HomeMy WebLinkAboutDRC-2000-001061 - 0901a068807b2fffUNITED STATES OF AMERICA
NUCLEAR REGULATORY COMMISSION
U
COMMISSIONERS:
Richard A. Meserve, Chairman
Greta Joy Dicus
Nils J. Diaz
Edward McGaffigan, Jr.
Jeffrey S. Merrifield
)
In the Matter of ))
INTERNATIONAL URANIUM (USA) )
CORPORATION ))
(Request for Materials License )
Amendment) ))
"00 Frl 10 P3 :2T
,A
UIEDB f 0 W
Docket No. 40-8681-MLA-4
CLI-00-01
MEMORANDUM AND ORDER
I. Introduction
In this decision we review a Presiding Officer's Initial Decision, LBP-99-5, 49 NRC 107
(1999), which upheld a license amendment issued to the International Uranium (USA)
S Corporation ("IUSA). The license amendment authorized IUSA to receive, process, and
dispose of particular alternate feed material from Tonawanda, New York. The state of Utah
challenges the license amendment and now on appeal seeks reversal of the Presiding Officer's
decision. Envirocare of Utah, Inc., has filed an amicus curiae brief supporting Utah's challenge
of the Presiding Officer's decision. The NRC staff and IUSA support the Presiding Officer's
decision. We affirm the decision for the reasons we give below.
r
01 p 43
2
II. Background
IUSA owns and operates a uranium mill located at White Mesa, near Blanding, Utah.
On May 8, 1998, IUSA submitted a request for a license amendment to allow it to receive and
process approximately 25,000 dry tons of uranium-bearing material from the Ashland 2 Formerly
Utilized Sites Remedial Action Program (FUSRAP) site, currently managed by the Army Corps
of Engineers and located near Tonawanda, New York.1 The NRC granted the IUSA license
amendment on June 23, 1998. Utah timely petitioned for leave to intervene in the license
amendment proceeding. On September 1, 1998, the Presiding Officer admitted Utah as a party
to the proceeding. See International Uranium (USA) Corporation (Receipt of Material from
Tonawanda, New York), LBP-98-21, 48 NRC 137 (1998).
At issue in this proceeding is the Atomic Energy Act's definition of 11 e.(2) material,
defined by the statute as "the tailings or wastes produced by the extraction or concentration of
uranium or thorium from any ore processed primarily for its source material content." 42 U.S.C.
§ 2014e (emphasis added). Utah interprets this to mean that the primary purpose for acquiring
the ore must be an interest in processing the material to recover the uranium. Emphasizing that
IUSA is being paid over four million dollars to receive the Ashland 2 material from the FUSRAP
site, Utah argues that IUSA's interest in obtaining the material is "primarily for payment of a
disposal fee" and not for recovering any uranium the material might contain. Utah's Appeal Brief
(May 24, 1999) at 11.
Utah explains that the fee IUSA will receive for this transaction far exceeds the monetary
value of the uranium which might be extracted from the material. Utah accordingly suggests that
1 IUSA made a similar request to receive, process, and dispose of uranium-bearing
material from the nearby Ashland 1 and Seaway Area D FUSRAP sites. That license
amendment is the subject of a separate NRC adjudicatory proceeding (Docket No. 40-8681-
MLA-5) currently held in abeyance pending the outcome of this appeal.
3
the "primary" reason IUSA is processing the material is so that it can be reclassified as 1 le.(2)
material and then disposed of at the IUSA mill site. See id. at 10.
In short, Utah argues that the NRC staff improperly granted this license amendment
because IUSA is not processing the Ashland 2 material "primarily" to recover its relatively
minimal uranium content, but rather to obtain the generous handling and disposal fee. Utah
emphasizes that IUSA's license amendment application failed to adequately substantiate that
the material was to be "processed primarily" for its uranium content. Utah insists upon "some
objective documentation" to show that recovery of the uranium, not payment for disposal, was
IUSA's primary interest behind the license amendment. See Utah's Reply to NRC Staff's and
IUSA's Briefs (June 28, 1999)("Utah's Reply Brief') at 10. Given the "wide disparity" between
the fee IUSA will receive for taking and processing the material and the probable market value
of the uranium that can be recovered, Utah claims that the "only reasonable conclusion" to be
drawn is that the "primary purpose of applying for the license amendment was to receive a four
million dollar disposal fee." Id. at 9-11.
In interpreting what is meant by § 1 le.(2)'s requirement that ore be "processed primarily
for its source material content," Utah relies heavily upon language in the NRC's "Final Revised
Guidance on the Use of Uranium Mill Feed Material Other Than Natural Ores," 60 Fed. Reg.
49,296 (Sept. 22, 1995)("Alternate Feed Guidance"). The Alternate Feed Guidance asks
licensees to "certify" that the feed material will be "processed primarily for the recovery of
uranium and for no other purpose." Id. at 49,297. The Guidance goes on to enumerate three
possible ways a licensee can "justify" this certification that feed material is to be processed for
source material. The three possible factors a licensee can cite are "financial considerations,
high uranium feed content of the feed material, or other grounds." Id. Throughout this
4
proceeding, the parties sharply have disputed the meaning of these and other statements in the
Alternate Feed Guidance.
