Loading...
HomeMy WebLinkAboutDAQ-2024-004484Yr*g.fls_gar Hunter Plant 1000 South Highway l0 P.O. Box 569 Castle Dale, UT 84513 January 22,2024 Mr. Bryce Bird, Director Utah Deparftnent of Environmental Quality Division of Air Quality 150 North 1950 West P.O. Box 144820 EWIRONMENTAL QUAUTY JAN i I ,-,11,q DTVISION OF AIR OUALIT\I Salt Lake City, UT 841144820 PacifiCorp Hunter Power Plant SO2 and NOx PAL Emissions Report for the Reporting Period July 1,2023 through December3l,2023. Dear Mr. Bryce Bird: PursuanttoConditionll.B.l.ioftheTitleVOperatingPermit(PermitNo. 1500101004)forHunterpower Plant, and 40 CFR Subpart 52.21(aa)(14), submission of this SO2 and NOx PAL Emissions Report is for the period ending December 31,2023. The PacifiCorp, Hunter Power Plan! has been in compliance with the glant-wide applicability limitation (PAL) of So2 emission limit of 5,537.5 tons per year and the pAL of NOx emission limit of I 1,041 tons per year, based on l2-month rolling total for tire entire Hunter plant from all point sources and fugitive emissions throughout the reporting piriod. Permit Req uirement 11.8.1.i.3 : Reporting: In addition to the reporting requirement described in Provision I.S.2 of this permit, the permittee shall comply with 40 CFR Subpart 52.21(n)(14), Reporting and notification requirements for PALs. As per 40 CFR Subpart 52.21(aaXl4Xil Semi-annual renort: Item (a) - Pacificorp, Hunter power plant, Title v permit No. I 5001 0 I 004 Item (b) - see attachment titled '?acifiCorp, Ilunter Power Plant, SO2 and NOx 12 Month Rolling Total, PAL Emissions" Item (c) - All data used to calculate the monthly SO2 and NOx emission totals is at the facility and available for review. SO2 and NOx 12 Month Rolling Total (MRT) emissions were calculated uln*r,"",, Generating Units l, z, &3- January 2023 thruDecember 2023 So2 and Nox Tons per Month (TPM) values, are the reported values to the EPA's Acid Rain Emissions database, Provision II.B.l.i.l (a). Units #1, #2 and #3 emergency diesel-fired generators, emissions were calculated by multiplying the appropriate so2 and Nox emission factors from EpA Ap-42 and logged hours of operation, Provision II.B.l.i.l(b).r Units #l & #2 emergency diesel-fired fire pumps, emissions were calculated by multiplying the appropriate so2 and Nox emission factors from EpA Ap-42 and, logged hours of operation, Provision II.B.l.i.l(c). REVIEWED Initials JBR Date 2/5/2024 Comp Status Meets File # 10237 Blue 2 Item (d) - There were no modifications or emission units added during the preceding reporting period. Item (e) - No deviations. During any CEMS monitoring system malfunction, SO2 and NOx emission data were substituted in accordance with 40 CFR Part 75 requirements. Substituted data was included in determining the 12 MRT for SO2 and NOx. See attachment titled *CEMS Monitoring Unavailability" for a summary of the duration, cause and corrective actions. Item (f) - There was no shutdown of any monitoring system during boiler operation during the reporting period. I am authorized to make this submission on behalf of the ownerc and operators of the affected source or affected units for which the submission is made. I certify under penalty of law that I have personally examined, and am familiar with, the statements and Information submitted in this document and all its attachments. Based on my inquiry of those individuats with primary