HomeMy WebLinkAboutDERR-2024-006925 WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
PRODUCT PIPING INTEGRITY TESTING
Facility Name: Market Express Owner: Michael Holm
Address: 51 West Main Address: 399 River Road
City, State, Zip: Midway, Utah 84049 City, State, Zip: Midway, Utah 84049
Facility I.D.#: 1100073 Phone #: 801-558-7055
Testing Company: Westech Phone #: 801-266-2545 Date: 5/1/24
This procedure is to test the integrity of product piping. Tests were performed with Petro-Tite line tester.
Tank Number 1 2 3
Product Stored RUL PUL DSL
Piping Run Only Only Only
Piping Type Flex Flex Flex
Test Pressure (PSI) 50 50 50
Test Duration (minutes) 30 30 30
Leak Rate (GPH) 0.002 0.002 0.001
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail
Comments:
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature
PU
L
RU
L
DS
L
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
MECHANICAL AND ELECTRONIC LINE LEAK DETECTOR PERFORMANCE TESTS
Facility Name: Market Express Owner: Michael Holm
Address: 51 West Main Address: 399 River Road
City, State, Zip: Midway, Utah 84049 City, State, Zip: Midway, Utah 84049
Facility I.D.#: 1100073 Phone #: 801-558-7055
Testing Company: Westech Phone #: 801-266-2545 Date: 5/1/24
This data sheet can be used to test the mechanical line leak detector (MLLD) and electronic line leak detector (ELLD) with submersible turbine
pump (STP) systems. See PEI/RP 1200 Sections 9.1 and 9.2 for test procedures.
Line Number 1 2 3
Product Stored RUL PUL DSL
Leak Detector Manufacturer Red Jacket Red Jacket Red Jacket
Leak Detector Model FX1V FX1V FX1DV
Type Of leak Detector
☒MLLD
☐ELLD
☒MLLD
☐ELLD
☒MLLD
☐ELLD
☐MLLD
☐ELLD
MLLD (ALL PRESSURE MEASURMENTS ARE MADE IN PSIG)
STP full operating pressure 29 29 30
Check valve holding pressure 15 14 15
Line resiliency (ml) (line bleedback volume as measured
from check valve holding pressure to 0 psig) 95 75 65
Step through time in seconds (time the MLLD hesitates at
metering pressure before going to full operating pressure as
measured from 0 sig with no leak induced on the line)
1 1 1
Metering pressure (STP pressure when simulated leak rate 3
gph at 10 psig) 10 10 11
Opening time in seconds (the time the MLLD opens to allow
full pressure after simulated leak is stopped) 1 1 1
Does the STP pressure remain at or below the metering
pressure for at least 60 seconds when the simulated leak is
induced? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No
Does the leak detector reset (trip) when the line pressure is
bled off to zero psig? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No
Does STP properly clycle on/off under normal fuel system
operating conditions? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No
A "No" answer to any of the above questions indicates that the MLLD fails the test.
ELLD (ALL PRESSURE MEASURMENTS ARE MADE IN PSIG)
STP full operating pressure
How many test cycles are observed before alarm/shutdown
occurs?
Does the simulated leak cause on alarm? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
A "No" answer to the above question indicates that the ELLD fails the test.
Does the simulated leak cause an STP shutdown? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail
Comments:
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
AUTOMATIC TANK GAUGE OPERATION INSPECTION
Facility Name: Market Express Owner: Michael Holm
Address: 51 West Main Address: 399 River Road
City, State, Zip: Midway, Utah 84049 City, State, Zip: Midway, Utah 84049
Facility I.D.#: 1100073 Phone #: 801-558-7055
Testing Company: Westech Phone #: 801-266-2545 Date: 5/1/24
This procedure is to determine whether the automatic tank gauge (ATG) is operating properly. See PEI/RP1200 Section 8.2 for the inspection
procedure. This procedure is applicable to tank monitor stems the touch the bottom of the tank when in place.
Tank Number 1 2 3
Product Stored RUL PUL DSL
ATG Brand and Model TLS-300 TLS-300 TLS-300
1. Tank Volume, gallons 11,595 11,595 5,897
2. Tank Diameter, inches 92 92 92
3. After removing the ATG from the tank, it has been
inspected and any damaged or missing parts replaced? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No
4. Float moves freely on the stem without binding? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No
5. Fuel float level agree with the value programmed
into the console? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No
6. Water float level agree with the value programmed
into the console? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No
7. Inch level from the bottom of the stem when 90%
alarm is triggered? 76.875 76.875 76.375
8. Inch level at which the overfill alarm activates
corresponds with the value programmed in the
gauge?
☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No
9. Inch level from the bottom when the water float
first triggers an alarm? 1.5 1.5 1.5
10. Inch level at which the water float alarm activates
corresponds with the value programmed in the
gauge?
☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No
If any answers in Lines 3, 4, 5, or 6 are "No" the system has failed the test.
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail
Comments: Battery OK
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature