HomeMy WebLinkAboutDDW-2024-007514System Name:
System Number:
Address:
City, State, Zip:
20
Name:
Title:
Address:
City, State, Zip:
Phone No.:
E-mail Address:
Name:
Company:
Address:
City, State, Zip:
Phone No.:
E-mail Address:
Name:
Company:
Address:
City, State, Zip:
E-mail Address:
Name:
7/1/2024Aqua Engineering Bid Opening:
https://deq.utah.gov/drinking-water/plan-review-program-tools
Checklists for use in preparing plans for review by DDW are available at:
Aqua Engineering in conjuction with Mountain Green Subdivision Water Association
and Highlands Water Company have designed an Interconnect Vault and associated
pipeline to connect Highlands Water Company water system to the Mountain Green
Subdivision Water Association water system. The Interconnect will include the
installation of a Precast Concrete Manhole that will have a Pressure Reducing Valve
to control pressures entering the Mountain Green Water System. This project will
also include abandoning the existing tank that is currently serving as the water
source for Mountain Green Subdivision Water Association. The Interconnect piping
will connect to an existing fire hydrant at the cul-de-sac end of Riverview Circle. The
location of the project is approximately at 41°08'41.1"N 111°48'58.8"W.
Mountain Green, UT, 84050
Darin Hawkes
Douglas Perkins
5801 West Poll Drive
Water System Designated Person
PROJECT NOTIFICATION FORM (PNF)
Utah Division of Drinking Water (DDW)
Present No. of ERCs system is obligated to serve:
No. of ERCs this project will add:
60
0
Population Served:
6. Project Description (provide a unique facility name, location, and sufficient
details to specifically identify the project):
DDW - Plan Review File No.:
DDW - Date Received:
Please provide the following information for a proposed Public Drinking Water Project.
For a new public water system (PWS) also complete a New PWS Application Form (see DDW website).
Req'd flow (gpm):1500
Loan #
City, State, Zip:4565 West Old Highway Road, Morgan, UT 84050
E-mail Address:chief131@mgfpd.org
2. Name and Address for Official Correspondence (Mayor, Public Works
Director, Administrative Contact, etc.)
Submit (preferably by email) the completed PNF with plans and specifications to DDW.
Email completed form & documents to ddwpnf@utah.gov or mail to: Utah Division of Drinking Water
P.O. Box 144830, Salt Lake City, Utah 84114-4830, (801) 536-4200
Mountain Green, UT, 84050
5801 West Poll Drive
1. Public Water System (PWS) Information
Mountain Green Subdivision Water Association
15015
6/1/2024
[ERC = Equivalent Residential Connection; SRF = State Revolving Fund]
701-260-8889
9/15/2024
3. Professional Engineer (PE) Responsible for System Oversight (if
applicable)
4. Professional Engineer (PE) Responsible for Design of this Project
Begin Construction:
Complete Construction:
7. Anticipated Construction Schedule (if applicable):
Advertise for Bids:
5. Local Fire Code Official & Required Fire Flow for Proposed Project
Phone No.:
8b. If YES, specify rule reference below [R309-511-4(1)(a)(i)-(iv)]:
Phone No.:801-876-2277
Brian Brendel, Fire Chief
9. State or Federal Agency Funding:
8a. Is the project exempt from the Hydraulic Model Report requirement? [see
R309-511-4(1)(a)(i) through (iv)]
Duration (hrs):2
7/15/2024
darin.hawkes@aquaeng.com
R309-511-4(1)(a)(i)
Bountiful, UT, 84010
533 West 2600 South Suite 275
801-299-1327
Yes No
Drinking Water Board (SRF or FSRF)
Community Impact Board (CIB)
None
Other (Specify)
DDW- Eng-0004 Page 1 of 1 3/22/2018