50 50 25 25 50 50 50 50 50 50 50
Thallium 2 1 1 1.4 0.5 0.5 1 1 1 1 1.5 2.01 1.1 Tin 17,000 (4) 8,500 8,500 8,500 4,250 4,250 8,500 8,500 8,500 8,500 8,500 8,500 8,500
Uranium 30 (3) 34 18.45 35 7.5 7.5 23.5 98 65.7 46.66 32 11.9 7.25
Vanadium 60 (4) 30 30 30 15 15 30 30 40 30 30 30 30
Zinc 5,000 2,500 2,500 155 87.38 1,250 2,500 35.04 2,500 2,500 74 2,500 2,500
Radiologics (pCi/L)
Gross Alpha 15 2 3.2 7.5 3.75 3.75 7.5 7.5 7.5 2.8 2.86 7.5 7.5
Volatile Organic Compounds (µg/L)
Acetone 700 (4) 350 350 350 175 175 350 350 350 350 350 350 350
Benzene 5 2.5 2.5 2.5 1.25 1.25 2.5 2.5 2.5 2.5 2.5 2.5 2.5
2-Butanone (MEK) 4,000 (2) 2,000 2,000 2,000 1,000 1,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
Carbon Tetrachloride 5 2.5 2.5 2.5 1.25 1.25 2.5 2.5 2.5 2.5 2.5 2.5 2.5
Chloroform 70 (4) 35 35 35 17.5 17.5 35 35 35 35 35 35 35
Chloromethane 30 (2) 15 15 9.4 7.5 7.5 15 15 15 15 5.7 15 15
Dichloromethane 5 (3) 2.5 2.5 2.5 1.25 1.25 2.5 2.5 2.5 2.5 2.5 2.5 2.5
Naphthalene 100 (2) 50 50 50 25 25 50 50 50 50 50 50 50
Tetrahydrofuran 46 (4) 23 23 23 11.5 11.5 23 23 23 23 23 23 23
Toluene 1,000 500 500 500 250 250 500 500 500 500 500 500 500
Xylenes (total) 10,000 5,000 5,000 5,000 2,500 2,500 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Others
Field pH (S.U.) 6.5 - 8.5 6.47 - 8.5 6.72 - 8.5 5.84 - 8.5 7.04 - 8.5 6.25 - 8.5 5.86 - 8.5 5.42 - 8.5 5.88 - 8.5 6.27 - 8.5 5.97 - 8.5 5.03 - 8.5 5.77 - 8.5
Fluoride (mg/L) 4 0.85 0.43 1.6 1.42 1 2 0.22 2 2 2 0.47 0.42
Chloride (mg/L) 38 20 70 71 39.16 80.5 27 57.1 46.8 10 71 35 Sulfate (mg/L) 462 2,147 3,949.27 1,518 1,309 2,560 2,330 2,549.02 2,860 2,524 2,903 1,933
TDS (mg/L) 1,185.72 3,800 6,028 2,575 2,528 4,323 4,062 4,530 5,085.42 3,670 4,450 2,976
4
Table 2 Continued. Groundwater Compliance Limits (GWCL)
Down or Lateral Gradient Wells
MW-26 (Class III) MW-28 (Class III) MW-29 (Class III) MW-30 (Class II) MW-31 (Class III) MW-32 (Class III) MW-35 (Class III) MW-36 (Class III) MW-37 (Class III)
Contaminant GWQS (1) GWCL GWCL GWCL GWCL GWCL GWCL (7) GWCL GWCL GWCL
Nutrients (mg/L)
Ammonia (as N) 25 (2) 0.92 12.5 1.3 0.14 12.5 1.17 0.14 12.5 12.5
Nitrate + Nitrite (as N) 10 0.62 5 5 2.5 5 5 5 5 2.22
Heavy Metals (µg/L)
Arsenic 50 25 21 25 12.5 25 25 25 25 25
Beryllium 4 2 2 2 1 2 2 2 2 2
Cadmium 5 2.5 5.2 2.5 1.25 2.5 4.72 2.5 2.5 2.5
Chromium 100 50 50 50 25 50 50 50 50 50
Cobalt 730 (5) 365 47 365 182.5 365 75.21 365 365 365 Copper 1,300 650 650 650 325 650 650 650 650 650
Iron 11,000 (5) 2,675.83 299 1,869 2,750 5,500 14,060 330.08 5,500 5,500
Lead 15 7.5 7.5 7.5 3.75 7.5 7.5 7.5 7.5 7.5
Manganese 800 (4) 1,610 1,837 5,624 61 400 5,594.90 290.68 400 400
Mercury 2 1 1 1 0.5 1 1 1 1 1 Molybdenum 40 (2) 20 20 20 10 20 20 20 20 20
Nickel 100 (3) 50 50 50 25 50 94 50 50 50
Selenium 50 25 11.1 25 47.2 119.4 25 25 307.42 25
Silver 100 50 50 50 25 50 50 50 50 50
Thallium 2 1 1 1.2 0.5 1 1 1 1.35 1 Tin 17,000 (4) 8,500 8,500 8,500 4,250 8,500 8,500 8,500 8,500 8,500
Uranium 30 (3) 119 4.9 15 8.32 15 5.26 26.76 26.42 18.08
Vanadium 60 (4) 30 30 30 15 30 30 30 30 30
Zinc 5,000 2,500 83 30 1,250 2,500 230 2,500 2,500 41.25
Radiologics (pCi/L) Gross Alpha 15 4.69 2.42 2 3.75 7.5 7 7.5 7.5 4.2
Volatile Organic Compounds (µg/L)
Acetone 700 (4) 350 350 350 175 350 350 350 350 350
Benzene 5 2.5 2.5 2.5 1.25 2.5 2.5 2.5 2.5 2.5
2-Butanone (MEK) 4,000 (2) 2,000 2,000 2,000 1,000 2,000 2,000 2,000 2,000 2,000
Carbon Tetrachloride 5 5 2.5 2.5 1.25 2.5 2.5 2.5 2.5 2.5
Chloroform 70 (4) 70 35 35 17.5 35 35 35 35 35
Chloromethane 30 (2) 30 4.6 15 7.5 6.1 15 15 15 15 Dichloromethane 5 (3) 5 2.5 2.5 1.25 2.5 2.5 2.5 2.5 2.5
Naphthalene 100 (2) 50 50 50 25 50 50 50 50 50
Tetrahydrofuran 46 (4) 23 23 23 11.5 23 23 23 23 23
Toluene 1,000 500 500 500 250 500 500 500 500 500
Xylenes (total) 10,000 5,000 5,000 5,000 2,500 5,000 5,000 5,000 5,000 5,000
Others
Field pH (S.U.) 6.5 - 8.5 5.61 - 8.5 5.58 - 8.5 5.94 - 8.5 6.47 - 8.5 6.23 - 8.5 5.31 - 8.5 6.15 - 8.5 6.49 - 8.5 6.61 - 8.5
Fluoride (mg/l) 4 2 0.73 1.1 0.51 2 2 0.42 0.35 0.31
Chloride (mg/l) 58.31 105 41 128 143 35.39 69.12 73 57.3 Sulfate (mg/l) 2,082.06 2,533 2,946 972 993 2,556.70 2,400 3,146.21 2,927.65
TDS (mg/l) 3,284.19 3,852 4,570 1,918 2,132 3,960 4,821.88 5,470 4,866.25
5
Footnotes: 1) Utah Ground Water Quality Standards (GWQS) as defined in UAC R317-6, Table 2. Ad hoc GWQS also provided herein, as noted, and as allowed by UAC R317-6-2.2. 2) Ad hoc GWQS for ammonia (as N), molybdenum, 2-Butanone (MEK), chloromethane, and naphthalene based on EPA drinking water lifetime health advisories. 3) Ad hoc GWQS for nickel, uranium, and dichloromethane (methylene chloride, CAS No. 75-09-2) based on final EPA drinking water maximum concentration limits (MCL). 4) Ad hoc GWQS for manganese, tin, vanadium, acetone, chloroform (CAS No. 67-66-3), and tetrahydrofuran based on drinking water ad hoc lifetime health advisories prepared by or in collaboration with EPA Region 8 staff. 5) Ad hoc GWQS for cobalt and iron based on EPA Region 3 Risk Based Concentration limits for tap water. 6) Ground Water Compliance Limits (GWCL) were set after Director review and approval of two Background Groundwater Quality Reports dated October_2007 and April 30, 2008 from the Permittee. 7) GWCLs listed in the table above are those proposed by the Permittee in the October 2007, April 30, 2008, and May 1, 2014 EFR Background Groundwater Quality Reports, and approved by the Director and also include values modified by the Director after review of GWCLs proposed in the Permittee’s October 2007, April 30, 2008, May 1, 2014 Background Groundwater Quality Reports. For wells MW-2, MW-3, MW-5, MW-11, MW-12, MW-14, MW-15, MW-17, MW-26, and MW-32; these modifications are documented in the June 16, 2008 URS Completeness Review for the October, 2007 Revised Background Groundwater Quality Report for Existing Wells. For wells MW-3A, MW-23, MW-24, MW-25, MW-27, MW-28, MW-29, MW-30, and MW-31; these modifications are documented in the June 24, 2008 DRC Findings Memorandum regarding the April 30, 2008 Revised Background Groundwater Quality Report for New Wells. For wells MW-35, MW-36, MW-37; these modifications are documented in the July 14, 2014 DRC Findings Memorandum regarding the May 1, 2014 Background Groundwater Quality Report for Wells MW-35, MW-36, and MW-37
Part I.D
Permit No. UGW370004
6
D. DISCHARGE MINIMIZATION AND BEST AVAILABLE TECHNOLOGY STANDARDS - the tailings
disposal facility must be built, operated, and maintained according to the following Discharge Minimization Technology (DMT) and Best Available Technology (BAT) standards:
1. DMT Design Standards for Existing Tailings Cells 1, 2, and 3 - shall be based on existing
construction as described by design and construction information provided by the
Permittee, as summarized in Table 3 below for Tailings Cells 1, 2, and 3: Table 3. DMT Engineering Design and Specifications
Tailings Cell Report Type Engineering Report Design Figures Construction Specifications Cell 1 Design June, 1979 D’Appolonia Consulting Engineers, Inc (1) Appendix A, Sheets 2, 4, 8, 9, 12-15 Appendix B
Cell 2 Design June, 1979 D’Appolonia Consulting Engineers, Inc (1) Appendix A, Sheets 2, 4, 7-10, 12-15 Appendix B
As-Built February, 1982 D’Appolonia Consulting Engineers, Inc (2) Figures 1, 2, and 11 N/A
Cell 3 Design May, 1981 D’Appolonia Consulting Engineers, Inc (3) Sheets 2-5 Appendix B
As-Built March, 1983 Energy Fuels Nuclear, Inc. (4) Figures 1-4 N/A
Footnotes: 1) D’Appolonia Consulting Engineers, Inc., June, 1979, “Engineers Report Tailings Management System White Mesa Uranium Project Blanding, Utah Energy Fuels Nuclear, Inc. Denver, Colorado”, unpublished consultants report, approximately 50 pp., 2 figures, 16 sheets, 2 appendices. 2) D’Appolonia Consulting Engineers, Inc., February, 1982, “Construction Report Initial Phase - Tailings Management System White Mesa Uranium Project Blanding, Utah Energy Fuels Nuclear, Inc. Denver, Colorado”, unpublished consultants report, approximately 7 pp., 6 tables, 13 figures, 4 appendices. 3) D’Appolonia Consulting Engineers, Inc., May, 1981, “Engineer’s Report Second Phase Design - Cell 3 Tailings Management System White Mesa Uranium Project Blanding, Utah Energy Fuels Nuclear, Inc. Denver, Colorado”, unpublished consultants report, approximately 20 pp., 1 figure, 5 sheets, and 3 appendices. 4) Energy Fuels Nuclear, Inc., March, 1983, “Construction Report Second Phase Tailings Management System White Mesa Uranium Project Energy Fuels Nuclear, Inc.”, unpublished company report, 18 pp., 3 tables, 4 figures, 5 appendices.
a) Tailings Cell 1 - consisting of the following major design elements:
1) Cross-valley Dike and East Dike - constructed on the south side of the pond of native granular materials with a 3:1 slope, a 20-foot crest width, and a crest elevation of about 5,620 ft above mean sea level (amsl). A dike of similar design was constructed on the east margin of the pond, which forms a continuous earthen
structure with the south dike. The remaining interior slopes are cut-slopes at 3:1
grade.
2) Liner System - including a single 30 mil PVC flexible membrane liner (FML) constructed of solvent welded seams on a prepared sub-base. Top elevation of the FML liner was 5,618.5 ft amsl on both the south dike and the north cut-slope. A
protective soil cover layer was constructed immediately over the FML with a
thickness of 12-inches on the cell floor and 18-inches on the interior sideslope.
3) Crushed Sandstone Underlay - immediately below the FML a nominal 6-inch thick layer of crushed sandstone was prepared and rolled smooth as a FML sub-base layer. Beneath this underlay, native sandstone and other foundation materials
were graded to drain to a single low point near the upstream toe of the south
Part I.D
Permit No. UGW370004
7
cross-valley dike. Inside this layer, an east-west oriented pipe was installed to
gather fluids at the upstream toe of the cross-valley dike.
b) Tailings Cell 2 - which consists of the following major design elements:
1) Cross-valley Dike - constructed at the south margin of Cell 2 of native granular materials with a 3:1 slope, a 20-foot crest width, and crest elevation of about
5,615 ft amsl. The east and west interior slopes consist of cut-slopes with a 3:1
grade. The Cell 1 south dike forms the north margin of Cell 2, with a crest elevation of 5,620 ft amsl.
2) Liner System - includes a single 30 mil PVC FML liner constructed of solvent welded seams on a prepared sub-base, and overlain by a slimes drain collection
system. Top elevation of the FML liner in Cell 2 is 5,615.0 ft and 5,613.5 ft amsl
on the north and south dikes, respectively. Said Cell 2 FML liner is independent of all other disposal cell FML liners. Immediately above the FML, a nominal 12-inch (cell floor) to 18-inch (inside sideslope) soil protective blanket was constructed of native sands from on-site excavated soils.
3) Crushed Sandstone Underlay - immediately below the FML a nominal 6-inch
thick layer of crushed sandstone was prepared and rolled smooth as a FML sub-base layer. Beneath this underlay, native sandstone and other foundation materials were graded to drain to a single low point near the upstream toe of the south cross-valley dike. Inside this layer, an east-west oriented pipe was installed to
gather fluids at the upstream toe of the cross-valley dike.
4) Slimes Drain Collection System immediately above the FML a nominal 12-inch thick protective blanket layer was constructed of native silty-sandy soil. On top of this protective blanket, a network of 1.5-inch PVC perforated pipe laterals was installed on a grid spacing interval of about 50-feet. These pipe laterals gravity
drain to a 3-inch diameter perforated PVC collector pipe which also drains toward
the south dike and is accessed from the ground surface via a 24-inch diameter, vertical non-perforated HDPE access pipe. Each run of lateral drainpipe and collector piping was covered with a 12 to 18-inch thick berm of native granular filter material. At cell closure, leachate head inside the pipe network will be
removed via a submersible pump installed inside the 24-inch diameter HDPE
access pipe.
c) Tailings Cell 3 - consisting of the following major design elements:
1) Cross-valley Dike - constructed at the south margin of Cell 3 of native granular materials with a 3:1 slope, a 20-foot crest width, and a crest elevation of 5,610 ft
amsl. The east and west interior slopes consist of cut-slopes with a 3:1 grade. The
Cell 2 south dike forms the north margin of Cell 3, with a crest elevation of 5,615 ft amsl.
2) Liner System - includes a single 30 mil PVC FML liner constructed of solvent welded seams on a prepared sub-base, and overlain by a slimes drain collection
system. Top elevation of the FML liner in Cell 3 is 5,613.5 ft and 5,608.5 ft amsl
on the north and south dikes, respectively. Said Cell 3 FML liner is independent of all other disposal cell FML liners.
Part I.D
Permit No. UGW370004
8
3) Crushed Sandstone Underlay - immediately below the FML a nominal 6-inch
thick layer of crushed sandstone was prepared and rolled smooth as a FML sub-base layer. Beneath this underlay, native sandstone and other foundation materials were graded to drain to a single low point near the upstream toe of the south cross-valley dike. Inside this layer, an east-west oriented pipe was installed to
gather fluids at the upstream toe of the cross-valley dike.
4) Slimes Drain Collection Layer and System - immediately above the FML, a nominal 12-inch (cell floor) to 18-inch (inside sideslope) soil protective blanket was constructed of native sands from on-site excavated soils (70%) and dewatered and cyclone separated tailings sands from the mill (30%). On top of this
protective blanket, a network of 3-inch PVC perforated pipe laterals was installed
on approximately 50-foot centers. This pipe network gravity drains to a 3-inch perforated PVC collector pipe which also drains toward the south dike, where it is accessed from the ground surface by a 12-inch diameter, inclined HDPE access pipe. Each run of the 3-inch lateral drainpipe and collector pipe was covered with
a 12 to 18-inch thick berm of native granular filter media. At cell closure, leachate
head inside the pipe network will be removed via a submersible pump installed inside the 12-inch diameter inclined access pipe.
2. Existing Tailings Cell Construction Authorized - tailings disposal in existing Tailings Cells 1, 2, and 3 is authorized by this Permit as defined in Table 3 and Part I.D.1, above.
Authorized operation and maximum disposal capacity in each of the existing tailings cells
shall not exceed the levels authorized by the License. Under no circumstances shall the freeboard be less than three feet, as measured from the top of the FML. Any modification by the Permittee to any approved engineering design parameter at these existing tailings cells shall require prior Director approval, modification of this Permit, and issuance of a
construction permit.
3. Existing Facility DMT Performance Standards - the Permittee shall operate and maintain certain mill site facilities and the existing tailings disposal cells to minimize the potential for wastewater release to groundwater and the environment, including, but not limited to the following additional DMT compliance measures:
a) DMT Monitoring Wells at Tailings Cell 1 - at all times the Permittee shall operate
and maintain Tailings Cell 1 to prevent groundwater quality conditions in any nearby monitoring well from exceeding any Ground Water Compliance Limit established in Table 2 of this Permit.
b) Tailings Cells 2 and 3 - including the following performance criteria:
1) Slimes Drain Maximum Allowable Head - the Permittee shall at all times
maintain the average wastewater recovery head in the slimes drain access pipe to be as low as reasonably achievable (ALARA) in each tailings disposal cell, in accordance with the currently approved DMT Monitoring Plan.
2) Quarterly Slimes Drain Recovery Test - effective July 11, 2011, the Permittee
shall conduct a quarterly slimes drain recovery test at each tailings cell slimes
drain that meets the following minimum requirements:
i. Includes a duration of at least 90-hours, as measured from the time that pumping ceases, and
Part I.D
Permit No. UGW370004
9
ii. Achieves a stable water level at the end of the test, as measured by three
consecutive hourly water level depth measurements, with no change in water level, as measured to the nearest 0.01 foot.
3) Annual Slimes Drain Compliance – The Permittee shall submit an annual report on or before March 1 following the reporting year which includes but is not
limited to; 1) Monthly volumes of fluid pumped from the slimes drain for each
applicable tailings disposal cell; 2) The results of all quarterly slimes drain recovery tests; 3) A calculation of average annual wastewater recovery elevation in the slimes drain access pipe, and; 4) The annual report shall include an assessment and verification that the maximum fluid volume which could
practicably be extracted from the slimes drain in accordance with the systems in
place was removed.
c) Maximum Tailings Waste Solids Elevation - upon closure of any tailings cell, the Permittee shall ensure that the maximum elevation of the tailings waste solids does not exceed the top of the FML liner.
d) DMT Monitoring Wells - at all times the Permittee shall operate and maintain
Tailings Cells 2 and 3 to prevent groundwater quality conditions in any nearby monitoring well from exceeding any Ground Water Compliance Limit established in Table 2 of this Permit.
e) Feedstock Storage Area - open-air or bulk storage of all feedstock materials at the
facility awaiting mill processing shall be limited to the eastern portion of the mill site
area described in Table 4, below. Storage of feedstock materials at the facility outside this area, shall meet the requirements in Part I.D.11. At the time of mill site closure, the Permittee shall reclaim and decommission the Feedstock Storage Area in compliance with an approved Reclamation Plan. The Permittee shall maintain a
minimum 4-foot wide buffer zone on the inside margin of the Feedstock Storage Area
between the storage area fence and the Feedstock which shall be absent of feed material in order to assure that materials do not encroach on the boundary of the storage area.
Table 4. Feedstock Storage Area Coordinates (1)
Corner Northing (ft) Easting (ft)
Northeast 323,595 2,580,925
Southeast 322,140 2,580,920
Southwest 322,140 2,580,420
West 1 322,815 2,580,410
West 2 323,040 2,580,085 West 3 323,120 2,580,085 West 4 323,315 2,580,285
West 5 323,415 2,579,990
Northwest 323,600 2,579,990
Footnote: 1) Approximate State Plane Coordinates beginning from the extreme northeast corner and progressing clockwise around the feedstock area (from 6/22/01 DUSA Response, Attachment K, Site Topographic Map, Revised June, 2001.)
f) Mill Site Chemical Reagent Storage - for all chemical reagents stored at existing storage facilities and held for use in the milling process, the Permittee shall provide secondary containment to capture and contain all volumes of reagent(s) that might be
released at any individual storage area. Response to spills, cleanup thereof, and
Part I.D
Permit No. UGW370004
10
required reporting shall comply with the provisions of the approved Emergency
Response Plan as found in the currently approved Stormwater Best Management Practices Plan. For any new construction of reagent storage facilities, said secondary containment and control shall prevent any contact of the spilled or otherwise released reagent or product with the ground surface.
4. Best Available Technology Requirements for New Construction - any construction,
modification, or operation of new waste or wastewater disposal, treatment, or storage facilities shall require submittal of engineering design plans and specifications, and prior Director review and approval. All engineering plans or specifications submitted shall demonstrate compliance with all Best Available Technology (BAT) requirements
stipulated by the Utah Ground Water Quality Protection Regulations (UAC R317-6).
Upon Director approval this Permit may be re-opened and modified to include any necessary requirements. 5. BAT Design Standards for Tailings Cell 4A - the BAT design standard for Tailings Cell
4A shall be defined by and construction conform to the requirements of the June 25, 2007
Director design approval letter for the relining of former existing Tailings Cell No. 4A, and as summarized by the engineering drawings, specifications, and description in Table 5, below:
Table 5. Approved Tailings Cell 4A Engineering Design and Specifications
Engineering Drawings
Name Date Revision No. Title
Sheet 1 of 7 June, 2007 Title Sheet
Sheet 2 of 7 June 15, 2007 Rev. 1 Site Plan
Sheet 3 of 7 June 15, 2007 Rev. 1 Base Grading Plan
Sheet 4 of 7 June 15, 2007 Rev. 1 Pipe Layout Plan Sheet 5 of 7 June 15, 2007 Rev. 1 Lining System Details I Sheet 6 of 7 June 15, 2007 Rev. 1 Lining System Details II
Sheet 7 of 7 June 15, 2007 Rev. 1 Lining System Details III
Figure 1 August, 2008 - Spillway Splash Pad Anchor
Engineering Specifications Date Document Title Prepared by June, 2007 Revised Technical Specifications for the Construction of Cell 4A Lining System Geosyntec Consultants
June, 2007 Revised Construction Quality Assurance Plan for the Construction of Cell 4A Lining System Geosyntec Consultants
March 27, 2007 Revised Geosynthetic Clay Liner Hydration Demonstration Work Plan (1) Geosyntec Consultants
November 27, 2006 Cell Seismic Study (2) MFG Consulting Scientists and Engineers October 6, 2006 Calculation of Action Leakage Rate Through the Leakage Detection System Underlying a Geomembrane Liner
Geosyntec Consultants
June 22, 2006 Slope Stability Analysis Cell 4A - Interim
Conditions
Geosyntec Consultants
June 23, 2006 Settlement Evaluation of Berms (2) Geosyntec Consultants
August 22, 2006 Pipe Strength Calculations Geosyntec Consultants
September 27, 2007 DMC Cell 4A - GCL Hydration Geosyntec Consultants
Footnotes:
Part I.D
Permit No. UGW370004
11
1) As qualified by conditions found in May 2, 2007 Division of Radiation Control letter. 2) As clarified by February 8, 2007 Division of Radiation Control Round 6 Interrogatory. Tailings Cell 4A Design and Construction - approved by the Director will consist of the following major elements:
a) Dikes - consisting of existing earthen embankments of compacted soil, constructed by
the Permittee between 1989 and1990, and composed of four dikes, each including a
15-foot wide road at the top (minimum). On the north, east, and south margins these dikes have slopes of 3H to 1V. The west dike has an interior slope of 2H to 1V. Width of these dikes varies; each has a minimum crest width of at least 15 feet to support an access road. Base width also varies from 89-feet on the east dike (with no
exterior embankment), to 211-feet at the west dike.
b) Foundation - including existing subgrade soils over bedrock materials. Foundation preparation included excavation and removal of contaminated soils, compaction of imported soils to a maximum dry density of 90%. Floor of Cell 4A has an average slope of 1% that grades from the northeast to the southwest corners.
c) Tailings Capacity - the floor and inside slopes of Cell 4A encompass about 40 acres
and have a maximum capacity of about 1.6 million cubic yards of tailings material storage (as measured below the required 3-foot freeboard).
d) Liner and Leak Detection Systems - including the following layers, in descending order:
1) Primary Flexible Membrane Liner (FML) - consisting of impermeable 60 mil
high density polyethylene (HDPE) membrane that extends across both the entire cell floor and the inside side-slopes, and is anchored in a trench at the top of the dikes on all four sides. The primary FML will be in direct physical contact with the tailings material over most of the Cell 4A floor area. In other locations, the
primary FML will be in contact with the slimes drain collection system (discussed
below).
2) Leak Detection System - includes a permeable HDPE geonet fabric that extends across the entire area under the primary FML in Cell 4A, and drains to a leak detection sump in the southwest corner. Access to the leak detection sump is via
an 18-inch inside diameter (ID) PVC pipe placed down the inside slope, located
between the primary and secondary FML liners. At its base this pipe will be surrounded with a gravel filter set in the leak detection sump, having dimensions of 10 feet by 10 feet by 2 feet deep. In turn, the gravel filter layer will be enclosed in an envelope of geotextile fabric. The purpose of both the gravel and geotextile
fabric is to serve as a filter.
3) Secondary FML - consisting of an impermeable 60-mil HDPE membrane found immediately below the leak detection geonet. Said FML also extends across the entire Cell 4A floor, up the inside side-slopes and is also anchored in a trench at the top of all four dikes.
4) Geosynthetic Clay Liner - consisting of a manufactured geosynthetic clay liner
(GCL) composed of 0.2-inch of low permeability bentonite clay centered and stitched between two layers of geotextile. Prior to disposal of any wastewater in Cell 4A, the Permittee shall demonstrate that the GCL has achieved a moisture
Part I.D
Permit No. UGW370004
12
content of at least 50% by weight. This item is a revised requirement per DRC
letter to DUSA dated September 28, 2007.
e) Slimes Drain Collection System - including a two-part system of strip drains and perforated collection pipes both installed immediately above the primary FML, as follows:
1) Horizontal Strip Drain System - is installed in a herringbone pattern across the
floor of Cell 4A that drain to a “backbone” of perforated collection pipes. These strip drains are made of a prefabricated two-part geo-composite drain material (solid polymer drainage strip) core surrounded by an envelope of non-woven geotextile filter fabric. The strip drains are placed immediately over the primary
FML on 50-foot centers, where they conduct fluids downgradient in a
southwesterly direction to a physical and hydraulic connection to the perforated slimes drain collection pipe. A series of continuous sand bags, filled with filter sand cover the strip drains. The sand bags are composed of a woven polyester fabric filled with well graded filter sand to protect the drainage system from
plugging.
2) Horizontal Slimes Drain Collection Pipe System - includes a “backbone” piping system of 4-inch ID Schedule 40 perforated PVC slimes drain collection (SDC) pipe found at the downgradient end of the strip drain lines. This pipe is in turn overlain by a berm of gravel that runs the entire diagonal length of the cell,
surrounded by a geotextile fabric cushion in immediate contact with the primary
FML. In turn, the gravel is overlain by a layer of non-woven geotextile to serve as an additional filter material. This perforated collection pipe serves as the “backbone” to the slimes drain system and runs from the far northeast corner downhill to the far southwest corner of Cell 4A where it joins the slimes drain
access pipe.
3) Slimes Drain Access Pipe - consisting of an 18-inch ID Schedule 40 PVC pipe placed down the inside slope of Cell 4A at the southwest corner, above the primary FML. Said pipe then merges with another horizontal pipe of equivalent diameter and material, where it is enveloped by gravel and woven geotextile that
serves as a cushion to protect the primary FML. A reducer connects the horizontal
18-inch pipe with the 4-inch SDC pipe. At some future time, a pump will be set in this 18-inch pipe and used to remove tailings wastewaters for purposes of de-watering the tailings cell.
f) Cell 4A North Dike Splash Pads - three 20-foot wide splash pads will be constructed
on the north dike to protect the primary FML from abrasion and scouring by tailings
slurry. These pads will consist of an extra layer of 60 mil HDPE membrane that will be installed in the anchor trench and placed down the inside slope of Cell 4A, from the top of the dike, under the inlet pipe, and down the inside slope to a point 5-feet beyond the toe of the slope.
g) Cell 4A Emergency Spillway - a concrete lined spillway will be constructed near the
western corner of the north dike to allow emergency runoff from Cell 3 into Cell 4A. This spillway will be limited to a 6-inch reinforced concrete slab set directly over the primary FML in a 4-foot deep trapezoidal channel. No other spillway or overflow structure will be constructed at Cell 4A. All stormwater runoff and tailings
Part I.D
Permit No. UGW370004
13
wastewaters not retained in Cells 2 and 3, will be managed and contained in Cell 4A,
including the Probable Maximum Precipitation and flood event.
6. BAT Performance Standards for Tailings Cell 4A - the Permittee shall operate and maintain Tailings Cell 4A so as to prevent release of wastewater to groundwater and the environment in accordance with the currently approved Cell 4A BAT, Monitoring,
Operations and Maintenance Plan. Any failure to achieve or maintain the required BAT
performance standards shall constitute a violation of the Permit and shall be reported to the Director in accordance with Part I.G.3. Performance standards for Tailings Cell 4A shall include the following:
a) Leak Detection System (LDS) Maximum Allowable Daily Head - the fluid head in
the LDS shall not exceed 1 foot above the lowest point on the lower flexible
membrane liner on the cell floor. For purposes of compliance this elevation will equate to a maximum distance of 2.28 feet above the LDS transducer. At all times the Permittee shall operate the LDS pump and transducer in a horizontal position at the lowest point of the LDS sump floor.
b) LDS Maximum Allowable Daily Leak Rate - shall not exceed 24,160 gallons/day.
c) Slimes Drain Annual Average Recovery Head Criteria - after the Permittee initiates pumping conditions in the slimes drain layer in Cell 4A, the Permittee will provide: 1) continuous declining fluid heads in the slimes drain layer, in a manner equivalent to the requirements found in Part I.D.3(b), and 2) a maximum head of 1.0 feet in the
tailings (as measured from the lowest point of upper flexible membrane liner) in 6.4
years or less.
d) Maximum Weekly Wastewater Level - under no circumstance shall the freeboard be less then 3-feet in Cell 4A, as measured from the top of the upper FML.
7. Definition of 11e.(2) Waste - for purposes of this Permit, 11e.(2) waste is defined as: "...
tailings or wastes produced by the extraction or concentration of uranium or thorium
from any ore processed primarily for its source material content", as defined in Section 11e.(2) of the U.S. Atomic Energy Act of 1954, as amended; which includes other process related wastes and waste streams described by a March 7, 2003 NRC letter from Paul H. Lohaus to William J. Sinclair.
8. Closed Cell Performance Requirements - before reclamation and closure of any tailings
disposal cell, the Permittee shall ensure that the final design, construction, and operation of the cover system at each tailings cell will comply with all requirements of an approved Reclamation Plan, and will for a period of not less than 200 years meet the following minimum performance requirements:
a) Minimize infiltration of precipitation or other surface water into the tailings,
including, but not limited to the radon barrier,
b) Prevent the accumulation of leachate head within the tailings waste layer that could rise above or over-top the maximum FML liner elevation internal to any disposal cell, i.e. create a “bathtub” effect, and
Part I.D
Permit No. UGW370004
14
c) Ensure that groundwater quality at the compliance monitoring wells does not exceed
the Ground Water Quality Standards or Ground Water Compliance Limits specified in Part I.C.1 and Table 2 of this Permit.
9. Facility Reclamation Requirements - upon commencement of decommissioning, the Permittee shall reclaim the mill site and all related facilities, stabilize the tailings cells,
and construct a cover system over the tailings cells in compliance with all engineering
design and specifications in an approved Reclamation Plan. The Director reserves the right to require modifications of the Reclamation Plan for purposes of compliance with the Utah Ground Water Quality Protection Regulations, including but not limited to containment and control of contaminants, or discharges, or potential discharges to Waters
of the State.
10. Stormwater Management and Spill Control Requirements - the Permittee will manage all contact and non-contact stormwater and control contaminant spills at the facility in accordance with the currently approved Stormwater Best Management Practices Plan. Said plan includes the following minimum provisions:
a) Protect groundwater quality or other waters of the state by design, construction,
and/or active operational measures that meet the requirements of the Ground Water Quality Protection Regulations found in UAC R317-6-6.3(G) and R317-6-6.4(C),
b) Prevent, control and contain spills of stored reagents or other chemicals at the mill site,
c) Cleanup spills of stored reagents or other chemicals at the mill site immediately upon
discovery, and
d) Report reagent spills or other releases at the mill site to the Director in accordance with UAC 19-5-114.
Reconstruction of stormwater management and/or chemical reagent storage facilities,
existing at the time of original Permit issuance, may be required by the Director after
occurrence of a major spill or catastrophic failure, pursuant to Part IV.N.3 of this Permit.
11. BAT Requirements for Feedstock Material Stored Outside the Feedstock Storage Area - the Permittee shall store and manage feedstock materials outside the ore storage pad in accordance with the following minimum performance requirements:
a) Feedstock materials shall be stored at all times in water-tight containers or water-tight
container overpacks, and aisle ways will be provided at all times to allow visual inspection of each and every feedstock container and container overpack, or
b) Feedstock containers shall be stored on a hardened surface to prevent spillage onto subsurface soils, and that conforms with the following minimum physical
requirements:
1) A storage area composed of a hardened engineered surface of asphalt or concrete, and
2) A storage area designed, constructed, and operated in accordance with engineering plans and specifications approved in advance by the Director. All
such engineering plans or specifications submitted shall demonstrate compliance
with Part I.D.4,
Part I.D
Permit No. UGW370004
15
3) A storage area that provides containment berms to control stormwater run-on and
run-off, and
4) Stormwater drainage works approved in advance by the Director, or
5) Other storage facilities and means approved in advance by the Director.
12. BAT Design Standards for Tailings Cell 4B - the BAT design standard for Tailings Cell
4B shall be defined by and constructed in accordance with the requirements as
summarized by the engineering drawings, specifications, and description in Table 6, below:
Table 6. Approved Tailings Cell 4B Engineering Design and Specifications
Engineering Drawings
Name Date Revision No. Title
Sheet 1 of 8 January 2009 Rev. 1 Cover Sheet
Sheet 2 of 8 January 2009 Rev. 1 Site Plan Sheet 3 of 8 January 2009 Rev. 1 Base Grading Plan Sheet 4 of 8 January 2009 Rev. 1 Pipe Layout and Details
Sheet 5 of 8 December 2007 Rev. 0 Lining System Details I
Sheet 6 of 8 January 2009 Rev. 1 Lining System Details II
Sheet 7 of 8 January 2009 Rev. 1 Lining System Details III
Sheet 8 of 8 January 2009 Rev. 1 Lining System Details IV Figure 1 January 2009 - Mill Site Drainage Basins (supporting reference)
Engineering Specifications
Date Document Title Prepared by
January 2009 Slope Stability Analysis Calculation Package Geosyntec Consultants
January 2009 Seismic Deformation Analysis Calculation Package Geosyntec Consultants
January 2009 Revised Pipe Strength Analysis Calculation
Package
Geosyntec Consultants
January 2009 Revised Comparison of Flow Though Compacted Clay Liner and Geosynthetic Clay Liner Calculation Package
Geosyntec Consultants
January 2009 Revised Action Leakage Rate Calculation Package Geosyntec Consultants
August 2009 Blasting - Locations and Profiles, Attachment:
Figures 1 and 2
Geosyntec Consultants
August 2009 (Revised) Technical Specifications, with the exception of Section 02200 (Earthwork) Geosyntec Consultants
August 2009 Cell 4B Capacity Calculations Geosyntec Consultants
August 2009 Revised Cushion Fabric Calculations
August 2009 Construction Quality Assurance Plan for the
Construction of Cell 4B Lining System
Geosyntec Consultants
September 2009 (Revised) Technical Specification Section 02200 (Earthwork) Geosyntec Consultants
August 6, 2009 Blast Plan, KGL and Associates and Blast Plan Review, Geosyntec Consultants letter dated September 10, 2009
KGL and Associates and Geosyntec Consultants
September 2009 Probable Maximum Precipitation (PMP) Event
Computation
Geosyntec Consultants
January 2009 Slope Stability Analysis Calculation Package Geosyntec Consultants
Part I.D
Permit No. UGW370004
16
Tailings Cell 4B Design and Construction - approved by the Director will consist of the
following major elements:
a) Dikes - consisting of newly constructed dikes on the south and west side of the cell, each including a 20-foot wide road at the top (minimum) to support an access road. The grading plan for the Cell 4B excavation includes interior slopes of 2H to 1V. The
exterior slopes of the southern and western dikes will have typical slopes of 3H to 1V.
Limited portions of the Cell 4B interior sideslopes in the northwest corner and southeast corner of the cell, (where the slimes drain and leak detection sump will be located will also have a slope of 3H to 1V. The base width of the southern dikes varies from approximately 92 feet at the western end to approximately 190 feet at the
eastern end of the dike, with no exterior embankment present on any other side of the
cell.
b) Foundation - including existing subgrade soils over bedrock materials. Foundation preparation included excavation and removal of contaminated soils, compaction of imported soils to a maximum dry density of 90% at a moisture content between +3%
and -3% of optimum moisture content, as determined by ASTM D-1557. The floor of
Cell 4B has an average slope of 1% that grades from the northwest corner to the southeast corner.
c) Tailings Capacity - the floor and inside slopes of Cell 4B encompass about 44 acres, and the cell will have a water surface area of 40 acres and a maximum capacity of
about 1.9 million cubic yards of tailings material storage (as measured below the
required 3-foot freeboard).
d) Liner and Leak Detection Systems - including the following layers, in descending order:
1) Primary Flexible Membrane Liner (FML) - consisting of 60-mil high density
polyethylene (HDPE) membrane that extends across both the entire cell floor and
the inside side-slopes, and is anchored in a trench at the top of the dikes on all four sides. The primary FML will be in direct physical contact with the tailings material over most of the Cell 4B floor area. In other locations, the primary FML will be in contact with the slimes drain collection system (discussed below).
2) Leak Detection System - includes a permeable HDPE geonet that extends across
the entire area under the primary FML in Cell 4B, and drains to a leak detection sump in the southeast corner. Access to the leak detection sump is via an 18-inch inside diameter (ID) PVC pipe placed down the inside slope, located between the primary and secondary FML liners. At its base this pipe will be surrounded with a
gravel filter set in a sump having dimensions of 15 feet by 10 feet by 2 feet deep
that contains a leak detection system sump area. In turn, the gravel filter layer will be enclosed in an envelope of geotextile fabric. The purpose of both the gravel and geotextile fabric is to serve as a filter.
3) Secondary FML - consisting of a 60-mil HDPE membrane found immediately
below the leak detection geonet. Said FML also extends across the entire Cell 4B
floor, up the inside side-slopes and is also anchored in a trench at the top of all four dikes.
4) Geosynthetic Clay Liner - consisting of a manufactured geosynthetic clay liner (GCL) composed of 0.2-inch of low permeability bentonite clay centered and
Part I.D
Permit No. UGW370004
17
stitched between two layers of geotextile. Prior to disposal of any wastewater in
Cell 4B, the Permittee shall demonstrate that the GCL has achieved a moisture content of at least 50% by weight.
e) Slimes Drain Collection System - including a two-part system of strip drains and perforated collection pipes both installed immediately above the primary FML, as
follows:
1) Horizontal Strip Drain System - is installed in a herringbone pattern across the floor of Cell 4B that drain to a “backbone” of perforated collection pipes. These strip drains are made of a prefabricated two-part geo-composite drain material (solid polymer drainage strip) core surrounded by an envelope of non-woven
geotextile filter fabric. The strip drains are placed immediately over the primary
FML on 50-foot centers, where they conduct fluids downgradient in a southwesterly direction to a physical and hydraulic connection to the perforated slimes drain collection pipe. A series of continuous sand bags, filled with filter sand cover the strip drains. The sand bags are composed of a woven polyester
fabric filled with well graded filter sand to protect the drainage system from
plugging.
2) Horizontal Slimes Drain Collection Pipe System - includes a “backbone” piping system of 4-inch ID Schedule 40 perforated PVC slimes drain collection (SDC) pipe found at the downgradient end of the strip drain lines. This pipe is in turn
overlain by a berm of gravel that runs the entire diagonal length of the cell,
surrounded by a geotextile fabric cushion in immediate contact with the primary FML. In turn, the gravel is overlain by a layer of non-woven geotextile to serve as an additional filter material. This perforated collection pipe serves as the “backbone” to the slimes drain system and runs from the far northwest corner
downhill to the far southeast corner of Cell 4B where it joins the slimes drain
access pipe.
3) Slimes Drain Access Pipe - consisting of an 18-inch ID Schedule 40 PVC pipe placed down the inside slope of Cell 4B at the southeast corner, above the primary FML. Said pipe then merges with another horizontal pipe of equivalent diameter
and material, where it is enveloped by gravel and woven geotextile that serves as
a cushion to protect the primary FML. A reducer connects the horizontal 18-inch pipe with the 4-inch SDC pipe. At some future time, a pump will be set in this 18-inch pipe and used to remove tailings wastewaters for purposes of de-watering the tailings cell.
f) Cell 4B North and East Dike Splash Pads - Nine 20-foot-wide splash pads will be constructed on the north and east dikes to protect the primary FML from abrasion and scouring by tailings slurry. These pads will consist of an extra layer of 60 mil HDPE membrane that will be installed in the anchor trench and placed down the inside slope
of Cell 4B, from the top of the dike, under the inlet pipe, and down the inside slope to
a point at least 5 feet onto the Cell 4B floor beyond the toe of the slope.
g) Cell 4B Emergency Spillway - a concrete lined spillway will be constructed near the southeastern corner of the east dike to allow emergency runoff from Cell 4A into Cell 4B. This spillway will be limited to a 6-inch reinforced concrete slab, with a welded
Part I.D
Permit No. UGW370004
18
wire fabric installed within it at its midsection, set atop a cushion geotextile placed
directly over the primary FML in a 4-foot deep trapezoidal channel. A 100-foot wide, 60-mil HDPE membrane splash pad will be installed beneath the emergency spillway. No other spillway or overflow structure will be constructed at Cell 4B. All stormwater runoff and tailings wastewaters not retained in Cells 2 and 3, and 4A will
be managed and contained in Cell 4B, including the Probable Maximum Precipitation
and flood event.
13. BAT Performance Standards for Tailings Cell 4B - the Permittee shall operate and maintain Tailings Cell 4B so as to prevent release of wastewater to groundwater and the environment in accordance with the currently approved Cell 4B BAT, Monitoring,
Operations and Maintenance Plan. Any failure to achieve or maintain the required BAT
performance standards shall constitute a violation of the Permit and shall be reported to the Director in accordance with Part I.G.3. Performance standards for Tailings Cell 4B shall include the following:
a) Leak Detection System (LDS) Maximum Allowable Daily Head - the fluid head in
the LDS shall not exceed 1 foot above the lowest point on the lower flexible
membrane liner on the cell floor. At all times the Permittee shall operate the LDS pump and transducer in a horizontal position at the lowest point of the LDS sump floor.
b) LDS Maximum Allowable Daily Leak Rate - shall not exceed 26,145 gallons/day.
c) Slimes Drain Annual Average Recovery Head Criteria - after the Permittee initiates
pumping conditions in the slimes drain layer in Cell 4B, the Permittee will provide: 1) continuous declining fluid heads in the slimes drain layer, in a manner equivalent to the requirements found in Part I.D.3(b), and 2) a maximum head of 1.0 feet in the tailings (as measured from the lowest point of upper flexible membrane liner) in 5.5
years or less.
d) Maximum Weekly Wastewater Level - under no circumstance shall the freeboard be less than 3-feet in Cell 4B, as measured from the top of the upper FML.
14. BAT Performance Standards for the New Decontamination Pad - the Permittee shall operate and maintain the New Decontamination Pad (NDP) to prevent release of
wastewater to groundwater and the environment in accordance with the currently
approved DMT Monitoring Plan. Any failure to achieve or maintain the required BAT performance standards shall constitute a violation of the Permit and shall be reported to the Director in accordance with Part I.G.3. Performance standards for the NDP shall include, but are not limited to, the following:
a) NDP LDS Access Pipes - the water level shall not exceed 0.10 foot above the
concrete floor in any LDS access pipe, at any time. Compliance will be defined as a depth to standing water present in any of the LDS access pipes of more than or equal to 6.2 feet as measured from the water measuring point (top of access pipe).
b) Soil and debris will be removed from the wash pad of the NDP, in accordance with
the currently approved DMT Monitoring Plan. Cracks in the wash pad greater than
1/8 inch (width) will be repaired within five working days of discovery.
Part I.E.
Permit No. UGW370004
19
E. GROUND WATER COMPLIANCE AND TECHNOLOGY PERFORMANCE MONITORING - beginning
with the effective date and lasting through the term of this Permit or as stated in an approved closure plan, the Permittee shall sample groundwater monitoring wells, tailing cell wastewaters, seeps and springs, monitor groundwater levels, monitor water levels of process solutions, and monitor and keep records of the operation of the facility, as follows:
1. Routine Groundwater Compliance Monitoring - the Permittee shall monitor upgradient,
lateral gradient, and downgradient groundwater monitoring wells completed in the shallow aquifer in the vicinity of all potential discharge sources that could affect local groundwater conditions at the facility, as follows:
a) Ground Water Monitoring Quality Assurance Plan - all groundwater monitoring and
analysis performed under this Permit shall be conducted in accordance with a Quality
Assurance Plan (QAP) currently approved by the Director. Any non-conformance with QAP requirements in a given quarterly groundwater monitoring period will be corrected and reported to the Director on or before submittal of the next quarterly groundwater monitoring report pursuant to Part I.F.1.
b) Quarterly Monitoring - the Permittee shall monitor on a quarterly basis all monitoring
wells listed in Table 2 of this Permit where local groundwater average linear velocity has been found by the Director to be equal to or greater than 10 feet/year. For purposes of this Permit, quarterly monitoring is required at the following wells:
1) Upgradient Wells: none
2) Lateral or Downgradient Wells: MW-11, MW-14, MW-25, MW-26 (formerly
TW4-15), MW-30, MW-31, MW-36.
c) Semi-annual Monitoring - the Permittee shall monitor on a semi-annual basis all monitoring wells listed in Table 2 of this Permit, where local groundwater average linear velocity has been found by the Director to be less than 10 feet/year, and all
general monitoring wells. For purposes of this Permit, semi-annual monitoring is
required at the following wells:
1) Monitoring Wells Listed on Table 2:
i. Upgradient Well: MW-27.
ii. Lateral or Downgradient Wells: MW-2, MW-3A, MW-5, MW-12, MW-
15, MW-17, MW-23, MW-24, MW-28, MW-29, and MW-32 (formerly
TW4-17), MW-35, and MW-37.
2) General Monitoring Wells:
i. Upgradient Wells: MW-1, MW-18, and MW-19.
ii. Lateral or Downgradient Wells: TW4-24, MW-20 and MW-22.
d) Compliance Monitoring Parameters - all groundwater samples collected shall be
analyzed for the following parameters:
1) Field Parameters - depth to groundwater, pH, temperature, specific conductance, dissolved oxygen, and redox potential (Eh).
2) Laboratory Parameters
Part I.E.
Permit No. UGW370004
20
i. GWCL Parameters - all contaminants specified in Table 2.
ii. General Inorganics - chloride, sulfate, carbonate, bicarbonate, sodium, potassium, magnesium, calcium, and total anions and cations.
e) Special Provisions for Groundwater Monitoring - the Permittee shall ensure that all groundwater monitoring conducted and reported complies with the following
requirements:
1) Depth to Groundwater Measurements - shall always be made to the nearest 0.01 foot.
2) Minimum Detection Limits - all groundwater quality analyses reported shall have a minimum detection limit or reporting limit that is less than its respective Ground
Water Compliance Limit concentration defined in Table 2.
3) Gross Alpha Counting Variance - all gross alpha analysis shall be reported with an error term. All gross alpha analysis reported with an activity equal to or greater than the GWCL, shall have a counting variance that is equal to or less than 20% of the reported activity concentration. An error term may be greater than 20% of
the reported activity concentration when the sum of the activity concentration and
error term is less than or equal to the GWCL.
4) All equipment used for purging and sampling of groundwater shall be made of inert materials.
2. Groundwater Monitoring: General Monitoring Wells - Upgradient wells MW-1, MW-18,
and MW-19; Lateral Monitoring Well TW4-24; and Downgradient wells MW-20 and
MW-22. The Permittee shall monitor wells MW-1, MW-18, MW-19, TW4-24, MW-20 and MW-22 on a semi-annual basis. Said sampling shall comply with the following Permit requirements, but shall not be considered compliance monitoring for the purposes of Part G:
a) Routine groundwater compliance monitoring requirements of Part I.E.1.
b) Groundwater head monitoring requirements of Part I.E.3
c) Well monitoring procedure requirements of Part I.E.5.
3. Groundwater Head Monitoring - on a quarterly basis and at the same frequency as groundwater monitoring required by Part I.E.1, the Permittee shall measure depth to
groundwater in the following wells and/or piezometers:
a) Point of Compliance Wells - identified in Table 2 and Part I.E.1 of this Permit.
b) Piezometers - P-1, P-2, P-3, P-4, and P-5.
c) Head Monitoring Well - MW-34.
d) General Monitoring Wells - Upgradient wells MW-1, MW-18, and MW-19; Lateral
well TW4-24; and Downgradient wells MW-20 and MW-22.
e) Contaminant Investigation Wells - any well required by the Director as a part of a contaminant investigation or groundwater corrective action.
f) Any other wells or piezometers required by the Director.
Part I.E.
Permit No. UGW370004
21
4. Groundwater Monitoring Well Design and Construction Criteria - all new groundwater
monitoring wells installed at the facility shall comply with the following design and construction criteria:
a) Located as close as practical to the contamination source, tailings cell, or other potential origin of groundwater pollution.
b) Screened and completed in the shallow aquifer.
c) Designed and constructed in compliance with UAC R317-6-6.3(I)(6), including the EPA RCRA Ground Water Monitoring Technical Enforcement Guidance Document, 1986, OSWER-9950.1.
d) Aquifer tested to determine local hydraulic properties, including but not limited to
hydraulic conductivity.
5. Monitoring Procedures for Wells - beginning with the date of Permit issuance, all monitoring shall be conducted by the Permittee in conformance with the following procedures:
a) Sampling - grab samples shall be taken of the groundwater, only after adequate
removal or purging of standing water within the well casing has been performed.
b) Sampling Plan - all sampling shall be conducted to ensure collection of representative samples, and reliability and validity of groundwater monitoring data.
c) Laboratory Approval - all analyses shall be performed by a laboratory certified by the State of Utah to perform the tests required.
d) Damage to Monitoring Wells - if any monitor well is damaged or is otherwise
rendered inadequate for its intended purpose, the Permittee shall notify the Director in writing within five calendar days of discovery.
e) Field Monitoring Equipment Calibration and Records - immediately prior to each monitoring event, the Permittee shall calibrate all field monitoring equipment in
accordance with the respective manufacturer's procedures and guidelines. The
Permittee shall make and preserve on-site written records of such equipment calibration in accordance with Part II.G and H of this Permit. Said records shall identify the manufacturer's and model number of each piece of field equipment used and calibration.
6. White Mesa Seeps and Springs Monitoring - the Permittee shall conduct annual
monitoring of all seeps and springs identified in the currently approved Sampling Plan for Seeps and Springs in the Vicinity of the White Mesa Uranium Mill. Said monitoring shall include, but is not limited to:
a) Field Measurements - including: pH, temperature, and specific conductivity.
b) Water Quality Sampling and Analysis - the Permittee shall collect grab samples and
perform laboratory analysis of all water quality parameters identified in Table 2 of this Permit.
c) Certified Laboratory Analysis - all laboratory analysis will be conducted by a Utah certified laboratory.
d) Analytical Methods - all laboratory analysis shall be conducted using analytical
methods listed in the currently approved QAP pursuant to Part I.E.1 of this Permit.
Part I.E.
Permit No. UGW370004
22
e) Minimum Detection Limits - all seeps or springs water quality analyses reported shall
have a minimum detection limit or reporting limit that is less than or equal to the respective:
1) Ground Water Quality Standards concentrations defined in Table 2 of this Permit, and
2) For TDS, Sulfate, and Chloride, the Minimum Detection Limit for those
constituents for seeps and springs monitoring will be as follows: 10 mg/L, 1 mg/L, and 1 mg/L, respectively.
f) Quality Control Samples - the Permittee will conduct quality control (QC) sampling and analysis as a part of all seeps and springs sampling, in accordance with the
requirements of Section 4.3 of the currently approved QAP; pursuant to Part I.E.1 of
this Permit. Said QC samples shall include, but are not limited to: trip blanks, duplicate samples, and equipment rinse blanks.
g) Prior Notification - at least 15 calendar days before any fieldwork or water quality sample collection, the Permittee shall provide written notice to allow the Director to
observe or split sample any or all seeps or springs.
7. DMT Performance Standards Monitoring - the Permittee shall perform technology performance monitoring in accordance with the currently approved DMT Monitoring Plan to determine if DMT is effective in minimizing and controlling the release of contaminants pursuant to the provisions of Parts I.D.1 and I.D.3 of this Permit, including,
but not limited to the following activities:
a) Weekly Tailings Wastewater Pool Elevation Monitoring: Cells 1 and 3 - the Permittee shall monitor and record weekly the elevation of wastewater in Tailings Cells 1 and 3 to ensure compliance with the maximum wastewater elevation criteria mandated by Condition 10.3 of the License. Said measurements shall be made from a wastewater
level gauge or elevation survey to the nearest 0.01 foot.
b) Quarterly Slimes Drain Water Level Monitoring: Cells 2 and 3 - the Permittee shall monitor and record quarterly the depth to wastewater in the slimes drain access pipes as described in Part I.D.3 of this Permit and the currently approved DMT Monitoring Plan at Tailings Cells 2 and 3 to determine the recovery head. For purposes of said
monitoring, the Permittee shall at each tailings cell:
1) Perform at least 1 separate slimes drain recovery test at each disposal cell in each quarterly period of each calendar year that meets the requirements of Part I.D.3,
2) Designate, operate, maintain, and preserve one water level measuring point at the centerline of the slimes drain access pipe that has been surveyed and certified by a
Utah licensed engineer or land surveyor,
3) Make all slimes drain recovery head test (depth to fluid) measurements from the same designated water level measuring point, and
4) Record and report all fluid depth measurements to the nearest 0.01 foot.
5) For Cell 3 these requirements shall apply upon initiation of tailings de-watering
operations.
Part I.E.
Permit No. UGW370004
23
c) Weekly Feedstock Storage Area Inspection - the Permittee shall conduct weekly
inspections of all feedstock storage to: 1) Confirm the bulk feedstock materials are maintained within the approved Feedstock Storage Area defined by Table 4, and 2) Verify that all alternate feedstock materials located outside the Feedstock Area defined in Table 4, are stored in accordance with the requirements found in Part
I.D.11.
d) Feedstock Material Stored Outside the Feedstock Storage Area Inspections
a) Weekly Inspection - the Permittee will conduct weekly inspections to verify that each feed material container complies with the requirements of Part I.D.11.
b) Hardened Surface Storage Area - in the event the Permittee constructs a hardened
surface storage area for feed materials, pursuant to Part I.D.11, prior Director
approval will be secured for the following:
i. Engineering Design and Specifications - in accordance with the requirements of Part I.D.4, and
ii. Operation and Maintenance Plan.
e) Inspections of Tailing Cell and Pond Liner Systems - the Permittee shall inspect the
liner system at Tailing Cells 1, 2, and 3 on a daily basis pursuant to the requirements of Sections 2.1 and 2.2 of the currently approved DMT Monitoring Plan. In the event that any liner defect or damage is identified during a liner system inspection, the Permittee shall: 1) report and repair said defect or damage pursuant to Part I.G.3 by
implementation of the currently approved Liner Maintenance Provisions, and 2)
report all repairs made pursuant to Part I.F.2.
f) Weekly New Decontamination Pad Inspection - the Permittee shall conduct weekly inspections of the New Decontamination Pad as described in Part I.D.14 of this Permit and the currently approved DMT Monitoring Plan.
8. Cell 4A BAT Performance Standards Monitoring and Maintenance - in accordance with
the currently approved Cell 4A BAT, Monitoring, Operations and Maintenance Plan, the Permittee shall immediately implement all monitoring and recordkeeping requirements therein. The Cell 4A BAT monitoring includes the following:
a) Weekly Leak Detection System (LDS) Monitoring - including:
1) Leak Detection System Pumping and Monitoring Equipment - the Permittee shall
provide continuous operation of the leak detection system pumping and monitoring equipment, including, but not limited to, the submersible pump, pump controller, head monitoring, and flow meter equipment approved by the Director. Failure of any LDS pumping or monitoring equipment not repaired and made
fully operational within 24-hours of discovery shall constitute failure of BAT, and
a violation of this Permit.
2) Maximum Allowable Head - the Permittee shall measure the fluid head above the lowest point on the secondary flexible membrane by the use of procedures and equipment approved by the Director. Under no circumstance shall fluid head in
the leak detection system sump exceed a 1-foot level above the lowest point in the
lower flexible membrane liner on the cell floor. For purposes of compliance
Part I.E.
Permit No. UGW370004
24
monitoring this 1-foot distance shall equate to 2.28 feet above the leak detection
system transducer.
3) Maximum Allowable Daily LDS Flow Rates - the Permittee shall measure the volume of all fluids pumped from the LDS. Under no circumstances shall the average daily LDS flow volume exceed 24,160 gallons/day.
4) 3-foot Minimum Vertical Freeboard Criteria - the Permittee shall operate and
maintain wastewater levels to provide a 3-foot Minimum of vertical freeboard in Tailings Cell 4A. Said measurements shall be made to the nearest 0.1 foot.
b) Quarterly Slimes Drain Recovery Head Monitoring - immediately after the Permittee initiates pumping conditions in the Tailings Cell 4A slimes drain system, quarterly
recovery head tests and fluid level measurements will be made in accordance with the
requirements of Parts I.D.3 and I.E.7(b) of this Permit and the currently approved Cell 4A BAT, Monitoring, Operations and Maintenance Plan.
c) Liner Maintenance and Repair - all repairs to the liner shall be completed in accordance with Section 9.4 of the approved June 2007 Geosyntec Consultants Cell
4A Construction Quality Assurance Plan (CQA/QC Plan) as found in Table 5 of this
Permit. Repairs shall be performed by qualified liner repair personnel and shall be reported in a Liner Repair Report, certified by a Utah licensed Professional Engineer. The Liner Repair Report shall be submitted to for Director approval in accordance with Part I.F.3 of the Permit. Any leak, hole, or other damage to the liner will be
reported to the Director pursuant to the requirements found in Part I.G.3.
9. On-site Chemicals Inventory - the Permittee shall monitor and maintain a current inventory of all chemicals used at the facility at rates equal to or greater than 100 kg/yr. Said inventory shall be maintained on-site, and shall include, but is not limited to:
a) Identification of chemicals used in the milling process and the on-site laboratory, and
b) Determination of volume and mass of each raw chemical currently held in storage at
the facility.
10. Tailings Cell Wastewater Quality Monitoring - on an annual basis, the Permittee shall collect wastewater quality samples from each wastewater source at each tailings cell at the facility, including, but not limited to:
a) One surface impounded wastewater location at each of Tailings Cells 1, 3, 4A, and
4B.
b) One slimes drain wastewater access pipe at each of Tailings Cells 2, 3, 4A, and 4B. For Cells 3, 4A, and 4B, this requirement shall apply immediately after initiation of de-watering operations at these cells, and
c) One leak detection wastewater access pipe at Tailings Cells 4A and 4B.
d) All such sampling shall be conducted in August of each calendar year in compliance with the currently approved White Mesa Uranium Mill Tailing and Slimes Drain Sampling Program. Said annual monitoring shall include, but is not limited to:
1) Water Quality Sampling and Analysis - the Permittee shall collect grab samples
and perform laboratory analysis of all:
i. Water quality parameters identified in Table 2 of this Permit, and
Part I.E.
Permit No. UGW370004
25
ii. Semi-volatile compounds identified in EPA Method 8270D.
2) Certified Laboratory Analysis - all laboratory analysis will be conducted by a Utah certified laboratory.
3) Analytical Methods - all laboratory analysis shall be conducted using analytical methods listed in the currently approved QAP pursuant to Part I.E.1 of this
Permit.
4) Minimum Detection Limits - all water quality analyses reported shall have a minimum detection limit or reporting limit that is less than or equal to the respective:
i. Ground Water Quality Standards concentrations defined in Table 2 of this
Permit,
ii. For TDS, Sulfate, and Chloride, the Minimum Detection Limit for those constituents for Tailing Cell wastewater monitoring will be as follows: 1,000 mg/L, 1,000 mg/L, and 1 mg/L, respectively, and
iii. Lower limits of quantitation for groundwater for semi-volatile organic
compounds listed in Table 2 of EPA Method 8270D, Revision 4, dated
February, 2007.
5) Quality Control Samples - the Permittee will conduct quality control (QC) sampling and analysis as a part of all tailings wastewater sampling, in accordance with the requirements of Section 4.3 of the currently approved QAP; pursuant to
Part I.E.1 of this Permit. Said QC samples shall include, but are not limited to:
trip blanks, duplicate samples, and equipment rinse blanks.
6) Prior Notification - at least 30 calendar days before any water quality sample collection, the Permittee shall provide written notice to allow the Director to observe or split sample any tailings cell, slimes drain, or leak detection
wastewaters.
7) Sample Omission - in the course of each annual sampling event, the Permittee shall sample and analyze all tailings cell, slimes drain, and leak detection wastewater sources identified in the currently approved Tailings and Slimes Drain Sampling Program (pp. 1-3), or as required by this Permit, whichever is greater.
The Permittee shall not omit sampling of any of tailings cell wastewater source
during said annual event, without prior written approval from the Director.
11. Groundwater Monitoring Modifications - before any modification of groundwater monitoring or analysis procedures, methods, or equipment, the Permittee must obtain prior written approval from the Director.
12. Cell 4B BAT Performance Standards Monitoring and Maintenance - immediately
following Director approval of the Cell 4B BAT, Monitoring, Operations and Maintenance Plan, the Permittee shall immediately implement all monitoring and recordkeeping requirements therein. The Cell 4B BAT monitoring shall include the following: Weekly Leak Detection System (LDS) Monitoring - including:
1) Leak Detection System Pumping and Monitoring Equipment - the Permittee shall
provide continuous operation of the leak detection system pumping and
Part I.E.
Permit No. UGW370004
26
monitoring equipment, including, but not limited to, the submersible pump, pump
controller, head monitoring, and flow meter equipment approved by the Director. Failure of any LDS pumping or related monitoring equipment not repaired and made fully operational within 24-hours of discovery shall constitute failure of BAT, and a violation of this Permit.
2) Maximum Allowable Head - the Permittee shall measure the fluid head above the
lowest point on the secondary flexible membrane by the use of procedures and equipment approved by the Director. Under no circumstance shall fluid head in the leak detection system (LDS) sump exceed a 1-foot level above the lowest point in the lower flexible membrane liner on the cell floor. Any occurrence of
leak detection system fluids above this 1-foot limit shall constitute failure of
BAT, and a violation of this Permit.
3) Maximum Allowable Daily LDS Flow Rates - the Permittee shall measure the volume of all fluids pumped from the LDS. Under no circumstances shall the average daily LDS flow volume exceed 26,145 gallons/day.
4) 3-foot Minimum Vertical Freeboard Criteria - the Permittee shall operate and
maintain wastewater levels to provide a 3-foot Minimum of vertical freeboard in Tailings Cell 4B. Said measurements shall be made to the nearest 0.1 foot.
b) Quarterly Slimes Drain Recovery Head Monitoring - immediately after the Permittee initiates pumping conditions in the Tailings Cell 4B slimes drain system, quarterly
recovery head tests and fluid level measurements will be made in accordance with the
requirements of Parts I.D.3 and I.E.7(b) of this Permit and the currently approved Cell 4B BAT, Monitoring, Operations and Maintenance Plan.
c) Liner Maintenance and Repairs - all repairs to the liner shall be completed in accordance with Section 10.4 of the approved August 2009 Geosyntec Consultants
Cell 4B Construction Quality Assurance Plan (CQA/QC Plan) as found in Table 6 of
this Permit. Repairs shall be performed by qualified liner repair personnel and shall be reported in a Liner Repair Report, certified by a Utah licensed Professional Engineer. The Liner Repair Report shall be submitted for Director approval in accordance with Part I.F.3 of the Permit. Any leak, hole, or other damage to the liner
will be reported pursuant to the requirements found in Part I.G.3.
Part I.F.
Permit No. UGW370004
27
F. REPORTING REQUIREMENTS - The following reporting procedures for routine and compliance reports must be met.
1. Routine Groundwater Monitoring Reports - the Permittee shall submit quarterly monitoring reports of field and laboratory analyses of all well monitoring and samples
described in Parts I.E.1, I.E.2, I.E.3, and I.E.5 of this Permit for Director review and
approval. Reports shall be submitted according to the following schedule:
Table 7. Groundwater Monitoring Reporting Schedule
Quarter Period Due Date
First January - March June 1
Second April - June September 1
Third July - September December 1
Fourth October - December March 1
Failure to submit the reports by the due date shall be deemed as noncompliance with this
Permit. Said monitoring reports shall include, but are not limited to, the following
minimum information:
a) Field Data Sheets - or copies thereof that provide the following: well name, date and time of well purging, date and time of well sampling, type and condition of well pump, depth to groundwater before purging and sampling, calculated well casing volume, volume of water purged before sampling, volume of water collected for
analysis, types of sample containers and preservatives.
b) Laboratory Results - or copies thereof that provide the following: date and time sampled, date received by laboratory, and for each parameter analyzed, the following information: laboratory result or concentration, units of measurement, minimum detection limit or reporting limit, analytical method, date of analysis, counting error
for radiological analyses, total cations and anions for inorganic analysis.
c) Water Table Contour Map - which provides the location and identity of all wells sampled that quarter, the measured groundwater elevation at each well measured in feet above mean sea level, and isocontour lines to delineate groundwater flow directions observed during the quarterly sampling event.
d) Quality Assurance Evaluation and Data Validation - including a written description and findings of all quality assurance and data validation efforts conducted by the Permittee in compliance with the currently approved Groundwater Monitoring Quality Assurance Plan. Said report shall verify the accuracy and reliability of the groundwater quality compliance data, after evaluation of sample collection techniques
and equipment, sample handling and preservation, analytical methods used, etc
e) Non-conformance disclosure - with each quarterly groundwater monitoring report the Permittee shall fully and completely disclose all non-conformance with requirements of the currently approved QAP, mandated by Part I.E.1(a).
f) Electronic Data Files and Format - in addition to written results required for every
sampling report, the Permittee shall provide an electronic copy of all laboratory results for groundwater quality monitoring conducted. Said electronic files shall
Part I.F.
Permit No. UGW370004
28
consist of Comma Separated Values (CSV) format, or as otherwise approved by the
Director.
g) Time Concentration Plots - with each quarterly groundwater monitoring report the Permittee shall submit time concentration plots for each monitoring well for the following constituents: chloride, fluoride, sulfate, and uranium.
2. Routine DMT Performance Standards Monitoring Report - the Permittee shall provide
quarterly monitoring reports of all DMT performance standards monitoring required by Parts I.D.3 and I.E.7 of this Permit. DMT monitoring shall be conducted in compliance with this Permit and the currently approved DMT Monitoring Plan. When a liner repair is performed at any DMT impoundment, a Repair Report is required by the Liner
Maintenance Provisions. This Repair Report shall be included with the next quarterly
DMT Report. Said monitoring reports and results shall be submitted for Director approval on the schedule provided in Table 7, above.
3. Routine Cell 4A and 4B BAT Performance Standards Monitoring Reports - the Permittee shall provide quarterly monitoring reports of all BAT performance standards monitoring
required by Parts I E.8 and I.E.12 of this Permit. BAT Monitoring at Cells 4A and 4B
shall be conducted in compliance with the currently approved BAT Monitoring, Operations and Maintenance Plan. When a liner repair is performed at Tailings Cell 4A or 4B, a Repair Report is required by Parts I.E.8(c) and I.E.12(c) of the Permit. This Repair Report shall be included with the next quarterly BAT Report. Said monitoring
report and results shall be submitted for Director approval on the schedule provided in
Table 7 above. At a minimum, reporting of BAT monitoring for Cells 4A and 4B will include:
a) LDS Monitoring - including:
1) Report on the operational status of the LDS pumping and monitoring equipment
during the quarter, including identification of any intervals of non-operational
status and repairs.
2) Measurement of the weekly fluid head at the lowest point of the secondary membrane.
3) Measurement of the volume of all fluids pumped from the LDS.
b) Measurement of the weekly wastewater fluids elevation in the Cells 4A and 4B to
determine freeboard.
c) Slimes Drain Recovery Head Monitoring as per the requirements of Parts I.D.6 and I.E.8(b).
4. DMT and BAT Performance Upset Reports - the Permittee shall report any non-
compliance with the DMT or BAT performance criteria of Part I.D in accordance with
the requirements of Part I.G.3 of this Permit.
5. Other Information - when the Permittee becomes aware of a failure to submit any relevant facts in the permit application or submittal of incorrect information in a permit
Part I.F.
Permit No. UGW370004
29
application or in any report to the Director, the Permittee shall submit such facts or
information within 10 calendar days of discovery.
6. Groundwater Monitoring Well As-Built Reports - as-built reports for new groundwater monitoring wells shall be submitted for Director approval within 60 calendar days of well completion, and at a minimum will include the following information:
a) Geologic Logs - that detail all soil and rock lithologies and physical properties of all
subsurface materials encountered during drilling. Said logs shall be prepared by a Professional Geologist licensed by the State of Utah, or otherwise approved beforehand by the Director.
b) Well Completion Diagram - that detail all physical attributes of the well construction,
including:
1) Total depth and diameters of boring,
2) Depth, type, diameter, and physical properties of well casing and screen, including well screen slot size,
3) Depth intervals, type and physical properties of annular filterpack and seal
materials used,
4) Design, type, diameter, and construction of protective surface casing, and
5) Survey coordinates prepared by a State of Utah licensed engineer or land surveyor, including horizontal coordinates and elevation of water level measuring point, as measured to the nearest 0.01 foot.
c) Aquifer Permeability Data - including field data, data analysis, and interpretation of
slug test, aquifer pump test or other hydraulic analysis to determine local aquifer hydraulic conductivity in each well.
7. White Mesa Seeps and Springs Monitoring Reports - a seeps and springs monitoring report shall be submitted for Director review and approval with the 4th Quarter Routine
Groundwater Monitoring Report due on March 1, of each calendar year. Said report shall
include, but is not limited to:
a) Field Measurement Results and Worksheets - for each sample collected that comply with the requirements of Part I.F.1(a) of this Permit,
b) Laboratory Results - for each sample collected that comply with the requirements of Part I.F.1(b) of this Permit,
c) Water Table Contour Map - that includes groundwater elevations for each well at the facility and the elevations of the phreatic surfaces observed at each of the seeps and springs sampled. The contour map will include all water level data measurements from seeps, springs, and monitoring wells at the site from the 3rd Quarter Routine
Groundwater Monitoring event of each year. The contour map shall be at a map scale,
such that, all seeps and springs listed in the approved Sampling Plan for Seeps and Springs in the Vicinity of the White Mesa Uranium Mill and the monitoring wells on site may be seen on one map,
d) Data Evaluation - and interpretation of all groundwater quality data collected,
Part I.F.
Permit No. UGW370004
30
e) Quality Assurance Evaluation and Data Validation - for the seeps and springs water
quality data that meets the requirements of Part I.F.1(d),
f) Electronic Data Files and Format - that meet the requirements of Part I.F.1(e) of this Permit, and
g) Survey data for the seeps and springs shall be based on an elevation survey,
conducted under the direction of and certified by a Utah licensed professional
engineer or land surveyor. The survey will include State Plan Coordinates (northings and eastings) and vertical elevations. The surveyed coordinates and elevations of the seeps and springs shall be within 1 foot of the highest point of the saturated seepage face on the day of the survey. This survey data must be obtained before any samples
are collected.
8. Chemicals Inventory Report - at the time of submittal of an application for Permit renewal the Permittee shall submit a report to update the facilities chemical inventory report. Said report shall include:
a) Identification of all chemicals used in the milling and milling related processes at the
White Mesa Mill, and
b) Provide all inventory information gathered pursuant to Part I.E.9,
c) Determination of the total volumes currently in use and historically used, as data is available.
9. Tailings Cell Wastewater Quality Reports - all annual wastewater quality sampling and
analysis required by Part I.E.10 shall be reported to the Director with the 3rd Quarter
groundwater quality report due on December 1, of each calendar year. Said report shall include:
a) Data evaluation and interpretation of all wastewater quality samples collected,
b) All information required by Part I.F.1(a), (b), (d), and (e) of this Permit, and
c) For slimes drain samples, the Permittee shall report depth to wastewater
measurements from the water level measurement point. Said wastewater level shall be measured immediately before sample collection.
10. Revised Hydrogeologic Report - pursuant to Part IV.D of this Permit, and at least 180 calendar days prior to Permit expiration, the Permittee shall submit for Director approval a revised hydrogeologic report for the facility and surrounding area. Said report shall
provide a comprehensive update and evaluation of:
a) Local hydrogeologic conditions in the shallow aquifer, including, but not limited to: local geologic conditions; time relationships and distribution of shallow aquifer head measurements from facility wells and piezometers; local groundwater flow directions; and distribution of aquifer permeability and average linear groundwater velocity
across the site, and
b) Well specific groundwater quality conditions measured at facility monitoring wells for all groundwater monitoring parameters required by this Permit, including, but not limited to: temporal contaminant concentrations and trends from each monitoring well; statistical tests for normality of each contaminant and well, including univariate
Part I.F.
Permit No. UGW370004
31
or equivalent tests; calculation of the mean concentration and standard deviation for
each well and contaminant.
11. Annual Slimes Drain Recovery Head Report - on or before March 1 of each year the Permittee shall submit for Director approval an annual slimes drain recovery head report for Tailings Cells 2 and 3. Said report shall conform to the requirements of Part I.D.3(b),
I.E.7(b), and II.G of this Permit, and:
a) Provide the individual slimes drain recovery head monitoring data for the previous calendar year, including, but not limited to: date and time for the start and end of recovery test, initial water level, final depth to stable water level and equivalent recovery water level elevation.
b) Calculate the average slimes drain recovery head for the previous calendar year.
c) Include a time series chart to show trends of the recovery water level elevations at each slimes drain.
d) Include the results of a quality assurance evaluation and data validation. Said examination shall provide written descriptions and findings that:
1) Evaluate all data collected, data collection methods, and all related calculations
required by this Permit, and
2) Verify the accuracy and reliability of both the data and calculations reported.
e) Demonstrate compliance status with the requirements of Part I.D.3(b) and I.E.7(b) of this Permit.
12. Decontamination Pads Annual Inspection Report - the New Decontamination Pad and
Existing Decontamination Pad will be taken out of service and inspected annually during the second quarter of each year, to ensure integrity of the concrete wash pad surfaces. If physical defects in the wash pad as defined by Part I.D.14 of the Permit are identified during the inspection, repairs shall be made prior to resuming the use of the facility. Said
defects include, but are not limited to concrete deterioration, cracking, subsidence, etc.
The results of the annual inspection and all repairs will be documented on inspection forms in accordance with the currently approved DMT Monitoring Plan. The inspection forms and documentation of all repairs completed shall be included in the 2nd Quarter DMT Monitoring Report due September 1, of each calendar year.
Part I.G
Permit No. UGW370004
32
G. OUT OF COMPLIANCE STATUS
1. Accelerated Monitoring Status - is required if the concentration of a pollutant in any compliance monitoring sample exceeds a GWCL in Table 2 of the Permit; the facility shall then:
a) Notify the Director in writing (the Exceedance Notice) within 30 calendar days of
receipt of the last analytical data report for samples collected within a quarter,
including quarterly and monthly samples, but no later than 60 days after the end of the quarter, and
b) Initiate accelerated sampling of the pollutant as follows:
1) Quarterly Baseline Monitoring Wells - for wells defined by Part I.E.1(b) the
Permittee shall initiate monthly monitoring. Monthly monitoring shall begin the
month following the month in which the Exceedance Notice is provided to the Director.
2) Semi-annual Baseline Monitoring Wells - for wells defined by Part I.E.1(c) the Permittee shall initiate quarterly monitoring. Quarterly monitoring shall begin the
quarter following the quarter in which the Exceedance Notice is provided to the
Director.
3) Said accelerated monitoring shall continue at the frequencies defined above until the compliance status of the facility can be determined by the Director.
2. Violation of Permit Limits - out-of-compliance status exists when the concentration of a
pollutant in two consecutive samples from a compliance monitoring point exceeds a
GWCL in Table 2 of this Permit.
3. Failure to Maintain DMT or BAT Required by Permit
a) Permittee to Provide Information - in the event that the Permittee fails to maintain DMT or BAT or otherwise fails to meet DMT or BAT standards as required by the
Permit, the Permittee shall submit to the Director a notification and description of the
failure according to R317-6-6.16(C)(1). Notification shall be given orally within 24- hours of the Permittee's discovery of the failure of DMT or BAT, and shall be followed up by written notification, including the information necessary to make a determination under R317-6-6.16(C)(2), within five calendar days of the Permittee's
discovery of the failure of best available technology.
b) The Director shall use the information provided under R317-6-6.16.C(1) and any additional information provided by the Permittee to determine whether to initiate a compliance action against the Permittee for violation of Permit conditions. A compliance action shall not be initiated, if the Director determines that the Permittee
has met the standards for an affirmative defense, as specified in R317-6-
6.16(C)(3)(c).
c) Affirmative Defense - in the event a compliance action is initiated against the Permittee for violation of Permit conditions relating to best available technology or DMT, the Permittee may affirmatively defend against that action by demonstrating
the following:
1) The Permittee submitted notification according to R317-6-6.13,
Part I.G
Permit No. UGW370004
33
2) The failure was not intentional or caused by the Permittee's negligence, either in
action or in failure to act,
3) The Permittee has taken adequate measures to meet Permit conditions in a timely manner or has submitted to the Director, for the Director's approval, an adequate plan and schedule for meeting Permit conditions, and
4) The provisions of UCA 19-5-107 have not been violated.
4. Facility Out of Compliance Status - if the facility is out of compliance, the following is required:
a) The Permittee shall notify the Director of the out of compliance status within 24-hours after detection of that status, followed by a written notice within 5 calendar
days of the detection.
b) The Permittee shall continue accelerated sampling pursuant to Part I.G.1, unless the Director determines that other periodic sampling is appropriate, until the facility is brought into compliance.
c) The Permittee shall prepare and submit to the Director within 30 calendar days
following the date the Exceedance Notice is submitted to the Director, a plan and a
time schedule for assessment of the sources, extent and potential dispersion of the contamination, and an evaluation of potential remedial action to restore and maintain groundwater quality to insure that Permit limits will not be exceeded at the compliance monitoring point and that DMT or BAT will be reestablished.
d) The Director may require immediate implementation of the currently approved
contingency plan in order to regain and maintain compliance with the Permit limit standards at the compliance monitoring point or to reestablish DMT or BAT as defined in the Permit.
e) Where it is infeasible to reestablish DMT or BAT as defined in the Permit, the
Permittee may propose an alternative DMT or BAT for approval by the Director.
Part I.H
Permit No. UGW370004
34
H. COMPLIANCE SCHEDULE REQUIREMENTS. The Permittee will comply with the schedules as
described and summarized below:
1. Slimes Drain Compliance Plan - Within two (2) years after the effective date of the Permit Renewal (January 19, 2018), the Permittee shall submit a Slimes Drain Compliance Plan for Director Review and Approval. The Plan shall include measures to
ensure that wastewater removal from the tailings cell slimes drain is effectively
dewatering the tailings to the extent practicable in order to allow placement of final cover within specified time frames. The Plan may incorporate multiple methods to evaluate the effectiveness of tailings cell dewatering and projected timelines for placement of final tailings cell cover, including, but not limited to; 1. Demonstration of decreasing fluid
elevation trends as measured by slimes drain recovery tests; 2. Evaluations of head data
from piezometers installed in the affected tailings cell demonstrating net dewatering, and 3. Demonstration of decreasing trends in cell settlement monitoring. The Plan shall include specific measures for Tailings Cell 2 and will incorporate Tailings Cell 3 after initiation of dewatering operations.
2. Installation of New Groundwater Monitoring Wells – the Permittee shall install three new
groundwater monitoring wells within 90 calendar days of issuance of the Permit, designated MW-38, MW-39 and MW-40, located southeast of the tailings cells between monitoring wells MW-17 and MW-22. Specifically, the monitoring well locations shall include the three locations identified by the Permittee in Figure 1 attached to the January
2018 License/Permit Statement of Basis. These monitoring wells shall be drilled and
installed in accordance with the following requirements:
a) All new monitoring wells must be properly designed, installed, screened/completed, and developed in accordance with Part I.E.4 of the Permit.
b) All new monitoring well screens will fully encompass the Burro Canyon
Formation saturated zone.
c) All new monitoring wells will be designed to be monitored for the full suite of monitoring parameters listed in the Permit Table 2.
d) On or before August 31, 2018 or as otherwise approved by the Director, the Permittee shall submit a monitoring well As- built report for the monitoring wells
installed to document the well construction. The As-built report shall comply
with the requirements of Part I.F.6.
e) The Permittee shall provide at least a 14 calendar day written notice prior to field drilling and construction of the monitoring wells to allow the Director to observe all drilling and well installation activities.
3. Background Groundwater Quality Report for Wells MW-38, MW-39, MW-40 - within
30 calendar days of Director approval of the new monitoring well As-built Report, required by Part I.H.2, above, the Permittee shall commence a quarterly groundwater sampling program that will comply with the following Permit requirements:
Part I.H
Permit No. UGW370004
35
a) Routine groundwater compliance monitoring requirements of Part I.E.1.
b) Well monitoring procedure requirements of Part I.E.5.
c) After completion of eight consecutive quarters of groundwater sampling and analysis of wells MW-38, MW-39, MW-40 required by Part I.H.2, the Permittee shall submit a Background Report for Director approval, that will include:
1) Data preparation and statistical analysis of groundwater quality data,
including, but not limited to, evaluation of data characteristics and internal data consistency, treatment of non-detectable values, and statistical methods used. These statistics shall be calculated using the Decision Tree/Flowchart used for the previous Background Reports that was conditionally approved by
the DRC on August 24, 2007.
2) Shallow aquifer average linear groundwater velocity calculated for the new wells, based on well specific hydraulic conductivity, hydraulic gradient, and effective aquifer porosity.
d) If after review of the report, and the Director determines that additional
information is required, the Permittee shall provide all requested information,
resolve all issues identified, and re-submit the report for Director review and approval within a timeframe approved by the Director. After approval of this report, the Director will re-open this Permit and establish an appropriate monitoring frequency with the criteria found in Part I.E.1(b). Designation of these
wells as “compliance” or “general” monitoring wells will be determined after
analysis of the Background Quality Groundwater Report. If the new wells are determined to be compliance wells, the Director will establish Groundwater Compliance Limits in Table 2 for wells MW-38, MW-39, MW-40.
4. Revised Groundwater Quality Assurance Plan to Include Dissolved Oxygen – The
Permittee shall update the White Mesa Mill Groundwater Quality Assurance Plan
(QAP) to include the collection of dissolved oxygen during field sampling (QAP Parts6.2.2 and Attachment 2-3 (Purging Procedures) and field sampling form) and submit a draft copy of the updated QAP including the updated field sampling form to The Director for review and approval within 60 calendar days of issuance of the
modified Permit. The Permittee shall commence field sampling of dissolved oxygen
within 30 days of the Director approval of the revised QAP in conformance with Part I.E.1d of the Permit.
Part II
Permit No. UGW370004
36
PART II. REPORTING REQUIREMENTS
A. REPRESENTATIVE SAMPLING. Samples taken in compliance with the monitoring requirements established under Part I shall be representative of the monitored activity.
B. ANALYTICAL PROCEDURES. Water sample analysis must be conducted according to test
procedures specified under UAC R317-6-6.3.12 unless other test procedures have been
specified in this Permit.
C. PENALTIES FOR TAMPERING. The Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this Permit shall, upon conviction, be punished by a fine of not more than $10,000 per
violation, or by imprisonment for not more than six months per violation, or by both.
D. REPORTING OF MONITORING RESULTS. Monitoring results obtained during reporting periods specified in the Permit, shall be submitted to the Director at the following address, no later than the date specified following the completed reporting period: Division of Waste Management and Radiation Control
Utah Department of Environmental Quality 195 North 1950 West P.O. Box 144880 Salt Lake City, Utah 84114-4880
The quarterly due dates for reporting are: June 1, September 1, December 1, and March 1.
E. COMPLIANCE SCHEDULES. Reports of compliance or noncompliance with, or any progress reports on interim and final requirements contained in any Compliance Schedule of this Permit shall be submitted no later than 14 calendar days following each schedule date.
F. ADDITIONAL MONITORING BY THE PERMITTEE. If the Permittee monitors any pollutant more
frequently than required by this Permit, using approved test procedures as specified in this Permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted. Such increased frequency shall also be indicated. G. RECORDS CONTENTS.
1. Records of monitoring information shall include:
a) The date, exact place, and time of sampling, observations, or measurements:
b) The individual(s) who performed the sampling, observations, or measurements;
c) The date(s) and time(s) analyses were performed;
d) The name of the certified laboratory which performed the analyses;
e) The analytical techniques or methods used; and,
f) The results of such analyses.
Part II
Permit No. UGW370004
37
H. RETENTION OF RECORDS. The Permittee shall retain records of all monitoring information,
including all calibration and maintenance records and copies of all reports required by this Permit, and records of all data used to complete the application for this Permit, for a period of at least five years from the date of the sample, measurement, report or application. This period may be extended by request of the Director at any time.
I. NOTICE OF NONCOMPLIANCE REPORTING.
1. The Permittee shall verbally report any noncompliance which may endanger public health or the environment as soon as possible, but no later than 24-hours from the time the Permittee first became aware of the circumstances. The report shall be made to the Utah Department of Environmental Quality 24-hour number, (801) 538-6333, or to the
Division of Water Quality, Ground Water Protection Section at (801) 538-6146, during
normal business hours (8:00 am - 5:00 pm Mountain Time).
2. A written submission shall also be provided to the Director within five calendar days of the time that the Permittee becomes aware of the circumstances. The written submission shall contain:
a) A description of the noncompliance and its cause;
b) The period of noncompliance, including exact dates and times;
c) The estimated time noncompliance is expected to continue if it has not been corrected; and,
d) Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the
noncompliance.
3. Reports shall be submitted to the addresses in Part II.D, Reporting of Monitoring Results.
J. OTHER NONCOMPLIANCE REPORTING. Instances of noncompliance not required to be reported within 5 calendar days, shall be reported at the time that monitoring reports for Part II.D are submitted.
K. INSPECTION AND ENTRY. The Permittee shall allow the Director, or an authorized
representative, upon the presentation of credentials and other documents as may be required by law, to:
1. Enter upon the Permittee’s premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of the Permit;
2. Have access to and copy, at reasonable times, any records that must be kept under the
conditions of this Permit;
3. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this Permit; and,
4. Sample or monitor at reasonable times, for the purpose of assuring Permit compliance or
as otherwise authorized by the Act, any substances or parameters at any location.
Part III
Permit No. UGW370004
38
PART III. COMPLIANCE RESPONSIBILITIES
A. DUTY TO COMPLY. The Permittee must comply with all conditions of this Permit. Any Permit noncompliance constitutes a violation of the Act and is grounds for enforcement action; for permit termination, revocation and re-issuance, or modification; or for denial of a permit renewal application. The Permittee shall give advance notice to the Director of the Division
of Water Quality of any planned changes in the permitted facility or activity which may
result in noncompliance with Permit requirements.
B. PENALTIES FOR VIOLATIONS OF PERMIT CONDITIONS. The Act provides that any person who violates a Permit condition implementing provisions of the Act is subject to a civil penalty not to exceed $10,000 per day of such violation. Any person who willfully or negligently
violates Permit conditions is subject to a fine not exceeding $25,000 per day of violation.
Any person convicted under Section 19-5-115 of the Act a second time shall be punished by a fine not exceeding $50,000 per day. Nothing in this Permit shall be construed to relieve the Permittee of the civil or criminal penalties for noncompliance.
C. NEED TO HALT OR REDUCE ACTIVITY NOT A DEFENSE. It shall not be a defense for a Permittee
in an enforcement action that it would have been necessary to halt or reduce the permitted
activity in order to maintain compliance with the conditions of this Permit.
D. DUTY TO MITIGATE. The Permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this Permit which has a reasonable likelihood of adversely affecting human health or the environment.
E. PROPER OPERATION AND MAINTENANCE. The Permittee shall at all times properly operate and
maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the Permittee to achieve compliance with the conditions of this Permit. Proper operation and maintenance also includes adequate laboratory controls and quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a Permittee only when the operation is
necessary to achieve compliance with the conditions of the Permit.
Part IV
Permit No. UGW370004
39
PART IV. GENERAL REQUIREMENTS
A. PLANNED CHANGES. The Permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required when the alteration or addition could significantly change the nature of the facility or
increase the quantity of pollutants discharged.
B. ANTICIPATED NONCOMPLIANCE. The Permittee shall give advance notice of any planned changes in the permitted facility or activity which may result in noncompliance with Permit requirements.
C. PERMIT ACTIONS. This Permit may be modified, revoked and reissued, or terminated for
cause. The filing of a request by the Permittee for a permit modification, revocation and re-
issuance, or termination, or a notification of planned changes or anticipated noncompliance, does not stay any permit condition.
D. DUTY TO REAPPLY. If the Permittee wishes to continue an activity regulated by this Permit after the expiration date of this Permit, the Permittee must apply for and obtain a new permit.
The application should be submitted at least 180 calendar days before the expiration date of
this Permit.
E. DUTY TO PROVIDE INFORMATION. The Permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this Permit, or to determine
compliance with this Permit. The Permittee shall also furnish to the Director, upon request,
copies of records required to be kept by this Permit.
F. OTHER INFORMATION. When the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or any report to the Director, it shall promptly submit such facts or information.
G. SIGNATORY REQUIREMENTS. All applications, reports or information submitted to the
Director shall be signed and certified.
1. All permit applications shall be signed as follows:
a) For a corporation: by a responsible corporate officer;
b) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively.
c) For a municipality, State, Federal, or other public agency: by either a principal executive officer or ranking elected official.
2. All reports required by the Permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that
person. A person is a duly authorized representative only if:
a) The authorization is made in writing by a person described above and submitted to the Director, and,
Part IV
Permit No. UGW370004
40
b) The authorization specified either an individual or a position having responsibility for
the overall operation of the regulated facility or activity, such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus
be either a named individual or any individual occupying a named position).
