NRD Trustee – Findings and Conclusions 1
SOUTHWEST JORDAN VALLEY GROUND WATER CLEANUP PROJECT
STATE OF UTAH NATURAL RESOURCE DAMAGE TRUSTEE
FINDINGS AND CONCLUSIONS
AUGUST 31, 2004
I. PURPOSE
The purpose of this document is to describe how the Joint Proposal, Project Agreement, 3-Party
Agreement, and the associated documents and reports, collectively referred to as the Project, address the
requirements and options within the August 21, 1995, Consent Decree entered in Civil Action No. 86-C-
0902G in the United States District Court for the District of Utah (Consent Decree).
II. INTRODUCTION
In August 2003, Kennecott Utah Copper Corporation (Kennecott) and the Jordan Valley Water
Conservancy District (District or JVWCD) submitted a proposal to the Natural Resources Damage
Trustee for the State of Utah (Trustee) to construct and operate a groundwater extraction and treatment
project with groundwater remedial functions that will provide treated, municipal quality water to the
public in the Affected Area of the southwestern Jordan Valley (Project) as defined in the Consent Decree.
The document, Proposal to the Utah State NRD Trustee and USEPA CERCLA Remedial Project
Manager for a Groundwater Extraction and Treatment Remedial Project in the Southwestern Jordan
Valley (Joint Proposal) describes how Kennecott and the District propose to extract and treat sulfate
contaminated ground water and provide municipal quality drinking water pursuant to requirements of the
Consent Decree. In conjunction with the Joint Proposal, Kennecott and the District submitted a 3-Party
Agreement and a Project Agreement (Implementing Agreements) to specify how the Joint Proposal would
be implemented.
The Joint Proposal and Implementing Agreements include the following components:
• A plan to provide a minimum of 8235 acre feet per year (afy) of municipal quality drinking water
to the public in the Affected Area;
• Construct and operate two reverse-osmosis water treatment plants and associated extraction wells
and pipeline;
• Contain the spread of groundwater contamination and remove contamination from the deep
(Principal) aquifer in Affected Area;
• Derive funding for the Joint Proposal from the Natural Resource Damage Trust Fund, with
additional funding provided by Kennecott and the District; and
• Integrate the CERCLA remedial response for the acidic core and elevated sulfate portions of the
Zone A plume with the Natural Resource Damage provisions of the Consent Decree.
The Trustee, in considering the Project for the Affected Area, advertised and hosted a public comment
period from September 2, 2003 to November 21, 2003, and June 18, 2004 to August 2, 2004. The Joint
Proposal and Implementation Agreements were provided to the public for review and comment. The
Trustee is providing a Comment Response Summary of those comments and responses in conjunction
NRD Trustee – Findings and Conclusions 2
with this Findings and Conclusions document and the Trustee’s decision regarding the Joint Proposal and
Implementing Agreements.
The Consent Decree details requirements and options regarding natural resource damages and settlement
of the damage claim. Following are the clauses and requirements for activities pursued by or proposed by
Kennecott and JVWCD under the Consent Decree and findings and conclusions regarding how the Joint
Proposal and Implementing Agreements meet the Consent Decree terms.
III. FINDINGS AND CONCLUSIONS
The Consent Decree, in Section V, identifies specific actions to be performed by Kennecott, in full and
complete satisfaction of the State’s NRD claim against Kennecott. In reaching a decision regarding the
Joint Proposal, Project Agreement, and 3-Party Agreement to implement the NRD cleanup program for
the Affected Area, the Trustee has evaluated whether the terms of the Consent Decree are being fulfilled.
Following are Findings and Conclusions regarding each of the applicable terms of the Consent Decree.
Consent Decree Section V.A – Remedial Investigation and Feasibility Study
“Kennecott agrees to conduct and complete the RI/FS in accordance with the work plan approved by the
State and by the Environmental Protection Agency (“EPA”) on March 8, 1995 or any amendments
subsequently approved and agreed to by Kennecott, the State and EPA. Kennecott, the State and the
District all reserve the right to contest any remedial decision by EPA which results from or follows the
completion of the RI/FS.” (Consent Decree Section V.A)
FINDINGS:
Upon signing the December 13, 2000, Record of Decision for Operable Unit No. 2 (ROD),
drafted by the Environmental Protection Agency Region VIII (EPA), both DEQ and EPA agreed
that the Remedial Investigation and Feasibility Study (RI/FS) were complete. At the same time,
both EPA and DEQ recognized that the unfinished studies listed in the FS could be deferred to
the Remedial Design (RD) activities. The statement in the ROD (page 9), “The RI/FS document
was submitted in 1998 although additional experiments relating to remedial design (RD) are on-
going and will be completed during RD,” memorialized this deferment.
