HomeMy WebLinkAboutDERR-2024-0078652006 Work Planned or In Progress  Kennecott South & North Zones  By  Douglas Bacon – DEQ/DERR Kennecott South Zone – In Progress  ®The Division Drinking Water issued a  Drinking Water Systems permit for the  Zone A RO Plant; May 26, 2006.  ®The State Trustee executed a 60%  reduction of the Zone A ILC’s face  value, pursuant to the terms of Section  III of the Three Party Agreement; July  26, 2006. Kennecott South Zone – In Progress  ®A South Zone TRC meeting was held  on June 8, 2006.  A Presentation on the  2005 monitoring activities at Operable  Unit (OU) #2 – SWJV Ground Water  Plumes was provided.  ®Source controls will continue under  existing state permits, renewed per the  program rules. Kennecott South Zone – In Progress  ®Negotiations will continue to develop a  final CERCLA remedial design consent  decree for OU #2; Summer 2006.  ®Monitoring will continue to assess the  reaction of the Zone A sulfate and acid  plumes to the CERCLA and NRD  response actions; 2006/2007.  ®Parameters to be monitored include: water  quality, levels, and land subsidence Kennecott South Zone – In Progress  ® Kennecott will continue to perform operation  and maintenance activities at OU #2;  2006/2007.  ® DERR & EPA will evaluate and render a  construction completion determination for  Kennecott’s CERCLA response work at OU  #2; Fall 2006.  ® DERR will complete an inspection report on  constructed remedial components; Summer  2006.  ® Kennecott will submit a formal request for  completion determination; Summer/Fall 2006. Kennecott South Zone – In Progress  ®Kennecott will continue to provide  disposal space for impacted soils  excavated in the Herriman area, as  agreed to in the CERCLA consent  decree for OU #3 – Butterfield Creek,  Butterfield Canyon, Herriman;  2006/2007.  ®DERR and Kennecott will complete a  joint Five­Year Review schedule  proposal and submit it to EPA;  Summer/Fall 2006. Kennecott South Zone ­ Planned  ® The negotiating parties will lodge a remedial  design consent decree for OU #2 with the  Federal District Court and EPA/DEQ will  announce a public comment period; ≈ Fall  2006.  ® Kennecott will notify the NRD Trustee on  treated water volumes as part of the formal  request to reduce the Zone A ILC by 15%; on  each anniversary of the Zone A Completion  Date, for next five years. Kennecott South Zone ­ Planned  ®Kennecott will submit an annual  remedial progress report for monitoring  activities at OU #2; 2005 report ≈ Fall  2006.  ®DERR and EPA will periodically  comment on the to KUCC annual  remedial progress reports for OU #2;  after review of submitted report. Kennecott South Zone ­ Planned  ® Kennecott will periodically copy DERR and  EPA on annual compliance reports for  permits; per the permit schedule.  ®The GWPP report for Bingham Canyon  permit will document the volume of  impacted soil delivered to the Bluewater  repository.  ® DERR will initiate an investigation into the  operational history of the historic facility,  Bingham­Magna Ditch, and determine a  regulatory response; Summer/Fall 2006. Kennecott North Zone – In Progress  ® Kennecott  completed the  demolition of  certain  structures and  installed an  interim cap at  the  Precipitation  Plant located  west of  Copperton;  January 2006. Kennecott North Zone – In Progress  ® Kennecott will  continue to  demolish certain  structures and  characterize the  soils at the  Bonneville  Crushing and  Grinding facility. Demolition –Fall/Winter 2006; Characterization ­Spring 2007 Kennecott North Zone – In Progress  ® Kennecott  monitored the  North Zone  Wetlands  (Eastside and  Garfield) for  the 2006  sampling  season; June  2006. Samples collected ­Macroinvertebrate tissues; Water; Organic Flocculent / Mineral Soil Kennecott North Zone – In Progress  ® A North Zone TRC meeting was held on  January 19, 2006.  Monitoring results for the  North Zone Wetlands 2005 sampling season  were presented and discussed.  ® Source controls will continue under existing  state permits, renewed per the program rules.  ®GWPP permit for MTI was renewed Fall  2005.  ®UPDES permit for MTI is planned for  renewal this Summer 2006.  ® Public comment period ended July 25, 2006. Kennecott North Zone – Planned  ® DERR will perform a final inspection of the  interim cap constructed at the Precipitation  Plant and render a completion determination;  Fall 2006.  ® Kennecott will continue demolition activities at  the Bonneville C&G facility to address  remaining concrete and structural debris, as  well as backfill certain areas; Fall/Winter  2006/2007.  ® DERR w ill provide oversight during work. Kennecott North Zone – Planned  ®Kennecott will characterize the soils  located at the Bonneville C&G facility  once demolition work is completed;  Spring 2007.  ®Kennecott will provide a report on the  North Zone Wetlands monitoring activity  for 2006 and present it to the North  Zone TRC; ≈ Winter 2007. Kennecott North Zone – Planned  ®A RDRA work plan for remedial  activities selected under the North Zone  ROD (Sept. 2002) will be prepared and  reviewed; no time frame set yet.  ®The EPA, DEQ and Kennecott will  initiate negotiations on a CERCLA  remedial design consent decree for the  operable units listed in the North Zone  ROD; no time frame set yet.