Loading...
HomeMy WebLinkAboutDAQ-2024-004451KIilDEFI#,}TORGAN V AlrArorr LLc FedEx 27OO79309696 January 22,2024 Bryce Bird, Director Utah Department of Environmental Quality Division of Air Quality L95 North 1950 West salt Lake city, utah 84L16 I'TAH DEPARTMENT OF EWIRONMENTAL OUAUry JAN 2 !l 'ii.iit; DIVISION OF AIH QUALITY Re: Kinder Morgan Altamont LLC Altamont South Compressor Station, Title V Operating Permit No. 1300041005 Semiannual Monitoring Report - July t,2023 through December 31,2023 Dear Mr. Bird, Kinder Morgan Altamont LLC respectfully submits the attached Semiannual Monitoring Report for the reporting period from July L,2023 through December 3L,2023 as required by Condition l.S.2.a of Title V Operating Permit No. 1300041005 for the Altamont South Compressor Station. There were no deviations from the facility Title V Operating Permit conditions during this six- month reporting period as noted in the attached report. lf you have any questions or require additional information, please contact me by phone at (303) 9L4-7605 or by email at Erin_Dunman@KinderMorgan.com. Enclosures: o Six-Month Monitoring Report (July 1, 2023 through December 3t,2023l. Sincerely, @ Erin Dunman Environmental Engineer REVIEWED Initials JBR Date 2/5/2024 Comp Status Meets File # 10211 Blue 1 no dev in file UI AH DEPARI il.1FN T OI: KINDE ONGAil E NVI ROTIIVlE NTAI. Q UALITY l-#_-_-lL,', i', inor I IrL-_-ALTAHONT LLC SIX MONTH MONITORING REPORT Director, Utah Division of Air Quality Kinder Morgan Altamont LLC - Altamont South Compressor Station Monitoring Report for Permit f1300041005 lanuarv 22,2024 DIVISION OF AIR OI]A.I ITY TO: FROM: RE: DATE: ln accordance with Operating Permit provision l.S.2.a and Utah Administrative Code (UAC) R307-415- 6a(3XcXi), the following monitoring report is submitted. This Report covers the period from July L,2023 through December 3L,2023. For the indicated reporting period: There were no deviations from any permit requirements. Attached is a list of permit requirements for which there were deviations. The list includes the information required by Operating Permit provision l.S.2.a and UAC R307-41s-5a(3XcXi). ln lieu of attaching the above list, deviation reports submitted in accordance with permit provision 1.S.2.c, and UAC R307-415-6a(gXcXii)as referenced below. ln accordance with Operating Permit provision l.K and UAC R307-415-5d, and based on information and belief formed after reasonable inquiry, I certify that the statements and information in this document are true, accurate, and complete. Don Perkins, Director Print or type the name and title of Responsible Official tr tr tr of Responsible Official for the Source