Loading...
HomeMy WebLinkAboutDERR-2024-008203Overview of the Design and Construction Activities for Zone B Slide Show 2 of 3 Mark Atencio March 17, 2010 Zone B Facilities By -product Pipeline •Design •Bidding •Construction By-Product Pipeline Construction •Phase I –9200 West to 1300 West •Phase II –9200 West to Great Salt Lake Trench Design in City Street Typical Construction Scenario Trench Design in Canal Road Delivery and Stockpiling Pipeline Grading and Laying Pipeline Fuse Welding of HDPE Pipeline Joints (welded joint is stronger than the pipeline) Fuse Welding Machine Fuse Welding Machine Interior of Fuse Welding Machine “Clean Edge” Saw Blade Hot “Iron” Weld Beads Interior Weld Bead Removal Welded Pipeline prior to Installation Welded Pipeline Directional Drilling under some Roads Trench Excavation Trench Excavation Welded Pipeline and Trench Excavation Pipeline Installation (note sandbags under the pipeline) Pipeline Installation Welded Pipeline Installation Installed Pipeline (note the sand bags underneath the pipeline) Placing Low Strength Cement Mortar Backfill (flowable backfill) Placing Flowable Backfill Backfilled Pipeline Concrete Truck Leaving the Work Site Placing Backfill directly from Concrete Truck Placing Backfill directly from Concrete Truck Placing Pipeline Backfill (end of slides 2 of 2)