As stated in the Kennecott Utah Copper Final South Facilities Groundwater Remedial Design
Work Plan (August 6, 2001), Kennecott was required to report on the results of the investigations
deferred from the FS to the RD (page 1), including the following: 1) Effects of potential
discharges on the Great Salt Lake; 2) Characterization of extracted and treated water; 3)
Additional treatability studies; 4) Containment and delivery system optimization; 5) Additional
modeling; 6) Definition of delivery options; and 7) Delineation of institutional controls. The
studies deferred have been completed.
CONCLUSION:
The Trustee finds that, to the extent the completion of the RI/FS is related to the implementation
of the Joint Proposal, Project Agreement, and 3-Party Agreement, the requirements of Section
V.A. of the Consent Decree have been met.
Consent Decree Section V.B – Low pH/Heavy Metals Plume
“Kennecott Agrees to drill a well or wells into the low pH/heavy metals plume within 24 months of the
entry of this Decree, at a location or locations agreed to by the Trustee, to equip that well or wells to
pump at a rate of at least 1,000 gallons per minute, and to pump the water from the plume to the leach
water handling system at the waste rock disposal areas for evaporation. This measure will result in
removal of at least a rolling average of 400 acre feet of water on an annual basis over a fiver year period
NRD Trustee – Findings and Conclusions 3
from the low pH plume which will remove contaminants from the aquifer and help to contain that plume.
Kennecott shall continue operation of the extraction well unless it is determined by the Trustee, EPA, or
other applicable authority that pumping is causing spread of the plume, or unless an alternative action of
equivalent benefit is undertaken to remove contaminants from the aquifer and help contain the plume.”
(Consent Decree Section V.B)
FINDINGS:
Kennecott has reported to the Trustee on the progress of the extraction program twice. Excerpts
from the letters are provided below.
A Kennecott letter to the Trustee, dated January 28, 2002, states:
“An extraction well is completed in the core of the low pH/heavy metals plume (acid plume). A
dual-wall, high-density polyethylene (HDPE) pipeline conveys plume water to the Eastside leach
collection system or process water system (as allowed by UDEQ). Extraction of plume
groundwater commenced in August 1997. Through 21 August 2001 (four complete years of
operation), 1173.6 acre-feet of acid water have been extracted. A total of over 85,402 tons of
sulfate has been removed by pumping on this well, the plume containment wells (K60
replacement, K109) and sulfate extraction well.
“As part of the NRD settlement with the Trustee, KUCC has committed to pump 400 acre-feet per
year (on a five-year rolling average) from the acid extraction well. Year five ends August 21,
2002. As of January 1, 2002, KUCC is approximately 542 acre-ft in deficit [of] our commitment.
A new pump is scheduled to be installed during 2002 that will have the capability of pumping up
to 1800 gpm. Provided scaling issues in the tailings pipeline are appropriately managed and
permitted discharge from the tailings impoundment continues, KUCC will be able to meet the
pumping commitment by the required date. Assuming 542 acre-ft remain to be extracted, a
continuous pumping rate of approximately 526 gpm will be required to meet KUCC’s
obligation.”
A follow up letter from Kennecott to the Trustee, dated August 26, 2002, states:
“An extraction well is completed in the core of the low pH/heavy metals plume (acid plume). A
dual-wall, high-density polyethylene (HDPE) pipeline conveys plume water to our process water
system for treatment. Extraction of plume groundwater commenced in August 1997. Through 21
August 2002 (five complete years of operation), 2203.0 acre-feet of acid water have been
extracted. A total of over 136,595 tons of sulfate has been removed by pumping on this well, the
plume containment wells (K60 replacement, K109) and sulfate extraction well.
“As part of the NRD settlement with the Trustee, KUCC committed to pump 400 acre-feet per
year (on a five-year rolling average) from the acid extraction well. Year five ended August 21,
2002. As shown above, KUCC has met and exceeded this requirement. Pumping of the acid well
continues at rates higher than 400 ac-ft per year and designs are currently being engineered to
install the second acid extraction well.”
The Joint Proposal describes project elements which are outlined in the CERCLA Record of
Decision and reconfirmed in the draft “Explanation of Significant Differences” dated June 23,
2003 (Appendix B, Joint Proposal), including “withdraw and treat the heavily contaminated
waters from the core of the acid plume in Zone A.” (Joint Proposal Section 3.2)
The Joint Proposal includes the commitment to continue to extract acid core contaminants:
“KUCC plans to operate its acid plume extraction wells 1146 and 1202 and possibly other acid
extraction wells. KUCC is required as part of the Consent Decree to extract 400 afy annually
NRD Trustee – Findings and Conclusions 4
from the acid plume. KUCC intends to exceed this requirement in order to remove the majority
mass of the acid plume as quickly as possible (see Appendix D). However, the extraction rate
from these wells will be constrained by the capacity of KUCC’s existing water rights and the safe
yield of the aquifer. KUCC’s existing water rights (Section 7.2) will allow for extraction of 2020
afy from the acid wells.