Utah, for instance, argues that the Guidance included a "Certification and Justification"
test expressly to prohibit licensees from "using a uranium mill to process material for the primary
purpose of ... [reclassifying] the material to allow it to be disposed of in the mill tailings
impoundment." See Utah's Appeal Brief at 10,12. Utah claims that processing material merely
for the sake of reclassifying it as 1 le.(2) material is "sham processing," and that the wastes or
mill tailings generated from such "sham processing" do not meet the definition of 1 le.(2)
byproduct material. See id. at 10-11. Utah concludes that IUSA "failed to justify and document
under the Alternate Feed Guidance any satisfactory or plausible grounds to show that [IUSA]
was not engaged in sham processing." Id. at 11.
In LBP-99-5, the Presiding Officer rejected Utah's arguments. "[O]re is processed
primarily for its source material content," stated the Presiding Officer, "when the extraction of
source material is the principal reason for processing the ore," regardless of any other reason
behind the licensee's interest in acquiring the material or seeking the overall transaction. See
49 NRC at 109.
On the other hand, the Presiding Officer went on to explain, "[i]f ... the material were
processed primarily to remove some other substances (vanadium, titanium, coal, etc.) and the
extraction of uranium was incidental, then the processing would not fall within the statutory test
and it would not be byproduct material within the meaning of the Atomic Energy Act. That is, the
adverb 'primarily,' applies to what is removed from the material by the process and not to the
motivation for undertaking the process." Id. (emphasis added). In the Presiding Officer's view,
"the only 'sham' that stops material from being byproduct material is if it is not actually milled. If
it is milled, then it is not a sham." Id. at 111 n.6.
5
The Presiding Officer found this interpretation of § 1 le.(2) consistent with the language
and legislative history of the Uranium Mill Tailings Radiation Control Act of 1978, as amended
(UMTRCA). He went on to conclude that the staff appropriately granted the license amendment
because IUSA "is milling ore" to extract uranium and therefore is "not involved in a sham." See
id. at 113. The Presiding Officer also found that Utah had misunderstood the NRC Alternate
Feed Guidance. He rejected Utah's claim that the Guidance was intended to prevent material
from being categorized as 1 le.(2) byproduct material if the licensee's primary economic motive
was to receive a fee for waste disposal instead of to recover the uranium. Id. at 112. "The
Alternate Feed Guidance," the Presiding Officer stated, "is not supportive of the position, taken
by the State of Utah, that material is to be considered byproduct only if the primary economic
motivation is to remove uranium rather than to dispose of waste." Id. Under LBP-99-5, then, the
licensee's underlying motive or purpose for acquiring the material in the first place is irrelevant.
What matters is that the material actually is processed through the mill to recover source
material.
Both the NRC staff and IUSA endorse the Presiding Officer's conclusions. The staff
explains that "the Presiding Officer properly applied the [alternate feed] guidance by focusing on
whether the processing was primarily to extract uranium," regardless of any economic
motivations involved. See NRC Staff Opposition to Utah Appeal of LBP-99-5 ("Staff Brief')(June
14, 1999) at 13 (emphasis added). The staff also stresses that "[n]either a high uranium content
nor economic profitability is 'required' under the guidance," which provides three separate and
alternative reasons a licensee can describe to support a proposed license amendment,
including any number of reasons which might fall within the category of "other grounds." See id.
Indeed, the staff argues, the definition of § 1 le.(2) byproduct material should be broad enough
to encompass those fuel cycle activities involving the processing of even low grade -- with
6
relatively low concentration of uranium -- feedstock. Id. at 15. "Utah's attempt to require an
economic motive test and to require detailed financial review should be rejected," the staff
urges. Id.
Focusing upon UMTRCA's legislative history, IUSA similarly concludes that at issue is
simply whether the tailings and wastes were "produced as part of the nuclear fuel cycle." See
IUSA's Reply to Utah's Appeal Brief and Envirocare's Amicus Curiae Brief ("IUSA Brief')(June
14, 1999) at 9-10. According to IUSA, those tailings and waste from feeds processed to recover
uranium outside of the nuclear fuel cycle, as in a.secondary or side-stream process at a
phosphate recovery operation, would not be 1 le.(2) material because the actual processinq was
not [intended] primarily for the source material content. Id. But where there is a licensed
uranium mill involved, "the only question to be answered," argues IUSA, "is whether it is
reasonable to expect that the ore will, in fact, be processed for the extraction of uranium." Id. at
15.
While not adopting the Presiding Officer's reasoning in its entirety, the Commission
affirms LBP-99-5, for the reasons given below.
Ill. Analysis
To clear away a threshold matter, we must briefly consider the NRC staffs claim that the
Ashland 2 material already was § 1 le.(2) byproduct material, even before it was sent to IUSA
and even before it was processed. See Staff Brief at 8 n.1 1; 14 n.18; 15 n.19. The staff's theory
derives from the Department of Energy's certification that the Ashland 2 material was the
residue of a Manhattan Project uranium extraction project, and therefore constituted "tailings or
waste produced by the extraction ... of uranium ... from ... ore processed primarily for its source
material content" within the meaning of section 11e.(2). We find it unnecessary to reach the
7
staff argument. Historically, the NRC has maintained that it lacks regulatory authority over
uranium-bearing material, like the Ashland 2 material, generated at facilities not licensed on or
after 1978 (when UMTRCA was passed). See United States Army Corps of Engineers, DD-99-
7, 49 NRC 299, 307-08 (1999). Nothing in this opinion addresses the pre-1978 question or
should be understood to do so. Instead, our opinion rests solely on section 1 le.(2)'s "processed
primarily for its source material content" clause.
