Loading...
HomeMy WebLinkAboutDAQ-2024-010186SAMPLE COMPLIANCE CERTIFICATION REPORT revised May 17, 2005 Page 1 of 4 TO: Executive Secretary, Utah Air Quality Board FROM: Source name as indicated on the permit RE: Annual Compliance Certification for Permit # DATE: In accordance with Operating Permit provision I.L and Utah Administrative Code (UAC) R307-415-6c(5), the following compliance certification is submitted. This certification covers operations from ___/___/___ to ___/___/___. (Note: The certification period must be consecutive to the last certification, and cannot cover more than one year. Be sure to submit by the date in your permit!) Term Description of permit provision Method used to determine compliance status Was compliance during report period continuous, intermittent or undetermined? Other info relevant to compliance status, including references to any and all deviations; reason for “undetermined” status; any excursions or exceedances (for CAM provisions only); etc. I.B Was the source operated in compliance with the operating permit? I.C.3 Did the permittee furnish information requested by the Executive Secretary? I.G.1 Did the permittee pay the annual emission fee? I.G.2 Was the fee paid on time? I.K Were all application forms, reports and certifications submitted pursuant to the permit properly certified by a responsible official? I.L.1 Did the permittee submit this compliance certification complete & on time? I.L.2 Did the permittee also send all compliance certifications to EPA? I.S.1.a Did the permittee properly retain all records required by the permit? SAMPLE COMPLIANCE CERTIFICATION REPORT revised May 17, 2005 Page 2 of 4 Term Description of permit provision Method used to determine compliance status Was compliance during report period continuous, intermittent or undetermined? Other info relevant to compliance status, including references to any and all deviations; reason for “undetermined” status; any excursions or exceedances (for CAM provisions only); etc. I.S.1.b Did the permittee include all applicable information in records of monitoring required by the permit? I.S.2.a Did the permittee submit monitoring reports every six months, or more frequently if specified in Section II, and were all instances of deviation from permit requirements clearly identified in the monitoring reports? I.S.2.c Did the permittee promptly notify the Executive Secretary of all deviations from permit requirements? I.U Did the permittee submit the inventory required by R307-150 in accordance with the requirements of that rule? (This covers R307-150, 155 and 158 if listed in permit) II.B.x Each provision in Section II.B, including each monitoring, record keeping, and reporting requirement SAMPLE COMPLIANCE CERTIFICATION REPORT revised May 17, 2005 Page 3 of 4 Term Description of permit provision Method used to determine compliance status Was compliance during report period continuous or intermittent? Other facts relevant to compliance status, including references to any and all deviations IV.B.2.a Did the permittee operate each affected unit in compliance with a complete Acid Rain permit application or permit? IV.C.1.a Did the permittee hold the required allowances as of the allowance transfer deadline? IV.C.1.b Did the permittee comply with the applicable Acid Rain emissions limitations for sulfur dioxide? IV.C.5 Did the permittee deduct any allowance prior to the calendar year for which it was allocated? IV.D.x Did the permittee comply with the applicable NOx requirements? (Any term under IV.D that contains emission limits must be certified; early election and averaging plan conditions need not be certified.) IV.E.1 Did the permittee comply with the monitoring requirements in 40 CFR 74, 75 and 76? IV.F.1 Did the permittee properly retain all listed documents? IV.F.2 Did the designated representative submit all reports and compliance certifications required under the Acid Rain program? IV.G.1 Did the designated representative submit a proposed offset plan if required? IV.G.2.a Did the permittee pay penalties and interest as required? IV.G.2.b Did the permittee comply with terms of an approved offset plan? SAMPLE COMPLIANCE CERTIFICATION REPORT revised May 17, 2005 Page 4 of 4 Certification In accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on information and belief formed after reasonable inquiry, I certify that the statements and information in this document are true, accurate, and complete. Signature of a Responsible Official for the Source Date Print or type the name and title of Responsible Official