responsibility for obtaining the Informationr l certify that the statements and Information are to the best of my knowledge and belief true, accurate, and complete. f am aware that there are significant penalties for submitting false statements and information, or omitting statements and information, including the possibility of fine or imprisonment. Should you have any questions regarding this information, please contact Terry Guthrie, Environmental Manager, Hunter & Huntington Power Plants (435-748-6059). Enclosures Marypaz Cuessy - 310 NTO W enclosures for Units 1,2, and 3 @DF copy) Terry Guthrie - Hunter Power Plant il enclosures for Units 1,2, and3 anaging Director - Hunter Power Plant Responsible Offrcial F 3ox IIo a U) E Ir =l<l:flolrl*lzlull Er oirt 5:2tul' F tll l.-t L UJo T t-:l .E dt-z&Ea -FJ Ft&y= Fdd8: oaq F E xZzl 2 F a 'l N o N 0r !ro .lr > Zl a.F *l ig H .gs H< ?: EE B) I=VEz? rl:l >lil _l ol>tll 3l eq co ooco qo Nooqo z F LE i9 ti(J uE.: .9 x>v&Zl ,l!l)tttjl o qo N qo F ;t)ltt rl oooqo t grio.:OE-3 IEzi ol q t: {l IF I tl'\t &FbE rd() $E IE Zl J\l!tftil , ?5 ;1olNIotol F 33 j ;1olololol { 5 bn o.:C'C-D o .(: Zt< 2 *lol "l @{ F q ,l Bl 6 @ 6.Il HIr.! u. EEo .{>VAZl D,?3 "lcl5lcl NNNoo AF sl5tcl "l o Io s;!E ril O *g .{>VAZl ---= F ?l 8ldl _l,lct5lc!ci N Nco ooIc o g*o.:Oc-=c a il>UOZts nl !l ttt AF *l ,l el G Fo E -lNl,tol tst N bo E E =o EoNoN oo Eoooo toootr J (L oNoN tooot) o- J o- *oot zU o E.i ."E Ddo E6= 5-U:=lE s6 d1$ i 5A? L S-9fif0oeE6 iHoc * E 9"E Cv:al= - *E S p.-tro9o .EEY U g I >pAo c-3kZE.9;xe$ I d14A<I5S;< =4 s+6EU:i;r<-f6o:qr^i;fr€;€E -- oq)F EaEd-=L tr:'E Eo o a= or.t;Exoo^ e >Y E.qdEib H 3*q, ,.'d H*8 >;ig€.gQEiP.:'.' 3 o >F P = EE I.H{EEaxllo>6: g d: EEHgEErSIEdx,=E3 u:99bo ;.9q, 9.: >3 E:XH€;E-TAE.;: H AH.=D6b= E {t E; X E E$ H z Et.d8 3.!oiEk 6 d.:.: ,gSssi a Ez oNoN i: ")L-3 A0 =E.E €AT-eS - sHRi Ei E E==PT -c .9* !i l6 6E ?X-Es-+(J '.4'=-r E;E t > 5F ii:I ^r 'V O; L ^6 h li 'lftxfl- E r S Ez.g =(J- eEEEZ *.5 BE oltr a2G5.l 'a '=\JEari '] Downtime Events - Duration Plant: HUNTER PLANT Report Period: 07 / 0 I / 2023 00 :00 Through 0 12 I 3 1 12023 23 : 59 Time Online Criteria: 1 minute(s) Source: UNITI Parameter: NOX#/HR Interval: 00lH Incident ID Start Date/Time End Date/Time Duration (dd:hh:mm) Reason Code - Description Action Code - Description 08/08/2023 08:00 08/08/2023 08:59 0d - th - 0m Quarterly linearity testing performed. Iniated auto calibration following linearity 09116/2023 08:00 0911612023 08:59 0d - th - 0m Statup cal failed to initiate within the 8 hour grace period Auto starnrp calibration was initiated 09/20/2023 10:00 0912012023 20:59 0d - 1lh - 0m Startup Calibration Iniated auto calibration following Unit Startup 09127 12023 10:00 09/27 /2023 10:59 0d - rh - 0m Pre.Rata calibration drift test was performed on one or more imalyzers in order to verifo system accuracy. Auto startup calibration was initiated 10/30/2023 15:00 10/3012023 15.59 0d - lh - 0m A calibration^drift test was performed on one or more analyzers in order to verrfy system accuracy Auto startup calibration was initiated l l/0g/2023 0g:00 ry0g/2023 11:59 0d - 4h - 0r Maintenance of another monitor required normal sampling to ben intemrpted. The system was returned to service upon completion of maintenance followed by an auto calibration. Number ofEvents: 6 Total Duration: 0d - l9h - 0m Source: UNITI Parameter: SO2#/llRB Intervrl: 