On appeal, Utah finds the Presiding Officer's "first error" to have been that of having
"resort[ed] to interpretation of the AEA and the legislative history of UMTRCA in searching for
the meaning of 'primarily processed for."' See Utah Appeal Brief at 11-12. Instead, Utah argues,
the Presiding Officer should have focused only upon the NRC's Alternate Feed Guidance to
discern how the § 1 le.(2) definition is to be applied and met. Id. at 12. The Commission,
however, agrees with the Presiding Officer that the § 11 P.(2) definition, with its requirement that
material be "primarily processed for its source material content," can only be properly
understood within the context of UMTRCA and its legislative history.
Based on an in-depth review of UMTRCA and its legislative history, and of the Alternate
Feed Guidance and its background documents, the Commission reaches several conclusions.
To begin with, the Guidance does appear to contemplate an NRC staff inquiry into a licensee's
motives for a license amendment, just as Utah suggests. The Guidance, for instance,
expresses a "concern that wastes that would have to be disposed of as radioactive or mixed
waste would be proposed for processing at a uranium mill primarily to be able to dispose of it in
the tailings pile as 1 le.(2) byproduct material." 60 Fe d. Reg. 49,296, 49,297 (Sept. 22, 1995).
The Guidance thus outlines possible "justifications" that a licensee may describe in support of
the license application, and these are intended to assist the staff "[i]n determining whether the
proposed processing is primarily for the source material content or for the disposal of waste." Id.
8
Indeed, the requirement of a licensee "justification" apparently stemmed from a 1993 Presiding
Officer decision which questioned, in another proceeding, whether a simple licensee
"certification, without more, would adequately protect against ulterior motives to dispose of
waste." See UMETCO Minerals Corp., LBP-93-7, 37 NRC 267, 283 (1993)(emphasis added).
Such statements do not support the NRC staff's current view that under the Guidance all
that matters is that processing for uranium was intended, regardless of underlying motive. On
the contrary, the statements in both the proposed and final Guidance take as a given that
processing for uranium content will take place, but also indicate that such processing should not
be employed simply as a device to reclassify material to enable it to be disposed of-- as 1 le.(2)
byproduct material -- at a uranium mill site. As Utah has maintained, therefore, the Alternate
Feed Guidance certainly can be understood -- and is perhaps best understood -- as reflecting
an intent to prevent material from being categorized as 1 le.(2) byproduct material when the
licensee's overriding economic motive is to receive a fee for waste disposal.
Yet, although the drafters of the Guidance apparently intended to distinguish between
those license amendment requests where the licensee's overriding interest is obtaining uranium
and those where payment for disposal is driving the transaction, the NRC staff apparently has
not consistently utilized the Guidance in this way. While the language of the Guidance may
suggest that a licensee's motivations are to be scrutinized, parsed, and weighed, the NRC staff
2 In fact, when the Guidance was first proposed, there was a description of how owners
of low-level or mixed waste, facing the high costs of disposal, might find it "very attractive" to"pay a mill operator substantially less to process [the material] for its uranium content and
dispose of the resulting 1 le.(2) material," rather than to pay for disposal at a low-level or mixed
waste facility. See "Uranium Mill Facilities, Request for Public Comments on Guidance on the
Use of Uranium Mill Feed Materials Other Than Natural Ores," 57 Fed. Reg. 20,525, 20,533
(May 13, 1992)("Proposed Guidance"). The Proposed Guidance labeled such transactions"sham disposals," and implied they "would not meet the definition of 1 le.(2) byproduct material."
Id. at 20,533.
9
typically has not relied upon such probing reviews of licensee motives, It has not been the
staff's practice, for example, to require licensees essentially to "prove" quantitatively or
otherwise that the value of the uranium to be recovered from a particular licensing action will
outweigh other economic reasons for the transaction. See, e.g., UMETCO, 37 NRC at 274, 281-
82; Staff Brief at 15-16. Since the Guidance was first issued, it seems, there has been little
connection between what the Guidance seemingly proposes and what the staff in reality has
required.
This fact has prompted the Commission on this appeal to take an in-depth look at the
Guidance and its policy ramifications. We find that the apparent intent in the Guidance to have
the staff scrutinize the motives behind the license amendment transaction is neither compelled
by the statutory language or history of UMTRCA nor reflects sound policy. Our review of
UMTRCA and its legislative history confirms the Presiding Officer's conclusion that the
requirement that material be "processed primarily for its source material content" most logically
refers to the actual act of processing for uranium or thorium within the course of the nuclear fuel
cycle, and does not bear upon any other underlying or "hidden" issues that might be driving the
overall transaction.