“If necessary, additional extractions may be made by KUCC to contain and contract critical
portions of the acid and highly elevated sulfate plume to protect human health and the
environment. These extractions would require transfer of additional water rights to the remedial
area.” (Joint Proposal Section 5.2)
CONCLUSION:
The Trustee finds that, to the extent the extraction of the low pH/heavy metals plume water is
related to the Joint Proposal, Project Agreement, and 3-Party Agreement, the requirements of
Section V.B of the Consent Decree have been met and can reasonably be expected to continue to
be met.
Consent Decree Section V.C – Additional Source Controls
“Kennecott agrees to complete additional source control measures within 24 months of the entry of this
Decree, described as the completion of the eastside collection system and the Bingham Creek cutoff
system, in accordance with Kennecott’s application for and in compliance with a Utah Groundwater
Discharge Permit.” (Consent Decree Section V.C)
FINDINGS:
Construction began on the Eastside Collection System in 1996. A ground water protection permit
was issued by the Division of Water Quality and took effect on May 3, 1999. As part of the
Eastside Collection System, the Bingham Canyon Cutoff wall was constructed in 1995. The
Large Bingham Reservoir was reconstructed in stages, with the last stage (Zone 2) completed in
1995. A permit for the reconstruction, as well as for groundwater discharges, was provided to
Kennecott by the DEQ Division of Water Quality on May 3, 1995.
CONCLUSION:
The Trustee finds that, to the extent the additional source control measures relate to the Joint
Proposal, Project Agreement, and 3-Party Agreement, the requirements of Section V.C of the
Consent Decree have been met.
Consent Decree Section V.D.1 – Natural Resource Damage Claim Trust Fund
“Kennecott shall, within fifteen days following the date of entry of this Decree:
1. Pay to the Trustee in cash the sum of nine million dollars ($9,000,000) which the Trustee shall
place in the Trust Fund to be administered by the Trustee and which shall be expended only to restore,
replace, or acquire the equivalent of the surface or ground water resources for the benefit of the public in
the Affected Area as provided by Section 107(f) of CERCLA, 42 U.S.C. § 9607 (f). Allocation of the right
to use surface or ground water resources by the public shall be by the Utah State Engineer pursuant to
Utah water law.” (Consent Decree Section V.D.1)
FINDINGS:
The $9.0 million cash portion of the settlement was provided to the Trustee by Kennecott on
September 5, 1995. The cash portion of the Trust Fund is managed by the State Treasurer under a
separate PTIF account. Since its establishment, it has been earning interest at the PTIF rate,
which has fluctuated between 6.0% to 1.5%.
NRD Trustee – Findings and Conclusions 5
As provided in the Joint Proposal (Section 9.0), this cash portion of the Trust Fund will be used
for operation and maintenance of the Lost Use treatment facility operated by JVWCD to produce
municipal quality drinking water. The water will be provided to municipalities in the Affected
Area for the benefit of the public.
Under the terms of the Consent Decree, JVWCD commits to provide a minimum of 1,235 acre
feet per year of municipal quality drinking water, representing the lost use component of the
groundwater cleanup. If JVWCD does not operate the Lost Use shallow groundwater facility, it
will continue to deliver at least 1,235 acre feet of water per year from its other sources to the
Affected Municipalities for the remainder of the Operational Period. (Joint Proposal, Section
10.3)
Section VI of the 3-Party Agreement recognizes the use of the cash portion of the Trust Fund for
the Lost Use Facility. The Project Agreement recognizes the role of the Lost Use Facility in
providing municipal quality drinking water for the benefit of the Public in the Affected Area.
In the Project Agreement, Section 7 details the role of the Lost Use Facility in providing
municipal quality drinking water in the Affected Area.
CONCLUSION:
The Trustee finds that the Joint Proposal, Project Agreement, and 3-Party Agreement provide for
use of the cash portion of the Trust Fund consistent with the terms of the Consent Decree and in a
manner that will restore, replace or acquire the equivalent of the surface or ground water resource
for the benefit of the public in the Affected Area.
Consent Decree Section V.D.2 – Natural Resource Damage Claim Trust Fund
“Kennecott shall, within fifteen days following the date of entry of the Decree:
2. Provide to the Trustee an irrevocable letter of credit in the amount of twenty-eight million
dollars ($28,000,000) substantially in a form acceptable to the Trustee which shall be held by the Trustee
as part of the Trust Fund. For purposes of this paragraph 2, the Trustee has determined that the unit cost
of producing municipal quality water from groundwater I n the Affected Area is $4000 per acre foot in
1995 dollars and that $28 million is sufficient to construct a facility that will provide 7000 acre feet per
year of municipal quality water.” (Consent Decree Section V.D.2)
FINDINGS:
Within 15 days of entry of the Consent Decree, Kennecott was required to provide the Trustee
with an Irrevocable Letter of Credit (ILC) in the amount of twenty-eight million dollars to be held
by the Trustee as part of the Trust Fund. The Trustee arrived at the $28.0 million figure by
calculating the unit cost of producing municipal quality water from ground water in the Affected
Area assuming $4,000 per acre foot in 1995 dollars. Pursuant to this determination, the $28.0
million was judged sufficient to construct a facility that would provide 7000 acre-feet per year of
municipal quality drinking water.
