HomeMy WebLinkAboutDAQ-2024-004454KINDEwoq*i#H
January 22,2024
Bryce Bird, Director
Utah Department of Environmental Quality
Division of Air Quality
195 North 1950 West
salt Lake city, Utah 84116
Re:Kinder Morgan Altamont LLC
Bluebell Facility, Title V Operating Permlt No. 1300033003
Semiannual Monitoring Report -July L,2O2? through December 31,2023
Dear Mr. Bird,
Kinder Morgan Altamont LLC respectfully submits the attached Semiannual Monitoring Report
for the reporting period from July L,2023 through December 3L,2023 as requlred by Condition
l.S.2.a of Title V Operation Permit No. 1300033003 for the Bluebell Facility (Bluebell).
There were no deviations from the facility Title V Operating Permit conditions during the
compliance period covered by this six month monitoring report.
lf you have any questions or require additional information, please contact me by phone at
(918) 588-5044 or by email at Janel_Nelson@KinderMorgan.com.
Sincerely,
Janel Nelson
EHS Specialist - Air Permitting/Compliance Sr ll
Enclosures:r Six-Month Monitoring Report (July 1, 2023 through December 31,20231
UTAH DEPAHTMENT OF
EIWIRONMENTAL QUATJTY
JAN 2 q ?A?4
DIVISION OF AIR QUALITY
REVIEWED
Initials JBR Date 2/5/2024
Comp Status Meets
File # 10219 Blue 1
No dev in file
TO:
FROM:
RE:
DATE:
/t
KTNDEw]ilOBg.AN
7 ALTAHoNTLLc
SIX MONTH MONITORING REPORT
Director, Utah Division of Air Quality
Kinder Morgan LLC - Bluebell Facility
Monitoring Report for Permit # 1300033003
lanuaw22.2024
ln accordance with Operating Permit provision 1.S.2.a, and Utah Administrative Code (UAC)
R307-415-6a(3XcXi), the following monitoring report is submitted.
This Report covers the period from July L,2023 through December 31,2023.
For the indicated reporting period:
There were no deviations from any permit requirements.
Attached is a list of permit requirements for which there were deviations. The
list includes the information required by Operating Permit provision l.S.2.a and
UAc R307-41s-6a(3XcXi).
ln lieu of attaching the above list, deviation reports submitted in accordance
with permit provision 1.S.2.c, and UAC R307-415-6a(3XcXii) as referenced below.
ln accordance with Operating Permit provision LK and UAC R307-415-5d, and based on
information and belief formed after reasonable inquiry, lcertifythatthe statements and
information in this document are true, accurate, and complete.
Don Perkins, Director
iFlli-nr:'tr${TMENTEF
i,iVIS)ION OF AIR OUALITY
tr
u
tr
ature of Responsible Official for the Source
Print or type the name and title of Responsible Official