As we describe in further detail below, the purposes behind the wording of § 1 le.(2)'s
definition served: (1) to expand the types of materials that properly could be classified as
byproduct material; (2) to make clear that even feedstock containing less than 0.05% source
material could qualify as byproduct material; and (3) to assure that the NRC's jurisdiction did not
cross over into activities unrelated to the nuclear fuel cycle. The IUSA license amendment is
consistent with these statutory intentions, regardless of whether IUSA's bigger interest was
payment for taking the material or payment for the recovered uranium. Indeed, even accepting
Utah's claim that the four million dollar payment IUSA contracted to receive for processing and
10
disposing of the Ashland 2 FUSRAP site material was the primary motivator for this transaction,
the tailings generated from the processing can still properly be classified as § 1 le.(2) byproduct
material.
UMTRCA's Purposes and History
It may be helpful to outline a little of UMTRCA's legislative history and, in particular, how
the § 1le.(2) definition came about. UMTRCA had two general goals: (1) providing a remedial-
action program to stabilize and control mill tailings at various identified inactive mill sites, and (2)
assuring the adequate regulation of mill tailings at active mill sites, both during processing and
after operations ceased. As then Chairman Hendrie of the NRC explained to Congress, the
agency at the time did not have direct regulatory control over uranium mill tailings. The tailings
themselves were not source material and did not fall into any other category of NRC licensable
material. The NRC exercised some control over tailings, but only indirectly as part of the
Commission's licensing of ongoing milling operations. Once operations ceased, however, the
NRC had no further jurisdiction over tailings. This resulted in dozens of abandoned or
"orphaned" mill tailings piles.
To prevent future abandoned and unregulated tailings piles, Congress enacted the
1 le.(2) definition, which expressly declared mill tailings to be a form of byproduct material. As
Chairman Hendrie explained, tailings are "fairly regarded as waste materials from the milling
operation," but the proposed definition would classify them as byproduct material and thus make
them licensable under the AEA. Under the new § 11e.(2) definition, Chairman Hendrie
emphasized, tailings generated during uranium milling operations would "formally be byproducts
rather than waste." Uranium Mill Tailings Radiation Control Act of 1978, Hearings on H.R.
11698, H.R. 12229, H.R. 12938, H.R. 12535, H.R. 13049, and H.R. 13650, (hereinafter
11
"UMTRCA Hearings I") Subcomm. On Energy & Power, House Comm. On Interstate & Foreign
Commerce, 95th Cong. 2 nd Sess. at 400 (1978)(statement of Joseph M. Hendrie, Chairman,
NRC).
At the time Congress drafted UMTRCA, the Environmental Protection Agency had some
authority over uranium mill tailings under the Resource Conservation and Recovery Act of 1976
(RCRA), but EPA had no authority over the milling process which generated the tailings. By
defining mill tailings as a byproduct material, the new 1 le.(2) definition removed mill tailings
from RCRA's coverage since RCRA excludes all source, byproduct, and special nuclear
material. This exclusion from RCRA was intended to minimize any "dual regulation" of tailings
by both EPA and the NRC. Chairman Hendrie suggested that since the NRC already regulated
the site-specific details of uranium milling, it seemed logical for the NRC to regulate the
treatment and disposal of tailings "which we permitted to be generated in the first place." Id. at
342-43.
From the legislative history, we can glean a few conclusions about the actual wording of
the 1 le.(2) definition. As originally proposed, the definition of 1 le.(2) byproduct material was
directly linked to the Commission's definition of source material. The original definition referred
to "the naturally occurring daughters of uranium and thorium found in the tailings or wastes
produced by the extraction or concentration of uranium or thorium from source material as
defined in [then] Section 1 lz.(2)." But Chairman Hendrie was concerned that a definition of
byproduct material that was linked to that of source material would exclude ores containing
0.05% or less of uranium or thorium.3 He proposed that the language be revised to "from any
3 "Source material" has been defined by the Commission to exclude ores containing less
than 0.05% of uranium or thorium. 10 C.F.R. § 40.4.
12
ore processed primarily for its source material content." His discussion with Congressman
Dingell went as follows:
Mr. Hendrie: The Commission is informed that there are a few mills
currently using feedstock of less than 0.05 percent uranium.
As high grade ores become scarcer, there may be a greater
incentive in the future to turn to such low grade materials.
Since such operations should be covered by any regulatory
regime over mill tailings, the Commission would suggest that the
definition of byproduct material in H.R. 13382 be revised to include
tailings produced by extraction of uranium or thorium from any
ore processed primarily for its source material content.
Mr. Din-qell: I am curious why you include in that the word "processed"
primarily for source material content. There are other ores that are being
processed that do contain thorium and uranium in amounts and I
assume equal in value to those you are discussing here. Is there any
reason why we ought not to give you the same authority with regard to
those ores?
Mr. Hendrie: The intent of the language is to keep NRC's regulatory
authority primarily in the field of the nuclear fuel cycle. Not to extend
this out into such things as phosphate mining and perhaps even
limestone mining which are operations that do disturb the radium-bearing
crust of the Earth and produce some exposures but those other activities
are not connected with the nuclear fuel cycle.
UMTRCA Hearings I at 343-44.
There were, therefore, two principal intentions behind Chairman Hendrie's proposed
language, which Congress accepted. First, the 1 le.(2) definition was intended to reach even
"low grade" feedstock with less than a 0.05% concentration of uranium. Second, the definition
was intended to make sure that the NRC's jurisdiction did not expand into areas not traditionally
part of the NRC's control over the "nuclear fuel cycle." The definition therefore "focuses upon
uranium milling wastes" and not, for example, upon the wastes from phosphate ore processing
which are also contaminated with small quantities of radioactive elements. Id. at 354 ("Section
by Section Analysis of H.R. 13382 As Revised by NRC Recommended Language Changes").
