HomeMy WebLinkAboutDERR-2024-006833Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name Papa Don's Chevron Inc.
Address PO Box 108
MINERSVILLE, UT 84752
Contact Papa Don's Chevron Inc.
Phone
Email Kassye@ymail.com
TANK LOCATION
Name Papa Don's Chevron
Address 118 S CENTER ST
MINERSVILLE, UT 84752
A Operator DONALD EVANS
Phone (435) 386-2323
B Operator SAME
Phone SAME
Facility ID: 6000013 Inspection Date: 04/29/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1/2 Gas/Diesel No Booted Steel Flex Aug.
31,
1996
None Yes No None None
2 - 3/4 Gasoline No Booted Steel Flex Aug.
31,
1996
None Yes No None None
TANK DETAILS
Tank ID/Alt ID 5 / 5A
E-Gen/AST No / No
Siphon/Compart No / Yes
Tank Status Currently In Use
Installed/Cap/Loc Aug. 31, 1996 / 6000 / West
Substance Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1000
LTT Test Oct. 17, 2023
LLD Test Oct. 17, 2023
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
None
Pipe type/STP
Cont Pressurized / No
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 6 / 6A
E-Gen/AST No / No
Siphon/Compart No / Yes
Tank Status Currently In Use
Installed/Cap/Loc Aug. 31, 1996 / 6000 / East
Substance Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1000
LTT Test Oct. 17, 2023
LLD Test Oct. 17, 2023
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
None
Pipe type/STP
Cont Pressurized / No
STP Flex
Connectors Steel Flex in Sump
LLD Model Vaporless LD2000
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
2024-04-29 Page 1 of 7
Tank ID/Alt ID 8 / 6B
E-Gen/AST No / No
Siphon/Compart No / Yes
Tank Status Currently In Use
Installed/Cap/Loc Aug. 31, 1996 / 4000 / East
Substance Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1000
LTT Test Oct. 17, 2023
LLD Test Oct. 17, 2023
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
None
Pipe type/STP
Cont Pressurized / No
STP Flex
Connectors Steel Flex in Sump
LLD Model FE Petro MLD-D (tan- diesel)
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 9 / 5B
E-Gen/AST No / No
Siphon/Compart No / Yes
Tank Status Currently In Use
Installed/Cap/Loc Aug. 31, 1996 / 4000 / West
Substance Stored Gasoline / Premium
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG INCON / TS-1000
LTT Test Oct. 17, 2023
LLD Test Oct. 17, 2023
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
None
Pipe type/STP
Cont Pressurized / No
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1V
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2024-04-29 Page 2 of 7
FACILITY RESPONSES
Financial Responsibility
Financial responsibility method is ok?Yes
The above accurately represents the
facility's release detection records Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
Is the site unmanned?No
C Operators trained?Yes
TANK RESPONSES
Tank 5A Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 5A ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 5A ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 5A Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Tank 5A Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 5A Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 6A Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Tank 6A Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
2024-04-29 Page 3 of 7
Tank 6A Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?No
Does the Spill Prevention device have a
potential to release product into the
environment?
Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 6A ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 6A ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 6B Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 6A Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 6B Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Tank 6B Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 6B Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 5B Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Tank 5B Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 5B Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
2024-04-29 Page 4 of 7
Tank 6B ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 6B ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 5B Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
2024-04-29 Page 5 of 7
Tank 5B ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 5B ATG/IM
Does the ATG system have a valid
annual test?Yes
DISPENSER RESPONSES
Dispenser 3/4
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1/2
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
MONTHLY LEAK DETECTION MONITORING
Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24
Tank 5 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 6 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 8 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 9 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
TANK 6A
2024-04-29 Page 6 of 7
Prepared by fueloperator.com
Question:Is the spill containment bucket intact?
Comments:liquid in the interstice
Inspection Information
Inspector:Warner, Sean
Record Created:April 29, 2024, 2:21 p.m.
Inspection Date:April 29, 2024
2024-04-29 Page 7 of 7