Loading...
HomeMy WebLinkAboutDAQ-2024-0043091 DAQC-1315-23 Site ID 10237 (B4) MEMORANDUM TO: STACK TEST FILE – PAFICIFICORP ENERGY – Hunter Power Plant THROUGH: Harold Burge, Major Source Compliance Section Manager FROM: Paul Morris, Environmental Scientist DATE: December 5, 2023 SUBJECT: Location: Hunter Power Plant, Castle Dale, Carbon County, Utah Contact: Tom Wiscomb: 435-748-6519 Tester: Montrose Air Quality Services, LLC: 303-495-3936 Sources: Units 1, 2, and 3 FRS ID #: UT0000004901500101 Permit# Title V operating permit 1500101004 dated September 4, 2020, revised November 19, 2021 Action Code: TR Subject: Review of Stack Test Reports Dated December 4, 2023 On December 4, 2023, the Utah Division of Air Quality (DAQ) received a stack test report for the PacifiCorp Hunter Power Plant Units 1, 2, and 3 located in Castle Dale, Utah. Testing was performed from October 31, thru November 2, 2023, to determine compliance with Permit Conditions II.B.2.a and II.B.3.a. The DAQ calculated result is: Source Test Date RM/Pollutant DAQ Result Test Result Limit Unit 1 11/02/2023 RM 5/PM 0.005 lb/mmBtu 0.005 lb/mmBtu 0.015 lb/mmBtu Unit 2 10/31/2023 RM 5/PM 0.008 lb/mmBtu 0.008 lb/mmBtu 0.015 lb/mmBtu Unit 3 11/01/2023 RM 5/PM 0.007 lb/mmBtu 0.006 lb/mmBtu 0.020 lb/mmBtu DEVIATIONS: No deviations were reported. CONCLUSION: Unit 1, 2, and 3 should be considered to have been in compliance with the applicable PM emission limit at the time of testing. RECOMMENDATION: No further action is required. HPV: No ATTACHMENTS: PacifiCorp Hunter Plant test report dated December 5, 2023, and DAQ generated excel spreadsheets 6 , 3 Source Test Report for 2023 Compliance Testing Units 1, 2 and 3 PacifiCorp Hunter Power Plant Castle Dale, Utah Prepared For: PacifiCorp 1407 W North Temple, Suite 210 Salt Lake City, Utah 84116 Prepared By: Montrose Air Quality Services, LLC 990 West 43rd Avenue Denver, Colorado 80211 For Submission To: Utah Division of Air Quality 195 North 1950 West Salt Lake City, UT 84116 Document Number: GP043AS-023437-RT-1481 Test Dates: October 31 - November 2, 2023 Submittal Date: December 2, 2023 PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Review and Certification All work, calculations, and other activities and tasks performed and presented in this document were carried out by me or under my direction and supervision. I hereby certify that, to the best of my knowledge, Montrose operated in conformance with the requirements of the Montrose Quality Management System and ASTM D7036-04 during this test project. Signature: Date: November 30, 2023 Name: Craig Kormylo Title: Project Manager I have reviewed, technically and editorially, details, calculations, results, conclusions, and other appropriate written materials contained herein. I hereby certify that, to the best of my knowledge, the presented material is authentic, accurate, and conforms to the requirements of the Montrose Quality Management System and ASTM D7036-04. Signature: Date: November 30, 2023 Name: Matthew Parks Title: QA/QC Specialist PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Table of Contents Section Page 1.0 Introduction ...................................................................................................... 5 1.1 Summary of Test Program ........................................................................... 5 1.2 Key Personnel ............................................................................................ 6 2.0 Plant and Sampling Location Descriptions .............................................................. 8 2.1 Process Description, Operation, and Control Equipment ................................... 8 2.2 Flue Gas Sampling Location ......................................................................... 8 2.3 Operating Conditions and Process Data .......................................................... 9 3.0 Sampling and Analytical Procedures ...................................................................... 9 3.1 Test Methods ............................................................................................. 9 3.1.1 EPA Method 3A .................................................................................. 9 3.1.2 EPA Methods 5 and 202 ..................................................................... 11 3.2 Process Test Methods ................................................................................. 12 4.0 Test Discussion and Results ................................................................................ 13 4.1 Field Test Deviations and Exceptions ............................................................ 13 4.2 Presentation of Results ............................................................................... 13 5.0 Internal QA/QC Activities ................................................................................... 13 5.1 QA/QC Audits ........................................................................................... 13 5.2 QA/QC Discussion ...................................................................................... 13 5.3 Quality Statement ..................................................................................... 13 List of Appendices A Field Data and Calculations ............................................................................... 15 A.1 Sampling Locations ................................................................................... 16 A.2 Particulate Matter Results and Data Sheets .................................................. 18 A.2.1 Unit 1 ..................................................................................................... 19 A.2.2 Unit 2 ..................................................................................................... 25 A.2.3 Unit 3 ..................................................................................................... 31 A.3 Example Calculations ................................................................................ 37 B Facility Process Data ........................................................................................ 41 B.1 Unit 1 .............................................................................................................. 42 B.2 Unit 2 .............................................................................................................. 55 B.3 Unit 3 .............................................................................................................. 68 C Laboratory Analysis Data .................................................................................. 81 C.1 Gravimetric Analyses ................................................................................ 82 PacifiCorp 2023 Compliance Test Report, Huntington Power Plant D Quality Assurance/Quality Control ...................................................................... 93 D.1 Units and Abbreviations ............................................................................. .94 D.2 Manual Test Method QA/QC Data ................................................................ .102 D.3 Instrumental Test Method QA/QC Data ........................................................ .108 D.4 Accreditation Information/Certifications ....................................................... .112 List of Tables Table 1-1 Summary of Test Program .......................................................................... 5 Table 1-2 Summary of Average Compliance Results ..................................................... 6 Table 1-3 Test Personnel and Observers ..................................................................... 7 Table 2-1 Sampling Locations ................................................................................... 8 List of Figures Figure 3-1 EPA Method 3 Sampling Train .................................................................... 10 Figure 3-2 EPA Methods 5 and 202 Sampling Train ...................................................... 12 PacifiCorp 2023 Compliance Test Report, Huntington Power Plant 1.0 Introduction 1.1 Summary of Test Program PacifiCorp contracted Montrose Air Quality Services, LLC (Montrose) to perform a compliance test program at Hunter Power Plant located near Castle Dale, Utah. The tests are conducted to determine compliance with the applicable UDEQ permit. The specific objectives were to: •Perform annual Particulate Matter (PM) emissions testing on the exhaust stacks of Unit 1, Unit 2 and Unit 3 •Perform diagnostic Condensable Particulate Matter (CPM) emissions testing on the exhaust stacks of Unit 1, Unit 2 and Unit 3 •Conduct the test program with a focus on safety. Montrose performed the tests to measure the emission parameters listed in Table 1-1. Table 1-1 Summary of Test Program Test Date Unit ID/ Source Name Activity/Parameters Test Methods No. of Runs Duration (Minutes) 11/2/2023 Unit 1 PM, CPM EPA M5, 202 3 120 10/31/2023 Unit 2 PM, CPM EPA M5, 202 3 120 11/1/2023 Unit 3 PM, CPM EPA M5, 202 3 120 To simplify this report, a list of Units and Abbreviations is included in Appendix D.1. Throughout this report, chemical nomenclature, acronyms, and reporting units are not defined. Please refer to the list for specific details. This report presents the test results and supporting data, descriptions of the testing procedures, descriptions of the facility and sampling locations, and a summary of the quality assurance procedures used by Montrose. The average emission test results are summarized and compared to their respective permit limits in Table 1-2. Detailed results for individual test runs and all supporting data can be found in the appendices. The testing was conducted by the Montrose personnel listed in Table 1-3. The tests were conducted according to the test plan (protocol) that was submitted to and approved by UDEQ. PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Table 1-2 Summary of Average Compliance Results October 30 – November 2, 2023 Unit ID/ Source Parameter/Units Average Result Emission Limit Regulatory Reference Particulate Matter (PM) Unit 1 lb/mmBtu 0.005 0.030 40 CFR Part 63, Subpart UUUUU lb/mmBtu 0.005 0.015 40 CFR Part 60, Subpart D Unit 2 lb/mmBtu 0.008 0.030 40 CFR Part 63, Subpart UUUUU lb/mmBtu 0.008 0.015 40 CFR Part 60, Subpart D Unit 3 lb/mmBtu 0.006 0.030 40 CFR Part 63, Subpart UUUUU lb/mmBtu 0.006 0.02 40 CFR Part 60, Subpart Da 1.2 Key Personnel A list of project participants is included below: Facility Information Source Location: PacifiCorp Hunter Power Plant State Highway 10 Castle Dale, Utah 84513 Project Contact: Tom Wiscomb Role: Sr. Environmental Advisor Company: PacifiCorp Telephone: (801) 220-2373 Email: Tom.Wiscomb@pacificorp.com Jay Howard Senior Environmental Analyst PacifiCorp (435)748-6519 Jay.Howard@PacifiCorp.com Agency Information Regulatory Agency: Utah Department of Air Quality Agency Contact: Rob Leishman Telephone: (801) 536-4438 Email: RLeishman@utah.gov Testing Company Information Testing Firm: Montrose Air Quality Services, LLC Contact: Craig Kormylo Title: District Manager Telephone: (303) 495-3936 Email: CKormylo@montrose-env.com PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Test personnel and observers are summarized in Table 1-3. Table 1-3 Test Personnel and Observers Name Affiliation Role/Responsibility Chris Wall Montrose Project Manager Qualified Individual (QI) Trailer operator Allon Kienitz Montrose Sample train operator Matthew Parks Montrose Calculations and report preparation Tom Wiscomb PacifiCorp Test Coordinator Jay Howard PacifiCorp Plant Representative PacifiCorp 2023 Compliance Test Report, Huntington Power Plant 2.0 Plant and Sampling Location Descriptions 2.1 Process Description, Operation, and Control Equipment The Hunter Plant comprises three pulverized coal-fired boilers. Hunter Unit #1 is a dry- bottom, tangentially-fired boiler rated at 480 gross megawatts (GMW) and equipped with a fabric-filter baghouse for particulate matter (PM) control and a flue gas desulfurization (FGD) scrubber for sulfur dioxide (SO2) control. Hunter Unit #2 is a dry-bottom, tangentially-fired boiler rated at 480 GMW and equipped with low-NOx burners and overfire air for nitrogen oxides (NOx) control, a fabric filter baghouse for PM control and an FGD scrubber for SO2 control. Hunter Unit #3 is a dry-bottom, wall-fired boiler rated at 495 GMW and equipped with low-NOx burners and overfire air for NOx control, a fabric filter baghouse for PM control and an FGD scrubber for SO2 control. In accordance with Conditions II.B.2 and II.B.3 of Utah Department of Environmental Quality (UDEQ) Operating Permit 1500101004, the Unit #1, Unit #2 and Unit #3 exhaust stacks are equipped with Continuous Emission Monitoring Systems (CEMS) to quantify carbon dioxide (CO2), SO2 and NOx emissions. Units 1, 2 and 3 are equipped with CEMS to quantify carbon monoxide (CO) emissions for comparison to UDEQ permit limits. 2.2 Flue Gas Sampling Location Information regarding the sampling location is presented in Table 2-1. Table 2-1 Sampling Locations Sampling Location Stack Inside Diameter (in.) Distance from Nearest Disturbance Number of Traverse Points Downstream EPA “B” (in./dia.) Upstream EPA “A” (in./dia.) Unit 1 322.6 3228 / 10.0 2388 / 7.4 Isokinetic: 12 (3/port) Unit 2 340.7 3240 / 9.5 2484 / 7.3 Isokinetic: 12 (3/port) Unit 3 307.4 3228 / 10.5 2616 / 8.5 Isokinetic: 12 (3/port) Sample location(s) were verified in the field to conform to EPA Method 1. See Appendix A.1 for more information. PacifiCorp 2023 Compliance Test Report, Huntington Power Plant 2.3 Operating Conditions and Process Data Emission tests were performed while the source/units and air pollution control devices were operating at the conditions required by the permit. The unit(s) were tested when operating normally. Plant personnel were responsible for establishing the test conditions and collecting all applicable unit-operating data. The process data that was provided is presented in Appendix B. Data collected includes the following parameters: •Unit Load (MW) •Relevant CEMS Parameters 3.0 Sampling and Analytical Procedures 3.1 Test Methods The test methods for this test program have been presented in Table 1-1. Additional information regarding specific applications or modifications to standard procedures is presented below. 3.1.1 EPA Method 3A, Determination of Oxygen and Carbon Dioxide in Emissions from Stationary Sources (Instrumental Analyzer Procedure) EPA Method 3A is an instrumental test method used to measure the concentration of O2 and CO2 in stack gas. The effluent gas is continuously or intermittently sampled and conveyed to analyzers that measure the concentrations of O2 and CO2. The performance requirements of the method must be met to validate data. Pertinent information regarding the performance of the method is presented below: •Method Options: o Single-point sampling is performed if O2 and CO2 measurements are for molecular weight calculations only •Method Exceptions: o Samples are collected in a Tedlar bag and analyzed on-site. The typical sampling system is detailed in Figure 3-1. PacifiCorp 2023 Compliance Test Report, Huntington Power Plant FIGURE 3-1 US EPA METHOD 3 (TEDLAR BAG) SAMPLING TRAIN TEDLAR BAG PROBE FILTER (GLASS WOOL) FLEXIBLE TUBING SQUEEZE BULB PacifiCorp 2023 Compliance Test Report, Huntington Power Plant 3.1.2 EPA Methods 5 and 202 Determination of Particulate Matter from Stationary Sources and Dry Impinger Method for Determining Condensable Particulate Emissions from Stationary Sources EPA Methods 5 and 202 are manual, isokinetic methods used to measure FPM and CPM emissions. The methods are performed in conjunction with EPA Methods 1 through 4. The stack gas is sampled through a nozzle, probe, heated filter, unheated CPM filter, condenser, and impinger train. FPM is collected from the probe and heater filter. CPM is collected from the unheated CPM filter and the impinger train. The samples are analyzed gravimetrically. The sum of FPM and CPM represents TPM. The FPM, CPM, and TPM results are reported in emission concentration and emission rate units. Pertinent information regarding the performance of the method is presented below: o Condensed water is measured gravimetrically o The post-test nitrogen purge is performed by passing nitrogen through the train under pressure o To simplify shipping arrangements to remote locations, stainless steel probe liners and nozzles are used. After each run, the nozzle and probe liner are brushed and washed a total of six times with reagent-grade acetone to assure complete recovery of all particulate matter. The brush is given a final rinse with acetone and the nozzle and probe liner are given a final rinse with acetone and all rinsate is collected into the appropriate sample container The typical sampling system is detailed in Figure 3-2. PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Figure 3-2 EPA Methods 5 and 202 Sampling Train 3.2 Process Test Methods The test plan did not require that process samples be collected during this test program; therefore, no process sample data are presented in this test report. PacifiCorp 2023 Compliance Test Report, Huntington Power Plant 4.0 Test Discussion and Results 4.1 Field Test Deviations and Exceptions No field deviations or exceptions from the test plan or test methods were identified by the Project Manager. 4.2 Presentation of Results The average results are compared to the permit limits in Table 1-2. Emissions are reported in units consistent with those in the applicable regulations. Additional information is included in the appendices as presented in the Table of Contents. 5.0 Internal QA/QC Activities 5.1 QA/QC Audits The meter box and sampling trains used during sampling performed within the requirements of their respective methods. All post-test leak checks, minimum metered volumes, minimum sample durations, and percent isokinetics met the applicable QA/QC criteria, except where noted in Section 5.2. EPA Method 5 analytical QA/QC results are included in the laboratory report. The method QA/QC criteria were met, except if noted in Section 5.2. An EPA Method 5 reagent blank was analyzed. The maximum allowable amount that can be subtracted is 0.001% of the weight of the acetone used. The blank did not exceed the maximum residue allowed, except where noted in Section 5.2. EPA Method 202 analytical QA/QC results are included in the laboratory report. The method QA/QC criteria were met, except where noted in Section 5.2. An EPA Method 202 Field Train Recovery Blank (FTRB) was performed for each source category. The maximum allowable amount that can be subtracted is 0.002 g (2.0 mg). 5.2 QA/QC Discussion All QA/QC criteria were met during this test program. 