13
Similarly, 1 le.(2) material was not to encompass uranium mining wastes because, as Chairman
Hendrie explained, "[w]e don't regulate mines. The mining is regulated by the Department of
Labor under other regulations so our definition was drawn to maintain that and to keep us out of
the mine-regulating business." Id. at 401.
We find, then, that the § 1 le.(2) definition focused upon whether the process generating
the wastes was uranium milling within the course of the nuclear fuel cycle. As Chairman
Hendrie made clear, the concentration of the uranium or thorium in the feedstock was not a
determinative factor in whether the resulting tailings should be considered 1 le.(2) material. The
focus was not on the value of the extracted uranium but on the activity involved.
In short, the § 1 le.(2) definition focuses upon the proces that generated the radioactive
wastes -- the removal of uranium or thorium as part of the nuclear fuel cycle. See Kerr-McGee
Chemical Corp. v. NRC, 903 F.2d 1, 7 (D.C. Cir. 1990). But UMTRCA does not require that the
market value of the uranium recovered be the licensee's predominant interest, and thus
UMTRCA does not require the NRC to assure that no other incentives lie behind the licensee's
interest in processing material for uranium. There simply is no reason under UMTRCA why
licensees cannot have several motives for a transaction.4 That IUSA's primary goal here may
4 See also, e.g Kerr-McGee, 903 F.2d at 7 (where the court suggested that the word"primarily" in the § 1 le.(2) definition could be read to mean "substantially," and thus the tailings
from the coproduction of source material and rare earths could still be deemed 1 le.(2)
byproduct material so long as one of the reasons for processing the ore was for extracting
source material). The court's reasoning in Kerr-McGee is consistent with the UMTRCA history,
which reflects that it has long been the case, for instance, that both vanadium and uranium
might be extracted during a processing of material, and indeed that the amount of recoverable
vanadium may very likely be much greater than that of the recoverable uranium. See,. eg.,
UMTRCA Hearings I at 155 (where private company reprocessing material was extracting 2 1/
pounds of vanadium for every 1½ pound of uranium extracted); see also UMTRCA Hearings III at
136 ("We recover ... about 1,000 pounds a day of uranium, about 4,000 pounds of vanadium").
There was never any suggestion in the legislative history that if the amount or value of the
vanadium proved higher than that of the uranium, the tailings could not be categorized as
1 le.(2) byproduct material.
14
have been the four million dollar payment for disposal, instead of potential profit from any
recoverable uranium, does not in and of itself prevent the tailings generated from the milling
process from falling within the § 1 le.(2) definition. Moreover, as we touch upon further below,
making such purely economic considerations a determinative part of the staff's review would
unnecessarily divert agency resources to issues unrelated to public health and safety.
The Need for Revising the Guidance
In this litigation, Utah and the other parties focused not upon UMTRCA and its legislative
history, but upon the NRC's Alternative Feed Guidance. The Commission, however, is not
bound by the Guidance. Like NRC NUREGS and Regulatory Guides, NRC Guidance
documents are routine agency policy pronouncements that do not carry the binding effect of
regulations. See,e._.R, Curators of the University of Missouri, CLI-95-1, 41 NRC 71, 149 (1995);
International Uranium (USA) Corp. (White Mesa Uranium Mill), LBP-97-12, 46 NRC 1, 2
(1997)(referring specifically to final Alternate Feed Guidance as "non-binding Staff guidance").
Such guidance documents merely constitute NRC staff advice on one or more possible methods
licensees may use to meet particular regulatory requirements. See, e_.., The Curators of the
University of Missouri, CLI-95-1, 41 NRC 71, 150 & n.121 (1995); Petition for Emergency and
Remedial Action, CLI-78-6, 7 NRC 400, 406-07 (1978); Consumers Power Co. (Big Rock Point
Nuclear Plant), ALAB-725, 17 NRC 562, 568 n.10 (1983); Vermont Yankee Nuclear Power
Corp. (Vermont Yankee Nuclear Power Station), CLI-74-40, 8 AEC 809, 811 (1974). These
guides, however, do not themselves have the force of regulations for they do not impose any
additional legal requirements upon licensees. Licensees remain free to use other means to
accomplish the same regulatory objectives. See id. "[A]gency interpretations and policies are
not 'carved in stone' but rather must be subject to re-evaluations of their wisdom on a continuing
15
basis." Kansas Gas & Elec. Co. (Wolf Creek Generating Station, Unit 1), 49 NRC 441, 460
(1999)(referencing Chevron U.S.A., Inc. v. Natural Resources Defense Council, Inc., 467 U.S.
837, 863-64).
