Loading...
HomeMy WebLinkAboutDDW-2024-007514System Name: System Number: Address: City, State, Zip: 20 Name: Title: Address: City, State, Zip: Phone No.: E-mail Address: Name: Company: Address: City, State, Zip: Phone No.: E-mail Address: Name: Company: Address: City, State, Zip: E-mail Address: Name: 7/1/2024Aqua Engineering Bid Opening: https://deq.utah.gov/drinking-water/plan-review-program-tools Checklists for use in preparing plans for review by DDW are available at: Aqua Engineering in conjuction with Mountain Green Subdivision Water Association and Highlands Water Company have designed an Interconnect Vault and associated pipeline to connect Highlands Water Company water system to the Mountain Green Subdivision Water Association water system. The Interconnect will include the installation of a Precast Concrete Manhole that will have a Pressure Reducing Valve to control pressures entering the Mountain Green Water System. This project will also include abandoning the existing tank that is currently serving as the water source for Mountain Green Subdivision Water Association. The Interconnect piping will connect to an existing fire hydrant at the cul-de-sac end of Riverview Circle. The location of the project is approximately at 41°08'41.1"N 111°48'58.8"W. Mountain Green, UT, 84050 Darin Hawkes Douglas Perkins 5801 West Poll Drive Water System Designated Person PROJECT NOTIFICATION FORM (PNF) Utah Division of Drinking Water (DDW) Present No. of ERCs system is obligated to serve: No. of ERCs this project will add: 60 0 Population Served: 6. Project Description (provide a unique facility name, location, and sufficient details to specifically identify the project): DDW - Plan Review File No.: DDW - Date Received: Please provide the following information for a proposed Public Drinking Water Project. For a new public water system (PWS) also complete a New PWS Application Form (see DDW website). Req'd flow (gpm):1500 Loan # City, State, Zip:4565 West Old Highway Road, Morgan, UT 84050 E-mail Address:chief131@mgfpd.org 2. Name and Address for Official Correspondence (Mayor, Public Works Director, Administrative Contact, etc.) Submit (preferably by email) the completed PNF with plans and specifications to DDW. Email completed form & documents to ddwpnf@utah.gov or mail to: Utah Division of Drinking Water P.O. Box 144830, Salt Lake City, Utah 84114-4830, (801) 536-4200 Mountain Green, UT, 84050 5801 West Poll Drive 1. Public Water System (PWS) Information Mountain Green Subdivision Water Association 15015 6/1/2024 [ERC = Equivalent Residential Connection; SRF = State Revolving Fund] 701-260-8889 9/15/2024 3. Professional Engineer (PE) Responsible for System Oversight (if applicable) 4. Professional Engineer (PE) Responsible for Design of this Project Begin Construction: Complete Construction: 7. Anticipated Construction Schedule (if applicable): Advertise for Bids: 5. Local Fire Code Official & Required Fire Flow for Proposed Project Phone No.: 8b. If YES, specify rule reference below [R309-511-4(1)(a)(i)-(iv)]: Phone No.:801-876-2277 Brian Brendel, Fire Chief 9. State or Federal Agency Funding: 8a. Is the project exempt from the Hydraulic Model Report requirement? [see R309-511-4(1)(a)(i) through (iv)] Duration (hrs):2 7/15/2024 darin.hawkes@aquaeng.com R309-511-4(1)(a)(i) Bountiful, UT, 84010 533 West 2600 South Suite 275 801-299-1327 Yes No Drinking Water Board (SRF or FSRF) Community Impact Board (CIB) None Other (Specify) DDW- Eng-0004 Page 1 of 1 3/22/2018