Kennecott provided the Trustee with the ILC on September 5, 1995. The Trustee is the
beneficiary under the ILC. As required by the Consent Decree, the irrevocable letter of credit
increases at a rate of 7 percent annually
Morgan Guaranty Trust Company issued the original ILC. On August 25, 1999, Kennecott
provided a substitute ILC through Wachovia Bank, N.A. The ILC portion of the Trust Fund is
subject to reduction in accordance with the terms of the Consent Decree, as more fully discussed
below.
NRD Trustee – Findings and Conclusions 6
CONCLUSION:
The ILC provided by Kennecott was established consistent with the requirements of Section
V.D.2 of the Consent Decree.
“The letter of credit shall be adjusted as follows:
a. Increased annually by 7 percent of the then current amount of the letter of credit.” (Consent
Decree Section V.D.2.a)
FINDING:
The value of the Irrevocable Letter of Credit, provided in accordance with Section V.D.2 of the
Consent Decree, has been increased annually by 7 percent of the then current total amount.
The initial ILC, established in accordance with Section V.D.2, and its associated 7 percent
interest rate, will not be retained under the Joint Proposal. Two new ILCs, Zone A ILC and Zone
B ILC, will be managed consistent with Section V.D.2.b.i-iv and Section V.D.4, respectively.
CONCLUSION:
The Joint Proposal, Project Agreement and 3-Party Agreement, will establish two new ILCs
which are not subject to the 7 percent interest rate associate with the initial ILC under the Consent
Decree.
“The letter of credit shall be adjusted as follows:
b. If Kennecott provides and delivers municipal quality water through treatment of contaminated
water to a system of a purveyor of municipal and industrial (“M&I”) water in a manner acceptable to the
Trustee, and” (Consent Decree Section V.D.2.b)
FINDINGS:
The Joint Proposal, Project Agreement, and 3-Party Agreement and the supporting studies and
operations support the finding that Kennecott can provide municipal quality water through
treatment of contaminated water.
Under the terms of the Joint Proposal, Project Agreement, and 3-Party Agreement, Kennecot will
deliver treated water to JVWCD.
“i) The water is accepted by a purveyor of M&I water (other than Kennecott) with the water right to put
the water to beneficial use, and the purveyor is obligated to pay to Kennecott no more than the operation
and maintenance costs the purveyor would have incurred absent the contamination up to $49 per acre
foot in 1995 dollars. Kennecott’s agreement with the purveyor may contain such other non-financial
terms and conditions as Kennecott and the purveyor may negotiate, and” (Consent Decree Section
V.D.2.b.i)
FINDINGS:
JVWCD is a purveyor of municipal and industrial water and has presented the proposed project to
the Trustee together with Kennecott. Under the terms of the Project Agreement discussed in
Section 13.4 of the Proposal, JVWCD agrees to accept the treated water produced from the Zone
A Plant, deliver it to the public in the Affected Area, and pay to Kennecott, as avoided operation
and maintenance costs, $49 (1995 dollars) for each acre foot of treated water delivered to it.
Based on the information regarding water right provided by JVWCD in conjunction with the Joint
Proposal, Project Agreement, and 3-Party Agreement, JVWCD has the water right to put the
water to beneficial use.
NRD Trustee – Findings and Conclusions 7
CONCLUSION:
The Joint Proposal, Project Agreement, and 3-Party Agreement meets the requirements of Section
V.D.2.b.i of the Consent Decree.
“ii) The Trustee determines that the extraction of contaminated water will proportionately prevent or
reduce the spread of aquifer contamination. Such extraction shall be deemed to proportionately prevent
or reduce the spread of aquifer contamination if it has the result of (a) ratably providing the same
quantity of municipal water and (b) ratably capturing the same mass of sulfates as the methodology
utilized by the State to determine the unit cost of producing treated water. In making the determination
the Trustee shall consider the underlying basis for the Trust Fund as described in the Supporting
Document, consistency with CERCLA, and any other measures taken by Kennecott that have a containing
effect, and” (Consent Decree Section V.D.2.b.ii)
FINDINGS:
Data from existing extraction of the acid core plume and studies and modeling of the deep
(principal) aquifer supports the determination that the Joint Proposal will prevent and reduce the
spread of contamination.
With a base volume of treated municipal quality water of 3500 acre feet per year, the required
reduction of (dry weight) sulfate that must be produced each year from the proposed Zone A
treatment operation is 9,156,000 lbs of sulfate per year. The production requirement of treated
municipal quality water for the proposed Zone A operation is half (3500 acre feet) of the total
production requirement (7000 acre feet). The required sulfate production value was calculated as
follows, given:
Conceptual extraction and treatment system would remove approximately 2,616 lbs. sulfate
per acre foot produced, for each year of operation. (Source – NRD Supporting Document,
page 41-42).