5.3 Quality Statement Montrose is qualified to conduct this test program and has established a quality management system that led to accreditation with ASTM Standard D7036-04 (Standard Practice for Competence of Air Emission Testing Bodies). Montrose participates in annual functional assessments for conformance with D7036-04 which are conducted by the American Association for Laboratory Accreditation (A2LA). All testing performed by Montrose is supervised on site by at least one Qualified Individual (QI) as defined in D7036-04 Section 8.3.2. Data quality objectives for estimating measurement uncertainty within the documented limits in the test methods are met by using approved test protocols for each PacifiCorp 2023 Compliance Test Report, Huntington Power Plant project as defined in D7036-04 Sections 7.2.1 and 12.10. Additional quality assurance information is included in the report appendices. The content of this report is modeled after the EPA Emission Measurement Center Guideline Document (GD-043). PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix A Field Data and Calculations PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix A.1 Sampling Locations PacifiCorp 2023 Compliance Test Report, Huntington Power Plant PacifiCorp Hunter Power Plant Sampling Locations Particulate Matter Sampling Points Unit 1 2 3 Diameter (D) 322.6” 340.7” 307.4” Upstream Distance (A) 198.9’ 207.3’ 217.7’ Downstream Distance (B) 268.8’ 269.7’ 268.9’ Sample Point Distances from Stack Wall Traverse Point 1 14.1” 14.8” 13.4” Traverse Point 2 47.2” 49.9” 45.0” Traverse Point 3 95.4” 100.8” 91.1” 1 5 2 1 2 3 3 1 2 3 3 2 1 Stack Cross Section (A-A) D A B A A PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix A.2 Particulate Matter Results and Data Sheets PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix A.2 .1 Unit 1 Run # 1 2 3 Start Time 7:34 10:01 12:37 Stop Time 9:44 12:10 14:46 Ѳ Sample Time (min.)120 120 120 EPA Method 2 Data 1 2 3 Average Inputs Ds Stack Diameter (inches)322.6 322.6 322.6 322.6 Pbar Barometric Pressure ("Hg)24.6 24.6 24.6 24.6 Pg Stack Static Pressure ("H2O)‐1.4 ‐1.4 ‐1.4 ‐1.4 Cp Pitot Tube Coefficient (unitless)0.84 0.84 0.84 0.84 √∆pavg Avg. Velocity Head of Stack Gas √("H2O)0.7185 0.7214 0.7196 0.7198 Ts Stack Gas Temperature (°F)118.2 118.7 117.2 118 Calculations A Stack Area (ft2)567.618 567.618 567.618 567.618 Pg Stack Static Pressure ("Hg)‐0.10 ‐0.10 ‐0.10 ‐0.10 Md Stack Gas Molecular Weight, dry basis (lb/lb‐mole)30.31 30.32 30.31 30.31 Ms Stack Gas Molecular Weight, wet basis (lb/lb‐mole)28.92 28.92 28.87 28.90 Ps Absolute Stack Pressure ("Hg)24.50 24.50 24.50 24.50 Ts(abs)Absolute Stack Gas Temperature (°R )578.2 578.7 577.2 578 Vs Stack Gas Velocity (ft/sec)46.6 46.8 46.7 46.7 Q Stack Gas Dry Volumetric Flow Rate (dscf/hr)63,170,352 63,348,570 63,082,897 63,200,606 Q Stack Gas Dry Volumetric Flow Rate (dscf/min)1,052,839 1,055,809 1,051,382 1,053,343 Diluent Data 1 2 3 Average O2 (%vd)6.6 6.5 6.5 6.5 CO2 (%vd)12.8 12.9 12.8 12.8 EPA Method 4 Data 1 2 3 Average Inputs Vlc Volume of Water Condensed (mL)243.3 245.8 257.9 249.0 Vm Volume of Stack Gas Collected (dcf)111.594 113.309 113.108 112.670 Y Meter Calibration Factor (unitless)0.9935 0.9935 0.9935 0.9935 ∆H Pressure Differential Across Orifice ("H2O)2.7 2.8 2.8 2.8 Tm Temperature at Gas Meter (°F)79.3 85.7 77.5 81 Calculations Pm Absolute Pressure at Gas Meter ("Hg) 24.80 24.81 24.81 24.80 Tm Absolute Temperature at Gas Meter (°R)539.3 545.7 537.5 540.8 Vwc(std)Volume of Water Condensed (scf)11.45 11.57 12.14 11.72 Vm(std)Sample Gas Volume (dscf)89.93 90.27 91.48 90.56 Bws act Observed Stack Gas Moisture Content (%/100)0.113 0.114 0.117 0.115 Bws sat Saturated Moisture Content (%/100)0.134 0.136 0.130 0.133 Bws Moisture Content Used (%/100)0.113 0.114 0.117 0.115 EPA Method 5 Data 1 2 3 Average Inputs Dn Nozzle diameter (")0.270 0.270 0.270 0.270 C1 Mass of PM collected on filter (mg)5.4 5.1 5.9 5.5 C2 Mass of PM collected in rinse (mg)10.5 11.4 7.8 9.9 Wa Mass of acetone blank (mg)0.0 0.0 0.0 0.0 EPA Method 202 Data 1 2 3 Average Inputs Mass of Inorganic Condensible PM (mg)7.5 14.8 15.7 12.7 Mass of Organic Condensible PM (mg)4.5 4.5 3.4 4.1 Total CPM Mass (mg)12.0 19.3 19.1 16.8 Mass of train blank (mg)2.0 2.0 2.0 2.0 Total CPM Mass less Blank (mg)10.0 17.3 17.1 14.8 Emission Calculations Fc Fuel F‐Factor (scf/mmBtu)1800 1800 1800 1800 An Cross‐sectional area of nozzle (ft2)3.98E‐04 3.98E‐04 3.98E‐04 3.98E‐04 I Isokinetic variation (%) 101.7 101.8 103.6 102.3 mn Total Filterable PM mass less blank (mg) 15.9 16.5 13.7 15.4 Cs Filterable Particulate concentration (gr/dscf)0.003 0.003 0.002 0.003 Cs Filterable Particulate concentration (lb/dscf)3.90E‐07 4.03E‐07 3.30E‐07 3.74E‐07 Elb/hr Filterable Particulate mass emission rate (lb/hr)24.6 25.5 20.8 23.7 Boiler Load (MW)450 449 449 449 Filterable Particulate mass emission rate (lb/MW‐hr)0.05 0.06 0.05 0.05 Fc Filterable Particulate mass emission rate (lb/mmBtu)0.005 0.006 0.005 0.005 8760 hrs/yr Filterable Particulate mass emission rate (tons/year)108 112 91 104 Cs Condensible Particulate concentration (gr/dscf)0.002 0.003 0.003 0.003 Cs Condensible Particulate concentration (lb/dscf)2.45E‐07 4.23E‐07 4.12E‐07 3.60E‐07 Elb/hr Condensible Particulate mass emission rate (lb/hr)15.5 26.8 26.0 22.7 Fc Condensible Particulate mass emission rate (lb/mmBtu)0.003 0.006 0.006 0.005 8760 hrs/yr Condensible Particulate mass emission rate (tons/year)68 117 114 100 Total Particulate concentration (gr/dscf)0.004 0.006 0.005 0.005 Total Particulate concentration (lb/dscf)6.35E‐07 8.26E‐07 7.42E‐07 7.34E‐07 Total Particulate mass emission rate (lb/hr)40.1 52.3 46.8 46.4 Boiler Load (MW)450 449 449 449 Total Particulate mass emission rate (lb/MW‐hr)0.09 0.12 0.10 0.10 Total Particulate mass emission rate (lb/mmBtu)0.009 0.012 0.010 0.010 Total Particulate mass emission rate (tons/year)176 229 205 203 PROJ‐023437 PacifiCorp Hunter Unit 1 11/2/2023 PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix A.2 .2 Unit 2 Run # 1 2 3 Start Time 7:52 10:28 13:30 Stop Time 10:03 12:37 15:41 Ѳ Sample Time (min.)120 120 120 EPA Method 2 Data 1 2 3 Average Inputs Ds Stack Diameter (inches)340.7 340.7 340.7 340.7 Pbar Barometric Pressure ("Hg)24.75 24.75 24.75 24.8 Pg Stack Static Pressure ("H2O)‐4.3 ‐4.3 ‐4.3 ‐4.3 Cp Pitot Tube Coefficient (unitless)0.84 0.84 0.84 0.84 √∆pavg Avg. Velocity Head of Stack Gas √("H2O)0.6914 0.6776 0.6894 0.6861 Ts Stack Gas Temperature (°F)116.6 120.3 121 119 Calculations A Stack Area (ft2)633.099 633.099 633.099 633.099 Pg Stack Static Pressure ("Hg)‐0.32 ‐0.32 ‐0.32 ‐0.32 Md Stack Gas Molecular Weight, dry basis (lb/lb‐mole)30.22 30.21 30.22 30.22 Ms Stack Gas Molecular Weight, wet basis (lb/lb‐mole)28.89 28.84 28.81 28.85 Ps Absolute Stack Pressure ("Hg)24.43 24.43 24.43 24.43 Ts(abs)Absolute Stack Gas Temperature (°R )576.6 580.3 581 579 Vs Stack Gas Velocity (ft/sec)44.9 44.2 45.0 44.7 Q Stack Gas Dry Volumetric Flow Rate (dscf/hr)68,182,070 66,421,994 67,260,780 67,288,281 Q Stack Gas Dry Volumetric Flow Rate (dscf/min)1,136,368 1,107,033 1,121,013 1,121,471 Diluent Data 1 2 3 Average O2 (%vd)7.1 7.2 7.2 7.2 CO2 (%vd)12.1 12.0 12.1 12.1 EPA Method 4 Data 1 2 3 Average Inputs Vlc Volume of Water Condensed (mL)223.9 225.5 236.2 228.5 Vm Volume of Stack Gas Collected (dcf)104.055 102.880 104.170 103.702 Y Meter Calibration Factor (unitless)0.9935 0.9935 0.9935 0.9935 ∆H Pressure Differential Across Orifice ("H2O)2.4 2.3 2.4 2.4 Tm Temperature at Gas Meter (°F)64.7 72.4 76.8 71 Calculations Pm Absolute Pressure at Gas Meter ("Hg) 24.93 24.92 24.93 24.92 Tm Absolute Temperature at Gas Meter (°R)524.7 532.4 536.8 531.3 Vwc(std)Volume of Water Condensed (scf)10.54 10.61 11.12 10.75 Vm(std)Sample Gas Volume (dscf)86.63 84.39 84.77 85.27 Bws act Observed Stack Gas Moisture Content (%/100)0.108 0.112 0.116 0.112 Bws sat Saturated Moisture Content (%/100)0.128 0.142 0.145 0.139 Bws Moisture Content Used (%/100)0.108 0.112 0.116 0.112 EPA Method 5 Data 1 2 3 Average Inputs Dn Nozzle diameter (")0.270 0.270 0.270 0.270 C1 Mass of PM collected on filter (mg)4.5 4.4 4.2 4.4 C2 Mass of PM collected in rinse (mg)23.9 12.2 13.3 16.5 Wa Mass of acetone blank (mg)0.0 0.0 0.0 0.0 EPA Method 202 Data 1 2 3 Average Inputs Mass of Inorganic Condensible PM (mg)8.0 7.3 4.6 6.6 Mass of Organic Condensible PM (mg)2.4 2.7 3.7 2.9 Total CPM Mass (mg)10.4 10.0 8.3 9.6 Mass of train blank (mg)2.0 2.0 2.0 2.0 Total CPM Mass less Blank (mg)8.4 8.0 6.3 7.6 Emission Calculations Fc Fuel F‐Factor (scf/mmBtu)1800 1800 1800 1800 An Cross‐sectional area of nozzle (ft2)3.98E‐04 3.98E‐04 3.98E‐04 3.98E‐04 I Isokinetic variation (%) 101.2 101.2 100.4 100.9 mn Total Filterable PM mass less blank (mg) 28.4 16.6 17.5 20.8 Cs Filterable Particulate concentration (gr/dscf)0.005 0.003 0.003 0.004 Cs Filterable Particulate concentration (lb/dscf)7.23E‐07 4.34E‐07 4.55E‐07 5.37E‐07 Elb/hr Filterable Particulate mass emission rate (lb/hr)49.3 28.8 30.6 36.2 Boiler Load (MW)476 476 474 475 Filterable Particulate mass emission rate (lb/MW‐hr)0.10 0.06 0.06 0.08 Fc Filterable Particulate mass emission rate (lb/mmBtu)0.011 0.007 0.007 0.008 8760 hrs/yr Filterable Particulate mass emission rate (tons/year)216 126 134 159 Cs Condensible Particulate concentration (gr/dscf)0.001 0.001 0.001 0.001 Cs Condensible Particulate concentration (lb/dscf)2.14E‐07 2.09E‐07 1.64E‐07 1.96E‐07 Elb/hr Condensible Particulate mass emission rate (lb/hr)14.6 13.9 11.0 13.2 Fc Condensible Particulate mass emission rate (lb/mmBtu)0.003 0.003 0.002 0.003 8760 hrs/yr Condensible Particulate mass emission rate (tons/year)64 61 48 58 Total Particulate concentration (gr/dscf)0.007 0.004 0.004 0.005 Total Particulate concentration (lb/dscf)9.36E‐07 6.43E‐07 6.19E‐07 7.33E‐07 Total Particulate mass emission rate (lb/hr)63.9 42.7 41.6 49.4 Boiler Load (MW)476 476 474 475 Total Particulate mass emission rate (lb/MW‐hr)0.13 0.09 0.09 0.10 Total Particulate mass emission rate (lb/mmBtu)0.014 0.010 0.009 0.011 Total Particulate mass emission rate (tons/year)280 187 182 216 PROJ‐023437 PacifiCorp Hunter Unit 2 10/31/2023 PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix A.2 .3 Unit 3 Run # 1 2 3 Start Time 7:04 9:43 12:50 Stop Time 9:13 11:51 14:59 Ѳ Sample Time (min.)120 120 120 EPA Method 2 Data 1 2 3 Average Inputs Ds Stack Diameter (inches)307.4 307.4 307.4 307.4 Pbar Barometric Pressure ("Hg)24.64 24.64 24.64 24.6 Pg Stack Static Pressure ("H2O)‐6.0 ‐6.0 ‐6.0 ‐6.0 Cp Pitot Tube Coefficient (unitless)0.84 0.84 0.84 0.84 √∆pavg Avg. Velocity Head of Stack Gas √("H2O)0.7202 0.7286 0.7476 0.7321 Ts Stack Gas Temperature (°F)110.9 113 112.75 112 Calculations A Stack Area (ft2)515.389 515.389 515.389 515.389 Pg Stack Static Pressure ("Hg)‐0.44 ‐0.44 ‐0.44 ‐0.44 Md Stack Gas Molecular Weight, dry basis (lb/lb‐mole)30.36 30.39 30.39 30.38 Ms Stack Gas Molecular Weight, wet basis (lb/lb‐mole)29.06 29.05 28.97 29.02 Ps Absolute Stack Pressure ("Hg)24.20 24.20 24.20 24.20 Ts(abs)Absolute Stack Gas Temperature (°R )570.9 573 572.75 572 Vs Stack Gas Velocity (ft/sec)46.6 47.2 48.5 47.5 Q Stack Gas Dry Volumetric Flow Rate (dscf/hr)57,839,986 58,265,907 59,414,304 58,506,732 Q Stack Gas Dry Volumetric Flow Rate (dscf/min)964,000 971,098 990,238 975,112 Diluent Data 1 2 3 Average O2 (%vd)5.9 6.1 6.2 6.1 CO2 (%vd)13.3 13.4 13.4 13.4 EPA Method 4 Data 1 2 3 Average Inputs Vlc Volume of Water Condensed (mL)221.5 228.4 253.0 234.3 Vm Volume of Stack Gas Collected (dcf)108.278 109.845 113.158 110.427 Y Meter Calibration Factor (unitless)0.9826 0.9826 0.9826 0.9826 ∆H Pressure Differential Across Orifice ("H2O)2.3 2.4 2.5 2.4 Tm Temperature at Gas Meter (°F)68 72 71 70 Calculations Pm Absolute Pressure at Gas Meter ("Hg) 24.81 24.82 24.82 24.82 Tm Absolute Temperature at Gas Meter (°R)528 532.1 531.25 530.5 Vwc(std)Volume of Water Condensed (scf)10.42 10.75 11.91 11.03 Vm(std)Sample Gas Volume (dscf)88.18 88.80 91.65 89.54 Bws act Observed Stack Gas Moisture Content (%/100)0.106 0.108 0.115 0.110 Bws sat Saturated Moisture Content (%/100)0.110 0.117 0.116 0.114 Bws Moisture Content Used (%/100)0.106 0.108 0.115 0.110 EPA Method 5 Data 1 2 3 Average Inputs Dn Nozzle diameter (")0.270 0.270 0.270 0.270 C1 Mass of PM collected on filter (mg)4.6 6.2 6.4 5.7 C2 Mass of PM collected in rinse (mg)18.7 14.8 7.8 13.8 Wa Mass of acetone blank (mg)0.0 0.0 0.0 0.0 EPA Method 202 Data 1 2 3 Average Inputs Mass of Inorganic Condensible PM (mg)8.4 6.6 3.5 6.2 Mass of Organic Condensible PM (mg)3.0 3.9 3.1 3.3 Total CPM Mass (mg)11.4 10.5 6.6 9.5 Mass of train blank (mg)2.0 2.0 2.0 2.0 Total CPM Mass less Blank (mg)9.4 8.5 4.6 7.5 Emission Calculations Fc Fuel F‐Factor (scf/mmBtu)1800 1800 1800 1800 An Cross‐sectional area of nozzle (ft2)3.98E‐04 3.98E‐04 3.98E‐04 3.98E‐04 I Isokinetic variation (%) 98.9 98.8 100.0 99.2 mn Total Filterable PM mass less blank (mg) 23.3 21.0 14.2 19.5 Cs Filterable Particulate concentration (gr/dscf)0.004 0.004 0.002 0.003 Cs Filterable Particulate concentration (lb/dscf)5.83E‐07 5.21E‐07 3.42E‐07 4.82E‐07 Elb/hr Filterable Particulate mass emission rate (lb/hr)33.7 30.4 20.3 28.1 Boiler Load (MW)450 449 450 450 Filterable Particulate mass emission rate (lb/MW‐hr)0.07 0.07 0.05 0.06 Fc Filterable Particulate mass emission rate (lb/mmBtu)0.008 0.007 0.005 0.006 8760 hrs/yr Filterable Particulate mass emission rate (tons/year)148 133 89 123 Cs Condensible Particulate concentration (gr/dscf)0.002 0.001 0.001 0.001 Cs Condensible Particulate concentration (lb/dscf)2.35E‐07 2.11E‐07 1.11E‐07 1.86E‐07 Elb/hr Condensible Particulate mass emission rate (lb/hr)13.6 12.3 6.6 10.8 Fc Condensible Particulate mass emission rate (lb/mmBtu)0.003 0.003 0.001 0.003 8760 hrs/yr Condensible Particulate mass emission rate (tons/year)60 54 29 47 Total Particulate concentration (gr/dscf)0.006 0.005 0.003 0.005 Total Particulate concentration (lb/dscf)8.18E‐07 7.32E‐07 4.52E‐07 6.67E‐07 Total Particulate mass emission rate (lb/hr)47.3 42.7 26.9 38.9 Boiler Load (MW)450 449 450 450 Total Particulate mass emission rate (lb/MW‐hr)0.11 0.10 0.06 0.09 Total Particulate mass emission rate (lb/mmBtu)0.011 0.010 0.006 0.009 Total Particulate mass emission rate (tons/year)207 187 118 171 PROJ‐023437 PacifiCorp Hunter Unit 3 11/1/2023 PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix A.3 Example Calculations Run #1 Sample Calculations EPA Method 5:  Determination of Particulate Matter Emissions (40 CFR Part 60, Appendix A‐1) Variable Value DefinitionUnit of Measurement Ds 322.6 Stack Diameter inches A 567.62 Cross‐Sectional Area of the Stack ft2 Pg ‐1.40 Stack Static Pressure in. H2O Pg ‐0.10 Stack Static Pressure in. Hg %CO2 12.8 Concentration of Carbon Dioxide Dry Volume Percent (%vd) %O2 6.6 Concentration of Oxygen Dry Volume Percent (%vd) Md 30.31 Dry Molecular Weight of the Stack Gas (default) lb/lb‐mole Pbar 24.60 Barometric Pressure in. Hg ∆H 2.70 Pressure Differential across Orifice in. H2O Pm 24.80 Absolute Pressure at Gas Meter in.Hg tm 79 Temperature at Gas Meter °F Tm 539 Absolute Temperature at Gas Meter °R K1 0.04706 Conversion Factor ft3/mL Vlc 243.3 Volume of Water Condensed g Vwc(std)11.45 Volume of Water Condensed scf K4 17.64 Constant °R/in.Hg Y 0.9935 Meter Calibration Factor Unitless Vm 111.594 Volume of Stack Gas Collected dcf Vm(std)89.930 Sample Gas Volume dscf Bws 0.113 Stack Gas Moisture Content %/100 Ms 28.92 Actual Molecular Weight of the Stack Gas lb/lb‐mole Ps 24.50 Absolute Stack Pressure in. Hg Ts 118.2 Average Stack Temperature °F Ts(abs)578 Average Absolute Stack Temperature °R Kp 85.49 Conversion Factor (ft/sec) x √(((lb/lb‐mole)(in.Hg))/((°R)(in.H2O))) Cp 0.84 Pitot Coefficient Dimensionless Avg√∆p 0.7185 Average Square Root of Velocity Head Readings in. H2O Vs 46.61 Average Stack Gas Velocity ft/sec   Tstd 528 Standard Absolute Temperature °R Pstd 29.92 Standard Absolute Pressure in. Hg Q 63,170,352 Dry Volumetric Flow Rate Corrected to Standard Conditions dscf/hr Dn 0.27 Nozzle Diameter inches An 3.98E‐04 Cross‐Sectional Area of the Nozzle ft2 mn 25.90 Total PM and CPM Mass mg Cs 6.35E‐07 Particulate Concentration lb/dscf Elb/hr 40.1 PM Mass Emission Rate pounds per hour Fc 1800 F‐Factor from EPA Method 19 scf/mmBtu Elb/mmBtu 0.009 PM Mass Emission Rate pounds per million Btu Etons/yr 175.7 PM Mass Emission Rate tons per year K5 0.0945 Constant (in.Hg ∙ min)  / (°R ∙ sec) Ѳ 120 Sample Time minutes I 101.7 % Isokinetic variation percent PROJ‐023437 PacifiCorp Hunter Unit 1 PROJ‐023437 PacifiCorp Hunter Unit 1 Run #1 Sample Calculations EPA Method 5:  Determination of Particulate Matter Emissions (40 CFR Part 60, Appendix A‐1) A=π(Ds/24)2 π(322.6/24)^2 =567.62 ft^2 Pg =Pg/13.6 =‐1.4/13.6 = ‐0.10 in. Hg Md =(0.44 x %CO2) + (0.32 x %O2) + 0.28(100‐%CO2‐%O2) =(0.44 x 12.8) + (0.32 x 6.6) + 0.28(100 ‐ 12.8 ‐ 6.6) = 30.31 lb/lb‐mole Pm =Pbar + (∆H/13.6) =24.6 + (2.7/13.6) = 24.80 in. Hg Tm =460 + tm =460 + 79.3 = 539  R Vwc(std) =K1 x Vlc =0.04706 x 243.3 = 11.45 scf (Eq. 4‐1) Vm(std)=K4 x Y x Vm x Pm Tm =17.64 x 0.9935 x 111.594 x 24.80 539 =89.93 dscf (Eq. 4‐3) Bws=Vwc(std) Vwc(std) + Vm(std) =11.45 11.45 + 89.93 =0.113 (%/100)(Eq. 4‐4) Ms =Md x (1‐Bws) + (18.0 x Bws) =(0.44 x 12.8) + (0.32 x 6.6) + 0.28(100 ‐ 12.8 ‐ 6.6) x (1 ‐ 0.113) + (18.0 x 0.113) = 28.92 lb/lb‐mole (Eq. 2‐6) Ps=Pbar + Pg = 24.6 + (‐0.10) = 24.50 in. Hg Ts(abs) =460 + Ts =460 + 118.2 = 578  R PROJ‐023437 PacifiCorp Hunter Unit 1 Run #1 Sample Calculations EPA Method 5:  Determination of Particulate Matter Emissions (40 CFR Part 60, Appendix A‐1) Vs =Kp x Cp x Avg√∆p x              = 85.49 x 0.84 x 0.7185 x =46.6 ft/sec (Eq. 2‐7) Q =3600 x (1‐Bws) x (Vs) x (A) x         = 3600 x (1 ‐ 0.113) x (46.61) x (567.62) x  =63,170,352 dscf/hr (Eq. 2‐8) An =π(Dn/24)2 π(0.27/24)^2 =3.98E‐04 ft^2 Cs = mn (mg/g) (g/lb) (Vm(std)) =25.9 (1000) (453.592) (89.930) =6.35E‐07 lb/dscf Elb/hr =Cs x Q = 6.35E‐07 x 63170352 =40.1 lb/hr Elb/mmBtu =Cs x Fc x 100 (CO2%vd) = 6.35E‐07 x 1800 x 100 (12.8) =0.009 lb/mmBtu Etons/yr =Elb/hr  x (Hrs/yr) (lbs/ton) = 40.11 x 8,760 2000 =175.7 tons/year I = = =101.7 % (Eq. 5‐7) 0.0945 x 578 x 89.930 x 100 24.50 x 46.61 x 4.0E‐04 x 120 x (1 ‐ 0.113) (528 x 24.50) (578 x 29.92) K5 x Ts(abs) x Vm(std) x 100 Ps(abs) x Vs x An x Ѳ x (1‐Bws) (Ts(abs) x Pstd) Ts(abs) (Ps x Ms) 578 (24.50 x 28.92) (Tstd x Ps) PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix B Facility Process Data PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix B.1 Unit 1 11/02/23 07:34 24.702 10.9 0.9 112.52 451 11/02/23 07:35 24.703 10.8 0.9 112.38 451 11/02/23 07:36 24.703 8.2 I 0.8 112.43 450 11/02/23 07:37 24.704 10.9 I 0.8 112.36 448 11/02/23 07:38 24.705 10.8 0.8 112.26 448 11/02/23 07:39 24.704 10.9 0.8 112.30 447 11/02/23 07:40 24.704 10.8 0.8 112.24 447 11/02/23 07:41 24.703 10.6 0.8 112.22 448 11/02/23 07:42 24.703 10.8 0.8 112.29 448 11/02/23 07:43 24.704 10.9 0.8 112.15 449 11/02/23 07:44 24.705 10.9 0.8 112.06 449 11/02/23 07:45 24.705 10.7 0.8 112.14 449 11/02/23 07:46 24.705 10.6 0.8 112.17 449 11/02/23 07:47 24.705 10.9 0.8 112.15 449 11/02/23 07:48 24.704 11.0 0.8 112.01 449 11/02/23 07:49 24.705 10.9 0.8 111.74 449 11/02/23 07:50 24.705 10.7 0.8 111.57 450 11/02/23 07:51 24.706 10.7 0.8 111.77 450 11/02/23 07:52 24.708 10.8 0.8 111.80 449 11/02/23 07:53 24.708 10.9 0.9 111.83 449 11/02/23 07:54 24.708 10.8 0.8 111.92 449 11/02/23 07:55 24.709 10.6 0.8 111.85 449 11/02/23 07:56 24.709 10.6 0.8 111.74 449 11/02/23 07:57 24.710 10.9 0.8 111.59 449 11/02/23 07:58 24.711 10.9 0.8 111.44 450 11/02/23 07:59 24.711 10.9 0.8 111.33 451 11/02/23 08:00 24.711 10.8 0.8 111.37 452 11/02/23 08:01 24.712 10.8 0.8 111.30 451 11/02/23 08:02 24.712 10.9 0.8 111.44 450 11/02/23 08:03 24.712 10.8 0.8 111.87 451 11/02/23 08:04 24.713 10.6 0.8 112.00 450 11/02/23 08:05 24.714 10.7 0.8 111.59 449 11/02/23 08:06 24.713 8.3 I 0.8 111.51 448 11/02/23 08:07 24.714 11.0 I 0.8 111.77 449 11/02/23 08:08 24.714 11.0 0.9 112.02 450 11/02/23 08:09 24.713 10.9 0.9 112.09 449 11/02/23 08:10 24.714 10.6 0.8 112.15 448 11/02/23 08:11 24.715 10.7 0.8 112.37 449 Source UNIT1 BARPRESS (INHG) CO2 (PCT) OPACITY (PCT) STKTEMP (DEGF) UNITLOAD (MW) Average Data - Run 1 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/02/2023 07:34 Through 11/02/2023 09:44 Time Online Criteria: 1 minute(s) F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 08:35  C = Calibration S = Substituted  * = Suspect  Average Data - Run 1 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/02/2023 07:34 Through 11/02/2023 09:44 Time Online Criteria: 1 minute(s) 11/02/23 08:12 24.715 10.9 0.8 112.50 449 11/02/23 08:13 24.715 10.8 0.8 112.59 447 11/02/23 08:14 24.716 10.7 0.8 112.72 445 11/02/23 08:15 24.716 10.4 0.8 112.92 446 11/02/23 08:16 24.717 10.5 0.8 112.78 447 11/02/23 08:17 24.717 10.9 0.8 112.15 448 11/02/23 08:18 24.718 10.9 0.8 112.03 448 11/02/23 08:19 24.718 10.8 0.8 112.04 449 11/02/23 08:20 24.719 10.6 1.0 111.91 449 11/02/23 08:21 24.720 10.8 0.9 111.86 448 11/02/23 08:22 24.720 10.9 0.8 112.05 449 11/02/23 08:23 24.720 10.9 0.8 112.17 449 11/02/23 08:24 24.719 10.7 0.8 112.31 450 11/02/23 08:25 24.720 10.5 0.8 112.34 451 11/02/23 08:26 24.720 10.8 0.8 112.40 450 11/02/23 08:27 24.719 10.9 0.9 112.48 448 11/02/23 08:28 24.719 10.8 0.8 112.79 449 11/02/23 08:29 24.719 10.7 0.8 112.66 450 11/02/23 08:30 24.719 10.7 0.8 112.33 450 11/02/23 08:31 24.720 10.9 0.8 112.21 450 11/02/23 08:32 24.720 10.9 0.8 112.44 450 11/02/23 08:33 24.721 11.0 0.8 112.58 450 11/02/23 08:34 24.722 10.8 0.8 112.45 451 11/02/23 08:35 24.722 10.7 0.8 112.42 451 11/02/23 08:36 24.721 8.4 I 0.8 112.22 451 11/02/23 08:37 24.721 11.1 I 0.8 111.92 452 11/02/23 08:38 24.723 11.1 0.8 111.94 452 11/02/23 08:39 24.723 10.8 0.8 112.07 453 11/02/23 08:40 24.724 10.8 0.8 111.93 454 11/02/23 08:41 24.725 11.0 0.8 111.78 454 11/02/23 08:42 24.725 11.1 0.9 111.94 452 11/02/23 08:43 24.724 10.9 1.0 112.33 453 11/02/23 08:44 24.724 10.7 0.9 112.67 452 11/02/23 08:45 24.724 10.6 0.8 112.94 451 11/02/23 08:46 24.724 10.7 0.8 113.25 449 11/02/23 08:47 24.724 10.8 0.8 113.19 449 11/02/23 08:48 24.724 10.8 0.8 112.96 448 11/02/23 08:49 24.724 10.6 0.8 112.89 449 11/02/23 08:50 24.723 10.6 0.8 112.86 448 11/02/23 