Accordingly, it has long been an established principle of administrative law that an
agency is free to choose among permissible interpretations of its governing statute, and that at
times new interpretations may represent a sharp shift from prior agency views or
pronouncements. Chevron, 467 U.S. at 842-43, 862 (1984). This is permissible so long as the
agency gives "adequate reasons for changing course." Envirocare of Utah v. NRC,_ F.3d_,
No. 98-1426 (D.C. Cir., Oct. 22, 1999), slip op. at 6. Given that: (1) the disputed portions of the
Alternate Feed Guidance are not derived directly from UMTRCA or its history; (2) the Guidance
apparently has not been consistently applied in the manner proposed by the State of Utah; (3)
the precise terms of the Guidance are not entirely clear (c.f.,e_.g., "other grounds"); and (4) the
Commission believes that literal adherence to the apparent intent of the Guidance would lead to
unsound policy results, the Commission declines to follow it here and will require the NRC staff
to revise it as soon as practicable.5
Several policy reasons support departing from the Guidance. First, the NRC's statutory
mission is public health and safety. Our regulations establish comprehensive criteria for the
possession and disposal of 1 le.(2) byproduct material under NRC or Agreement State
jurisdiction. See 10 C.F.R. Part 40, Appendix A. The criteria were designed to assure the safe
' The Commission has promulgated no regulation implementing the Guidance. Thus, the
Commission's rejection of the Guidance does not present a situation where the Commission has
altered "suddenly and sub silentio settled interpretations of its own regulations." Natural
Resources Defense Council, Inc. v. NRC, 695 F.2d 623, 625 (D.C. Cir. 1982). See generally
Syncor Int'l Corp. v. Shalala, 127 F.3d 90 (D.C. Cir. 1997); Paralyzed Veterans of America v.
D.C. Arena L.P., 117 F.3d 579 (1997), cert. denied, 523 U.S. 1003 (1998); United Technologies
Corp. v. EPA, 821 F.2d 714 (D.C. Cir. 1987).
16
disposal of bulk material whose primary radiological contamination is uranium, thorium, and
radium in low concentrations. But whether the concentration of uranium in the feedstock
material is .058% or .008% -- the initial high and low estimates, respectively, of the Ashland 2
material based upon samples taken -- has no impact upon the general applicability and
adequacy of the agency's health and safety standards for disposal of § 1 le.(2) material. Yet, in
Utah's view, whether the actual uranium concentration proved to be .058% or .008% could well
dictate whether the resulting tailings appropriately could be classified as § 1 le.(2) material and
regulated by the NRC.
Utah's interpretation thus divides byproduct material into two different regulatory camps
based solely upon market-oriented factors, i.e., the expected profit from selling recovered
uranium versus any other economically advantageous aspects of the license amendment. Utah
emphasizes, for example, that it "has not objected to several [IUSA] alternate feed license
amendment requests where the waste material contained [greater amounts] of uranium." See
Utah's Petition for Review of LBP-99-5 (Feb. 26, 1999) at 9 n.10. From a health and safety
perspective, though, there is no reason to prohibit IUSA from disposing of tailings material in its
disposal cells solely on account of the feedstock having a lower uranium concentration or lower
market value. Cf. Kerr-McGee, 903 F.2 at 7-8.
Second, the Guidance, if applied as originally intended, would cast the NRC staff into an
inappropriate role, conducting potentially multi-faceted inquiries into the financial attractiveness
of transactions. The staff essentially would need to look behind and verify every assertion about
the economic factors motivating a proposed processing of material -- an unnecessary and
wasteful use of limited agency resources, at a time when the Commission increasingly has
17
moved away from performing economics-oriented reviews that have no direct bearing on safety
and are not specifically required by Congress.6
In addition, the NRC seeks to regulate efficiently, imposing the least amount of burdens
necessary to carry out our public health and safety mission. Yet, as this proceeding itself
demonstrates, the Alternate Feed Guidance's unwieldy "Certification and Justification" test lends
itself easily to protracted disputes among the NRC staff, intervenors, and the licensee over such
issues as how much the licensee will "really" profit from selling recovered uranium, what the
licensee's "bigger" motives may be, etc. All this effort and attention imposes burdens on the
parties while detracting from our central mission -- radiological safety, i.e., assuring that there
are no constituents in the alternate feed material that would prevent the mill from complying with
all applicable NRC health and safety regulations.
Nor is it inconceivable that eventual potential changes in the marketplace could impact
whether particular material might fall within the § 1 le.(2) definition one year but not the next,
merely on account of some new market factor. Purely economic factors, in short, should not
determine how radioactive material is defined. Whether IUSA was paid a "substantial sum," as
Utah emphasizes, a nominal sum, or had to pay a sum to acquire the Ashland 2 material has no
bearing on health and safety issues. Therefore, this is not appropriately the Commission's
concern and also should have no bearing on whether the resulting tailings meet the statutory
definition of byproduct material under § 1 le.(2).
While it may be true, as Utah states, that when Congress enacted UMTRCA there was
no "thought of using offsite active uranium mills to process and dispose of industrial cleanup
6 See, ejq., Final Rule, Environmental Review for Renewal of Nuclear Power Plant
Operating Licenses, 61 Fed. Reg. 28,467, 28,484 (June 5, 1996); Kansas Gas & Elec. Co. (Wolf
Creek Generating Station, Unit 1), CLI-99-19, 49 NRC 441 (1999).
18
waste from FUSRAP sites," Utah's Reply Brief at 5, several Congressmen did express an
interest in having private corporations take and reprocess materials as a means to offset the
federal government's ultimate disposal costs for cleaning up UMTRCA's designated Title I sites.