Proposed production amount: 3500 acre feet per year (Source – Joint Proposal)
Required sulfate production calculation: (3500 acre-feet/year) x (2,616 lbs/acre foot per year)
= 9,156,000 lbs/year
The current proposal for the Zone A treatment facility could produce approximately 11,907,000
lbs per year of dry weight sulfate. This value was determined by the following calculation, given:
Based upon feed water characteristics (1500 mg/l sulfate) the Zone A facility will produce a
net sulfate quantity of 1250 mg/l in the waste stream.
1,250 mg/l sulfate equates to 1.25 g/l of sulfate.
The Zone A operation should produce 3402 lbs/acre foot of sulfate per year, as calculated by
the following formula: (1.25 g/l) x (3.79 l/gal) x (1 lb./454 grams) x (326 gal/acre foot) =
3402 lbs/acre foot
Proposed sulfate production calculation: (3500 acre-feet/year) x (3402 lbs./acre-foot per
year) = 11,907,000 lbs of sulfate per year.
A comparison of the “Extracted Acre Feet per Year” to the “Pounds (lbs) Extracted Per Year”
demonstrates that the “Pounds Per Acre Foot” produced since extractions began in Zone A
removes a sufficient quantity of sulfate per acre-feet to exceed the conceptual extraction quantity
of 2,616 lbs. sulfate per acre-foot produced. Kennecott will continue to specifically account for
the amount of sulfate the treatment process produces each year as part of its annual reporting
requirement.
Kennecott provided proposed design and pilot testing information to the Trustee.
NRD Trustee – Findings and Conclusions 8
CONCLUSION:
The Joint Proposal, Project Agreement, and 3-Party Agreement meet the requirements of Section
V.D.2.b.ii of the Consent Decree.
“iii) The Trustee determines that the municipal quality water is a sustainable water supply (40 or more
years) and” (Consent Decree Section V.D.2.b.iii)
FINDINGS:
Kennecott has modeled water table drawdown along with the thickness of the principal aquifer
for those areas where planned extractions of sulfate-contaminated water is to occur. Using the
planned extraction rates of 1100 gpm each in wells K60 (#1193) and K109 (#1200), and an
extraction rate of 1000 gpm for well #1147, modeling indicates a drawdown or lowering of the
water table of approximately 70-80 feet in the area at year 2047.
The existing water levels at wells #1193 and #1200 are approximately 435 and 400 feet below
ground surface (bgs) respectively. A drawdown of an additional 70 feet would result in a water
level of 505 feet bgs at #1193 and 470 feet bgs at #1200 compared to the base of the principal
aquifer of approximately 1080 feet in #1193 and 800 feet in #1200. Based upon these numbers,
the principal aquifer would be able to produce the volume of water for the 40-year period
required under the terms of the Consent Decree.
In addition to this requirement, under the agreements discussed in Section 13.4 of the Joint
Proposal, municipal quality water also will be provided from the Zone B Facilities or other
sources available to the District for at least forty years. The model for Zone B indicates that a
drawdown of less than 20 feet in year 2047 is expected. Water levels are currently in the 100 to
150 feet range. The deep wells that the District plans to install in the sulfate-contaminated zone
are to be completed at 500-600 feet bgs, well below any anticipated drawdown affects.
CONCLUSION:
The Joint Proposal, Project Agreement, and 3-Party Agreement meet the requirements of Section
V.D.2.b.iii of the Consent Decree.
“iv) Kennecott demonstrates that its project does not increase materially the Trustee’s unit cost to
produce the remainder of the 7,000 acre feet per year of municipal quality water (an underlying
assumption of this Decree is that at least 7,000 acre feet per year is available in the area, and the cost of
acquiring water rights is not a factor to be considered by the Trustee in making this determination),
then the letter of credit shall be reduced ratably by an amount equal to the water provided based on the
$4000 per acre foot unit cost in 1995 dollars. A partial reduction shall be made at the time the treatment
facilities are deemed by the Trustee to be complete and operational based on the portion of the $4000 per
acre foot unit cost in 1995 dollars that represents capital costs in accordance with the Supporting
Document for this Decree. Further reductions for operation and maintenance shall be made based on
established obligations to provide water or as water is provided up to a maximum of 7,000 acre feet per
year.” (Consent Decree Section V.D.2.b.iv)
FINDINGS:
As more fully described below, the project proposed by Kennecott and JVWCD will produce in
excess of 7000 acre feet per year of municipal quality water.
Furthermore, if the project outlined in the Joint Proposal does not go forward with regard to the
Zone B treatment facilities (which is to produce 3500 acre feet), the costs for the Zone A Plant
NRD Trustee – Findings and Conclusions 9
(producing the other 3500 acre feet) demonstrate that the remaining 3500 acre feet can be
produced with the amount attributable to the Zone B ILC. If reductions to the Zone B ILC have
occurred so that the District is obligated to deliver at least 1750 acre feet per year, the balance of
the Zone B irrevocable letter of credit remains for the Trustee’s use to restore, replace or acquire
the equivalent of the remaining volume of water.