08:51 24.723 10.8 0.8 112.71 448 11/02/23 08:52 24.723 10.9 0.8 112.53 447 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 08:35  C = Calibration S = Substituted  * = Suspect  Average Data - Run 1 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/02/2023 07:34 Through 11/02/2023 09:44 Time Online Criteria: 1 minute(s) 11/02/23 08:53 24.724 10.9 0.8 112.34 448 11/02/23 08:54 24.724 10.7 0.8 112.32 448 11/02/23 08:55 24.724 10.7 0.9 112.30 450 11/02/23 08:56 24.725 10.9 0.8 112.39 452 11/02/23 08:57 24.726 10.9 0.9 112.55 453 11/02/23 08:58 24.726 10.9 0.8 112.54 452 11/02/23 08:59 24.728 10.7 0.8 112.42 450 11/02/23 09:00 24.727 10.7 0.8 112.46 450 11/02/23 09:01 24.727 10.9 0.8 112.50 450 11/02/23 09:02 24.727 11.0 0.8 112.61 451 11/02/23 09:03 24.727 10.8 0.8 112.71 450 11/02/23 09:04 24.726 10.6 0.8 112.74 450 11/02/23 09:05 24.726 10.6 0.8 112.56 451 11/02/23 09:06 24.727 8.4 I 0.8 112.29 450 11/02/23 09:07 24.726 11.1 I 0.8 112.28 450 11/02/23 09:08 24.725 10.9 0.8 112.38 451 11/02/23 09:09 24.725 10.7 0.9 112.55 451 11/02/23 09:10 24.725 10.8 0.8 112.72 451 11/02/23 09:11 24.725 11.0 0.8 112.67 451 11/02/23 09:12 24.726 11.0 0.8 112.41 450 11/02/23 09:13 24.726 10.8 0.8 111.96 451 11/02/23 09:14 24.726 10.7 0.8 111.99 451 11/02/23 09:15 24.726 10.8 0.8 112.30 451 11/02/23 09:16 24.726 11.0 0.8 112.51 451 11/02/23 09:17 24.726 11.0 0.8 112.61 450 11/02/23 09:18 24.726 10.8 1.0 112.86 449 11/02/23 09:19 24.726 10.6 1.1 113.10 450 11/02/23 09:20 24.726 10.8 1.0 113.49 450 11/02/23 09:21 24.727 10.8 0.9 113.85 452 11/02/23 09:22 24.727 10.8 0.9 114.05 450 11/02/23 09:23 24.728 10.8 0.9 114.18 451 11/02/23 09:24 24.728 10.6 0.8 114.22 451 11/02/23 09:25 24.728 10.8 0.8 114.18 450 11/02/23 09:26 24.728 10.9 0.8 113.95 449 11/02/23 09:27 24.729 10.9 0.8 113.98 448 11/02/23 09:28 24.729 10.7 0.8 113.97 449 11/02/23 09:29 24.728 10.6 0.8 113.85 449 11/02/23 09:30 24.727 10.8 0.8 113.70 449 11/02/23 09:31 24.727 10.9 0.8 113.61 448 11/02/23 09:32 24.726 10.8 0.8 113.65 448 11/02/23 09:33 24.726 10.6 0.8 113.67 448 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 08:35  C = Calibration S = Substituted  * = Suspect  Average Data - Run 1 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/02/2023 07:34 Through 11/02/2023 09:44 Time Online Criteria: 1 minute(s) 11/02/23 09:34 24.727 10.5 0.8 113.58 449 11/02/23 09:35 24.727 10.6 0.8 113.47 449 11/02/23 09:36 24.727 8.4 I 0.8 113.25 449 11/02/23 09:37 24.728 11.0 I 0.8 113.08 449 11/02/23 09:38 24.728 10.8 0.8 112.74 449 11/02/23 09:39 24.728 10.7 0.8 112.52 449 11/02/23 09:40 24.728 10.8 0.8 112.70 449 11/02/23 09:41 24.728 10.8 0.9 112.92 448 11/02/23 09:42 24.727 10.8 0.8 112.88 449 11/02/23 09:43 24.728 10.7 0.8 112.84 449 11/02/23 09:44 24.728 10.6 0.8 112.87 450 24.719 10.8 0.8 112.50 450 24.702 10.4 0.8 111.30 445 24.729 11.1 1.1 114.22 454 3,238.242 1,305.3 107.5 14,737.27 58,901 131 121 131 131 131 131 131 131 131 131 Geometric Mean Included Data Points Total number of Data Points Average Minimum Maximum Summation F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 08:35  C = Calibration S = Substituted  * = Suspect  11/02/23 10:01 24.726 10.8 0.8 113.59 451 11/02/23 10:02 24.726 10.8 0.8 113.45 450 11/02/23 10:03 24.725 10.5 0.8 113.38 450 11/02/23 10:04 24.724 10.6 0.8 113.41 450 11/02/23 10:05 24.725 10.8 0.8 113.36 449 11/02/23 10:06 24.725 8.3 I 0.8 113.24 448 11/02/23 10:07 24.725 10.8 I 0.8 113.25 447 11/02/23 10:08 24.726 10.5 0.8 113.29 447 11/02/23 10:09 24.726 10.7 0.9 113.10 448 11/02/23 10:10 24.727 10.9 0.9 112.69 449 11/02/23 10:11 24.727 10.9 0.8 112.53 450 11/02/23 10:12 24.727 10.8 0.8 112.47 449 11/02/23 10:13 24.726 10.6 0.8 112.58 449 11/02/23 10:14 24.726 10.7 0.9 112.85 449 11/02/23 10:15 24.726 10.8 0.8 112.99 450 11/02/23 10:16 24.726 10.9 0.8 112.83 450 11/02/23 10:17 24.725 10.8 0.8 112.64 450 11/02/23 10:18 24.725 10.6 0.8 112.90 450 11/02/23 10:19 24.725 10.8 0.8 113.12 449 11/02/23 10:20 24.725 10.9 0.8 113.30 449 11/02/23 10:21 24.725 10.8 0.8 113.35 449 11/02/23 10:22 24.725 10.7 0.8 113.20 450 11/02/23 10:23 24.724 10.6 0.8 113.30 449 11/02/23 10:24 24.723 10.7 0.8 113.62 447 11/02/23 10:25 24.723 10.8 0.8 113.72 447 11/02/23 10:26 24.722 10.8 0.8 113.71 448 11/02/23 10:27 24.722 10.6 0.8 113.76 448 11/02/23 10:28 24.723 10.5 0.8 113.75 449 11/02/23 10:29 24.721 10.8 0.8 113.49 449 11/02/23 10:30 24.720 10.9 0.8 113.27 450 11/02/23 10:31 24.720 10.9 0.8 113.14 451 11/02/23 10:32 24.719 10.7 0.9 113.09 450 11/02/23 10:33 24.719 10.6 1.0 113.31 449 11/02/23 10:34 24.719 10.8 1.0 113.65 450 11/02/23 10:35 24.720 10.8 0.9 114.19 450 11/02/23 10:36 24.719 8.3 I 0.9 114.53 449 11/02/23 10:37 24.719 10.6 I 0.9 114.80 449 11/02/23 10:38 24.719 10.6 0.8 114.95 450 Source UNIT1 BARPRESS (INHG) CO2 (PCT) OPACITY (PCT) STKTEMP (DEGF) UNITLOAD (MW) Average Data - Run 2 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/02/2023 10:01 Through 11/02/2023 12:10 Time Online Criteria: 1 minute(s) F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 08:39  C = Calibration S = Substituted  * = Suspect  Average Data - Run 2 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/02/2023 10:01 Through 11/02/2023 12:10 Time Online Criteria: 1 minute(s) 11/02/23 10:39 24.720 10.7 0.8 114.97 449 11/02/23 10:40 24.720 10.7 0.8 114.92 448 11/02/23 10:41 24.719 10.7 0.8 114.82 446 11/02/23 10:42 24.718 10.6 0.8 114.60 447 11/02/23 10:43 24.718 10.6 0.8 114.31 448 11/02/23 10:44 24.718 10.8 0.8 114.23 449 11/02/23 10:45 24.719 10.9 0.8 113.98 448 11/02/23 10:46 24.719 10.8 0.8 113.95 448 11/02/23 10:47 24.720 10.5 0.9 114.10 448 11/02/23 10:48 24.719 10.6 0.8 114.13 449 11/02/23 10:49 24.718 10.8 0.9 114.01 449 11/02/23 10:50 24.718 10.8 0.8 113.97 450 11/02/23 10:51 24.718 10.7 0.8 113.85 450 11/02/23 10:52 24.717 10.5 0.8 113.68 450 11/02/23 10:53 24.717 10.6 0.8 113.58 450 11/02/23 10:54 24.716 10.9 0.8 113.47 449 11/02/23 10:55 24.715 10.8 0.8 113.31 449 11/02/23 10:56 24.716 10.7 0.8 113.20 448 11/02/23 10:57 24.717 10.5 0.8 113.01 447 11/02/23 10:58 24.716 10.6 0.8 113.06 447 11/02/23 10:59 24.717 10.8 0.8 113.07 447 11/02/23 11:00 24.717 10.8 0.8 112.98 448 11/02/23 11:01 24.717 10.7 0.8 113.08 448 11/02/23 11:02 24.717 10.5 0.8 113.14 449 11/02/23 11:03 24.717 10.7 0.8 113.20 449 11/02/23 11:04 24.717 10.9 0.8 113.37 449 11/02/23 11:05 24.717 10.9 0.8 113.32 449 11/02/23 11:06 24.717 8.3 I 0.8 113.23 448 11/02/23 11:07 24.716 10.6 I 0.8 113.39 448 11/02/23 11:08 24.715 10.7 0.9 113.62 447 11/02/23 11:09 24.715 10.9 1.0 113.64 447 11/02/23 11:10 24.715 10.9 1.0 113.95 449 11/02/23 11:11 24.714 10.7 0.9 114.45 451 11/02/23 11:12 24.715 10.6 0.9 114.26 450 11/02/23 11:13 24.714 10.8 0.9 114.34 450 11/02/23 11:14 24.714 10.9 0.8 114.54 450 11/02/23 11:15 24.714 10.9 0.8 114.67 449 11/02/23 11:16 24.714 10.7 0.8 114.77 449 11/02/23 11:17 24.713 10.6 0.8 114.66 448 11/02/23 11:18 24.713 10.7 0.8 114.59 449 11/02/23 11:19 24.713 10.8 0.8 114.54 449 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 08:39  C = Calibration S = Substituted  * = Suspect  Average Data - Run 2 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/02/2023 10:01 Through 11/02/2023 12:10 Time Online Criteria: 1 minute(s) 11/02/23 11:20 24.712 10.8 0.8 114.48 449 11/02/23 11:21 24.712 10.7 0.8 114.67 450 11/02/23 11:22 24.711 10.5 0.8 114.81 450 11/02/23 11:23 24.711 10.7 0.8 114.59 450 11/02/23 11:24 24.711 10.8 0.8 114.49 449 11/02/23 11:25 24.710 10.8 0.8 114.61 448 11/02/23 11:26 24.710 10.6 0.8 114.69 448 11/02/23 11:27 24.710 10.5 0.8 114.47 448 11/02/23 11:28 24.710 10.7 0.8 114.34 448 11/02/23 11:29 24.710 10.8 0.8 114.21 449 11/02/23 11:30 24.708 10.8 0.8 113.94 450 11/02/23 11:31 24.709 10.6 0.8 113.84 449 11/02/23 11:32 24.708 10.5 0.8 113.95 448 11/02/23 11:33 24.708 10.7 0.8 114.01 447 11/02/23 11:34 24.707 10.8 0.8 114.00 448 11/02/23 11:35 24.708 10.8 0.8 114.01 450 11/02/23 11:36 24.707 8.1 I 0.8 114.28 451 11/02/23 11:37 24.708 10.7 I 0.9 114.34 451 11/02/23 11:38 24.707 10.8 0.9 114.26 450 11/02/23 11:39 24.707 10.8 0.9 114.33 449 11/02/23 11:40 24.707 10.8 0.9 114.30 449 11/02/23 11:41 24.707 10.5 0.9 114.31 450 11/02/23 11:42 24.707 10.6 0.9 114.55 450 11/02/23 11:43 24.705 10.8 0.9 114.57 450 11/02/23 11:44 24.705 10.9 0.9 114.18 449 11/02/23 11:45 24.705 10.7 1.0 113.86 449 11/02/23 11:46 24.705 10.6 1.0 114.20 450 11/02/23 11:47 24.704 10.6 1.0 114.49 451 11/02/23 11:48 24.704 10.8 1.0 114.60 451 11/02/23 11:49 24.704 10.9 0.9 114.60 450 11/02/23 11:50 24.704 10.7 0.9 114.82 448 11/02/23 11:51 24.703 10.5 0.9 115.47 448 11/02/23 11:52 24.704 10.5 0.9 115.72 449 11/02/23 11:53 24.704 10.8 0.9 116.42 450 11/02/23 11:54 24.704 10.8 0.9 115.43 451 11/02/23 11:55 24.704 10.8 0.9 114.88 450 11/02/23 11:56 24.703 10.6 0.9 114.75 450 11/02/23 11:57 24.702 10.6 0.9 114.83 450 11/02/23 11:58 24.702 10.8 0.8 114.75 449 11/02/23 11:59 24.702 10.8 0.9 114.48 449 11/02/23 12:00 24.700 10.7 0.9 114.34 448 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 08:39  C = Calibration S = Substituted  * = Suspect  Average Data - Run 2 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/02/2023 10:01 Through 11/02/2023 12:10 Time Online Criteria: 1 minute(s) 11/02/23 12:01 24.700 10.5 0.8 114.34 448 11/02/23 12:02 24.699 10.6 0.9 114.34 449 11/02/23 12:03 24.699 10.8 0.9 114.26 449 11/02/23 12:04 24.698 10.8 0.9 114.20 449 11/02/23 12:05 24.698 10.8 0.8 114.27 449 11/02/23 12:06 24.698 8.1 I 0.9 114.21 448 11/02/23 12:07 24.698 10.8 I 0.9 114.06 448 11/02/23 12:08 24.697 10.9 0.9 114.26 449 11/02/23 12:09 24.697 10.9 0.9 114.30 451 11/02/23 12:10 24.697 10.8 0.9 114.52 453 24.714 10.7 0.8 113.97 449 24.697 10.5 0.8 112.47 446 24.727 10.9 1.0 116.42 453 3,212.824 1,286.9 109.6 14,816.39 58,376 130 120 130 130 130 130 130 130 130 130 Geometric Mean Included Data Points Total number of Data Points Average Minimum Maximum Summation F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 08:39  C = Calibration S = Substituted  * = Suspect  11/02/23 12:37 24.688 10.9 I 0.9 116.68 449 11/02/23 12:38 24.687 10.8 0.9 117.90 448 11/02/23 12:39 24.686 10.7 0.9 115.50 448 11/02/23 12:40 24.686 10.5 0.9 115.01 448 11/02/23 12:41 24.685 10.6 0.9 114.80 448 11/02/23 12:42 24.685 10.8 0.9 114.61 449 11/02/23 12:43 24.685 10.8 0.9 114.63 449 11/02/23 12:44 24.684 10.7 0.8 114.84 448 11/02/23 12:45 24.683 10.5 0.9 114.88 450 11/02/23 12:46 24.683 10.7 0.9 114.59 450 11/02/23 12:47 24.682 10.8 0.9 114.50 449 11/02/23 12:48 24.681 10.9 0.8 114.50 448 11/02/23 12:49 24.680 10.7 0.9 114.58 448 11/02/23 12:50 24.680 10.6 0.8 114.39 448 11/02/23 12:51 24.681 10.7 0.9 114.46 449 11/02/23 12:52 24.682 10.8 0.9 114.50 450 11/02/23 12:53 24.680 10.9 0.9 114.39 450 11/02/23 12:54 24.679 10.8 0.9 114.43 451 11/02/23 12:55 24.679 10.6 0.9 114.34 449 11/02/23 12:56 24.678 10.7 0.9 114.29 448 11/02/23 12:57 24.677 10.8 0.9 114.50 448 11/02/23 12:58 24.677 10.8 0.9 114.66 448 11/02/23 12:59 24.676 10.7 0.9 114.63 448 11/02/23 13:00 24.675 10.6 0.9 114.55 448 11/02/23 13:01 24.675 10.7 0.9 114.49 449 11/02/23 13:02 24.675 10.9 1.0 114.54 449 11/02/23 13:03 24.674 10.9 1.0 114.57 449 11/02/23 13:04 24.673 10.7 0.9 114.64 448 11/02/23 13:05 24.673 10.6 0.9 114.91 448 11/02/23 13:06 24.674 8.3 I 0.9 116.45 449 11/02/23 13:07 24.674 11.0 I 0.9 117.93 449 11/02/23 13:08 24.673 10.9 0.9 116.99 451 11/02/23 13:09 24.673 10.8 0.8 117.52 450 11/02/23 13:10 24.672 10.6 0.8 117.96 451 11/02/23 13:11 24.673 10.8 0.8 117.98 451 11/02/23 13:12 24.671 10.9 0.8 118.03 451 11/02/23 13:13 24.671 10.9 0.9 118.01 450 11/02/23 13:14 24.671 10.7 0.8 116.85 450 Source UNIT1 BARPRESS (INHG) CO2 (PCT) OPACITY (PCT) STKTEMP (DEGF) UNITLOAD (MW) Average Data - Run 3 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/02/2023 12:37 Through 11/02/2023 14:46 Time Online Criteria: 1 minute(s) F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 08:42  C = Calibration S = Substituted  * = Suspect  Average Data - Run 3 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/02/2023 12:37 Through 11/02/2023 14:46 Time Online Criteria: 1 minute(s) 11/02/23 13:15 24.670 10.6 0.8 117.63 449 11/02/23 13:16 24.670 10.8 0.8 117.94 450 11/02/23 13:17 24.669 10.8 0.9 118.03 449 11/02/23 13:18 24.668 10.8 0.9 118.25 449 11/02/23 13:19 24.669 10.6 0.8 118.26 449 11/02/23 13:20 24.668 10.6 0.8 117.97 449 11/02/23 13:21 24.668 10.8 0.9 116.62 449 11/02/23 13:22 24.668 10.8 0.9 117.92 449 11/02/23 13:23 24.667 10.8 0.9 117.91 450 11/02/23 13:24 24.667 10.6 0.9 117.86 450 11/02/23 13:25 24.666 10.6 0.9 117.86 450 11/02/23 13:26 24.665 10.8 0.9 117.72 450 11/02/23 13:27 24.665 10.9 0.9 117.33 450 11/02/23 13:28 24.665 10.7 0.9 116.67 451 11/02/23 13:29 24.664 10.6 0.9 117.14 451 11/02/23 13:30 24.664 10.6 0.9 117.86 452 11/02/23 13:31 24.664 10.8 0.9 117.90 451 11/02/23 13:32 24.664 10.8 0.9 117.89 451 11/02/23 13:33 24.664 10.7 0.9 117.89 450 11/02/23 13:34 24.664 10.5 0.9 117.87 449 11/02/23 13:35 24.663 10.5 0.9 117.86 448 11/02/23 13:36 24.663 8.3 I 0.9 118.04 447 11/02/23 13:37 24.663 10.9 I 0.9 118.01 447 11/02/23 13:38 24.663 10.7 0.9 115.87 447 11/02/23 13:39 24.663 10.5 0.9 115.13 446 11/02/23 13:40 24.662 10.6 0.9 115.03 446 11/02/23 13:41 24.662 10.8 0.9 114.99 449 11/02/23 13:42 24.662 10.9 0.9 114.94 451 11/02/23 13:43 24.662 10.9 0.9 115.09 452 11/02/23 13:44 24.661 10.7 0.9 116.82 453 11/02/23 13:45 24.660 10.7 0.9 117.85 453 11/02/23 13:46 24.660 11.0 0.9 117.90 452 11/02/23 13:47 24.660 10.9 0.9 117.88 452 11/02/23 13:48 24.660 10.7 0.9 117.99 451 11/02/23 13:49 24.660 10.5 0.9 118.03 450 11/02/23 13:50 24.659 10.6 0.9 118.03 449 11/02/23 13:51 24.659 10.7 0.9 117.98 448 11/02/23 13:52 24.659 10.7 0.9 118.03 447 11/02/23 13:53 24.659 10.6 0.9 118.22 447 11/02/23 13:54 24.658 10.4 0.9 118.12 445 11/02/23 13:55 24.657 10.6 0.9 116.98 445 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 08:42  C = Calibration S = Substituted  * = Suspect  Average Data - Run 3 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/02/2023 12:37 Through 11/02/2023 14:46 Time Online Criteria: 1 minute(s) 11/02/23 13:56 24.657 10.7 0.9 115.93 446 11/02/23 13:57 24.656 10.7 0.9 116.60 448 11/02/23 13:58 24.656 10.7 0.9 115.26 451 11/02/23 13:59 24.654 10.6 0.9 115.00 452 11/02/23 14:00 24.655 10.7 0.9 115.08 452 11/02/23 14:01 24.655 10.8 0.9 115.07 452 11/02/23 14:02 24.655 10.9 0.9 115.04 450 11/02/23 14:03 24.654 10.7 0.9 115.19 451 11/02/23 14:04 24.654 10.6 0.9 115.28 451 11/02/23 14:05 24.655 10.7 0.9 114.98 452 11/02/23 14:06 24.654 8.4 I 0.9 114.80 451 11/02/23 14:07 24.655 11.0 I 0.9 114.64 451 11/02/23 14:08 24.653 10.7 0.9 114.67 451 11/02/23 14:09 24.654 10.5 0.9 114.90 450 11/02/23 14:10 24.653 10.7 0.9 115.07 448 11/02/23 14:11 24.653 10.7 0.9 115.12 448 11/02/23 14:12 24.653 10.7 0.8 115.12 448 11/02/23 14:13 24.652 10.5 0.9 115.44 448 11/02/23 14:14 24.652 10.5 0.9 117.83 448 11/02/23 14:15 24.652 10.8 0.8 118.08 448 11/02/23 14:16 24.652 10.8 0.9 118.19 446 11/02/23 14:17 24.652 10.8 1.5 118.39 444 11/02/23 14:18 24.651 10.5 1.4 118.96 445 11/02/23 14:19 24.652 10.5 1.1 118.97 447 11/02/23 14:20 24.652 10.7 0.9 119.00 450 11/02/23 14:21 24.652 10.7 0.9 119.11 450 11/02/23 14:22 24.651 10.7 0.9 118.86 449 11/02/23 14:23 24.652 10.6 0.8 118.60 450 11/02/23 14:24 24.651 10.5 0.8 118.54 451 11/02/23 14:25 24.651 10.9 0.9 118.44 451 11/02/23 14:26 24.651 10.8 0.9 118.37 450 11/02/23 14:27 24.652 10.7 0.9 118.40 450 11/02/23 14:28 24.652 10.5 0.9 118.46 449 11/02/23 14:29 24.651 10.5 0.9 118.57 451 11/02/23 14:30 24.650 10.8 0.9 118.51 453 11/02/23 14:31 24.650 10.8 0.8 118.47 454 11/02/23 14:32 24.650 10.8 0.9 118.36 452 11/02/23 14:33 24.649 10.5 0.9 118.40 450 11/02/23 14:34 24.649 10.5 0.9 118.72 451 11/02/23 14:35 24.648 10.7 0.9 118.81 450 11/02/23 14:36 24.650 8.4 I 0.9 118.77 450 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 08:42  C = Calibration S = Substituted  * = Suspect  Average Data - Run 3 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/02/2023 12:37 Through 11/02/2023 14:46 Time Online Criteria: 1 minute(s) 11/02/23 14:37 24.651 10.8 I 0.9 118.70 450 11/02/23 14:38 24.651 10.5 0.9 118.53 450 11/02/23 14:39 24.651 10.6 0.9 118.37 451 11/02/23 14:40 24.652 10.8 0.9 118.40 451 11/02/23 14:41 24.651 10.8 0.9 118.36 450 11/02/23 14:42 24.653 10.6 0.9 118.24 449 11/02/23 14:43 24.653 10.4 0.9 118.43 448 11/02/23 14:44 24.653 10.6 0.9 118.42 448 11/02/23 14:45 24.653 10.8 0.9 118.37 448 11/02/23 14:46 24.653 10.7 0.9 118.33 448 24.664 10.7 0.9 116.80 449 24.648 10.4 0.8 114.29 444 24.688 11.0 1.5 119.11 454 3,206.256 1,294.4 116.8 15,184.49 58,419 130 121 130 130 130 130 130 130 130 130 Geometric Mean Included Data Points Total number of Data Points Average Minimum Maximum Summation F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 08:42  C = Calibration S = Substituted  * = Suspect  PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix B.2 Unit 2 10/31/23 07:52 24.806 11.0 1.9 108.95 476 10/31/23 07:53 24.807 11.0 1.9 108.59 477 10/31/23 07:54 24.806 11.0 1.9 108.31 477 10/31/23 07:55 24.807 11.0 1.9 108.38 478 10/31/23 07:56 24.806 11.0 1.9 108.44 477 10/31/23 07:57 24.807 11.0 1.9 108.34 478 10/31/23 07:58 24.807 11.0 1.9 108.16 478 10/31/23 07:59 24.807 11.0 1.9 108.09 477 10/31/23 08:00 24.808 11.0 1.9 108.36 477 10/31/23 08:01 24.808 11.0 1.9 108.55 477 10/31/23 08:02 24.808 11.0 1.9 108.59 477 10/31/23 08:03 24.809 11.0 1.9 108.72 478 10/31/23 08:04 24.810 11.0 1.9 108.94 477 10/31/23 08:05 24.810 11.0 1.9 108.98 477 10/31/23 08:06 24.811 7.9 I 1.9 108.94 476 10/31/23 08:07 24.811 10.9 I 1.9 108.87 475 10/31/23 08:08 24.812 10.9 1.9 108.77 474 10/31/23 08:09 24.812 10.9 1.9 108.83 475 10/31/23 08:10 24.813 11.0 1.9 108.77 475 10/31/23 08:11 24.813 10.9 1.9 108.73 475 10/31/23 08:12 24.813 10.9 1.9 108.74 476 10/31/23 08:13 24.813 11.0 1.9 108.72 475 10/31/23 08:14 24.813 11.0 1.9 108.79 476 10/31/23 08:15 24.813 11.0 1.9 108.79 476 10/31/23 08:16 24.814 11.0 1.9 108.72 476 10/31/23 08:17 24.814 11.0 1.9 108.82 476 10/31/23 08:18 24.815 10.9 1.9 108.94 475 10/31/23 08:19 24.816 10.9 1.9 109.11 475 10/31/23 08:20 24.815 10.9 1.9 109.04 475 10/31/23 08:21 24.816 10.9 1.9 108.68 475 10/31/23 08:22 24.816 10.9 1.9 108.68 475 10/31/23 08:23 24.815 10.9 1.9 108.78 475 10/31/23 08:24 24.816 10.9 1.9 108.81 475 10/31/23 08:25 24.815 10.9 1.9 108.96 476 10/31/23 08:26 24.815 10.9 1.9 108.84 476 10/31/23 08:27 24.816 10.9 1.9 108.53 477 10/31/23 08:28 24.815 11.0 1.9 108.50 476 10/31/23 08:29 24.816 11.0 1.9 108.60 476 Source UNIT2 BARPRESS (INHG) CO2 (PCT) OPACITY (PCT) STKTEMP (DEGF) UNITLOAD (MW) Average Data - Run 1 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 10/31/2023 07:52 Through 10/31/2023 10:03 Time Online Criteria: 1 minute(s) F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:37  C = Calibration S = Substituted  * = Suspect  Average Data - Run 1 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 10/31/2023 07:52 Through 10/31/2023 10:03 Time Online Criteria: 1 minute(s) 10/31/23 08:30 24.816 11.0 1.9 108.61 477 10/31/23 08:31 24.817 11.0 1.9 108.63 477 10/31/23 08:32 24.816 11.0 1.9 108.80 476 10/31/23 08:33 24.816 11.0 1.9 108.82 475 10/31/23 08:34 24.817 10.9 1.9 108.88 476 10/31/23 08:35 24.817 10.9 1.9 108.94 476 10/31/23 08:36 24.817 8.1 I 1.9 109.06 476 10/31/23 08:37 24.817 10.9 I 1.9 109.19 475 10/31/23 08:38 24.817 10.8 1.9 109.15 473 10/31/23 08:39 24.817 10.8 1.9 109.12 473 10/31/23 08:40 24.818 10.8 1.9 109.05 473 10/31/23 08:41 24.818 10.8 1.9 108.93 474 10/31/23 08:42 24.818 10.8 1.9 108.94 475 10/31/23 08:43 24.818 10.9 1.9 108.92 476 10/31/23 08:44 24.819 10.9 1.9 108.73 477 10/31/23 08:45 24.819 11.0 1.9 108.61 477 10/31/23 08:46 24.819 11.0 1.9 108.65 477 10/31/23 08:47 24.818 11.0 1.9 108.84 476 10/31/23 08:48 24.819 10.9 1.9 108.75 476 10/31/23 08:49 24.820 10.9 1.9 108.40 475 10/31/23 08:50 24.820 11.0 1.9 108.26 476 10/31/23 08:51 24.820 10.9 1.9 108.48 476 10/31/23 08:52 24.819 10.9 1.9 108.61 476 10/31/23 08:53 24.819 10.9 1.9 108.73 476 10/31/23 08:54 24.818 10.9 1.9 108.80 476 10/31/23 08:55 24.817 11.0 1.9 108.60 476 10/31/23 08:56 24.817 11.0 1.9 108.39 476 10/31/23 08:57 24.816 11.0 1.9 108.49 475 10/31/23 08:58 24.816 10.9 1.9 108.71 473 10/31/23 08:59 24.817 10.8 1.9 108.87 474 10/31/23 09:00 24.817 10.8 1.9 109.11 473 10/31/23 09:01 24.817 10.9 1.9 109.12 473 10/31/23 09:02 24.817 10.9 1.9 109.04 473 10/31/23 09:03 24.817 10.9 1.9 109.03 474 10/31/23 09:04 24.816 10.9 1.9 108.69 474 10/31/23 09:05 24.817 10.9 1.9 108.86 475 10/31/23 09:06 24.818 8.0 I 1.9 108.88 476 10/31/23 09:07 24.818 11.0 I 