00lH Incident ID Start Date/Time End Date/Time Juration 'dd:hh:mm) Reason Code - Description Action Code - Descrintion 08/08/2023 08:00 08/08/2023 08:59 0d - lh - 0m Quarterly linearity testing performed. lniated auto calibration following linearity 09/16/2023 08:00 0911612023 08:59 0d - lh - 0m Statup cal failed to initiate within the 8 hour grace period Auto startup calibration was initiated 0912012023 10:00 0912012023 20:59 0d - I lh - 0m Startup Calibratron Iniated auto calibration following Unit Startup l0 0912712023 10:00 0912712023 10.59 0d - rh - 0m Pre-Rata calibration drift test was performed on one or more" analyzers in order to verify system accuracy. Auto startup calibration was initiated 1l 10/3012023 15:00 r0r30r2023 15.59 0d - lh - 0m A calibration drift test was performed on one or more analyzers in order to veflty system accuracy Auto startup calibration was initiated l2 r l/0g/2023 0g:00 r1r0gr2023 |:59 0d - 4h - 0m Maintenarrce of another monitor required normal sampling to be lnterupted. The system was retumed to service upon completion of maintenance followed bv an auto calibration. Number of Events: Total Duration:0d-l9h-0m Source: Unit2 Parameter: NOX#/HR Intervrl: 00lH Incident ID Start )atelTime End Date/Time Duration lReason Code - Description (dd:hh:mm) lAction Code - Descriotion l3 09lll/2023 07:00 0911112023 08:59 0d-2h-0m Maintenance of another monitor required normal sampling to be intemrpted. The systern was retumed to service following the maintenance. 09/25/2023 0l:OO 09125/2023 03:59 0d-3h-0m Maintenance of another monitor required normal sampling to be intemrpted. The system was returned to service following the maintenance. 09/27/2023 08:00 0912712023 08:59 0d- th-0m Statup cal failed to initiate within the 8 hour grace period due to the unit startup being abandoned. Auto startup calibration was initiated when unit was returned to service. l6 l2ll0D023 18:00 1211012023 18:59 0d- lh-0m Statup cal failed to initiate within the 8 hour grace period due to the unit startup being abandoned. Auto startup calibration was initiated when unit was retumed to service. Number of f,vents: 4 Total Duration: 0d - 7h - 0m Source: UNIT2 Parameter: SO2#/HRB lnterval: 00lH Incident ID Start Date/Time End Date/Time )uratron 'dd:hh:mm) Reason Code - Description Action Code - Description 0911112023 05:00 09lrl/2023 08:59 0d-4h-0m The SO2 monitor readings locked up. The monitor was reset (powered down and then powered backup.) The system was refurned to service following the maintenance and an auto cal. 09/2s12023 0l:00 0912512023 03:59 0d-3h-0m Maintenance of another monitor required normal sampling to be intemrpted. The system was returned to service following the maintenance. l9 0912712023 08:00 0912712023 08:59 0d-lh-0m Statup ca! failed to initiate within the 8 hour grace period due to the unit startup being abandoned. Auto startup calibration was initiated when unit was returned to service. 20 1211012023 18:00 1211012023 18:59 0d-lh-0m Statup cal failed to initiate within the 8 hour grace period due to the unit startup being abandoned. Auto startup calibration was initiated when unit was retumed to service. Number ofEvents: 4 Total Duration: 0d - th - 0m Source: UNIT3 Parameter: NOX#/HR Intervrl: 00lH Incident ID Start Date/Time End DatelTime Duration (dd:hh mm) Reason Code - Description Action Code - Description 2l 07/1912023 13:00 0711912023 13:59 0d - lh - 0m Startup Calibration Auto startup calibration was initiated when unit was returned to service. 