3. Changes to Authorization. If an authorization under Part IV.G.2. is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of Part IV.G.2 must be submitted to the Director prior to or together with any reports, information, or
applications to be signed by an authorized representative.
4. Certification. Any person signing a document under this section shall make the following certification:
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on
my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine
and imprisonment for knowing violations."
H. PENALTIES FOR FALSIFICATION OF REPORTS. The Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this Permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than six months
per violation, or by both.
I. AVAILABILITY OF REPORTS. Except for data determined to be confidential by the Permittee, all reports prepared in accordance with the terms of this Permit shall be available for public inspection at the offices of the Director. As required by the Act, permit applications, permits,
effluent data, and groundwater quality data shall not be considered confidential.
J. PROPERTY RIGHTS. The issuance of this Permit does not convey any property rights of any sort, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of federal, state or local laws or regulations.
K. SEVERABILITY. The provisions of this Permit are severable, and if any provision of this
Permit, or the application of any provision of this Permit to any circumstance, is held invalid,
the application of such provision to other circumstances, and the remainder of this Permit, shall not be affected thereby.
L. TRANSFERS. This Permit may be automatically transferred to a new Permittee if:
1. The current Permittee notifies the Director at least 30 calendar days in advance of the
proposed transfer date;
Part IV
Permit No. UGW370004
41
2. The notice includes a written agreement between the existing and new Permittee
containing a specific date for transfer of permit responsibility, coverage, and liability between them; and,
3. The Director does not notify the existing Permittee and the proposed new Permittee of his or her intent to modify, or revoke and reissue the permit. If this notice is not received, the
transfer is effective on the date specified in the agreement mentioned in paragraph 2
above.
M. STATE LAWS. Nothing in this Permit shall be construed to preclude the institution of any legal action or relieve the Permittee from any responsibilities, liabilities, penalties established pursuant to any applicable state law or regulation under authority preserved by Section 19-5-
115 of the Act.
N. REOPENER PROVISIONS. This Permit may be reopened and modified (following proper administrative procedures) to include the appropriate limitations and compliance schedule, if necessary, if one or more of the following events occurs:
1. If new ground water standards are adopted by the Board, the Permit may be reopened and modified to extend the terms of the Permit or to include pollutants covered by new
standards. The Permittee may apply for a variance under the conditions outlined in R317-6-6.4(D).
2. Changes have been determined in background groundwater quality.
3. The Director determines permit modification is necessary to protect human health or the environment.
Public Participation Summary
Utah Groundwater Discharge Permit No. UGW370004 Energy Fuels Resources (USA) Inc.
White Mesa Uranium Mill San Juan County, Utah January 14, 2019 TABLE OF CONTENTS
Public Comments
Colin Larrick, Water Quality Program Manager, Ute Mountain Ute Tribe: Pages: 2 - 20
Ivan Weber, Weber Sustainability Consulting: Pages: 20-21
ATTACHMENTS Attachment 1 Summary of the Public Meeting Held at the Arts and Events Center in Blanding, UT on December 17, 2018.
Attachment 2 Copy of the Ute Mountain Ute Tribe August 17, 2012 Written
Comments Attachment 3 Copy of the Weber Sustainability December 28, 2018 Written Comments
Attachment 4 Statement of Basis and Groundwater Permit No UGW370004 - Redline/Strikeout Version Showing any Additional Changes after the Public Comment Period
Attachment 5 Final Statement of Basis and Groundwater Permit, UGW370004 –
Blackline Copies
Introduction
The purpose of this document is to respond to public comments received by the Utah Division of Waste Management and Radiation Control (“Division”) regarding proposed
modification of the Energy Fuels Resources (USA) Inc. Groundwater Discharge Permit No. UGW370004 (“Permit”) for the White Mesa Uranium Mill, Blanding, Utah. An associated Statement of Basis was also prepared with information regarding the basis for the proposed Permit modifications.
Two submissions were received by the Division regarding the Permit modification, although only one of the submissions included written comments, during the comment period which ended on Friday, December 28, 2018 (associated documents included as Attachment 1). Specifically, comments were received from the Ute Mountain Ute Tribe (“UMUT”) and a
submission was received from Weber Sustainability Consulting. A public meeting was held
on December 17, 2018 in Blanding Utah to receive public comment. The submissions and Division responses to UMUT comments are included below: Comments from Colin Larrick, Water Quality Program Manager, Ute Mountain Ute Tribe, on December 28, 2018
The Division notes that the Ute Mountain Ute Tribes comments are related to Permit changes
regarding compliance issues and the addition of dissolved oxygen. A copy of the complete comments letter is attached to this public participation summary. The comments portions of the letter have been extracted and copied below followed by the Division response to each comment:
UMUT Comment #1: After establishing GWCLs in 2010 – five years after MW-31 was
installed, DWMRC now, less than ten years later, is proposing to raise the GWCLs to
levels that are over 60% higher after persistent exceedances of the originally established GWCLS.
The Modification would substantially relax certain GWCLs for monitoring well MW-31,
which is located immediately between Tailing Cell 2 and Tailing Cell 3 and as such, down-
gradient of Cell 2 and up-gradient of Cell 3. Tailing Cells 2 and 3 are legacy tailings cells built over 35 years ago with single 30 mil PVC liners and without modern leak detection systems. The Modification would also modify a single GWCL for monitoring well MW-14, which is located directly down-gradient of Tailing Cell 4A. Specifically, the Modification
would relax the following GWCLS:
Monitoring Well Parameter Current GWCL Modified GWCL
MW-31 Selenium 86.81 μg/L 119.4 μg/L
Monitoring Well Parameter Current GWCL Modified GWCL
Sulfate 697.6 mg/L 993 mg/L
Total Dissolved
Solids (TDS)
1,700 mg/L
2,132 mg/L
MW-14
Uranium Fluoride
9.1 μg/L
0.2 mg/L
15 μg/L
0.22 mg/L
Monitoring MW-31was installed in 2005 between Cell 2 and Cell 3. From the first 8
consecutive quarters of groundwater monitoring in MW-31, the highest observed values reported by the Mill operator (INTERA 2008) for the parameters affected by this Modification were as follows:
Selenium 70.1 µg/L
Sulfate 532 mg/L
TDS 1320 mg/L
Uranium 9.32 µg/L The iteration of the Permit issued by the DWMRC dated January 20, 2010, stated that
the average concentration of TDS in MW-31 was 1,265 mg/L and set GWCLs for the
subject constituents at the following levels:
Selenium 71 µg/L
Sulfate 532 mg/L
TDS 1320 mg/L Uranium 9.1 µg/L
Since 2010, the permitted GWCLs for Selenium, Sulfate and TDS in MW-31 have been
raised multiple times and the GWCL for Uranium is now being raised, as follows:
Parameter 2010 GWCL 2018 GWCL Percent Increase
Selenium 71 µg/L 119.4 µg/L 68.7%
Sulfate 532 mg/L 993 mg/L 86.65%
TDS 1320 mg/L 2132 mg/L 61.52%
Uranium 9.1 µg/L 15 µg/L 64.84%
Division Response: The ground water compliance limit (GWCL) modifications are
based on Division review of source assessment reports, statistical review and groundwater data review regarding the proposed modifications. Based on this review and statistical guidance the proposed modified GWCL’s were determined to be appropriate and protective.
UMUT Comment #2: DWMRC has not provided the public any credible explanation of how it calculated the GWCLs and how it justifies the dramatic increases. Instead, the Statement of Basis merely cites prior approvals and various technical documents, leaving the public to research and divine the basis of the proposed regulatory action.
DWMRC should provide the public a clear explanation in the Statement of Basis or in the Permit of exactly how it calculated the GWCLs and how it justifies the dramatic increases under its regulations.
DWMRC statements that it previously approved the GWCLs (without
opportunity for public comment) does not relieve the agency from providing the public a
reasoned explanation for its proposed actions.
DWMRC must also explain the basis for its own specific conclusions and reasons
for raising the GWCLs and not merely cite to reports submitted by EFRI which contain a
myriad of unproven explanations and inconsistent arguments.
Division Response: All of the documents associated with the Permit modification, as listed in the Permit Statement of Basis, were posted on the DWMRC website and publicly
available. In the event that these could not be accessed by an individual on the website, contact information was provided in the public notice regarding questions. All documents are available to the public through GRAMA. It is noted that the UMUT had full access to the documents and per previous correspondence had reviewed the source assessment documents and Division technical review memorandums, which provide detailed
information regarding justifications for raising the affected ground water compliance limits. The Statement of Basis provides clear citations regarding source assessment documents and Division review documents.
UMUT Comment #3: DWMRC should provide an explanation of the basis for its action in
light of data collected and reports submitted in 2017 and 2018 which show accelerating
degradation of the shallow groundwater quality at the Mill, the expansion of the area and concentration of identified contaminant plumes (nitrate/chloride and chloroform), and the failure of ongoing corrective actions to restrict the plumes and reduce the masses of the
contaminants.
Division Response: Information regarding the Permit modification is in the Statement of Basis and associated documents cited therein.
UMUT Comment #4: The Tribe is very concerned about the increasing signature of
contamination in the groundwater spreading to the east, south and southeast directions
from the Mill facility. The Tribe, as it has in past comments, again urges DWMRC to add requirements in the Permit for the Mill operator to monitor a full analytical suite of parameters for all of the Chloroform (TW-4 series wells) and the Nitrate (TWN-series
wells) in order to identify the source(s) of the contamination. Contamination from Mill
operations could also be moving in narrow preferential pathways, or paleochannels in the
aquifer, to the area of MW-22 while being undetected due to gaps in the monitoring well network which is orientated in a NW-SW trend despite a large amount of evidence for S -SE preferential groundwater flow.
Division Response: These UMUT comments have been previously made and previously responded to by Division during the Permit renewal process and approval process for nitrate and chloroform corrective action plans. Per response, monitoring well TW4-24 was included in the Permit for semi-annual groundwater monitoring for a “full analytical suite of
parameters” and three new monitoring wells (MW-38, MW39 and MW-40) have been
installed S-SE from the Mill, between the Mill and monitoring well MW-22. UMUT Comment #5: In response to the forgoing concern expressed by the Tribe, DIVISION added a requirement to the Permit in early 2018 for collection of a full suite of analytics at TW4-24 a well on the SE margin of Tailings Cell 1. Subsequent sampling
results in 2018 revealed uranium concentrations above 600 ug/L - far above possible
natural conditions and indicative of facility impact to a severe degree. This uranium loading at TW4-24 should immediately trigger additional investigation. The Tribe urges that an analysis of the uranium isotopes be required and undertaken immediately to evaluate the activity ratio (AR) signature. DIVISION has agreed publicly (DIVISION,
2012) that the AR calculation is valid and valuable. It’s now time for DIVISION to impose
the requirement.
Division Response: Since it serves as a pumping well for groundwater treatment, it is anticipated that TW4-24 groundwater data will be highly variable and may show high values for some constituents. Further action based on a single monitoring event is not warranted. Division concerns regarding data review were discussed in the January 19, 2019 Permit
renewal statement of basis. It should also be noted that based on the status of the well as a pumping well, TW4-24 is not a compliance monitoring well, data is used as informational.
Additionally, issues regarding activity ratio was discussed in the public participation summary for the January 19, 2018 Permit renewal. The Division incorporates its previous
responses to comments on these points. The Division does not see the use of uranium
isotopic activity analysis and ratio as an effective regulatory tool in the Permit. There are no State Ground Water Quality Standards for uranium isotope activity. Therefore, in the event
that an activity ratio indicated a tailings wastewater source of uranium, there would be no applicable standard associated with the finding.
Due to analytical limitations, the use of uranium activity ratios is likely not a
reliable/reproducible method for tailings source identification in groundwater. Specifically,
measurement of uranium isotope activity by alpha spectrometry yields high error terms making comparison of sources with “near” natural (unimpacted) ratios unfeasible. Measurement of uranium isotope mass by induced coupled plasma – Mass Spectromety (ICP-MS) also has large error terms and further requires the conversion of each isotope mass
to equivalent activity, resulting in additional potential errors.
Based on the lack of a Utah regulatory standard for uranium activity ratios and analytical method errors a requirement for determining uranium activity, ratios will not be included in the Permit.” UMUT Comment #6: In connection with the 2018 renewal of the Permit three additional monitoring wells were installed to the SE towards existing monitoring well MW-22. One of these new wells (MW-39) revealed extremely concerning concentrations of beryllium,
cobalt, cadmium, nickel and thallium along with very low pH, similar to MW-22 and
provides evidence that MW-39 may be affected by a nearby preferential pathway of a high concentration contamination vector leading from the facility to the SE of the facility. The new wells near MW-22 should be included in a comprehensive, up-dated isotopic study
along with other site wells as recommended in our relicensing comments. A new and
updated isotopic study and re-evaluation of the source(s) of contamination causing the
decline and spread of groundwater contamination in the Burro Canyon aquifer should be required and undertaken immediately.
Division Response: To date only one groundwater sample for each new monitoring well has
been analyzed and reported. It is unclear what the UMUT means by the term “extremely concerning concentrations” in relation to monitoring well MW-39. In comparison to the Utah Groundwater Quality Standards, the sample results show higher concentrations for beryllium, iron, manganese, and thallium and lower pH. Any conclusions regarding data at
these wells will be based on comprehensive data review but in no case does the data indicate
that contamination is being transported from MW-39 to MW-22. This is evident since the MW-39 concentrations are lower than the MW-22 concentrations. If this indicated a potential preferential pathway for contamination from the Mill, as the UMUT seems to suggest, then the MW-39 concentrations should be considerably higher than MW-22. In any
case, this UMUT comment does not appear to be relevant to the Permit modification.
UMUT Comment #7: A new, updated isotopic study of monitoring wells should be required and undertaken, updating the isotopic study work performed at the Mill by the University of Utah in 2007 and additionally characterize chemical composition, noble gas composition, and age of the groundwater monitoring wells and surface water sites
that were not part of the 2007 University of Utah Study. The study should include at a
minimum:
Isotopic Groundwater and Surface Water Investigation and Report - within 180 calendar days of issuance of this Permit, the Permittee shall submit an isotopic groundwater and
surface water investigation report for Executive Secretary approval. The purpose of this
investigation and associated report shall be to characterize chemical composition, noble
gas composition, and age of the groundwater monitoring wells and surface water sites. Minimum locations required to be included in the study: On-site Wells: MW-1, MW-18,
MW-19, MW- 27, MW-02, MW-29, MW-30, MW-31, MW-05, MW-11, MW-15, MW-14,
MW-3, MW-22 (wells included in initial 2007 University of Utah sampling). In addition,
all POC and general monitoring wells not included in the University of Utah Study and; TWN-2, TW4-24, MW-39, WW-2 and Springs: Entrance Spring, Westwater Spring, Cottonwood Spring, Ruin Spring.
The report shall include, but is not limited to:
a. An examination of groundwater age and isotopic/geochemical conditions using a comprehensive analytical suite of major and trace elements (including all analytes required under Table 2 of the GWDP at a minimum) with the addition of stable isotopes of
oxygen, hydrogen, carbon, boron, strontium, lithium and sulfur and isotopes of
radionuclides (uranium, radium, lead-210). After concentrations have been obtained for each well, the Permittee must verify if any of the monitoring wells have been influenced by the artificial recharge from the tailings and/or facility operations.
b. An examination of evaporative signatures including isotopes Deuterium and
Oxygen-18 in water at each sampling location, Examination of groundwater age using the tritium/helium-3 method in each monitoring well and surface water sources , Evaluation of isotopes Oxygen-18 and Sulfur-34 on dissolved sulfate molecules in the water samples.
c. The purpose of this supplemental investigation and associated report
shall be to establish and evaluate isotopic benchmarks, geochemical characteristics, and a ground/surface water age at these locations. Division Response: These comments have all been addressed by the Division previously
during the Permit renewal for the January 19, 2018 Permit. Please review the public participation summary for that action. The Division incorporates its previous responses to comments on these points. There is no regulatory or scientific basis to require additional isotopic sample collection and analysis at the Mill groundwater monitoring wells at this time. The 2008 University of Utah Study confirmed that the elevated concentration in monitoring
wells were not due to the discharge of tailings wastewater. The Permit requires that 38 compliance parameters be analyzed on an appropriate frequency. Although exceedances of some parameters have occurred, these exceedances are expected based on previously identified increasing trends in background or have been shown not to be related to Mill
discharge of tailings wastewater according to source assessment investigations and multiple other lines of evidence. No requirement will be added to the Permit.
UMUT Comment #8: When significant trends in background compliance well data are
discovered, the contaminant source must be identified, and the source of the trend must be
found to be unrelated to the regulated facility prior to modifying the associated compliance limit. (See, e.g., Utah Admin. Code R317-6-1 (definition of “background concentration”)).
Division Response: The definition of “background concentration” in Utah Admin. Code
R317-6-1 states “background concentration means the concentration of a pollutant in ground water upgradient or lateral hydraulically equivalent point from a facility, practice or activity which has not been affected by that facility, practice or activity.” Upgradient monitoring well data is used when evaluating tailings monitoring wells. In the case of the White Mesa
Mill permit background concentrations have been determined on a well-by-well (Intrawell)
basis. There is no evidence that background concentrations in MW-31 are being affected by Mill operations and activities. This is supported by the source assessment requirements of the Permit,
which were undertaken for the MW-31 compliance limit modifications. UMUT Comment #9: Under the Utah Groundwater Protection Regulations, DWMRC
should not constantly adjust background levels to justify repeated resetting of GWCLs to more lenient compliance levels to avoid exceedances, but, instead, should require the Mill operator to follow the established regulatory process for setting alternate concentration
limits – which necessarily requires, among other things, steps to correct the source of the
contamination.
Division Response: There is no evidence that background concentrations in MW-31 are being
affected by Mill operations and activities. Additionally, there is no evidence that any monitoring well background concentrations are being affected by tailings solution. The background concentrations in the Mill monitoring well MW-31 are based on statistically sound data sets. A detailed source assessment was conducted regarding modifying the GWCL’s and was technically reviewed by the Division. Additionally, in 2007, a specific study was conducted to verify that
elevated concentrations of metals and other ions were not due to impacts from the Mill (University of Utah Report). UMUT Comment #10: Under the so-called EPA 2011 Unified Guidance which DWMRC states it relied on in setting GWCLs on an intra-well basis for MW-31 and all other wells, GWCLS should not be adjusted when, as is the case at the Mill, statistically significant
trends in groundwater contamination are evident and the source of the contamination has
not been identified.
Division Response: The Permit includes specific requirements for source investigation and follow-up actions for any parameter which goes into out-of- compliance status. If it is determined that the exceedance was caused by natural variations in the groundwater, then it
is appropriate to adjust the GWCL according to the extended data set including more recent
data points and in conformance with statistical guidance.
UMUT Comment #11: A foundational element of the EPA 2011 Unified Guidance is that it is unacceptable to raise a GWCL if there is a possibility the Mill facility may be the cause of the exceedance. The original GWCLs should be retained and the DWMRC review and
approval of the modified GWCLs should be re-visited in a sound scientific manner (e.g.,
based on an updated isotopic study) prior to the proposal of adjusted background levels
and modified GWCLs.
Division Response: There is no evidence that background concentrations in MW-31 are being affected by Mill operations and activities. The background concentrations in the Mill monitoring well MW-31 are based on statistically sound data sets. A detailed source assessment was
conducted regarding modifying the GWCL’s and was technically reviewed by the Division. Additionally, in 2007, a specific study was conducted to verify that elevated concentrations of metals and other ions were not due to impacts from the Mill (University of Utah Report).
UMUT Comment #12: There has been no showing by EFR or DWMRC that the purportedly changing background concentrations detected in Mill monitoring wells
“[have] not been affected by that facility, activity, or practice” as required by Utah
regulations and the Unified Guidance. In fact, the very opposite is true - background concentrations have been and are being affected by the Mill operations and activities. Both EFRI and DWMRC have recently acknowledged that it has not been possible to determine the source or cause of increasing nitrate and chloride contamination or to rule out a source
caused by Mill operations (EFRI, November 2018).
These two contaminants have been called “smoking gun” indicator parameters of tailings
cell leakage by DWMRC in the past (DWMRC, 1999) and are associated with rising concentrations of selenium, uranium and total dissolved solids (TDS) in well MW-31. The source of increasing contamination in the Burro Canyon aquifer must be positively
determined prior to the approval of any modified GWCLs for this well.
Division Response: In regards to the plume, the Division incorporates its previous response to UMUTcomments regarding the plume:
During a review of the Permittee April 30, 2008 New Wells Background Report and other
Permittee reports, Nitrate + Nitrite (as N) (“Nitrate”) concentrations were observed above the Utah GWQS (10 mg/L) in five monitoring wells in the Mill area, including wells: MW- 30, MW-31, TW4-22, TW4-24, and TW4-25.
After the Nitrate Plume was identified and the information was shared with the Permittee, the Director and the Permittee entered into a Stipulation and Consent Agreement dated
January 28, 2009, which required, among other things, that the Permittee complete a Contaminant Investigation Report (CIR) to determine the potential sources of the nitrate contamination. An immediate action to install 19 additional nitrate monitoring wells was then initiated to define the nature and extent of the contamination.
The Permittee submitted a CIR to the Director on January 4, 2010, which identified a
number of potential sources. After review of the CIR, the Director determined that additional investigation was required. This conclusion was shared with the Permittee in an
October 5, 2010 letter. The Permittee responded in a November 15, 2010 letter in which they proposed additional studies to be conducted to further define the nature, extent, and source of the Nitrate Plume. The additional studies were discussed in detail during a
November 30, 2010 meeting with the Permittee and Divisions staff.
The Director agreed with the Permittee that conducting the proposed, additional studies would be appropriate. Therefore, the Director and the Permittee entered into a Tolling Agreement on December 20, 2010 to allow the Permittee time to conduct additional studies. The additional characterization work was completed and the results evaluated. The new data
ruled out tailings cell leakage as a source of the Nitrate Plume. Rather, the new study
generated more than enough data to support a conclusion that the Ammonium Sulfate Crystal tanks at the Facility site is a primary or source of the Nitrate Plume. The factual and technical basis for this determination includes the following factors, as described in more detail in the relevant reports:
• The location of the highest nitrate concentrations of the Nitrate Plume are at or directly
downgradient from the Ammonium Sulfate tanks;
• The Nitrate plume is upgradient or cross-gradient from the tailings cells, demonstrating that the tailings cells are not contributing to the contamination; and
• While some of the monitoring wells that are downgradient from the tailings cells do show nitrate, these concentrations are not above standards and do not indicate increasing trends.
Moreover, the nitrate in these wells appears to be unrelated to the Nitrate Plume. Nitrate occurs naturally in groundwater, so its presence in concentrations below standards is not considered an indication of a problem or a connection with the Nitrate Plume or a release from the tailings cells. There is no data to support a conclusion that the tailings cells are leaking.
After completion of the studies, the Director and the Permittee subsequently agreed to pursue the development and implementation of a corrective action plan (CAP) to address the Nitrate Plume in the groundwater. The Permittee completed and submitted a draft Nitrate Plume CAP to the Director. The Permittee’s chosen remediation plan requires the Permittee to pump the groundwater and treat it by evaporation and/or use it as process water
for milling.
In response to the draft Nitrate Plume CAP, the Division prepared a proposed, draft Stipulated Consent Order, Docket No. UGW12-04 (“SCO”) and solicited public comments. The public comment period began on July 18, 2012. The Division conducted a public hearing to receive comments on the SCO and CAP August 20, 2012. Based on the
comments, the Director prepared and published a detailed public participation summary and response to the comments on December 12, 2012, the effective date of the SCO. The Director’s approval of the Nitrate Plume CAP is subject to conditions, stipulated penalties and timelines outlined more fully in the SCO.
The Permittee implemented the CAP and initiated groundwater pumping in January, 2013.
The footprint of the Nitrate Plume is located within the confines of the Mill property. Based
on all available information, the Division has concluded that it is unlikely that the Nitrate Plume will extend outside of the boundaries of the Mill property in the future.
UMUT Comment #13: The Tribe supports the DWMRCs addition of a requirement to
monitor and report dissolved oxygen (DO). As noted by DWMRC in their rationale for the
addition, DO will provide valuable information providing insight into the fate and transport of metals in the groundwater and the feasibility of the theory of chloroform degradation that EFRI has proposed and would require anoxic conditions.
Division Response: The Division rationale for including DO as a field monitoring parameter is included in the Permit Modification Statement of Basis. The UMUT re-wording of the rationale is not accurate. Addition of DO as a field parameter is not directly related to evaluation of the chloroform or nitrate plume degradation, isotopic studies or fate and
transport modeling.
UMUT Comment #14: The Tribe urges DWMRC to use a formal scientific screening criteria to comprehensively evaluate the theory of chloroform attenuation; the theory must be clearly and scientifically demonstrated with site specific data. The Minnesota Pollution Control Agency has developed a specific guideline document with scoring criteria for this
purpose (Minnesota, 2006).
Division Response: This comment is not related to the Permit modification
UMUT Comment #15: The DWMRC should add requirements for collection of dissolved
organic carbon, methane, sulfide and ferrous iron as additional relevant analytes to
provide a clear demonstration of whether or not chlorinated solvent natural attenuation is occurring. If abiotic degradation of pyrite is to be taken seriously, it needs to be demonstrated as feasible using a microcosm study with aquifer material from the site
(Minnesota, 2006). The data presented to date by EFRI is not sufficient to support either
theory. Neither theory is credible.
Division Response: This comment is not related to the Permit modification.
UMUT Comment #16: The Tribe again requests that DWMRC support a geochemistry
microcosm study to evaluate feasibility of pyrite acting as a source or driver of increasing contamination in the aquifer as well as attenuation mechanism as EFRI has proposed. The data collected to date and presented in the recent Chloroform CACME and Nitrate
CACME show overall greater spatial extent of the plumes along with concentrations that are
continuing to increase, indicative of continuing sources that remain unidentified. Division Response: This comment is not related to the Permit modification.
UMUT Comment #17: The nitrate and chloroform wells should be included in a comprehensive updated isotopic study to provide fundamental information required for a source evaluation assessment, advanced geophysical characterization of the vadose zone
using high performance subsurface imagery techniques should also be mandated.
Division Response: This comment is not related to the Permit modification.
UMUT Comment #18: While the collection of DO data will be valuable for the assessment
of declining pH and increasing metals and ions in many of the point-of-compliance
monitoring wells, including MW-31 and MW-14 addressed in this proposed Modification of the Permit, the DO data need to be considered in a comprehensive isotopic study for any valid conclusions regarding the driving forces behind the decline in water quality and the true source of the contamination.
Division Response: This comment is not related to the Permit modification.
Document from Ivan Weber, Weber Sustainability Consulting
Please forgive this non-review of the WMUM groundwater permit. We have had no
opportunity to review the documents, themselves, apparently due to a non-functional
relationship between my laptop computer and the DEQ website document repository --- as well as lack of time to set aside competing demands on our discretionary time. If opportunity may exist for review in upcoming days or hours, we will strive to do so as a continuation of
our review over previous years of White Mesa Mill’s permit processes. If not, please accept
our apologies, and exercise your own critical sensibilities in your own review of the
Mill. We have found it to be terribly ineffective, in the past, and have every anticipation that the current EPA and Presidential administrative climate will only cause it to be worse than ever before.
Division Response – The received submittal did not contain any comments for Division response. The document was received by the Department of Environmental Quality Public E-mail and was logged into and is maintained in the Division electronic records.
References - Public Comments
December 28, 2018: Colin Larrick, Water Quality Program Manager, Ute Mountain Ute Tribe (Received by the Director via e-mail on December 28, 2018).
December 28, 2018: Ivan Weber, Weber Sustainability Consulting (Received by the Director via e-mail on December 28, 2018).
References
References
1Energy Fuels Resources (USA) Inc., November 7, 2012, Second Revision Hydrogeology of the Perched Groundwater Zone in the Area Southwest of the Tailings Cells White
Mesa Uranium Mill Site. Prepared by HYDRO GEO CHEM, INC.
2Energy Fuels Resources (USA) Inc., August 20, 2017, Source Assessment Report for MW-
31, White Mesa Uranium Mill, Prepared by Intera
3Energy Fuels Resources (USA) Inc., July 25, 2018, Source Assessment Report for MW-14,
Prepared by Intera
4 Energy Fuels Resources (USA) Inc., October 29, 2018, Letter to Scott Anderson, Director DIVISION, Re: White Mesa Uranium Mill, State of Utah Ground Water Discharge Permit
No. UGW370004, Request for Change to Part I.F.7.
5 Utah Division of Waste Management and Radiation Control, 2018, Public
Participation Summary, Radiactive Materials License UT1900779 and Groundwater
Discharge Permit UGW370004 Renewal for the Energy Fuels Resources (USA) Inc.,
White Mesa Uranium Mill, San Juan County, Utah
6Utah Division of Waste Management and Radiation Control, March 14, 2018, DIVISION Staff Review of the Energy Fuels Resources (USA) Inc. August 21, 2017 Source
Assessment Report for Monitoring Well MW-31
7Utah Division of Waste Management and Radiation Control, July 17, 2018, DIVISION Staff Review of the Energy Fuels Resources June 25, 2018 Source Assessment Report for Fluoride
in Monitoring Well MW-14
8Utah Division of Waste Management and Radiation Control, March 20, 2018, DIVISION Directors Letter Regarding Review of the EFR August 21, 2017 Source Assessment Report
for Monitoring Well MW-31
9 Utah Division of Waste Management and Radiation Control, July 25, 2018, DIVISION Directors Letter Regarding Review of the EFR June 25, 2018 Source Assessment Report for
Monitoring Well MW-14
10 Utah Division of Waste Management and Radiation Control, November 2018, Statement and Basis for Permit Modification, Utah Ground Water Quality Discharge Permit No.
UGW370004.
Attachment 1 -- Summary of the Public Meeting Held in Blanding, UT December 17, 2018
A public hearing for the Proposed Modification of the White Mesa Uranium Mill Ground Water Discharge Permit No. UGW370004 was held at the Blanding, Utah Arts and Events Center on December 17, 2018. The meeting was held to solicit public input and comments
regarding the proposed modification.
Public notice was printed in the Salt Lake Tribune, Deseret News and San Juan County Record on November 28, 2018 and was additionally available on the DIVISION website public notice and White Mesa Uranium Mill pages throughout the public comment period. A
copy of the newspaper notice is included below.
DWMRC Representatives Present:
Tom Rushing, P.G., Environmental Scientist/ Hydrogeologist, Utah Division of Waste Management and Radiation Control
Phil Goble, Manager, Uranium Mills Section, Utah Division of Waste Management and Radiation Control Attendees:
Kirk Benge, San Juan Public Health Department Garrin Palmer, Energy Fuels Resources (USA) Inc. Logan Shumway, Energy Fuels Resources (USA) Inc. Terry Slade, Energy Fuels Resources (USA) Inc.
Meeting Minutes:
Tom Rushing opened the public hearing at 6:00 P.M. and provided a short presentation regarding the meeting purpose and a summary of the proposed Permit modification. It was noted that only four people were present in the audience. Mr. Rushing asked if there were
any comments that the attendees would like to make. No comments were given. Mr. Rushing reported that the public hearing would be suspended until 7:10 P.M. to allow for more attendees to arrive and make comments.
Mr. Rushing re-convened the public hearing at 7:10 P.M. and noted that no new attendees had arrived. Mr. Rushing closed the public hearing at approximately 7:30 P.M.
Copy of Public Notice
Public notice NOTICE OF PUBLIC COMMENT Energy Fuels Resources (USA) Inc., White Mesa Uranium Mill Groundwater Discharge Permit Modification Utah Groundwater Permit No. UGW370004
The Director of the Division of Waste Management and Radiation Control is seeking public comment on a request from Energy Fuels Resources to modify the Groundwater Discharge Permit (Permit No. UGW370004) for the White Mesa Uranium Mill located in Blanding, Utah. This modification includes: 1. Changes to select groundwater compliance limits; 2. The addition of dissolved oxygen to field monitoring requirements; 3. A change regarding seeps and springs monitoring frequency to allow for 4th quarter monitoring, and; 4. A clarification of the due date for the slimes drain compliance plan. The action modifies the groundwater permit issued effective January 19, 2018. The action does not alter the effective or expiration dates of the groundwater permit. A draft permit has been prepared. The public comment period to receive comments on the groundwater permit modification will commence on November 28, 2018 and end on December 28, 2018. A public hearing has been scheduled at 6:00 P.M. to 8:00 P.M. on Monday, December 17, 2018 at the Blanding Arts and Events Center Auditorium, Utah State University Eastern, 715 West 200 South, Blanding, Utah. Documents related to this modification can be reviewed at the following location: Division of Waste Management and Radiation Control Multi Agency State Office Building 195 North 1950 West, 2nd Floor Salt Lake City, Utah For the public’s convenience, an unofficial copy of the groundwater statement of basis for the draft groundwater permit is available on the Internet at “https://deq.utah.gov/waste-management-and-radiation-control/waste-management-radiation-control-public-notices”. Written comments will be accepted if received by 5:00 p.m. on Friday, December 28, 2018 and should be submitted to the address below. Comments can also be hand delivered to the Division address above and must be received by 5:00 p.m. on Friday, December 28, 2018. Scott T. Anderson, Director Division of Waste Management and Radiation Control Department of Environmental Quality P.O. Box 144880 Salt Lake City, Utah 84114-4880 Comments can also be sent by electronic mail to: “Divisionpublic@utah.gov”. Comments sent in electronic format should be identified by putting the following in the subject line: “Public Comment regarding the White Mesa Uranium Mill Groundwater Permit.” All documents included in comments should be submitted as ASCII (text) files or in pdf format. Under Utah Code Section 19-1-301.5, a person who wishes to challenge a Permit Order may only raise an issue or argument during an adjudicatory proceeding that was raised during the public comment period and was supported with sufficient information or documentation to enable the Director to fully consider the substance and significance of the issue. For further information, contact Tom Rushing of the Division of Waste Management and Radiation Control at (801) 536-0080. In compliance with the Americans with Disabilities Act, individuals with special needs (including auxiliary communicative aids and services) should contact Kimberly Diamond- Smith, Office of Human Resources at (801) 536-4285, Telecommunications Relay Service 711, or by email at “kdiamondsmith@utah.gov”. Published November 28, 2018 in the San Juan Record, Monticello, Utah.
Attachment 2 -- Copy of the Ute Mountain Ute Tribe December 28, 2018 Written Comments
1 | P a g e
Ute Mountain Ute Tribe
Environmental Programs Department
P.O. Box 448
Towaoc, Colorado 81334-0448
(970) 564-5430 Sent via email to dwmrcpublic@utah.gov
Scott T. Anderson, Director Division of Waste Management and Radiation Control Department of Environmental Quality
P.O. Box 144880
Salt Lake City, Utah 84114-4880 RE: Public Comment regarding the White Mesa Uranium Mill Groundwater Permit Energy Fuels Resources (USA) Inc., White Mesa Uranium Mill
Groundwater Discharge Permit Modification
Utah Groundwater Permit No. UGW370004
Dear Director Anderson:
The Ute Mountain Ute Tribe (the Tribe), through its Environmental Programs Department, submits these
comments regarding the proposed modification (Modification) of Groundwater Discharge Permit No. UGW370004 (Permit) as issued effective January 18, 2018 for the White Mesa Uranium Mill which was publicly noticed by the Utah Division of Waste Management and Radiation Control (DWMRC) on November 28, 2018, for public comment. The Modification involves relaxation of certain groundwater compliance limits (GWCLs) and other changes to the Permit.
The Tribe is a federally-recognized Indian tribe with lands located in southwestern Colorado, northwestern New Mexico, and southeast Utah. There are two Tribal communities on the Ute Mountain Ute Reservation: Towaoc, in southwestern Colorado, and White Mesa, which is located in Utah within three miles of the White Mesa Uranium Mill (Mill) facility owned and operated by Energy Fuels Resources (USA) Inc. (EFRI).
The Mill is located on Ute aboriginal lands. The White Mesa Tribal community is the nearest populated community to the Mill, and the White Mesa community’s lands are contiguous to the lands owned by EFRI. The White Mesa Community’s lands are held in trust for the Tribe and for other individual Tribal member owners. The Tribe has jurisdiction (as a federally-
recognized tribal government) over Tribally-owned lands, Tribal member-owned lands, and members of the Tribe (UMU Tribal Members) who live in the White Mesa community. Under the Tribe’s Constitution, the Tribal Council is responsible for, among other things, the management and protection of Tribal lands and for the protection of public peace, safety, and welfare.
UMU Tribal Members and their ancestors have lived on and around White Mesa for centuries and intend to do so forever. The community of White Mesa depends on groundwater resources buried deep in the Navajo aquifer for its municipal (domestic) needs. UMU Tribal members also make use of the perched (shallow) aquifer
2 | P a g e
near the Mill and near the White Mesa Community for drinking and ceremonial use as well as indirect uses through livestock watering and the harvesting of wildlife and plants. UMU Tribal Members continue traditional
practices, which include hunting and gathering and using the land, plants, wildlife and water in ways that are integral to their culture.
The Mill’s nearby, upgradient location from the White Mesa Tribal community means that contamination
from Mill operations generally flows through ground and surface water towards the Tribal community and surrounding area. The Tribe has a strong interest in maintaining the long-term quality of land and natural resources and preventing short-term users like the owners and operators of the Mill from polluting Tribal lands, members, and resources and making aboriginal and Tribal lands uninhabitable for future generations of Tribal members. The Tribe’s interests in protecting Tribally-owned lands, Tribal member-owned lands, and the public
peace, safety, and welfare of UMU Tribal Members who live in White Mesa and adjacent to the Mill are substantially affected by the actions taken and decisions made by the DWMRC in regulating and permitting the operations of the White Mesa Mill. Protection of the groundwater and seeps in and around White Mesa is a matter of extreme concern to the Tribe and its UMU Tribal members.
In support of these comments, the Tribe refers the DWMRC to the technical assessment of groundwater conditions at the Mill prepared by Geo-Logic Associates (Geo-Logic Associates, 2017) and previously submitted to the DWMRC in connection with the 2018 renewal of the Permit. In early 2018, the DWMRC issued a renewal of the Permit for a five-year period and relaxed GWCLs for
various parameters in several monitoring wells, including raising the GWCL for selenium and lowering the GWCL for field pH in monitoring well MW-31 and lowering the GWCL for field pH in MW-14 – the two wells which are the subject of this current modification. Since the 2018 renewal of the Permit, quarterly groundwater monitoring reports submitted by EFRI show
continued degradation of the shallow groundwater quality, with significant increasing trends in many parameters and continued lowering of pH to more acidic conditions. Data already show exceedances of GWCLs under the new Permit. Another alarming development in 2018 is data showing that the expanding chloroform plume has now
extended further to the south beyond the chloroform monitoring well network along the eastern edge of the Mill property and toward the Tribe’s lands. Ongoing corrective actions to address a chloroform contaminant plume and a nitrate/chloride contaminant plume have not reduced the areal extent, concentrations or contaminant masses of these plumes after several
years of corrective action. The 10-year Chloroform Corrective Action Plan Comprehensive Monitoring Report
(Chloroform CACME) and the 5-year Nitrate Corrective Action Plan Comprehensive Monitoring Report (Nitrate CACME) submitted by EFRI in late 2017 and early 2018, respectively, show that despite several years of groundwater pumping and removal of contaminants, the areal extents of the plumes are expanding, contaminant levels are increasing or unchanged, and their contaminant masses have not been reduced. The data from these
reports show that the current corrective actions will not remove the plumes or them to acceptable levels for
decades or hundreds of years, if ever. DWMRC has conservatively estimated the travel time for the chloroform plume at rates of 65 ft/yr and noted the possibility of undetected preferential flow paths with much faster travel times (DWMRC, 2018). More aggressive corrective actions should be implemented immediately to identify the sources of the contamination and engineer effective remedial actions.
3 | P a g e
Now, less than a year after renewal of the Permit and modification of its GWCLs, and in the face of continuing degradation of the quality of the shallow groundwater and expansion of the area and concentrations of
the contaminant plumes, the DWMRC is again proposing to further relax certain GWCLs based on a faulty assumption that background quality in a contaminated aquifer is changing due to natural conditions, rather than taking direct action to investigate and address the root cause of the site-wide degradation of shallow groundwater quality. The Tribe urges the DWMRC to take a holistic approach and look at the big picture in light of the overwhelming data showing significant trends of increasing groundwater contaminants and acidification in the
shallow groundwater beneath the Mill, rather than simply readjusting background levels to justify relaxation of compliance limits.
According to the public notice published by DWMRC the proposed Modification of the Permit includes:
1. Changes to select groundwater compliance limits; 2. The addition of dissolved oxygen to field monitoring requirements; 3. A change regarding seeps and springs monitoring frequency to allow for 4th quarter monitoring, and; 4. A clarification of the due date for the slimes drain compliance plan.
Our comments relate to items 1 and 2. I. CHANGES TO SELECT GROUNDWATER COMPLIANCE LIMITS (GWCLs). Comment #1: After establishing GWCLs in 2010 – five years after MW-31 was installed, DWMRC now,
less than ten years later, is proposing to raise the GWCLs to levels that are over 60% higher after persistent exceedances of the originally established GWCLS. The Modification would substantially relax certain GWCLs for monitoring well MW-31, which is located immediately between Tailing Cell 2 and Tailing Cell 3 and as such, down-gradient of Cell 2 and up-gradient of
Cell 3. Tailing Cells 2 and 3 are legacy tailings cells built over 35 years ago with single 30 mil PVC liners and without modern leak detection systems. The Modification would also modify a single GWCL for monitoring well MW-14, which is located directly down-gradient of Tailing Cell 4A. Specifically, the Modification would relax the following GWCLS: Monitoring Well Parameter Current GWCL Modified GWCL
MW-31 Selenium 86.81 μg/L 119.4 μg/L
Sulfate 697.6 mg/L 993 mg/L
Total
Dissolved
Solids (TDS)
1,700 mg/L
2,132 mg/L
MW-14 Uranium Fluoride 9.1 μg/L 0.2 mg/L 15 μg/L 0.22 mg/L
Monitoring MW-31was installed in 2005 between Cell 2 and Cell 3. From the first 8 consecutive quarters of groundwater monitoring in MW-31, the highest observed values reported by the Mill operator (INTERA 2008)
for the parameters affected by this Modification were as follows:
4 | P a g e
Selenium 70.1 µg/L Sulfate 532 mg/L
TDS 1320 mg/L Uranium 9.32 µg/L The iteration of the Permit issued by the DWMRC dated January 20, 2010, stated that the average
concentration of TDS in MW-31 was 1,265 mg/L and set GWCLs for the subject constituents at the following
levels: Selenium 71 µg/L Sulfate 532 mg/L TDS 1320 mg/L
Uranium 9.1 µg/L
Since 2010, the permitted GWCLs for Selenium, Sulfate and TDS in MW-31 have been raised multiple times and the GWCL for Uranium is now being raised, as follows:
Parameter 2010 GWCL 2018 GWCL Percent Increase
Selenium 71 µg/L 119.4 µg/L 68.7%
Sulfate 532 mg/L 993 mg/L 86.65% TDS 1320 mg/L 2132 mg/L 61.52% Uranium 9.1 µg/L 15 µg/L 64.84%
Comment #2: DWMRC has not provided the public any credible explanation of how it calculated the GWCLs and how it justifies the dramatic increases. Instead, the Statement of Basis merely cites prior approvals
and various technical documents, leaving the public to research and divine the basis of the proposed regulatory action. DWMRC should provide the public a clear explanation in the Statement of Basis or in the Permit of exactly how it calculated the GWCLs and how it justifies the dramatic increases under its regulations.
DWMRC statements that it previously approved the GWCLs (without opportunity for public comment) does not relieve the agency from providing the public a reasoned explanation for its proposed actions.
DWMRC must also explain the basis for its own specific conclusions and reasons for raising the GWCLs
and not merely cite to reports submitted by EFRI which contain a myriad of unproven explanations and
inconsistent arguments. Comment #3. DWMRC should provide an explanation of the basis for its action in light of data collected and reports submitted in 2017 and 2018 which show accelerating degradation of the shallow groundwater quality
at the Mill, the expansion of the area and concentration of identified contaminant plumes (nitrate/chloride and
chloroform), and the failure of ongoing corrective actions to restrict the plumes and reduce the masses of the contaminants. Comment #4. The Tribe is very concerned about the increasing signature of contamination in the
groundwater spreading to the east, south and southeast directions from the Mill facility. The Tribe, as it has in
past comments, again urges DWMRC to add requirements in the Permit for the Mill operator to monitor a full analytical suite of parameters for all of the Chloroform (TW-4 series wells) and the Nitrate (TWN-series wells) in
5 | P a g e
order to identify the source(s) of the contamination. Contamination from Mill operations could also be moving in narrow preferential pathways, or paleochannels in the aquifer, to the area of MW-22 while being undetected due
to gaps in the monitoring well network which is orientated in a NW-SW trend despite a large amount of evidence for S -SE preferential groundwater flow. Comment #5. In response to the forgoing concern expressed by the Tribe, DWMRC added a requirement to the Permit in early 2018 for collection of a full suite of analytics at TW4-24 a well on the SE margin of
Tailings Cell 1. Subsequent sampling results in 2018 revealed uranium concentrations above 600 ug/L - far above possible natural conditions and indicative of facility impact to a severe degree. This uranium loading at TW4-24 should immediately trigger additional investigation. The Tribe urges that an analysis of the uranium isotopes be required and undertaken immediately to evaluate the activity ratio (AR) signature. DWMRC has agreed publicly (DWMRC, 2012) that the AR calculation is valid and valuable. It’s now time for DWMRC to
impose the requirement.
Comment #6. In connection with the 2018 renewal of the Permit three additional monitoring wells were installed to the SE towards existing monitoring well MW-22. One of these new wells (MW-39) revealed extremely concerning concentrations of beryllium, cobalt, cadmium, nickel and thallium along with very low pH,
similar to MW-22 and provides evidence that MW-39 may be affected by a nearby preferential pathway of a high concentration contamination vector leading from the facility to the SE of the facility. The new wells near MW-22 should be included in a comprehensive, up-dated isotopic study along with other site wells as recommended in our relicensing comments. A new and updated isotopic study and re-evaluation of the source(s) of contamination causing the decline and spread of groundwater contamination in the Burro Canyon aquifer should be required and
undertaken immediately.