1.9 108.78 476 10/31/23 09:08 24.818 11.0 1.9 108.70 477 10/31/23 09:09 24.817 10.9 1.9 108.50 475 10/31/23 09:10 24.817 10.9 1.9 108.39 475 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:37  C = Calibration S = Substituted  * = Suspect  Average Data - Run 1 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 10/31/2023 07:52 Through 10/31/2023 10:03 Time Online Criteria: 1 minute(s) 10/31/23 09:11 24.817 10.9 1.9 108.54 474 10/31/23 09:12 24.816 10.9 1.9 108.45 474 10/31/23 09:13 24.817 10.9 1.9 108.49 473 10/31/23 09:14 24.817 10.9 1.9 108.66 474 10/31/23 09:15 24.817 10.9 1.9 108.56 475 10/31/23 09:16 24.817 11.0 1.9 108.43 476 10/31/23 09:17 24.818 11.0 1.9 108.51 477 10/31/23 09:18 24.818 11.0 1.9 108.57 477 10/31/23 09:19 24.818 11.0 1.9 108.43 477 10/31/23 09:20 24.818 11.0 1.9 108.41 476 10/31/23 09:21 24.819 11.0 1.9 108.38 476 10/31/23 09:22 24.819 11.0 1.9 108.19 475 10/31/23 09:23 24.819 11.0 1.9 108.39 474 10/31/23 09:24 24.819 10.9 1.9 108.65 473 10/31/23 09:25 24.819 10.8 1.9 108.90 472 10/31/23 09:26 24.820 10.8 1.9 109.16 472 10/31/23 09:27 24.818 10.8 1.9 109.20 474 10/31/23 09:28 24.819 10.9 1.9 109.11 475 10/31/23 09:29 24.818 10.9 1.9 108.97 476 10/31/23 09:30 24.818 10.9 1.9 108.80 476 10/31/23 09:31 24.819 11.0 1.9 108.63 477 10/31/23 09:32 24.819 11.0 1.9 108.73 477 10/31/23 09:33 24.819 11.0 1.9 108.96 477 10/31/23 09:34 24.819 11.0 1.9 109.03 477 10/31/23 09:35 24.819 11.0 1.9 109.04 476 10/31/23 09:36 24.819 8.0 I 1.9 108.95 474 10/31/23 09:37 24.819 10.9 I 1.9 109.02 473 10/31/23 09:38 24.820 10.8 1.9 109.19 473 10/31/23 09:39 24.820 10.9 1.9 109.20 473 10/31/23 09:40 24.819 10.9 1.9 108.94 474 10/31/23 09:41 24.819 10.9 1.9 109.00 474 10/31/23 09:42 24.820 10.8 1.9 109.34 475 10/31/23 09:43 24.820 11.0 1.9 109.24 476 10/31/23 09:44 24.818 11.0 1.9 109.21 477 10/31/23 09:45 24.819 11.0 1.9 109.11 478 10/31/23 09:46 24.818 11.0 1.9 109.09 477 10/31/23 09:47 24.818 11.0 1.9 109.26 477 10/31/23 09:48 24.817 11.0 1.9 109.46 476 10/31/23 09:49 24.817 11.0 1.9 109.66 477 10/31/23 09:50 24.818 11.0 1.9 109.99 477 10/31/23 09:51 24.818 10.9 1.9 110.09 477 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:37  C = Calibration S = Substituted  * = Suspect  Average Data - Run 1 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 10/31/2023 07:52 Through 10/31/2023 10:03 Time Online Criteria: 1 minute(s) 10/31/23 09:52 24.818 10.9 1.9 110.08 476 10/31/23 09:53 24.818 10.9 1.9 110.19 475 10/31/23 09:54 24.817 10.8 1.9 110.35 473 10/31/23 09:55 24.818 10.8 1.9 110.26 472 10/31/23 09:56 24.818 10.8 1.9 110.15 471 10/31/23 09:57 24.818 10.9 1.9 110.19 473 10/31/23 09:58 24.818 10.9 1.9 110.04 474 10/31/23 09:59 24.816 10.9 1.9 109.89 477 10/31/23 10:00 24.816 11.0 1.9 109.86 478 10/31/23 10:01 24.815 11.0 1.9 109.84 481 10/31/23 10:02 24.815 11.1 1.9 109.87 481 10/31/23 10:03 24.815 11.0 1.9 109.97 479 24.816 10.9 1.9 108.92 476 24.806 10.8 1.9 108.09 471 24.820 11.1 1.9 110.35 481 3,275.722 1,356.1 250.8 14,377.05 62,775 132 124 132 132 132 132 132 132 132 132 Geometric Mean Included Data Points Total number of Data Points Average Minimum Maximum Summation F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:37  C = Calibration S = Substituted  * = Suspect  10/31/23 10:28 24.810 11.0 1.9 109.82 477 10/31/23 10:29 24.811 11.0 1.9 109.74 477 10/31/23 10:30 24.811 11.0 1.9 109.92 477 10/31/23 10:31 24.811 10.9 1.9 110.24 477 10/31/23 10:32 24.811 10.9 1.9 110.39 477 10/31/23 10:33 24.810 11.0 1.9 110.40 477 10/31/23 10:34 24.809 11.0 1.9 110.55 477 10/31/23 10:35 24.809 11.0 1.9 110.60 476 10/31/23 10:36 24.809 7.9 I 1.9 110.62 476 10/31/23 10:37 24.809 10.9 I 1.9 110.45 475 10/31/23 10:38 24.808 11.0 1.9 110.26 475 10/31/23 10:39 24.808 11.0 1.9 110.36 476 10/31/23 10:40 24.808 11.0 1.9 110.41 475 10/31/23 10:41 24.809 10.8 1.9 110.44 475 10/31/23 10:42 24.809 10.9 1.9 110.58 475 10/31/23 10:43 24.809 10.8 1.9 110.56 474 10/31/23 10:44 24.809 10.8 1.9 110.47 473 10/31/23 10:45 24.809 10.9 1.9 110.17 474 10/31/23 10:46 24.808 10.9 1.9 110.06 475 10/31/23 10:47 24.808 11.0 1.9 109.90 477 10/31/23 10:48 24.808 11.0 1.9 109.74 479 10/31/23 10:49 24.808 11.1 1.9 109.52 480 10/31/23 10:50 24.808 11.1 1.9 109.54 480 10/31/23 10:51 24.809 11.0 1.9 109.42 479 10/31/23 10:52 24.810 11.0 1.9 109.99 475 10/31/23 10:53 24.809 11.0 1.9 110.06 473 10/31/23 10:54 24.809 10.9 1.9 110.07 472 10/31/23 10:55 24.809 10.8 1.9 109.99 473 10/31/23 10:56 24.808 11.0 1.9 109.74 478 10/31/23 10:57 24.809 11.0 1.9 109.49 480 10/31/23 10:58 24.809 11.0 1.9 109.36 481 10/31/23 10:59 24.808 11.1 1.9 109.23 479 10/31/23 11:00 24.808 11.1 1.9 109.31 477 10/31/23 11:01 24.808 11.0 1.9 109.45 476 10/31/23 11:02 24.808 11.0 1.9 109.49 475 10/31/23 11:03 24.807 10.9 1.9 109.51 472 10/31/23 11:04 24.807 10.9 1.9 109.65 472 10/31/23 11:05 24.807 10.9 1.9 109.80 473 Source UNIT2 BARPRESS (INHG) CO2 (PCT) OPACITY (PCT) STKTEMP (DEGF) UNITLOAD (MW) Average Data - Run 2 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 10/31/2023 10:28 Through 10/31/2023 12:37 Time Online Criteria: 1 minute(s) F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:44  C = Calibration S = Substituted  * = Suspect  Average Data - Run 2 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 10/31/2023 10:28 Through 10/31/2023 12:37 Time Online Criteria: 1 minute(s) 10/31/23 11:06 24.808 8.1 I 1.9 109.91 474 10/31/23 11:07 24.808 10.9 I 1.9 109.85 475 10/31/23 11:08 24.807 10.9 1.9 109.67 475 10/31/23 11:09 24.807 11.0 1.9 109.37 476 10/31/23 11:10 24.807 11.0 1.9 109.27 478 10/31/23 11:11 24.807 11.1 1.9 109.29 479 10/31/23 11:12 24.808 11.1 1.9 109.46 480 10/31/23 11:13 24.807 11.0 1.9 109.60 482 10/31/23 11:14 24.806 11.0 1.9 109.62 480 10/31/23 11:15 24.805 11.0 1.9 109.52 478 10/31/23 11:16 24.804 11.1 1.9 109.42 476 10/31/23 11:17 24.804 11.0 1.9 109.40 473 10/31/23 11:18 24.804 10.9 1.9 109.42 472 10/31/23 11:19 24.804 10.9 1.9 109.44 473 10/31/23 11:20 24.804 10.9 1.9 109.52 473 10/31/23 11:21 24.803 10.9 1.9 109.51 474 10/31/23 11:22 24.803 10.9 1.9 109.41 475 10/31/23 11:23 24.802 11.0 1.9 109.40 475 10/31/23 11:24 24.802 11.0 1.9 109.31 476 10/31/23 11:25 24.803 11.1 1.9 109.25 478 10/31/23 11:26 24.803 11.1 1.9 109.43 479 10/31/23 11:27 24.802 11.0 1.9 109.50 480 10/31/23 11:28 24.802 11.0 1.9 109.52 481 10/31/23 11:29 24.801 11.0 1.9 109.71 479 10/31/23 11:30 24.801 11.0 1.9 110.01 477 10/31/23 11:31 24.801 10.9 1.9 110.24 475 10/31/23 11:32 24.800 10.9 1.9 110.38 472 10/31/23 11:33 24.800 10.8 1.9 110.40 470 10/31/23 11:34 24.799 10.8 1.9 110.30 470 10/31/23 11:35 24.798 10.8 1.9 110.28 472 10/31/23 11:36 24.797 8.0 I 1.9 110.13 476 10/31/23 11:37 24.797 11.0 I 1.9 110.04 479 10/31/23 11:38 24.795 11.1 1.9 110.22 480 10/31/23 11:39 24.795 11.0 1.7 110.22 479 10/31/23 11:40 24.795 11.0 1.7 110.21 477 10/31/23 11:41 24.795 11.0 1.7 110.48 477 10/31/23 11:42 24.795 10.9 1.7 110.69 478 10/31/23 11:43 24.795 11.0 1.7 110.80 477 10/31/23 11:44 24.795 10.9 1.7 110.53 477 10/31/23 11:45 24.795 10.9 1.7 110.38 475 10/31/23 11:46 24.794 10.9 1.7 110.70 474 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:44  C = Calibration S = Substituted  * = Suspect  Average Data - Run 2 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 10/31/2023 10:28 Through 10/31/2023 12:37 Time Online Criteria: 1 minute(s) 10/31/23 11:47 24.794 10.9 1.7 110.88 474 10/31/23 11:48 24.794 10.9 1.7 110.85 474 10/31/23 11:49 24.794 10.9 1.7 110.70 474 10/31/23 11:50 24.794 10.9 1.7 110.64 475 10/31/23 11:51 24.794 10.9 1.7 110.71 475 10/31/23 11:52 24.795 11.0 1.7 110.50 477 10/31/23 11:53 24.795 11.1 1.7 110.25 477 10/31/23 11:54 24.794 11.1 1.7 110.43 477 10/31/23 11:55 24.794 11.0 1.8 110.65 476 10/31/23 11:56 24.793 11.0 1.9 110.70 476 10/31/23 11:57 24.793 11.0 1.8 110.95 475 10/31/23 11:58 24.792 10.9 1.8 111.01 474 10/31/23 11:59 24.791 10.9 1.8 111.13 474 10/31/23 12:00 24.790 10.8 1.8 111.15 473 10/31/23 12:01 24.788 10.8 1.8 111.28 472 10/31/23 12:02 24.788 10.8 1.8 111.28 472 10/31/23 12:03 24.787 10.8 1.8 111.17 471 10/31/23 12:04 24.786 10.9 1.8 110.97 473 10/31/23 12:05 24.785 10.9 1.8 110.79 475 10/31/23 12:06 24.785 8.1 I 1.9 110.67 477 10/31/23 12:07 24.785 11.0 I 1.9 110.69 478 10/31/23 12:08 24.785 11.0 1.9 110.89 478 10/31/23 12:09 24.785 11.0 1.9 110.71 476 10/31/23 12:10 24.784 11.0 1.9 110.76 475 10/31/23 12:11 24.785 11.0 1.9 111.02 475 10/31/23 12:12 24.784 11.0 1.9 111.02 476 10/31/23 12:13 24.784 10.9 1.9 110.86 478 10/31/23 12:14 24.782 11.0 1.9 110.93 477 10/31/23 12:15 24.782 11.1 2.0 110.95 476 10/31/23 12:16 24.782 11.0 2.0 110.80 477 10/31/23 12:17 24.782 11.0 2.0 110.85 477 10/31/23 12:18 24.782 11.0 2.0 111.00 477 10/31/23 12:19 24.781 11.0 2.0 110.97 478 10/31/23 12:20 24.780 11.1 2.0 110.69 479 10/31/23 12:21 24.779 11.0 2.0 110.54 479 10/31/23 12:22 24.779 10.9 2.0 110.90 477 10/31/23 12:23 24.779 10.9 1.9 110.95 474 10/31/23 12:24 24.778 10.9 1.9 110.99 472 10/31/23 12:25 24.778 10.8 2.0 111.01 471 10/31/23 12:26 24.777 10.8 2.0 111.30 470 10/31/23 12:27 24.777 10.8 2.0 111.15 471 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:44  C = Calibration S = Substituted  * = Suspect  Average Data - Run 2 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 10/31/2023 10:28 Through 10/31/2023 12:37 Time Online Criteria: 1 minute(s) 10/31/23 12:28 24.776 10.8 2.0 110.84 472 10/31/23 12:29 24.777 11.0 2.0 110.70 475 10/31/23 12:30 24.776 11.0 2.0 110.35 477 10/31/23 12:31 24.775 11.0 1.9 110.30 477 10/31/23 12:32 24.774 11.0 1.9 110.40 477 10/31/23 12:33 24.773 11.1 1.9 110.29 478 10/31/23 12:34 24.773 11.1 1.8 110.21 480 10/31/23 12:35 24.772 11.1 1.8 110.49 481 10/31/23 12:36 24.772 8.0 I 1.8 110.73 480 10/31/23 12:37 24.773 11.0 I 1.8 110.65 479 24.797 11.0 1.9 110.26 476 24.772 10.8 1.7 109.23 470 24.811 11.1 2.0 111.30 482 3,223.569 1,315.3 243.8 14,333.76 61,873 130 120 130 130 130 130 130 130 130 130 Geometric Mean Included Data Points Total number of Data Points Average Minimum Maximum Summation F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:44  C = Calibration S = Substituted  * = Suspect  10/31/23 13:30 24.751 10.9 1.9 111.32 474 10/31/23 13:31 24.751 10.9 1.9 111.56 474 10/31/23 13:32 24.751 10.8 1.9 111.76 473 10/31/23 13:33 24.751 10.8 1.9 111.59 472 10/31/23 13:34 24.751 10.9 2.0 111.49 473 10/31/23 13:35 24.751 10.9 1.9 111.60 471 10/31/23 13:36 24.751 8.2 I 1.9 111.87 474 10/31/23 13:37 24.751 10.9 I 2.0 112.28 476 10/31/23 13:38 24.751 11.0 1.9 112.41 476 10/31/23 13:39 24.750 11.0 1.9 112.72 476 10/31/23 13:40 24.750 11.1 1.9 112.90 477 10/31/23 13:41 24.751 11.1 1.9 112.92 478 10/31/23 13:42 24.751 11.0 2.0 113.03 478 10/31/23 13:43 24.750 11.0 1.9 112.94 477 10/31/23 13:44 24.750 11.0 1.9 112.72 476 10/31/23 13:45 24.750 11.0 1.9 112.74 476 10/31/23 13:46 24.750 11.0 1.9 112.67 476 10/31/23 13:47 24.750 11.0 1.9 112.38 476 10/31/23 13:48 24.750 10.9 1.9 112.49 475 10/31/23 13:49 24.749 11.0 1.9 112.64 474 10/31/23 13:50 24.750 10.9 1.9 112.41 475 10/31/23 13:51 24.749 11.0 1.9 112.23 475 10/31/23 13:52 24.748 11.0 1.9 112.27 475 10/31/23 13:53 24.749 11.0 1.9 112.22 476 10/31/23 13:54 24.748 11.0 1.9 112.30 476 10/31/23 13:55 24.748 10.9 1.9 112.47 475 10/31/23 13:56 24.748 10.9 1.9 112.37 475 10/31/23 13:57 24.748 11.0 1.9 112.09 475 10/31/23 13:58 24.747 11.0 1.9 112.07 475 10/31/23 13:59 24.747 10.9 1.9 112.20 474 10/31/23 14:00 24.747 10.8 1.9 112.19 473 10/31/23 14:01 24.746 10.9 1.9 112.17 472 10/31/23 14:02 24.746 10.9 1.9 112.03 472 10/31/23 14:03 24.747 10.9 2.0 112.28 473 10/31/23 14:04 24.747 10.9 2.0 112.72 475 10/31/23 14:05 24.746 10.9 1.9 113.10 475 10/31/23 14:06 24.746 7.9 I 1.9 113.15 474 10/31/23 14:07 24.746 10.9 I 1.9 112.98 473 Source UNIT2 BARPRESS (INHG) CO2 (PCT) OPACITY (PCT) STKTEMP (DEGF) UNITLOAD (MW) Average Data - Run 3 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 10/31/2023 13:30 Through 10/31/2023 15:41 Time Online Criteria: 1 minute(s) F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 10:14  C = Calibration S = Substituted  * = Suspect  Average Data - Run 3 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 10/31/2023 13:30 Through 10/31/2023 15:41 Time Online Criteria: 1 minute(s) 10/31/23 14:08 24.746 10.9 1.9 113.24 472 10/31/23 14:09 24.746 10.8 1.9 113.29 471 10/31/23 14:10 24.745 10.8 1.9 112.97 471 10/31/23 14:11 24.746 10.8 1.9 112.65 471 10/31/23 14:12 24.746 10.9 1.9 112.55 473 10/31/23 14:13 24.746 10.9 1.9 112.39 474 10/31/23 14:14 24.746 11.0 1.9 112.21 475 10/31/23 14:15 24.745 11.0 1.9 112.16 476 10/31/23 14:16 24.745 11.0 1.9 112.11 476 10/31/23 14:17 24.745 11.0 1.9 111.89 475 10/31/23 14:18 24.745 11.0 1.9 111.86 475 10/31/23 14:19 24.745 10.9 1.9 111.96 474 10/31/23 14:20 24.745 10.9 1.9 111.94 474 10/31/23 14:21 24.744 10.9 1.9 111.97 474 10/31/23 14:22 24.743 10.9 1.9 111.91 473 10/31/23 14:23 24.744 10.9 1.9 111.86 473 10/31/23 14:24 24.744 10.9 1.9 111.94 472 10/31/23 14:25 24.743 10.8 2.0 112.03 472 10/31/23 14:26 24.743 10.9 2.0 111.90 473 10/31/23 14:27 24.743 11.0 2.0 111.59 474 10/31/23 14:28 24.743 11.0 2.0 111.44 474 10/31/23 14:29 24.743 10.9 2.0 111.48 474 10/31/23 14:30 24.743 10.9 2.0 111.53 474 10/31/23 14:31 24.743 10.9 2.0 111.61 474 10/31/23 14:32 24.743 11.0 2.0 111.58 473 10/31/23 14:33 24.743 10.9 2.0 111.43 473 10/31/23 14:34 24.742 10.9 2.0 111.21 472 10/31/23 14:35 24.742 10.9 2.0 111.44 472 10/31/23 14:36 24.742 8.0 I 2.0 111.80 473 10/31/23 14:37 24.742 10.9 I 2.0 111.74 473 10/31/23 14:38 24.741 10.9 2.0 111.51 474 10/31/23 14:39 24.740 11.0 2.0 111.22 475 10/31/23 14:40 24.740 10.9 2.0 111.19 474 10/31/23 14:41 24.740 10.8 1.9 111.32 473 10/31/23 14:42 24.740 10.9 1.9 111.23 473 10/31/23 14:43 24.740 10.9 1.9 111.03 473 10/31/23 14:44 24.741 10.9 1.9 111.10 473 10/31/23 14:45 24.741 10.9 1.9 111.04 473 10/31/23 14:46 24.741 10.9 1.9 110.80 473 10/31/23 14:47 24.741 11.0 1.9 110.86 473 10/31/23 14:48 24.741 10.9 1.9 110.94 473 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 10:14  C = Calibration S = Substituted  * = Suspect  Average Data - Run 3 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 10/31/2023 13:30 Through 10/31/2023 15:41 Time Online Criteria: 1 minute(s) 10/31/23 14:49 24.740 11.0 1.9 110.97 475 10/31/23 14:50 24.739 11.0 1.9 110.85 476 10/31/23 14:51 24.739 11.0 1.9 110.95 477 10/31/23 14:52 24.738 10.9 1.9 111.26 476 10/31/23 14:53 24.737 10.9 1.9 111.45 476 10/31/23 14:54 24.738 10.9 1.9 111.32 475 10/31/23 14:55 24.738 10.9 1.9 111.29 474 10/31/23 14:56 24.739 10.9 1.9 111.38 472 10/31/23 14:57 24.738 10.9 1.9 111.28 473 10/31/23 14:58 24.739 10.9 1.9 111.10 474 10/31/23 14:59 24.738 11.0 1.9 110.99 475 10/31/23 15:00 24.738 10.9 1.9 110.94 476 10/31/23 15:01 24.738 11.0 1.9 110.87 477 10/31/23 15:02 24.737 11.0 1.9 110.73 477 10/31/23 15:03 24.737 11.0 1.9 110.89 477 10/31/23 15:04 24.737 11.0 1.9 110.89 478 10/31/23 15:05 24.737 11.0 1.9 110.72 476 10/31/23 15:06 24.736 8.0 I 1.9 110.97 475 10/31/23 15:07 24.735 10.9 I 1.9 111.42 474 10/31/23 15:08 24.736 10.9 1.9 111.53 474 10/31/23 15:09 24.735 10.9 1.9 111.54 474 10/31/23 15:10 24.735 11.0 1.9 111.36 475 10/31/23 15:11 24.735 11.0 1.9 111.16 476 10/31/23 15:12 24.735 11.0 1.9 111.40 477 10/31/23 15:13 24.734 11.0 1.9 111.34 478 10/31/23 15:14 24.734 11.0 1.9 111.13 479 10/31/23 15:15 24.734 11.0 1.9 111.35 479 10/31/23 15:16 24.733 11.0 1.9 111.41 478 10/31/23 15:17 24.732 11.1 1.9 111.44 478 10/31/23 15:18 24.732 11.1 1.9 111.43 477 10/31/23 15:19 24.732 11.0 1.9 111.49 475 10/31/23 15:20 24.732 10.9 2.0 111.48 474 10/31/23 15:21 24.731 11.0 1.9 111.50 473 10/31/23 15:22 24.732 10.9 1.9 111.57 472 10/31/23 15:23 24.733 10.9 1.9 111.72 472 10/31/23 15:24 24.733 10.9 1.9 111.94 472 10/31/23 15:25 24.733 10.9 1.9 112.01 472 10/31/23 15:26 24.733 10.9 1.9 112.10 473 10/31/23 15:27 24.733 11.0 1.9 112.15 475 10/31/23 15:28 24.733 11.0 2.0 112.09 476 10/31/23 15:29 24.732 10.9 1.9 112.09 477 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 10:14  C = Calibration S = Substituted  * = Suspect  Average Data - Run 3 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 10/31/2023 13:30 Through 10/31/2023 15:41 Time Online Criteria: 1 minute(s) 10/31/23 15:30 24.732 11.0 1.9 112.23 477 10/31/23 15:31 24.731 11.0 2.0 112.23 477 10/31/23 15:32 24.731 10.9 1.9 112.06 475 10/31/23 15:33 24.730 10.8 2.0 112.04 473 10/31/23 15:34 24.731 10.9 1.9 112.09 472 10/31/23 15:35 24.731 10.9 2.0 111.93 473 10/31/23 15:36 24.731 8.0 I 2.0 111.83 474 10/31/23 15:37 24.731 10.9 I 2.0 111.83 475 10/31/23 15:38 24.732 10.9 1.9 111.91 475 10/31/23 15:39 24.731 10.9 1.9 111.92 475 10/31/23 15:40 24.731 10.9 1.9 111.63 474 10/31/23 15:41 24.731 11.1 2.0 111.35 475 24.741 10.9 1.9 111.82 474 24.730 10.8 1.9 110.72 471 24.751 11.1 2.0 113.29 479 3,265.853 1,334.6 253.7 14,759.75 62,631 132 122 132 132 132 132 132 132 132 132 Geometric Mean Included Data Points Total number of Data Points Average Minimum Maximum Summation F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 10:14  C = Calibration S = Substituted  * = Suspect  PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix B.3 Unit 3 11/01/23 07:04 24.747 12.3 5.0 101.65 452 11/01/23 07:05 24.746 12.3 5.0 101.55 452 11/01/23 07:06 24.746 6.4 I 4.9 101.53 452 11/01/23 07:07 24.746 12.2 I 5.0 101.82 454 11/01/23 07:08 24.745 12.3 5.0 101.44 455 11/01/23 07:09 24.746 12.3 4.9 101.04 454 11/01/23 07:10 24.747 12.3 5.0 101.18 451 11/01/23 07:11 24.747 12.2 4.9 101.60 451 11/01/23 07:12 24.747 12.3 5.0 101.82 451 11/01/23 07:13 24.748 12.3 5.1 102.07 451 11/01/23 07:14 24.748 12.2 5.0 102.24 451 11/01/23 07:15 24.749 12.2 4.9 103.26 451 11/01/23 07:16 24.749 12.2 5.0 103.52 451 11/01/23 07:17 24.749 12.2 4.9 103.87 450 11/01/23 07:18 24.749 12.2 5.0 104.36 451 11/01/23 07:19 24.750 12.3 5.2 104.78 452 11/01/23 07:20 24.750 12.3 5.2 105.08 451 11/01/23 07:21 24.750 12.3 5.1 105.28 452 11/01/23 07:22 24.749 12.3 5.2 105.11 452 11/01/23 07:23 24.750 12.2 5.2 105.19 451 11/01/23 07:24 24.751 12.2 5.2 105.72 450 11/01/23 07:25 24.751 12.2 5.2 104.15 450 11/01/23 07:26 24.751 12.2 5.1 103.46 449 11/01/23 07:27 24.750 12.2 5.1 103.32 448 11/01/23 07:28 24.751 12.3 5.1 103.67 448 11/01/23 07:29 24.751 12.2 5.1 104.73 448 11/01/23 07:30 24.751 12.2 5.0 105.19 449 11/01/23 07:31 24.751 12.2 5.0 104.81 448 11/01/23 07:32 24.751 12.2 5.1 105.14 449 11/01/23 07:33 24.752 12.2 5.1 105.49 452 11/01/23 07:34 24.753 12.2 4.9 105.45 453 11/01/23 07:35 24.752 12.2 4.9 105.25 452 11/01/23 07:36 24.753 6.2 I 4.8 104.93 450 11/01/23 07:37 24.754 12.2 I 4.8 104.22 450 11/01/23 07:38 24.755 12.2 5.2 103.99 449 11/01/23 07:39 24.754 12.3 6.6 103.99 449 11/01/23 07:40 24.754 12.2 7.7 104.43 449 11/01/23 07:41 24.753 12.0 6.5 105.26 448 Source UNIT3 BARPRESS (INHG) CO2 (PCT) OPACITY (PCT) STKTEMP (DEGF) UNITLOAD (MW) Average Data - Run 1 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/01/2023 07:04 Through 11/01/2023 09:13 Time Online Criteria: 1 minute(s) F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:48  C = Calibration S = Substituted  * = Suspect  Average Data - Run 1 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/01/2023 07:04 Through 11/01/2023 09:13 Time Online Criteria: 1 minute(s) 11/01/23 07:42 24.754 12.2 6.2 105.78 449 11/01/23 07:43 24.754 12.2 5.5 105.39 450 11/01/23 07:44 24.753 12.3 5.9 104.78 450 11/01/23 07:45 24.754 12.3 5.6 104.78 450 11/01/23 07:46 24.755 12.3 4.9 104.56 451 11/01/23 07:47 24.755 12.3 5.3 104.39 450 11/01/23 07:48 24.754 12.3 5.3 104.64 451 11/01/23 07:49 24.755 12.3 4.9 104.95 452 11/01/23 07:50 24.755 12.4 4.9 105.08 451 11/01/23 07:51 24.756 12.4 4.9 105.28 451 11/01/23 07:52 24.758 12.4 4.7 105.53 450 11/01/23 07:53 24.759 12.4 4.8 105.35 450 11/01/23 07:54 24.760 12.4 5.0 105.59 450 11/01/23 07:55 24.760 12.4 5.3 105.84 450 11/01/23 07:56 24.760 12.4 4.6 105.53 450 11/01/23 07:57 24.760 12.4 4.9 105.20 450 11/01/23 07:58 24.761 12.4 4.8 105.35 452 11/01/23 07:59 24.762 12.5 4.5 105.33 451 11/01/23 08:00 24.763 12.5 4.8 105.35 450 11/01/23 08:01 24.765 12.5 4.8 105.82 449 11/01/23 08:02 24.763 12.5 4.6 106.22 449 11/01/23 08:03 24.762 12.5 5.0 106.34 452 11/01/23 08:04 24.762 12.5 4.9 106.18 451 11/01/23 08:05 24.762 12.5 4.6 105.77 451 11/01/23 08:06 24.763 6.1 I 4.6 105.57 450 11/01/23 08:07 24.763 12.4 I 4.5 105.59 450 11/01/23 08:08 24.763 12.4 4.4 105.67 449 11/01/23 08:09 24.764 12.5 4.4 105.89 448 11/01/23 08:10 24.764 12.5 4.3 105.85 449 11/01/23 08:11 24.764 12.4 4.3 105.69 449 11/01/23 08:12 24.765 12.5 4.3 105.53 449 11/01/23 08:13 24.765 12.5 4.3 105.72 448 11/01/23 08:14 24.765 12.5 4.3 106.07 448 