Loading...
HomeMy WebLinkAboutDAQ-2024-007686Mr. Bryce Bird Director Utah Division of Air Quality P.O. Box 144820 Salt Lake City, Utah 841144820 Dear Mr. Bird: On behalf of U.S. Army Dugway Proving Ground (DPG) and in accordance with Utah Administrative Code (UAC) R307-401-12, I am pleased to submit written detailed description of a Reduction in Air Pollutants (RIAP) resulting from the removal of one (1) existing stationary propane (LPG) fired emergency generator (E-Gen). The stationary LPG-fired E-Gen is included within DPG's existing ApprovalOrder (AO) DAQE-AN107060057-23, and is a 126 horsepower (HP) LPG-fired E-Gen located at the Master Radio Station, building 8050, located at the following coordinates: Building Number Location UTM Latitude/Longitude 8050 Master Radio Station 327912.11 Easting 4448179.82 Northing Latitude 40,166353 Longitude -1 13.020886 The removalof the emission unitwill result in a decrease of emissions lowering DPG's potential to emit (PTE) values. Rounding of emissions is possible. DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT COMMAND UNITED STATES ARMY GARRISON, DUGWAY PROVING GROUND DUGWAY UT 84022-s000 March 14,2024 T'TAH DEPARTMENT OF E}.IVIRONMENTAL qt'A.M/ ltAR 1 I 2024 Drvtsro{ oF AR otAt tY fi*nd- D"bv"r,{ Pollutant Gurrent AO RIAP Submitted February 28,2024 RIAP for LPG- Fired E-Gen RIAP for LPG- Fired E-Gen Existinq Resultinq Resultinq Reduc{ion Potentialto Emit ffons oer vear) Potentialto Emit (Tons oer vear) Potentialto Emit fions oer vear) Potentialto Emit (Tons per year) Particulate Matter (PM) 10 7.03 6,91 6.91 -0.0002 PM 2.5 (subset of PM10)6.91 6,80 6.80 -0.0002 Nitrooen Oxides (N0,)163.77 162.77 162.71 -0.065 Sulfur Dioxide (SOr)1.94 1.93 1.93 -0 00001 Carbon Monoxide (CO)41.26 41.01 41.01 -0.005 Volatile Organic Comnorrnds (VOC)6.50 6.49 6.49 -0.002 HAPs 0.07 0.07 0.07 -0.001 COze 27613.32 26484.10 26483.90 -0.20 B-2-10706 The table above includes values from a Reduction in Air Pollutant action submitted on February 28, 2024. Detailed emission calculations regarding this reduction in air pollutants have been provided within a Microsoft Excel spreadsheet. The spreadsheet , includes recent PTE updated values from the Reduction in Air Pollutant submitted on February 28th. A redline/strikethrough of AO DAQE-AN107060057-23 is included as an enclosure to fris submission, it also reflects changes in the Reduction in Air Pollutant action submitted on February 28,2024. " Please direct your staff to contact Boyd Roberts of the Division of Environmental Programs at (a35) 831-2546 with any questions or comments regarding this matter. ln accordance with operating permit provision l.K and Utah Administrative Code R307- 415-5d and based on information and belief formed after reasonable inquiry, I certify that the statements and information in this document are true, accurate, and complete. Sincerely, Christopher D. Damour Garrison Manager Enclosures State of Utah SPENCERJ. COX Govemor DEIDREHENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIRQUALITY Bryce C. Bird Director DAQE-AN107060057-23 March 74,2023 Boyd Roberts Dugway Proving Ground Department of the Army 5450 Doolittle Avenue Dugway, UT 84022-5000 boyd.roberts.civ@mail.mil Dear Mr. Roberts: Re: Approval Order: Minor Modificationto Approval Order DAQE-AN107060055-20 to Update Equipment and Emissions Project Num'ber: Nl 07060057 The attached Approval Order (AO) is issued pursuant to the Notice of Intent (NOI) received on November 15,2021. Dugway Proving Ground must comply with the requirements of this AO, all applicable state requirements (R307), and Federal Standards. The project engineer for this action is Jake Ries, who can be contacted at (385) 306-6530 or jries@utah.gov. Future correspondence on this AO should include the engineer's name as well as the DAQE number shown on the upper right-hand corner of this letter. No public comments were received on this action. Sincerely, 4-rd BryceC. Bird Director BCB:JRjg cc: Tooele County Health Department Dan Fagnant, EPA Region 8 I 95 North 1950 West . Salt Lake City, UT Mailing Address: P.O. Box 144820 . Salt Lake City, UT 84114-4820 Telephone (80 I ) 5364000 . Fax (80 I ) 536-4099 . T.D.D. (80 I ) 536-44 I 4 uw.deq.utah.gov Printed on 100% recycled paper STATE OF UTAH Department of Environmental Quality Division of Air Quality APPROVAL ORDER DAQE-Ar\107060057-23 Minor Modification to Approval Order DAQE-AN107060055-20 to Update Equipment and Emissions Prepared By Jake Ries, Engineer (3Es) 306-6s30 jries@utah.gov Issued to Dugway Proving Ground - U.S. Army - Dugway Proving Ground Issued On March 1.4,2023 Issued By 4ad Bryce C. Bird Director Division of Air Quatity TABLE OF CONTENTS TITLE/SIGNATURE PAGE.. GENERAL INFORMATION ........3 SECTION II: PERMITTED EQUIPMENT.....................5 SECTION II: SPECIAL PROVISIONS...... PERMIT HISTORY ACRONYMS .................... 12 DAQE-AN107060057-23 Page 3 Owner Name Dugway Proving Ground Mailing Address Department of the Army 5450 Doolittle Avenue Dugway, UT 84022-5000 GENERAL INFORMATION CONTACT/LOCATION INFORMATION Source Name Dugway Proving Ground - U.S. Army - Dugway Proving Ground Physical Address Department of the Army 5450 Doolittle Avenue Dugway, UT 84022-5000 Source Contact UTM Coordinates Name Boyd Roberts 309,300 m Easting Phone (435) 83 l-2546 4,444,300 m Northing Email boyd.roberts.civ@mail.pil Datum NAD27 UTMZone 12 SIC code 9711 (National Security) SOURCE INFORMATION General Description Dugway Proving Ground (DPG), a United States Army installation, is responsible for testing chemical and biological defense systems. NSR Classification Minor Modification at Major Source Source Classification Located in Attainment Area Tooele County Airs Source Size: A Appl icable Federal Standards NSPS (Part 60), A: General Provisions NSPS (Part 60), Dc: Standards of Performance for Small Industrial-Commercial-lnstitutional Steam Generating Units NSPS (Part 60), IIII: Standards of Performance for Stationary Compression Ignition Internal Combustion Engines MACT (Part 63), A: General Provisions MACT (Part 63), ZZZZ: National Emissions Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines MACT (Part 63), CCCCCC: National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline Dispensing Facilities MACT (Part 63), JJJJJJ: National Emission Standards for Hazardous Air Pollutants for Industrial, Commercial, and Institutional Boilers Area Sources Title V (Part 70) Major Source DAQE-AN1070600s7-23 Page 4 Project Description DPG has requested a modification to AO DAQE-AN107060055-20, to remove three diesel-fired emergency generator engines, install a diesel-fired emergency generator engine, replace a diesel-fired emergency generator engine, and replace a hot water boiler. Facility-wide PTE was re-evaluated based on the updated equipment list. The following updates were made to the AO: l) Addition of a713 hp diesel-fired emergency generator engine (ll.4.6) 2) Removal of three diesel-fired emergency generator engines, rated at 96 hp, 713 hp, and 755 hp (ll.4.6) 3) Replacement of a hot water boiler (ll.A.4) 4) Replacement of a 450 hp diesel-fired emergency generator engine with a 324hp diesel-fired emergency generator engine (II.A.6) 5) Updated PTE to account for updated equipment. SUMMARY OF EMISSIONS The emissions listed below are an estimate of the total potential emissions from the source. Some rounding of emissions is possible. SECTION I: GENERAL PROVISIONS Criteria Pollutant Change (TPY)Total (TPY) CO2 Equivalent {gl129.42 z76W?5!3 3.90 Carbon Monoxide +540.26 413641.01 Nitrogen Oxides 3=+9- t.06 +63J+162.77 Parttculate Matter - PMro 4g-0.12 1#6.91 Hartlculate Matter - PMz s 157-0.t 6+16.80 Sulfur Dioxide g2-0.0 r ptl.93 Volatile Orsanic Comoounds -H-0.01 ffi6.49 Hazardous Air Pollutant Chanse (lbs/vr)Total (lbs/vr) Generic HAPs (CAS #GHAPS)40 140 Chanse (TPY)Total (TPY) Total HAPs #10 0.07 I.l All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-l0l] 1.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401] Moditications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401-l] DAQE-AN1070600s7-23 Page 5 t.4 All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, shall be made available to the Director or Director's representative upon request, andthe records shall include the five-year period prior to the date ofthe request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of five (5) years. [R307-401-8] 1.