Comment #7. A new, updated isotopic study of monitoring wells should be required and undertaken, updating the isotopic study work performed at the Mill by the University of Utah in 2007 and additionally characterize chemical composition, noble gas composition, and age of the groundwater monitoring wells and
surface water sites that were not part of the 2007 University of Utah Study. The study should include at a minimum: Isotopic Groundwater and Surface Water Investigation and Report - within 180 calendar days of issuance of this Permit, the Permittee shall submit an isotopic groundwater and surface water investigation report for
Executive Secretary approval. The purpose of this investigation and associated report shall be to characterize chemical composition, noble gas composition, and age of the groundwater monitoring wells and surface water sites. Minimum locations required to be included in the study: On-site Wells: MW-1, MW-18, MW-19, MW- 27, MW-02, MW-29, MW-30, MW-31, MW-05, MW-11, MW-15, MW-14, MW-3, MW-22 (wells included in
initial 2007 University of Utah sampling). In addition, all POC and general monitoring wells not included in the University of Utah Study and; TWN-2, TW4-24, MW-39, WW-2 and Springs: Entrance Spring, Westwater Spring, Cottonwood Spring, Ruin Spring. The report shall include, but is not limited to: a. An examination of groundwater age and isotopic/geochemical conditions using a comprehensive
analytical suite of major and trace elements (including all analytes required under Table 2 of the GWDP at a minimum) with the addition of stable isotopes of oxygen, hydrogen, carbon, boron, strontium, lithium and sulfur and isotopes of radionuclides (uranium, radium, lead-210). After concentrations have been obtained for each well, the Permittee must verify if any of the monitoring wells have been influenced by the artificial recharge from the tailings and/or facility operations.
6 | P a g e
b. An examination of evaporative signatures including isotopes Deuterium and Oxygen-18 in water at each sampling location, Examination of groundwater age using the tritium/helium-3 method in each monitoring
well and surface water sources , Evaluation of isotopes Oxygen-18 and Sulfur-34 on dissolved sulfate molecules in the water samples.
The purpose of this supplemental investigation and associated report shall be to establish and evaluate isotopic benchmarks, geochemical characteristics, and a ground/surface water age at these locations.
Comment #8. When significant trends in background compliance well data are discovered, the contaminant source must be identified, and the source of the trend must be found to be unrelated to the regulated facility prior to modifying the associated compliance limit. (See, e.g., Utah Admin. Code R317-6-1 (definition of “background concentration”)).
Comment #9. Under the Utah Groundwater Protection Regulations, DWMRC should not constantly adjust background levels to justify repeated resetting of GWCLs to more lenient compliance levels to avoid exceedances, but, instead, should require the Mill operator to follow the established regulatory process for setting alternate concentration limits – which necessarily requires, among other things, steps to correct the source of the
contamination.
Comment #10. Under the so-called EPA 2011 Unified Guidance which DWMRC states it relied on in setting GWCLs on an intra-well basis for MW-31 and all other wells, GWCLS should not be adjusted when, as is
the case at the Mill, statistically significant trends in groundwater contamination are evident and the source of the
contamination has not been identified. Comment #11. A foundational element of the EPA 2011 Unified Guidance is that it is unacceptable to raise a GWCL if there is a possibility the Mill facility may be the cause of the exceedance. The original GWCLs should be retained and the DWMRC review and approval of the modified GWCLs should be re-visited in a sound
scientific manner (e.g., based on an updated isotopic study) prior to the proposal of adjusted background levels and modified GWCLs. Comment #12. There has been no showing by EFR or DWMRC that the purportedly changing background concentrations detected in Mill monitoring wells “[have] not been affected by that facility, activity,
or practice” as required by Utah regulations and the Unified Guidance. In fact, the very opposite is true - background concentrations have been and are being affected by the Mill operations and activities. Both EFRI and DWMRC have recently acknowledged that it has not been possible to determine the source or cause of increasing nitrate and chloride contamination or to rule out a source caused by Mill operations (EFRI, November 2018). These two contaminants have been called “smoking gun” indicator parameters of tailings cell leakage by
DWMRC in the past (DWMRC, 1999) and are associated with rising concentrations of selenium, uranium and total dissolved solids (TDS) in well MW-31. The source of increasing contamination in the Burro Canyon aquifer must be positively determined prior to the approval of any modified GWCLs for this well.
II. THE ADDITION OF DISSOLVED OXYGEN TO FIELD MONITORING REQUIREMENTS
Comment #13. The Tribe supports the DWMRC’s addition of a requirement to monitor and report dissolved oxygen (DO). As noted by DWMRC in their rationale for the addition, DO will provide valuable information providing insight into the fate and transport of metals in the groundwater and the feasibility of the theory of chloroform degradation that EFRI has proposed and would require anoxic conditions.
7 | P a g e
Comment #14. The Tribe urges DWMRC to use a formal scientific screening criteria to comprehensively evaluate the theory of chloroform attenuation; the theory must be clearly and scientifically demonstrated with site
specific data. The Minnesota Pollution Control Agency has developed a specific guideline document with scoring criteria for this purpose (Minnesota, 2006). Comment #15. The DWMRC should add requirements for collection of dissolved organic carbon, methane, sulfide and ferrous iron as additional relevant analytes to provide a clear demonstration of whether or
not chlorinated solvent natural attenuation is occurring. If abiotic degradation of pyrite is to be taken seriously, it needs to be demonstrated as feasible using a microcosm study with aquifer material from the site (Minnesota, 2006). The data presented to date by EFRI is not sufficient to support either theory. Neither theory is credible.
Comment #16. The Tribe again requests that DWMRC support a geochemistry microcosm study to
evaluate feasibility of pyrite acting as a source or driver of increasing contamination in the aquifer as well as attenuation mechanism as EFRI has proposed. The data collected to date and presented in the recent Chloroform CACME and Nitrate CACME show
overall greater spatial extent of the plumes along with concentrations that are continuing to increase, indicative of
continuing sources that remain unidentified. Comment #17.The nitrate and chloroform wells should be included in a comprehensive updated isotopic study to provide fundamental information required for a source evaluation assessment, advanced geophysical characterization of the vadose zone using high performance subsurface imagery techniques should also be
mandated.
Comment #18. While the collection of DO data will be valuable for the assessment of declining pH and increasing metals and ions in many of the point-of-compliance monitoring wells, including MW-31 and MW-14 addressed in this proposed Modification of the Permit, the DO data need to be considered in a comprehensive
isotopic study for any valid conclusions regarding the driving forces behind the decline in water quality and the true source of the contamination. The Tribe appreciates the opportunity to submit these comments.
Sincerely,
Colin Larrick Water Quality Program Manager Ute Mountain Ute Tribe
8 | P a g e
References
INTERA, Revised Addendum Background Groundwater Quality Report: New Wells For Denison Mines (USA) Corp.’s White Mesa Mill Site, San Juan County, Utah, Table 10 (April 30, 2008).
Utah Division of Radiation Control. July 9, 2012. Public Presentation, Blanding Utah. USGS Report: White Mesa
Uranium Mill. https://deq.utah.gov/legacy/businesses/e/energy-fuels-resources- usa/docs/2012/08Aug/2012USGSReport_070612.PDF State of Utah Department of Environmental Quality Division of Waste Management and Radiation Control.
March, 20, 2018. Re: Energy Fuels Resources (USA) Inc. August 21, 2017, Source Assessment Report for MW-
31 Groundwater Discharge Permit No. UGW370004 (Permit) White Mesa Uranium Mill. State of Utah Department of Environmental Quality Division of Waste Management and Radiation Control. June 13, 2018. Letter from Dean Henderson to Phil Goble. Review of the December 11, 2017 Nitrate Corrective Action Comprehensive Evaluation and Monitoring Report (“CACME”), White Mesa Uranium Mill near
Blanding Utah, for Energy Fuels (USA) Inc (“EFRI”) stipulated consent order UDEQ Docket No. UGW 12-04 (“SCO”). DRC-2018-006564. Energy Fuels Resources (USA) Inc. November 14, 2018. Letter to Scott Anderson, Director of Utah Division of Waste Management and Radiation Control. State of Utah Ground Water Discharge Permit No. UGW370004
White Mesa Uranium Mill Notice Pursuant to Part IG.1(a). DRC-2018-011997. Geo-Logic Report: Updated Data Review and Evaluation of Groundwater Monitoring, White Mesa Uranium Mill, Blanding, Utah, July 2017; Project No. AU17.1116; Prepared for: Ute Mountain Ute Tribe, P.O. Box 448,
Towaoc, CO 81334; Prepared by: Geo-Logic Associates, 1760 E. River Road, Suite 115, Tucson, AZ 85718.
Hydro Geo Chem, Inc. December 11, 2017. Nitrate Corrective Action Comprehensive Monitoring and Evaluation (CACME) Report, White Mesa Uranium Mill near Blanding Utah. Prepared for Energy Fuels Resources (USA) Inc.
Hydro Geo Chem, Inc. March 30, 2018. Chloroform Corrective Action Comprehensive Monitoring and Evaluation (CACME) Report, White Mesa Uranium Mill near Blanding Utah. Prepared for Energy Fuels Resources (USA) Inc. Minnesota Pollution Control Agency. 2006. Guidelines Natural Attenuation of Chlorinated Solvents in
Groundwater. Site Remediation Section. https://www.pca.state.mn.us/sites/default/files/c-s4-05.pdf U.S. Environmental Protection Agency Office of Resource Conservation and Recovery Program Implementation Division. March 2009. Unified Guidance, Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities. EPA 530-R-09-007.
Attachment 3 – Copy of the December 28, 2018 Document from Weber Sustainability Consulting
Fwd: [DWMRC Public] White Mesa Uranium Mill
Groundwater Permit Review
From: Ivan Weber <> Date: Fri, Dec 28, 2018 at 3:57 PM Subject: [DWMRC Public] White Mesa Uranium Mill Groundwater Permit Review
To: <dwmrcpublic@utah.gov>
Cc: WMAN Uranium Caucus <>
Scott T. Anderson, Director:
Dear Mr. Anderson, Please forgive this non-review of the WMUM groundwater permit. We have had no
opportunity to review the documents, themselves, apparently due to a non-functional
relationship between my laptop computer and the DEQ website document repository --- as well as lack of time to set aside competing demands on our discretionary time. If opportunity may exist for review in upcoming days or hours, we will strive to do so as a continuation of our review over previous years of White Mesa Mill’s permit processes. If
not, please accept our apologies, and exercise your own critical sensibilities in your own
review of the Mill. We have found it to be terribly ineffective, in the past, and have every anticipation that the current EPA and Presidential administrative climate will only cause it to be worse than ever before.
Again, please accept our apologies, along with our simple assurance that we had every
intention of critical review. We suspect that you will have received other reviews from WMAN and environmental activists around the Southwest and from within Utah. Ivan Weber
Ivan Weber, LEED-AP
Principal/Owner Weber Sustainability Consulting 953 1st Avenue Salt Lake City, Utah 84103 801-651-8841 cellular / 801-355-6863 land-home ivan@webersustain.com Regenerative economic development through industrial ecology
Attachment 4 – Copy of the Energy Fuels Resources (USA) Inc. August 22, 2012 Red-line Strike-out Groundwater Permit No. UGW370004
Permit No. UGW370004
STATE OF UTAH
DIVISION OF WATER QUALITY DEPARTMENT OF ENVIRONMENTAL QUALITY UTAH WATER QUALITY BOARD SALT LAKE CITY, UTAH 84114-4870
GROUND WATER DISCHARGE PERMIT In compliance with the provisions of the Utah Water Quality Act, Title 19, Chapter 5, Utah Code
Annotated 1953, as amended, the Act,
Energy Fuels Resources (USA) Inc. 225 Union Boulevard, Suite 600 Lakewood, CO 80228
is granted a ground water discharge permit for the operation of a uranium milling and tailings disposal facility located approximately 6 miles south of Blanding, Utah. The facility is located on a tract of land in Sections 28, 29, 32, and 33, Township 37 South, Range 22 East, Salt Lake Base and Meridian, San Juan County, Utah.
The permit is based on representations made by the Permittee and other information contained in the administrative record. It is the responsibility of the Permittee to read and understand all provisions of this Permit. The milling and tailings disposal facility shall be operated and revised in accordance with
conditions set forth in the Permit and the Utah Ground Water Quality Protection Regulations. This Ground Water Quality Discharge Permit amends and supersedes all other Ground Water Discharge permits for this facility issued previously.
Permit Modified on ____________, ______, 2018 This Permit shall become effective on January_____________, 19_____, 2018.
This Permit shall expire on January_______________, 19_____, 2023.
Signed this ____ day of ______________, 2018.
_____________________________ Scott T. Anderson, Director Division of Waste Management and Radiation Control
i
Table of Contents
PART I. SPECIFIC PERMIT CONDITIONS ................................................................................ 1 A. GROUND WATER CLASSIFICATION....................................................................................... 1 B. BACKGROUND WATER QUALITY ......................................................................................... 1
C. PERMIT LIMITS ..................................................................................................................... 2
1. Ground Water Compliance Limits .................................................................................. 2 2. Tailings Cell Operations .................................................................................................. 2 3. Prohibited Discharges ..................................................................................................... 2 D. DISCHARGE MINIMIZATION AND BEST AVAILABLE TECHNOLOGY STANDARDS .................. 6
1. DMT Design Standards for Existing Tailings Cells 1, 2, and 3 ...................................... 6
2. Existing Tailings Cell Construction Authorized ............................................................. 8 3. Existing Facility DMT Performance Standards .............................................................. 8 4. Best Available Technology Requirements for New Construction ................................ 10 5. BAT Design Standards for Tailings Cell 4A ................................................................ 10
6. BAT Performance Standards for Tailings Cell 4A ....................................................... 13
7. Definition of 11e.(2) Waste ........................................................................................... 13 8. Closed Cell Performance Requirements........................................................................ 13 9. Facility Reclamation Requirements .............................................................................. 14 10. Stormwater Management and Spill Control Requirements ........................................... 14
11. Requirements for Feedstock Material Stored Outside the Feedstock Storage Area ..... 14
12. BAT Design Standards for Tailings Cell 4B ................................................................. 15 13. BAT Performance Standards for Tailings Cell 4B ........................................................ 18 14. BAT Performance Standards for the New Decontamination Pad ................................. 18 E. GROUND WATER COMPLIANCE AND TECHNOLOGY PERFORMANCE MONITORING ............ 19
1. Routine Groundwater Compliance Monitoring ............................................................. 19
2. Groundwater Monitoring: General Monitoring Wells .................................................. 20 3. Groundwater Head Monitoring ..................................................................................... 20 4. Groundwater Monitoring Well Design and Construction Criteria ................................ 21 5. Monitoring Procedures for Wells .................................................................................. 21 6. White Mesa Seep and Spring Monitoring ..................................................................... 21
7. DMT Performance Standard Monitoring ...................................................................... 22 8. BAT Performance Standard Monitoring ....................................................................... 23 9. On-site Chemicals Inventory ......................................................................................... 24 10. Tailings Cell Wastewater Quality Monitoring .............................................................. 24 11. Groundwater Monitoring Modifications ....................................................................... 25
12. BAT Performance Standard Monitoring ....................................................................... 25 F. REPORTING REQUIREMENTS .............................................................................................. 27 1. Routine Groundwater Monitoring Reports ................................................................... 27 2. Routine DMT Performance Standard Monitoring Report ............................................. 28
3. Routine BAT Performance Standard Monitoring Reports ............................................ 28
4. DMT and BAT Performance Upset Reports ................................................................. 28 5. Other Information .......................................................................................................... 28 6. Groundwater Monitoring Well As-Built Reports .......................................................... 29 7. White Mesa Seeps and Springs Monitoring Reports .................................................... 29 8. Chemicals Inventory Report .......................................................................................... 30
9. Tailings Cell Wastewater Quality Reports .................................................................... 30 10. Revised Hydrogeologic Report ..................................................................................... 30 11. Annual Slimes Drain Recovery Head Report................................................................ 31 12. Decontamination Pads Annual Inspection Report ........................................................ 31
G. OUT OF COMPLIANCE STATUS ........................................................................................... 32
ii
1. Accelerated Monitoring Status ...................................................................................... 32
2. Violation of Permit Limits ............................................................................................ 32 3. Failure to Maintain DMT or BAT Required by Permit................................................. 32 4. Facility Out of Compliance Status ................................................................................ 33 H. COMPLIANCE SCHEDULE REQUIREMENTS. ......................................................................... 34
1. Slimes Drain Compliance Plan. .................................................................................... 34
2. Installation of New Groundwater Monitoring Wells .................................................... 34 3. Background Groundwater Quality Report for MW-38, MW-39, MW-40 .................... 34 PART II. REPORTING REQUIREMENTS ................................................................................ 36 A. REPRESENTATIVE SAMPLING. ............................................................................................ 36
B. ANALYTICAL PROCEDURES. ............................................................................................... 36
C. PENALTIES FOR TAMPERING. ............................................................................................. 36 D. REPORTING OF MONITORING RESULTS .............................................................................. 36 E. COMPLIANCE SCHEDULES .................................................................................................. 36 F. ADDITIONAL MONITORING BY THE PERMITTEE ................................................................. 36
G. RECORDS CONTENTS ......................................................................................................... 36
H. RETENTION OF RECORDS ................................................................................................... 37 I. NOTICE OF NONCOMPLIANCE REPORTING.......................................................................... 37 J. OTHER NONCOMPLIANCE REPORTING ............................................................................... 37 K. INSPECTION AND ENTRY .................................................................................................... 37
PART III. COMPLIANCE RESPONSIBILITIES ....................................................................... 38
A. DUTY TO COMPLY .............................................................................................................. 38 B. PENALTIES FOR VIOLATIONS OF PERMIT CONDITIONS ....................................................... 38 C. NEED TO HALT OR REDUCE ACTIVITY NOT A DEFENSE ..................................................... 38 D. DUTY TO MITIGATE ........................................................................................................... 38
E. PROPER OPERATION AND MAINTENANCE .......................................................................... 38
PART IV. GENERAL REQUIREMENTS .................................................................................. 39 A. PLANNED CHANGES ........................................................................................................... 39 B. ANTICIPATED NONCOMPLIANCE ........................................................................................ 39 C. PERMIT ACTIONS ............................................................................................................... 39
D. DUTY TO REAPPLY ............................................................................................................. 39
E. DUTY TO PROVIDE INFORMATION ...................................................................................... 39 F. OTHER INFORMATION ........................................................................................................ 39 G. SIGNATORY REQUIREMENTS .............................................................................................. 39 H. PENALTIES FOR FALSIFICATION OF REPORTS ..................................................................... 40
I. AVAILABILITY OF REPORTS ............................................................................................... 40
J. PROPERTY RIGHTS ............................................................................................................. 40 K. SEVERABILITY ................................................................................................................... 40 L. TRANSFERS ........................................................................................................................ 40 M. STATE LAWS ...................................................................................................................... 41
N. REOPENER PROVISIONS ...................................................................................................... 41
iii
List of Tables
Table 1. Ground Water Classification ............................................................................................ 1 Table 2. Groundwater Compliance Limits...................................................................................... 3 Table 3. DMT Engineering Design and Specifications .................................................................. 6 Table 4. Feedstock Storage Area Coordinates ................................................................................ 9
Table 5. Approved Tailings Cell 4A Engineering Design and Specifications ............................. 10
Table 6. Approved Tailings Cell 4B Engineering Design and Specifications .............................. 15 Table 7. Groundwater Monitoring Reporting Schedule ............................................................... 27
Part I.A Permit No. UGW370004
1
PART I. SPECIFIC PERMIT CONDITIONS
A. GROUND WATER CLASSIFICATION - the groundwater classification of the shallow aquifer under the tailings facility has been determined on a well-by-well basis, as defined in Table 1,
below:
Table 1. Ground Water Classification
Class II Groundwater Class III Groundwater Average TDS (mg/L) Average TDS (mg/L) DUSA Data DUSA Data
Well ID N(1) Average Concentration(2) Standard Deviation(2) Well ID N(1) Average Concentration(2) Standard Deviation(2) MW-1(3) 77 1,273 93 MW-2 77 3,050 252 MW-5 82 2,058 170 MW-12 61 3,894 241
MW-11 71 1,844 178 MW-14 51 3,592 176
MW-30 42 1601 100 MW-15 47 3,857 243
MW-17 22 4,444 321
MW-18(3) 18 2,605 297 MW-19(3) 22 2,457 900 MW-20(4) 23 5,192 475
MW-22(4) 23 7,633 656
MW-3A 40 5,684 184
MW-23 33 3,419 408
MW-24 32 4,080 268
MW-25(5) 46 2,763 97
MW-26(6) 60 3,106 231
MW-27(7) 45 1,067 56
MW-28 32 3,633 101 MW-29 40 4,332 118 MW-31(7) 90 1,395 138
MW-32(8) 32 3,703 166
MW-35 24 3,725 354
MW-36 21 4,344 154
MW-37 21 3,881 108
Footnotes:
1) N = Number of Samples 2) Based on historic total dissolved solids (TDS) data provided by the Permittee for period between October, 1979 and September 2016. This data was obtained from the Permittee’s background groundwater quality reports.. 3) Background concentrations of uranium in well MW-18 (55.1 µg/L) and thallium in MW-19 (2.1 µg/L) exceed the GWQS, 30 µg/L and 2.0 µg/L, respectively. Therefore these wells have been classified as Class III groundwater rather than Class II groundwater. 4) Wells MW-1, MW-18, MW-19, MW-20, MW-22, and TW4-24 are not point of compliance monitoring wells, but instead are general monitoring wells as per Part I.E.2. Average concentrations and standard deviations for wells MW-20 and MW-22 were provided by the Permittee for the period between June, 2008 and February, 2010. This data was obtained from the Permittee’s Background Groundwater Quality Report for wells MW-20 and MW-22 dated June, 2010. 5) Background concentration of manganese in well MW-25 (1,806 µg/L) exceeds the GWQS, therefore well MW-25 has been classified as Class III groundwater rather than Class II groundwater. 6) Well MW-26 was originally named TW4-15 and was installed as part of the chloroform contaminant investigation at the facility. Under this Permit, MW-26 is defined as a Point of Compliance (POC) well for the tailings cells (see Part I.E.1). 7) Background concentrations of uranium in well MW-27 (34 µg/L) and selenium in MW-31 (71 µg/L) exceed the GWQS, therefore these wells have been classified as Class III groundwater rather than Class II groundwater. 8) Well MW-32 was originally named TW4-17 and was installed as part of the chloroform contaminant investigation at the facility. Under this Permit it is included as a POC well for the tailings cells in Part I.E.1. B. BACKGROUND WATER QUALITY - based on groundwater samples collected through June 2007 for existing wells (MW-1, MW-2, MW-3, MW-5, MW-11, MW-12, MW-14, MW-15, MW-17,
Part I.B & I.C Permit No. UGW370004
2
MW-18, MW-19, MW-26, and MW-32) and through December 2007 for new wells (MW-3A, MW-23, MW 24, MW-25, MW-27, MW-28, MW-29, MW-30 and MW-31), the upper boundary of background groundwater quality is determined on a well-by-well basis, pursuant to
Environmental Protection Agency (EPA) guidance, and documented in the Permittee’s
background groundwater quality reports dated October 2007, April 30, 2008, and May 1, 2014.
C. PERMIT LIMITS - the Permittee shall comply with the following permit limits:
1. Ground Water Compliance Limits - contaminant concentrations measured in each monitoring well listed in Table 2 below shall not exceed the Ground Water Compliance
Limits (GWCL) defined in Table 2, below. Groundwater quality in the wells listed in
Table 2 below must at all times meet all the applicable GWQS and ad hoc GWQS defined in R317-6 even though this permit does not require monitoring for each specific contaminant.
2. Tailings Cell Operations - only 11.e.(2) by-product material authorized by Utah
Radioactive Materials License No. UT-2300478 (hereafter License) shall be discharged
to or disposed of in the tailings ponds.
3. Prohibited Discharges - discharge of other compounds such as paints, used oil, antifreeze, pesticides, or any other contaminant not defined as 11e.(2) material is prohibited.
3
Table 2. Groundwater Compliance Limits (GWCL)
Upgradient Well Down or Lateral Gradient Wells
MW-27 (Class III) MW-2 (Class III) MW-3A (Class III) MW-5 (Class II) MW-11 (Class II) MW-12 (Class III) MW-14 (Class III) MW-15 (Class III) MW-17 (Class III) MW-23 (Class III) MW-24 (Class III) MW-25 (Class III)
Contaminant GWQS (1) GWCL GWCL (6) GWCL GWCL GWCL (7) GWCL GWCL GWCL GWCL GWCL GWCL GWCL
Nutrients (mg/L)
Ammonia (as N) 25 (2) 12.5 12.5 0.6 1.02 6.25 0.6 12.5 0.21 0.26 0.6 7 0.77
Nitrate + Nitrite (as N) 10 5.6 0.12 1.3 2.5 2.5 5 5 0.27 5 (8) 5 5 5
Heavy Metals (µg/L)
Arsenic 50 25 25 25 17 15 25 25 25 25 25 17 25
Beryllium 4 2 2 2 1 1 2 2 2 2 2 2 2
Cadmium 5 2.5 2.5 3.55 2 1.25 7 2.5 2.5 2.5 2.5 6.43 1.5
Chromium 100 50 50 50 25 25 50 50 50 50 50 50 50
Cobalt 730 (5) 365 365 365 182.5 182.5 365 365 365 365 365 365 365
Copper 1,300 650 650 650 325 325 650 650 650 650 650 650 650
Iron 11,000 (5) 5,500 151.6 5,500 2,750 2,750 5,500 5,500 81.7 5,500 5,500 4,162 5,500
Lead 15 7.5 7.5 7.5 4.1 3.75 7.5 7.5 7.5 7.5 7.5 7.5 7.5
Manganese 800 (4) 400 378.76 383 376.74 164.67 2,088.80 2,230.30 400 915.4 550 7,507 1,806
Mercury 2 1 1 1 1 0.5 1 1 1 1 1 1 1 Molybdenum 40 (2) 20 20 20 10 10 20 25 30 20 20 20 20
Nickel 100 (3) 50 60 105 44.1 46.2 60 50 97 50 50 50 50
Selenium 50 25 26.6 109.58 12.5 12.5 39 25 128.7 25 25 25 25
Silver 100 50 50 50 25 25 50 50 50 50 50 50 50
Thallium 2 1 1 1.4 0.5 0.5 1 1 1 1 1.5 2.01 1.1 Tin 17,000 (4) 8,500 8,500 8,500 4,250 4,250 8,500 8,500 8,500 8,500 8,500 8,500 8,500
Uranium 30 (3) 34 18.45 35 7.5 7.5 23.5 98 65.7 46.66 32 11.9 7.25
Vanadium 60 (4) 30 30 30 15 15 30 30 40 30 30 30 30
Zinc 5,000 2,500 2,500 155 87.38 1,250 2,500 35.04 2,500 2,500 74 2,500 2,500
Radiologics (pCi/L)
Gross Alpha 15 2 3.2 7.5 3.75 3.75 7.5 7.5 7.5 2.8 2.86 7.5 7.5
Volatile Organic Compounds (µg/L)
Acetone 700 (4) 350 350 350 175 175 350 350 350 350 350 350 350
Benzene 5 2.5 2.5 2.5 1.25 1.25 2.5 2.5 2.5 2.5 2.5 2.5 2.5
2-Butanone (MEK) 4,000 (2) 2,000 2,000 2,000 1,000 1,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
Carbon Tetrachloride 5 2.5 2.5 2.5 1.25 1.25 2.5 2.5 2.5 2.5 2.5 2.5 2.5
Chloroform 70 (4) 35 35 35 17.5 17.5 35 35 35 35 35 35 35
Chloromethane 30 (2) 15 15 9.4 7.5 7.5 15 15 15 15 5.7 15 15
Dichloromethane 5 (3) 2.5 2.5 2.5 1.25 1.25 2.5 2.5 2.5 2.5 2.5 2.5 2.5
Naphthalene 100 (2) 50 50 50 25 25 50 50 50 50 50 50 50
Tetrahydrofuran 46 (4) 23 23 23 11.5 11.5 23 23 23 23 23 23 23
Toluene 1,000 500 500 500 250 250 500 500 500 500 500 500 500
Xylenes (total) 10,000 5,000 5,000 5,000 2,500 2,500 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Others
Field pH (S.U.) 6.5 - 8.5 6.47 - 8.5 6.72 - 8.5 5.84 - 8.5 7.04 - 8.5 6.25 - 8.5 5.86 - 8.5 5.42 - 8.5 5.88 - 8.5 6.27 - 8.5 5.97 - 8.5 5.03 - 8.5 5.77 - 8.5
Fluoride (mg/L) 4 0.85 0.43 1.6 1.42 1 2 0.220.2 2 2 2 0.47 0.42
Chloride (mg/L) 38 20 70 71 39.16 80.5 27 57.1 46.8 10 71 35 Sulfate (mg/L) 462 2,147 3,949.27 1,518 1,309 2,560 2,330 2,549.02 2,860 2,524 2,903 1,933
TDS (mg/L) 1,185.72 3,800 6,028 2,575 2,528 4,323 4,062 4,530 5,085.42 3,670 4,450 2,976
4
Table 2 Continued. Groundwater Compliance Limits (GWCL)
Down or Lateral Gradient Wells
MW-26 (Class III) MW-28 (Class III) MW-29 (Class III) MW-30 (Class II) MW-31 (Class III) MW-32 (Class III) MW-35 (Class III) MW-36 (Class III) MW-37 (Class III)
Contaminant GWQS (
1) GWCL GWCL GWCL GWCL GWCL GWCL (7) GWCL GWCL GWCL
Nutrients (mg/L)
Ammonia (as N) 25 (2) 0.92 12.5 1.3 0.14 12.5 1.17 0.14 12.5 12.5
Nitrate + Nitrite (as N) 10 0.62 5 5 2.5 5 5 5 5 2.22
Heavy Metals (µg/L)
Arsenic 50 25 21 25 12.5 25 25 25 25 25
Beryllium 4 2 2 2 1 2 2 2 2 2
Cadmium 5 2.5 5.2 2.5 1.25 2.5 4.72 2.5 2.5 2.5
Chromium 100 50 50 50 25 50 50 50 50 50
Cobalt 730 (5) 365 47 365 182.5 365 75.21 365 365 365 Copper 1,300 650 650 650 325 650 650 650 650 650
Iron 11,000 (5) 2,675.83 299 1,869 2,750 5,500 14,060 330.08 5,500 5,500
Lead 15 7.5 7.5 7.5 3.75 7.5 7.5 7.5 7.5 7.5
Manganese 800 (4) 1,610 1,837 5,624 61 400 5,594.90 290.68 400 400
Mercury 2 1 1 1 0.5 1 1 1 1 1 Molybdenum 40 (2) 20 20 20 10 20 20 20 20 20
Nickel 100 (3) 50 50 50 25 50 94 50 50 50
Selenium 50 25 11.1 25 47.2 119.486.81 25 25 307.42 25
Silver 100 50 50 50 25 50 50 50 50 50
Thallium 2 1 1 1.2 0.5 1 1 1 1.35 1
Tin 17,000 (4) 8,500 8,500 8,500 4,250 8,500 8,500 8,500 8,500 8,500
Uranium 30 (3) 119 4.9 15 8.32 159.1 5.26 26.76 26.42 18.08
Vanadium 60 (4) 30 30 30 15 30 30 30 30 30
Zinc 5,000 2,500 83 30 1,250 2,500 230 2,500 2,500 41.25
Radiologics (pCi/L)
Gross Alpha 15 4.69 2.42 2 3.75 7.5 7 7.5 7.5 4.2
Volatile Organic Compounds (µg/L)
Acetone 700 (4) 350 350 350 175 350 350 350 350 350 Benzene 5 2.5 2.5 2.5 1.25 2.5 2.5 2.5 2.5 2.5
2-Butanone (MEK) 4,000 (2) 2,000 2,000 2,000 1,000 2,000 2,000 2,000 2,000 2,000
Carbon Tetrachloride 5 5 2.5 2.5 1.25 2.5 2.5 2.5 2.5 2.5
Chloroform 70 (4) 70 35 35 17.5 35 35 35 35 35 Chloromethane 30 (2) 30 4.6 15 7.5 6.1 15 15 15 15
Dichloromethane 5 (3) 5 2.5 2.5 1.25 2.5 2.5 2.5 2.5 2.5
Naphthalene 100 (2) 50 50 50 25 50 50 50 50 50
Tetrahydrofuran 46 (4) 23 23 23 11.5 23 23 23 23 23
Toluene 1,000 500 500 500 250 500 500 500 500 500 Xylenes (total) 10,000 5,000 5,000 5,000 2,500 5,000 5,000 5,000 5,000 5,000
Others
Field pH (S.U.) 6.5 - 8.5 5.61 - 8.5 5.58 - 8.5 5.94 - 8.5 6.47 - 8.5 6.23 - 8.5 5.31 - 8.5 6.15 - 8.5 6.49 - 8.5 6.61 - 8.5
Fluoride (mg/l) 4 2 0.73 1.1 0.51 2 2 0.42 0.35 0.31
Chloride (mg/l) 58.31 105 41 128 143 35.39 69.12 73 57.3 Sulfate (mg/l) 2,082.06 2,533 2,946 972 993697.60 2,556.70 2,400 3,146.21 2,927.65
5
TDS (mg/l) 3,284.19 3,852 4,570 1,918 2,1321,700 3,960 4,821.88 5,470 4,866.25
Footnotes: 1) Utah Ground Water Quality Standards (GWQS) as defined in UAC R317-6, Table 2. Ad hoc GWQS also provided herein, as noted, and as allowed by UAC R317-6-2.2. 2) Ad hoc GWQS for ammonia (as N), molybdenum, 2-Butanone (MEK), chloromethane, and naphthalene based on EPA drinking water lifetime health advisories. 3) Ad hoc GWQS for nickel, uranium, and dichloromethane (methylene chloride, CAS No. 75-09-2) based on final EPA drinking water maximum concentration limits (MCL). 4) Ad hoc GWQS for manganese, tin, vanadium, acetone, chloroform (CAS No. 67-66-3), and tetrahydrofuran based on drinking water ad hoc lifetime health advisories prepared by or in collaboration with EPA Region 8 staff. 5) Ad hoc GWQS for cobalt and iron based on EPA Region 3 Risk Based Concentration limits for tap water. 6) Ground Water Compliance Limits (GWCL) were set after Director review and approval of two Background Groundwater Quality Reports dated October_2007 and April 30, 2008 from the Permittee. 7) GWCLs listed in the table above are those proposed by the Permittee in the October 2007, April 30, 2008, and May 1, 2014 EFR Background Groundwater Quality Reports, and approved by the Director and also include values modified by the Director after review of GWCLs proposed in the Permittee’s October 2007, April 30, 2008, May 1, 2014 Background Groundwater Quality Reports. For wells MW-2, MW-3, MW-5, MW-11, MW-12, MW-14, MW-15, MW-17, MW-26, and MW-32; these modifications are documented in the June 16, 2008 URS Completeness Review for the October, 2007 Revised Background Groundwater Quality Report for Existing Wells. For wells MW-3A, MW-23, MW-24, MW-25, MW-27, MW-28, MW-29, MW-30, and MW-31; these modifications are documented in the June 24, 2008 DRC Findings Memorandum regarding the April 30, 2008 Revised Background Groundwater Quality Report for New Wells. For wells MW-35, MW-36, MW-37; these modifications are documented in the July 14, 2014 DRC Findings Memorandum regarding the May 1, 2014 Background Groundwater Quality Report for Wells MW-35, MW-36, and MW-37
Part I.D
Permit No. UGW370004
6
D. DISCHARGE MINIMIZATION AND BEST AVAILABLE TECHNOLOGY STANDARDS - the tailings
disposal facility must be built, operated, and maintained according to the following Discharge Minimization Technology (DMT) and Best Available Technology (BAT) standards:
1. DMT Design Standards for Existing Tailings Cells 1, 2, and 3 - shall be based on existing
construction as described by design and construction information provided by the
Permittee, as summarized in Table 3 below for Tailings Cells 1, 2, and 3: Table 3. DMT Engineering Design and Specifications
Tailings Cell Report Type Engineering Report Design Figures Construction Specifications Cell 1 Design June, 1979 D’Appolonia Consulting Engineers, Inc (1) Appendix A, Sheets 2, 4, 8, 9, 12-15 Appendix B
Cell 2 Design June, 1979 D’Appolonia Consulting Engineers, Inc (1) Appendix A, Sheets 2, 4, 7-10, 12-15 Appendix B
As-Built February, 1982 D’Appolonia Consulting Engineers, Inc (2) Figures 1, 2, and 11 N/A
Cell 3 Design May, 1981 D’Appolonia Consulting Engineers, Inc (3) Sheets 2-5 Appendix B
As-Built March, 1983 Energy Fuels Nuclear, Inc. (4) Figures 1-4 N/A
Footnotes: 1) D’Appolonia Consulting Engineers, Inc., June, 1979, “Engineers Report Tailings Management System White Mesa Uranium Project Blanding, Utah Energy Fuels Nuclear, Inc. Denver, Colorado”, unpublished consultants report, approximately 50 pp., 2 figures, 16 sheets, 2 appendices. 2) D’Appolonia Consulting Engineers, Inc., February, 1982, “Construction Report Initial Phase - Tailings Management System White Mesa Uranium Project Blanding, Utah Energy Fuels Nuclear, Inc. Denver, Colorado”, unpublished consultants report, approximately 7 pp., 6 tables, 13 figures, 4 appendices. 3) D’Appolonia Consulting Engineers, Inc., May, 1981, “Engineer’s Report Second Phase Design - Cell 3 Tailings Management System White Mesa Uranium Project Blanding, Utah Energy Fuels Nuclear, Inc. Denver, Colorado”, unpublished consultants report, approximately 20 pp., 1 figure, 5 sheets, and 3 appendices. 4) Energy Fuels Nuclear, Inc., March, 1983, “Construction Report Second Phase Tailings Management System White Mesa Uranium Project Energy Fuels Nuclear, Inc.”, unpublished company report, 18 pp., 3 tables, 4 figures, 5 appendices.
a) Tailings Cell 1 - consisting of the following major design elements:
1) Cross-valley Dike and East Dike - constructed on the south side of the pond of native granular materials with a 3:1 slope, a 20-foot crest width, and a crest elevation of about 5,620 ft above mean sea level (amsl). A dike of similar design was constructed on the east margin of the pond, which forms a continuous earthen
structure with the south dike. The remaining interior slopes are cut-slopes at 3:1
grade.
2) Liner System - including a single 30 mil PVC flexible membrane liner (FML) constructed of solvent welded seams on a prepared sub-base. Top elevation of the FML liner was 5,618.5 ft amsl on both the south dike and the north cut-slope. A
protective soil cover layer was constructed immediately over the FML with a
thickness of 12-inches on the cell floor and 18-inches on the interior sideslope.
3) Crushed Sandstone Underlay - immediately below the FML a nominal 6-inch thick layer of crushed sandstone was prepared and rolled smooth as a FML sub-base layer. Beneath this underlay, native sandstone and other foundation materials
were graded to drain to a single low point near the upstream toe of the south
Part I.D
Permit No. UGW370004
7
cross-valley dike. Inside this layer, an east-west oriented pipe was installed to
gather fluids at the upstream toe of the cross-valley dike.
b) Tailings Cell 2 - which consists of the following major design elements:
1) Cross-valley Dike - constructed at the south margin of Cell 2 of native granular materials with a 3:1 slope, a 20-foot crest width, and crest elevation of about
5,615 ft amsl. The east and west interior slopes consist of cut-slopes with a 3:1
grade. The Cell 1 south dike forms the north margin of Cell 2, with a crest elevation of 5,620 ft amsl.
2) Liner System - includes a single 30 mil PVC FML liner constructed of solvent welded seams on a prepared sub-base, and overlain by a slimes drain collection
system. Top elevation of the FML liner in Cell 2 is 5,615.0 ft and 5,613.5 ft amsl
on the north and south dikes, respectively. Said Cell 2 FML liner is independent of all other disposal cell FML liners. Immediately above the FML, a nominal 12-inch (cell floor) to 18-inch (inside sideslope) soil protective blanket was constructed of native sands from on-site excavated soils.
3) Crushed Sandstone Underlay - immediately below the FML a nominal 6-inch
thick layer of crushed sandstone was prepared and rolled smooth as a FML sub-base layer. Beneath this underlay, native sandstone and other foundation materials were graded to drain to a single low point near the upstream toe of the south cross-valley dike. Inside this layer, an east-west oriented pipe was installed to
gather fluids at the upstream toe of the cross-valley dike.
4) Slimes Drain Collection System immediately above the FML a nominal 12-inch thick protective blanket layer was constructed of native silty-sandy soil. On top of this protective blanket, a network of 1.5-inch PVC perforated pipe laterals was installed on a grid spacing interval of about 50-feet. These pipe laterals gravity
drain to a 3-inch diameter perforated PVC collector pipe which also drains toward
the south dike and is accessed from the ground surface via a 24-inch diameter, vertical non-perforated HDPE access pipe. Each run of lateral drainpipe and collector piping was covered with a 12 to 18-inch thick berm of native granular filter material. At cell closure, leachate head inside the pipe network will be
removed via a submersible pump installed inside the 24-inch diameter HDPE
access pipe.
c) Tailings Cell 3 - consisting of the following major design elements:
1) Cross-valley Dike - constructed at the south margin of Cell 3 of native granular materials with a 3:1 slope, a 20-foot crest width, and a crest elevation of 5,610 ft
amsl. The east and west interior slopes consist of cut-slopes with a 3:1 grade. The
Cell 2 south dike forms the north margin of Cell 3, with a crest elevation of 5,615 ft amsl.
2) Liner System - includes a single 30 mil PVC FML liner constructed of solvent welded seams on a prepared sub-base, and overlain by a slimes drain collection
system. Top elevation of the FML liner in Cell 3 is 5,613.5 ft and 5,608.5 ft amsl
on the north and south dikes, respectively. Said Cell 3 FML liner is independent of all other disposal cell FML liners.
Part I.D
Permit No. UGW370004
8
3) Crushed Sandstone Underlay - immediately below the FML a nominal 6-inch
thick layer of crushed sandstone was prepared and rolled smooth as a FML sub-base layer. Beneath this underlay, native sandstone and other foundation materials were graded to drain to a single low point near the upstream toe of the south cross-valley dike. Inside this layer, an east-west oriented pipe was installed to
gather fluids at the upstream toe of the cross-valley dike.
4) Slimes Drain Collection Layer and System - immediately above the FML, a nominal 12-inch (cell floor) to 18-inch (inside sideslope) soil protective blanket was constructed of native sands from on-site excavated soils (70%) and dewatered and cyclone separated tailings sands from the mill (30%). On top of this
protective blanket, a network of 3-inch PVC perforated pipe laterals was installed
on approximately 50-foot centers. This pipe network gravity drains to a 3-inch perforated PVC collector pipe which also drains toward the south dike, where it is accessed from the ground surface by a 12-inch diameter, inclined HDPE access pipe. Each run of the 3-inch lateral drainpipe and collector pipe was covered with
a 12 to 18-inch thick berm of native granular filter media. At cell closure, leachate
head inside the pipe network will be removed via a submersible pump installed inside the 12-inch diameter inclined access pipe.
2. Existing Tailings Cell Construction Authorized - tailings disposal in existing Tailings Cells 1, 2, and 3 is authorized by this Permit as defined in Table 3 and Part I.D.1, above.
Authorized operation and maximum disposal capacity in each of the existing tailings cells
shall not exceed the levels authorized by the License. Under no circumstances shall the freeboard be less than three feet, as measured from the top of the FML. Any modification by the Permittee to any approved engineering design parameter at these existing tailings cells shall require prior Director approval, modification of this Permit, and issuance of a
construction permit.
3. Existing Facility DMT Performance Standards - the Permittee shall operate and maintain certain mill site facilities and the existing tailings disposal cells to minimize the potential for wastewater release to groundwater and the environment, including, but not limited to the following additional DMT compliance measures:
a) DMT Monitoring Wells at Tailings Cell 1 - at all times the Permittee shall operate
and maintain Tailings Cell 1 to prevent groundwater quality conditions in any nearby monitoring well from exceeding any Ground Water Compliance Limit established in Table 2 of this Permit.
b) Tailings Cells 2 and 3 - including the following performance criteria:
1) Slimes Drain Maximum Allowable Head - the Permittee shall at all times
maintain the average wastewater recovery head in the slimes drain access pipe to be as low as reasonably achievable (ALARA) in each tailings disposal cell, in accordance with the currently approved DMT Monitoring Plan.
2) Quarterly Slimes Drain Recovery Test - effective July 11, 2011, the Permittee
shall conduct a quarterly slimes drain recovery test at each tailings cell slimes
drain that meets the following minimum requirements:
i. Includes a duration of at least 90-hours, as measured from the time that pumping ceases, and
Part I.D
Permit No. UGW370004
9
ii. Achieves a stable water level at the end of the test, as measured by three
consecutive hourly water level depth measurements, with no change in water level, as measured to the nearest 0.01 foot.
3) Annual Slimes Drain Compliance – The Permittee shall submit an annual report on or before March 1 following the reporting year which includes but is not
limited to; 1) Monthly volumes of fluid pumped from the slimes drain for each
applicable tailings disposal cell; 2) The results of all quarterly slimes drain recovery tests; 3) A calculation of average annual wastewater recovery elevation in the slimes drain access pipe, and; 4) The annual report shall include an assessment and verification that the maximum fluid volume which could
practicably be extracted from the slimes drain in accordance with the systems in
place was removed.
c) Maximum Tailings Waste Solids Elevation - upon closure of any tailings cell, the Permittee shall ensure that the maximum elevation of the tailings waste solids does not exceed the top of the FML liner.
d) DMT Monitoring Wells - at all times the Permittee shall operate and maintain
Tailings Cells 2 and 3 to prevent groundwater quality conditions in any nearby monitoring well from exceeding any Ground Water Compliance Limit established in Table 2 of this Permit.
e) Feedstock Storage Area - open-air or bulk storage of all feedstock materials at the
facility awaiting mill processing shall be limited to the eastern portion of the mill site
area described in Table 4, below. Storage of feedstock materials at the facility outside this area, shall meet the requirements in Part I.D.11. At the time of mill site closure, the Permittee shall reclaim and decommission the Feedstock Storage Area in compliance with an approved Reclamation Plan. The Permittee shall maintain a
minimum 4-foot wide buffer zone on the inside margin of the Feedstock Storage Area
between the storage area fence and the Feedstock which shall be absent of feed material in order to assure that materials do not encroach on the boundary of the storage area.