11/01/23 08:15 24.765 12.5 4.3 105.95 449 11/01/23 08:16 24.764 12.5 4.3 105.06 449 11/01/23 08:17 24.765 12.5 4.3 104.75 449 11/01/23 08:18 24.765 12.6 4.3 105.00 449 11/01/23 08:19 24.765 12.6 4.3 105.51 449 11/01/23 08:20 24.765 12.6 4.3 106.07 450 11/01/23 08:21 24.765 12.6 4.4 105.99 449 11/01/23 08:22 24.765 12.6 4.4 105.58 450 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:48  C = Calibration S = Substituted  * = Suspect  Average Data - Run 1 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/01/2023 07:04 Through 11/01/2023 09:13 Time Online Criteria: 1 minute(s) 11/01/23 08:23 24.764 12.6 4.4 105.49 450 11/01/23 08:24 24.765 12.6 4.4 105.83 450 11/01/23 08:25 24.765 12.6 4.5 105.92 451 11/01/23 08:26 24.764 12.6 4.4 106.08 450 11/01/23 08:27 24.764 12.6 4.4 105.92 449 11/01/23 08:28 24.764 12.6 4.5 105.62 448 11/01/23 08:29 24.763 12.5 4.5 105.60 448 11/01/23 08:30 24.763 12.5 4.5 105.61 448 11/01/23 08:31 24.764 12.5 4.4 105.96 448 11/01/23 08:32 24.765 12.5 4.5 106.55 444 11/01/23 08:33 24.765 12.5 4.8 106.73 444 11/01/23 08:34 24.764 12.6 4.6 106.18 447 11/01/23 08:35 24.764 12.6 4.5 105.71 450 11/01/23 08:36 24.764 6.9 I 4.5 105.80 452 11/01/23 08:37 24.765 12.6 I 4.4 105.79 454 11/01/23 08:38 24.765 12.6 4.5 105.85 453 11/01/23 08:39 24.765 12.6 4.4 106.06 452 11/01/23 08:40 24.765 12.5 4.4 106.22 450 11/01/23 08:41 24.765 12.3 4.4 106.46 450 11/01/23 08:42 24.765 12.6 4.4 106.52 450 11/01/23 08:43 24.765 12.6 4.4 106.29 450 11/01/23 08:44 24.765 12.6 4.3 106.14 450 11/01/23 08:45 24.764 12.5 4.4 106.38 450 11/01/23 08:46 24.764 12.5 4.3 106.49 451 11/01/23 08:47 24.763 12.5 4.4 106.35 452 11/01/23 08:48 24.763 12.5 4.3 106.44 452 11/01/23 08:49 24.763 12.5 4.3 106.56 452 11/01/23 08:50 24.764 12.5 4.3 106.15 452 11/01/23 08:51 24.765 12.5 4.3 106.06 451 11/01/23 08:52 24.766 12.5 4.4 106.20 450 11/01/23 08:53 24.765 12.5 4.4 106.27 449 11/01/23 08:54 24.765 12.5 4.3 106.28 449 11/01/23 08:55 24.764 12.6 4.4 106.23 448 11/01/23 08:56 24.764 12.6 4.5 106.67 448 11/01/23 08:57 24.766 12.6 4.5 107.54 448 11/01/23 08:58 24.766 12.6 4.5 107.60 449 11/01/23 08:59 24.765 12.6 4.6 106.85 451 11/01/23 09:00 24.766 12.6 4.5 106.42 453 11/01/23 09:01 24.765 12.6 4.5 106.42 453 11/01/23 09:02 24.765 12.6 4.6 107.41 451 11/01/23 09:03 24.765 12.5 4.7 108.19 449 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:48  C = Calibration S = Substituted  * = Suspect  Average Data - Run 1 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/01/2023 07:04 Through 11/01/2023 09:13 Time Online Criteria: 1 minute(s) 11/01/23 09:04 24.765 12.5 4.6 108.32 449 11/01/23 09:05 24.764 12.5 4.6 108.02 450 11/01/23 09:06 24.765 5.9 I 4.5 107.65 449 11/01/23 09:07 24.765 12.5 I 4.5 107.49 449 11/01/23 09:08 24.765 12.5 4.5 107.35 449 11/01/23 09:09 24.765 12.6 4.5 106.99 448 11/01/23 09:10 24.765 12.5 4.4 106.99 448 11/01/23 09:11 24.765 12.4 4.4 107.63 448 11/01/23 09:12 24.765 12.5 4.4 108.12 447 11/01/23 09:13 24.765 12.5 4.6 107.82 449 24.759 12.4 4.8 105.39 450 24.745 12.0 4.3 101.04 444 24.766 12.6 7.7 108.32 455 3,218.688 1,490.4 618.9 13,701.33 58,502 130 120 130 130 130 130 130 130 130 130 Geometric Mean Included Data Points Total number of Data Points Average Minimum Maximum Summation F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:48  C = Calibration S = Substituted  * = Suspect  11/01/23 09:43 24.763 12.3 6.0 111.64 449 11/01/23 09:44 24.762 12.3 5.9 112.08 452 11/01/23 09:45 24.762 12.3 5.2 112.18 453 11/01/23 09:46 24.761 12.3 4.6 112.08 453 11/01/23 09:47 24.760 12.3 4.6 111.86 452 11/01/23 09:48 24.759 12.3 4.5 111.63 450 11/01/23 09:49 24.759 12.3 4.5 111.55 448 11/01/23 09:50 24.759 12.4 4.6 111.53 446 11/01/23 09:51 24.759 12.4 4.6 111.46 446 11/01/23 09:52 24.759 12.4 4.5 111.27 446 11/01/23 09:53 24.759 12.4 4.5 111.18 448 11/01/23 09:54 24.758 12.4 4.6 111.20 450 11/01/23 09:55 24.757 12.5 4.6 111.11 452 11/01/23 09:56 24.756 12.5 5.4 111.01 451 11/01/23 09:57 24.756 12.5 6.0 111.04 450 11/01/23 09:58 24.756 12.6 6.0 111.30 449 11/01/23 09:59 24.756 12.6 5.7 111.62 450 11/01/23 10:00 24.756 12.5 5.4 111.89 452 11/01/23 10:01 24.756 12.5 5.0 111.93 452 11/01/23 10:02 24.755 12.5 4.8 111.98 447 11/01/23 10:03 24.755 12.5 5.3 112.08 446 11/01/23 10:04 24.755 12.5 4.9 111.85 451 11/01/23 10:05 24.755 12.5 5.0 111.65 453 11/01/23 10:06 24.756 6.3 I 4.9 111.81 453 11/01/23 10:07 24.756 12.4 I 4.8 111.86 454 11/01/23 10:08 24.755 12.4 4.8 111.70 453 11/01/23 10:09 24.756 12.4 4.9 111.53 452 11/01/23 10:10 24.755 12.5 4.7 111.38 452 11/01/23 10:11 24.755 12.3 4.7 111.38 452 11/01/23 10:12 24.753 12.4 5.1 111.37 452 11/01/23 10:13 24.752 12.5 5.8 111.19 452 11/01/23 10:14 24.753 12.5 6.1 111.17 452 11/01/23 10:15 24.752 12.5 6.0 111.40 451 11/01/23 10:16 24.751 12.5 5.8 111.59 451 11/01/23 10:17 24.751 12.5 5.7 111.70 450 11/01/23 10:18 24.752 12.4 5.4 111.78 450 11/01/23 10:19 24.751 12.4 5.3 111.95 451 11/01/23 10:20 24.751 12.4 4.8 112.13 452 Source UNIT3 BARPRESS (INHG) CO2 (PCT) OPACITY (PCT) STKTEMP (DEGF) UNITLOAD (MW) Average Data - Run 2 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/01/2023 09:43 Through 11/01/2023 11:51 Time Online Criteria: 1 minute(s) F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:51  C = Calibration S = Substituted  * = Suspect  Average Data - Run 2 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/01/2023 09:43 Through 11/01/2023 11:51 Time Online Criteria: 1 minute(s) 11/01/23 10:21 24.751 12.4 4.8 112.13 452 11/01/23 10:22 24.751 12.4 4.7 111.99 454 11/01/23 10:23 24.751 12.4 4.7 111.95 454 11/01/23 10:24 24.750 12.4 4.7 111.91 453 11/01/23 10:25 24.749 12.4 4.6 111.79 453 11/01/23 10:26 24.749 12.4 4.7 111.59 452 11/01/23 10:27 24.748 12.4 4.7 111.44 451 11/01/23 10:28 24.747 12.4 4.6 111.34 452 11/01/23 10:29 24.747 12.4 4.2 111.24 453 11/01/23 10:30 24.747 12.4 4.5 111.23 453 11/01/23 10:31 24.747 12.4 8.6 111.32 451 11/01/23 10:32 24.748 12.4 7.6 111.45 450 11/01/23 10:33 24.747 12.4 7.8 111.50 447 11/01/23 10:34 24.746 12.4 8.3 111.45 447 11/01/23 10:35 24.745 12.3 7.6 111.60 447 11/01/23 10:36 24.745 6.1 I 8.5 111.79 447 11/01/23 10:37 24.744 12.2 I 9.1 111.78 447 11/01/23 10:38 24.743 12.2 8.2 111.97 448 11/01/23 10:39 24.743 12.2 8.8 112.17 448 11/01/23 10:40 24.743 12.2 8.6 112.04 449 11/01/23 10:41 24.744 12.0 7.2 111.70 450 11/01/23 10:42 24.744 12.2 8.5 111.50 453 11/01/23 10:43 24.743 12.2 7.7 111.46 453 11/01/23 10:44 24.744 12.3 5.6 111.38 452 11/01/23 10:45 24.743 12.3 6.8 111.32 450 11/01/23 10:46 24.743 12.3 6.9 111.34 449 11/01/23 10:47 24.743 12.3 6.1 111.35 449 11/01/23 10:48 24.743 12.3 6.7 111.38 448 11/01/23 10:49 24.742 12.3 7.7 111.33 448 11/01/23 10:50 24.742 12.3 5.9 111.20 450 11/01/23 10:51 24.741 12.3 4.6 111.18 451 11/01/23 10:52 24.741 12.3 4.9 I 111.19 451 11/01/23 10:53 24.741 12.3 4.8 I 111.29 451 11/01/23 10:54 24.740 12.3 4.8 111.36 450 11/01/23 10:55 24.740 12.3 4.9 111.45 448 11/01/23 10:56 24.741 12.3 5.6 111.59 448 11/01/23 10:57 24.741 12.3 5.4 111.75 448 11/01/23 10:58 24.741 12.3 4.4 111.90 448 11/01/23 10:59 24.740 12.2 4.7 112.04 448 11/01/23 11:00 24.739 12.2 4.6 112.05 448 11/01/23 11:01 24.739 12.2 4.1 112.22 447 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:51  C = Calibration S = Substituted  * = Suspect  Average Data - Run 2 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/01/2023 09:43 Through 11/01/2023 11:51 Time Online Criteria: 1 minute(s) 11/01/23 11:02 24.739 12.2 4.1 112.60 448 11/01/23 11:03 24.739 12.1 4.0 112.64 449 11/01/23 11:04 24.738 12.1 3.9 112.15 449 11/01/23 11:05 24.739 12.1 4.0 111.92 449 11/01/23 11:06 24.738 6.1 I 4.0 111.90 450 11/01/23 11:07 24.738 12.3 I 4.0 111.75 450 11/01/23 11:08 24.737 12.2 4.0 111.71 449 11/01/23 11:09 24.736 12.2 4.0 111.81 447 11/01/23 11:10 24.736 12.1 4.3 111.98 447 11/01/23 11:11 24.735 12.0 4.5 112.01 447 11/01/23 11:12 24.736 12.2 4.2 111.95 447 11/01/23 11:13 24.736 12.2 4.4 111.89 448 11/01/23 11:14 24.736 12.2 5.1 111.85 448 11/01/23 11:15 24.736 12.2 5.1 111.86 448 11/01/23 11:16 24.735 12.2 4.5 111.95 448 11/01/23 11:17 24.735 12.2 4.5 112.17 449 11/01/23 11:18 24.735 12.2 4.4 112.21 449 11/01/23 11:19 24.736 12.2 4.2 112.11 449 11/01/23 11:20 24.737 12.1 4.1 112.08 450 11/01/23 11:21 24.737 12.1 4.0 112.06 450 11/01/23 11:22 24.738 12.1 4.0 111.99 449 11/01/23 11:23 24.737 12.1 4.0 112.08 449 11/01/23 11:24 24.736 12.1 4.0 112.14 447 11/01/23 11:25 24.734 12.1 4.1 112.05 447 11/01/23 11:26 24.733 12.1 4.4 111.79 448 11/01/23 11:27 24.732 12.1 4.7 111.73 449 11/01/23 11:28 24.731 12.2 4.5 111.92 449 11/01/23 11:29 24.731 12.2 4.2 112.04 447 11/01/23 11:30 24.731 12.2 4.5 112.13 447 11/01/23 11:31 24.731 12.2 4.8 112.30 447 11/01/23 11:32 24.730 12.2 5.2 112.42 447 11/01/23 11:33 24.730 12.1 4.9 112.57 448 11/01/23 11:34 24.729 12.1 4.4 112.57 449 11/01/23 11:35 24.728 12.1 4.4 112.49 448 11/01/23 11:36 24.728 6.0 I 4.3 112.64 448 11/01/23 11:37 24.728 12.1 I 4.3 112.80 450 11/01/23 11:38 24.727 12.2 4.2 112.57 449 11/01/23 11:39 24.727 12.1 4.1 112.47 449 11/01/23 11:40 24.725 12.0 4.3 112.57 449 11/01/23 11:41 24.724 12.0 4.3 112.49 448 11/01/23 11:42 24.724 12.1 4.4 112.27 448 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:51  C = Calibration S = Substituted  * = Suspect  Average Data - Run 2 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/01/2023 09:43 Through 11/01/2023 11:51 Time Online Criteria: 1 minute(s) 11/01/23 11:43 24.724 12.1 4.5 112.28 448 11/01/23 11:44 24.724 12.1 4.7 112.52 448 11/01/23 11:45 24.724 12.1 4.6 112.66 447 11/01/23 11:46 24.724 12.1 4.4 112.60 447 11/01/23 11:47 24.724 12.1 4.3 112.60 448 11/01/23 11:48 24.725 12.1 4.4 112.60 448 11/01/23 11:49 24.724 12.1 4.7 112.48 448 11/01/23 11:50 24.723 12.0 4.8 112.54 448 11/01/23 11:51 24.723 12.0 4.8 112.63 448 24.743 12.3 5.2 111.85 449 24.723 12.0 3.9 111.01 446 24.763 12.6 9.1 112.80 454 3,191.831 1,485.3 655.0 14,428.26 57,984 129 121 127 129 129 129 129 129 129 129 Geometric Mean Included Data Points Total number of Data Points Average Minimum Maximum Summation F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:51  C = Calibration S = Substituted  * = Suspect  11/01/23 12:50 24.697 11.9 4.0 112.57 450 11/01/23 12:51 24.696 11.9 4.1 112.51 450 11/01/23 12:52 24.694 11.9 4.1 112.43 450 11/01/23 12:53 24.693 11.9 4.0 112.30 450 11/01/23 12:54 24.693 11.9 4.1 112.22 449 11/01/23 12:55 24.693 11.9 4.1 112.25 447 11/01/23 12:56 24.692 11.9 4.0 112.32 448 11/01/23 12:57 24.690 11.9 4.1 112.40 449 11/01/23 12:58 24.690 11.9 4.2 112.44 450 11/01/23 12:59 24.690 11.9 4.2 112.22 451 11/01/23 13:00 24.689 11.9 4.1 111.92 452 11/01/23 13:01 24.689 11.9 4.1 111.85 451 11/01/23 13:02 24.689 11.9 4.0 111.88 449 11/01/23 13:03 24.689 11.9 4.0 111.94 449 11/01/23 13:04 24.689 11.9 4.0 112.06 450 11/01/23 13:05 24.689 11.9 4.1 112.14 450 11/01/23 13:06 24.689 6.4 I 4.3 112.00 450 11/01/23 13:07 24.688 11.9 I 5.1 111.99 452 11/01/23 13:08 24.688 11.9 5.5 112.11 453 11/01/23 13:09 24.687 11.8 5.5 112.15 453 11/01/23 13:10 24.687 11.8 4.8 112.23 451 11/01/23 13:11 24.687 11.7 4.6 112.25 450 11/01/23 13:12 24.687 11.9 4.6 112.32 449 11/01/23 13:13 24.686 11.9 4.5 112.46 448 11/01/23 13:14 24.686 11.9 4.4 112.58 448 11/01/23 13:15 24.684 11.9 4.3 112.57 449 11/01/23 13:16 24.684 11.9 4.2 112.46 452 11/01/23 13:17 24.684 12.0 4.2 112.27 453 11/01/23 13:18 24.683 12.0 4.1 112.11 453 11/01/23 13:19 24.682 12.0 4.1 111.95 452 11/01/23 13:20 24.681 12.0 4.1 111.86 450 11/01/23 13:21 24.681 12.0 4.1 111.88 448 11/01/23 13:22 24.681 12.0 4.1 111.86 447 11/01/23 13:23 24.681 12.0 4.1 111.81 448 11/01/23 13:24 24.681 12.0 4.2 111.82 448 11/01/23 13:25 24.680 12.0 4.2 111.92 449 11/01/23 13:26 24.680 12.0 4.2 111.80 450 11/01/23 13:27 24.680 12.1 4.0 111.57 449 Source UNIT3 BARPRESS (INHG) CO2 (PCT) OPACITY (PCT) STKTEMP (DEGF) UNITLOAD (MW) Average Data - Run 3 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/01/2023 12:50 Through 11/01/2023 14:59 Time Online Criteria: 1 minute(s) F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:54  C = Calibration S = Substituted  * = Suspect  Average Data - Run 3 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/01/2023 12:50 Through 11/01/2023 14:59 Time Online Criteria: 1 minute(s) 11/01/23 13:28 24.680 12.1 4.0 111.64 448 11/01/23 13:29 24.680 12.1 4.1 111.77 450 11/01/23 13:30 24.680 12.1 4.1 111.76 451 11/01/23 13:31 24.679 12.1 4.1 111.74 448 11/01/23 13:32 24.678 12.1 4.2 111.73 449 11/01/23 13:33 24.678 12.1 4.2 111.53 453 11/01/23 13:34 24.678 12.2 4.5 111.58 452 11/01/23 13:35 24.677 12.2 4.4 111.91 453 11/01/23 13:36 24.676 5.9 I 4.2 112.16 454 11/01/23 13:37 24.676 12.0 I 4.2 112.11 453 11/01/23 13:38 24.674 12.1 4.2 111.94 451 11/01/23 13:39 24.674 12.1 4.1 111.90 449 11/01/23 13:40 24.674 12.1 4.2 111.88 449 11/01/23 13:41 24.673 12.0 4.2 111.76 448 11/01/23 13:42 24.673 12.1 4.2 111.74 447 11/01/23 13:43 24.673 12.1 4.2 111.78 448 11/01/23 13:44 24.672 12.1 4.1 111.99 448 11/01/23 13:45 24.673 12.1 4.2 112.05 448 11/01/23 13:46 24.673 12.1 4.2 111.96 448 11/01/23 13:47 24.673 12.1 4.1 111.87 447 11/01/23 13:48 24.672 12.1 4.3 111.95 448 11/01/23 13:49 24.672 12.1 4.3 112.03 449 11/01/23 13:50 24.672 12.1 4.2 111.99 451 11/01/23 13:51 24.671 12.1 4.2 111.99 451 11/01/23 13:52 24.670 12.2 4.2 111.95 450 11/01/23 13:53 24.670 12.2 4.2 111.89 450 11/01/23 13:54 24.669 12.2 4.2 111.99 448 11/01/23 13:55 24.669 12.2 4.2 112.13 448 11/01/23 13:56 24.669 12.1 4.2 112.05 448 11/01/23 13:57 24.669 12.1 4.2 111.94 447 11/01/23 13:58 24.669 12.1 4.2 111.89 446 11/01/23 13:59 24.669 12.1 4.2 111.82 447 11/01/23 14:00 24.669 12.1 4.2 111.78 448 11/01/23 14:01 24.668 12.1 4.3 111.79 448 11/01/23 14:02 24.669 12.1 4.3 111.66 450 11/01/23 14:03 24.668 12.2 4.2 111.50 451 11/01/23 14:04 24.668 12.2 4.2 111.53 453 11/01/23 14:05 24.667 12.3 4.1 111.67 452 11/01/23 14:06 24.667 5.8 I 4.1 112.01 450 11/01/23 14:07 24.667 12.0 I 4.2 112.27 448 11/01/23 14:08 24.667 12.1 4.2 112.04 448 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:54  C = Calibration S = Substituted  * = Suspect  Average Data - Run 3 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/01/2023 12:50 Through 11/01/2023 14:59 Time Online Criteria: 1 minute(s) 11/01/23 14:09 24.666 12.2 4.2 111.94 448 11/01/23 14:10 24.666 12.2 4.2 111.91 449 11/01/23 14:11 24.665 11.9 4.2 111.86 449 11/01/23 14:12 24.665 12.1 4.2 111.93 449 11/01/23 14:13 24.665 12.2 4.2 111.90 449 11/01/23 14:14 24.664 12.1 4.2 111.87 450 11/01/23 14:15 24.664 12.2 4.3 111.92 450 11/01/23 14:16 24.664 12.2 4.2 111.97 450 11/01/23 14:17 24.664 12.2 4.3 111.90 451 11/01/23 14:18 24.664 12.2 4.2 111.84 450 11/01/23 14:19 24.663 12.2 4.2 111.94 450 11/01/23 14:20 24.663 12.2 4.2 112.04 450 11/01/23 14:21 24.662 12.2 4.3 112.08 449 11/01/23 14:22 24.662 12.2 4.2 111.99 450 11/01/23 14:23 24.662 12.2 4.2 111.91 451 11/01/23 14:24 24.662 12.2 4.2 111.77 451 11/01/23 14:25 24.663 12.2 4.2 111.73 450 11/01/23 14:26 24.661 12.2 4.2 111.85 450 11/01/23 14:27 24.661 12.2 4.2 111.93 449 11/01/23 14:28 24.661 12.2 4.2 111.95 449 11/01/23 14:29 24.661 12.2 4.2 111.92 449 11/01/23 14:30 24.661 12.2 4.2 111.81 449 11/01/23 14:31 24.661 12.2 4.2 111.86 449 11/01/23 14:32 24.660 12.2 4.1 112.00 448 11/01/23 14:33 24.660 12.2 4.2 112.08 448 11/01/23 14:34 24.661 12.2 4.2 112.09 448 11/01/23 14:35 24.660 12.2 4.3 111.95 449 11/01/23 14:36 24.660 6.2 I 4.3 111.83 451 11/01/23 14:37 24.660 12.3 I 4.3 111.85 452 11/01/23 14:38 24.660 12.2 4.3 111.90 453 11/01/23 14:39 24.659 12.2 4.3 112.01 453 11/01/23 14:40 24.659 12.0 4.4 112.15 451 11/01/23 14:41 24.659 12.0 4.3 112.37 450 11/01/23 14:42 24.659 12.1 4.3 112.41 448 11/01/23 14:43 24.660 12.1 4.3 112.35 448 11/01/23 14:44 24.659 12.1 4.3 112.26 448 11/01/23 14:45 24.659 12.1 4.3 112.36 449 11/01/23 14:46 24.659 12.1 4.4 112.37 449 11/01/23 14:47 24.658 12.1 4.3 112.47 450 11/01/23 14:48 24.658 12.1 4.3 112.71 450 11/01/23 14:49 24.657 12.1 4.2 112.75 450 F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:54  C = Calibration S = Substituted  * = Suspect  Average Data - Run 3 Plant: HUNTER PLANT Interval: 1 Minute Type: Block Report Period: 11/01/2023 12:50 Through 11/01/2023 14:59 Time Online Criteria: 1 minute(s) 11/01/23 14:50 24.657 12.1 4.2 112.61 450 11/01/23 14:51 24.657 12.1 4.2 112.60 449 11/01/23 14:52 24.657 12.1 4.3 112.53 449 11/01/23 14:53 24.657 12.1 4.3 112.46 448 11/01/23 14:54 24.657 12.1 4.3 112.52 447 11/01/23 14:55 24.657 12.0 4.3 112.60 447 11/01/23 14:56 24.657 12.0 4.4 112.52 449 11/01/23 14:57 24.656 12.0 4.3 112.38 450 11/01/23 14:58 24.657 12.0 4.3 112.28 450 11/01/23 14:59 24.656 12.0 4.3 112.12 451 24.672 12.1 4.2 112.05 450 24.656 11.7 4.0 111.50 446 24.697 12.3 5.5 112.75 454 3,207.359 1,472.4 551.4 14,566.44 58,448 130 122 130 130 130 130 130 130 130 130 Geometric Mean Included Data Points Total number of Data Points Average Minimum Maximum Summation F = Unit Offline E = Exceedance  M = Maintenance  T = Out Of Control   Report Generated: 11/30/23 09:54  C = Calibration S = Substituted  * = Suspect  PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix C Laboratory Analysis Data PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix C.1 Gravimetric Analyses Analytical Narrative Instrumentation Detection Limit / Sensitivity Notes Attachments Gravimetric Analysis Logs Sample Chain of Custody EPA Method 5/202 Gravimetric Analysis Report Project Code: Date Finalized: Laboratory Results Summary Filterable Particulate Matter (mg)Sample ID PROJ‐023437 11/28/2023 T. Wojtach 15.9 16.5 13.7 Condensable Particulate Matter (mg) Hunter Unit 1, Run #1 Hunter Unit 1, Run #2 Teflon CPM filters were extracted in a sonicator three times with water and three times with hexane.  The extraction  water was added to the back‐half impinger contents and extracted with hexane three times in a separatory funnel.   The inorganic fraction was transferred to a tared Teflon baggie, baked at 105C until 10 mL remained, taken to dryness  under a fume hood, dessicated for at least 24 hours, then weighed to a constant weight (±0.5 mg).  The organic  fraction was combined with the acetone and hexane field rinses, measured to the nearest milliliter, transferred to a  tared aluminum weighing dish, taken to dryness under a fume hood, dessicated for at least 24 hours, then weighed to  a constant weight (±0.5 mg).  No blank correction was performed unless otherwise indicated. All measurements were taken using a Torbal Model AGCN200 Analytical Balance under laboratory conditions.  The  instrument is auto‐calibrated and challanged with three NIST‐traceable reference weights daily.   All measurements are recorded to 0.0001g (0.1mg). No deviations from the analytical procedures from EPA Method 5 were noted.  All samples were received in good  condition.  After analysis, all samples are archived for a period of one year. Analyst: Hunter Unit 1, Run #1 Hunter Unit 1, Run #2 Hunter Unit 1, Run #3 10.0 17.3 17.1 No acetone blank corrections were performed. CPM value includes a field blank correction. Filters were dessicated and tared to a constant weight in the MAQS laboratory prior to sampling.  Following testing,  the filters were dessicated for at least 24 hours, then weighed to a constant weight (±0.5 mg).  The acetone rinses  were measured to the nearest milliliter, transferred to tared aluminum weighing dishes, taken to dryness under a  fume hood, dessicated for at least 24 hours, then weighed to a constant weight (±0.5 mg).  