HomeMy WebLinkAboutDDW-2024-007463
May 6, 2024
Douglas Pincock
Bear Lake Water Company
PO Box 12
Garden City, Utah 84028
Subject:Operating Permit, 8-inch Diameter Valley View Water Main Replacement; Bear Lake
Water Company, System #17010, File #12960
Dear Douglas Pincock:The Division of Drinking Water (the Division) became aware of the completion of this project on April 25, 2024. The Division issued Plan Approval for this project
on April 12, 2022.
Our understanding of the project was the upsizing of the main line located in Valley View Drive
from 6 to 8 inches in diameter. The existing water line was replaced with 2,300 feet of HDPE pipe with six new fire hydrants and two new air vac vents.
We have determined that all conditions for operating permit issuance have been met. On this basis, an Operating Permit for an 8-inch Diameter Valley View Water Main Replacementis hereby
issued as constituted by this letter. You may now place 8-inch Diameter Valley View Water Main Replacement in service in your water system.
Please maintain a copy of this letter with your permanent records for future reference.
If you have any questions regarding this Operating Permit, please contact Cameron Draney, P.E., of this office, at (385) 271-7039, or Michael Newberry, Permitting and Engineering Manager,
at (385) 515-1464.
Sincerely,
Russell Seeley, P.E.
Assistant Director
CLD/mrn/mdbcc:Ben Harker, Bear River Health Department, bharker@brhd.orgDouglas Pincock, Bear Lake Water Company, dgpincock@gmail.comCameron Draney, P.E., Division of Drinking Water,
cdraney@utah.gov
CDraney 17010 12960 OP Valley View Dr. Water Line Replacement