Table 4. Feedstock Storage Area Coordinates (1)
Corner Northing (ft) Easting (ft)
Northeast 323,595 2,580,925
Southeast 322,140 2,580,920
Southwest 322,140 2,580,420
West 1 322,815 2,580,410
West 2 323,040 2,580,085 West 3 323,120 2,580,085 West 4 323,315 2,580,285
West 5 323,415 2,579,990
Northwest 323,600 2,579,990
Footnote: 1) Approximate State Plane Coordinates beginning from the extreme northeast corner and progressing clockwise around the feedstock area (from 6/22/01 DUSA Response, Attachment K, Site Topographic Map, Revised June, 2001.)
f) Mill Site Chemical Reagent Storage - for all chemical reagents stored at existing storage facilities and held for use in the milling process, the Permittee shall provide secondary containment to capture and contain all volumes of reagent(s) that might be
released at any individual storage area. Response to spills, cleanup thereof, and
Part I.D
Permit No. UGW370004
10
required reporting shall comply with the provisions of the approved Emergency
Response Plan as found in the currently approved Stormwater Best Management Practices Plan. For any new construction of reagent storage facilities, said secondary containment and control shall prevent any contact of the spilled or otherwise released reagent or product with the ground surface.
4. Best Available Technology Requirements for New Construction - any construction,
modification, or operation of new waste or wastewater disposal, treatment, or storage facilities shall require submittal of engineering design plans and specifications, and prior Director review and approval. All engineering plans or specifications submitted shall demonstrate compliance with all Best Available Technology (BAT) requirements
stipulated by the Utah Ground Water Quality Protection Regulations (UAC R317-6).
Upon Director approval this Permit may be re-opened and modified to include any necessary requirements. 5. BAT Design Standards for Tailings Cell 4A - the BAT design standard for Tailings Cell
4A shall be defined by and construction conform to the requirements of the June 25, 2007
Director design approval letter for the relining of former existing Tailings Cell No. 4A, and as summarized by the engineering drawings, specifications, and description in Table 5, below:
Table 5. Approved Tailings Cell 4A Engineering Design and Specifications
Engineering Drawings
Name Date Revision No. Title
Sheet 1 of 7 June, 2007 Title Sheet
Sheet 2 of 7 June 15, 2007 Rev. 1 Site Plan
Sheet 3 of 7 June 15, 2007 Rev. 1 Base Grading Plan
Sheet 4 of 7 June 15, 2007 Rev. 1 Pipe Layout Plan Sheet 5 of 7 June 15, 2007 Rev. 1 Lining System Details I Sheet 6 of 7 June 15, 2007 Rev. 1 Lining System Details II
Sheet 7 of 7 June 15, 2007 Rev. 1 Lining System Details III
Figure 1 August, 2008 - Spillway Splash Pad Anchor
Engineering Specifications Date Document Title Prepared by June, 2007 Revised Technical Specifications for the Construction of Cell 4A Lining System Geosyntec Consultants
June, 2007 Revised Construction Quality Assurance Plan for the Construction of Cell 4A Lining System Geosyntec Consultants
March 27, 2007 Revised Geosynthetic Clay Liner Hydration Demonstration Work Plan (1) Geosyntec Consultants
November 27, 2006 Cell Seismic Study (2) MFG Consulting Scientists and Engineers October 6, 2006 Calculation of Action Leakage Rate Through the Leakage Detection System Underlying a Geomembrane Liner
Geosyntec Consultants
June 22, 2006 Slope Stability Analysis Cell 4A - Interim
Conditions
Geosyntec Consultants
June 23, 2006 Settlement Evaluation of Berms (2) Geosyntec Consultants
August 22, 2006 Pipe Strength Calculations Geosyntec Consultants
September 27, 2007 DMC Cell 4A - GCL Hydration Geosyntec Consultants
Footnotes:
Part I.D
Permit No. UGW370004
11
1) As qualified by conditions found in May 2, 2007 Division of Radiation Control letter. 2) As clarified by February 8, 2007 Division of Radiation Control Round 6 Interrogatory. Tailings Cell 4A Design and Construction - approved by the Director will consist of the following major elements:
a) Dikes - consisting of existing earthen embankments of compacted soil, constructed by
the Permittee between 1989 and1990, and composed of four dikes, each including a
15-foot wide road at the top (minimum). On the north, east, and south margins these dikes have slopes of 3H to 1V. The west dike has an interior slope of 2H to 1V. Width of these dikes varies; each has a minimum crest width of at least 15 feet to support an access road. Base width also varies from 89-feet on the east dike (with no
exterior embankment), to 211-feet at the west dike.
b) Foundation - including existing subgrade soils over bedrock materials. Foundation preparation included excavation and removal of contaminated soils, compaction of imported soils to a maximum dry density of 90%. Floor of Cell 4A has an average slope of 1% that grades from the northeast to the southwest corners.
c) Tailings Capacity - the floor and inside slopes of Cell 4A encompass about 40 acres
and have a maximum capacity of about 1.6 million cubic yards of tailings material storage (as measured below the required 3-foot freeboard).
d) Liner and Leak Detection Systems - including the following layers, in descending order:
1) Primary Flexible Membrane Liner (FML) - consisting of impermeable 60 mil
high density polyethylene (HDPE) membrane that extends across both the entire cell floor and the inside side-slopes, and is anchored in a trench at the top of the dikes on all four sides. The primary FML will be in direct physical contact with the tailings material over most of the Cell 4A floor area. In other locations, the
primary FML will be in contact with the slimes drain collection system (discussed
below).
2) Leak Detection System - includes a permeable HDPE geonet fabric that extends across the entire area under the primary FML in Cell 4A, and drains to a leak detection sump in the southwest corner. Access to the leak detection sump is via
an 18-inch inside diameter (ID) PVC pipe placed down the inside slope, located
between the primary and secondary FML liners. At its base this pipe will be surrounded with a gravel filter set in the leak detection sump, having dimensions of 10 feet by 10 feet by 2 feet deep. In turn, the gravel filter layer will be enclosed in an envelope of geotextile fabric. The purpose of both the gravel and geotextile
fabric is to serve as a filter.
3) Secondary FML - consisting of an impermeable 60-mil HDPE membrane found immediately below the leak detection geonet. Said FML also extends across the entire Cell 4A floor, up the inside side-slopes and is also anchored in a trench at the top of all four dikes.
4) Geosynthetic Clay Liner - consisting of a manufactured geosynthetic clay liner
(GCL) composed of 0.2-inch of low permeability bentonite clay centered and stitched between two layers of geotextile. Prior to disposal of any wastewater in Cell 4A, the Permittee shall demonstrate that the GCL has achieved a moisture
Part I.D
Permit No. UGW370004
12
content of at least 50% by weight. This item is a revised requirement per DRC
letter to DUSA dated September 28, 2007.
e) Slimes Drain Collection System - including a two-part system of strip drains and perforated collection pipes both installed immediately above the primary FML, as follows:
1) Horizontal Strip Drain System - is installed in a herringbone pattern across the
floor of Cell 4A that drain to a “backbone” of perforated collection pipes. These strip drains are made of a prefabricated two-part geo-composite drain material (solid polymer drainage strip) core surrounded by an envelope of non-woven geotextile filter fabric. The strip drains are placed immediately over the primary
FML on 50-foot centers, where they conduct fluids downgradient in a
southwesterly direction to a physical and hydraulic connection to the perforated slimes drain collection pipe. A series of continuous sand bags, filled with filter sand cover the strip drains. The sand bags are composed of a woven polyester fabric filled with well graded filter sand to protect the drainage system from
plugging.
2) Horizontal Slimes Drain Collection Pipe System - includes a “backbone” piping system of 4-inch ID Schedule 40 perforated PVC slimes drain collection (SDC) pipe found at the downgradient end of the strip drain lines. This pipe is in turn overlain by a berm of gravel that runs the entire diagonal length of the cell,
surrounded by a geotextile fabric cushion in immediate contact with the primary
FML. In turn, the gravel is overlain by a layer of non-woven geotextile to serve as an additional filter material. This perforated collection pipe serves as the “backbone” to the slimes drain system and runs from the far northeast corner downhill to the far southwest corner of Cell 4A where it joins the slimes drain
access pipe.
3) Slimes Drain Access Pipe - consisting of an 18-inch ID Schedule 40 PVC pipe placed down the inside slope of Cell 4A at the southwest corner, above the primary FML. Said pipe then merges with another horizontal pipe of equivalent diameter and material, where it is enveloped by gravel and woven geotextile that
serves as a cushion to protect the primary FML. A reducer connects the horizontal
18-inch pipe with the 4-inch SDC pipe. At some future time, a pump will be set in this 18-inch pipe and used to remove tailings wastewaters for purposes of de-watering the tailings cell.
f) Cell 4A North Dike Splash Pads - three 20-foot wide splash pads will be constructed
on the north dike to protect the primary FML from abrasion and scouring by tailings
slurry. These pads will consist of an extra layer of 60 mil HDPE membrane that will be installed in the anchor trench and placed down the inside slope of Cell 4A, from the top of the dike, under the inlet pipe, and down the inside slope to a point 5-feet beyond the toe of the slope.
g) Cell 4A Emergency Spillway - a concrete lined spillway will be constructed near the
western corner of the north dike to allow emergency runoff from Cell 3 into Cell 4A. This spillway will be limited to a 6-inch reinforced concrete slab set directly over the primary FML in a 4-foot deep trapezoidal channel. No other spillway or overflow structure will be constructed at Cell 4A. All stormwater runoff and tailings
Part I.D
Permit No. UGW370004
13
wastewaters not retained in Cells 2 and 3, will be managed and contained in Cell 4A,
including the Probable Maximum Precipitation and flood event.
6. BAT Performance Standards for Tailings Cell 4A - the Permittee shall operate and maintain Tailings Cell 4A so as to prevent release of wastewater to groundwater and the environment in accordance with the currently approved Cell 4A BAT, Monitoring,
Operations and Maintenance Plan. Any failure to achieve or maintain the required BAT
performance standards shall constitute a violation of the Permit and shall be reported to the Director in accordance with Part I.G.3. Performance standards for Tailings Cell 4A shall include the following:
a) Leak Detection System (LDS) Maximum Allowable Daily Head - the fluid head in
the LDS shall not exceed 1 foot above the lowest point on the lower flexible
membrane liner on the cell floor. For purposes of compliance this elevation will equate to a maximum distance of 2.28 feet above the LDS transducer. At all times the Permittee shall operate the LDS pump and transducer in a horizontal position at the lowest point of the LDS sump floor.
b) LDS Maximum Allowable Daily Leak Rate - shall not exceed 24,160 gallons/day.
c) Slimes Drain Annual Average Recovery Head Criteria - after the Permittee initiates pumping conditions in the slimes drain layer in Cell 4A, the Permittee will provide: 1) continuous declining fluid heads in the slimes drain layer, in a manner equivalent to the requirements found in Part I.D.3(b), and 2) a maximum head of 1.0 feet in the
tailings (as measured from the lowest point of upper flexible membrane liner) in 6.4
years or less.
d) Maximum Weekly Wastewater Level - under no circumstance shall the freeboard be less then 3-feet in Cell 4A, as measured from the top of the upper FML.
7. Definition of 11e.(2) Waste - for purposes of this Permit, 11e.(2) waste is defined as: "...
tailings or wastes produced by the extraction or concentration of uranium or thorium
from any ore processed primarily for its source material content", as defined in Section 11e.(2) of the U.S. Atomic Energy Act of 1954, as amended; which includes other process related wastes and waste streams described by a March 7, 2003 NRC letter from Paul H. Lohaus to William J. Sinclair.
8. Closed Cell Performance Requirements - before reclamation and closure of any tailings
disposal cell, the Permittee shall ensure that the final design, construction, and operation of the cover system at each tailings cell will comply with all requirements of an approved Reclamation Plan, and will for a period of not less than 200 years meet the following minimum performance requirements:
a) Minimize infiltration of precipitation or other surface water into the tailings,
including, but not limited to the radon barrier,
b) Prevent the accumulation of leachate head within the tailings waste layer that could rise above or over-top the maximum FML liner elevation internal to any disposal cell, i.e. create a “bathtub” effect, and
Part I.D
Permit No. UGW370004
14
c) Ensure that groundwater quality at the compliance monitoring wells does not exceed
the Ground Water Quality Standards or Ground Water Compliance Limits specified in Part I.C.1 and Table 2 of this Permit.
9. Facility Reclamation Requirements - upon commencement of decommissioning, the Permittee shall reclaim the mill site and all related facilities, stabilize the tailings cells,
and construct a cover system over the tailings cells in compliance with all engineering
design and specifications in an approved Reclamation Plan. The Director reserves the right to require modifications of the Reclamation Plan for purposes of compliance with the Utah Ground Water Quality Protection Regulations, including but not limited to containment and control of contaminants, or discharges, or potential discharges to Waters
of the State.
10. Stormwater Management and Spill Control Requirements - the Permittee will manage all contact and non-contact stormwater and control contaminant spills at the facility in accordance with the currently approved Stormwater Best Management Practices Plan. Said plan includes the following minimum provisions:
a) Protect groundwater quality or other waters of the state by design, construction,
and/or active operational measures that meet the requirements of the Ground Water Quality Protection Regulations found in UAC R317-6-6.3(G) and R317-6-6.4(C),
b) Prevent, control and contain spills of stored reagents or other chemicals at the mill site,
c) Cleanup spills of stored reagents or other chemicals at the mill site immediately upon
discovery, and
d) Report reagent spills or other releases at the mill site to the Director in accordance with UAC 19-5-114.
Reconstruction of stormwater management and/or chemical reagent storage facilities,
existing at the time of original Permit issuance, may be required by the Director after
occurrence of a major spill or catastrophic failure, pursuant to Part IV.N.3 of this Permit.
11. BAT Requirements for Feedstock Material Stored Outside the Feedstock Storage Area - the Permittee shall store and manage feedstock materials outside the ore storage pad in accordance with the following minimum performance requirements:
a) Feedstock materials shall be stored at all times in water-tight containers or water-tight
container overpacks, and aisle ways will be provided at all times to allow visual inspection of each and every feedstock container and container overpack, or
b) Feedstock containers shall be stored on a hardened surface to prevent spillage onto subsurface soils, and that conforms with the following minimum physical
requirements:
1) A storage area composed of a hardened engineered surface of asphalt or concrete, and
2) A storage area designed, constructed, and operated in accordance with engineering plans and specifications approved in advance by the Director. All
such engineering plans or specifications submitted shall demonstrate compliance
with Part I.D.4,
Part I.D
Permit No. UGW370004
15
3) A storage area that provides containment berms to control stormwater run-on and
run-off, and
4) Stormwater drainage works approved in advance by the Director, or
5) Other storage facilities and means approved in advance by the Director.
12. BAT Design Standards for Tailings Cell 4B - the BAT design standard for Tailings Cell
4B shall be defined by and constructed in accordance with the requirements as
summarized by the engineering drawings, specifications, and description in Table 6, below:
Table 6. Approved Tailings Cell 4B Engineering Design and Specifications
Engineering Drawings
Name Date Revision No. Title
Sheet 1 of 8 January 2009 Rev. 1 Cover Sheet
Sheet 2 of 8 January 2009 Rev. 1 Site Plan Sheet 3 of 8 January 2009 Rev. 1 Base Grading Plan Sheet 4 of 8 January 2009 Rev. 1 Pipe Layout and Details
Sheet 5 of 8 December 2007 Rev. 0 Lining System Details I
Sheet 6 of 8 January 2009 Rev. 1 Lining System Details II
Sheet 7 of 8 January 2009 Rev. 1 Lining System Details III
Sheet 8 of 8 January 2009 Rev. 1 Lining System Details IV Figure 1 January 2009 - Mill Site Drainage Basins (supporting reference)
Engineering Specifications
Date Document Title Prepared by
January 2009 Slope Stability Analysis Calculation Package Geosyntec Consultants
January 2009 Seismic Deformation Analysis Calculation Package Geosyntec Consultants
January 2009 Revised Pipe Strength Analysis Calculation
Package
Geosyntec Consultants
January 2009 Revised Comparison of Flow Though Compacted Clay Liner and Geosynthetic Clay Liner Calculation Package
Geosyntec Consultants
January 2009 Revised Action Leakage Rate Calculation Package Geosyntec Consultants
August 2009 Blasting - Locations and Profiles, Attachment:
Figures 1 and 2
Geosyntec Consultants
August 2009 (Revised) Technical Specifications, with the exception of Section 02200 (Earthwork) Geosyntec Consultants
August 2009 Cell 4B Capacity Calculations Geosyntec Consultants
August 2009 Revised Cushion Fabric Calculations
August 2009 Construction Quality Assurance Plan for the
Construction of Cell 4B Lining System
Geosyntec Consultants
September 2009 (Revised) Technical Specification Section 02200 (Earthwork) Geosyntec Consultants
August 6, 2009 Blast Plan, KGL and Associates and Blast Plan Review, Geosyntec Consultants letter dated September 10, 2009
KGL and Associates and Geosyntec Consultants
September 2009 Probable Maximum Precipitation (PMP) Event
Computation
Geosyntec Consultants
January 2009 Slope Stability Analysis Calculation Package Geosyntec Consultants
Part I.D
Permit No. UGW370004
16
Tailings Cell 4B Design and Construction - approved by the Director will consist of the
following major elements:
a) Dikes - consisting of newly constructed dikes on the south and west side of the cell, each including a 20-foot wide road at the top (minimum) to support an access road. The grading plan for the Cell 4B excavation includes interior slopes of 2H to 1V. The
exterior slopes of the southern and western dikes will have typical slopes of 3H to 1V.
Limited portions of the Cell 4B interior sideslopes in the northwest corner and southeast corner of the cell, (where the slimes drain and leak detection sump will be located will also have a slope of 3H to 1V. The base width of the southern dikes varies from approximately 92 feet at the western end to approximately 190 feet at the
eastern end of the dike, with no exterior embankment present on any other side of the
cell.
b) Foundation - including existing subgrade soils over bedrock materials. Foundation preparation included excavation and removal of contaminated soils, compaction of imported soils to a maximum dry density of 90% at a moisture content between +3%
and -3% of optimum moisture content, as determined by ASTM D-1557. The floor of
Cell 4B has an average slope of 1% that grades from the northwest corner to the southeast corner.
c) Tailings Capacity - the floor and inside slopes of Cell 4B encompass about 44 acres, and the cell will have a water surface area of 40 acres and a maximum capacity of
about 1.9 million cubic yards of tailings material storage (as measured below the
required 3-foot freeboard).
d) Liner and Leak Detection Systems - including the following layers, in descending order:
1) Primary Flexible Membrane Liner (FML) - consisting of 60-mil high density
polyethylene (HDPE) membrane that extends across both the entire cell floor and
the inside side-slopes, and is anchored in a trench at the top of the dikes on all four sides. The primary FML will be in direct physical contact with the tailings material over most of the Cell 4B floor area. In other locations, the primary FML will be in contact with the slimes drain collection system (discussed below).
2) Leak Detection System - includes a permeable HDPE geonet that extends across
the entire area under the primary FML in Cell 4B, and drains to a leak detection sump in the southeast corner. Access to the leak detection sump is via an 18-inch inside diameter (ID) PVC pipe placed down the inside slope, located between the primary and secondary FML liners. At its base this pipe will be surrounded with a
gravel filter set in a sump having dimensions of 15 feet by 10 feet by 2 feet deep
that contains a leak detection system sump area. In turn, the gravel filter layer will be enclosed in an envelope of geotextile fabric. The purpose of both the gravel and geotextile fabric is to serve as a filter.
3) Secondary FML - consisting of a 60-mil HDPE membrane found immediately
below the leak detection geonet. Said FML also extends across the entire Cell 4B
floor, up the inside side-slopes and is also anchored in a trench at the top of all four dikes.
4) Geosynthetic Clay Liner - consisting of a manufactured geosynthetic clay liner (GCL) composed of 0.2-inch of low permeability bentonite clay centered and
Part I.D
Permit No. UGW370004
17
stitched between two layers of geotextile. Prior to disposal of any wastewater in
Cell 4B, the Permittee shall demonstrate that the GCL has achieved a moisture content of at least 50% by weight.
e) Slimes Drain Collection System - including a two-part system of strip drains and perforated collection pipes both installed immediately above the primary FML, as
follows:
1) Horizontal Strip Drain System - is installed in a herringbone pattern across the floor of Cell 4B that drain to a “backbone” of perforated collection pipes. These strip drains are made of a prefabricated two-part geo-composite drain material (solid polymer drainage strip) core surrounded by an envelope of non-woven
geotextile filter fabric. The strip drains are placed immediately over the primary
FML on 50-foot centers, where they conduct fluids downgradient in a southwesterly direction to a physical and hydraulic connection to the perforated slimes drain collection pipe. A series of continuous sand bags, filled with filter sand cover the strip drains. The sand bags are composed of a woven polyester
fabric filled with well graded filter sand to protect the drainage system from
plugging.
2) Horizontal Slimes Drain Collection Pipe System - includes a “backbone” piping system of 4-inch ID Schedule 40 perforated PVC slimes drain collection (SDC) pipe found at the downgradient end of the strip drain lines. This pipe is in turn
overlain by a berm of gravel that runs the entire diagonal length of the cell,
surrounded by a geotextile fabric cushion in immediate contact with the primary FML. In turn, the gravel is overlain by a layer of non-woven geotextile to serve as an additional filter material. This perforated collection pipe serves as the “backbone” to the slimes drain system and runs from the far northwest corner
downhill to the far southeast corner of Cell 4B where it joins the slimes drain
access pipe.
3) Slimes Drain Access Pipe - consisting of an 18-inch ID Schedule 40 PVC pipe placed down the inside slope of Cell 4B at the southeast corner, above the primary FML. Said pipe then merges with another horizontal pipe of equivalent diameter
and material, where it is enveloped by gravel and woven geotextile that serves as
a cushion to protect the primary FML. A reducer connects the horizontal 18-inch pipe with the 4-inch SDC pipe. At some future time, a pump will be set in this 18-inch pipe and used to remove tailings wastewaters for purposes of de-watering the tailings cell.
f) Cell 4B North and East Dike Splash Pads - Nine 20-foot-wide splash pads will be constructed on the north and east dikes to protect the primary FML from abrasion and scouring by tailings slurry. These pads will consist of an extra layer of 60 mil HDPE membrane that will be installed in the anchor trench and placed down the inside slope
of Cell 4B, from the top of the dike, under the inlet pipe, and down the inside slope to
a point at least 5 feet onto the Cell 4B floor beyond the toe of the slope.
g) Cell 4B Emergency Spillway - a concrete lined spillway will be constructed near the southeastern corner of the east dike to allow emergency runoff from Cell 4A into Cell 4B. This spillway will be limited to a 6-inch reinforced concrete slab, with a welded
Part I.D
Permit No. UGW370004
18
wire fabric installed within it at its midsection, set atop a cushion geotextile placed
directly over the primary FML in a 4-foot deep trapezoidal channel. A 100-foot wide, 60-mil HDPE membrane splash pad will be installed beneath the emergency spillway. No other spillway or overflow structure will be constructed at Cell 4B. All stormwater runoff and tailings wastewaters not retained in Cells 2 and 3, and 4A will
be managed and contained in Cell 4B, including the Probable Maximum Precipitation
and flood event.
13. BAT Performance Standards for Tailings Cell 4B - the Permittee shall operate and maintain Tailings Cell 4B so as to prevent release of wastewater to groundwater and the environment in accordance with the currently approved Cell 4B BAT, Monitoring,
Operations and Maintenance Plan. Any failure to achieve or maintain the required BAT
performance standards shall constitute a violation of the Permit and shall be reported to the Director in accordance with Part I.G.3. Performance standards for Tailings Cell 4B shall include the following:
a) Leak Detection System (LDS) Maximum Allowable Daily Head - the fluid head in
the LDS shall not exceed 1 foot above the lowest point on the lower flexible
membrane liner on the cell floor. At all times the Permittee shall operate the LDS pump and transducer in a horizontal position at the lowest point of the LDS sump floor.
b) LDS Maximum Allowable Daily Leak Rate - shall not exceed 26,145 gallons/day.
c) Slimes Drain Annual Average Recovery Head Criteria - after the Permittee initiates
pumping conditions in the slimes drain layer in Cell 4B, the Permittee will provide: 1) continuous declining fluid heads in the slimes drain layer, in a manner equivalent to the requirements found in Part I.D.3(b), and 2) a maximum head of 1.0 feet in the tailings (as measured from the lowest point of upper flexible membrane liner) in 5.5
years or less.
d) Maximum Weekly Wastewater Level - under no circumstance shall the freeboard be less than 3-feet in Cell 4B, as measured from the top of the upper FML.
14. BAT Performance Standards for the New Decontamination Pad - the Permittee shall operate and maintain the New Decontamination Pad (NDP) to prevent release of
wastewater to groundwater and the environment in accordance with the currently
approved DMT Monitoring Plan. Any failure to achieve or maintain the required BAT performance standards shall constitute a violation of the Permit and shall be reported to the Director in accordance with Part I.G.3. Performance standards for the NDP shall include, but are not limited to, the following:
a) NDP LDS Access Pipes - the water level shall not exceed 0.10 foot above the
concrete floor in any LDS access pipe, at any time. Compliance will be defined as a depth to standing water present in any of the LDS access pipes of more than or equal to 6.2 feet as measured from the water measuring point (top of access pipe).
b) Soil and debris will be removed from the wash pad of the NDP, in accordance with
the currently approved DMT Monitoring Plan. Cracks in the wash pad greater than
1/8 inch (width) will be repaired within five working days of discovery.
Part I.E.
Permit No. UGW370004
19
E. GROUND WATER COMPLIANCE AND TECHNOLOGY PERFORMANCE MONITORING - beginning
with the effective date and lasting through the term of this Permit or as stated in an approved closure plan, the Permittee shall sample groundwater monitoring wells, tailing cell wastewaters, seeps and springs, monitor groundwater levels, monitor water levels of process solutions, and monitor and keep records of the operation of the facility, as follows:
1. Routine Groundwater Compliance Monitoring - the Permittee shall monitor upgradient,
lateral gradient, and downgradient groundwater monitoring wells completed in the shallow aquifer in the vicinity of all potential discharge sources that could affect local groundwater conditions at the facility, as follows:
a) Ground Water Monitoring Quality Assurance Plan - all groundwater monitoring and
analysis performed under this Permit shall be conducted in accordance with a Quality
Assurance Plan (QAP) currently approved by the Director. Any non-conformance with QAP requirements in a given quarterly groundwater monitoring period will be corrected and reported to the Director on or before submittal of the next quarterly groundwater monitoring report pursuant to Part I.F.1.
b) Quarterly Monitoring - the Permittee shall monitor on a quarterly basis all monitoring
wells listed in Table 2 of this Permit where local groundwater average linear velocity has been found by the Director to be equal to or greater than 10 feet/year. For purposes of this Permit, quarterly monitoring is required at the following wells:
1) Upgradient Wells: none
2) Lateral or Downgradient Wells: MW-11, MW-14, MW-25, MW-26 (formerly
TW4-15), MW-30, MW-31, MW-36.
c) Semi-annual Monitoring - the Permittee shall monitor on a semi-annual basis all monitoring wells listed in Table 2 of this Permit, where local groundwater average linear velocity has been found by the Director to be less than 10 feet/year, and all
general monitoring wells. For purposes of this Permit, semi-annual monitoring is
required at the following wells:
1) Monitoring Wells Listed on Table 2:
i. Upgradient Well: MW-27.
ii. Lateral or Downgradient Wells: MW-2, MW-3A, MW-5, MW-12, MW-
15, MW-17, MW-23, MW-24, MW-28, MW-29, and MW-32 (formerly
TW4-17), MW-35, and MW-37.
2) General Monitoring Wells:
i. Upgradient Wells: MW-1, MW-18, and MW-19.
ii. Lateral or Downgradient Wells: TW4-24, MW-20 and MW-22.
d) Compliance Monitoring Parameters - all groundwater samples collected shall be
analyzed for the following parameters:
1) Field Parameters - depth to groundwater, pH, temperature, specific conductance, dissolved oxygen, and redox potential (Eh).
2) Laboratory Parameters
Part I.E.
Permit No. UGW370004
20
i. GWCL Parameters - all contaminants specified in Table 2.
ii. General Inorganics - chloride, sulfate, carbonate, bicarbonate, sodium, potassium, magnesium, calcium, and total anions and cations.
e) Special Provisions for Groundwater Monitoring - the Permittee shall ensure that all groundwater monitoring conducted and reported complies with the following
requirements:
1) Depth to Groundwater Measurements - shall always be made to the nearest 0.01 foot.
2) Minimum Detection Limits - all groundwater quality analyses reported shall have a minimum detection limit or reporting limit that is less than its respective Ground
Water Compliance Limit concentration defined in Table 2.
3) Gross Alpha Counting Variance - all gross alpha analysis shall be reported with an error term. All gross alpha analysis reported with an activity equal to or greater than the GWCL, shall have a counting variance that is equal to or less than 20% of the reported activity concentration. An error term may be greater than 20% of
the reported activity concentration when the sum of the activity concentration and
error term is less than or equal to the GWCL.
4) All equipment used for purging and sampling of groundwater shall be made of inert materials.
2. Groundwater Monitoring: General Monitoring Wells - Upgradient wells MW-1, MW-18,
and MW-19; Lateral Monitoring Well TW4-24; and Downgradient wells MW-20 and
MW-22. The Permittee shall monitor wells MW-1, MW-18, MW-19, TW4-24, MW-20 and MW-22 on a semi-annual basis. Said sampling shall comply with the following Permit requirements, but shall not be considered compliance monitoring for the purposes of Part G:
a) Routine groundwater compliance monitoring requirements of Part I.E.1.
b) Groundwater head monitoring requirements of Part I.E.3
c) Well monitoring procedure requirements of Part I.E.5.
3. Groundwater Head Monitoring - on a quarterly basis and at the same frequency as groundwater monitoring required by Part I.E.1, the Permittee shall measure depth to
groundwater in the following wells and/or piezometers:
a) Point of Compliance Wells - identified in Table 2 and Part I.E.1 of this Permit.
b) Piezometers - P-1, P-2, P-3, P-4, and P-5.
c) Head Monitoring Well - MW-34.
d) General Monitoring Wells - Upgradient wells MW-1, MW-18, and MW-19; Lateral
well TW4-24; and Downgradient wells MW-20 and MW-22.
e) Contaminant Investigation Wells - any well required by the Director as a part of a contaminant investigation or groundwater corrective action.
f) Any other wells or piezometers required by the Director.
Part I.E.
Permit No. UGW370004
21
4. Groundwater Monitoring Well Design and Construction Criteria - all new groundwater
monitoring wells installed at the facility shall comply with the following design and construction criteria:
a) Located as close as practical to the contamination source, tailings cell, or other potential origin of groundwater pollution.
b) Screened and completed in the shallow aquifer.
c) Designed and constructed in compliance with UAC R317-6-6.3(I)(6), including the EPA RCRA Ground Water Monitoring Technical Enforcement Guidance Document, 1986, OSWER-9950.1.
d) Aquifer tested to determine local hydraulic properties, including but not limited to
hydraulic conductivity.
5. Monitoring Procedures for Wells - beginning with the date of Permit issuance, all monitoring shall be conducted by the Permittee in conformance with the following procedures:
a) Sampling - grab samples shall be taken of the groundwater, only after adequate
removal or purging of standing water within the well casing has been performed.
b) Sampling Plan - all sampling shall be conducted to ensure collection of representative samples, and reliability and validity of groundwater monitoring data.
c) Laboratory Approval - all analyses shall be performed by a laboratory certified by the State of Utah to perform the tests required.
d) Damage to Monitoring Wells - if any monitor well is damaged or is otherwise
rendered inadequate for its intended purpose, the Permittee shall notify the Director in writing within five calendar days of discovery.
e) Field Monitoring Equipment Calibration and Records - immediately prior to each monitoring event, the Permittee shall calibrate all field monitoring equipment in
accordance with the respective manufacturer's procedures and guidelines. The
Permittee shall make and preserve on-site written records of such equipment calibration in accordance with Part II.G and H of this Permit. Said records shall identify the manufacturer's and model number of each piece of field equipment used and calibration.
6. White Mesa Seeps and Springs Monitoring - the Permittee shall conduct annual
monitoring of all seeps and springs identified in the currently approved Sampling Plan for Seeps and Springs in the Vicinity of the White Mesa Uranium Mill. Said monitoring shall include, but is not limited to:
a) Field Measurements - including: pH, temperature, and specific conductivity.
b) Water Quality Sampling and Analysis - the Permittee shall collect grab samples and
perform laboratory analysis of all water quality parameters identified in Table 2 of this Permit.
c) Certified Laboratory Analysis - all laboratory analysis will be conducted by a Utah certified laboratory.
d) Analytical Methods - all laboratory analysis shall be conducted using analytical
methods listed in the currently approved QAP pursuant to Part I.E.1 of this Permit.
Part I.E.
Permit No. UGW370004
22
e) Minimum Detection Limits - all seeps or springs water quality analyses reported shall
have a minimum detection limit or reporting limit that is less than or equal to the respective:
1) Ground Water Quality Standards concentrations defined in Table 2 of this Permit, and
2) For TDS, Sulfate, and Chloride, the Minimum Detection Limit for those
constituents for seeps and springs monitoring will be as follows: 10 mg/L, 1 mg/L, and 1 mg/L, respectively.
f) Quality Control Samples - the Permittee will conduct quality control (QC) sampling and analysis as a part of all seeps and springs sampling, in accordance with the
requirements of Section 4.3 of the currently approved QAP; pursuant to Part I.E.1 of
this Permit. Said QC samples shall include, but are not limited to: trip blanks, duplicate samples, and equipment rinse blanks.
g) Prior Notification - at least 15 calendar days before any fieldwork or water quality sample collection, the Permittee shall provide written notice to allow the Director to
observe or split sample any or all seeps or springs.
7. DMT Performance Standards Monitoring - the Permittee shall perform technology performance monitoring in accordance with the currently approved DMT Monitoring Plan to determine if DMT is effective in minimizing and controlling the release of contaminants pursuant to the provisions of Parts I.D.1 and I.D.3 of this Permit, including,
but not limited to the following activities:
a) Weekly Tailings Wastewater Pool Elevation Monitoring: Cells 1 and 3 - the Permittee shall monitor and record weekly the elevation of wastewater in Tailings Cells 1 and 3 to ensure compliance with the maximum wastewater elevation criteria mandated by Condition 10.3 of the License. Said measurements shall be made from a wastewater
level gauge or elevation survey to the nearest 0.01 foot.
b) Quarterly Slimes Drain Water Level Monitoring: Cells 2 and 3 - the Permittee shall monitor and record quarterly the depth to wastewater in the slimes drain access pipes as described in Part I.D.3 of this Permit and the currently approved DMT Monitoring Plan at Tailings Cells 2 and 3 to determine the recovery head. For purposes of said
monitoring, the Permittee shall at each tailings cell:
1) Perform at least 1 separate slimes drain recovery test at each disposal cell in each quarterly period of each calendar year that meets the requirements of Part I.D.3,
2) Designate, operate, maintain, and preserve one water level measuring point at the centerline of the slimes drain access pipe that has been surveyed and certified by a
Utah licensed engineer or land surveyor,
3) Make all slimes drain recovery head test (depth to fluid) measurements from the same designated water level measuring point, and
4) Record and report all fluid depth measurements to the nearest 0.01 foot.
5) For Cell 3 these requirements shall apply upon initiation of tailings de-watering
operations.
Part I.E.
Permit No. UGW370004
23
c) Weekly Feedstock Storage Area Inspection - the Permittee shall conduct weekly
inspections of all feedstock storage to: 1) Confirm the bulk feedstock materials are maintained within the approved Feedstock Storage Area defined by Table 4, and 2) Verify that all alternate feedstock materials located outside the Feedstock Area defined in Table 4, are stored in accordance with the requirements found in Part
I.D.11.
d) Feedstock Material Stored Outside the Feedstock Storage Area Inspections
a) Weekly Inspection - the Permittee will conduct weekly inspections to verify that each feed material container complies with the requirements of Part I.D.11.
b) Hardened Surface Storage Area - in the event the Permittee constructs a hardened
surface storage area for feed materials, pursuant to Part I.D.11, prior Director
approval will be secured for the following:
i. Engineering Design and Specifications - in accordance with the requirements of Part I.D.4, and
ii. Operation and Maintenance Plan.
e) Inspections of Tailing Cell and Pond Liner Systems - the Permittee shall inspect the
liner system at Tailing Cells 1, 2, and 3 on a daily basis pursuant to the requirements of Sections 2.1 and 2.2 of the currently approved DMT Monitoring Plan. In the event that any liner defect or damage is identified during a liner system inspection, the Permittee shall: 1) report and repair said defect or damage pursuant to Part I.G.3 by
implementation of the currently approved Liner Maintenance Provisions, and 2)
report all repairs made pursuant to Part I.F.2.
f) Weekly New Decontamination Pad Inspection - the Permittee shall conduct weekly inspections of the New Decontamination Pad as described in Part I.D.14 of this Permit and the currently approved DMT Monitoring Plan.
8. Cell 4A BAT Performance Standards Monitoring and Maintenance - in accordance with
the currently approved Cell 4A BAT, Monitoring, Operations and Maintenance Plan, the Permittee shall immediately implement all monitoring and recordkeeping requirements therein. The Cell 4A BAT monitoring includes the following:
a) Weekly Leak Detection System (LDS) Monitoring - including:
1) Leak Detection System Pumping and Monitoring Equipment - the Permittee shall
provide continuous operation of the leak detection system pumping and monitoring equipment, including, but not limited to, the submersible pump, pump controller, head monitoring, and flow meter equipment approved by the Director. Failure of any LDS pumping or monitoring equipment not repaired and made
fully operational within 24-hours of discovery shall constitute failure of BAT, and
a violation of this Permit.
2) Maximum Allowable Head - the Permittee shall measure the fluid head above the lowest point on the secondary flexible membrane by the use of procedures and equipment approved by the Director. Under no circumstance shall fluid head in
the leak detection system sump exceed a 1-foot level above the lowest point in the
lower flexible membrane liner on the cell floor. For purposes of compliance
Part I.E.
Permit No. UGW370004
24
monitoring this 1-foot distance shall equate to 2.28 feet above the leak detection
system transducer.
3) Maximum Allowable Daily LDS Flow Rates - the Permittee shall measure the volume of all fluids pumped from the LDS. Under no circumstances shall the average daily LDS flow volume exceed 24,160 gallons/day.
4) 3-foot Minimum Vertical Freeboard Criteria - the Permittee shall operate and
maintain wastewater levels to provide a 3-foot Minimum of vertical freeboard in Tailings Cell 4A. Said measurements shall be made to the nearest 0.1 foot.
b) Quarterly Slimes Drain Recovery Head Monitoring - immediately after the Permittee initiates pumping conditions in the Tailings Cell 4A slimes drain system, quarterly
recovery head tests and fluid level measurements will be made in accordance with the
requirements of Parts I.D.3 and I.E.7(b) of this Permit and the currently approved Cell 4A BAT, Monitoring, Operations and Maintenance Plan.
c) Liner Maintenance and Repair - all repairs to the liner shall be completed in accordance with Section 9.4 of the approved June 2007 Geosyntec Consultants Cell
4A Construction Quality Assurance Plan (CQA/QC Plan) as found in Table 5 of this
Permit. Repairs shall be performed by qualified liner repair personnel and shall be reported in a Liner Repair Report, certified by a Utah licensed Professional Engineer. The Liner Repair Report shall be submitted to for Director approval in accordance with Part I.F.3 of the Permit. Any leak, hole, or other damage to the liner will be
reported to the Director pursuant to the requirements found in Part I.G.3.
9. On-site Chemicals Inventory - the Permittee shall monitor and maintain a current inventory of all chemicals used at the facility at rates equal to or greater than 100 kg/yr. Said inventory shall be maintained on-site, and shall include, but is not limited to:
a) Identification of chemicals used in the milling process and the on-site laboratory, and
b) Determination of volume and mass of each raw chemical currently held in storage at
the facility.
10. Tailings Cell Wastewater Quality Monitoring - on an annual basis, the Permittee shall collect wastewater quality samples from each wastewater source at each tailings cell at the facility, including, but not limited to:
a) One surface impounded wastewater location at each of Tailings Cells 1, 3, 4A, and
4B.
b) One slimes drain wastewater access pipe at each of Tailings Cells 2, 3, 4A, and 4B. For Cells 3, 4A, and 4B, this requirement shall apply immediately after initiation of de-watering operations at these cells, and
c) One leak detection wastewater access pipe at Tailings Cells 4A and 4B.
d) All such sampling shall be conducted in August of each calendar year in compliance with the currently approved White Mesa Uranium Mill Tailing and Slimes Drain Sampling Program. Said annual monitoring shall include, but is not limited to:
1) Water Quality Sampling and Analysis - the Permittee shall collect grab samples
and perform laboratory analysis of all:
i. Water quality parameters identified in Table 2 of this Permit, and
Part I.E.
Permit No. UGW370004
25
ii. Semi-volatile compounds identified in EPA Method 8270D.
2) Certified Laboratory Analysis - all laboratory analysis will be conducted by a Utah certified laboratory.
3) Analytical Methods - all laboratory analysis shall be conducted using analytical methods listed in the currently approved QAP pursuant to Part I.E.1 of this
Permit.
4) Minimum Detection Limits - all water quality analyses reported shall have a minimum detection limit or reporting limit that is less than or equal to the respective:
i. Ground Water Quality Standards concentrations defined in Table 2 of this
Permit,
ii. For TDS, Sulfate, and Chloride, the Minimum Detection Limit for those constituents for Tailing Cell wastewater monitoring will be as follows: 1,000 mg/L, 1,000 mg/L, and 1 mg/L, respectively, and
iii. Lower limits of quantitation for groundwater for semi-volatile organic
compounds listed in Table 2 of EPA Method 8270D, Revision 4, dated
February, 2007.
5) Quality Control Samples - the Permittee will conduct quality control (QC) sampling and analysis as a part of all tailings wastewater sampling, in accordance with the requirements of Section 4.3 of the currently approved QAP; pursuant to
Part I.E.1 of this Permit. Said QC samples shall include, but are not limited to:
trip blanks, duplicate samples, and equipment rinse blanks.
6) Prior Notification - at least 30 calendar days before any water quality sample collection, the Permittee shall provide written notice to allow the Director to observe or split sample any tailings cell, slimes drain, or leak detection
wastewaters.
7) Sample Omission - in the course of each annual sampling event, the Permittee shall sample and analyze all tailings cell, slimes drain, and leak detection wastewater sources identified in the currently approved Tailings and Slimes Drain Sampling Program (pp. 1-3), or as required by this Permit, whichever is greater.
The Permittee shall not omit sampling of any of tailings cell wastewater source
during said annual event, without prior written approval from the Director.
11. Groundwater Monitoring Modifications - before any modification of groundwater monitoring or analysis procedures, methods, or equipment, the Permittee must obtain prior written approval from the Director.
12. Cell 4B BAT Performance Standards Monitoring and Maintenance - immediately
following Director approval of the Cell 4B BAT, Monitoring, Operations and Maintenance Plan, the Permittee shall immediately implement all monitoring and recordkeeping requirements therein. The Cell 4B BAT monitoring shall include the following: Weekly Leak Detection System (LDS) Monitoring - including:
1) Leak Detection System Pumping and Monitoring Equipment - the Permittee shall
provide continuous operation of the leak detection system pumping and
Part I.E.
Permit No. UGW370004
26
monitoring equipment, including, but not limited to, the submersible pump, pump
controller, head monitoring, and flow meter equipment approved by the Director. Failure of any LDS pumping or related monitoring equipment not repaired and made fully operational within 24-hours of discovery shall constitute failure of BAT, and a violation of this Permit.
2) Maximum Allowable Head - the Permittee shall measure the fluid head above the
lowest point on the secondary flexible membrane by the use of procedures and equipment approved by the Director. Under no circumstance shall fluid head in the leak detection system (LDS) sump exceed a 1-foot level above the lowest point in the lower flexible membrane liner on the cell floor. Any occurrence of
leak detection system fluids above this 1-foot limit shall constitute failure of
BAT, and a violation of this Permit.
3) Maximum Allowable Daily LDS Flow Rates - the Permittee shall measure the volume of all fluids pumped from the LDS. Under no circumstances shall the average daily LDS flow volume exceed 26,145 gallons/day.
4) 3-foot Minimum Vertical Freeboard Criteria - the Permittee shall operate and
maintain wastewater levels to provide a 3-foot Minimum of vertical freeboard in Tailings Cell 4B. Said measurements shall be made to the nearest 0.1 foot.
b) Quarterly Slimes Drain Recovery Head Monitoring - immediately after the Permittee initiates pumping conditions in the Tailings Cell 4B slimes drain system, quarterly
recovery head tests and fluid level measurements will be made in accordance with the
requirements of Parts I.D.3 and I.E.7(b) of this Permit and the currently approved Cell 4B BAT, Monitoring, Operations and Maintenance Plan.
c) Liner Maintenance and Repairs - all repairs to the liner shall be completed in accordance with Section 10.4 of the approved August 2009 Geosyntec Consultants
Cell 4B Construction Quality Assurance Plan (CQA/QC Plan) as found in Table 6 of
this Permit. Repairs shall be performed by qualified liner repair personnel and shall be reported in a Liner Repair Report, certified by a Utah licensed Professional Engineer. The Liner Repair Report shall be submitted for Director approval in accordance with Part I.F.3 of the Permit. Any leak, hole, or other damage to the liner
will be reported pursuant to the requirements found in Part I.G.3.
Part I.F.
