Summary of Changes to Figures
Figure Status
Figure 2.4A No changes
Figure 2.4B No changes
Figure 4.1A No changes
Figure 5.2A Number of shallow wells changed from five to four; Changed
notation in upper left quadrant to indicate that concentrate now
headed to KUCC tailings impoundment
Figure 5.4A Removed “4” from box for RO plant
Figure 5.4B Replaced with new flow chart showing Integrated Design
Figure 5.4C New: Flow chart for Minimum Integrated Design
Figure 5.4D New: Flow chart for Separate Design
Figure 6.3A Formerly Figure 14.1A-1; updated to reflect Zone A extractions as
now clarified in Table 5.2A, and updated groundwater monitoring
results; removed 250 mg/l sulfate isoconcentration line
Figure 6.3B Formerly Figure 14.1A-2; updated to reflect Zone A extractions as
now clarified in Table 5.2A, and updated groundwater monitoring
results; removed 250 mg/l sulfate isoconcentration line
Figure 8.5A No changes
Figure 14.1A-1 Removed: Renumbered as Figure 6.3A
Figure 14.1A-2 Removed: Renumbered as Figure 6.3B