Each result above  represents total filterable particulate matter for each test run (acetone rinse + filter catch), with no blank correction  performed unless otherwise indicated. Hunter Unit 1, Run #3 Sample ID Project Code: Unit ID: Front‐Half Particulate Matter Filter Catch Date Weight (g) Date Weight (g) Date Weight (g) Date Weight (g) 11/8/23 0.3795 11/8/23 0.3792 11/8/23 0.3780 11/8/23 0.3744 11/9/23 0.3795 11/9/23 0.3794 11/9/23 0.3779 11/9/23 0.3744 10/5/23 0.3741 10/5/23 0.3741 10/5/23 0.3722 10/5/23 0.3746 10/6/23 0.3741 10/6/23 0.3743 10/6/23 0.3720 10/6/23 0.3742 Front‐Half Particulate Matter Acetone Rinse Catch Rinse Mass (g) Date Weight (g) Date Weight (g) Date Weight (g) Date Weight (g) 11/10/23 6.3398 11/10/23 6.4681 11/10/23 6.4732 11/10/23 6.3135 11/13/23 6.3395 11/13/23 6.4676 11/13/23 6.4727 11/13/23 6.3136 11/1/23 6.3294 11/1/23 6.4565 11/1/23 6.4653 11/1/23 6.3136 11/3/23 6.3289 11/3/23 6.4564 11/3/23 6.4650 11/3/23 6.3135 Total Particulate Catch 1939 0.0000 EPA Method 5 Gravimetric Analysis Log PROJ‐023437 Run #1 Run #2 Run #3 Blank Run #1 Run #2 Run #3 Filter #1956 1944 1937 Final Filter Weight #1 (g) Final Filter Weight #2 (g) Filter Tare Weight #2 (g) Filter Catch (g) 0.0054 0.0051 0.0059 Filter Tare Weight #1 (g) Rinse Volume (mL)95.5 113.8 107.8 Tin #8253 8256 8269 75 84.689.3 Blank 112.2 Run #3 88.1 Dish Tare Weight (g) 8271 0.00000.0105 0.0114 0.0078 Dish Tare Weight (g) Final Dish Weight #1 (g) Final Dish Weight #2 (g) 0.0054 0.0051 0.0159 0.0165 Run #1 Run #2 0.0137 Total Rinse Catch (g) Hunter Unit 1 0.0059 0.0105 0.0000 0.0114 0.0000 0.0078 0.0000 Filter Catch (g) + Rinse Catch (g) ‐ Acetone Blank (g) Total PM (g) Project Code: Unit ID: Back‐Half Organic Particulate Matter Catch Date Weight (g) Date Weight (g) Date Weight (g) Date Weight (g) 11/27/23 6.3648 11/27/23 6.3688 11/27/23 6.4280 11/27/23 6.3457 Final Weight #2 (g)11/28/23 6.3649 11/27/23 6.3686 11/27/23 6.4280 11/27/23 6.3455 11/8/23 6.3602 11/8/23 6.3642 11/8/23 6.4248 11/8/23 6.3427 11/9/23 6.3606 11/9/23 6.3642 11/9/23 6.4244 11/9/23 6.3429 Back‐Half Inorganic Particulate Matter Catch Date Weight (g) Date Weight (g) Date Weight (g) Date Weight (g) 11/28/23 3.8925 11/28/23 3.8801 11/28/23 3.8579 11/28/23 4.0997 Final Weight #2 (g)11/28/23 3.8920 11/28/23 3.8800 11/28/23 3.8576 11/28/23 4.0992 9/25/23 3.8846 9/25/23 3.8651 9/25/23 3.8420 11/13/23 4.0978 9/26/23 3.8849 9/26/23 3.8654 9/26/23 3.8422 11/15/23 4.0983 Condensable Particulate Catch Final Weight #1 (g) EPA Method 202 Gravimetric Analysis Log PROJ‐023437 Hunter Unit 1 Run #1 Run #2 Run #3 Blank Tin #8296 8289 8308 8287 Tare Weight #2 (g) Organic CPM Catch (g)0.0045 0.0045 Tare Weight #1 (g) 0.0028 Run #1 Run #2 Run #3 Blank 0.0034 1791183518181811 Tare Weight #2 (g) Tare Weight #1 (g) Teflon Baggie # Final Weight #1 (g) 0.0014 Run #1 Run #2 Run #3 Organic CPM Catch (g)0.0045 0.0034 Inorganic CPM Catch (g) 0.0045 0.0075 0.0148 0.0157 Total CPM (g) 0.0100 0.0173 0.0171 + Inorganic CPM Catch (g)0.0075 0.0157 ‐ CPM Blank (g)0.0020 0.0020 0.0020 0.0148 Analytical Narrative Instrumentation Detection Limit / Sensitivity Notes Attachments Gravimetric Analysis Logs Sample Chain of Custody EPA Method 5/202 Gravimetric Analysis Report Project Code: Date Finalized: Laboratory Results Summary Filterable Particulate Matter (mg)Sample ID PROJ‐023437 11/29/2023 T. Wojtach 28.4 16.6 17.5 Condensable Particulate Matter (mg) Hunter Unit 2, Run #1 Hunter Unit 2, Run #2 Teflon CPM filters were extracted in a sonicator three times with water and three times with hexane.  The extraction  water was added to the back‐half impinger contents and extracted with hexane three times in a separatory funnel.   The inorganic fraction was transferred to a tared Teflon baggie, baked at 105C until 10 mL remained, taken to dryness  under a fume hood, dessicated for at least 24 hours, then weighed to a constant weight (±0.5 mg).  The organic  fraction was combined with the acetone and hexane field rinses, measured to the nearest milliliter, transferred to a  tared aluminum weighing dish, taken to dryness under a fume hood, dessicated for at least 24 hours, then weighed to  a constant weight (±0.5 mg).  No blank correction was performed unless otherwise indicated. All measurements were taken using a Torbal Model AGCN200 Analytical Balance under laboratory conditions.  The  instrument is auto‐calibrated and challanged with three NIST‐traceable reference weights daily.   All measurements are recorded to 0.0001g (0.1mg). No deviations from the analytical procedures from EPA Method 5 were noted.  All samples were received in good  condition.  After analysis, all samples are archived for a period of one year. Analyst: Hunter Unit 2, Run #1 Hunter Unit 2, Run #2 Hunter Unit 2, Run #3 8.4 8.0 6.3 No acetone blank corrections were performed. CPM value includes a field blank correction. Filters were dessicated and tared to a constant weight in the MAQS laboratory prior to sampling.  Following testing,  the filters were dessicated for at least 24 hours, then weighed to a constant weight (±0.5 mg).  The acetone rinses  were measured to the nearest milliliter, transferred to tared aluminum weighing dishes, taken to dryness under a  fume hood, dessicated for at least 24 hours, then weighed to a constant weight (±0.5 mg).  Each result above  represents total filterable particulate matter for each test run (acetone rinse + filter catch), with no blank correction  performed unless otherwise indicated. Hunter Unit 2, Run #3 Sample ID Project Code: Unit ID: Front‐Half Particulate Matter Filter Catch Date Weight (g) Date Weight (g) Date Weight (g) Date Weight (g) 11/8/23 0.3790 11/8/23 0.3778 11/8/23 0.3775 11/8/23 0.3744 11/9/23 0.3790 11/9/23 0.3780 11/9/23 0.3773 11/9/23 0.3744 10/5/23 0.3745 9/15/23 0.3737 10/5/23 0.3732 10/5/23 0.3746 10/6/23 0.3745 9/25/23 0.3733 10/6/23 0.3732 10/6/23 0.3742 Front‐Half Particulate Matter Acetone Rinse Catch Rinse Mass (g) Date Weight (g) Date Weight (g) Date Weight (g) Date Weight (g) 11/10/23 6.4506 11/10/23 6.3960 11/10/23 6.4505 11/10/23 6.3135 11/13/23 6.4506 11/13/23 6.3962 11/13/23 6.4510 11/13/23 6.3136 10/3/23 6.4267 10/3/23 6.3837 11/1/23 6.4373 11/1/23 6.3136 10/4/23 6.4266 10/4/23 6.3841 11/3/23 6.4377 11/3/23 6.3135 Total Particulate Catch 1939 0.0000 EPA Method 5 Gravimetric Analysis Log PROJ‐023437 Run #1 Run #2 Run #3 Blank Run #1 Run #2 Run #3 Filter #1936 1900 1935 Final Filter Weight #1 (g) Final Filter Weight #2 (g) Filter Tare Weight #2 (g) Filter Catch (g) 0.0045 0.0044 0.0042 Filter Tare Weight #1 (g) Rinse Volume (mL)115.5 118.1 127.1 Tin #8221 8225 8263 90.7 99.892.7 Blank 112.2 Run #3 88.1 Dish Tare Weight (g) 8271 0.00000.0239 0.0122 0.0133 Dish Tare Weight (g) Final Dish Weight #1 (g) Final Dish Weight #2 (g) 0.0045 0.0044 0.0284 0.0166 Run #1 Run #2 0.0175 Total Rinse Catch (g) Hunter Unit 2 0.0042 0.0239 0.0000 0.0122 0.0000 0.0133 0.0000 Filter Catch (g) + Rinse Catch (g) ‐ Acetone Blank (g) Total PM (g) Project Code: Unit ID: Back‐Half Organic Particulate Matter Catch Date Weight (g) Date Weight (g) Date Weight (g) Date Weight (g) 11/27/23 6.3537 11/27/23 6.4689 11/27/23 6.3611 11/27/23 6.3457 Final Weight #2 (g)11/27/23 6.3539 11/27/23 6.4687 11/28/23 6.3610 11/27/23 6.3455 11/8/23 6.3513 11/8/23 6.4659 11/8/23 6.3572 11/8/23 6.3427 11/9/23 6.3515 11/9/23 6.4663 11/9/23 6.3575 11/9/23 6.3429 Back‐Half Inorganic Particulate Matter Catch Date Weight (g) Date Weight (g) Date Weight (g) Date Weight (g) 11/28/23 3.7908 11/28/23 3.8821 11/28/23 4.0674 11/28/23 4.0997 Final Weight #2 (g)11/28/23 3.7903 11/29/23 3.8825 11/29/23 4.0680 11/28/23 4.0992 9/25/23 3.7824 9/25/23 3.8751 9/25/23 4.0630 11/13/23 4.0978 9/26/23 3.7827 9/26/23 3.8749 9/26/23 4.0632 11/15/23 4.0983 Condensable Particulate Catch 1791 Final Weight #1 (g) EPA Method 202 Gravimetric Analysis Log PROJ‐023437 Hunter Unit 2 Run #1 Run #2 Run #3 Blank Tin #8309 8311 8281 8287 Tare Weight #2 (g) Organic CPM Catch (g)0.0024 0.0027 Tare Weight #1 (g) 0.00280.0037 Run #1 Run #2 Run #3 Blank 182418281820 Tare Weight #2 (g) Tare Weight #1 (g) Teflon Baggie # Final Weight #1 (g) 0.0014 Run #1 Run #2 Run #3 Organic CPM Catch (g)0.0024 0.0037 Inorganic CPM Catch (g) 0.0027 0.0080 0.0073 0.0046 Total CPM (g) 0.0084 0.0080 0.0063 + Inorganic CPM Catch (g)0.0080 0.0046 ‐ CPM Blank (g)0.0020 0.0020 0.0020 0.0073 Analytical Narrative Instrumentation Detection Limit / Sensitivity Notes Attachments Gravimetric Analysis Logs Sample Chain of Custody EPA Method 5/202 Gravimetric Analysis Report Project Code: Date Finalized: Laboratory Results Summary Filterable Particulate Matter (mg)Sample ID PROJ‐023437 11/29/2023 T. Wojtach 23.3 21.0 14.2 Condensable Particulate Matter (mg) Hunter Unit 3, Run #1 Hunter Unit 3, Run #2 Teflon CPM filters were extracted in a sonicator three times with water and three times with hexane.  The extraction  water was added to the back‐half impinger contents and extracted with hexane three times in a separatory funnel.   The inorganic fraction was transferred to a tared Teflon baggie, baked at 105C until 10 mL remained, taken to dryness  under a fume hood, dessicated for at least 24 hours, then weighed to a constant weight (±0.5 mg).  The organic  fraction was combined with the acetone and hexane field rinses, measured to the nearest milliliter, transferred to a  tared aluminum weighing dish, taken to dryness under a fume hood, dessicated for at least 24 hours, then weighed to  a constant weight (±0.5 mg).  No blank correction was performed unless otherwise indicated. All measurements were taken using a Torbal Model AGCN200 Analytical Balance under laboratory conditions.  The  instrument is auto‐calibrated and challanged with three NIST‐traceable reference weights daily.   All measurements are recorded to 0.0001g (0.1mg). No deviations from the analytical procedures from EPA Method 5 were noted.  All samples were received in good  condition.  After analysis, all samples are archived for a period of one year. Analyst: Hunter Unit 3, Run #1 Hunter Unit 3, Run #2 Hunter Unit 3, Run #3 9.4 8.5 4.6 No acetone blank corrections were performed. CPM value includes a field blank correction. Filters were dessicated and tared to a constant weight in the MAQS laboratory prior to sampling.  Following testing,  the filters were dessicated for at least 24 hours, then weighed to a constant weight (±0.5 mg).  The acetone rinses  were measured to the nearest milliliter, transferred to tared aluminum weighing dishes, taken to dryness under a  fume hood, dessicated for at least 24 hours, then weighed to a constant weight (±0.5 mg).  Each result above  represents total filterable particulate matter for each test run (acetone rinse + filter catch), with no blank correction  performed unless otherwise indicated. Hunter Unit 3, Run #3 Sample ID Project Code: Unit ID: Front‐Half Particulate Matter Filter Catch Date Weight (g) Date Weight (g) Date Weight (g) Date Weight (g) 11/8/23 0.3783 11/8/23 0.3810 11/8/23 0.3818 11/8/23 0.3744 11/9/23 0.3781 11/9/23 0.3805 11/9/23 0.3817 11/9/23 0.3744 10/5/23 0.3735 10/5/23 0.3743 10/5/23 0.3753 10/5/23 0.3746 10/6/23 0.3736 10/6/23 0.3748 10/6/23 0.3754 10/6/23 0.3742 Front‐Half Particulate Matter Acetone Rinse Catch Rinse Mass (g) Date Weight (g) Date Weight (g) Date Weight (g) Date Weight (g) 11/10/23 6.3755 11/10/23 6.3614 11/10/23 6.4121 11/10/23 6.3135 11/13/23 6.3759 11/13/23 6.3616 11/13/23 6.4123 11/13/23 6.3136 11/1/23 6.3570 11/1/23 6.3465 11/1/23 6.4041 11/1/23 6.3136 11/3/23 6.3570 11/3/23 6.3469 11/3/23 6.4046 11/3/23 6.3135 Total Particulate Catch 1939 0.0000 EPA Method 5 Gravimetric Analysis Log PROJ‐023437 Run #1 Run #2 Run #3 Blank Run #1 Run #2 Run #3 Filter #1942 1948 1934 Final Filter Weight #1 (g) Final Filter Weight #2 (g) Filter Tare Weight #2 (g) Filter Catch (g) 0.0046 0.0062 0.0064 Filter Tare Weight #1 (g) Rinse Volume (mL)116.4 125.9 111.0 Tin #8257 8275 8255 91.4 87.198.8 Blank 112.2 Run #3 88.1 Dish Tare Weight (g) 8271 0.00000.0187 0.0148 0.0078 Dish Tare Weight (g) Final Dish Weight #1 (g) Final Dish Weight #2 (g) 0.0046 0.0062 0.0233 0.0210 Run #1 Run #2 0.0142 Total Rinse Catch (g) Hunter Unit 3 0.0064 0.0187 0.0000 0.0148 0.0000 0.0078 0.0000 Filter Catch (g) + Rinse Catch (g) ‐ Acetone Blank (g) Total PM (g) Project Code: Unit ID: Back‐Half Organic Particulate Matter Catch Date Weight (g) Date Weight (g) Date Weight (g) Date Weight (g) 11/27/23 6.2790 11/27/23 6.3973 11/27/23 6.3448 11/27/23 6.3457 Final Weight #2 (g)11/27/23 6.2786 11/27/23 6.3972 11/27/23 6.3449 11/27/23 6.3455 11/8/23 6.2757 11/7/23 6.3933 11/7/23 6.3418 11/8/23 6.3427 11/9/23 6.2758 11/8/23 6.3935 11/8/23 6.3417 11/9/23 6.3429 Back‐Half Inorganic Particulate Matter Catch Date Weight (g) Date Weight (g) Date Weight (g) Date Weight (g) 11/28/23 3.8905 11/28/23 3.8114 11/28/23 4.0801 11/28/23 4.0997 Final Weight #2 (g)11/28/23 3.8901 11/29/23 3.8118 11/28/23 4.0796 11/28/23 4.0992 9/25/23 3.8819 9/25/23 3.8052 11/13/23 4.0761 11/13/23 4.0978 9/26/23 3.8818 9/26/23 3.8047 11/15/23 4.0766 11/15/23 4.0983 Condensable Particulate Catch Final Weight #1 (g) EPA Method 202 Gravimetric Analysis Log PROJ‐023437 Hunter Unit 3 Run #1 Run #2 Run #3 Blank Tin #8285 8290 8291 8287 Tare Weight #2 (g) Organic CPM Catch (g)0.0030 0.0039 Tare Weight #1 (g) 0.0028 Run #1 Run #2 Run #3 Blank 0.0031 1791179018171830 Tare Weight #2 (g) Tare Weight #1 (g) Teflon Baggie # Final Weight #1 (g) 0.0014 Run #1 Run #2 Run #3 Organic CPM Catch (g)0.0030 0.0031 Inorganic CPM Catch (g) 0.0039 0.0084 0.0066 0.0035 Total CPM (g) 0.0094 0.0085 0.0046 + Inorganic CPM Catch (g)0.0084 0.0035 ‐ CPM Blank (g)0.0020 0.0020 0.0020 0.0066 PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix D Quality Assurance/Quality Control PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix D.1 Units and Abbreviations @ X% O2 corrected to X% oxygen (corrected for dilution air) |CC|absolute value of the confidence coefficient |d|absolute value of the mean differences ºC degrees Celsius ºF degrees Fahrenheit ºR degrees Rankine " H2O inches of water column 13.6 specific gravity of mercury ΔH pressure drop across orifice meter, inches H2O ΔP velocity head of stack gas, inches H2O θ total sampling time, minutes µg microgram ρa density of acetone, mg/ml ρw density of water, 0.9982 g/ml or 0.002201 lb/ml acfm actual cubic feet of gas per minute at stack conditions An cross-sectional area of nozzle, ft2 As cross-sectional area of stack, square feet (ft2) Btu British thermal unit Bws proportion by volume of water vapor in gas stream Ca particulate matter concentration in stack gas, gr/acf CAvg average unadjusted gas concentration, ppmv CDir measured concentration of calibration gas, ppmv cf or ft3 cubic feet cfm cubic feet per minute CGas average gas concentration adjusted for bias, ppmv CM average of initial and final system bias check responses from upscale calibration gas, ppmv cm or m3 cubic meters CMA actual concentration of the upscale calibration gas, ppmv CO average of initial and final system bias check responses from low-level calibration gas, ppmv Cp pitot tube coefficient Cs particulate matter concentration in stack gas, gr/dscf CS calibration span, % or ppmv CS measured concentration of calibration gas, ppmv CV manufactured certified concentration of calibration gas, ppmv D drift assessment, % of span dcf dry cubic feet dcm dry cubic meters Dn diameter of nozzle, inches Ds diameter of stack, inches dscf dry standard cubic feet dscfm dry standard cubic feet per minute dscm dry standard cubic meters Fd F-factor, dscf/MMBtu of heat input fpm feet per minute fps feet per second ft feet ft2 square feet g gram gal gallons gr grains (7000 grains per pound) gr/dscf grains per dry standard cubic feet hr hour UNITS AND ABBREVIATIONS UNITS AND ABBREVIATIONS I percent of isokinetic sampling in inch k kilo or thousand (metric units, multiply by 103) K kelvin (temperature) K3 conversion factor 0.0154 gr/mg K4 conversion factor 0.002668 ((in. Hg)(ft3))/((ml)(°R)) kg kilogram Kp pitot tube constant (85.49 ft/sec) kwscfh thousand wet standard cubic feet per hour l liters lb/hr pounds per hour lb/MMBtu pounds per million Btu lpm liters per minute m meter or milli M thousand (English units) or mega (million, metric units) m3 cubic meters ma mass of residue of acetone after evaporation, mg Md molecular weight of stack gas; dry basis, lb/lb-mole meq milliequivalent mg milligram Mg megagram (106 grams) min minute ml or mL milliliter mm millimeter MM million (English units) MMBtu/hr million Btu per hour mn total amount of particulate matter collected, mg mol mole mol. wt. or MW molecular weight Ms molecular weight of stack gas; wet basis, lb/lb-mole MW molecular weight or megawatt n number of data points ng nanogram nm nanometer Pbar barometric pressure, inches Hg pg picogram Pg stack static pressure, inches H2O Pm barometric pressure of dry gas meter, inches Hg ppb parts per billion ppbv parts per billion, by volume ppbvd parts per billion by volume, dry basis ppm parts per million ppmv parts per million, by volume ppmvd parts per million by volume, dry basis ppmvw parts per million by volume, wet basis Ps absolute stack gas pressure, inches Hg psi pounds per square inch psia pounds per square inch absolute psig pounds per square inch gauge Pstd standard absolute pressure, 29.92 inches Hg Qa volumetric flow rate, actual conditions, acfm Qs volumetric flow rate, standard conditions, scfm Qstd volumetric flow rate, dry standard conditions, dscfm R ideal gas constant 21.85 ((in. Hg) (ft3))/((°R) (lbmole)) UNITS AND ABBREVIATIONS SBfinal post-run system bias check, % of span SBi pre-run system bias check, % of span scf standard cubic feet scfh standard cubic feet per hour scfm standard cubic feet per minute scm standard cubic meters scmh standard cubic meters per hour sec second sf, sq. ft., or ft2 square feet std standard t metric ton (1000 kg) T 0.975 t-value Ta absolute average ambient temperature, ºR (+459.67 for English) Tm absolute average dry gas meter temperature, ºR (+459.67 for English) ton or t ton = 2000 pounds tph or tons/hr tons per hour tpy or tons/yr tons per year Ts absolute average stack gas meter temperature, ºR (+459.67 for English) Tstd absolute temperature at standard conditions V volt Va volume of acetone blank, ml Vaw volume of acetone used in wash, ml Vlc total volume H2O collected in impingers and silica gel, grams Vm volume of gas sampled through dry gas meter, ft3 Vm(std)volume of gas measured by the dry gas meter, corrected to standard conditions, dscf Vma stack gas volume sampled, acf Vn volume collected at stack conditions through nozzle, acf Vs average stack gas velocity, feet per second Vwc(std)volume of water vapor condensed, corrected to standard conditions, scf Vwi(std)volume of water vapor in gas sampled from impingers, scf Vwsg(std)volume of water vapor in gas sampled from silica gel, scf W watt Wa weight of residue in acetone wash, mg Wimp total weight of impingers, grams Wsg total weight of silica gel, grams Y dry gas meter calibration factor, dimensionless AAS atomic absorption spectroscopy ACDP air contaminant discharge permit ACE analyzer calibration error, percent of span AD absolute difference ADL above detection limit AETB Air Emissions Testing Body AS applicable standard (emission limit) ASTM American Society For Testing And Materials BACT best achievable control technology BDL below detection limit BHP brake horsepower BIF boiler and industrial furnace BLS black liquor solids CC confidence coefficient CD calibration drift CE calibration error CEM continuous emissions monitor CEMS continuous emissions monitoring system CERMS continuous emissions rate monitoring system CET calibration error test CFR Code of Federal Regulations CGA cylinder gas audit CHNOS elemental analysis for determination of C, H, N, O, and S content in fuels CNCG concentrated non-condensable gas CO catalytic oxidizer COC chain of custody COMS continuous opacity monitoring system CPM condensible particulate matter CPMS continuous parameter monitoring system CT combustion turbine CTM conditional test method CTO catalytic thermal oxidizer CVAAS cold vapor atomic absorption spectroscopy De equivalent diameter DE destruction efficiency Dioxins polychlorinated dibenzo-p-dioxins (pcdd's) DLL detection level limited DNCG dilute non-condensable gas ECD electron capture detector EIT Engineer In Training ELCD electoconductivity detector (hall detector) EMPC estimated maximum possible concentration EPA US Environmental Protection Agency EPRI Electric Power Research Institute ES emission standard (applicable limit) ESP electrostatic precipitator EU emission unit FCCU fluid catalytic cracking unit FGD flue gas desulfurization FI flame ionization FIA flame ionization analyzer FID flame ionization detector FPD flame photometric detector FPM filterable particulate matter FTIR Fourier-transform infrared spectroscopy FTPB field train proof blank FTRB field train recovery blank Furans polychlorinated dibenzofurans (pcdf's) GC gas chromatography ACRONYMS ACRONYMS GC/MS gas chromatography/mass spectroscopy GFAAS graphite furnace atomic absorption spectroscopy GFC gas filter correlation GHG greenhouse gas HAP hazardous air pollutant HC hydrocarbons HHV higher heating value HPLC high performance liquid chromatography HRGC/HRMS high-resolution gas chromatography/high-resolution mass spectroscopy HRSG heat recovery steam generator IC ion chromatography ICAP inductively-coupled argon plasmography ICPCR ion chromatography with a post-column reactor ICP-MS inductively coupled