Permit No. UGW370004
27
F. REPORTING REQUIREMENTS - The following reporting procedures for routine and compliance reports must be met.
1. Routine Groundwater Monitoring Reports - the Permittee shall submit quarterly monitoring reports of field and laboratory analyses of all well monitoring and samples
described in Parts I.E.1, I.E.2, I.E.3, and I.E.5 of this Permit for Director review and
approval. Reports shall be submitted according to the following schedule:
Table 7. Groundwater Monitoring Reporting Schedule
Quarter Period Due Date
First January - March June 1
Second April - June September 1
Third July - September December 1
Fourth October - December March 1
Failure to submit the reports by the due date shall be deemed as noncompliance with this
Permit. Said monitoring reports shall include, but are not limited to, the following
minimum information:
a) Field Data Sheets - or copies thereof that provide the following: well name, date and time of well purging, date and time of well sampling, type and condition of well pump, depth to groundwater before purging and sampling, calculated well casing volume, volume of water purged before sampling, volume of water collected for
analysis, types of sample containers and preservatives.
b) Laboratory Results - or copies thereof that provide the following: date and time sampled, date received by laboratory, and for each parameter analyzed, the following information: laboratory result or concentration, units of measurement, minimum detection limit or reporting limit, analytical method, date of analysis, counting error
for radiological analyses, total cations and anions for inorganic analysis.
c) Water Table Contour Map - which provides the location and identity of all wells sampled that quarter, the measured groundwater elevation at each well measured in feet above mean sea level, and isocontour lines to delineate groundwater flow directions observed during the quarterly sampling event.
d) Quality Assurance Evaluation and Data Validation - including a written description and findings of all quality assurance and data validation efforts conducted by the Permittee in compliance with the currently approved Groundwater Monitoring Quality Assurance Plan. Said report shall verify the accuracy and reliability of the groundwater quality compliance data, after evaluation of sample collection techniques
and equipment, sample handling and preservation, analytical methods used, etc
e) Non-conformance disclosure - with each quarterly groundwater monitoring report the Permittee shall fully and completely disclose all non-conformance with requirements of the currently approved QAP, mandated by Part I.E.1(a).
f) Electronic Data Files and Format - in addition to written results required for every
sampling report, the Permittee shall provide an electronic copy of all laboratory results for groundwater quality monitoring conducted. Said electronic files shall
Part I.F.
Permit No. UGW370004
28
consist of Comma Separated Values (CSV) format, or as otherwise approved by the
Director.
g) Time Concentration Plots - with each quarterly groundwater monitoring report the Permittee shall submit time concentration plots for each monitoring well for the following constituents: chloride, fluoride, sulfate, and uranium.
2. Routine DMT Performance Standards Monitoring Report - the Permittee shall provide
quarterly monitoring reports of all DMT performance standards monitoring required by Parts I.D.3 and I.E.7 of this Permit. DMT monitoring shall be conducted in compliance with this Permit and the currently approved DMT Monitoring Plan. When a liner repair is performed at any DMT impoundment, a Repair Report is required by the Liner
Maintenance Provisions. This Repair Report shall be included with the next quarterly
DMT Report. Said monitoring reports and results shall be submitted for Director approval on the schedule provided in Table 7, above.
3. Routine Cell 4A and 4B BAT Performance Standards Monitoring Reports - the Permittee shall provide quarterly monitoring reports of all BAT performance standards monitoring
required by Parts I E.8 and I.E.12 of this Permit. BAT Monitoring at Cells 4A and 4B
shall be conducted in compliance with the currently approved BAT Monitoring, Operations and Maintenance Plan. When a liner repair is performed at Tailings Cell 4A or 4B, a Repair Report is required by Parts I.E.8(c) and I.E.12(c) of the Permit. This Repair Report shall be included with the next quarterly BAT Report. Said monitoring
report and results shall be submitted for Director approval on the schedule provided in
Table 7 above. At a minimum, reporting of BAT monitoring for Cells 4A and 4B will include:
a) LDS Monitoring - including:
1) Report on the operational status of the LDS pumping and monitoring equipment
during the quarter, including identification of any intervals of non-operational
status and repairs.
2) Measurement of the weekly fluid head at the lowest point of the secondary membrane.
3) Measurement of the volume of all fluids pumped from the LDS.
b) Measurement of the weekly wastewater fluids elevation in the Cells 4A and 4B to
determine freeboard.
c) Slimes Drain Recovery Head Monitoring as per the requirements of Parts I.D.6 and I.E.8(b).
4. DMT and BAT Performance Upset Reports - the Permittee shall report any non-
compliance with the DMT or BAT performance criteria of Part I.D in accordance with
the requirements of Part I.G.3 of this Permit.
5. Other Information - when the Permittee becomes aware of a failure to submit any relevant facts in the permit application or submittal of incorrect information in a permit
Part I.F.
Permit No. UGW370004
29
application or in any report to the Director, the Permittee shall submit such facts or
information within 10 calendar days of discovery.
6. Groundwater Monitoring Well As-Built Reports - as-built reports for new groundwater monitoring wells shall be submitted for Director approval within 60 calendar days of well completion, and at a minimum will include the following information:
a) Geologic Logs - that detail all soil and rock lithologies and physical properties of all
subsurface materials encountered during drilling. Said logs shall be prepared by a Professional Geologist licensed by the State of Utah, or otherwise approved beforehand by the Director.
b) Well Completion Diagram - that detail all physical attributes of the well construction,
including:
1) Total depth and diameters of boring,
2) Depth, type, diameter, and physical properties of well casing and screen, including well screen slot size,
3) Depth intervals, type and physical properties of annular filterpack and seal
materials used,
4) Design, type, diameter, and construction of protective surface casing, and
5) Survey coordinates prepared by a State of Utah licensed engineer or land surveyor, including horizontal coordinates and elevation of water level measuring point, as measured to the nearest 0.01 foot.
c) Aquifer Permeability Data - including field data, data analysis, and interpretation of
slug test, aquifer pump test or other hydraulic analysis to determine local aquifer hydraulic conductivity in each well.
7. White Mesa Seeps and Springs Monitoring Reports - a seeps and springs monitoring report shall be submitted for Director review and approval with the 4th3rd Quarter Routine
Groundwater Monitoring Report due on MarchDecember 1, of each calendar year. Said
report shall include, but is not limited to:
a) Field Measurement Results and Worksheets - for each sample collected that comply with the requirements of Part I.F.1(a) of this Permit,
b) Laboratory Results - for each sample collected that comply with the requirements of
Part I.F.1(b) of this Permit,
c) Water Table Contour Map - that includes groundwater elevations for each well at the facility and the elevations of the phreatic surfaces observed at each of the seeps and springs sampled. The contour map will include all water level data measurements from seeps, springs, and monitoring wells at the site from the 3rd Quarter Routine
Groundwater Monitoring event of each year. The contour map shall be at a map scale,
such that, all seeps and springs listed in the approved Sampling Plan for Seeps and Springs in the Vicinity of the White Mesa Uranium Mill and the monitoring wells on site may be seen on one map,
d) Data Evaluation - and interpretation of all groundwater quality data collected,
Part I.F.
Permit No. UGW370004
30
e) Quality Assurance Evaluation and Data Validation - for the seeps and springs water
quality data that meets the requirements of Part I.F.1(d),
f) Electronic Data Files and Format - that meet the requirements of Part I.F.1(e) of this Permit, and
g) Survey data for the seeps and springs shall be based on an elevation survey,
conducted under the direction of and certified by a Utah licensed professional
engineer or land surveyor. The survey will include State Plan Coordinates (northings and eastings) and vertical elevations. The surveyed coordinates and elevations of the seeps and springs shall be within 1 foot of the highest point of the saturated seepage face on the day of the survey. This survey data must be obtained before any samples
are collected.
8. Chemicals Inventory Report - at the time of submittal of an application for Permit renewal the Permittee shall submit a report to update the facilities chemical inventory report. Said report shall include:
a) Identification of all chemicals used in the milling and milling related processes at the
White Mesa Mill, and
b) Provide all inventory information gathered pursuant to Part I.E.9,
c) Determination of the total volumes currently in use and historically used, as data is available.
9. Tailings Cell Wastewater Quality Reports - all annual wastewater quality sampling and
analysis required by Part I.E.10 shall be reported to the Director with the 3rd Quarter
groundwater quality report due on December 1, of each calendar year. Said report shall include:
a) Data evaluation and interpretation of all wastewater quality samples collected,
b) All information required by Part I.F.1(a), (b), (d), and (e) of this Permit, and
c) For slimes drain samples, the Permittee shall report depth to wastewater
measurements from the water level measurement point. Said wastewater level shall be measured immediately before sample collection.
10. Revised Hydrogeologic Report - pursuant to Part IV.D of this Permit, and at least 180 calendar days prior to Permit expiration, the Permittee shall submit for Director approval a revised hydrogeologic report for the facility and surrounding area. Said report shall
provide a comprehensive update and evaluation of:
a) Local hydrogeologic conditions in the shallow aquifer, including, but not limited to: local geologic conditions; time relationships and distribution of shallow aquifer head measurements from facility wells and piezometers; local groundwater flow directions; and distribution of aquifer permeability and average linear groundwater velocity
across the site, and
b) Well specific groundwater quality conditions measured at facility monitoring wells for all groundwater monitoring parameters required by this Permit, including, but not limited to: temporal contaminant concentrations and trends from each monitoring well; statistical tests for normality of each contaminant and well, including univariate
Part I.F.
Permit No. UGW370004
31
or equivalent tests; calculation of the mean concentration and standard deviation for
each well and contaminant.
11. Annual Slimes Drain Recovery Head Report - on or before March 1 of each year the Permittee shall submit for Director approval an annual slimes drain recovery head report for Tailings Cells 2 and 3. Said report shall conform to the requirements of Part I.D.3(b),
I.E.7(b), and II.G of this Permit, and:
a) Provide the individual slimes drain recovery head monitoring data for the previous calendar year, including, but not limited to: date and time for the start and end of recovery test, initial water level, final depth to stable water level and equivalent recovery water level elevation.
b) Calculate the average slimes drain recovery head for the previous calendar year.
c) Include a time series chart to show trends of the recovery water level elevations at each slimes drain.
d) Include the results of a quality assurance evaluation and data validation. Said examination shall provide written descriptions and findings that:
1) Evaluate all data collected, data collection methods, and all related calculations
required by this Permit, and
2) Verify the accuracy and reliability of both the data and calculations reported.
e) Demonstrate compliance status with the requirements of Part I.D.3(b) and I.E.7(b) of this Permit.
12. Decontamination Pads Annual Inspection Report - the New Decontamination Pad and
Existing Decontamination Pad will be taken out of service and inspected annually during the second quarter of each year, to ensure integrity of the concrete wash pad surfaces. If physical defects in the wash pad as defined by Part I.D.14 of the Permit are identified during the inspection, repairs shall be made prior to resuming the use of the facility. Said
defects include, but are not limited to concrete deterioration, cracking, subsidence, etc.
The results of the annual inspection and all repairs will be documented on inspection forms in accordance with the currently approved DMT Monitoring Plan. The inspection forms and documentation of all repairs completed shall be included in the 2nd Quarter DMT Monitoring Report due September 1, of each calendar year.
Part I.G
Permit No. UGW370004
32
G. OUT OF COMPLIANCE STATUS
1. Accelerated Monitoring Status - is required if the concentration of a pollutant in any compliance monitoring sample exceeds a GWCL in Table 2 of the Permit; the facility shall then:
a) Notify the Director in writing (the Exceedance Notice) within 30 calendar days of
receipt of the last analytical data report for samples collected within a quarter,
including quarterly and monthly samples, but no later than 60 days after the end of the quarter, and
b) Initiate accelerated sampling of the pollutant as follows:
1) Quarterly Baseline Monitoring Wells - for wells defined by Part I.E.1(b) the
Permittee shall initiate monthly monitoring. Monthly monitoring shall begin the
month following the month in which the Exceedance Notice is provided to the Director.
2) Semi-annual Baseline Monitoring Wells - for wells defined by Part I.E.1(c) the Permittee shall initiate quarterly monitoring. Quarterly monitoring shall begin the
quarter following the quarter in which the Exceedance Notice is provided to the
Director.
3) Said accelerated monitoring shall continue at the frequencies defined above until the compliance status of the facility can be determined by the Director.
2. Violation of Permit Limits - out-of-compliance status exists when the concentration of a
pollutant in two consecutive samples from a compliance monitoring point exceeds a
GWCL in Table 2 of this Permit.
3. Failure to Maintain DMT or BAT Required by Permit
a) Permittee to Provide Information - in the event that the Permittee fails to maintain DMT or BAT or otherwise fails to meet DMT or BAT standards as required by the
Permit, the Permittee shall submit to the Director a notification and description of the
failure according to R317-6-6.16(C)(1). Notification shall be given orally within 24- hours of the Permittee's discovery of the failure of DMT or BAT, and shall be followed up by written notification, including the information necessary to make a determination under R317-6-6.16(C)(2), within five calendar days of the Permittee's
discovery of the failure of best available technology.
b) The Director shall use the information provided under R317-6-6.16.C(1) and any additional information provided by the Permittee to determine whether to initiate a compliance action against the Permittee for violation of Permit conditions. A compliance action shall not be initiated, if the Director determines that the Permittee
has met the standards for an affirmative defense, as specified in R317-6-
6.16(C)(3)(c).
c) Affirmative Defense - in the event a compliance action is initiated against the Permittee for violation of Permit conditions relating to best available technology or DMT, the Permittee may affirmatively defend against that action by demonstrating
the following:
1) The Permittee submitted notification according to R317-6-6.13,
Part I.G
Permit No. UGW370004
33
2) The failure was not intentional or caused by the Permittee's negligence, either in
action or in failure to act,
3) The Permittee has taken adequate measures to meet Permit conditions in a timely manner or has submitted to the Director, for the Director's approval, an adequate plan and schedule for meeting Permit conditions, and
4) The provisions of UCA 19-5-107 have not been violated.
4. Facility Out of Compliance Status - if the facility is out of compliance, the following is required:
a) The Permittee shall notify the Director of the out of compliance status within 24-hours after detection of that status, followed by a written notice within 5 calendar
days of the detection.
b) The Permittee shall continue accelerated sampling pursuant to Part I.G.1, unless the Director determines that other periodic sampling is appropriate, until the facility is brought into compliance.
c) The Permittee shall prepare and submit to the Director within 30 calendar days
following the date the Exceedance Notice is submitted to the Director, a plan and a
time schedule for assessment of the sources, extent and potential dispersion of the contamination, and an evaluation of potential remedial action to restore and maintain groundwater quality to insure that Permit limits will not be exceeded at the compliance monitoring point and that DMT or BAT will be reestablished.
d) The Director may require immediate implementation of the currently approved
contingency plan in order to regain and maintain compliance with the Permit limit standards at the compliance monitoring point or to reestablish DMT or BAT as defined in the Permit.
e) Where it is infeasible to reestablish DMT or BAT as defined in the Permit, the
Permittee may propose an alternative DMT or BAT for approval by the Director.
Part I.H
Permit No. UGW370004
34
H. COMPLIANCE SCHEDULE REQUIREMENTS. The Permittee will comply with the schedules as
described and summarized below:
1. Slimes Drain Compliance Plan - Within two (2) years after the effective date of thise Permit Renewal (January 19, 2018), the Permittee shall submit a Slimes Drain Compliance Plan for Director Review and Approval. The Plan shall include measures to
ensure that wastewater removal from the tailings cell slimes drain is effectively
dewatering the tailings to the extent practicable in order to allow placement of final cover within specified time frames. The Plan may incorporate multiple methods to evaluate the effectiveness of tailings cell dewatering and projected timelines for placement of final tailings cell cover, including, but not limited to; 1. Demonstration of decreasing fluid
elevation trends as measured by slimes drain recovery tests; 2. Evaluations of head data
from piezometers installed in the affected tailings cell demonstrating net dewatering, and 3. Demonstration of decreasing trends in cell settlement monitoring. The Plan shall include specific measures for Tailings Cell 2 and will incorporate Tailings Cell 3 after initiation of dewatering operations.
2. Installation of New Groundwater Monitoring Wells – the Permittee shall install three new
groundwater monitoring wells within 90 calendar days of issuance of the Permit, designated MW-38, MW-39 and MW-40, located southeast of the tailings cells between monitoring wells MW-17 and MW-22. Specifically, the monitoring well locations shall include the three locations identified by the Permittee in Figure 1 attached to the January 2018 License/Permit Statement of Basis. These monitoring wells shall be drilled and
installed in accordance with the following requirements:
a) All new monitoring wells must be properly designed, installed, screened/completed, and developed in accordance with Part I.E.4 of the Permit.
b) All new monitoring well screens will fully encompass the Burro Canyon Formation saturated zone.
c) All new monitoring wells will be designed to be monitored for the full suite of monitoring parameters listed in the Permit Table 2.
d) On or before August 31, 2018 or as otherwise approved by the Director, the Permittee shall submit a monitoring well As- built report for the monitoring wells installed to document the well construction. The As-built report shall comply
with the requirements of Part I.F.6.
e) The Permittee shall provide at least a 14 calendar day written notice prior to field drilling and construction of the monitoring wells to allow the Director to observe all drilling and well installation activities.
3. Background Groundwater Quality Report for Wells MW-38, MW-39, MW-40 - within
30 calendar days of Director approval of the new monitoring well As-built Report, required by Part I.H.2, above, the Permittee shall commence a quarterly groundwater sampling program that will comply with the following Permit requirements:
Part I.H
Permit No. UGW370004
35
a) Routine groundwater compliance monitoring requirements of Part I.E.1.
b) Well monitoring procedure requirements of Part I.E.5.
c) After completion of eight consecutive quarters of groundwater sampling and analysis of wells MW-38, MW-39, MW-40 required by Part I.H.2, the Permittee shall submit a Background Report for Director approval, that will include:
1) Data preparation and statistical analysis of groundwater quality data,
including, but not limited to, evaluation of data characteristics and internal data consistency, treatment of non-detectable values, and statistical methods used. These statistics shall be calculated using the Decision Tree/Flowchart used for the previous Background Reports that was conditionally approved by
the DRC on August 24, 2007.
2) Shallow aquifer average linear groundwater velocity calculated for the new wells, based on well specific hydraulic conductivity, hydraulic gradient, and effective aquifer porosity.
d) If after review of the report, and the Director determines that additional
information is required, the Permittee shall provide all requested information,
resolve all issues identified, and re-submit the report for Director review and approval within a timeframe approved by the Director. After approval of this report, the Director will re-open this Permit and establish an appropriate monitoring frequency with the criteria found in Part I.E.1(b). Designation of these wells as “compliance” or “general” monitoring wells will be determined after
analysis of the Background Quality Groundwater Report. If the new wells are determined to be compliance wells, the Director will establish Groundwater Compliance Limits in Table 2 for wells MW-38, MW-39, MW-40.
e)d)
4. Revised Groundwater Quality Assurance Plan to Include Dissolved Oxygen – The
Permittee shall update the White Mesa Mill Groundwater Quality Assurance Plan (QAP) to include the collection of dissolved oxygen during field sampling (QAP Parts6.2.2 and Attachment 2-3 (Purging Procedures) and field sampling form) and submit a draft copy of the updated QAP including the updated field sampling form to
The Director for review and approval within 60 calendar days of issuance of the
modified Permit. The Permittee shall commence field sampling of dissolved oxygen within 30 days of the Director approval of the revised QAP in conformance with Part I.E.1d of the Permit.
Part II
Permit No. UGW370004
36
PART II. REPORTING REQUIREMENTS
A. REPRESENTATIVE SAMPLING. Samples taken in compliance with the monitoring requirements established under Part I shall be representative of the monitored activity.
B. ANALYTICAL PROCEDURES. Water sample analysis must be conducted according to test
procedures specified under UAC R317-6-6.3.12 unless other test procedures have been
specified in this Permit.
C. PENALTIES FOR TAMPERING. The Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this Permit shall, upon conviction, be punished by a fine of not more than $10,000 per
violation, or by imprisonment for not more than six months per violation, or by both.
D. REPORTING OF MONITORING RESULTS. Monitoring results obtained during reporting periods specified in the Permit, shall be submitted to the Director at the following address, no later than the date specified following the completed reporting period: Division of Waste Management and Radiation Control
Utah Department of Environmental Quality 195 North 1950 West P.O. Box 144880 Salt Lake City, Utah 84114-4880
The quarterly due dates for reporting are: June 1, September 1, December 1, and March 1.
E. COMPLIANCE SCHEDULES. Reports of compliance or noncompliance with, or any progress reports on interim and final requirements contained in any Compliance Schedule of this Permit shall be submitted no later than 14 calendar days following each schedule date.
F. ADDITIONAL MONITORING BY THE PERMITTEE. If the Permittee monitors any pollutant more
frequently than required by this Permit, using approved test procedures as specified in this Permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted. Such increased frequency shall also be indicated. G. RECORDS CONTENTS.
1. Records of monitoring information shall include:
a) The date, exact place, and time of sampling, observations, or measurements:
b) The individual(s) who performed the sampling, observations, or measurements;
c) The date(s) and time(s) analyses were performed;
d) The name of the certified laboratory which performed the analyses;
e) The analytical techniques or methods used; and,
f) The results of such analyses.
Part II
Permit No. UGW370004
37
H. RETENTION OF RECORDS. The Permittee shall retain records of all monitoring information,
including all calibration and maintenance records and copies of all reports required by this Permit, and records of all data used to complete the application for this Permit, for a period of at least five years from the date of the sample, measurement, report or application. This period may be extended by request of the Director at any time.
I. NOTICE OF NONCOMPLIANCE REPORTING.
1. The Permittee shall verbally report any noncompliance which may endanger public health or the environment as soon as possible, but no later than 24-hours from the time the Permittee first became aware of the circumstances. The report shall be made to the Utah Department of Environmental Quality 24-hour number, (801) 538-6333, or to the
Division of Water Quality, Ground Water Protection Section at (801) 538-6146, during
normal business hours (8:00 am - 5:00 pm Mountain Time).
2. A written submission shall also be provided to the Director within five calendar days of the time that the Permittee becomes aware of the circumstances. The written submission shall contain:
a) A description of the noncompliance and its cause;
b) The period of noncompliance, including exact dates and times;
c) The estimated time noncompliance is expected to continue if it has not been corrected; and,
d) Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the
noncompliance.
3. Reports shall be submitted to the addresses in Part II.D, Reporting of Monitoring Results.
J. OTHER NONCOMPLIANCE REPORTING. Instances of noncompliance not required to be reported within 5 calendar days, shall be reported at the time that monitoring reports for Part II.D are submitted.
K. INSPECTION AND ENTRY. The Permittee shall allow the Director, or an authorized
representative, upon the presentation of credentials and other documents as may be required by law, to:
1. Enter upon the Permittee’s premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of the Permit;
2. Have access to and copy, at reasonable times, any records that must be kept under the
conditions of this Permit;
3. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this Permit; and,
4. Sample or monitor at reasonable times, for the purpose of assuring Permit compliance or
as otherwise authorized by the Act, any substances or parameters at any location.
Part III
Permit No. UGW370004
38
PART III. COMPLIANCE RESPONSIBILITIES
A. DUTY TO COMPLY. The Permittee must comply with all conditions of this Permit. Any Permit noncompliance constitutes a violation of the Act and is grounds for enforcement action; for permit termination, revocation and re-issuance, or modification; or for denial of a permit renewal application. The Permittee shall give advance notice to the Director of the Division
of Water Quality of any planned changes in the permitted facility or activity which may
result in noncompliance with Permit requirements.
B. PENALTIES FOR VIOLATIONS OF PERMIT CONDITIONS. The Act provides that any person who violates a Permit condition implementing provisions of the Act is subject to a civil penalty not to exceed $10,000 per day of such violation. Any person who willfully or negligently
violates Permit conditions is subject to a fine not exceeding $25,000 per day of violation.
Any person convicted under Section 19-5-115 of the Act a second time shall be punished by a fine not exceeding $50,000 per day. Nothing in this Permit shall be construed to relieve the Permittee of the civil or criminal penalties for noncompliance.
C. NEED TO HALT OR REDUCE ACTIVITY NOT A DEFENSE. It shall not be a defense for a Permittee
in an enforcement action that it would have been necessary to halt or reduce the permitted
activity in order to maintain compliance with the conditions of this Permit.
D. DUTY TO MITIGATE. The Permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this Permit which has a reasonable likelihood of adversely affecting human health or the environment.
E. PROPER OPERATION AND MAINTENANCE. The Permittee shall at all times properly operate and
maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the Permittee to achieve compliance with the conditions of this Permit. Proper operation and maintenance also includes adequate laboratory controls and quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a Permittee only when the operation is
necessary to achieve compliance with the conditions of the Permit.
Part IV
Permit No. UGW370004
39
PART IV. GENERAL REQUIREMENTS
A. PLANNED CHANGES. The Permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required when the alteration or addition could significantly change the nature of the facility or
increase the quantity of pollutants discharged.
B. ANTICIPATED NONCOMPLIANCE. The Permittee shall give advance notice of any planned changes in the permitted facility or activity which may result in noncompliance with Permit requirements.
C. PERMIT ACTIONS. This Permit may be modified, revoked and reissued, or terminated for
cause. The filing of a request by the Permittee for a permit modification, revocation and re-
issuance, or termination, or a notification of planned changes or anticipated noncompliance, does not stay any permit condition.
D. DUTY TO REAPPLY. If the Permittee wishes to continue an activity regulated by this Permit after the expiration date of this Permit, the Permittee must apply for and obtain a new permit.
The application should be submitted at least 180 calendar days before the expiration date of
this Permit.
E. DUTY TO PROVIDE INFORMATION. The Permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this Permit, or to determine
compliance with this Permit. The Permittee shall also furnish to the Director, upon request,
copies of records required to be kept by this Permit.
F. OTHER INFORMATION. When the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or any report to the Director, it shall promptly submit such facts or information.
G. SIGNATORY REQUIREMENTS. All applications, reports or information submitted to the
Director shall be signed and certified.
1. All permit applications shall be signed as follows:
a) For a corporation: by a responsible corporate officer;
b) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively.
c) For a municipality, State, Federal, or other public agency: by either a principal executive officer or ranking elected official.
2. All reports required by the Permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that
person. A person is a duly authorized representative only if:
a) The authorization is made in writing by a person described above and submitted to the Director, and,
Part IV
Permit No. UGW370004
40
b) The authorization specified either an individual or a position having responsibility for
the overall operation of the regulated facility or activity, such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus
be either a named individual or any individual occupying a named position).
3. Changes to Authorization. If an authorization under Part IV.G.2. is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of Part IV.G.2 must be submitted to the Director prior to or together with any reports, information, or
applications to be signed by an authorized representative.
4. Certification. Any person signing a document under this section shall make the following certification:
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on
my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine
and imprisonment for knowing violations."
H. PENALTIES FOR FALSIFICATION OF REPORTS. The Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this Permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than six months
per violation, or by both.
I. AVAILABILITY OF REPORTS. Except for data determined to be confidential by the Permittee, all reports prepared in accordance with the terms of this Permit shall be available for public inspection at the offices of the Director. As required by the Act, permit applications, permits,
effluent data, and groundwater quality data shall not be considered confidential.
J. PROPERTY RIGHTS. The issuance of this Permit does not convey any property rights of any sort, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of federal, state or local laws or regulations.
K. SEVERABILITY. The provisions of this Permit are severable, and if any provision of this
Permit, or the application of any provision of this Permit to any circumstance, is held invalid,
the application of such provision to other circumstances, and the remainder of this Permit, shall not be affected thereby.
L. TRANSFERS. This Permit may be automatically transferred to a new Permittee if:
1. The current Permittee notifies the Director at least 30 calendar days in advance of the
proposed transfer date;
Part IV
Permit No. UGW370004
41
2. The notice includes a written agreement between the existing and new Permittee
containing a specific date for transfer of permit responsibility, coverage, and liability between them; and,
3. The Director does not notify the existing Permittee and the proposed new Permittee of his or her intent to modify, or revoke and reissue the permit. If this notice is not received, the
transfer is effective on the date specified in the agreement mentioned in paragraph 2
above.
M. STATE LAWS. Nothing in this Permit shall be construed to preclude the institution of any legal action or relieve the Permittee from any responsibilities, liabilities, penalties established pursuant to any applicable state law or regulation under authority preserved by Section 19-5-
115 of the Act.
N. REOPENER PROVISIONS. This Permit may be reopened and modified (following proper administrative procedures) to include the appropriate limitations and compliance schedule, if necessary, if one or more of the following events occurs:
1. If new ground water standards are adopted by the Board, the Permit may be reopened and modified to extend the terms of the Permit or to include pollutants covered by new
standards. The Permittee may apply for a variance under the conditions outlined in R317-6-6.4(D).
2. Changes have been determined in background groundwater quality.
3. The Director determines permit modification is necessary to protect human health or the environment.
Attachment 5 – Final Modified Groundwater Permit UGW370004 – Blackline
Permit No. UGW370004
STATE OF UTAH
DIVISION OF WATER QUALITY DEPARTMENT OF ENVIRONMENTAL QUALITY UTAH WATER QUALITY BOARD SALT LAKE CITY, UTAH 84114-4870
GROUND WATER DISCHARGE PERMIT In compliance with the provisions of the Utah Water Quality Act, Title 19, Chapter 5, Utah Code
Annotated 1953, as amended, the Act,
Energy Fuels Resources (USA) Inc. 225 Union Boulevard, Suite 600 Lakewood, CO 80228
is granted a ground water discharge permit for the operation of a uranium milling and tailings disposal facility located approximately 6 miles south of Blanding, Utah. The facility is located on a tract of land in Sections 28, 29, 32, and 33, Township 37 South, Range 22 East, Salt Lake Base and Meridian, San Juan County, Utah.
The permit is based on representations made by the Permittee and other information contained in the administrative record. It is the responsibility of the Permittee to read and understand all provisions of this Permit. The milling and tailings disposal facility shall be operated and revised in accordance with
conditions set forth in the Permit and the Utah Ground Water Quality Protection Regulations. This Ground Water Quality Discharge Permit amends and supersedes all other Ground Water Discharge permits for this facility issued previously.
Permit Modified on February 1, 2019 This Permit shall become effective on January 19, 2018.
This Permit shall expire on January 19, 2023.
Signed this ____ day of ______________, 2019.
_____________________________ Rusty Lundberg, Acting Director Division of Waste Management and Radiation Control
i
Table of Contents
PART I. SPECIFIC PERMIT CONDITIONS ................................................................................ 1 A. GROUND WATER CLASSIFICATION....................................................................................... 1 B. BACKGROUND WATER QUALITY ......................................................................................... 1
C. PERMIT LIMITS ..................................................................................................................... 2
1. Ground Water Compliance Limits .................................................................................. 2 2. Tailings Cell Operations .................................................................................................. 2 3. Prohibited Discharges ..................................................................................................... 2 D. DISCHARGE MINIMIZATION AND BEST AVAILABLE TECHNOLOGY STANDARDS .................. 6
1. DMT Design Standards for Existing Tailings Cells 1, 2, and 3 ...................................... 6
2. Existing Tailings Cell Construction Authorized ............................................................. 8 3. Existing Facility DMT Performance Standards .............................................................. 8 4. Best Available Technology Requirements for New Construction ................................ 10 5. BAT Design Standards for Tailings Cell 4A ................................................................ 10
6. BAT Performance Standards for Tailings Cell 4A ....................................................... 13
7. Definition of 11e.(2) Waste ........................................................................................... 13 8. Closed Cell Performance Requirements........................................................................ 13 9. Facility Reclamation Requirements .............................................................................. 14 10. Stormwater Management and Spill Control Requirements ........................................... 14
11. Requirements for Feedstock Material Stored Outside the Feedstock Storage Area ..... 14
12. BAT Design Standards for Tailings Cell 4B ................................................................. 15 13. BAT Performance Standards for Tailings Cell 4B ........................................................ 18 14. BAT Performance Standards for the New Decontamination Pad ................................. 18 E. GROUND WATER COMPLIANCE AND TECHNOLOGY PERFORMANCE MONITORING ............ 19
1. Routine Groundwater Compliance Monitoring ............................................................. 19
2. Groundwater Monitoring: General Monitoring Wells .................................................. 20 3. Groundwater Head Monitoring ..................................................................................... 20 4. Groundwater Monitoring Well Design and Construction Criteria ................................ 21 5. Monitoring Procedures for Wells .................................................................................. 21
6. White Mesa Seep and Spring Monitoring ..................................................................... 21
7. DMT Performance Standard Monitoring ...................................................................... 22 8. BAT Performance Standard Monitoring ....................................................................... 23 9. On-site Chemicals Inventory ......................................................................................... 24 10. Tailings Cell Wastewater Quality Monitoring .............................................................. 24
11. Groundwater Monitoring Modifications ....................................................................... 25
12. BAT Performance Standard Monitoring ....................................................................... 25 F. REPORTING REQUIREMENTS .............................................................................................. 27 1. Routine Groundwater Monitoring Reports ................................................................... 27 2. Routine DMT Performance Standard Monitoring Report ............................................. 28
3. Routine BAT Performance Standard Monitoring Reports ............................................ 28
4. DMT and BAT Performance Upset Reports ................................................................. 28 5. Other Information .......................................................................................................... 28 6. Groundwater Monitoring Well As-Built Reports .......................................................... 29 7. White Mesa Seeps and Springs Monitoring Reports .................................................... 29 8. Chemicals Inventory Report .......................................................................................... 30
9. Tailings Cell Wastewater Quality Reports .................................................................... 30 10. Revised Hydrogeologic Report ..................................................................................... 30 11. Annual Slimes Drain Recovery Head Report................................................................ 31 12. Decontamination Pads Annual Inspection Report ........................................................ 31
G. OUT OF COMPLIANCE STATUS ........................................................................................... 32
ii
1. Accelerated Monitoring Status ...................................................................................... 32
2. Violation of Permit Limits ............................................................................................ 32 3. Failure to Maintain DMT or BAT Required by Permit................................................. 32 4. Facility Out of Compliance Status ................................................................................ 33 H. COMPLIANCE SCHEDULE REQUIREMENTS. ......................................................................... 34
1. Slimes Drain Compliance Plan. .................................................................................... 34
2. Installation of New Groundwater Monitoring Wells .................................................... 34 3. Background Groundwater Quality Report for MW-38, MW-39, MW-40 .................... 34 3. Revised Groundwater Quality Assurance Plan to Include Dissolved Oxygen ………..35 PART II. REPORTING REQUIREMENTS ................................................................................ 36
A. REPRESENTATIVE SAMPLING. ............................................................................................ 36
B. ANALYTICAL PROCEDURES. ............................................................................................... 36 C. PENALTIES FOR TAMPERING. ............................................................................................. 36 D. REPORTING OF MONITORING RESULTS .............................................................................. 36 E. COMPLIANCE SCHEDULES .................................................................................................. 36
F. ADDITIONAL MONITORING BY THE PERMITTEE ................................................................. 36
G. RECORDS CONTENTS ......................................................................................................... 36 H. RETENTION OF RECORDS ................................................................................................... 37 I. NOTICE OF NONCOMPLIANCE REPORTING.......................................................................... 37 J. OTHER NONCOMPLIANCE REPORTING ............................................................................... 37
K. INSPECTION AND ENTRY .................................................................................................... 37
PART III. COMPLIANCE RESPONSIBILITIES ....................................................................... 38 A. DUTY TO COMPLY .............................................................................................................. 38 B. PENALTIES FOR VIOLATIONS OF PERMIT CONDITIONS ....................................................... 38 C. NEED TO HALT OR REDUCE ACTIVITY NOT A DEFENSE ..................................................... 38
D. DUTY TO MITIGATE ........................................................................................................... 38
E. PROPER OPERATION AND MAINTENANCE .......................................................................... 38 PART IV. GENERAL REQUIREMENTS .................................................................................. 39 A. PLANNED CHANGES ........................................................................................................... 39 B. ANTICIPATED NONCOMPLIANCE ........................................................................................ 39
C. PERMIT ACTIONS ............................................................................................................... 39
D. DUTY TO REAPPLY ............................................................................................................. 39 E. DUTY TO PROVIDE INFORMATION ...................................................................................... 39 F. OTHER INFORMATION ........................................................................................................ 39 G. SIGNATORY REQUIREMENTS .............................................................................................. 39
H. PENALTIES FOR FALSIFICATION OF REPORTS ..................................................................... 40
I. AVAILABILITY OF REPORTS ............................................................................................... 40 J. PROPERTY RIGHTS ............................................................................................................. 40 K. SEVERABILITY ................................................................................................................... 40 L. TRANSFERS ........................................................................................................................ 40
M. STATE LAWS ...................................................................................................................... 41
N. REOPENER PROVISIONS ...................................................................................................... 41
iii
List of Tables
Table 1. Ground Water Classification ............................................................................................ 1 Table 2. Groundwater Compliance Limits...................................................................................... 3 Table 3. DMT Engineering Design and Specifications .................................................................. 6 Table 4. Feedstock Storage Area Coordinates ................................................................................ 9
Table 5. Approved Tailings Cell 4A Engineering Design and Specifications ............................. 10
Table 6. Approved Tailings Cell 4B Engineering Design and Specifications .............................. 15 Table 7. Groundwater Monitoring Reporting Schedule ............................................................... 27
Part I.A Permit No. UGW370004
1
PART I. SPECIFIC PERMIT CONDITIONS
A. GROUND WATER CLASSIFICATION - the groundwater classification of the shallow aquifer under the tailings facility has been determined on a well-by-well basis, as defined in Table 1,
below:
Table 1. Ground Water Classification
Class II Groundwater Class III Groundwater Average TDS (mg/L) Average TDS (mg/L) DUSA Data DUSA Data
Well ID N(1) Average Concentration(2) Standard Deviation(2) Well ID N(1) Average Concentration(2) Standard Deviation(2) MW-1(3) 77 1,273 93 MW-2 77 3,050 252 MW-5 82 2,058 170 MW-12 61 3,894 241
MW-11 71 1,844 178 MW-14 51 3,592 176
MW-30 42 1601 100 MW-15 47 3,857 243
MW-17 22 4,444 321
MW-18(3) 18 2,605 297 MW-19(3) 22 2,457 900 MW-20(4) 23 5,192 475
MW-22(4) 23 7,633 656
MW-3A 40 5,684 184
MW-23 33 3,419 408
MW-24 32 4,080 268
MW-25(5) 46 2,763 97
MW-26(6) 60 3,106 231
MW-27(7) 45 1,067 56
MW-28 32 3,633 101 MW-29 40 4,332 118 MW-31(7) 90 1,395 138
MW-32(8) 32 3,703 166
MW-35 24 3,725 354
MW-36 21 4,344 154
MW-37 21 3,881 108
Footnotes:
1) N = Number of Samples 2) Based on historic total dissolved solids (TDS) data provided by the Permittee for period between October, 1979 and September 2016. This data was obtained from the Permittee’s background groundwater quality reports.. 3) Background concentrations of uranium in well MW-18 (55.1 µg/L) and thallium in MW-19 (2.1 µg/L) exceed the GWQS, 30 µg/L and 2.0 µg/L, respectively. Therefore these wells have been classified as Class III groundwater rather than Class II groundwater. 4) Wells MW-1, MW-18, MW-19, MW-20, MW-22, and TW4-24 are not point of compliance monitoring wells, but instead are general monitoring wells as per Part I.E.2. Average concentrations and standard deviations for wells MW-20 and MW-22 were provided by the Permittee for the period between June, 2008 and February, 2010. This data was obtained from the Permittee’s Background Groundwater Quality Report for wells MW-20 and MW-22 dated June, 2010. 5) Background concentration of manganese in well MW-25 (1,806 µg/L) exceeds the GWQS, therefore well MW-25 has been classified as Class III groundwater rather than Class II groundwater. 6) Well MW-26 was originally named TW4-15 and was installed as part of the chloroform contaminant investigation at the facility. Under this Permit, MW-26 is defined as a Point of Compliance (POC) well for the tailings cells (see Part I.E.1). 7) Background concentrations of uranium in well MW-27 (34 µg/L) and selenium in MW-31 (71 µg/L) exceed the GWQS, therefore these wells have been classified as Class III groundwater rather than Class II groundwater. 8) Well MW-32 was originally named TW4-17 and was installed as part of the chloroform contaminant investigation at the facility. Under this Permit it is included as a POC well for the tailings cells in Part I.E.1. B. BACKGROUND WATER QUALITY - based on groundwater samples collected through June 2007 for existing wells (MW-1, MW-2, MW-3, MW-5, MW-11, MW-12, MW-14, MW-15, MW-17,
Part I.B & I.C Permit No. UGW370004
2
MW-18, MW-19, MW-26, and MW-32) and through December 2007 for new wells (MW-3A, MW-23, MW 24, MW-25, MW-27, MW-28, MW-29, MW-30 and MW-31), the upper boundary of background groundwater quality is determined on a well-by-well basis, pursuant to
Environmental Protection Agency (EPA) guidance, and documented in the Permittee’s
background groundwater quality reports dated October 2007, April 30, 2008, and May 1, 2014.
C. PERMIT LIMITS - the Permittee shall comply with the following permit limits:
1. Ground Water Compliance Limits - contaminant concentrations measured in each monitoring well listed in Table 2 below shall not exceed the Ground Water Compliance
Limits (GWCL) defined in Table 2, below. Groundwater quality in the wells listed in
Table 2 below must at all times meet all the applicable GWQS and ad hoc GWQS defined in R317-6 even though this permit does not require monitoring for each specific contaminant.
2. Tailings Cell Operations - only 11.e.(2) by-product material authorized by Utah
Radioactive Materials License No. UT-2300478 (hereafter License) shall be discharged
to or disposed of in the tailings ponds.
3. Prohibited Discharges - discharge of other compounds such as paints, used oil, antifreeze, pesticides, or any other contaminant not defined as 11e.(2) material is prohibited.
