HomeMy WebLinkAboutDAQ-2024-007050 DAQE-GN101230058-24 {{$d1 }} Eric Benson HF Sinclair Woods Cross Refining LLC 1070 West 500 South Woods Cross, UT 84087-1442 eric.benson@hfsinclair.com Dear Mr. Benson: RE: Request for Extension on Condition I.8 of Approval Order DAQE-AN101230057-23 Project Number: N101230058 The Utah Division of Air Quality (UDAQ) has received and reviewed your letter dated November 21, 2021, requesting an extension of the “18-month time frame to commence construction” on the project authorized under Approval Order DAQE-AN101230057-23, which was issued on November 15, 2023. That Approval Order (AO) is for updates to a previous AO (DAQE-101230053-22) which authorized the construction and operation of various equipment changes at the facility. Following issuance of this most recent AO, construction has not yet begun on three pieces of equipment, namely: II.A.107 – Tank 90, II.A.108 – Tank 92, and II.A.151 – Tank 170. The requirements found at R307-401-18, Eighteen Month Review, establish a review requirement for Approval Orders (AOs). This requirement applies to all AOs we issue. On January 31, 2014, the EPA issued a guidance memorandum which outlines “...what constitutes adequate justification for an extension of the 18-month timeframe for commencing construction...” UDAQ has reviewed this guidance memorandum and developed a guidance document dated March 25, 2014, that identifies the criteria the UDAQ Director will use in a review of requests for extension of the 18-months to commence construction requirement. In your request of November 21, you provided details of the ongoing engineering and evaluation process. Such factors are the precise justification discussed in the guidance memorandum and are therefore acceptable to UDAQ. As this request for an extension was timely (within 18-months from issuance of the AO) and using that memorandum as guidance, your request is approved with the following extension requirements: 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director " / 2 / 6 Û Û Û Ù Û Ý DAQE-GN101230058-24 Page 2 1. HF Sinclair Woods Cross Refining LLC is hereby granted an 18-month extension to commence construction on AO DAQE-AN101230057-23. 2. By no later than May 15, 2025, HF Sinclair Woods Cross Refining LLC shall notify the Director of the status of construction, installation, modification, relocation or establishment of the equipment listed in section II.A of the AO. 3. This initial permit extension is not subject to public notice or comment, nor is any additional review or permit analyses required, per the EPA and DAQ guidance identified above. Any additional extension requests beyond the initial 18-month period shall be reviewed on a case-by-case basis at the time of the request. At that time public notification and comment shall be required, along with the associated re-analysis and update of PSD requirements or re-submittal of an application as may be required. The charge for the review done in making this change is a flat fee plus a filing fee as authorized by the Utah Legislature. You will receive an invoice for these charges shortly. If you have any questions, please contact John Jenks who can be reached at (385) 306-6510 or jjenks@utah.gov. Sincerely, {{$s }} Bryce C. Bird Director BCB:JJ:jg {{#d1=date1_es_:signer1:date:format(date, "mmmm d, yyyy")}} {{#s=Sig_es_:signer1:signature}} DAQE-GN101230058-24 {{$d1 }} Eric Benson HF Sinclair Wood Cross Refining LLC 1070 W 500 S Woods Cross, UT 84087-1442 eric.benson@hfsinclair.com Dear Mr. Benson: RE: Request for Extension on Condition I.8 of DAQE-AN101230057-23 Project Number: N101230058 The Utah Division of Air Quality (UDAQ) has received and reviewed your letter dated November 21, 2021, requesting an extension of the “18-month time frame to commence construction” on the project authorized under DAQE-AN101230057-23, which was issued on November 15, 2023. That Approval Order (AO) is for updates to a previous AO (DAQE-101230053-22) which authorized the construction and operation of various equipment changes at the facility. Following issuance of this most recent AO, construction has not yet begun on three pieces of equipment, namely: II.A.107 – Tank 90, II.A.108 – Tank 92, and II.A.151 – Tank 170. The requirements found at R307-401-18, Eighteen Month Review, establish a review requirement for Approval Orders (AOs). This requirement applies to all AOs we issue. On January 31, 2014, the EPA issued a guidance memorandum which outlines “...what constitutes adequate justification for an extension of the 18-month timeframe for commencing construction....” UDAQ has reviewed this guidance memorandum and developed a guidance document dated March 25, 2014 that identifies the criteria the DAQ Director will use in a review of requests for extension of the 18-months to commence construction requirement. In your request of November 21, you provided details of the ongoing engineering and evaluation process. Such factors are the precise justification discussed in the guidance memorandum and are therefore acceptable to UDAQ. As this request for an extension was timely (within 18-months from issuance of the AO) and using that memorandum as guidance, your request is approved with the following extension requirements: 1. HF Sinclair Wood Cross Refining LLC is hereby granted an 18-month extension to commence construction on DAQE-AN101230057-23. 2. By no later than May 15, 2025, HF Sinclair Wood Cross Refining LLCa shall notify the Director of the status of construction, installation, modification, relocation or establishment of the equipment 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director DAQE-GN101230058-24 Page 2 listed in section II.A of the AO. 3. This initial permit extension is not subject to public notice or comment, nor is any additional review or permit analyses required, per the EPA and DAQ guidance identified above. Any additional extension requests beyond the initial 18-month period shall be reviewed on a case-by-case basis at the time of the request. At that time public notification and comment shall be required, along with the associated re-analysis and update of PSD requirements or re-submittal of an application as may be required. The charge for the review done in making this change is a flat fee plus a filing fee as authorized by the Utah Legislature. You will receive an invoice for these charges shortly. If you have any questions, please contact John Jenks who can be reached at (385) 306-6510 or jjenks@utah.gov. Sincerely, {{$s }} Insert signature block in here XXX:XX:xx {{#d1=date1_es_:signer1:date:format(date, "mmmm d, yyyy")}} {{#s=Sig_es_:signer1:signature}}