plasma-mass spectroscopy IR infrared radiation ISO International Standards Organization kW kilowatts LFG landfill gas LHV lower heating value LPG liquified petroleum gas MACT maximum achievable control technology MDI methylene diphyenyl diisocyanate MDL method detection limit MNOC maximum normal operating conditions MRL method reporting limit MS mass spectrometry NA not applicable or not available NCASI National Council For Air And Steam Improvement NCG non-condensable gases ND not detected NDIR non-dispersive infrared NESHAP National Emissions Standards For Hazardous Air Pollutants NG natural gas NIOSH National Institute For Occupational Safety And Health NIST National Institute Of Standards And Technology NMC non-methane cutter NMOC non-methane organic compounds NMVOC non-methane volatile organic compounds NPD nitrogen phosphorus detector NSPS New Source Performance Standards OSHA Occupational Safety And Health Administration PAH polycyclic aromatic hydrocarbons PCB polychlorinated biphenyl compounds PCWP plywood and composite wood products PE Professional Engineer PFAS per- and polyfluoroalkyl substances (PFAS) PI photoionization PID photoionization detector PM particulate matter PM10 particulate matter less than 10 microns in aerodynamic diameter PM2.5 particulate matter less than 2.5 microns in aerodynamic diameter POM polycyclic organic matter PS performance specification PSD particle size distribution PSEL plant site emission limits PST performance specification test PTE permanent total enclosure PTM performance test method ACRONYMS QA/QC quality assurance and quality control QI Qualified Individual QSTI Qualified Source Testing Individual RA relative accuracy RAA relative accuracy audit RACT reasonably available control technology RATA relative accuracy test audit RCTO rotary concentrator thermal oxidizer RICE stationary reciprocating internal combustion engine RM reference method RTO regenerative thermal oxidizer SAM sulfuric acid mist SCD sulfur chemiluminescent detector SCR selective catalytic reduction system SD standard deviation Semi-VOST semivolatile organic compounds sample train SRM standard reference material TAP toxic air pollutant TBD to be determined TCA thermal conductivity analyzer TCD thermal conductivity detector TGNENMOC total gaseous non-ethane non-methane organic compounds TGNMOC total gaseous non-methane organic compounds TGOC total gaseous organic compounds THC total hydrocarbons TIC tentatively identified compound TO thermal oxidizer TO toxic organic (as in EPA Method TO-15) TPM total particulate matter TSP total suspended particulate matter TTE temporary total enclosure ULSD ultra-low sulfur diesel UV ultraviolet radiation range VE visible emissions VOC volatile organic compounds VOST volatile organic sample train WC water column WW TP waste water treatment plant Ag silver Se selenium As arsenic SO2 sulfur dioxide Ba barium SO3 sulfur trioxide Be beryllium SOx sulfur oxides C carbon TCDD tetrachlorodibenzodioxin Cd cadmium TCDF tetrachlorodibenzofuran CdS cadmium sulfide TGOC total gaseous organic concentration CH2O formaldehyde THC total hydrocarbons CH3CHO acetaldehyde Tl thallium CH3OH methanol TRS total reduced sulfur compounds CH4 methane Zn zinc C2H4O ethylene oxide C2H6 ethane C3H4O acrolein C3H6O propionaldehyde C3H8 propane C6H5OH phenol Cl2 chlorine ClO2 chlorine dioxide CO carbon monoxide Co cobalt CO2 carbon dioxide Cr chromium Cu copper EtO ethylene oxide EtOH ethyl alcohol (ethanol) H2 hydrogen H2O water H2O2 hydrogen peroxide H2S hydrogen sulfide H2SO4 sulfuric acid HCl hydrogen chloride Hg mercury IPA isopropyl alcohol MDI methylene diphyenyl diisocyanate MeCl2 methylene chloride MEK methyl ethyl ketone MeOH methanol Mn manganese N2 nitrogen NH3 ammonia Ni nickel NO nitric oxide NO2 nitrogen dioxide NOx nitrogen oxides O2 oxygen P phosphorus Pb lead PCDD polychlorinated dibenzo-p-dioxins PCDF polychlorinated dibenzofurans Sb antimony CHEMICAL NOMENCLATURE PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix D.2 Manual Test Method QA/QC Data Meter box ID:M5-4 Date: Meter ID (if applicable):Location: Orifice set ID:1531 No. of orifices used (min. 3) Calibrated by:CS Barometric pressure (in. Hg): Expires:3/20/24 Theoretical critical vacuum Meter Box Orifice Calibration IMPORTANT For valid test results, the Actual Vacuum should be 1 to 2 in. Hg greater than the Theoretical Critical Vacuum shown above IMPORTANT The Critical Orifice Coefficient, K', must be entered in English units, (ft)^3*(deg R)^0.5/((in.Hg)*(min)). Orifice K' Orifice ΔH Time Initial Final Net Inlet Outlet Inlet Outlet Serial#Coefficient Vacuum Initial Final Average (in H2O)(min)(cu ft)(cu ft)(cu ft)(deg F)(deg F)(deg F)(deg F)(number)(see above)(in Hg)(deg F)(deg F)(deg F) 0.96 10.00 529.934 535.918 5.984 66.0 66.0 67.0 66.0 16 0.4469 16.0 69.0 69.0 69.0 1.16 10.00 535.918 542.443 6.525 67.0 67.0 68.0 66.0 18 0.4979 15.5 69.0 70.0 69.5 1.68 10.00 542.443 550.741 8.298 68.0 66.0 69.0 67.0 23 0.6385 14.0 70.0 70.0 70.0 0.000 #DIV/0! 0.000 #DIV/0! --------- ORIFICE ------------------ ORIFICE --------- VOLUME VOLUME CALIBRATION FACTOR CORRECTED NOMINAL Yd ΔH Sample Rate Vcr(std)Vcr Value Variation Value Variation (in. H2O)(scfm)(cu ft)(cu ft)(number)(number)(in H2O)(in H2O) 0.96 0.481 4.809 5.827 0.9659 -0.017 1.939 0.109 1.16 0.536 5.355 6.495 0.9873 0.005 1.887 0.057 1.68 0.686 6.864 8.333 0.9945 0.012 1.664 -0.166 0.00 #DIV/0!#DIV/0!#DIV/0! 0.00 #DIV/0!#DIV/0!#DIV/0! For Calibration Factor Y, the ratio of the reading of the calibration meter to the dry gas meter,Average Yd 0.9826 acceptable tolerance of individual values from the average is +/-0.02.Average ΔH@ 1.8300 Variation of Yd's PASS For Orifice Calibration Factor ΔH@, the orifice differential pressure in inches of H20 that equates to 0.75 cfm of air Variation of ΔH@ PASS at 68 F and 29.92 inches of Hg, acceptable tolerance of individual values from the average is +/-0.2.Vacuum Criteria PASS Meter Box Pressure Leak Check Meter Box Vacuum Leak Check Test Pressure, (in H2O):6 Should be 5-7 in. H2O Test Vacuum, (in. Hg):23 Coarse adjust valve fully open, fine adjust fully closed, sample inlet plugged Leak Rate, (in H2O/min):0 Must be zero (manometer level stable for 1 minute)Leak Rate, (cfm):0 Must be zero (meter dial stable for 1 minute) Meter Box Thermocouple Readout Calibration Check Input Temperature Allowable Temp. Dev.*Low High Stack Probe Filter Exit Aux.Meter In / Out 32 7 25 39 32 32 31 30 30 32 Make: 68 8 60 76 66 67 66 66 65 67 Model: 120 9 111 129 119 119 118 118 117 118 Serial Number: 250 11 239 261 252 251 250 Cal Date: 350 12 338 362 350 350 349 500 14 486 514 498 700 17 683 717 701 900 20 880 920 900 * Reading values must be within 1.5% of reference thermometer values (based on absolute temperature scale) for calibration to be acceptable. Performed by:Name:__________________________________________Singature_______________________________________________________________Date:_______________________ Approved by:Name:__________________________________________Singature_______________________________________________________________Date:_______________________ ΔH@ VOLUME CALIBRATION FACTORINDICATED VS. ACTUAL Meter box 6-month calibration form (orifices) R0 19-12-18 107078 TC-Source PIE #DIV/0! #DIV/0! CORRECTED Vm(std) (cu ft) 4.979 5.424 6.902 Thermocouple simulator QA Criteria: EPA Method 5 Meter Box Calibration by Calibrated Critical Orifice, Leak Check, and Thermocouple Calibration Check English Meter Box Units, English K' Factor ΔH@: --- SAMPLE RATE ------ DRY GAS METER --- Yd:0.9826 1.830 11.67 in. Hg 24.75 in. Hg 9/20/23 3 Den-AT -- DRY GAS METER -- -- Ambient Temperature --Volume Initial Temps.Final Temps. Meter box ID:M5-4 Date: Meter ID (if applicable):17176782 Location: Orifice set ID:CO-1721s No. of runs (default 3) Calibrated by (initials):cs Barometric pressure (in. Hg): Current 6-month calibration Yd:1.0079 Theoretical critical vacuum: Date of 6-month calibration:4/272023 Meter Box Orifice Calibration IMPORTANT For valid test results, the Actual Vacuum should be 1 to 2 in. Hg greater than the Theoretical Critical Vacuum shown above IMPORTANT The Critical Orifice Coefficient, K', must be entered in English units, (ft)^3*(deg R)^0.5/((in.Hg)*(min)). Orifice K' Orifice ΔH Time Initial Final Net Inlet Outlet Inlet Outlet Serial#Coefficient Vacuum Initial Final Average (in H2O)(min)(cu ft)(cu ft)(cu ft)(deg F)(deg F)(deg F)(deg F)(number)(see above)(in Hg)(deg F)(deg F)(deg F) 0.93 10.00 702.38 708.42 6.040 66 64 67 65 CO-1721s 0.4528 13.3 64 67 65.3 1.20 11.00 684.62 692.11 7.488 61 59 62 60 CO-1721s 0.5114 14.0 63 65 64.0 1.20 15.00 692.11 702.38 10.272 62 60 65 62 CO-1721s 0.5114 13.2 65 67 65.8 XX 5.00 702.381 6.582 -695.799 55 0.4593 #NAME?XX #DIV/0! XX 5.00 6.582 XX -6.582 XX XX XX XX 55 0.4593 xx XX XX #DIV/0! VOLUME VOLUME CORRECTED NOMINAL ΔH Sample Rate Vcr(std)Vcr Value Variation Value Variation (in. H2O)(scfm)(cu ft)(cu ft)(number)(number)(in H2O)(in H2O) 0.93 0.49 4.896 5.883 0.9718 0.006 1.82 -0.023 1.20 0.55 6.090 7.300 0.9650 -0.001 1.85 0.011 1.20 0.55 8.290 9.971 0.9608 -0.005 1.85 0.012 XX #DIV/0!#DIV/0!#DIV/0! XX #DIV/0!#DIV/0!#DIV/0! For Calibration Factor Y, the ratio of the reading of the calibration meter to the dry gas meter,Average Yd 0.9659 acceptable tolerance of individual values from the average is +/-0.02.Average ΔH@ 1.8427 Variation of Yd's PASS For Orifice Calibration Factor ΔH@, the orifice differential pressure in inches of H20 that equates to 0.75 cfm of air Variation of ΔH@ PASS at 68 F and 29.92 inches of Hg, acceptable tolerance of individual values from the average is +/-0.2.Vacuum Criteria #NAME? Meter Box Vacuum Leak Check Test Vacuum, (in. Hg):21 Coarse adjust valve fully open, fine adjust fully closed, sample inlet plugged Leak Rate, (cfm):0 Must be zero (meter dial stable for 1 minute) Performed by:Name:__________________________________________djs Signature_______________________________________________________________Date:_______________________6.17.2023 Approved by:Name:__________________________________________Signature_______________________________________________________________Date:_______________________ --- SAMPLE RATE --- INDICATED VS. ACTUAL --------- ORIFICE --------- Yd ΔH@ CALIBRATION FACTOR --------- ORIFICE ------------ DRY GAS METER ----- DRY GAS METER -- VOLUME CALIBRATION FACTOR -- Ambient Temperature -- Post-test Result:PASS Volume Initial Temps.Final Temps. EPA Method 5 Meter Box Calibration by Calibrated Critical Orifice: Post-Test, English Meter Box Units, English K' Factor QA Criteria: #DIV/0! #DIV/0! CORRECTED Vm(std) (cu ft) 5.038 6.311 8.628 DENVER, CO Meter box post-test calibration form (orifices) R3 Post-test Yd: Current Cal. Yd:1.0079 0.9659 11.69 in. Hg 24.78 in. Hg 11/27/23 3 Meter box ID:M5-13 Date: Meter ID (if applicable):NA Location: Orifice set ID:1531s No. of orifices used (min. 3) Calibrated by:AK Barometric pressure (in. Hg): Expires:12/23/23 Theoretical critical vacuum Meter Box Orifice Calibration IMPORTANT For valid test results, the Actual Vacuum should be 1 to 2 in. Hg greater than the Theoretical Critical Vacuum shown above IMPORTANT The Critical Orifice Coefficient, K', must be entered in English units, (ft)^3*(deg R)^0.5/((in.Hg)*(min)). Orifice K' Orifice ΔH Time Initial Final Net Inlet Outlet Inlet Outlet Serial#Coefficient Vacuum Initial Final Average (in H2O)(min)(cu ft)(cu ft)(cu ft)(deg F)(deg F)(deg F)(deg F)(number)(see above)(in Hg)(deg F)(deg F)(deg F) 1.30 10.00 598.400 604.911 6.511 78.0 78.0 79.0 78.0 18 0.4979 17.0 77.0 78.0 77.5 1.10 10.00 606.200 612.178 5.978 79.0 78.0 80.0 78.0 16 0.4469 17.5 78.0 78.0 78.0 2.15 10.00 612.300 620.692 8.392 80.0 78.0 82.0 78.0 23 0.6385 15.5 78.0 78.0 78.0 0.000 #DIV/0! 0.000 #DIV/0! --------- ORIFICE ------------------ ORIFICE --------- VOLUME VOLUME CALIBRATION FACTOR CORRECTED NOMINAL Yd ΔH Sample Rate Vcr(std)Vcr Value Variation Value Variation (in. H2O)(scfm)(cu ft)(cu ft)(number)(number)(in H2O)(in H2O) 1.30 0.527 5.274 6.544 1.0025 0.009 2.117 -0.041 1.10 0.473 4.732 5.876 0.9811 -0.012 2.226 0.068 2.15 0.676 6.761 8.396 0.9968 0.003 2.131 -0.027 0.00 #DIV/0!#DIV/0!#DIV/0! 0.00 #DIV/0!#DIV/0!#DIV/0! For Calibration Factor Y, the ratio of the reading of the calibration meter to the dry gas meter,Average Yd 0.9935 acceptable tolerance of individual values from the average is +/-0.02.Average ΔH@ 2.1583 Variation of Yd's PASS For Orifice Calibration Factor ΔH@, the orifice differential pressure in inches of H20 that equates to 0.75 cfm of air Variation of ΔH@ PASS at 68 F and 29.92 inches of Hg, acceptable tolerance of individual values from the average is +/-0.2.Vacuum Criteria PASS Meter Box Pressure Leak Check Meter Box Vacuum Leak Check Test Pressure, (in H2O):7 Should be 5-7 in. H2O Test Vacuum, (in. Hg):22 Coarse adjust valve fully open, fine adjust fully closed, sample inlet plugged Leak Rate, (in H2O/min):0 Must be zero (manometer level stable for 1 minute)Leak Rate, (cfm):0 Must be zero (meter dial stable for 1 minute) Meter Box Thermocouple Readout Calibration Check Input Temperature Allowable Temp. Dev.*Low High Stack Probe Filter Exit Aux.Meter In / Out 32 7 25 39 37 36 36 37 36 36 Make: 68 8 60 76 73 72 72 73 73 73 Model: 120 9 111 129 125 126 127 125 125 125 Serial Number: 250 11 239 261 258 255 255 Cal Date: 350 12 338 362 359 357 358 500 14 486 514 509 700 17 683 717 710 900 20 880 920 911 * Reading values must be within 1.5% of reference thermometer values (based on absolute temperature scale) for calibration to be acceptable. Performed by:Allon Kienitz Singature_______________________________________________________________Date:_______________________6/23/2023 Approved by:Name:__________________________________________Singature_______________________________________________________________Date:_______________________ ΔH@ VOLUME CALIBRATION FACTORINDICATED VS. ACTUAL Meter box 6-month calibration form (orifices) R0 3/17/2024 14000534 CL3512A Omega #DIV/0! #DIV/0! CORRECTED Vm(std) (cu ft) 5.261 4.823 6.782 Thermocouple simulator QA Criteria: EPA Method 5 Meter Box Calibration by Calibrated Critical Orifice, Leak Check, and Thermocouple Calibration Check English Meter Box Units, English K' Factor ΔH@: --- SAMPLE RATE ------ DRY GAS METER --- Yd:0.9935 2.158 11.58 in. Hg 24.56 in. Hg 6/23/23 3 Den Shop -- DRY GAS METER -- -- Ambient Temperature --Volume Initial Temps.Final Temps. Meter box ID:M5-13 Date: Meter ID (if applicable): Location: Orifice set ID:1721s No. of runs (default 3) Calibrated by (initials):AB Barometric pressure (in. Hg): Current 6-month calibration Yd:0.9935 Theoretical critical vacuum: Date of 6-month calibration:6/23/23 Meter Box Orifice Calibration IMPORTANT For valid test results, the Actual Vacuum should be 1 to 2 in. Hg greater than the Theoretical Critical Vacuum shown above IMPORTANT The Critical Orifice Coefficient, K', must be entered in English units, (ft)^3*(deg R)^0.5/((in.Hg)*(min)). Orifice K' Orifice ΔH Time Initial Final Net Inlet Outlet Inlet Outlet Serial# Coefficient Vacuum Initial Final Average (in H2O) (min) (cu ft) (cu ft) (cu ft) (deg F) (deg F) (deg F) (deg F) (number) (see above) (in Hg) (deg F) (deg F) (deg F) 1.60 8.00 950.171 955.639 5.468 72 70 72 71 19 0.5114 16.0 69 69 69.4 1.60 8.00 955.639 961.115 5.476 72 71 73 72 19 0.5114 16.0 69 69 69.0 1.60 8.00 961.115 966.589 5.474 73 72 74 73 19 0.5114 16.0 69 69 69.0 XX 5.00 966.589 XX -966.589 XX XX XX XX 55 0.4593 XX XX #DIV/0! XX 5.00 XX XX 0.000 XX XX XX XX 55 0.4593 XX XX #DIV/0! VOLUME VOLUME CORRECTED NOMINAL ΔH Sample Rate Vcr(std) Vcr Value Variation Value Variation (in. H2O) (scfm)(cu ft) (cu ft) (number) (number) (in H2O) (in H2O) 1.60 0.55 4.394 5.336 0.9747 -0.001 2.45 0.006 1.60 0.55 4.395 5.334 0.9750 -0.001 2.45 -0.001 1.60 0.55 4.395 5.334 0.9772 0.002 2.44 -0.005 XX #DIV/0!#DIV/0! #DIV/0! XX #DIV/0!#DIV/0! #DIV/0! For Calibration Factor Y, the ratio of the reading of the calibration meter to the dry gas meter,Average Yd 0.9756 acceptable tolerance of individual values from the average is +/-0.02.Average ΔH@ 2.4467 Variation of Yd's PASS For Orifice Calibration Factor ΔH@, the orifice differential pressure in inches of H20 that equates to 0.75 cfm of air Variation of ΔH@ PASS at 68 F and 29.92 inches of Hg, acceptable tolerance of individual values from the average is +/-0.2.Vacuum Criteria PASS Meter Box Vacuum Leak Check Test Vacuum, (in. Hg):19 Coarse adjust valve fully open, fine adjust fully closed, sample inlet plugged Leak Rate, (cfm):0 Must be zero (meter dial stable for 1 minute) Performed by: Name:__________________________Aiden Franklin Signature_______________________________________________________________ Date:_______________________ Approved by:Name:__________________________________________Signature_______________________________________________________________ Date:_______________________ Meter box post-test calibration form (orifices) R3 Post-test Yd: Current Cal. Yd: 0.9935 0.9756 11.66 in. Hg 24.71 in. Hg 11/3/23 3 DENVER, CO QA Criteria: #DIV/0! #DIV/0! CORRECTED Vm(std) (cu ft) 4.508 4.508 4.498 EPA Method 5 Meter Box Calibration by Calibrated Critical Orifice: Post-Test, English Meter Box Units, English K' Factor -- Ambient Temperature -- Post-test Result: PASS Volume Initial Temps.Final Temps. --- SAMPLE RATE --- INDICATED VS. ACTUAL --------- ORIFICE --------- Yd ΔH@ CALIBRATION FACTOR --------- ORIFICE ------------ DRY GAS METER --- -- DRY GAS METER -- VOLUME CALIBRATION FACTOR PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix D.3 Instrumental Test Method QA/QC Data PROJ‐023437 PacifiCorp Hunter Unit 1 11/2/2023 EPA Method 3A Calibration Error Check Initial Gas Concentration Value Response Error OK? O2 Low 0 0 0.0% Y Mid 10.57 10.6 0.1% Y High 21.02 21 0.1% Y CO2 Low 0 0.1 0.6% Y Mid 8.933 9.1 0.9% Y High 17.87 17.8 0.4% Y Tedlar Bag Analysis Data O2 CO2 Run #1 6.6 12.8 Run #2 6.5 12.9 Run #3 6.5 12.8 PROJ‐023437 PacifiCorp Hunter Unit 2 10/31/2023 EPA Method 3A Calibration Error Check Initial Gas Concentration Value Response Error OK? O2 Low 0 0 0.0% Y Mid 10.57 10.6 0.1% Y High 21.02 21 0.1% Y CO2 Low 0 0.1 0.6% Y Mid 8.933 9.1 0.9% Y High 17.87 17.8 0.4% Y Tedlar Bag Analysis Data O2 CO2 Run #1 7.1 12.1 Run #2 7.2 12 Run #3 7.2 12.1 PROJ‐023437 PacifiCorp Hunter Unit 3 11/1/2023 EPA Method 3A Calibration Error Check Initial Gas Concentration Value Response Error OK? O2 Low 0 0 0.0% Y Mid 10.57 10.6 0.1% Y High 21.02 21 0.1% Y CO2 Low 0 0.1 0.6% Y Mid 8.933 9.1 0.9% Y High 17.87 17.8 0.4% Y Tedlar Bag Analysis Data O2 CO2 Run #1 5.9 13.3 Run #2 6.1 13.4 Run #3 6.2 13.4 PacifiCorp 2023 Compliance Test Report, Huntington Power Plant Appendix D.4 Accreditation Information/Certifications Accredited Air Emission Testing Body A2LA has accredited MONTROSE AIR QUALITY SERVICES In recognition of the successful completion of the joint A2LA and Stack Testing Accreditation Council (STAC) evaluation process, this laboratory is accredited to perform testing activities in compliance with ASTM D7036:2004 - Standard Practice for Competence of Air Emission Testing Bodies. Presented this 4th day of February 2022. _______________________ Vice President, Accreditation Services For the Accreditation Council Certificate Number 3925.01 Valid to February 29, 2024 This accreditation program is not included under the A2LA ILAC Mutual Recognition Arrangement. A merican Association for Laboratory Accreditation CERTIFICATE OF COMPLETION Christopher Wall This document certifies that this individual has passed a comprehensive examination and is now a Qualified Individual (QI) as defined in Section 8.3 of ASTM D7036-04 for the following method(s): Source Evaluation Society Group 1:EPA Manual Gas Volume and Flow Measurements and Isokinetic Particulate Sampling Methods Certificate Number:043-2023-3 DATE OF ISSUE:02/12/2023 DATE OF EXPIRATION:02/11/2028 PacifiCorp 2023 Compliance Test Report, Huntington Power Plant This is the Last Page of This Document If you have any questions, please contact one of the following individuals by email or phone. Name: Craig Kormylo Title: District Manager Region: USA - Stack - Great Plains - Operations Email: CKormylo@montrose-env.com Phone: (303) 495-3936 Name: Glen Capra Title: Vice President Region: USA – Stack Email: GCapra@montrose-env.com Phone: (512) 772-6450 Source Information Division of Air Quality Compliance Demonstration Source Information Company Name PacifiCorp Hunter - Unit No. 1 Company Contact:Tom Wiscomb Contact Phone No.801-220-2373 Source Designation:Unit No. 1 Test & Review Dates Test Date: 11/2/2023 Review Date: 12/5/2023 Tabs Are Shown Observer:Na Reviewer:Paul Morris Particulate Emission Limits lbs/MMBtu lbs/hr gr/dscf 0.015 Emission Rates - "Front Half" lbs/MMBtu lbs/hr gr/dscf 0.0052 23.6712 0.0026 Test Information Stack_I.D._inches As ft^2 Y Dl H @ Cp Pbar Pq (static)Dn 322.56 567.48 0.9935 2.2 0.84 24.6 -1.4 0.27 Contractor Information Contracting Company: Montrose Air Quality Services, LLC Contact: Craig Kormylo Phone No.: 303-670-0530 Project No.: 1800 Circular 10100 9780 9860 9190 8710 8710 8710 10540 10640 11950 320 10610 10200 10390 1970 1800 1910 1420 1040 1190 1250 F factor usedF factors for Coal, Oil, and Gas Anthrocite 2 Lignite Natural Propane Butane COAL OIL GAS Bituminous 2 Fd Fw Fc scf/MMBtu scf/MMBtu scf/MMBtu O2 CO2 lbs/MMBtu Page 1 Summary Division of Air Quality Reference Methods 5 - TSP Compliance Demonstration of PacifiCorp Hunter - Unit No. 1 Testing Results Lab Data - grams collected Test Date 11/2/2023 11/2/2023 11/2/2023 11/2/2023 Lab Data Probe Filter Back Circular Run 1 Run 2 Run 3 Run 4 Run 1 0.0105 0.0054 0.01 As ft^2 567.48 567.48 567.48 Run 2 0.0114 0.0051 0.0173 Pbar 24.60 24.60 24.60 Run 3 0.0078 0.0059 0.0171 Pq (static)-1.40 -1.40 -1.40 Run 4 Ps 24.50 24.50 24.50 Avg. Ts F 118.17 118.67 117.17 Front Half Emissions Summary CO2 - FCO2 12.80 12.90 12.80 Run 1 Run 2 Run 3 Run 4 Avg. O2 6.60 6.50 6.50 gr./dscf 0.0027 0.0028 0.0023 0.0026 N2+C 80.60 80.60 80.70 lbs/hr 24.6145 25.5705 20.8285 23.6712 Md 30.31 30.32 30.31 lbs/MMBtu 5.480E-03 5.624E-03 4.643E-03 0.0052 Ms 28.92 28.92 28.87 Y 0.99 0.99 0.99 Cp 0.84 0.84 0.84 Total Emissions Summary w/back half condensable Vm cf 111.61 113.31 113.11 Run 1 Run 2 Run 3 Run 4 Avg. Vlc 243.30 245.80 257.90 gr./dscf 0.0044 0.0058 0.0052 0.0051 AVG. Tm F 79.25 85.71 77.50 lbs/hr 40.0953 52.3808 46.8261 46.4341 Vm std 89.96 90.25 91.47 lbs/MMBtu 8.926E-03 1.152E-02 1.044E-02 0.0103 Vw std 11.45 11.57 12.14 Bws 0.11 0.11 0.12 S Bws 0.13 0.14 0.13 Avg. Sqrt Dlp 0.72 0.72 0.72 Vs 46.61 46.89 46.69 F factor used scfm wet 1186634.77 1192723.12 1190665.93 1800 acfm 1587021.56 1596543.71 1589658.64 Qsd dscfh 63157809.15 63431846.54 63069977.07 # Sample Points 12.00 12.00 12.00 Dn 0.270 0.270 0.270 An 3.98E-04 3.98E-04 3.98E-04 Start Time 0:00 0:00 0:00 End Time 0:00 0:00 0:00 Total Test time 120.00 120.00 120.00 Time @ point 10.00 10.00 10.00 80.00 90.00 100.00 110.00 120.