See, e._, UMTRCA Hearings on H.R. 13382, H.R. 12938, H.R. 12535, and H.R. 13049
("UMTRCA Hearings Ir") Subcomm. On Energy & the Environment, House Comm. On Interior &
Insular Affairs (1978) at 82 (statement of Rep. Weaver)(some "companies might be interested in
sharing the cost of stabilization of tailings in return for access to minerals remaining in the
piles").7 Then Chairman Hendrie voiced no objection, stating that "[i]f they want to reprocess the
piling to make a complete recovery of the resource there, I think that is fine from a conservation
standpoint. It also puts them back in the active business of milling." See UMTRCA Hearings II
at 82.
Here, the Ashland 2 material has been approved for processing and disposal, and the
resulting byproduct material will be disposed of pursuant to the same health and safety
standards that apply to any other 1 le.(2) material in an NRC-licensed mill: 10 C.F.R. Part 40,
Appendix A. Though Utah may be dissatisfied with those standards, an adjudicatory proceeding
is not the appropriate forum to contest generic NRC requirements or regulations. See, e..q.,
Duke Energy Corporation (Oconee Nuclear Station, Units 1, 3, and 3), CLI-99-11, 49 NRC 328,
334 (1999).
We note, additionally, that early in the proceeding Utah expressed concern that the
Ashland 2 material, contrary to the NRC staff's findings, possibly contained listed hazardous
' See also, e.q., UMTRCA Hearings 1 at 89-90 (written statement of Rep. Johnson);
Hearings On S.3008, S.3078, and S.3253 ("UMTRCA Hearings I1l") Subcomm. On Energy Prod.
& Supply, Senate Comm. On Energy & Natural Resources (1978) at 59 (statement of Sen.
Haskell)(if private companies reprocessed some of the tailings, that would be regulated under
the NRC's regulations).
19
waste. But while the accuracy of the license application can appropriately be the subject of an
adjudication, notwithstanding staff findings, here subsequent events have rendered Utah's
hazardous waste concern moot. Following negotiations with IUSA and, after analyzing
investigations and data from the Ashland 2 site, Utah formally withdrew its allegation that the
Ashland 2 material may contain listed hazardous waste. See Utah's Appeal Brief at 3 n.2.
Instead, although Utah is upset that the staff's allegedly "scanty" review took only "about six
weeks," its own review failed to uncover any errors in the staffs conclusion that the material
contains no listed hazardous waste. Utah's remaining generalized complaint about how the staff
reached its conclusion is not a litigable issue, given that Utah now concurs with the staff's
conclusion and no longer alleges the presence of any listed hazardous waste.
Nevertheless, such disputes about the presence of hazardous waste are likely to recur,
and the issue is a significant one, implicating three concerns: (1) possible health and safety
issues, (2) the potential for an undesirable, complex NRC-EPA "dual regulation" of the same
tailings impoundment, and (3) the potential for jeopardizing the ultimate transfer of the tailings
pile to the U.S. government, for perpetual custody and maintenance. See generally UMTRCA,
Title II, § 202 (Section 83 of the AEA). In view of our decision that the Alternate Feed Guidance
requires revision to reflect our decision on the 1 le.(2) definition, we will direct the staff to
consider whether the Guidance also should be revised to include more definitive and objective
requirements or tests to assure that listed hazardous or toxic waste is not present in the
proposed feed material. We note, for example, that in a recent license amendment proceeding,
the Presiding Officer declared it simply "impossible" for him to "ascertain the basis for the Staff
determination that this material is not hazardous." International Uranium (USA) Corp. (White
Mesa Uranium Mill), LBP-97-12, 46 NRC 1, 5 (1997). Similarly, in another earlier proceeding,
the Presiding Officer found that the "Staff's new guidance for determining whether feed material
20
is a mixed [or hazardous] waste appears confusing," and accordingly suggested there be more
"specific protocols ... to determine if alternate feed materials contain hazardous components."
UMETCO, 37 NRC at 280-81. The Commission concludes that this issue warrants further staff
refinement and standardization.
In conclusion, applying the Commission's statutory interpretation of § 1 le.(2) byproduct
material, the Commission finds that the IUSA license amendment properly was issued and that
the mill tailings at issue do constitute § 1 le.(2) byproduct material. From the information in the
record, we believe that it was reasonable for the NRC staff to have concluded that: (1)
processing would take place, and (2) uranium would be recovered from the ore. Utah itself has
acknowledged that "[i]n three different estimates, taken from DOE documents, the average
uranium content of the material ranged from a high of 0.058% to a low of 0.008%." See Utah's
Appeal Brief at 4; see also Utah's Brief in Opposition to IUSA's License Amendment (Dec. 7,
1998)("Utah's Brief in Opposition") at 8, and Attachment at 7-8. Utah's own expert estimated
that up to $617,000 worth of uranium might be recovered from the Ashland 2 material. See
Utah's Brief in Opposition at 8, and Attachment at 9. Utah's primary argument all along has
been that the monetary value of the recovered uranium would be much lower than the 4 million
dollar payment IUSA would receive, not that no source material would be recovered through
processing. See, e.__., id., Attachment at 9 (where Utah's expert stressed that the value of the
uranium-238 that could be extracted from the Ashland 2 material "represents a fraction (1.6 to
15 percent) of the $4,050,000 that [IUSA] will receive from Material Handling & Disposal
Services fees"); Utah's Reply Brief at 11 (the "disposal fee received by [IUSA] ... is almost 60
times the value of the uranium recovery").