Under the proposed project, at the time the Zone A Plant (proposed under Section V.D.2.b of the
Consent Decree) is complete and operational, Kennecott is obligated to produce 3500 acre feet
per year from the plant for the forty year period. Only at this time do the reductions to the Zone
A ILC begin. These obligations are set forth in the 3- Party Agreement, which is discussed at
Section 13.4 of the project proposal.
The District’s commitment with regard to the Zone B Facilities (proposed under Section V.D.4 of
the Consent Decree) is to produce 3500 acre feet per year from the facilities or other sources
available to the District for a forty-year period, whether or not the Zone B Facilities reach
complete and operational status. The District’s commitment is incremental. (See discussion of
the 3- Party Agreement at Section 13.4 of the Project Proposal.) The District commits to deliver
1750 acre feet per year of water for 40 years when Kennecott has reimbursed the District for
Zone B construction costs equal to one-half of the Zone B ILC. At this time, the Zone B ILC will
be reduced by 50 percent. Further reductions to the Zone B ILC will occur consistent with
increases in reimbursements made by Kennecott and increases in the District’s commitments for
water delivery. The District’s commitment to deliver water will be 3500 acre feet per year for 40
years when Kennecott has reimbursed the District for construction costs equal to the full amount
of the Zone B ILC. At that time, the Zone B ILC will be reduced to zero.
CONCLUSION:
The provisions of the Joint Proposal, Project Agreement, and 3-Party Agreement meet the
requirements of Sections V.D.2.b.i, ii, iii, and iv of the Consent Decree.
Consent Decree Section V.D.2.c –Natural Resource Damage Claim Trust Fund
“c. If the Record of Decision (“ROD”) issued by the EPA at the completion of the RI/FS
mandates or EPA otherwise requires Kennecott to treat and provide water at a lesser quality (i.e., water
of a quality with sulfates between 250 to 500 mg/l and total dissolved solids between 500 to 1000 mg/l),
and the manner of providing water is acceptable to the Trustee and the conditions of paragraph 2 (b)(i-
iv) are met, the letter of credit shall be reduced at one half the rate described in paragraph 2(b). There
will be no reduction in the amount of the letter of credit for water produced with concentrations greater
than 500 mg/1 sulfate and 1,000 mg/l total dissolved solids.” (Consent Decree Section V.D.2.c)
FINDING:
The December 13, 2000 Record of Decision did not require Kennecott to treat and provide water
of lesser quality, i.e., water with sulfate concentrations above 500 mg/l and a TDS concentration
above 1000 mg/l.
CONCLUSION:
The criteria under Section V.D.2.c are not applicable and a reduction under this option has not
been considered.
Consent Decree Section V.D.2.d.i -iv – Natural Resource Damage Claim Trust Fund
“d. If Kennecott provides and delivers municipal quality water through extraction or collection
of water to a purveyor of M&I water in a manner acceptable to the Trustee; and
NRD Trustee – Findings and Conclusions 10
i) The water is accepted by a purveyor of M&I water (other than Kennecott) with the
water right to put the water to beneficial use, and the purveyor is obligated to pay Kennecott no
more than the operation and maintenance costs the purveyor would have incurred absent the
contamination up to $49 per acre foot in 1995 dollars. Kennecott’s agreement with the purveyor
may contain such other non-financial terms and conditions as Kennecott and the purveyor may
negotiate, and
ii) The Trustee determines that the extraction or collection of water, which may include
intercepting upgradient recharge to the aquifer, will proportionately prevent or reduce the
spread of aquifer contamination. Such extraction or collection shall be deemed to
proportionately prevent or reduce the spread of aquifer contamination if it has the result of (a)
ratably providing the same quantity of municipal water and (b) ratably capturing the same mass
of sulfates as the methodology utilized by the State to determine the unit cost of producing treated
water. In making the determination the Trustee shall consider the underlying basis for the Trust
Fund as described in the Supporting Document, consistency with CERCLA, and any other
measures taken by Kennecott that have a containing effect, and,
iii) The Trustee determines that the municipal quality water supplied by extraction or
collection is a sustainable water supply (40 or more years); and
iv) Kennecott demonstrates that its project to extract or collect water does not increase
materially the Trustee's unit cost to produce the remainder of the 7,000 acre feet/year of
municipal quality water (an underlying assumption of this Decree is that at least 7,000 acre feet
per year is available in the area, and the cost of acquiring water rights is not a factor to be
considered by the Trustee in making this determination),
then the letter of credit shall be reduced by $100 per acre foot in 1995 dollars (up to a maximum of 7,000
acre feet per year for 40 years) for each year the municipal quality water is provided.” (Consent Decree
Sec. V.D.2.d)
FINDING:
The Joint Proposal under consideration by the Trustee provides for treatment of contaminated
groundwater, as defined in Section V.D.2.b of the Consent Decree, not extraction or collection of
water as defined in this Section.
