HomeMy WebLinkAboutDERR-2024-008853pei.org 53
Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities
APPENDIX C-4
CONTAINMENT SUMP INTEGRITY TESTING
HYDROSTATIC TESTING METHOD
Facility Name:Owner:
Address:Address:
City, State, Zip Code:City, State, Zip Code:
Facility I.D. #:Phone #:
Testing Company:Phone #:Date:
This procedure is to test the leak integrity of containment sumps. See PEI/RP1200 Section 6.5 for the test method.
Containment Sump ID
Containment Sump
Material
Liquid and debris
removed from sump?* Yes No Yes No Yes No Yes No Yes No Yes No
Visual Inspection (No
cracks, loose parts
or separation of the
containment sump.)
Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail
Containment Sump
Depth
Height From Bottom to
Top of Highest
Penetration
Starting Water Level
Test Start Time
Ending Water Level
Test End Time
Test Period (Minimum
test time: 1 hour)
Water Level Change
Pass/fail criteria: Must pass visual inspection. Water level drop of less than 1/8 inch.
Test Results Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail
Comments:
*All liquids and debris must be disposed of properly.
Tester’s Name (print) ___________________________________ Tester’s Signature _________________________________