22 10108/2023 rz.,00 10/08/2023 13:59 0d - 2h - 0m Statup cal failed to initiate within the 8 hour grace period due to the unit startup being abandoned. Auto startup calibration was initiated when unit was returned to service. 23 1112712023 08:00 l'112712023 19:59 0d - l2h - 0m The monitor failed its daily/starnrp calibration. The monitor was recalibrated and returned to service. 24 1113012023 1300 1113012023 13:59 0d - th - 0m Rodded probe, cleaned or replaced ceramic filter, followed by auto calibration. No adjustments made to analyzers. 26 r2r05r2023 09:00 r2r05r2023 09:59 0d - th - 0m The monitor exhibited excessive drift critical orifices were cleaned and/or replaced . 25 1210412023 10:00 12/0412023 ll:59 0d - 2h - 0m Rodded probe, cleaned or replaced ceramic filter. followed by auto calibration. No adjustrnents made to analyzers. A manual and/or auto calibration was initiated and upon successful completion the monitor was retumed to service. A manual and/or auto calibration was initiated and upon successful completion the monitor was retumed to service. 27 12106/2023 09:00 12/0612023 rr:59 0d - 3h - 0m The monitor exhibited excessive drift Eductor block was replaced . 28 12112/2023 05:00 12112/2023 10:59 0d - 6h - 0m The monitor failed its daily/startup calibration. The monitor was recalibrated and returned to service. 29 l2ll2/2023 12:00 1211212023 14:59 0d - 3h - 0m Roddedprobe, cleaned orreplaced ceramic filter, followed by auto calibration. No adjustments made to analyzers. Number ofEvents: 9 Total Duration: ld - 7h - 0m Source: UNIT3 Parameter: SO2#/HRB Intervrl: 00lH Incident ID Start Date/Time End Date/Time Duration (dd:hh:mm) Reason Code - Description Action Code - Description 30 0711912023 13:00 0711912023 13:59 0d - lh - 0m Startup Calibration Auto startup calibration was initiated when unit was retumed to service. 3l r0t0gr20z3 12.00 r0t08t2023 13:59 0d - 2h - 0m statup cal failed to initiate within the 8 hour grace period due to the unit startup being abandoned. Auto startup calibration was initiated when unit was returned to service. 32 llD7D023 05:00 1112712023 19:59 0d - l5h - 0m The monitor failed its daily/starhrp calibration. The monitor was recalibrated and rehrmed to service. 33 1113012023 13:00 1113012023 13:59 0d - lh - 0m Rodded probe, cleaned or replaced ceramic filter, followed by auto calibration. No adjustnents made to analyzers. 35 r2r05t2023 09:00 r2t05t2023 09:59 0d - lh - 0m The monitor exhibited excessive drift' critical orifices were cleaned and/or replaced . 34 1210412023 10:00 12104/2023 ll:59 0d - 2h - 0m Rodded probe, cleaned or replaced ceramic filter, followed by auto calibration. No adjustrnents made to analyzers. A manual and/or auto calibration was initiated and upon successfrrl completion the monitor was retumed to service. A manual and/or auto calibration was initiated and upon successfrrl completion the monitor was retumed to service. 36 r2t06r2023 og:oo r2t06t2023 n:59 0d - 3h - 0m The monitor exhibited excessive drift' Eductor block was replaced. 37 1211212023 05:00 12/12/2023 10:59 0d - 6h - 0m The monitor failed its daily/startup calibration The monitor was recalibrated and returned to service. UTAH DEPARTMENT OF ENVIRONMENTAL OUAUTY .iAl,l 2 ii 2024 DIVISION OF AIR QUALITY