Loading...
HomeMy WebLinkAboutDAQ-2024-004481Yr*sjfls.g,.Rr Hunter Plant 1000 South Highway 10 P.O. Box 569 Cqstle Dqle, UT 84513 January 22,2024 Mr. Bryce Bird Utah Department of Environmental Quality Utah Division of Air Quality 195 North 1950 West P.O. Box 144820 Salt Lake City, Utah 84114-4820 UTAH DEPAHTMENT OF ENVIRONMENTAL OUALITY -.iVISION OF AIR QUALITV RE: SIX-MONTH MONITORING REPORT FOR III]NTER POWER PLANT (PERMIT #1s00101004) Dear Mr. Bird: Attached is the Six-Month Monitoring Report for the Hunter Power Plant for the period of I July 2023 tbrotrgh and including 3l Decernber 2023. The information contained therein is submitted in accordance with Provision I.S.2.a. of the Hunter Power Plant Title V Operating Permit (Permit #1s00101004). I hereby certify that the information submitted therein is true, accurate, and complete, based on information and beliefformed after reasonable inquiry. Please call Jay Howard, Hunter Power Plant Senior Environmental Analyst at (435) 748-6519, should you have any questions or require additional information. Plant Manager- Managing Director Hunter Power Plant Responsible Official Marypaz Cuessy 310 NTO Terry Guthrie - Hunter Power Plant REVIEWED Initials JBR Date 2/5/2024 Comp Status Meets File # 10237 Blue 2 dev submitted as COM 1/4 report Hunter Power Plant - Operating Permit #1500101004 SIX-MONTH MONITORING REPORT For the period I July 2023 through and including 3l December 2023 The Hunter Power Plant has completed monitoring as required by the Title V Operating Permit except for the monitoring deviations that were reported in the following deviation reports. Date of Deviation Report Permit Condition for Which Deviation Was Reported 10125123 II.B.2.f - Ooaciw Exceedance of 32.8o/o at 19.36 7/25/23 The results of the monitoring conducted in accordance with the permit conditions demonstrated that all emission units were operated in compliance with the permit terms and conditions except for the periods identified in the following deviation reports : Date of Deviation Reoort Permit Condition for Which Deviation Was Reported or Referenced t0125/23 **II.B.2.f - Opacitv Exceedance of 32.8o/o at 19:36 7125123 **Deviation Report submitted in conjunction with the Quarterly Excess Emissions Report (EER)/Quarterly Compliance Report (QCR), in accordance with Provisions II.B.2.f.3.a-d and II.B.3.d.3.a, c-e of the Hunter Plant Title V Operating Permit. The results of the Compliance Assurance Monitoring (CAM) conducted in accordance with the permit conditions demonstrated that all emission units were operated in compliance with the permit terms and conditions except for the periods identified below: Date of Excursion Permit Condition Cause/Corrective Action No excursions to report during reporting period * In accordance with $63.10031(e) of 40 CFR 63 Subpart UUUW Requirements beginning September 9,2020, monitoring system deviations are reported in the Mercury and Air Toxic Semi-Annual Compliance Report. UTAH DFPARTMEI{T OF ENVIRONMENTAL QUALITY DIVISION OF AIR QUALITY