Not only was it reasonable to conclude that uranium could be recovered from the
Ashland 2 material, but it was also reasonable to conclude that the processing would indeed
21
take place. IUSA had a contractual commitment to do so; its contract with the Army Corps of
Engineers required IUSA to process the material prior to disposal. See IUSA Brief at 18, 25. In
addition, as the Presiding Officer noted, "IUSA has a history of successfully extracting uranium
from alternate feed material and has developed credibility with the NRC ... for fulfilling its
proposals to recover uranium from alternate feeds." 49 NRC at 112. This was not an instance,
then, where there was no reasonable expectation that the mill operator would in fact process
material through the mill to extract recoverable uranium. Moreover, it is also the Commission's
understanding that the Ashland 2 material has in fact been processed in the IUSA mill and that
approximately 8,000 pounds of uranium were extracted. While that quantity of uranium was on
the low end of IUSA's estimates, it nevertheless represents more than a minute or negligible
recovery of uranium.'
I Moreover, even if we had adhered to and sought to apply the Guidance's tests for
licensee "motives," the record does not show that IUSA processed the Ashland 2 material as a
means to change non-1le.(2) material into § 1le.(2) material. IUSA was aware that the NRC
staff had accepted a DOE certification declaring that the Ashland 2 FUSRAP material met the
1 le.(2) byproduct material definition. Based upon the DOE certification, the staff had concluded
that "the material could be disposed of directly in the White Mesa tailings impoundments,"
without any need of processing at the mill. See Technical Evaluation Report at 6, attached to
Amendment 6 to Source Material License Sua-1 358 (June 23, 1998). The staff thus claims that"sham disposal" was not a concern "since it did not appear that the material was being
processed to change its legal definition, and as such was truly being processed for its uranium
content." See Staff Aff. of Joseph Holonich at 7. Whether the Ashland 2 material actually
already was § 1 le.(2) byproduct material under UMTRCA remains unclear. See supra at 6-7.
Nevertheless, IUSA was aware that DOE, the Army Corps of Engineers, and the NRC staff all
had categorized the material as such, and that the staff indeed had stated that this was material
that could have been disposed of without any further processing. This suggests that IUSA had a
genuine interest in processing the material for the uranium and not simply an interest in"reclassifying" the material by processing it. The subtle and complex nature of this inquiry,
however, reinforces our view that discerning a licensee's motives for a license amendment
transaction is a difficult, virtually impossible and, in any event, unnecessary exercise.
Accordingly, our approach in this decision rejects ultimate business motivations as irrelevant to
the § 1 le.(2) definition.
22
The Commission concludes, therefore, that the Presiding Officer's interpretation of the
11 e.(2) definition reflects a sensible reading of the UMTRCA statute and legislative history --
one we hereby embrace -- and that the record overall supports the issuance of the license
amendment.
Ill. Conclusion
For the foregoing reasons, LBP-99-5 is affirmed.
IT IS SO ORDERED.
For the Commission
Annette L. Vietti-Cook
Secretary of the Commission
Dated at Rockville, Maryland,
this 10th day of February, 2000.
UNITED STATES OF AMERICA
NUCLEAR REGULATORY COMMISSION
In the Matter of
INTERNATIONAL URANIUM (USA)
CORPORATION (IUSA)
(Receipt of Material from
Tonawanda, New York)
))
)
)
)
)
Docket No. 40-8681-MLA-4
CERTIFICATE OF SERVICE
I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER
(CLI-00-01) have been served upon the following persons by U.S. mail, first class, except as
otherwise noted and in accordance with the requirements of 10 CFR Sec. 2.712.
Office of Commission Appellate
Adjudication
U.S. Nuclear Regulatory Commission
Washington, DC 20555
Administrative Judge
Richard F. Cole, Special Assistant
Atomic Safety and Licensing Board Panel
Mail Stop -T-3 F23
U.S. Nuclear Regulatory Commission
Washington, DC 20555
David J. Jordan, Esq.
Jill M. Pohlman, Esq.
Stoel Rives LLP
One Utah Center, 11th Floor
201 South Main Street
Salt Lake City, UT 84111
Atomic Safety and Licensing Board Panel
Mail Stop -T-3 F23
U.S. Nuclear Regulatory Commission
Washington, DC 20555
Lisa B. Clark, Esq.
L. Michael Rafky, Esq.
Office of the General Counsel
Mail Stop -0-15 D21
U.S. Nuclear Regulatory Commission
Washington, DC 20555
Denise Chancellor, Esq.
Fred G Nelson, Esq.
Utah Attorney General's Office
160 East 300 South, 5th Floor
P.O. Box 140873
Salt Lake City, UT 84114
Anthony J. Thompson, Esq.
Frederick S. Phillips, Esq.
Shaw Pittman
2300 N Street, NW
Washington, DC 20037
2
Docket No. 40-8681-MLA-4
COMMISSION MEMORANDUM
AND ORDER (CLI-00-01)
Office of the Secretary of tieCommiss rn
Dated at Rockville, Maryland,
this 10th day of February 2000