Loading...
HomeMy WebLinkAboutDAQ-2024-004452KrNDEwoq'S#il FedEx 27OO79309696 January 22,2024 Bryce Bird, Director Utah Department of Environmental Quality Division of Air Quality 195 North 1950 West salt Lake city, Utah 84LL6 UTAH DEPAHTMENT OF ENVIRONMENTAL OUATITY JAN 2 9 2{)?4 DIVISION OF AIR OUALITY Re:Kinder Morgan Altamont LLC Altamont East Compressor Station, Title V Operating Permit No. 1300039005 Semiannual Monitoring Report -July L,2023 through December 31,2023 Dear Mr. Bird, Kinder Morgan Altamont LLC respectfully submits the attached Semiannual Monitoring Report for the reporting period from July L,2023 through December 3L,2023 as required by Condition l.S.2.a of Title V Operating Permit No. 1300039005 for Altamont East Compressor Station. There were no deviations from the facility Title V Operating Permit conditions during this six- month period as noted in the attached report. lf you have any questions or require additional information, please contact me by phone at (303) 914-7605 or by email at Erin_Dunman@KinderMorgan.com. Erin Dunman Environmenta! Engineer Enclosures: o Six-Month Monitoring Report (July 1, 2023 through December 3L,20231 Sincerely, REVIEWED Initials JBR Date 1/5/2024 Comp Status Meets File # 10209 Blue 1 no dev in file KrilDEwoB,S*il I ENVIRON|lr----_ll^r f-.** ul-AH Di JAN i]IVISION OF AIR QUALITY TO: FROM: RE: DATE: SIX MONTH MONITORING REPORT i Director, Utah Division of Air Quality Kinder Morgan Altamont LLC - Altamont East Compressor Station Monitoring Report for Permit #130q)39005 lanuary 22,2O24 ln accordance with Operating Permit provision 1.S.2.a, and Utah Administrative Code (UAC) R307-4L5-6a(3XcXi), the following monitoring report is submitted This report covers the period from January L,2023 through June 30, 2023. For the indicated reporting period: There were no deviations from any permit requirements. Attached is a list of permit requirements for which there were deviations. The list includes the information required by Operating Permit provision !.S.2.a and UAC R307-41s-6a(3XcXi). ln lieu of attaching the above list, deviation reports submitted in accordance with permit provision 1.S.2.c, and UAC R307-415-6a(3XcXii)as referenced below. ln accordance with Operating Permit provision l.K and UAC R307-415-5d, and based on information and belief formed after reasonable inquiry I certify that the statements and information in this document are true, accurate, and complete. Don Perkins, Director Print or type the name and title of Responsible Officia! tr tr tr IAIRTMENT i.ENfAL OUALTTY Signature of Responsible Official for the Source