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this AO, including associated air pollution control equipment, in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptatle operating and maintenance procedures are being used will be based on information available to the Director which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R307-401-4] 1.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns. 1R307-1071 T,7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories. 1R307-lsol I.8 The owner/operator shall submit documentation of the status of construction or modification to the Director within l8 months from the date of this AO. This AO may become invalid if construction is not commenced within l8 months from the date of this AO or if construction is discontinued for 18 months or more. To ensure proper credit when notifying the Director, send the documentation to the Director, attn.: NSR Section. [R307-401-18] SECTION II: PERMITTED EQUIPMENT II.A THE APPROVED EOUIPMENT II.A.I Dugway Proving Ground Tests Chemical and Biological Defense Systems il.4.2 Liquefied Petroleum Gas (LPG)-Fired Boilers A. Bio Lab (Building 2028) Boilers Rating: Quantity: 7 MMBtu/trr each 2 NSPS Applicability: None B. Bio Lab (Building 2029-A) Boilers Boilers less than 5 MMBtu/hr each, exempt from requirements of this AO as per R3 07-40 1 - I 0, listed for informational purposes. DAQE-AN107060057-23 Page 6 II.A.3 LPG-Fired Boilers (Cont'd) C. Combined Chem Lab (Building 4156) Boilers D. NSPS Applicability: 40 CFR 60 Subpart Dc Material Test Facility (Building 8027) Boilers Rating: Quantity: BumerRating: Rating: Ouantitv: B-urnerRating: 10.5 MMBtU/hreach 2 90 ppm NO. 10.461 MMBtu/hreach 2 40 ppm NO. NSPS Applicability: 40 CFR 60 Subpart Dc II.A.4 I'uel (rrl-frreo Eorlers and tleaters 68 fuel oil-fired boilers and heaters smaller than CFR 63 Subpart JJJJJJ l0 MMBtU/hr, 20 of which are subject to 40 to I MMBtu/hr with a combined rating ofA, il-2&units larger than or equalSgli]! MMBtu/hr B. 3a3zlunits smaller than 1 MMBtu/hr, exempt from requirements of this AO as per R307-401-10, listed for information purposes only. II.A.5 LPG-Fired Emergency Generator Engines ll engines rated at less than 600 hp with a combined rating of 4+l-j4lhp (35+25&kwm,26! 205 kWe). II.A.6 Diesel-Fired Emergency Generator Engines A. B. 21 engines rated at or greater than 600 hp with a combined rating of 37,886 hp (28,253 kWm, 23,131 kWe) (one NEW) 42 engines rated at less than 600 hp with a combined rating of 8,157 hp (6,082 kWm,4,67l kWe). II.A.7 Diesel-Fired Non-Emergency Generator Engines A. Police Firing Range Generator Engine Rating: 201 hp (150 kWm, 100 kWe) Manufacture Date: March 2016 NSPSiMACT Applicability: 40 CFR 60 Subpart IIII/40 CFR 63 Subpart ZZZZ B. Chem Lab Generator Engines Rating: 680 hp (507 kWm,400 kWe) each Quantity: 2 Manufacture Date: May 2011 NSPS/MACT Applicability: 40 CFR 60 Subpart IIII/40 CFR 63 Subpart ZZZZ II.A.8 Uutdoor lestlng and 'l raining (U'f) Outdoor test materials and training operations such as smoke and obscurants, material and delivery systems, munitions and incendiary devices. DAQE-AN1070600s7-23 PageT II.A.9 Open Burn/Open Detonation (Source Wide) (OtsOD-O) Open Burning (OB) and Open Detonation (OD) of residual munitions and propellants, explosives, and pyrotechnics (PEP) are conducted in the Dugway Thermal Treatment Facility (DTTF) and on the open ranges, II.A.IO oBoD-1 Open Burn at the DTTF destroys solid propellant, propellant charges, and bulk explosives. II.A.I I 0B()D-2 Open Detonation at the DTTF destroys conventional range recovered munitions, residual explosive material housed in munitions, hung ordnance, solid propellants and obscurant when the explosive and nonexplosive components cannot be safely separated. il.A.12 OtsOD-3 Due to safety concerns, some munitions must be destroyed in place. In these emergency situations, explosives ordnance experts use Department of Defense approved procedures best suited to the specific circumstances. II.A.I3 Underground Storage 'l anl(s ('l NK-f ) Four 20,000-gallon underground Fuel Oil No. 2 storage tanks. Three tanks are located at the