3
Table 2. Groundwater Compliance Limits (GWCL)
Upgradient Well Down or Lateral Gradient Wells
MW-27 (Class III) MW-2 (Class III) MW-3A (Class III) MW-5 (Class II) MW-11 (Class II) MW-12 (Class III) MW-14 (Class III) MW-15 (Class III) MW-17 (Class III) MW-23 (Class III) MW-24 (Class III) MW-25 (Class III)
Contaminant GWQS (1) GWCL GWCL (6) GWCL GWCL GWCL (7) GWCL GWCL GWCL GWCL GWCL GWCL GWCL
Nutrients (mg/L)
Ammonia (as N) 25 (2) 12.5 12.5 0.6 1.02 6.25 0.6 12.5 0.21 0.26 0.6 7 0.77
Nitrate + Nitrite (as N) 10 5.6 0.12 1.3 2.5 2.5 5 5 0.27 5 (8) 5 5 5
Heavy Metals (µg/L)
Arsenic 50 25 25 25 17 15 25 25 25 25 25 17 25
Beryllium 4 2 2 2 1 1 2 2 2 2 2 2 2
Cadmium 5 2.5 2.5 3.55 2 1.25 7 2.5 2.5 2.5 2.5 6.43 1.5
Chromium 100 50 50 50 25 25 50 50 50 50 50 50 50
Cobalt 730 (5) 365 365 365 182.5 182.5 365 365 365 365 365 365 365
Copper 1,300 650 650 650 325 325 650 650 650 650 650 650 650
Iron 11,000 (5) 5,500 151.6 5,500 2,750 2,750 5,500 5,500 81.7 5,500 5,500 4,162 5,500
Lead 15 7.5 7.5 7.5 4.1 3.75 7.5 7.5 7.5 7.5 7.5 7.5 7.5
Manganese 800 (4) 400 378.76 383 376.74 164.67 2,088.80 2,230.30 400 915.4 550 7,507 1,806
Mercury 2 1 1 1 1 0.5 1 1 1 1 1 1 1 Molybdenum 40 (2) 20 20 20 10 10 20 25 30 20 20 20 20
Nickel 100 (3) 50 60 105 44.1 46.2 60 50 97 50 50 50 50
Selenium 50 25 26.6 109.58 12.5 12.5 39 25 128.7 25 25 25 25
Silver 100 50 50 50 25 25 50 50 50 50 50 50 50
Thallium 2 1 1 1.4 0.5 0.5 1 1 1 1 1.5 2.01 1.1 Tin 17,000 (4) 8,500 8,500 8,500 4,250 4,250 8,500 8,500 8,500 8,500 8,500 8,500 8,500
Uranium 30 (3) 34 18.45 35 7.5 7.5 23.5 98 65.7 46.66 32 11.9 7.25
Vanadium 60 (4) 30 30 30 15 15 30 30 40 30 30 30 30
Zinc 5,000 2,500 2,500 155 87.38 1,250 2,500 35.04 2,500 2,500 74 2,500 2,500
Radiologics (pCi/L)
Gross Alpha 15 2 3.2 7.5 3.75 3.75 7.5 7.5 7.5 2.8 2.86 7.5 7.5
Volatile Organic Compounds (µg/L)
Acetone 700 (4) 350 350 350 175 175 350 350 350 350 350 350 350
Benzene 5 2.5 2.5 2.5 1.25 1.25 2.5 2.5 2.5 2.5 2.5 2.5 2.5
2-Butanone (MEK) 4,000 (2) 2,000 2,000 2,000 1,000 1,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
Carbon Tetrachloride 5 2.5 2.5 2.5 1.25 1.25 2.5 2.5 2.5 2.5 2.5 2.5 2.5
Chloroform 70 (4) 35 35 35 17.5 17.5 35 35 35 35 35 35 35
Chloromethane 30 (2) 15 15 9.4 7.5 7.5 15 15 15 15 5.7 15 15
Dichloromethane 5 (3) 2.5 2.5 2.5 1.25 1.25 2.5 2.5 2.5 2.5 2.5 2.5 2.5
Naphthalene 100 (2) 50 50 50 25 25 50 50 50 50 50 50 50
Tetrahydrofuran 46 (4) 23 23 23 11.5 11.5 23 23 23 23 23 23 23
Toluene 1,000 500 500 500 250 250 500 500 500 500 500 500 500
Xylenes (total) 10,000 5,000 5,000 5,000 2,500 2,500 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Others
Field pH (S.U.) 6.5 - 8.5 6.47 - 8.5 6.72 - 8.5 5.84 - 8.5 7.04 - 8.5 6.25 - 8.5 5.86 - 8.5 5.42 - 8.5 5.88 - 8.5 6.27 - 8.5 5.97 - 8.5 5.03 - 8.5 5.77 - 8.5
Fluoride (mg/L) 4 0.85 0.43 1.6 1.42 1 2 0.22 2 2 2 0.47 0.42
Chloride (mg/L) 38 20 70 71 39.16 80.5 27 57.1 46.8 10 71 35 Sulfate (mg/L) 462 2,147 3,949.27 1,518 1,309 2,560 2,330 2,549.02 2,860 2,524 2,903 1,933
TDS (mg/L) 1,185.72 3,800 6,028 2,575 2,528 4,323 4,062 4,530 5,085.42 3,670 4,450 2,976
4
Table 2 Continued. Groundwater Compliance Limits (GWCL)
Down or Lateral Gradient Wells
MW-26 (Class III) MW-28 (Class III) MW-29 (Class III) MW-30 (Class II) MW-31 (Class III) MW-32 (Class III) MW-35 (Class III) MW-36 (Class III) MW-37 (Class III)
Contaminant GWQS (1) GWCL GWCL GWCL GWCL GWCL GWCL (7) GWCL GWCL GWCL
Nutrients (mg/L)
Ammonia (as N) 25 (2) 0.92 12.5 1.3 0.14 12.5 1.17 0.14 12.5 12.5
Nitrate + Nitrite (as N) 10 0.62 5 5 2.5 5 5 5 5 2.22
Heavy Metals (µg/L)
Arsenic 50 25 21 25 12.5 25 25 25 25 25
Beryllium 4 2 2 2 1 2 2 2 2 2
Cadmium 5 2.5 5.2 2.5 1.25 2.5 4.72 2.5 2.5 2.5
Chromium 100 50 50 50 25 50 50 50 50 50
Cobalt 730 (5) 365 47 365 182.5 365 75.21 365 365 365 Copper 1,300 650 650 650 325 650 650 650 650 650
Iron 11,000 (5) 2,675.83 299 1,869 2,750 5,500 14,060 330.08 5,500 5,500
Lead 15 7.5 7.5 7.5 3.75 7.5 7.5 7.5 7.5 7.5
Manganese 800 (4) 1,610 1,837 5,624 61 400 5,594.90 290.68 400 400
Mercury 2 1 1 1 0.5 1 1 1 1 1 Molybdenum 40 (2) 20 20 20 10 20 20 20 20 20
Nickel 100 (3) 50 50 50 25 50 94 50 50 50
Selenium 50 25 11.1 25 47.2 119.4 25 25 307.42 25
Silver 100 50 50 50 25 50 50 50 50 50
Thallium 2 1 1 1.2 0.5 1 1 1 1.35 1 Tin 17,000 (4) 8,500 8,500 8,500 4,250 8,500 8,500 8,500 8,500 8,500
Uranium 30 (3) 119 4.9 15 8.32 15 5.26 26.76 26.42 18.08
Vanadium 60 (4) 30 30 30 15 30 30 30 30 30
Zinc 5,000 2,500 83 30 1,250 2,500 230 2,500 2,500 41.25
Radiologics (pCi/L) Gross Alpha 15 4.69 2.42 2 3.75 7.5 7 7.5 7.5 4.2
Volatile Organic Compounds (µg/L)
Acetone 700 (4) 350 350 350 175 350 350 350 350 350
Benzene 5 2.5 2.5 2.5 1.25 2.5 2.5 2.5 2.5 2.5
2-Butanone (MEK) 4,000 (2) 2,000 2,000 2,000 1,000 2,000 2,000 2,000 2,000 2,000
Carbon Tetrachloride 5 5 2.5 2.5 1.25 2.5 2.5 2.5 2.5 2.5
Chloroform 70 (4) 70 35 35 17.5 35 35 35 35 35
Chloromethane 30 (2) 30 4.6 15 7.5 6.1 15 15 15 15 Dichloromethane 5 (3) 5 2.5 2.5 1.25 2.5 2.5 2.5 2.5 2.5
Naphthalene 100 (2) 50 50 50 25 50 50 50 50 50
Tetrahydrofuran 46 (4) 23 23 23 11.5 23 23 23 23 23
Toluene 1,000 500 500 500 250 500 500 500 500 500
Xylenes (total) 10,000 5,000 5,000 5,000 2,500 5,000 5,000 5,000 5,000 5,000
Others
Field pH (S.U.) 6.5 - 8.5 5.61 - 8.5 5.58 - 8.5 5.94 - 8.5 6.47 - 8.5 6.23 - 8.5 5.31 - 8.5 6.15 - 8.5 6.49 - 8.5 6.61 - 8.5
Fluoride (mg/l) 4 2 0.73 1.1 0.51 2 2 0.42 0.35 0.31
Chloride (mg/l) 58.31 105 41 128 143 35.39 69.12 73 57.3 Sulfate (mg/l) 2,082.06 2,533 2,946 972 993 2,556.70 2,400 3,146.21 2,927.65
TDS (mg/l) 3,284.19 3,852 4,570 1,918 2,132 3,960 4,821.88 5,470 4,866.25
5
Footnotes: 1) Utah Ground Water Quality Standards (GWQS) as defined in UAC R317-6, Table 2. Ad hoc GWQS also provided herein, as noted, and as allowed by UAC R317-6-2.2. 2) Ad hoc GWQS for ammonia (as N), molybdenum, 2-Butanone (MEK), chloromethane, and naphthalene based on EPA drinking water lifetime health advisories. 3) Ad hoc GWQS for nickel, uranium, and dichloromethane (methylene chloride, CAS No. 75-09-2) based on final EPA drinking water maximum concentration limits (MCL). 4) Ad hoc GWQS for manganese, tin, vanadium, acetone, chloroform (CAS No. 67-66-3), and tetrahydrofuran based on drinking water ad hoc lifetime health advisories prepared by or in collaboration with EPA Region 8 staff. 5) Ad hoc GWQS for cobalt and iron based on EPA Region 3 Risk Based Concentration limits for tap water. 6) Ground Water Compliance Limits (GWCL) were set after Director review and approval of two Background Groundwater Quality Reports dated October_2007 and April 30, 2008 from the Permittee. 7) GWCLs listed in the table above are those proposed by the Permittee in the October 2007, April 30, 2008, and May 1, 2014 EFR Background Groundwater Quality Reports, and approved by the Director and also include values modified by the Director after review of GWCLs proposed in the Permittee’s October 2007, April 30, 2008, May 1, 2014 Background Groundwater Quality Reports. For wells MW-2, MW-3, MW-5, MW-11, MW-12, MW-14, MW-15, MW-17, MW-26, and MW-32; these modifications are documented in the June 16, 2008 URS Completeness Review for the October, 2007 Revised Background Groundwater Quality Report for Existing Wells. For wells MW-3A, MW-23, MW-24, MW-25, MW-27, MW-28, MW-29, MW-30, and MW-31; these modifications are documented in the June 24, 2008 DRC Findings Memorandum regarding the April 30, 2008 Revised Background Groundwater Quality Report for New Wells. For wells MW-35, MW-36, MW-37; these modifications are documented in the July 14, 2014 DRC Findings Memorandum regarding the May 1, 2014 Background Groundwater Quality Report for Wells MW-35, MW-36, and MW-37
Part I.D
Permit No. UGW370004
6
D. DISCHARGE MINIMIZATION AND BEST AVAILABLE TECHNOLOGY STANDARDS - the tailings
disposal facility must be built, operated, and maintained according to the following Discharge Minimization Technology (DMT) and Best Available Technology (BAT) standards:
1. DMT Design Standards for Existing Tailings Cells 1, 2, and 3 - shall be based on existing
construction as described by design and construction information provided by the
Permittee, as summarized in Table 3 below for Tailings Cells 1, 2, and 3: Table 3. DMT Engineering Design and Specifications
Tailings Cell Report Type Engineering Report Design Figures Construction Specifications Cell 1 Design June, 1979 D’Appolonia Consulting Engineers, Inc (1) Appendix A, Sheets 2, 4, 8, 9, 12-15 Appendix B
Cell 2 Design June, 1979 D’Appolonia Consulting Engineers, Inc (1) Appendix A, Sheets 2, 4, 7-10, 12-15 Appendix B
As-Built February, 1982 D’Appolonia Consulting Engineers, Inc (2) Figures 1, 2, and 11 N/A
Cell 3 Design May, 1981 D’Appolonia Consulting Engineers, Inc (3) Sheets 2-5 Appendix B
As-Built March, 1983 Energy Fuels Nuclear, Inc. (4) Figures 1-4 N/A
Footnotes: 1) D’Appolonia Consulting Engineers, Inc., June, 1979, “Engineers Report Tailings Management System White Mesa Uranium Project Blanding, Utah Energy Fuels Nuclear, Inc. Denver, Colorado”, unpublished consultants report, approximately 50 pp., 2 figures, 16 sheets, 2 appendices. 2) D’Appolonia Consulting Engineers, Inc., February, 1982, “Construction Report Initial Phase - Tailings Management System White Mesa Uranium Project Blanding, Utah Energy Fuels Nuclear, Inc. Denver, Colorado”, unpublished consultants report, approximately 7 pp., 6 tables, 13 figures, 4 appendices. 3) D’Appolonia Consulting Engineers, Inc., May, 1981, “Engineer’s Report Second Phase Design - Cell 3 Tailings Management System White Mesa Uranium Project Blanding, Utah Energy Fuels Nuclear, Inc. Denver, Colorado”, unpublished consultants report, approximately 20 pp., 1 figure, 5 sheets, and 3 appendices. 4) Energy Fuels Nuclear, Inc., March, 1983, “Construction Report Second Phase Tailings Management System White Mesa Uranium Project Energy Fuels Nuclear, Inc.”, unpublished company report, 18 pp., 3 tables, 4 figures, 5 appendices.
a) Tailings Cell 1 - consisting of the following major design elements:
1) Cross-valley Dike and East Dike - constructed on the south side of the pond of native granular materials with a 3:1 slope, a 20-foot crest width, and a crest elevation of about 5,620 ft above mean sea level (amsl). A dike of similar design was constructed on the east margin of the pond, which forms a continuous earthen
structure with the south dike. The remaining interior slopes are cut-slopes at 3:1
grade.
2) Liner System - including a single 30 mil PVC flexible membrane liner (FML) constructed of solvent welded seams on a prepared sub-base. Top elevation of the FML liner was 5,618.5 ft amsl on both the south dike and the north cut-slope. A
protective soil cover layer was constructed immediately over the FML with a
thickness of 12-inches on the cell floor and 18-inches on the interior sideslope.
3) Crushed Sandstone Underlay - immediately below the FML a nominal 6-inch thick layer of crushed sandstone was prepared and rolled smooth as a FML sub-base layer. Beneath this underlay, native sandstone and other foundation materials
were graded to drain to a single low point near the upstream toe of the south
Part I.D
Permit No. UGW370004
7
cross-valley dike. Inside this layer, an east-west oriented pipe was installed to
gather fluids at the upstream toe of the cross-valley dike.
b) Tailings Cell 2 - which consists of the following major design elements:
1) Cross-valley Dike - constructed at the south margin of Cell 2 of native granular materials with a 3:1 slope, a 20-foot crest width, and crest elevation of about
5,615 ft amsl. The east and west interior slopes consist of cut-slopes with a 3:1
grade. The Cell 1 south dike forms the north margin of Cell 2, with a crest elevation of 5,620 ft amsl.
2) Liner System - includes a single 30 mil PVC FML liner constructed of solvent welded seams on a prepared sub-base, and overlain by a slimes drain collection
system. Top elevation of the FML liner in Cell 2 is 5,615.0 ft and 5,613.5 ft amsl
on the north and south dikes, respectively. Said Cell 2 FML liner is independent of all other disposal cell FML liners. Immediately above the FML, a nominal 12-inch (cell floor) to 18-inch (inside sideslope) soil protective blanket was constructed of native sands from on-site excavated soils.
3) Crushed Sandstone Underlay - immediately below the FML a nominal 6-inch
thick layer of crushed sandstone was prepared and rolled smooth as a FML sub-base layer. Beneath this underlay, native sandstone and other foundation materials were graded to drain to a single low point near the upstream toe of the south cross-valley dike. Inside this layer, an east-west oriented pipe was installed to
gather fluids at the upstream toe of the cross-valley dike.
4) Slimes Drain Collection System immediately above the FML a nominal 12-inch thick protective blanket layer was constructed of native silty-sandy soil. On top of this protective blanket, a network of 1.5-inch PVC perforated pipe laterals was installed on a grid spacing interval of about 50-feet. These pipe laterals gravity
drain to a 3-inch diameter perforated PVC collector pipe which also drains toward
the south dike and is accessed from the ground surface via a 24-inch diameter, vertical non-perforated HDPE access pipe. Each run of lateral drainpipe and collector piping was covered with a 12 to 18-inch thick berm of native granular filter material. At cell closure, leachate head inside the pipe network will be
removed via a submersible pump installed inside the 24-inch diameter HDPE
access pipe.
c) Tailings Cell 3 - consisting of the following major design elements:
1) Cross-valley Dike - constructed at the south margin of Cell 3 of native granular materials with a 3:1 slope, a 20-foot crest width, and a crest elevation of 5,610 ft
amsl. The east and west interior slopes consist of cut-slopes with a 3:1 grade. The
Cell 2 south dike forms the north margin of Cell 3, with a crest elevation of 5,615 ft amsl.
2) Liner System - includes a single 30 mil PVC FML liner constructed of solvent welded seams on a prepared sub-base, and overlain by a slimes drain collection
system. Top elevation of the FML liner in Cell 3 is 5,613.5 ft and 5,608.5 ft amsl
on the north and south dikes, respectively. Said Cell 3 FML liner is independent of all other disposal cell FML liners.
Part I.D
Permit No. UGW370004
8
3) Crushed Sandstone Underlay - immediately below the FML a nominal 6-inch
thick layer of crushed sandstone was prepared and rolled smooth as a FML sub-base layer. Beneath this underlay, native sandstone and other foundation materials were graded to drain to a single low point near the upstream toe of the south cross-valley dike. Inside this layer, an east-west oriented pipe was installed to
gather fluids at the upstream toe of the cross-valley dike.
4) Slimes Drain Collection Layer and System - immediately above the FML, a nominal 12-inch (cell floor) to 18-inch (inside sideslope) soil protective blanket was constructed of native sands from on-site excavated soils (70%) and dewatered and cyclone separated tailings sands from the mill (30%). On top of this
protective blanket, a network of 3-inch PVC perforated pipe laterals was installed
on approximately 50-foot centers. This pipe network gravity drains to a 3-inch perforated PVC collector pipe which also drains toward the south dike, where it is accessed from the ground surface by a 12-inch diameter, inclined HDPE access pipe. Each run of the 3-inch lateral drainpipe and collector pipe was covered with
a 12 to 18-inch thick berm of native granular filter media. At cell closure, leachate
head inside the pipe network will be removed via a submersible pump installed inside the 12-inch diameter inclined access pipe.
2. Existing Tailings Cell Construction Authorized - tailings disposal in existing Tailings Cells 1, 2, and 3 is authorized by this Permit as defined in Table 3 and Part I.D.1, above.
Authorized operation and maximum disposal capacity in each of the existing tailings cells
shall not exceed the levels authorized by the License. Under no circumstances shall the freeboard be less than three feet, as measured from the top of the FML. Any modification by the Permittee to any approved engineering design parameter at these existing tailings cells shall require prior Director approval, modification of this Permit, and issuance of a
construction permit.
3. Existing Facility DMT Performance Standards - the Permittee shall operate and maintain certain mill site facilities and the existing tailings disposal cells to minimize the potential for wastewater release to groundwater and the environment, including, but not limited to the following additional DMT compliance measures:
a) DMT Monitoring Wells at Tailings Cell 1 - at all times the Permittee shall operate
and maintain Tailings Cell 1 to prevent groundwater quality conditions in any nearby monitoring well from exceeding any Ground Water Compliance Limit established in Table 2 of this Permit.
b) Tailings Cells 2 and 3 - including the following performance criteria:
1) Slimes Drain Maximum Allowable Head - the Permittee shall at all times
maintain the average wastewater recovery head in the slimes drain access pipe to be as low as reasonably achievable (ALARA) in each tailings disposal cell, in accordance with the currently approved DMT Monitoring Plan.
2) Quarterly Slimes Drain Recovery Test - effective July 11, 2011, the Permittee
shall conduct a quarterly slimes drain recovery test at each tailings cell slimes
drain that meets the following minimum requirements:
i. Includes a duration of at least 90-hours, as measured from the time that pumping ceases, and
Part I.D
Permit No. UGW370004
9
ii. Achieves a stable water level at the end of the test, as measured by three
consecutive hourly water level depth measurements, with no change in water level, as measured to the nearest 0.01 foot.
3) Annual Slimes Drain Compliance – The Permittee shall submit an annual report on or before March 1 following the reporting year which includes but is not
limited to; 1) Monthly volumes of fluid pumped from the slimes drain for each
applicable tailings disposal cell; 2) The results of all quarterly slimes drain recovery tests; 3) A calculation of average annual wastewater recovery elevation in the slimes drain access pipe, and; 4) The annual report shall include an assessment and verification that the maximum fluid volume which could
practicably be extracted from the slimes drain in accordance with the systems in
place was removed.
c) Maximum Tailings Waste Solids Elevation - upon closure of any tailings cell, the Permittee shall ensure that the maximum elevation of the tailings waste solids does not exceed the top of the FML liner.
d) DMT Monitoring Wells - at all times the Permittee shall operate and maintain
Tailings Cells 2 and 3 to prevent groundwater quality conditions in any nearby monitoring well from exceeding any Ground Water Compliance Limit established in Table 2 of this Permit.
e) Feedstock Storage Area - open-air or bulk storage of all feedstock materials at the
facility awaiting mill processing shall be limited to the eastern portion of the mill site
area described in Table 4, below. Storage of feedstock materials at the facility outside this area, shall meet the requirements in Part I.D.11. At the time of mill site closure, the Permittee shall reclaim and decommission the Feedstock Storage Area in compliance with an approved Reclamation Plan. The Permittee shall maintain a
minimum 4-foot wide buffer zone on the inside margin of the Feedstock Storage Area
between the storage area fence and the Feedstock which shall be absent of feed material in order to assure that materials do not encroach on the boundary of the storage area.
Table 4. Feedstock Storage Area Coordinates (1)
Corner Northing (ft) Easting (ft)
Northeast 323,595 2,580,925
Southeast 322,140 2,580,920
Southwest 322,140 2,580,420
West 1 322,815 2,580,410
West 2 323,040 2,580,085 West 3 323,120 2,580,085 West 4 323,315 2,580,285
West 5 323,415 2,579,990
Northwest 323,600 2,579,990
Footnote: 1) Approximate State Plane Coordinates beginning from the extreme northeast corner and progressing clockwise around the feedstock area (from 6/22/01 DUSA Response, Attachment K, Site Topographic Map, Revised June, 2001.)
f) Mill Site Chemical Reagent Storage - for all chemical reagents stored at existing storage facilities and held for use in the milling process, the Permittee shall provide secondary containment to capture and contain all volumes of reagent(s) that might be
released at any individual storage area. Response to spills, cleanup thereof, and
Part I.D
Permit No. UGW370004
10
required reporting shall comply with the provisions of the approved Emergency
Response Plan as found in the currently approved Stormwater Best Management Practices Plan. For any new construction of reagent storage facilities, said secondary containment and control shall prevent any contact of the spilled or otherwise released reagent or product with the ground surface.
4. Best Available Technology Requirements for New Construction - any construction,
modification, or operation of new waste or wastewater disposal, treatment, or storage facilities shall require submittal of engineering design plans and specifications, and prior Director review and approval. All engineering plans or specifications submitted shall demonstrate compliance with all Best Available Technology (BAT) requirements
stipulated by the Utah Ground Water Quality Protection Regulations (UAC R317-6).
Upon Director approval this Permit may be re-opened and modified to include any necessary requirements. 5. BAT Design Standards for Tailings Cell 4A - the BAT design standard for Tailings Cell
4A shall be defined by and construction conform to the requirements of the June 25, 2007
Director design approval letter for the relining of former existing Tailings Cell No. 4A, and as summarized by the engineering drawings, specifications, and description in Table 5, below:
Table 5. Approved Tailings Cell 4A Engineering Design and Specifications
Engineering Drawings
Name Date Revision No. Title
Sheet 1 of 7 June, 2007 Title Sheet
Sheet 2 of 7 June 15, 2007 Rev. 1 Site Plan
Sheet 3 of 7 June 15, 2007 Rev. 1 Base Grading Plan
Sheet 4 of 7 June 15, 2007 Rev. 1 Pipe Layout Plan Sheet 5 of 7 June 15, 2007 Rev. 1 Lining System Details I Sheet 6 of 7 June 15, 2007 Rev. 1 Lining System Details II
Sheet 7 of 7 June 15, 2007 Rev. 1 Lining System Details III
Figure 1 August, 2008 - Spillway Splash Pad Anchor
Engineering Specifications Date Document Title Prepared by June, 2007 Revised Technical Specifications for the Construction of Cell 4A Lining System Geosyntec Consultants
June, 2007 Revised Construction Quality Assurance Plan for the Construction of Cell 4A Lining System Geosyntec Consultants
March 27, 2007 Revised Geosynthetic Clay Liner Hydration Demonstration Work Plan (1) Geosyntec Consultants
November 27, 2006 Cell Seismic Study (2) MFG Consulting Scientists and Engineers October 6, 2006 Calculation of Action Leakage Rate Through the Leakage Detection System Underlying a Geomembrane Liner
Geosyntec Consultants
June 22, 2006 Slope Stability Analysis Cell 4A - Interim
Conditions
Geosyntec Consultants
June 23, 2006 Settlement Evaluation of Berms (2) Geosyntec Consultants
August 22, 2006 Pipe Strength Calculations Geosyntec Consultants
September 27, 2007 DMC Cell 4A - GCL Hydration Geosyntec Consultants
Footnotes:
Part I.D
Permit No. UGW370004
11
1) As qualified by conditions found in May 2, 2007 Division of Radiation Control letter. 2) As clarified by February 8, 2007 Division of Radiation Control Round 6 Interrogatory. Tailings Cell 4A Design and Construction - approved by the Director will consist of the following major elements:
a) Dikes - consisting of existing earthen embankments of compacted soil, constructed by
the Permittee between 1989 and1990, and composed of four dikes, each including a
15-foot wide road at the top (minimum). On the north, east, and south margins these dikes have slopes of 3H to 1V. The west dike has an interior slope of 2H to 1V. Width of these dikes varies; each has a minimum crest width of at least 15 feet to support an access road. Base width also varies from 89-feet on the east dike (with no
exterior embankment), to 211-feet at the west dike.
b) Foundation - including existing subgrade soils over bedrock materials. Foundation preparation included excavation and removal of contaminated soils, compaction of imported soils to a maximum dry density of 90%. Floor of Cell 4A has an average slope of 1% that grades from the northeast to the southwest corners.
c) Tailings Capacity - the floor and inside slopes of Cell 4A encompass about 40 acres
and have a maximum capacity of about 1.6 million cubic yards of tailings material storage (as measured below the required 3-foot freeboard).
d) Liner and Leak Detection Systems - including the following layers, in descending order:
1) Primary Flexible Membrane Liner (FML) - consisting of impermeable 60 mil
high density polyethylene (HDPE) membrane that extends across both the entire cell floor and the inside side-slopes, and is anchored in a trench at the top of the dikes on all four sides. The primary FML will be in direct physical contact with the tailings material over most of the Cell 4A floor area. In other locations, the
primary FML will be in contact with the slimes drain collection system (discussed
below).
2) Leak Detection System - includes a permeable HDPE geonet fabric that extends across the entire area under the primary FML in Cell 4A, and drains to a leak detection sump in the southwest corner. Access to the leak detection sump is via
an 18-inch inside diameter (ID) PVC pipe placed down the inside slope, located
between the primary and secondary FML liners. At its base this pipe will be surrounded with a gravel filter set in the leak detection sump, having dimensions of 10 feet by 10 feet by 2 feet deep. In turn, the gravel filter layer will be enclosed in an envelope of geotextile fabric. The purpose of both the gravel and geotextile
fabric is to serve as a filter.
3) Secondary FML - consisting of an impermeable 60-mil HDPE membrane found immediately below the leak detection geonet. Said FML also extends across the entire Cell 4A floor, up the inside side-slopes and is also anchored in a trench at the top of all four dikes.
4) Geosynthetic Clay Liner - consisting of a manufactured geosynthetic clay liner
(GCL) composed of 0.2-inch of low permeability bentonite clay centered and stitched between two layers of geotextile. Prior to disposal of any wastewater in Cell 4A, the Permittee shall demonstrate that the GCL has achieved a moisture
Part I.D
Permit No. UGW370004
12
content of at least 50% by weight. This item is a revised requirement per DRC
letter to DUSA dated September 28, 2007.
e) Slimes Drain Collection System - including a two-part system of strip drains and perforated collection pipes both installed immediately above the primary FML, as follows:
1) Horizontal Strip Drain System - is installed in a herringbone pattern across the
floor of Cell 4A that drain to a “backbone” of perforated collection pipes. These strip drains are made of a prefabricated two-part geo-composite drain material (solid polymer drainage strip) core surrounded by an envelope of non-woven geotextile filter fabric. The strip drains are placed immediately over the primary
FML on 50-foot centers, where they conduct fluids downgradient in a
southwesterly direction to a physical and hydraulic connection to the perforated slimes drain collection pipe. A series of continuous sand bags, filled with filter sand cover the strip drains. The sand bags are composed of a woven polyester fabric filled with well graded filter sand to protect the drainage system from
plugging.
2) Horizontal Slimes Drain Collection Pipe System - includes a “backbone” piping system of 4-inch ID Schedule 40 perforated PVC slimes drain collection (SDC) pipe found at the downgradient end of the strip drain lines. This pipe is in turn overlain by a berm of gravel that runs the entire diagonal length of the cell,
surrounded by a geotextile fabric cushion in immediate contact with the primary
FML. In turn, the gravel is overlain by a layer of non-woven geotextile to serve as an additional filter material. This perforated collection pipe serves as the “backbone” to the slimes drain system and runs from the far northeast corner downhill to the far southwest corner of Cell 4A where it joins the slimes drain
access pipe.
3) Slimes Drain Access Pipe - consisting of an 18-inch ID Schedule 40 PVC pipe placed down the inside slope of Cell 4A at the southwest corner, above the primary FML. Said pipe then merges with another horizontal pipe of equivalent diameter and material, where it is enveloped by gravel and woven geotextile that
serves as a cushion to protect the primary FML. A reducer connects the horizontal
18-inch pipe with the 4-inch SDC pipe. At some future time, a pump will be set in this 18-inch pipe and used to remove tailings wastewaters for purposes of de-watering the tailings cell.
f) Cell 4A North Dike Splash Pads - three 20-foot wide splash pads will be constructed
on the north dike to protect the primary FML from abrasion and scouring by tailings
slurry. These pads will consist of an extra layer of 60 mil HDPE membrane that will be installed in the anchor trench and placed down the inside slope of Cell 4A, from the top of the dike, under the inlet pipe, and down the inside slope to a point 5-feet beyond the toe of the slope.
g) Cell 4A Emergency Spillway - a concrete lined spillway will be constructed near the
western corner of the north dike to allow emergency runoff from Cell 3 into Cell 4A. This spillway will be limited to a 6-inch reinforced concrete slab set directly over the primary FML in a 4-foot deep trapezoidal channel. No other spillway or overflow structure will be constructed at Cell 4A. All stormwater runoff and tailings
Part I.D
Permit No. UGW370004
13
wastewaters not retained in Cells 2 and 3, will be managed and contained in Cell 4A,
including the Probable Maximum Precipitation and flood event.
6. BAT Performance Standards for Tailings Cell 4A - the Permittee shall operate and maintain Tailings Cell 4A so as to prevent release of wastewater to groundwater and the environment in accordance with the currently approved Cell 4A BAT, Monitoring,
Operations and Maintenance Plan. Any failure to achieve or maintain the required BAT
performance standards shall constitute a violation of the Permit and shall be reported to the Director in accordance with Part I.G.3. Performance standards for Tailings Cell 4A shall include the following:
a) Leak Detection System (LDS) Maximum Allowable Daily Head - the fluid head in
the LDS shall not exceed 1 foot above the lowest point on the lower flexible
membrane liner on the cell floor. For purposes of compliance this elevation will equate to a maximum distance of 2.28 feet above the LDS transducer. At all times the Permittee shall operate the LDS pump and transducer in a horizontal position at the lowest point of the LDS sump floor.
b) LDS Maximum Allowable Daily Leak Rate - shall not exceed 24,160 gallons/day.
c) Slimes Drain Annual Average Recovery Head Criteria - after the Permittee initiates pumping conditions in the slimes drain layer in Cell 4A, the Permittee will provide: 1) continuous declining fluid heads in the slimes drain layer, in a manner equivalent to the requirements found in Part I.D.3(b), and 2) a maximum head of 1.0 feet in the
tailings (as measured from the lowest point of upper flexible membrane liner) in 6.4
years or less.
d) Maximum Weekly Wastewater Level - under no circumstance shall the freeboard be less then 3-feet in Cell 4A, as measured from the top of the upper FML.
7. Definition of 11e.(2) Waste - for purposes of this Permit, 11e.(2) waste is defined as: "...
tailings or wastes produced by the extraction or concentration of uranium or thorium
from any ore processed primarily for its source material content", as defined in Section 11e.(2) of the U.S. Atomic Energy Act of 1954, as amended; which includes other process related wastes and waste streams described by a March 7, 2003 NRC letter from Paul H. Lohaus to William J. Sinclair.
8. Closed Cell Performance Requirements - before reclamation and closure of any tailings
disposal cell, the Permittee shall ensure that the final design, construction, and operation of the cover system at each tailings cell will comply with all requirements of an approved Reclamation Plan, and will for a period of not less than 200 years meet the following minimum performance requirements:
a) Minimize infiltration of precipitation or other surface water into the tailings,
including, but not limited to the radon barrier,
b) Prevent the accumulation of leachate head within the tailings waste layer that could rise above or over-top the maximum FML liner elevation internal to any disposal cell, i.e. create a “bathtub” effect, and
Part I.D
Permit No. UGW370004
14
c) Ensure that groundwater quality at the compliance monitoring wells does not exceed
the Ground Water Quality Standards or Ground Water Compliance Limits specified in Part I.C.1 and Table 2 of this Permit.
9. Facility Reclamation Requirements - upon commencement of decommissioning, the Permittee shall reclaim the mill site and all related facilities, stabilize the tailings cells,
and construct a cover system over the tailings cells in compliance with all engineering
design and specifications in an approved Reclamation Plan. The Director reserves the right to require modifications of the Reclamation Plan for purposes of compliance with the Utah Ground Water Quality Protection Regulations, including but not limited to containment and control of contaminants, or discharges, or potential discharges to Waters
of the State.
10. Stormwater Management and Spill Control Requirements - the Permittee will manage all contact and non-contact stormwater and control contaminant spills at the facility in accordance with the currently approved Stormwater Best Management Practices Plan. Said plan includes the following minimum provisions:
a) Protect groundwater quality or other waters of the state by design, construction,
and/or active operational measures that meet the requirements of the Ground Water Quality Protection Regulations found in UAC R317-6-6.3(G) and R317-6-6.4(C),
b) Prevent, control and contain spills of stored reagents or other chemicals at the mill site,
c) Cleanup spills of stored reagents or other chemicals at the mill site immediately upon
discovery, and
d) Report reagent spills or other releases at the mill site to the Director in accordance with UAC 19-5-114.
Reconstruction of stormwater management and/or chemical reagent storage facilities,
existing at the time of original Permit issuance, may be required by the Director after
occurrence of a major spill or catastrophic failure, pursuant to Part IV.N.3 of this Permit.
11. BAT Requirements for Feedstock Material Stored Outside the Feedstock Storage Area - the Permittee shall store and manage feedstock materials outside the ore storage pad in accordance with the following minimum performance requirements:
a) Feedstock materials shall be stored at all times in water-tight containers or water-tight
container overpacks, and aisle ways will be provided at all times to allow visual inspection of each and every feedstock container and container overpack, or
b) Feedstock containers shall be stored on a hardened surface to prevent spillage onto subsurface soils, and that conforms with the following minimum physical
requirements:
1) A storage area composed of a hardened engineered surface of asphalt or concrete, and
2) A storage area designed, constructed, and operated in accordance with engineering plans and specifications approved in advance by the Director. All
such engineering plans or specifications submitted shall demonstrate compliance
with Part I.D.4,
Part I.D
Permit No. UGW370004
15
3) A storage area that provides containment berms to control stormwater run-on and
run-off, and
4) Stormwater drainage works approved in advance by the Director, or
5) Other storage facilities and means approved in advance by the Director.
12. BAT Design Standards for Tailings Cell 4B - the BAT design standard for Tailings Cell
4B shall be defined by and constructed in accordance with the requirements as
summarized by the engineering drawings, specifications, and description in Table 6, below:
Table 6. Approved Tailings Cell 4B Engineering Design and Specifications
Engineering Drawings
Name Date Revision No. Title
Sheet 1 of 8 January 2009 Rev. 1 Cover Sheet
Sheet 2 of 8 January 2009 Rev. 1 Site Plan Sheet 3 of 8 January 2009 Rev. 1 Base Grading Plan Sheet 4 of 8 January 2009 Rev. 1 Pipe Layout and Details
Sheet 5 of 8 December 2007 Rev. 0 Lining System Details I
Sheet 6 of 8 January 2009 Rev. 1 Lining System Details II
Sheet 7 of 8 January 2009 Rev. 1 Lining System Details III
Sheet 8 of 8 January 2009 Rev. 1 Lining System Details IV Figure 1 January 2009 - Mill Site Drainage Basins (supporting reference)
Engineering Specifications
Date Document Title Prepared by
January 2009 Slope Stability Analysis Calculation Package Geosyntec Consultants
January 2009 Seismic Deformation Analysis Calculation Package Geosyntec Consultants
January 2009 Revised Pipe Strength Analysis Calculation
Package
Geosyntec Consultants
January 2009 Revised Comparison of Flow Though Compacted Clay Liner and Geosynthetic Clay Liner Calculation Package
Geosyntec Consultants
January 2009 Revised Action Leakage Rate Calculation Package Geosyntec Consultants
August 2009 Blasting - Locations and Profiles, Attachment:
Figures 1 and 2
Geosyntec Consultants
August 2009 (Revised) Technical Specifications, with the exception of Section 02200 (Earthwork) Geosyntec Consultants
August 2009 Cell 4B Capacity Calculations Geosyntec Consultants
August 2009 Revised Cushion Fabric Calculations
August 2009 Construction Quality Assurance Plan for the
Construction of Cell 4B Lining System
Geosyntec Consultants
September 2009 (Revised) Technical Specification Section 02200 (Earthwork) Geosyntec Consultants
August 6, 2009 Blast Plan, KGL and Associates and Blast Plan Review, Geosyntec Consultants letter dated September 10, 2009
KGL and Associates and Geosyntec Consultants
September 2009 Probable Maximum Precipitation (PMP) Event
Computation
Geosyntec Consultants
January 2009 Slope Stability Analysis Calculation Package Geosyntec Consultants
Part I.D
Permit No. UGW370004
16
Tailings Cell 4B Design and Construction - approved by the Director will consist of the
following major elements:
a) Dikes - consisting of newly constructed dikes on the south and west side of the cell, each including a 20-foot wide road at the top (minimum) to support an access road. The grading plan for the Cell 4B excavation includes interior slopes of 2H to 1V. The
exterior slopes of the southern and western dikes will have typical slopes of 3H to 1V.
Limited portions of the Cell 4B interior sideslopes in the northwest corner and southeast corner of the cell, (where the slimes drain and leak detection sump will be located will also have a slope of 3H to 1V. The base width of the southern dikes varies from approximately 92 feet at the western end to approximately 190 feet at the
eastern end of the dike, with no exterior embankment present on any other side of the
cell.
b) Foundation - including existing subgrade soils over bedrock materials. Foundation preparation included excavation and removal of contaminated soils, compaction of imported soils to a maximum dry density of 90% at a moisture content between +3%
and -3% of optimum moisture content, as determined by ASTM D-1557. The floor of
Cell 4B has an average slope of 1% that grades from the northwest corner to the southeast corner.
c) Tailings Capacity - the floor and inside slopes of Cell 4B encompass about 44 acres, and the cell will have a water surface area of 40 acres and a maximum capacity of
about 1.9 million cubic yards of tailings material storage (as measured below the
required 3-foot freeboard).
d) Liner and Leak Detection Systems - including the following layers, in descending order:
1) Primary Flexible Membrane Liner (FML) - consisting of 60-mil high density
polyethylene (HDPE) membrane that extends across both the entire cell floor and
the inside side-slopes, and is anchored in a trench at the top of the dikes on all four sides. The primary FML will be in direct physical contact with the tailings material over most of the Cell 4B floor area. In other locations, the primary FML will be in contact with the slimes drain collection system (discussed below).
2) Leak Detection System - includes a permeable HDPE geonet that extends across
the entire area under the primary FML in Cell 4B, and drains to a leak detection sump in the southeast corner. Access to the leak detection sump is via an 18-inch inside diameter (ID) PVC pipe placed down the inside slope, located between the primary and secondary FML liners. At its base this pipe will be surrounded with a
gravel filter set in a sump having dimensions of 15 feet by 10 feet by 2 feet deep
that contains a leak detection system sump area. In turn, the gravel filter layer will be enclosed in an envelope of geotextile fabric. The purpose of both the gravel and geotextile fabric is to serve as a filter.
3) Secondary FML - consisting of a 60-mil HDPE membrane found immediately
below the leak detection geonet. Said FML also extends across the entire Cell 4B
floor, up the inside side-slopes and is also anchored in a trench at the top of all four dikes.
4) Geosynthetic Clay Liner - consisting of a manufactured geosynthetic clay liner (GCL) composed of 0.2-inch of low permeability bentonite clay centered and
Part I.D
Permit No. UGW370004
17
stitched between two layers of geotextile. Prior to disposal of any wastewater in
Cell 4B, the Permittee shall demonstrate that the GCL has achieved a moisture content of at least 50% by weight.
e) Slimes Drain Collection System - including a two-part system of strip drains and perforated collection pipes both installed immediately above the primary FML, as
follows:
1) Horizontal Strip Drain System - is installed in a herringbone pattern across the floor of Cell 4B that drain to a “backbone” of perforated collection pipes. These strip drains are made of a prefabricated two-part geo-composite drain material (solid polymer drainage strip) core surrounded by an envelope of non-woven
geotextile filter fabric. The strip drains are placed immediately over the primary
FML on 50-foot centers, where they conduct fluids downgradient in a southwesterly direction to a physical and hydraulic connection to the perforated slimes drain collection pipe. A series of continuous sand bags, filled with filter sand cover the strip drains. The sand bags are composed of a woven polyester
fabric filled with well graded filter sand to protect the drainage system from
plugging.
2) Horizontal Slimes Drain Collection Pipe System - includes a “backbone” piping system of 4-inch ID Schedule 40 perforated PVC slimes drain collection (SDC) pipe found at the downgradient end of the strip drain lines. This pipe is in turn
overlain by a berm of gravel that runs the entire diagonal length of the cell,
surrounded by a geotextile fabric cushion in immediate contact with the primary FML. In turn, the gravel is overlain by a layer of non-woven geotextile to serve as an additional filter material. This perforated collection pipe serves as the “backbone” to the slimes drain system and runs from the far northwest corner
downhill to the far southeast corner of Cell 4B where it joins the slimes drain
access pipe.
3) Slimes Drain Access Pipe - consisting of an 18-inch ID Schedule 40 PVC pipe placed down the inside slope of Cell 4B at the southeast corner, above the primary FML. Said pipe then merges with another horizontal pipe of equivalent diameter
and material, where it is enveloped by gravel and woven geotextile that serves as
a cushion to protect the primary FML. A reducer connects the horizontal 18-inch pipe with the 4-inch SDC pipe. At some future time, a pump will be set in this 18-inch pipe and used to remove tailings wastewaters for purposes of de-watering the tailings cell.
f) Cell 4B North and East Dike Splash Pads - Nine 20-foot-wide splash pads will be constructed on the north and east dikes to protect the primary FML from abrasion and scouring by tailings slurry. These pads will consist of an extra layer of 60 mil HDPE membrane that will be installed in the anchor trench and placed down the inside slope
of Cell 4B, from the top of the dike, under the inlet pipe, and down the inside slope to
a point at least 5 feet onto the Cell 4B floor beyond the toe of the slope.
g) Cell 4B Emergency Spillway - a concrete lined spillway will be constructed near the southeastern corner of the east dike to allow emergency runoff from Cell 4A into Cell 4B. This spillway will be limited to a 6-inch reinforced concrete slab, with a welded
Part I.D
Permit No. UGW370004
18
wire fabric installed within it at its midsection, set atop a cushion geotextile placed
directly over the primary FML in a 4-foot deep trapezoidal channel. A 100-foot wide, 60-mil HDPE membrane splash pad will be installed beneath the emergency spillway. No other spillway or overflow structure will be constructed at Cell 4B. All stormwater runoff and tailings wastewaters not retained in Cells 2 and 3, and 4A will
be managed and contained in Cell 4B, including the Probable Maximum Precipitation
and flood event.
13. BAT Performance Standards for Tailings Cell 4B - the Permittee shall operate and maintain Tailings Cell 4B so as to prevent release of wastewater to groundwater and the environment in accordance with the currently approved Cell 4B BAT, Monitoring,
Operations and Maintenance Plan. Any failure to achieve or maintain the required BAT
performance standards shall constitute a violation of the Permit and shall be reported to the Director in accordance with Part I.G.3. Performance standards for Tailings Cell 4B shall include the following:
a) Leak Detection System (LDS) Maximum Allowable Daily Head - the fluid head in
the LDS shall not exceed 1 foot above the lowest point on the lower flexible
membrane liner on the cell floor. At all times the Permittee shall operate the LDS pump and transducer in a horizontal position at the lowest point of the LDS sump floor.
b) LDS Maximum Allowable Daily Leak Rate - shall not exceed 26,145 gallons/day.
c) Slimes Drain Annual Average Recovery Head Criteria - after the Permittee initiates
pumping conditions in the slimes drain layer in Cell 4B, the Permittee will provide: 1) continuous declining fluid heads in the slimes drain layer, in a manner equivalent to the requirements found in Part I.D.3(b), and 2) a maximum head of 1.0 feet in the tailings (as measured from the lowest point of upper flexible membrane liner) in 5.5
years or less.
d) Maximum Weekly Wastewater Level - under no circumstance shall the freeboard be less than 3-feet in Cell 4B, as measured from the top of the upper FML.
14. BAT Performance Standards for the New Decontamination Pad - the Permittee shall operate and maintain the New Decontamination Pad (NDP) to prevent release of
wastewater to groundwater and the environment in accordance with the currently
approved DMT Monitoring Plan. Any failure to achieve or maintain the required BAT performance standards shall constitute a violation of the Permit and shall be reported to the Director in accordance with Part I.G.3. Performance standards for the NDP shall include, but are not limited to, the following:
a) NDP LDS Access Pipes - the water level shall not exceed 0.10 foot above the
concrete floor in any LDS access pipe, at any time. Compliance will be defined as a depth to standing water present in any of the LDS access pipes of more than or equal to 6.2 feet as measured from the water measuring point (top of access pipe).
b) Soil and debris will be removed from the wash pad of the NDP, in accordance with
the currently approved DMT Monitoring Plan. Cracks in the wash pad greater than
1/8 inch (width) will be repaired within five working days of discovery.
Part I.E.
Permit No. UGW370004
19
E. GROUND WATER COMPLIANCE AND TECHNOLOGY PERFORMANCE MONITORING - beginning
with the effective date and lasting through the term of this Permit or as stated in an approved closure plan, the Permittee shall sample groundwater monitoring wells, tailing cell wastewaters, seeps and springs, monitor groundwater levels, monitor water levels of process solutions, and monitor and keep records of the operation of the facility, as follows:
1. Routine Groundwater Compliance Monitoring - the Permittee shall monitor upgradient,
lateral gradient, and downgradient groundwater monitoring wells completed in the shallow aquifer in the vicinity of all potential discharge sources that could affect local groundwater conditions at the facility, as follows:
a) Ground Water Monitoring Quality Assurance Plan - all groundwater monitoring and
analysis performed under this Permit shall be conducted in accordance with a Quality
Assurance Plan (QAP) currently approved by the Director. Any non-conformance with QAP requirements in a given quarterly groundwater monitoring period will be corrected and reported to the Director on or before submittal of the next quarterly groundwater monitoring report pursuant to Part I.F.1.
b) Quarterly Monitoring - the Permittee shall monitor on a quarterly basis all monitoring
wells listed in Table 2 of this Permit where local groundwater average linear velocity has been found by the Director to be equal to or greater than 10 feet/year. For purposes of this Permit, quarterly monitoring is required at the following wells:
1) Upgradient Wells: none
2) Lateral or Downgradient Wells: MW-11, MW-14, MW-25, MW-26 (formerly
TW4-15), MW-30, MW-31, MW-36.
c) Semi-annual Monitoring - the Permittee shall monitor on a semi-annual basis all monitoring wells listed in Table 2 of this Permit, where local groundwater average linear velocity has been found by the Director to be less than 10 feet/year, and all
general monitoring wells. For purposes of this Permit, semi-annual monitoring is
required at the following wells:
1) Monitoring Wells Listed on Table 2:
i. Upgradient Well: MW-27.
ii. Lateral or Downgradient Wells: MW-2, MW-3A, MW-5, MW-12, MW-
15, MW-17, MW-23, MW-24, MW-28, MW-29, and MW-32 (formerly
TW4-17), MW-35, and MW-37.
2) General Monitoring Wells:
i. Upgradient Wells: MW-1, MW-18, and MW-19.
ii. Lateral or Downgradient Wells: TW4-24, MW-20 and MW-22.
d) Compliance Monitoring Parameters - all groundwater samples collected shall be
analyzed for the following parameters:
1) Field Parameters - depth to groundwater, pH, temperature, specific conductance, dissolved oxygen, and redox potential (Eh).
2) Laboratory Parameters
Part I.E.