CONCLUSION:
The criteria for Section V.D.2.d.i-iv are not applicable, and a reduction under this option has not
been considered.
Consent Decree Section V.D.2.e – Natural Resource Damage Claim Trust Fund
e. If the ROD mandates or EPA otherwise requires Kennecott to replace water of a lesser quality
(250 to 500 mg/l sulfate and 500 to 1000 mg/l total dissolved solids) by extraction or collection and the
provision of water is in a manner acceptable to the Trustee and the conditions of paragraph 2(d)(i-iv) are
met, then the letter of credit shall be reduced by $50 per acre foot in 1995 dollars (up to a maximum of
7,000 acre feet per year for 40 years) for each year the water is provided. There will be no reduction in
the amount of the letter of credit for water produced with concentrations greater than 500 mg/l sulfate or
1,000 mg/l total dissolved solids. (Consent Decree Section V.D.2.e)
FINDING:
Kennecott is not required to replace water of a lesser quality.
CONCLUSION:
This provision does not apply to the Joint Proposal under consideration by the Trustee.
NRD Trustee – Findings and Conclusions 11
Consent Decree Section V.D.2.f – Natural Damage Claim Trust Fund
f. If Kennecott provides water in accordance with Section VD2 it will be eligible only for: i)
reduction in the then current amount of the letter of credit, or ii) if the letter of credit has been converted
to cash, reimbursement of funds resulting from conversion of the letter of credit. No other portion of the
Trust Fund is subject to adjustment or credit. Kennecott shall receive credit on the basis of quantity and
quality of water provided and not on the basis of Kennecott’s costs.
FINDING:
Part of the Joint Proposal will provide water in accordance with Section V.D.2. Under the Joint
Proposal, Project Agreement, and 3-Party Agreement, Kennecott would receive credit based on
the quantity and quality of water.
In the Joint Proposal before the Trustee, Kennecott and the District propose that the current ILC
be divided in half to provide funding for the two water treatment plants, as defined in the 3-Party
Agreement (paragraph II.A). One half, referred to as the Zone A ILC, is applicable to the Zone A
treatment plant which will be built and operated by Kennecott. This plant will produce 3500 acre
feet per year of municipal quality drinking water, which will be distributed to the public in the
Affected Area through an agreement with the JVWCD. The other half, referred to as the Zone B
ILC, is applicable to the Zone B treatment plant, which will also produce 3500 acre feet per year
of municipal quality drinking water, but will be built and operated by the JVWCD. Under the
proposal, these new ILCs (each equal in value to half of the value of the initial ILC) would be
subject to reduction as the water treatment plants are built and operated.
Reductions in the two new letters of credit would be governed by different sections of the
Consent Decree. Kennecott will seek full reduction of the Zone A ILC pursuant to the criteria
established under Section V.D.2.b.i-iv of the Consent Decree.
Reductions in the Zone B ILC would be governed by Section V.D.4 of the Consent Decree,
which authorizes the Trustee to spend the proceeds from the letter of credit that are “not allocated
for Kennecott projects” to “restore, replace or acquire the equivalent” of the injured ground
water resource. The Zone B plant will be built and operated by JVWCD. Accordingly, the
specific criteria for “Kennecott projects” in Section V.D.2.b. do not apply to the Trustee’s
decision to utilize the remaining one-half of the letter of credit for the Zone B plant. The Trustee
will reduce the Zone B ILC as the District commits to deliver water from the Zone B plant.
CONCLUSION:
The provisions of the Joint Proposal, Project Agreement, and 3-Party Agreement meet the
requirements of and are consistent with Section V.D.2.f of the Consent Decree.
Consent Decree Section V.D.3 –Natural Damage Claim Trust Fund
“Kennecott may identify projects to seek credit or reimbursement as provided in Section VD2 above to
the extent eligible funds are available in the Trust Fund.” (Consent Decree Sec. V.D.3)
FINDINGS:
Kennecott and the District have identified and proposed to the State Trustee a Project that will
provide 7000 acre feet of municipal quality drinking water to the public in the Affected Area via
the treatment of extracted deep groundwater from the sulfate plumes in both Zone A and Zone B.
As noted previously, the Zone A portion of the Proposal will address the ILC reduction
requirements listed in Section V.D.2.b of the Consent Decree, while the Zone B portion of the
Proposal will address the reduction requirements listed in Section V.D.4 of the Consent Decree.
NRD Trustee – Findings and Conclusions 12
Due to the selected treatment process (reverse osmosis), a percentage of water is “lost” to the
concentrate stream (waste). JVWCD has proposed in the Joint Proposal to use the cash portion of
the Trust Fund to produce or replace a minimum of 1,235 acre feet per year of make up water to
cover the water “lost” to the concentrate stream. A total combined quantity of at least 8,235 acre-
feet of municipal quality water is proposed for production and delivery to the public in the
“Affected Area”.
