Mr. Bryoe Bird, Director
Utah Department of Envircnmental Quality
Dlvlslon of Air Quality
195 North 1950 West
P.O. Box 144820
Salt Lake City, UT 84.11ffi20
UTAH DEPAHTMENT OF
E}WIRONMENTAL OUALITY
DEC - 5 2023
DIVISION OF AIR QUALITY
RE: Outage Notlflcatlon, Unlt 2, Hundngton Powcr PIant flltle V Permlt #1501001005)
Dear Mr. Bird:
As requlred by ll.B.1.f.3c of the Huntington Plant TiUe V operating permit, the purpooe of this letter is to
inform yott of a boller unit outage at the PacifiCorp, Huntington Porer Plant. Boiler Unit 2 was taken
offline for a malntenanoe outage. The unit load was lowered in anticipation of the planned overhaul at
11:58 PM on Saturday, November 19u1. The planned maintenance work was performed, and the
completion of startup and stable operatlon uras achieved at 11:51 PM on Saturday, Norcmber 25s.
I am authorized to make this submission on behalf of the o,vners and operators of the affected souroe or
afiected unlts for which the submission is made. t certifo under penalty of taw that I have personally
Examlned, and am famlliar with, the statements and information submi$ed in this document and al! its
attachments. Based on my inqulry of those individuals wi0r primary responsibility for obtaining the
inbrmation, I certlff that the statements and information are to the best of my knor{edge and believe
bue, accurate, and complete. I am a\irare that there are slgnlflcant penalties for submitting false
stratements and information, or omitting statemenb and informatlon, lncludlng the possibility of fine or
imprisonment.
For further information on this outage contact Terry Guthrls, Hunter and Huntington Plant Environmental
Manager, at 435€874334.
Laren Huntsman
Managing Director Huntlngton Plant
ResponsiHe Ofiicial
REVIEWED
Initials JBR Date 1/8/2023
Comp Status Meets
File # 10238 Blue 2
no excursions
Outage Reporg Hundngton Ptrrt Boller Untt#2 Screcn
Replecement Datc: llngn023
Datc Ilme Dcrcrbflon
ty19l2v23 l1:58 PM Utdt 2 load lowcrcd ia mticipation of thcplaoocd ortBge.Shutdowl
bcgtrr
1U20t2023 12:04 AM BFO Dowl-dme
bqlnr
1v2012023 l2:O4 AIvl Stoeeed Fodrciag electricity
LU2212023 3:31PM BFI Start-up beglnr
tu242023 5:45 PM BFO Down{me
contlnucr
Lu2312023 12:08 AM BFI Shrtup
condnuer
1U23D023 4:34 AIvl Sartcd prodring eloctricity
1u2512023 7:43 AJttl <109o heatiryrt ftom fireloilBFO
ttnsn023 7244 AJ0tl I sor6l mills in scrrrioe
11t25t2023 11:51PM Stablc operation (<lOplo hcat iryut firom oil, 3 ooal mills in serrrice, baghouse tc,mps
>200 dcgr€cs)Strrt-up cndr
BFO - BoilerFir€ Out
BFI - BoilerFire In
All times shown are inMountain Sandard Time.