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 % I s o k i n e t i c Points Run 1 PxP Isokinetic 80.00 90.00 100.00 110.00 120.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 % I s o k i n e t i c Sample Points Run 2 PxP Isokinetic 80.00 90.00 100.00 110.00 120.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 % I s o k i n e t i c Sample Points Run 3 PxP Isokinetic O2 CO2 lbs/MMBtu 80.00 90.00 100.00 110.00 120.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 Sample Points Run 4 PxP Isokinetic Page 1 Run 1 PacifiCorp Hunter - Unit No. 1 Flow & Moisture Test Date 11/2/2023 As ft^2 Pbar Pq (static) Ps Avg. Ts F CO2 - FCO2 O2 N2+C Md Ms 567.48 24.60 -1.40 24.50 118 12.80 6.60 80.60 30.31 28.92 Y Cp Vm cf Vlc Avg. Tm F Vm std Vw std Bws S Bws 0.1340 0.9935 0.84 111.614 243.30 79.25 89.959 11.452 0.1129 0.1340 0.999 Avg. Sqrt Dlp Vs scfm wet acfm Qsd dscfh # Sample Points Dn Total Test time (minutes) Time @ point (minutes)Avg. Dlh 0.719 46.61 1,186,635 1,587,022 6.32E+07 12 0.27 120 10.00 2.716667 TRUE Point No.Meter (cf) dl "p" dl "h" ts F tm F (in) tm F (out) Imp. Liquid Collected 1 589.136 0.42 2.20 118 72 69 Wt. (Final) Wt. (Initial) lc 2 597.510 0.57 3.00 118 76 70 590.40 499.60 90.8 3 607.160 0.58 3.00 118 80 72 734.50 655.00 79.5 4 616.880 0.45 2.30 117 80 74 770.80 732.80 38.0 5 625.450 0.55 2.90 118 83 75 969.60 934.60 35.0 6 635.030 0.57 3.00 118 84 77 0.0 7 644.800 0.41 2.10 118 83 78 8 653.040 0.54 2.80 119 84 78 Isokinetics 101.7 9 662.510 0.56 3.00 118 86 80 Test Date 11/2/2023 10 672.320 0.44 2.30 118 85 80 Start Time enter 11 681.040 0.55 2.90 119 87 81 End Time 12 690.740 0.58 3.10 119 87 81 Run 1 13 700.750 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Page 1 Run 2 PacifiCorp Hunter - Unit No. 1 Flow & Moisture Test Date 11/2/2023 As ft^2 Pbar Pq (static) Ps Avg. Ts F CO2 - FCO2 O2 N2+C Md Ms 567.48 24.60 -1.40 24.50 119 12.90 6.50 80.60 30.32 28.92 Y Cp Vm cf Vlc Avg. Tm F Vm std Vw std Bws S Bws 0.1359 0.9935 0.84 113.309 245.80 86 90.253 11.570 0.1136 0.1359 0.999 Avg. Sqrt Dlp Vs scfm wet acfm Qsd dscfh # Sample Points Dn Total Test time (minutes) Time @ point (minutes)Avg. Dlh 0.723 46.89 1,192,723 1,596,544 6.34E+07 12 0.27 120 10.00 2.75 TRUE Point No.Meter (cf) dl "p" dl "h" ts F tm F (in) tm F (out) Imp. Liquid Collected 1 701.103 0.42 2.20 119.0 79.0 80.0 Wt. (Final) Wt. (Initial) lc 2 709.540 0.57 3.00 118.0 83.0 79.0 452.70 348.50 104.2 3 719.350 0.59 3.10 119.0 88.0 80.0 718.50 643.50 75.0 4 729.300 0.45 2.30 118.0 89.0 82.0 810.10 769.20 40.9 5 737.960 0.55 2.90 119.0 90.0 82.0 957.20 931.50 25.7 6 747.670 0.59 3.10 119.0 90.0 83.0 0.0 7 757.710 0.44 2.30 118.0 89.0 84.0 8 766.390 0.54 2.90 119.0 89.0 84.0 Isokinetics 101.6 9 776.080 0.57 3.00 119.0 90.0 85.0 Test Date 11/2/2023 10 785.990 0.43 2.30 118.0 92.0 85.0 Start Time 11 794.790 0.55 2.90 119.0 91.0 85.0 End Time 12 804.520 0.59 3.00 119.0 92.0 86.0 Run 2 13 814.412 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Page 1 Run 3 PacifiCorp Hunter - Unit No. 1 Flow & Moisture Test Date 11/2/2023 As ft^2 Pbar Pq (static) Ps Avg. Ts F CO2 - FCO2 O2 N2+C Md Ms 567.48 24.60 -1.40 24.50 117 12.80 6.50 80.70 30.31 28.87 Y Cp Vm cf Vlc Avg. Tm F Vm std Vw std Bws S Bws 0.1303 0.9935 0.84 113.111 257.90 78 91.473 12.139 0.1172 0.1303 0.999 Avg. Sqrt Dlp Vs scfm wet acfm Qsd dscfh # Sample Points Dn Total Test time (minutes) Time @ point (minutes)Avg. Dlh 0.720 46.69 1,190,666 1,589,659 6.31E+07 12 0.27 120 10.00 2.76 TRUE Point No.Meter (cf) dl "p" dl "h" ts F tm F (in) tm F (out) Imp. Liquid Collected 1 816.050 0.43 2.30 117.0 74.0 78.0 Wt. (Final) Wt. (Initial) lc 2 824.800 0.56 3.00 116.0 77.0 77.0 597.0 494.4 102.6 3 834.520 0.58 3.10 117.0 80.0 75.0 710.5 635.9 74.6 4 844.540 0.44 2.30 117.0 80.0 76.0 765.8 717.2 48.6 5 853.220 0.54 2.90 117.0 79.0 74.0 959.0 926.9 32.1 6 862.910 0.55 2.90 117.0 79.0 75.0 0.0 7 872.680 0.42 2.20 117.0 78.0 74.0 8 881.050 0.57 3.00 118.0 80.0 75.0 Isokinetics 103.5 9 890.830 0.59 3.10 117.0 82.0 75.0 Test Date 11/2/2023 10 900.800 0.43 2.30 117.0 80.0 76.0 Start Time 11 909.570 0.55 2.90 118.0 82.0 76.0 End Time 12 919.190 0.58 3.10 118.0 82.0 76.0 Run 3 13 929.161 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Page 1 Source Information Division of Air Quality Compliance Demonstration Source Information Company Name PacifiCorp Hunter - Unit No. 2 Company Contact:Tom Wiscomb Contact Phone No.801-220-2373 Source Designation:Unit No. 2 Test & Review Dates Test Date: 10/31/2023 Review Date: 12/5/2023 Tabs Are Shown Observer:Na Reviewer:Paul Morris Particulate Emission Limits lbs/MMBtu lbs/hr gr/dscf 0.015 Emission Rates - "Front Half" lbs/MMBtu lbs/hr gr/dscf 0.0082 37.0753 0.0038 Test Information Stack_I.D._inches As ft^2 Y Dl H @ Cp Pbar Pq (static)Dn 340.70 633.10 0.9935 2.158 0.84 24.8 -4.3 0.27 Contractor Information Contracting Company: Montrose Air Quality Services, LLC Contact: Craig Kormylo Phone No.: 303-670-0530 Project No.: 1800 Circular 10100 9780 9860 9190 8710 8710 8710 10540 10640 11950 320 10610 10200 10390 1970 1800 1910 1420 1040 1190 1250 F factor usedF factors for Coal, Oil, and Gas Anthrocite 2 Lignite Natural Propane Butane COAL OIL GAS Bituminous 2 Fd Fw Fc scf/MMBtu scf/MMBtu scf/MMBtu O2 CO2 lbs/MMBtu Page 1 Summary Division of Air Quality Reference Methods 5 - TSP Compliance Demonstration of PacifiCorp Hunter - Unit No. 2 Testing Results Lab Data - grams collected Test Date 10/31/2023 10/31/2023 10/31/2023 10/31/2023 Lab Data Probe Filter Back Circular Run 1 Run 2 Run 3 Run 4 Run 1 0.0239 0.0045 0.0084 As ft^2 633.10 633.10 633.10 Run 2 0.0122 0.0044 0.008 Pbar 24.80 24.80 24.80 Run 3 0.0133 0.0042 0.0063 Pq (static)-4.30 -4.30 -4.30 Run 4 Ps 24.48 24.48 24.48 Avg. Ts F 116.58 120.25 111.83 Front Half Emissions Summary CO2 - FCO2 12.10 12.00 12.10 Run 1 Run 2 Run 3 Run 4 Avg. O2 7.10 7.20 7.20 gr./dscf 0.0050 0.0030 0.0034 0.0038 N2+C 80.80 80.80 80.70 lbs/hr 49.2447 28.7857 33.1954 37.0753 Md 30.22 30.21 30.22 lbs/MMBtu 1.073E-02 6.491E-03 7.314E-03 0.0082 Ms 28.90 28.85 28.85 Y 0.99 0.99 0.99 Cp 0.84 0.84 0.84 Total Emissions Summary w/back half condensable Vm cf 104.06 102.88 96.24 Run 1 Run 2 Run 3 Run 4 Avg. Vlc 223.90 225.50 236.20 gr./dscf 0.0065 0.0045 0.0047 0.0052 AVG. Tm F 64.71 72.42 76.79 lbs/hr 63.8100 42.6583 45.1457 50.5380 Vm std 86.81 84.57 78.47 lbs/MMBtu 1.390E-02 9.620E-03 9.947E-03 0.0112 Vw std 10.54 10.61 11.12 Bws 0.11 0.11 0.12 S Bws 0.13 0.14 0.11 Avg. Sqrt Dlp 0.69 0.68 0.68 Vs 44.82 44.11 44.15 F factor used scfm wet 1275844.78 1247533.62 1267149.26 1800 acfm 1702579.26 1675385.77 1677044.77 Qsd dscfh 68263048.32 66504622.10 67505199.84 # Sample Points 12.00 12.00 12.00 Dn 0.270 0.270 0.270 An 3.98E-04 3.98E-04 3.98E-04 Start Time 0:00 0:00 0:00 End Time 0:00 0:00 0:00 Total Test time 120.00 120.00 120.00 Time @ point 10.00 10.00 10.00 80.00 90.00 100.00 110.00 120.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 % I s o k i n e t i c Points Run 1 PxP Isokinetic 80.00 90.00 100.00 110.00 120.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 % I s o k i n e t i c Sample Points Run 2 PxP Isokinetic 80.00 90.00 100.00 110.00 120.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 % I s o k i n e t i c Sample Points Run 3 PxP Isokinetic O2 CO2 lbs/MMBtu 80.00 90.00 100.00 110.00 120.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 Sample Points Run 4 PxP Isokinetic Page 1 Run 1 PacifiCorp Hunter - Unit No. 2 Flow & Moisture Test Date 10/31/2023 As ft^2 Pbar Pq (static) Ps Avg. Ts F CO2 - FCO2 O2 N2+C Md Ms 633.10 24.80 -4.30 24.48 117 12.10 7.10 80.80 30.22 28.90 Y Cp Vm cf Vlc Avg. Tm F Vm std Vw std Bws S Bws 0.1283 0.9935 0.84 104.055 223.90 64.71 86.807 10.539 0.1083 0.1283 0.999 Avg. Sqrt Dlp Vs scfm wet acfm Qsd dscfh # Sample Points Dn Total Test time (minutes) Time @ point (minutes)Avg. Dlh 0.691 44.82 1,275,845 1,702,579 6.83E+07 12 0.27 120 10.00 2.408333 TRUE Point No.Meter (cf) dl "p" dl "h" ts F tm F (in) tm F (out) Imp. Liquid Collected 1 269.305 0.40 2.00 117 59 59 Wt. (Final) Wt. (Initial) lc 2 277.100 0.47 2.40 116 66 60 605.50 493.90 111.6 3 285.670 0.52 2.60 117 66 63 690.40 641.90 48.5 4 294.780 0.49 2.50 116 65 62 812.50 773.80 38.7 5 303.790 0.44 2.20 116 65 62 942.30 917.20 25.1 6 312.230 0.49 2.50 116 66 62 0.0 7 321.150 0.42 2.00 116 65 63 8 329.110 0.51 2.60 116 67 63 Isokinetics 101.3 9 337.960 0.54 2.70 117 71 64 Test Date 10/31/2023 10 347.080 0.42 2.10 117 70 63 Start Time enter 11 355.250 0.52 2.60 117 70 64 End Time 12 364.190 0.53 2.70 118 72 66 Run 1 13 373.360 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Page 1 Run 2 PacifiCorp Hunter - Unit No. 2 Flow & Moisture Test Date 10/31/2023 As ft^2 Pbar Pq (static) Ps Avg. Ts F CO2 - FCO2 O2 N2+C Md Ms 633.10 24.80 -4.30 24.48 120 12.00 7.20 80.80 30.21 28.85 Y Cp Vm cf Vlc Avg. Tm F Vm std Vw std Bws S Bws 0.1421 0.9935 0.84 102.880 225.50 72 84.565 10.614 0.1115 0.1421 0.999 Avg. Sqrt Dlp Vs scfm wet acfm Qsd dscfh # Sample Points Dn Total Test time (minutes) Time @ point (minutes)Avg. Dlh 0.678 44.11 1,247,534 1,675,386 6.65E+07 12 0.27 120 10.00 2.33 TRUE Point No.Meter (cf) dl "p" dl "h" ts F tm F (in) tm F (out) Imp. Liquid Collected 1 374.313 0.39 2.00 120.0 69.0 66.0 Wt. (Final) Wt. (Initial) lc 2 382.250 0.48 2.40 120.0 72.0 66.0 458.70 347.80 110.9 3 390.850 0.55 2.80 120.0 75.0 67.0 688.10 635.20 52.9 4 400.170 0.40 2.00 120.0 76.0 69.0 805.90 769.30 36.6 5 408.280 0.48 2.40 120.0 77.0 70.0 926.10 901.00 25.1 6 417.070 0.54 2.70 120.0 77.0 70.0 0.0 7 426.290 0.39 2.00 120.0 74.0 70.0 8 434.350 0.45 2.30 120.0 75.0 70.0 Isokinetics 101.3 9 443.070 0.49 2.50 121.0 77.0 71.0 Test Date 10/31/2023 10 451.680 0.39 2.00 120.0 75.0 71.0 Start Time 11 459.710 0.46 2.30 121.0 78.0 72.0 End Time 12 468.180 0.51 2.60 121.0 79.0 72.0 Run 2 13 477.193 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Page 1 Run 3 PacifiCorp Hunter - Unit No. 2 Flow & Moisture Test Date 10/31/2023 As ft^2 Pbar Pq (static) Ps Avg. Ts F CO2 - FCO2 O2 N2+C Md Ms 633.10 24.80 -4.30 24.48 112 12.10 7.20 80.70 30.22 28.85 Y Cp Vm cf Vlc Avg. Tm F Vm std Vw std Bws S Bws 0.1121 0.9935 0.84 96.238 236.20 77 78.470 11.118 0.1241 0.1121 0.999 Avg. Sqrt Dlp Vs scfm wet acfm Qsd dscfh # Sample Points Dn Total Test time (minutes) Time @ point (minutes)Avg. Dlh 0.683 44.15 1,267,149 1,677,045 6.75E+07 12 0.27 120 10.00 2.38 TRUE Point No.479.888 dl "p" dl "h" ts F tm F (in) tm F (out) Imp. Liquid Collected 1 487.820 0.40 2.00 121.0 72.0 70.0 Wt. (Final) Wt. (Initial) lc 2 496.250 0.45 2.30 12.0 77.0 71.0 608.1 496.1 112.0 3 505.090 0.50 2.50 121.0 79.0 72.0 706.0 649.5 56.5 4 513.010 0.38 1.90 121.0 78.0 73.0 827.2 788.2 39.0 5 521.790 0.49 2.50 121.0 81.0 74.0 964.7 936.0 28.7 6 530.920 0.51 2.60 122.0 82.0 75.0 0.0 7 539.280 0.42 2.10 120.0 78.0 74.0 8 548.150 0.49 2.50 121.0 80.0 75.0 Isokinetics 93.9 9 557.910 0.53 2.70 120.0 82.0 75.0 Test Date 10/31/2023 10 565.900 0.43 2.20 121.0 80.0 76.0 Start Time 11 574.620 0.47 2.40 121.0 83.0 76.0 End Time 12 584.058 0.55 2.80 121.0 83.0 77.0 Run 3 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Page 1 Source Information Division of Air Quality Compliance Demonstration Source Information Company Name PacifiCorp Hunter - Unit No. 3 Company Contact:Travice Larsen Contact Phone No.435-748-6568 Source Designation:Unit No. 3 Test & Review Dates Test Date: 11/1/2023 Review Date: 12/5/2023 Tabs Are Shown Observer:Na Reviewer:Paul Morris Particulate Emission Limits lbs/MMBtu lbs/hr gr/dscf 0.020 Emission Rates - "Front Half" lbs/MMBtu lbs/hr gr/dscf 0.0066 28.8693 0.0034 Test Information Stack_I.D._inches As ft^2 Y Dl H @ Cp Pbar Pq (static)Dn 307.44 515.52 0.9826 1.83 0.84 24.6 -6 0.27 Contractor Information Contracting Company: Montrose Air Quality Services, LLC Contact: Craig Kormylo Phone No.: 303-670-0530 Project No.: 1800 Circular 10100 9780 9860 9190 8710 8710 8710 10540 10640 11950 320 10610 10200 10390 1970 1800 1910 1420 1040 1190 1250 F factor usedF factors for Coal, Oil, and Gas Anthrocite 2 Lignite Natural Propane Butane COAL OIL GAS Bituminous 2 Fd Fw Fc scf/MMBtu scf/MMBtu scf/MMBtu O2 CO2 lbs/MMBtu Page 1 Summary Division of Air Quality Reference Methods 5 - TSP Compliance Demonstration of PacifiCorp Hunter - Unit No. 3 Testing Results Lab Data - grams collected Test Date 11/1/2023 11/1/2023 11/1/2023 11/1/2023 Lab Data Probe Filter Back Circular Run 1 Run 2 Run 3 Run 4 Run 1 0.0187 0.0046 0.0084 As ft^2 515.52 515.52 515.52 Run 2 0.0148 0.0062 0.0066 Pbar 24.60 24.60 24.60 Run 3 0.0078 0.0064 0.0035 Pq (static)-6.00 -6.00 -6.00 Run 4 Ps 24.16 24.16 24.16 Avg. Ts F 102.58 113.00 112.75 Front Half Emissions Summary CO2 - FCO2 13.30 13.40 13.40 Run 1 Run 2 Run 3 Run 4 Avg. O2 5.90 6.10 6.20 gr./dscf 0.0041 0.0038 0.0024 0.0034 N2+C 80.80 80.50 80.40 lbs/hr 34.5628 31.7296 20.3153 28.8693 Md 30.36 30.39 30.39 lbs/MMBtu 7.896E-03 7.350E-03 4.595E-03 0.0066 Ms 29.29 28.99 28.97 Y 0.98 0.98 0.98 Cp 0.84 0.84 0.84 Total Emissions Summary w/back half condensable Vm cf 108.28 104.85 113.16 Run 1 Run 2 Run 3 Run 4 Avg. Vlc 221.50 228.40 253.00 gr./dscf 0.0056 0.0050 0.0030 0.0045 AVG. Tm F 68.04 72.13 71.25 lbs/hr 47.0232 41.7018 25.3226 38.0159 Vm std 88.04 84.61 91.51 lbs/MMBtu 1.074E-02 9.660E-03 5.728E-03 0.0087 Vw std 10.43 10.75 11.91 Bws 0.11 0.11 0.12 S Bws 0.09 0.12 0.12 Avg. Sqrt Dlp 0.72 0.73 0.75 Vs 46.11 47.32 48.57 F factor used scfm wet 1080923.03 1089106.68 1118328.45 1800 acfm 1426371.00 1463780.36 1502399.19 Qsd dscfh 59229051.84 57979622.94 59373045.62 # Sample Points 12.00 12.00 12.00 Dn 0.270 0.270 0.270 An 3.98E-04 3.98E-04 3.98E-04 Start Time 0:00 0:00 0:00 End Time 0:00 0:00 0:00 Total Test time 120.00 120.00 120.00 Time @ point 10.00 10.00 10.00 80.00 90.00 100.00 110.00 120.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 % I s o k i n e t i c Points Run 1 PxP Isokinetic 80.00 90.00 100.00 110.00 120.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 % I s o k i n e t i c Sample Points Run 2 PxP Isokinetic 80.00 90.00 100.00 110.00 120.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 % I s o k i n e t i c Sample Points Run 3 PxP Isokinetic O2 CO2 lbs/MMBtu 80.00 90.00 100.00 110.00 120.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 Sample Points Run 4 PxP Isokinetic Page 1 Run 1 PacifiCorp Hunter - Unit No. 3 Flow & Moisture Test Date 11/1/2023 As ft^2 Pbar Pq (static) Ps Avg. Ts F CO2 - FCO2 O2 N2+C Md Ms 515.52 24.60 -6.00 24.16 103 13.30 5.90 80.80 30.36 29.29 Y Cp Vm cf Vlc Avg. Tm F Vm std Vw std Bws S Bws 0.0868 0.9826 0.84 108.278 221.50 68.04 88.042 10.426 0.1059 0.0868 0.999 Avg. Sqrt Dlp Vs scfm wet acfm Qsd dscfh # Sample Points Dn Total Test time (minutes) Time @ point (minutes)Avg. Dlh 0.720 46.11 1,080,923 1,426,371 5.92E+07 12 0.27 120 10.00 2.325000 TRUE Point No.Meter (cf) dl "p" dl "h" ts F tm F (in) tm F (out) Imp. Liquid Collected 1 603.208 0.34 1.50 110 61 61 Wt. (Final) Wt. (Initial) lc 2 610.440 0.47 2.10 111 64 60 421.60 353.00 68.6 3 618.840 0.68 3.00 11 67 61 717.20 637.30 79.9 4 629.110 0.38 1.70 110 65 63 817.60 766.00 51.6 5 637.060 0.53 2.30 111 71 65 947.50 926.10 21.4 6 645.980 0.63 2.80 111 73 65 0.0 7 656.010 0.40 1.80 111 72 67 8 663.970 0.59 2.60 111 74 67 Isokinetics 98.5 9 673.510 0.69 3.00 111 76 67 Test Date 11/1/2023 10 683.790 0.40 1.80 112 75 68 Start Time enter 11 692.010 0.54 2.40 111 77 69 End Time 12 701.240 0.66 2.90 111 76 69 Run 1 13 711.486 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Page 1 Run 2 PacifiCorp Hunter - Unit No. 3 Flow & Moisture Test Date 11/1/2023 As ft^2 Pbar Pq (static) Ps Avg. Ts F CO2 - FCO2 O2 N2+C Md Ms 515.52 24.60 -6.00 24.16 113 13.40 6.10 80.50 30.39 28.99 Y Cp Vm cf Vlc Avg. Tm F Vm std Vw std Bws S Bws 0.1175 0.9826 0.84 104.845 228.40 72 84.613 10.751 0.1127 0.1175 0.999 Avg. Sqrt Dlp Vs scfm wet acfm Qsd dscfh # Sample Points Dn Total Test time (minutes) Time @ point (minutes)Avg. Dlh 0.729 47.32 1,089,107 1,463,780 5.80E+07 12 0.27 120 10.00 2.39 TRUE Point No.Meter (cf) dl "p" dl "h" ts F tm F (in) tm F (out) Imp. Liquid Collected 1 719.044 0.39 1.70 113.0 71.0 68.0 Wt. (Final) Wt. (Initial) lc 2 721.950 0.60 2.70 113.0 71.0 68.0 571.30 496.00 75.3 3 731.530 0.68 3.00 114.0 74.0 69.0 710.70 645.10 65.6 4 741.700 0.42 1.90 113.0 74.0 69.0 839.80 781.90 57.9 5 750.030 0.61 2.70 113.0 74.0 69.0 957.80 928.20 29.6 6 759.260 0.66 3.00 113.0 75.0 69.0 0.0 7 770.150 0.39 1.70 112.0 75.0 70.0 8 777.550 0.53 2.40 113.0 76.0 71.0 Isokinetics 94.6 9 786.760 0.62 2.80 113.0 78.0 70.0 Test Date 11/1/2023 10 796.770 0.39 1.70 113.0 75.0 70.0 Start Time 11 804.850 0.50 2.20 113.0 76.0 70.0 End Time 12 813.670 0.65 2.90 113.0 77.0 72.0 Run 2 13 823.889 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Page 1 Run 3 PacifiCorp Hunter - Unit No. 3 Flow & Moisture Test Date 11/1/2023 As ft^2 Pbar Pq (static) Ps Avg. Ts F CO2 - FCO2 O2 N2+C Md Ms 515.52 24.60 -6.00 24.16 113 13.40 6.20 80.40 30.39 28.97 Y Cp Vm cf Vlc Avg. Tm F Vm std Vw std Bws S Bws 0.1166 0.9826 0.84 113.158 253.00 71 91.509 11.909 0.1152 0.1166 0.999 Avg. Sqrt Dlp Vs scfm wet acfm Qsd dscfh # Sample Points Dn Total Test time (minutes) Time @ point (minutes)Avg. Dlh 0.748 48.57 1,118,328 1,502,399 5.94E+07 12 0.27 120 10.00 2.53 TRUE Point No.Meter (cf) dl "p" dl "h" ts F tm F (in) tm F (out) Imp. Liquid Collected 1 827.496 0.37 1.70 113.0 71.0 68.0 Wt. (Final) Wt. (Initial) lc 2 835.270 0.62 2.80 113.0 73.0 70.0 434.7 348.9 85.8 3 845.250 0.65 2.90 112.0 76.0 69.0 713.9 636.4 77.5 4 855.410 0.40 1.80 112.0 74.0 70.0 829.6 770.4 59.2 5 863.580 0.61 2.70 113.0 74.0 71.0 955.6 925.1 30.5 6 873.350 0.67 3.00 113.0 74.0 69.0 0.0 7 883.650 0.41 1.80 112.0 71.0 68.0 8 891.660 0.63 2.80 113.0 72.0 68.0 Isokinetics 100.0 9 901.590 0.68 3.00 113.0 74.0 70.0 Test Date 11/1/2023 10 911.880 0.42 1.90 113.0 74.0 69.0 Start Time 11 920.150 0.65 2.90 113.0 74.0 68.0 End Time 12 930.260 0.68 3.00 113.0 74.0 69.0 Run 3 13 940.654 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Page 1