CONCLUSION:
The Joint Proposal, Project Agreement, and 3-Party Agreement are consistent with the
requirements of Section V.D.3 of the Consent Decree.
Consent Decree Section V.D.4 –Natural Resource Damage Claim Trust Fund
“4. The Trustee shall not expend funds secured by the letter of credit until the earlier of two
years after the issuance of the ROD or July 1, 2000, unless the Trustee determines that there exists a
direct and immediate threat to the public health or the environment which necessitates expenditures to
restore, replace or acquire the equivalent of the resource. Two years after issuance of the ROD or July 1,
2000, whichever occurs first, the portion of the Trust Fund secured by the letter of credit and not
allocated for Kennecott projects approved by the Trustee may, at the option of the Trustee, be converted
to cash which shall be used by the Trustee to restore, replace, or acquire the equivalent of the natural
resource for the benefit of the public in the Affected Area as provided under Section 107(f) of CERCLA.
Kennecott shall have the right at any time to convert the letter of credit to cash which shall be used by the
Trustee to restore, replace, or acquire the equivalent of the natural resource for the benefit of the public
in the Affected Area as provided under Section 107(f) of CERCLA. Allocation of the right to use surface
or ground water resources by the public shall be by the Utah State Engineer pursuant to Utah water
law.” (Consent Decree Section V.D.4)
FINDING:
No funds have been expended from the ILC established in 1995.
Kennecott and JVWCD have provided a Joint Proposal to the Trustee to restore the equivalent of
the natural resource for the benefit of the public in the Affected Area.
Under the Joint Proposal, one-half of the initial ILC will be allocated to the Kennecott Zone A
treatment plant. The remaining one-half of the initial ILC will be allocated to the JVWCD Zone
B treatment plant to be used, under the provisions of this Section V.D.4.
The cash portion of the Trust Fund will be used to provide 1,235 acre feet per year of Lost Use
water.
CONCLUSION:
The Joint Proposal, Project Agreement, and 3-Party Agreement are consistent with the
requirements of Section V.D.4 of the Consent Decree.
Consent Decree Section V.D.5 –Natural Resource Damage Claim Trust Fund
“5. Kennecott shall not receive or beneficially use any of the surface or ground water resources
provided to the public, and which are developed for credit or developed by expenditures of the Trustee
pursuant to Section VD of this Decree.” (Consent Decree Section V.D.5)
FINDING:
The water from the Zone A plant for which Kennecott is being given credit will go to the
JVWCD to be provided to the public in the Affected Area, consistent with the provisions of the
Consent Decree as descri~ above. Additionally, the water provided by "expenditures a/the
Trustee" through the Zone B and Lost Use treatment facilities will be provided to the public by
JVWCD in accordance with the Consent Decree.
Questions have been raised as to whether Kennecott would receive or beneficially use water
provided under the Joint Proposal, contrary to Section V.D.S of the Consent Decree. Kennecott
Land Company's Daybreak Development is located within the Affected Area. Municipal quality
drinking water (culinary water) is being provided to businesses, and will be provided to residents,
of Daybreak by the City of South Jordan through a contract that the City has with Jordan Valley
Water Conservancy District (JVWCD). This arrangement for providing culinary water is similar
to arrange~nts among businesses or residents and cities and JVWCD throughout the Affected
Area. Furthermore, it is an arrange~nt that operates independent of the source of the water.
CONCLUSION:
The arrange~nt for providing drinking water to the Daybreak Development will not violate
Section V.D.S of the Consent Decree if the Joint Proposal is approved.
The Joint Proposal, Project Agree~nt, and 3-Party Agree~nt are consistent with the
require~nts of Section V.D.5 of the Consent Decree.
Consent Decree Section V.D.6 -Natural Resouru Dama2e Claim Trust Fund
"6. Decisions of the Trustee under this section subject to judicial review shall be reviewed using
an arbitrary and capricious standard." (Consent Decree Section V .D.6)
FINDING:
This provision establishes the standard for judicial review.
Consent Decree Section V .D.7 -Natural Resource Dama2e Claim Trust Fund
"7. Interest earned on monies in the Trust Fund shall remain in and be used as part of the TrustFund. II (Consent Decree Section V .D. 7)
FINDINGS:
Interest ean1ed on monies in both the n..c and the cash portion of the Trust Fund has remained in
and will be used as part of the Trust Fund.
Upon the creation of the Zone A ll..c and Zone B ll..c, the Joint Proposal provides that interest
earned on those ll..Cs will remain in and be used as part of the Trust Fund.
CONCLUSION: This provision of the Consent Decree has been complied with and management
of the Trust Fund under the Joint Proposal can reasonably be expected to be in compliance.
As the State of Utah Trustee for Natural Resources, I hereby issue these Findings and Conclusions
and accept and approve the Joint Proposal, Project Agreement, and 3-Party Agreement.
c:-
n..- m~l~DateDian'De R. Nielson. Ph.D.
State of Utah Trustee for Natural Resource
NRD Trustee - Findings and Conclusions 13