Permit No. UGW370004
20
i. GWCL Parameters - all contaminants specified in Table 2.
ii. General Inorganics - chloride, sulfate, carbonate, bicarbonate, sodium, potassium, magnesium, calcium, and total anions and cations.
e) Special Provisions for Groundwater Monitoring - the Permittee shall ensure that all groundwater monitoring conducted and reported complies with the following
requirements:
1) Depth to Groundwater Measurements - shall always be made to the nearest 0.01 foot.
2) Minimum Detection Limits - all groundwater quality analyses reported shall have a minimum detection limit or reporting limit that is less than its respective Ground
Water Compliance Limit concentration defined in Table 2.
3) Gross Alpha Counting Variance - all gross alpha analysis shall be reported with an error term. All gross alpha analysis reported with an activity equal to or greater than the GWCL, shall have a counting variance that is equal to or less than 20% of the reported activity concentration. An error term may be greater than 20% of
the reported activity concentration when the sum of the activity concentration and
error term is less than or equal to the GWCL.
4) All equipment used for purging and sampling of groundwater shall be made of inert materials.
2. Groundwater Monitoring: General Monitoring Wells - Upgradient wells MW-1, MW-18,
and MW-19; Lateral Monitoring Well TW4-24; and Downgradient wells MW-20 and
MW-22. The Permittee shall monitor wells MW-1, MW-18, MW-19, TW4-24, MW-20 and MW-22 on a semi-annual basis. Said sampling shall comply with the following Permit requirements, but shall not be considered compliance monitoring for the purposes of Part G:
a) Routine groundwater compliance monitoring requirements of Part I.E.1.
b) Groundwater head monitoring requirements of Part I.E.3
c) Well monitoring procedure requirements of Part I.E.5.
3. Groundwater Head Monitoring - on a quarterly basis and at the same frequency as groundwater monitoring required by Part I.E.1, the Permittee shall measure depth to
groundwater in the following wells and/or piezometers:
a) Point of Compliance Wells - identified in Table 2 and Part I.E.1 of this Permit.
b) Piezometers - P-1, P-2, P-3, P-4, and P-5.
c) Head Monitoring Well - MW-34.
d) General Monitoring Wells - Upgradient wells MW-1, MW-18, and MW-19; Lateral
well TW4-24; and Downgradient wells MW-20 and MW-22.
e) Contaminant Investigation Wells - any well required by the Director as a part of a contaminant investigation or groundwater corrective action.
f) Any other wells or piezometers required by the Director.
Part I.E.
Permit No. UGW370004
21
4. Groundwater Monitoring Well Design and Construction Criteria - all new groundwater
monitoring wells installed at the facility shall comply with the following design and construction criteria:
a) Located as close as practical to the contamination source, tailings cell, or other potential origin of groundwater pollution.
b) Screened and completed in the shallow aquifer.
c) Designed and constructed in compliance with UAC R317-6-6.3(I)(6), including the EPA RCRA Ground Water Monitoring Technical Enforcement Guidance Document, 1986, OSWER-9950.1.
d) Aquifer tested to determine local hydraulic properties, including but not limited to
hydraulic conductivity.
5. Monitoring Procedures for Wells - beginning with the date of Permit issuance, all monitoring shall be conducted by the Permittee in conformance with the following procedures:
a) Sampling - grab samples shall be taken of the groundwater, only after adequate
removal or purging of standing water within the well casing has been performed.
b) Sampling Plan - all sampling shall be conducted to ensure collection of representative samples, and reliability and validity of groundwater monitoring data.
c) Laboratory Approval - all analyses shall be performed by a laboratory certified by the State of Utah to perform the tests required.
d) Damage to Monitoring Wells - if any monitor well is damaged or is otherwise
rendered inadequate for its intended purpose, the Permittee shall notify the Director in writing within five calendar days of discovery.
e) Field Monitoring Equipment Calibration and Records - immediately prior to each monitoring event, the Permittee shall calibrate all field monitoring equipment in
accordance with the respective manufacturer's procedures and guidelines. The
Permittee shall make and preserve on-site written records of such equipment calibration in accordance with Part II.G and H of this Permit. Said records shall identify the manufacturer's and model number of each piece of field equipment used and calibration.
6. White Mesa Seeps and Springs Monitoring - the Permittee shall conduct annual
monitoring of all seeps and springs identified in the currently approved Sampling Plan for Seeps and Springs in the Vicinity of the White Mesa Uranium Mill. Said monitoring shall include, but is not limited to:
a) Field Measurements - including: pH, temperature, and specific conductivity.
b) Water Quality Sampling and Analysis - the Permittee shall collect grab samples and
perform laboratory analysis of all water quality parameters identified in Table 2 of this Permit.
c) Certified Laboratory Analysis - all laboratory analysis will be conducted by a Utah certified laboratory.
d) Analytical Methods - all laboratory analysis shall be conducted using analytical
methods listed in the currently approved QAP pursuant to Part I.E.1 of this Permit.
Part I.E.
Permit No. UGW370004
22
e) Minimum Detection Limits - all seeps or springs water quality analyses reported shall
have a minimum detection limit or reporting limit that is less than or equal to the respective:
1) Ground Water Quality Standards concentrations defined in Table 2 of this Permit, and
2) For TDS, Sulfate, and Chloride, the Minimum Detection Limit for those
constituents for seeps and springs monitoring will be as follows: 10 mg/L, 1 mg/L, and 1 mg/L, respectively.
f) Quality Control Samples - the Permittee will conduct quality control (QC) sampling and analysis as a part of all seeps and springs sampling, in accordance with the
requirements of Section 4.3 of the currently approved QAP; pursuant to Part I.E.1 of
this Permit. Said QC samples shall include, but are not limited to: trip blanks, duplicate samples, and equipment rinse blanks.
g) Prior Notification - at least 15 calendar days before any fieldwork or water quality sample collection, the Permittee shall provide written notice to allow the Director to
observe or split sample any or all seeps or springs.
7. DMT Performance Standards Monitoring - the Permittee shall perform technology performance monitoring in accordance with the currently approved DMT Monitoring Plan to determine if DMT is effective in minimizing and controlling the release of contaminants pursuant to the provisions of Parts I.D.1 and I.D.3 of this Permit, including,
but not limited to the following activities:
a) Weekly Tailings Wastewater Pool Elevation Monitoring: Cells 1 and 3 - the Permittee shall monitor and record weekly the elevation of wastewater in Tailings Cells 1 and 3 to ensure compliance with the maximum wastewater elevation criteria mandated by Condition 10.3 of the License. Said measurements shall be made from a wastewater
level gauge or elevation survey to the nearest 0.01 foot.
b) Quarterly Slimes Drain Water Level Monitoring: Cells 2 and 3 - the Permittee shall monitor and record quarterly the depth to wastewater in the slimes drain access pipes as described in Part I.D.3 of this Permit and the currently approved DMT Monitoring Plan at Tailings Cells 2 and 3 to determine the recovery head. For purposes of said
monitoring, the Permittee shall at each tailings cell:
1) Perform at least 1 separate slimes drain recovery test at each disposal cell in each quarterly period of each calendar year that meets the requirements of Part I.D.3,
2) Designate, operate, maintain, and preserve one water level measuring point at the centerline of the slimes drain access pipe that has been surveyed and certified by a
Utah licensed engineer or land surveyor,
3) Make all slimes drain recovery head test (depth to fluid) measurements from the same designated water level measuring point, and
4) Record and report all fluid depth measurements to the nearest 0.01 foot.
5) For Cell 3 these requirements shall apply upon initiation of tailings de-watering
operations.
Part I.E.
Permit No. UGW370004
23
c) Weekly Feedstock Storage Area Inspection - the Permittee shall conduct weekly
inspections of all feedstock storage to: 1) Confirm the bulk feedstock materials are maintained within the approved Feedstock Storage Area defined by Table 4, and 2) Verify that all alternate feedstock materials located outside the Feedstock Area defined in Table 4, are stored in accordance with the requirements found in Part
I.D.11.
d) Feedstock Material Stored Outside the Feedstock Storage Area Inspections
a) Weekly Inspection - the Permittee will conduct weekly inspections to verify that each feed material container complies with the requirements of Part I.D.11.
b) Hardened Surface Storage Area - in the event the Permittee constructs a hardened
surface storage area for feed materials, pursuant to Part I.D.11, prior Director
approval will be secured for the following:
i. Engineering Design and Specifications - in accordance with the requirements of Part I.D.4, and
ii. Operation and Maintenance Plan.
e) Inspections of Tailing Cell and Pond Liner Systems - the Permittee shall inspect the
liner system at Tailing Cells 1, 2, and 3 on a daily basis pursuant to the requirements of Sections 2.1 and 2.2 of the currently approved DMT Monitoring Plan. In the event that any liner defect or damage is identified during a liner system inspection, the Permittee shall: 1) report and repair said defect or damage pursuant to Part I.G.3 by
implementation of the currently approved Liner Maintenance Provisions, and 2)
report all repairs made pursuant to Part I.F.2.
f) Weekly New Decontamination Pad Inspection - the Permittee shall conduct weekly inspections of the New Decontamination Pad as described in Part I.D.14 of this Permit and the currently approved DMT Monitoring Plan.
8. Cell 4A BAT Performance Standards Monitoring and Maintenance - in accordance with
the currently approved Cell 4A BAT, Monitoring, Operations and Maintenance Plan, the Permittee shall immediately implement all monitoring and recordkeeping requirements therein. The Cell 4A BAT monitoring includes the following:
a) Weekly Leak Detection System (LDS) Monitoring - including:
1) Leak Detection System Pumping and Monitoring Equipment - the Permittee shall
provide continuous operation of the leak detection system pumping and monitoring equipment, including, but not limited to, the submersible pump, pump controller, head monitoring, and flow meter equipment approved by the Director. Failure of any LDS pumping or monitoring equipment not repaired and made
fully operational within 24-hours of discovery shall constitute failure of BAT, and
a violation of this Permit.
2) Maximum Allowable Head - the Permittee shall measure the fluid head above the lowest point on the secondary flexible membrane by the use of procedures and equipment approved by the Director. Under no circumstance shall fluid head in
the leak detection system sump exceed a 1-foot level above the lowest point in the
lower flexible membrane liner on the cell floor. For purposes of compliance
Part I.E.
Permit No. UGW370004
24
monitoring this 1-foot distance shall equate to 2.28 feet above the leak detection
system transducer.
3) Maximum Allowable Daily LDS Flow Rates - the Permittee shall measure the volume of all fluids pumped from the LDS. Under no circumstances shall the average daily LDS flow volume exceed 24,160 gallons/day.
4) 3-foot Minimum Vertical Freeboard Criteria - the Permittee shall operate and
maintain wastewater levels to provide a 3-foot Minimum of vertical freeboard in Tailings Cell 4A. Said measurements shall be made to the nearest 0.1 foot.
b) Quarterly Slimes Drain Recovery Head Monitoring - immediately after the Permittee initiates pumping conditions in the Tailings Cell 4A slimes drain system, quarterly
recovery head tests and fluid level measurements will be made in accordance with the
requirements of Parts I.D.3 and I.E.7(b) of this Permit and the currently approved Cell 4A BAT, Monitoring, Operations and Maintenance Plan.
c) Liner Maintenance and Repair - all repairs to the liner shall be completed in accordance with Section 9.4 of the approved June 2007 Geosyntec Consultants Cell
4A Construction Quality Assurance Plan (CQA/QC Plan) as found in Table 5 of this
Permit. Repairs shall be performed by qualified liner repair personnel and shall be reported in a Liner Repair Report, certified by a Utah licensed Professional Engineer. The Liner Repair Report shall be submitted to for Director approval in accordance with Part I.F.3 of the Permit. Any leak, hole, or other damage to the liner will be
reported to the Director pursuant to the requirements found in Part I.G.3.
9. On-site Chemicals Inventory - the Permittee shall monitor and maintain a current inventory of all chemicals used at the facility at rates equal to or greater than 100 kg/yr. Said inventory shall be maintained on-site, and shall include, but is not limited to:
a) Identification of chemicals used in the milling process and the on-site laboratory, and
b) Determination of volume and mass of each raw chemical currently held in storage at
the facility.
10. Tailings Cell Wastewater Quality Monitoring - on an annual basis, the Permittee shall collect wastewater quality samples from each wastewater source at each tailings cell at the facility, including, but not limited to:
a) One surface impounded wastewater location at each of Tailings Cells 1, 3, 4A, and
4B.
b) One slimes drain wastewater access pipe at each of Tailings Cells 2, 3, 4A, and 4B. For Cells 3, 4A, and 4B, this requirement shall apply immediately after initiation of de-watering operations at these cells, and
c) One leak detection wastewater access pipe at Tailings Cells 4A and 4B.
d) All such sampling shall be conducted in August of each calendar year in compliance with the currently approved White Mesa Uranium Mill Tailing and Slimes Drain Sampling Program. Said annual monitoring shall include, but is not limited to:
1) Water Quality Sampling and Analysis - the Permittee shall collect grab samples
and perform laboratory analysis of all:
i. Water quality parameters identified in Table 2 of this Permit, and
Part I.E.
Permit No. UGW370004
25
ii. Semi-volatile compounds identified in EPA Method 8270D.
2) Certified Laboratory Analysis - all laboratory analysis will be conducted by a Utah certified laboratory.
3) Analytical Methods - all laboratory analysis shall be conducted using analytical methods listed in the currently approved QAP pursuant to Part I.E.1 of this
Permit.
4) Minimum Detection Limits - all water quality analyses reported shall have a minimum detection limit or reporting limit that is less than or equal to the respective:
i. Ground Water Quality Standards concentrations defined in Table 2 of this
Permit,
ii. For TDS, Sulfate, and Chloride, the Minimum Detection Limit for those constituents for Tailing Cell wastewater monitoring will be as follows: 1,000 mg/L, 1,000 mg/L, and 1 mg/L, respectively, and
iii. Lower limits of quantitation for groundwater for semi-volatile organic
compounds listed in Table 2 of EPA Method 8270D, Revision 4, dated
February, 2007.
5) Quality Control Samples - the Permittee will conduct quality control (QC) sampling and analysis as a part of all tailings wastewater sampling, in accordance with the requirements of Section 4.3 of the currently approved QAP; pursuant to
Part I.E.1 of this Permit. Said QC samples shall include, but are not limited to:
trip blanks, duplicate samples, and equipment rinse blanks.
6) Prior Notification - at least 30 calendar days before any water quality sample collection, the Permittee shall provide written notice to allow the Director to observe or split sample any tailings cell, slimes drain, or leak detection
wastewaters.
7) Sample Omission - in the course of each annual sampling event, the Permittee shall sample and analyze all tailings cell, slimes drain, and leak detection wastewater sources identified in the currently approved Tailings and Slimes Drain Sampling Program (pp. 1-3), or as required by this Permit, whichever is greater.
The Permittee shall not omit sampling of any of tailings cell wastewater source
during said annual event, without prior written approval from the Director.
11. Groundwater Monitoring Modifications - before any modification of groundwater monitoring or analysis procedures, methods, or equipment, the Permittee must obtain prior written approval from the Director.
12. Cell 4B BAT Performance Standards Monitoring and Maintenance - immediately
following Director approval of the Cell 4B BAT, Monitoring, Operations and Maintenance Plan, the Permittee shall immediately implement all monitoring and recordkeeping requirements therein. The Cell 4B BAT monitoring shall include the following: Weekly Leak Detection System (LDS) Monitoring - including:
1) Leak Detection System Pumping and Monitoring Equipment - the Permittee shall
provide continuous operation of the leak detection system pumping and
Part I.E.
Permit No. UGW370004
26
monitoring equipment, including, but not limited to, the submersible pump, pump
controller, head monitoring, and flow meter equipment approved by the Director. Failure of any LDS pumping or related monitoring equipment not repaired and made fully operational within 24-hours of discovery shall constitute failure of BAT, and a violation of this Permit.
2) Maximum Allowable Head - the Permittee shall measure the fluid head above the
lowest point on the secondary flexible membrane by the use of procedures and equipment approved by the Director. Under no circumstance shall fluid head in the leak detection system (LDS) sump exceed a 1-foot level above the lowest point in the lower flexible membrane liner on the cell floor. Any occurrence of
leak detection system fluids above this 1-foot limit shall constitute failure of
BAT, and a violation of this Permit.
3) Maximum Allowable Daily LDS Flow Rates - the Permittee shall measure the volume of all fluids pumped from the LDS. Under no circumstances shall the average daily LDS flow volume exceed 26,145 gallons/day.
4) 3-foot Minimum Vertical Freeboard Criteria - the Permittee shall operate and
maintain wastewater levels to provide a 3-foot Minimum of vertical freeboard in Tailings Cell 4B. Said measurements shall be made to the nearest 0.1 foot.
b) Quarterly Slimes Drain Recovery Head Monitoring - immediately after the Permittee initiates pumping conditions in the Tailings Cell 4B slimes drain system, quarterly
recovery head tests and fluid level measurements will be made in accordance with the
requirements of Parts I.D.3 and I.E.7(b) of this Permit and the currently approved Cell 4B BAT, Monitoring, Operations and Maintenance Plan.
c) Liner Maintenance and Repairs - all repairs to the liner shall be completed in accordance with Section 10.4 of the approved August 2009 Geosyntec Consultants
Cell 4B Construction Quality Assurance Plan (CQA/QC Plan) as found in Table 6 of
this Permit. Repairs shall be performed by qualified liner repair personnel and shall be reported in a Liner Repair Report, certified by a Utah licensed Professional Engineer. The Liner Repair Report shall be submitted for Director approval in accordance with Part I.F.3 of the Permit. Any leak, hole, or other damage to the liner
will be reported pursuant to the requirements found in Part I.G.3.
Part I.F.
Permit No. UGW370004
27
F. REPORTING REQUIREMENTS - The following reporting procedures for routine and compliance reports must be met.
1. Routine Groundwater Monitoring Reports - the Permittee shall submit quarterly monitoring reports of field and laboratory analyses of all well monitoring and samples
described in Parts I.E.1, I.E.2, I.E.3, and I.E.5 of this Permit for Director review and
approval. Reports shall be submitted according to the following schedule:
Table 7. Groundwater Monitoring Reporting Schedule
Quarter Period Due Date
First January - March June 1
Second April - June September 1
Third July - September December 1
Fourth October - December March 1
Failure to submit the reports by the due date shall be deemed as noncompliance with this
Permit. Said monitoring reports shall include, but are not limited to, the following
minimum information:
a) Field Data Sheets - or copies thereof that provide the following: well name, date and time of well purging, date and time of well sampling, type and condition of well pump, depth to groundwater before purging and sampling, calculated well casing volume, volume of water purged before sampling, volume of water collected for
analysis, types of sample containers and preservatives.
b) Laboratory Results - or copies thereof that provide the following: date and time sampled, date received by laboratory, and for each parameter analyzed, the following information: laboratory result or concentration, units of measurement, minimum detection limit or reporting limit, analytical method, date of analysis, counting error
for radiological analyses, total cations and anions for inorganic analysis.
c) Water Table Contour Map - which provides the location and identity of all wells sampled that quarter, the measured groundwater elevation at each well measured in feet above mean sea level, and isocontour lines to delineate groundwater flow directions observed during the quarterly sampling event.
d) Quality Assurance Evaluation and Data Validation - including a written description and findings of all quality assurance and data validation efforts conducted by the Permittee in compliance with the currently approved Groundwater Monitoring Quality Assurance Plan. Said report shall verify the accuracy and reliability of the groundwater quality compliance data, after evaluation of sample collection techniques
and equipment, sample handling and preservation, analytical methods used, etc
e) Non-conformance disclosure - with each quarterly groundwater monitoring report the Permittee shall fully and completely disclose all non-conformance with requirements of the currently approved QAP, mandated by Part I.E.1(a).
f) Electronic Data Files and Format - in addition to written results required for every
sampling report, the Permittee shall provide an electronic copy of all laboratory results for groundwater quality monitoring conducted. Said electronic files shall
Part I.F.
Permit No. UGW370004
28
consist of Comma Separated Values (CSV) format, or as otherwise approved by the
Director.
g) Time Concentration Plots - with each quarterly groundwater monitoring report the Permittee shall submit time concentration plots for each monitoring well for the following constituents: chloride, fluoride, sulfate, and uranium.
2. Routine DMT Performance Standards Monitoring Report - the Permittee shall provide
quarterly monitoring reports of all DMT performance standards monitoring required by Parts I.D.3 and I.E.7 of this Permit. DMT monitoring shall be conducted in compliance with this Permit and the currently approved DMT Monitoring Plan. When a liner repair is performed at any DMT impoundment, a Repair Report is required by the Liner
Maintenance Provisions. This Repair Report shall be included with the next quarterly
DMT Report. Said monitoring reports and results shall be submitted for Director approval on the schedule provided in Table 7, above.
3. Routine Cell 4A and 4B BAT Performance Standards Monitoring Reports - the Permittee shall provide quarterly monitoring reports of all BAT performance standards monitoring
required by Parts I E.8 and I.E.12 of this Permit. BAT Monitoring at Cells 4A and 4B
shall be conducted in compliance with the currently approved BAT Monitoring, Operations and Maintenance Plan. When a liner repair is performed at Tailings Cell 4A or 4B, a Repair Report is required by Parts I.E.8(c) and I.E.12(c) of the Permit. This Repair Report shall be included with the next quarterly BAT Report. Said monitoring
report and results shall be submitted for Director approval on the schedule provided in
Table 7 above. At a minimum, reporting of BAT monitoring for Cells 4A and 4B will include:
a) LDS Monitoring - including:
1) Report on the operational status of the LDS pumping and monitoring equipment
during the quarter, including identification of any intervals of non-operational
status and repairs.
2) Measurement of the weekly fluid head at the lowest point of the secondary membrane.
3) Measurement of the volume of all fluids pumped from the LDS.
b) Measurement of the weekly wastewater fluids elevation in the Cells 4A and 4B to
determine freeboard.
c) Slimes Drain Recovery Head Monitoring as per the requirements of Parts I.D.6 and I.E.8(b).
4. DMT and BAT Performance Upset Reports - the Permittee shall report any non-
compliance with the DMT or BAT performance criteria of Part I.D in accordance with
the requirements of Part I.G.3 of this Permit.
5. Other Information - when the Permittee becomes aware of a failure to submit any relevant facts in the permit application or submittal of incorrect information in a permit
Part I.F.
Permit No. UGW370004
29
application or in any report to the Director, the Permittee shall submit such facts or
information within 10 calendar days of discovery.
6. Groundwater Monitoring Well As-Built Reports - as-built reports for new groundwater monitoring wells shall be submitted for Director approval within 60 calendar days of well completion, and at a minimum will include the following information:
a) Geologic Logs - that detail all soil and rock lithologies and physical properties of all
subsurface materials encountered during drilling. Said logs shall be prepared by a Professional Geologist licensed by the State of Utah, or otherwise approved beforehand by the Director.
b) Well Completion Diagram - that detail all physical attributes of the well construction,
including:
1) Total depth and diameters of boring,
2) Depth, type, diameter, and physical properties of well casing and screen, including well screen slot size,
3) Depth intervals, type and physical properties of annular filterpack and seal
materials used,
4) Design, type, diameter, and construction of protective surface casing, and
5) Survey coordinates prepared by a State of Utah licensed engineer or land surveyor, including horizontal coordinates and elevation of water level measuring point, as measured to the nearest 0.01 foot.
c) Aquifer Permeability Data - including field data, data analysis, and interpretation of
slug test, aquifer pump test or other hydraulic analysis to determine local aquifer hydraulic conductivity in each well.
7. White Mesa Seeps and Springs Monitoring Reports - a seeps and springs monitoring report shall be submitted for Director review and approval with the 4th Quarter Routine
Groundwater Monitoring Report due on March 1, of each calendar year. Said report shall
include, but is not limited to:
a) Field Measurement Results and Worksheets - for each sample collected that comply with the requirements of Part I.F.1(a) of this Permit,
b) Laboratory Results - for each sample collected that comply with the requirements of Part I.F.1(b) of this Permit,
c) Water Table Contour Map - that includes groundwater elevations for each well at the facility and the elevations of the phreatic surfaces observed at each of the seeps and springs sampled. The contour map will include all water level data measurements from seeps, springs, and monitoring wells at the site from the 3rd Quarter Routine
Groundwater Monitoring event of each year. The contour map shall be at a map scale,
such that, all seeps and springs listed in the approved Sampling Plan for Seeps and Springs in the Vicinity of the White Mesa Uranium Mill and the monitoring wells on site may be seen on one map,
d) Data Evaluation - and interpretation of all groundwater quality data collected,
Part I.F.
Permit No. UGW370004
30
e) Quality Assurance Evaluation and Data Validation - for the seeps and springs water
quality data that meets the requirements of Part I.F.1(d),
f) Electronic Data Files and Format - that meet the requirements of Part I.F.1(e) of this Permit, and
g) Survey data for the seeps and springs shall be based on an elevation survey,
conducted under the direction of and certified by a Utah licensed professional
engineer or land surveyor. The survey will include State Plan Coordinates (northings and eastings) and vertical elevations. The surveyed coordinates and elevations of the seeps and springs shall be within 1 foot of the highest point of the saturated seepage face on the day of the survey. This survey data must be obtained before any samples
are collected.
8. Chemicals Inventory Report - at the time of submittal of an application for Permit renewal the Permittee shall submit a report to update the facilities chemical inventory report. Said report shall include:
a) Identification of all chemicals used in the milling and milling related processes at the
White Mesa Mill, and
b) Provide all inventory information gathered pursuant to Part I.E.9,
c) Determination of the total volumes currently in use and historically used, as data is available.
9. Tailings Cell Wastewater Quality Reports - all annual wastewater quality sampling and
analysis required by Part I.E.10 shall be reported to the Director with the 3rd Quarter
groundwater quality report due on December 1, of each calendar year. Said report shall include:
a) Data evaluation and interpretation of all wastewater quality samples collected,
b) All information required by Part I.F.1(a), (b), (d), and (e) of this Permit, and
c) For slimes drain samples, the Permittee shall report depth to wastewater
measurements from the water level measurement point. Said wastewater level shall be measured immediately before sample collection.
10. Revised Hydrogeologic Report - pursuant to Part IV.D of this Permit, and at least 180 calendar days prior to Permit expiration, the Permittee shall submit for Director approval a revised hydrogeologic report for the facility and surrounding area. Said report shall
provide a comprehensive update and evaluation of:
a) Local hydrogeologic conditions in the shallow aquifer, including, but not limited to: local geologic conditions; time relationships and distribution of shallow aquifer head measurements from facility wells and piezometers; local groundwater flow directions; and distribution of aquifer permeability and average linear groundwater velocity
across the site, and
b) Well specific groundwater quality conditions measured at facility monitoring wells for all groundwater monitoring parameters required by this Permit, including, but not limited to: temporal contaminant concentrations and trends from each monitoring well; statistical tests for normality of each contaminant and well, including univariate
Part I.F.
Permit No. UGW370004
31
or equivalent tests; calculation of the mean concentration and standard deviation for
each well and contaminant.
11. Annual Slimes Drain Recovery Head Report - on or before March 1 of each year the Permittee shall submit for Director approval an annual slimes drain recovery head report for Tailings Cells 2 and 3. Said report shall conform to the requirements of Part I.D.3(b),
I.E.7(b), and II.G of this Permit, and:
a) Provide the individual slimes drain recovery head monitoring data for the previous calendar year, including, but not limited to: date and time for the start and end of recovery test, initial water level, final depth to stable water level and equivalent recovery water level elevation.
b) Calculate the average slimes drain recovery head for the previous calendar year.
c) Include a time series chart to show trends of the recovery water level elevations at each slimes drain.
d) Include the results of a quality assurance evaluation and data validation. Said examination shall provide written descriptions and findings that:
1) Evaluate all data collected, data collection methods, and all related calculations
required by this Permit, and
2) Verify the accuracy and reliability of both the data and calculations reported.
e) Demonstrate compliance status with the requirements of Part I.D.3(b) and I.E.7(b) of this Permit.
12. Decontamination Pads Annual Inspection Report - the New Decontamination Pad and
Existing Decontamination Pad will be taken out of service and inspected annually during the second quarter of each year, to ensure integrity of the concrete wash pad surfaces. If physical defects in the wash pad as defined by Part I.D.14 of the Permit are identified during the inspection, repairs shall be made prior to resuming the use of the facility. Said
defects include, but are not limited to concrete deterioration, cracking, subsidence, etc.
The results of the annual inspection and all repairs will be documented on inspection forms in accordance with the currently approved DMT Monitoring Plan. The inspection forms and documentation of all repairs completed shall be included in the 2nd Quarter DMT Monitoring Report due September 1, of each calendar year.
Part I.G
Permit No. UGW370004
32
G. OUT OF COMPLIANCE STATUS
1. Accelerated Monitoring Status - is required if the concentration of a pollutant in any compliance monitoring sample exceeds a GWCL in Table 2 of the Permit; the facility shall then:
a) Notify the Director in writing (the Exceedance Notice) within 30 calendar days of
receipt of the last analytical data report for samples collected within a quarter,
including quarterly and monthly samples, but no later than 60 days after the end of the quarter, and
b) Initiate accelerated sampling of the pollutant as follows:
1) Quarterly Baseline Monitoring Wells - for wells defined by Part I.E.1(b) the
Permittee shall initiate monthly monitoring. Monthly monitoring shall begin the
month following the month in which the Exceedance Notice is provided to the Director.
2) Semi-annual Baseline Monitoring Wells - for wells defined by Part I.E.1(c) the Permittee shall initiate quarterly monitoring. Quarterly monitoring shall begin the
quarter following the quarter in which the Exceedance Notice is provided to the
Director.
3) Said accelerated monitoring shall continue at the frequencies defined above until the compliance status of the facility can be determined by the Director.
2. Violation of Permit Limits - out-of-compliance status exists when the concentration of a
pollutant in two consecutive samples from a compliance monitoring point exceeds a
GWCL in Table 2 of this Permit.
3. Failure to Maintain DMT or BAT Required by Permit
a) Permittee to Provide Information - in the event that the Permittee fails to maintain DMT or BAT or otherwise fails to meet DMT or BAT standards as required by the
Permit, the Permittee shall submit to the Director a notification and description of the
failure according to R317-6-6.16(C)(1). Notification shall be given orally within 24- hours of the Permittee's discovery of the failure of DMT or BAT, and shall be followed up by written notification, including the information necessary to make a determination under R317-6-6.16(C)(2), within five calendar days of the Permittee's
discovery of the failure of best available technology.
b) The Director shall use the information provided under R317-6-6.16.C(1) and any additional information provided by the Permittee to determine whether to initiate a compliance action against the Permittee for violation of Permit conditions. A compliance action shall not be initiated, if the Director determines that the Permittee
has met the standards for an affirmative defense, as specified in R317-6-
6.16(C)(3)(c).
c) Affirmative Defense - in the event a compliance action is initiated against the Permittee for violation of Permit conditions relating to best available technology or DMT, the Permittee may affirmatively defend against that action by demonstrating
the following:
1) The Permittee submitted notification according to R317-6-6.13,
Part I.G
Permit No. UGW370004
33
2) The failure was not intentional or caused by the Permittee's negligence, either in
action or in failure to act,
3) The Permittee has taken adequate measures to meet Permit conditions in a timely manner or has submitted to the Director, for the Director's approval, an adequate plan and schedule for meeting Permit conditions, and
4) The provisions of UCA 19-5-107 have not been violated.
4. Facility Out of Compliance Status - if the facility is out of compliance, the following is required:
a) The Permittee shall notify the Director of the out of compliance status within 24-hours after detection of that status, followed by a written notice within 5 calendar
days of the detection.
b) The Permittee shall continue accelerated sampling pursuant to Part I.G.1, unless the Director determines that other periodic sampling is appropriate, until the facility is brought into compliance.
c) The Permittee shall prepare and submit to the Director within 30 calendar days
following the date the Exceedance Notice is submitted to the Director, a plan and a
time schedule for assessment of the sources, extent and potential dispersion of the contamination, and an evaluation of potential remedial action to restore and maintain groundwater quality to insure that Permit limits will not be exceeded at the compliance monitoring point and that DMT or BAT will be reestablished.
d) The Director may require immediate implementation of the currently approved
contingency plan in order to regain and maintain compliance with the Permit limit standards at the compliance monitoring point or to reestablish DMT or BAT as defined in the Permit.
e) Where it is infeasible to reestablish DMT or BAT as defined in the Permit, the
Permittee may propose an alternative DMT or BAT for approval by the Director.
Part I.H
Permit No. UGW370004
34
H. COMPLIANCE SCHEDULE REQUIREMENTS. The Permittee will comply with the schedules as
described and summarized below:
1. Slimes Drain Compliance Plan - Within two (2) years after the effective date of the Permit Renewal (January 19, 2018), the Permittee shall submit a Slimes Drain Compliance Plan for Director Review and Approval. The Plan shall include measures to
ensure that wastewater removal from the tailings cell slimes drain is effectively
dewatering the tailings to the extent practicable in order to allow placement of final cover within specified time frames. The Plan may incorporate multiple methods to evaluate the effectiveness of tailings cell dewatering and projected timelines for placement of final tailings cell cover, including, but not limited to; 1. Demonstration of decreasing fluid
elevation trends as measured by slimes drain recovery tests; 2. Evaluations of head data
from piezometers installed in the affected tailings cell demonstrating net dewatering, and 3. Demonstration of decreasing trends in cell settlement monitoring. The Plan shall include specific measures for Tailings Cell 2 and will incorporate Tailings Cell 3 after initiation of dewatering operations.
2. Installation of New Groundwater Monitoring Wells – the Permittee shall install three new
groundwater monitoring wells within 90 calendar days of issuance of the Permit, designated MW-38, MW-39 and MW-40, located southeast of the tailings cells between monitoring wells MW-17 and MW-22. Specifically, the monitoring well locations shall include the three locations identified by the Permittee in Figure 1 attached to the January
2018 License/Permit Statement of Basis. These monitoring wells shall be drilled and
installed in accordance with the following requirements:
a) All new monitoring wells must be properly designed, installed, screened/completed, and developed in accordance with Part I.E.4 of the Permit.
b) All new monitoring well screens will fully encompass the Burro Canyon
Formation saturated zone.
c) All new monitoring wells will be designed to be monitored for the full suite of monitoring parameters listed in the Permit Table 2.
d) On or before August 31, 2018 or as otherwise approved by the Director, the Permittee shall submit a monitoring well As- built report for the monitoring wells
installed to document the well construction. The As-built report shall comply
with the requirements of Part I.F.6.
e) The Permittee shall provide at least a 14 calendar day written notice prior to field drilling and construction of the monitoring wells to allow the Director to observe all drilling and well installation activities.
3. Background Groundwater Quality Report for Wells MW-38, MW-39, MW-40 - within
30 calendar days of Director approval of the new monitoring well As-built Report, required by Part I.H.2, above, the Permittee shall commence a quarterly groundwater sampling program that will comply with the following Permit requirements:
Part I.H
Permit No. UGW370004
35
a) Routine groundwater compliance monitoring requirements of Part I.E.1.
b) Well monitoring procedure requirements of Part I.E.5.
c) After completion of eight consecutive quarters of groundwater sampling and analysis of wells MW-38, MW-39, MW-40 required by Part I.H.2, the Permittee shall submit a Background Report for Director approval, that will include:
1) Data preparation and statistical analysis of groundwater quality data,
including, but not limited to, evaluation of data characteristics and internal data consistency, treatment of non-detectable values, and statistical methods used. These statistics shall be calculated using the Decision Tree/Flowchart used for the previous Background Reports that was conditionally approved by
the DRC on August 24, 2007.
2) Shallow aquifer average linear groundwater velocity calculated for the new wells, based on well specific hydraulic conductivity, hydraulic gradient, and effective aquifer porosity.
d) If after review of the report, and the Director determines that additional
information is required, the Permittee shall provide all requested information,
resolve all issues identified, and re-submit the report for Director review and approval within a timeframe approved by the Director. After approval of this report, the Director will re-open this Permit and establish an appropriate monitoring frequency with the criteria found in Part I.E.1(b). Designation of these
wells as “compliance” or “general” monitoring wells will be determined after
analysis of the Background Quality Groundwater Report. If the new wells are determined to be compliance wells, the Director will establish Groundwater Compliance Limits in Table 2 for wells MW-38, MW-39, MW-40.
4. Revised Groundwater Quality Assurance Plan to Include Dissolved Oxygen – The
Permittee shall update the White Mesa Mill Groundwater Quality Assurance Plan
(QAP) to include the collection of dissolved oxygen during field sampling (QAP Parts6.2.2 and Attachment 2-3 (Purging Procedures) and field sampling form) and submit a draft copy of the updated QAP including the updated field sampling form to The Director for review and approval within 60 calendar days of issuance of the
modified Permit. The Permittee shall commence field sampling of dissolved oxygen
within 30 days of the Director approval of the revised QAP in conformance with Part I.E.1d of the Permit.
Part II
Permit No. UGW370004
36
PART II. REPORTING REQUIREMENTS
A. REPRESENTATIVE SAMPLING. Samples taken in compliance with the monitoring requirements established under Part I shall be representative of the monitored activity.
B. ANALYTICAL PROCEDURES. Water sample analysis must be conducted according to test
procedures specified under UAC R317-6-6.3.12 unless other test procedures have been
specified in this Permit.
C. PENALTIES FOR TAMPERING. The Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this Permit shall, upon conviction, be punished by a fine of not more than $10,000 per
violation, or by imprisonment for not more than six months per violation, or by both.
D. REPORTING OF MONITORING RESULTS. Monitoring results obtained during reporting periods specified in the Permit, shall be submitted to the Director at the following address, no later than the date specified following the completed reporting period: Division of Waste Management and Radiation Control
Utah Department of Environmental Quality 195 North 1950 West P.O. Box 144880 Salt Lake City, Utah 84114-4880
The quarterly due dates for reporting are: June 1, September 1, December 1, and March 1.
E. COMPLIANCE SCHEDULES. Reports of compliance or noncompliance with, or any progress reports on interim and final requirements contained in any Compliance Schedule of this Permit shall be submitted no later than 14 calendar days following each schedule date.
F. ADDITIONAL MONITORING BY THE PERMITTEE. If the Permittee monitors any pollutant more
frequently than required by this Permit, using approved test procedures as specified in this Permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted. Such increased frequency shall also be indicated. G. RECORDS CONTENTS.
1. Records of monitoring information shall include:
a) The date, exact place, and time of sampling, observations, or measurements:
b) The individual(s) who performed the sampling, observations, or measurements;
c) The date(s) and time(s) analyses were performed;
d) The name of the certified laboratory which performed the analyses;
e) The analytical techniques or methods used; and,
f) The results of such analyses.
Part II
Permit No. UGW370004
37
H. RETENTION OF RECORDS. The Permittee shall retain records of all monitoring information,
including all calibration and maintenance records and copies of all reports required by this Permit, and records of all data used to complete the application for this Permit, for a period of at least five years from the date of the sample, measurement, report or application. This period may be extended by request of the Director at any time.
I. NOTICE OF NONCOMPLIANCE REPORTING.
1. The Permittee shall verbally report any noncompliance which may endanger public health or the environment as soon as possible, but no later than 24-hours from the time the Permittee first became aware of the circumstances. The report shall be made to the Utah Department of Environmental Quality 24-hour number, (801) 538-6333, or to the
Division of Water Quality, Ground Water Protection Section at (801) 538-6146, during
normal business hours (8:00 am - 5:00 pm Mountain Time).
2. A written submission shall also be provided to the Director within five calendar days of the time that the Permittee becomes aware of the circumstances. The written submission shall contain:
a) A description of the noncompliance and its cause;
b) The period of noncompliance, including exact dates and times;
c) The estimated time noncompliance is expected to continue if it has not been corrected; and,
d) Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the
noncompliance.
3. Reports shall be submitted to the addresses in Part II.D, Reporting of Monitoring Results.
J. OTHER NONCOMPLIANCE REPORTING. Instances of noncompliance not required to be reported within 5 calendar days, shall be reported at the time that monitoring reports for Part II.D are submitted.
K. INSPECTION AND ENTRY. The Permittee shall allow the Director, or an authorized
representative, upon the presentation of credentials and other documents as may be required by law, to:
1. Enter upon the Permittee’s premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of the Permit;
2. Have access to and copy, at reasonable times, any records that must be kept under the
conditions of this Permit;
3. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this Permit; and,
4. Sample or monitor at reasonable times, for the purpose of assuring Permit compliance or
as otherwise authorized by the Act, any substances or parameters at any location.
Part III
Permit No. UGW370004
38
PART III. COMPLIANCE RESPONSIBILITIES
A. DUTY TO COMPLY. The Permittee must comply with all conditions of this Permit. Any Permit noncompliance constitutes a violation of the Act and is grounds for enforcement action; for permit termination, revocation and re-issuance, or modification; or for denial of a permit renewal application. The Permittee shall give advance notice to the Director of the Division
of Water Quality of any planned changes in the permitted facility or activity which may
result in noncompliance with Permit requirements.
B. PENALTIES FOR VIOLATIONS OF PERMIT CONDITIONS. The Act provides that any person who violates a Permit condition implementing provisions of the Act is subject to a civil penalty not to exceed $10,000 per day of such violation. Any person who willfully or negligently
violates Permit conditions is subject to a fine not exceeding $25,000 per day of violation.
Any person convicted under Section 19-5-115 of the Act a second time shall be punished by a fine not exceeding $50,000 per day. Nothing in this Permit shall be construed to relieve the Permittee of the civil or criminal penalties for noncompliance.
C. NEED TO HALT OR REDUCE ACTIVITY NOT A DEFENSE. It shall not be a defense for a Permittee
in an enforcement action that it would have been necessary to halt or reduce the permitted
activity in order to maintain compliance with the conditions of this Permit.
D. DUTY TO MITIGATE. The Permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this Permit which has a reasonable likelihood of adversely affecting human health or the environment.
E. PROPER OPERATION AND MAINTENANCE. The Permittee shall at all times properly operate and
maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the Permittee to achieve compliance with the conditions of this Permit. Proper operation and maintenance also includes adequate laboratory controls and quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a Permittee only when the operation is
necessary to achieve compliance with the conditions of the Permit.
Part IV
Permit No. UGW370004
39
PART IV. GENERAL REQUIREMENTS
A. PLANNED CHANGES. The Permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required when the alteration or addition could significantly change the nature of the facility or
increase the quantity of pollutants discharged.
B. ANTICIPATED NONCOMPLIANCE. The Permittee shall give advance notice of any planned changes in the permitted facility or activity which may result in noncompliance with Permit requirements.
C. PERMIT ACTIONS. This Permit may be modified, revoked and reissued, or terminated for
cause. The filing of a request by the Permittee for a permit modification, revocation and re-
issuance, or termination, or a notification of planned changes or anticipated noncompliance, does not stay any permit condition.
D. DUTY TO REAPPLY. If the Permittee wishes to continue an activity regulated by this Permit after the expiration date of this Permit, the Permittee must apply for and obtain a new permit.
The application should be submitted at least 180 calendar days before the expiration date of
this Permit.
E. DUTY TO PROVIDE INFORMATION. The Permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this Permit, or to determine
compliance with this Permit. The Permittee shall also furnish to the Director, upon request,
copies of records required to be kept by this Permit.
F. OTHER INFORMATION. When the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or any report to the Director, it shall promptly submit such facts or information.
G. SIGNATORY REQUIREMENTS. All applications, reports or information submitted to the
Director shall be signed and certified.
1. All permit applications shall be signed as follows:
a) For a corporation: by a responsible corporate officer;
b) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively.
c) For a municipality, State, Federal, or other public agency: by either a principal executive officer or ranking elected official.
2. All reports required by the Permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that
person. A person is a duly authorized representative only if:
a) The authorization is made in writing by a person described above and submitted to the Director, and,
Part IV
Permit No. UGW370004
40
b) The authorization specified either an individual or a position having responsibility for
the overall operation of the regulated facility or activity, such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus
be either a named individual or any individual occupying a named position).
3. Changes to Authorization. If an authorization under Part IV.G.2. is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of Part IV.G.2 must be submitted to the Director prior to or together with any reports, information, or
applications to be signed by an authorized representative.
4. Certification. Any person signing a document under this section shall make the following certification:
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on
my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine
and imprisonment for knowing violations."
H. PENALTIES FOR FALSIFICATION OF REPORTS. The Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this Permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than six months
per violation, or by both.
I. AVAILABILITY OF REPORTS. Except for data determined to be confidential by the Permittee, all reports prepared in accordance with the terms of this Permit shall be available for public inspection at the offices of the Director. As required by the Act, permit applications, permits,
effluent data, and groundwater quality data shall not be considered confidential.
J. PROPERTY RIGHTS. The issuance of this Permit does not convey any property rights of any sort, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of federal, state or local laws or regulations.
K. SEVERABILITY. The provisions of this Permit are severable, and if any provision of this
Permit, or the application of any provision of this Permit to any circumstance, is held invalid,
the application of such provision to other circumstances, and the remainder of this Permit, shall not be affected thereby.
L. TRANSFERS. This Permit may be automatically transferred to a new Permittee if:
1. The current Permittee notifies the Director at least 30 calendar days in advance of the
proposed transfer date;
Part IV
Permit No. UGW370004
41
2. The notice includes a written agreement between the existing and new Permittee
containing a specific date for transfer of permit responsibility, coverage, and liability between them; and,
3. The Director does not notify the existing Permittee and the proposed new Permittee of his or her intent to modify, or revoke and reissue the permit. If this notice is not received, the
transfer is effective on the date specified in the agreement mentioned in paragraph 2
above.
M. STATE LAWS. Nothing in this Permit shall be construed to preclude the institution of any legal action or relieve the Permittee from any responsibilities, liabilities, penalties established pursuant to any applicable state law or regulation under authority preserved by Section 19-5-
115 of the Act.
N. REOPENER PROVISIONS. This Permit may be reopened and modified (following proper administrative procedures) to include the appropriate limitations and compliance schedule, if necessary, if one or more of the following events occurs:
1. If new ground water standards are adopted by the Board, the Permit may be reopened and modified to extend the terms of the Permit or to include pollutants covered by new
standards. The Permittee may apply for a variance under the conditions outlined in R317-6-6.4(D).
2. Changes have been determined in background groundwater quality.
3. The Director determines permit modification is necessary to protect human health or the environment.