Baker facility and one tank is located at the Ditto facility. Three underground gasoline storage tanks. One 10,000-gallon tank is located at the AAFES gas station, one 20,000-gallon tank is located at the English Village Motor Pool and one 20,000- gallon tank is located at the Ditto Motor Pool. II.A.14 Aboveground Storage'l'anks ('I'NK-z) Two 24,000-gallon aboveground JP-4 storage tanks located at the Michael Army Airfield. II.A.I5 Combined Chemical Test Facility (CC'f'l')* The CCTF includes emission units CCTF-l (Bldg 4156) and CCTF-2 (Bldg a165). Chemical agent operations are conducted at CCTF. Air from each room where chemical agent operations are performed is exhausted to the atmosphere through laboratory exhaust stacks equipped with multiple HEPA and carbon filters in series. Operated in accordance with Army regulations PAM385-61, AR 50- l, and other the rules and standards. II.A.I6 Bushnell Material Test Facility (BMTI')x The BMTF and associated buildings (BMTF-l - 8) are used to test military hardware under varied direct exposure to chemical agents and non-agents. Operations are conducted in Multi- Purpose Chambers, Agent Transfer Chambers, Thermal Pollution Abatement Device, Closed System Chamber, and Agent Repository. Emission controls include Pollution Abatement System, Redundant Pollution Abatement System, HEPA filters, and carbon filters. Operated in accordance with Army regulations PAM385-61 and AR 50-l. II.A.I7 Lit'e Sciences Test Facility (LS'I'}')* The LSTF and associated buildings are used to conduct operations with biosafety level (BSL) I, 2, and 3 materials. The LSTF includes emission units LSTF I through 4. BSL-3 operations are conducted in Class II or III Biological Safety Cabinets (BSCs). HEPA filters controls emissions to the atmosphere from the containment area. Operated in accordance with Army regulations PAM385-10, PAM 385-69, AR 50-1, and other CDC and HHS rules and standards. *Listed for information purposes only. DAQE-AN107060057-23 Page 8 SECTION II: SPECIAL PROVISIONS II.B REOUIREMENTS AND LIMITATIONS l.u.I uonortrons on permrtted sources (source wrde) II.B.l.a Conditions on All Approved Installations A. Emissions from sources of fugitive dust shall be minimized B. For all affected emission units, prompt reporting of deviations from permit requirements shall be defined as written notification within 2l days. 1R307-401-81 I.B.l.b 'Ihe owner/operator shall only use diesel and f-uel oil that contain less than 15 ppm sulfur. 1R307-401-81 II.B.l.b.1 To demonstrate compliance with the diesel fuel and fuel oil requirements for any diesel fuel and fuel oil purchased, the owner/operator shall keep and maintain fuel purchase invoices. The owner/operator shall obtain certification ofsulfur content from the fuel supplier or fuel purchase invoices indicating that the diesel or fuel oil purchased meets the sulfur content requirement. 1R307-401-81 II.B.l.c Conditions on LPG-Fired Boilers, Heaters and Generators A. Visible emissions shall be no greater than 20 percent opacity for affected emission units constructed after April 25, 197 1 B. Visible emissions shall be no greater than 40 percent opacity for affected emission units constructed prior to April 25,1971 C. The consumption of LPG on DPG for all LPG-fired boilers and heaters, that have a heat input that is greater than 5.0 MMBTU/hr, and all LPG-fired generators, shall not exceed 1,750,000 gallons per rolling l2-month period By the l5th day of each month, DPG shall calculate the total volume of fuel consumed in the previous 12 months. Fuel consumption for each affected emission unit shall be determined by a fuel meter, fuel bills, or trip tickets. Records of fuel consumption shall be kept on a monthly basis for each affected emission unit. 1R307-401-81 u.B.r.d Additional Conditions on NSPS LPG-Fired Boilers and Heaters A. DPG shall comply with all applicable requirements of 40 CFR 60 Subpart A B. DPG shall keep records of the amount of fuel combusted for each month for each affected emission unit. Fuel consumption for the affected emission units shall be determined by a common line fuel meter, fuel bills, or tank system gauge. Fuel consumption shall be prorated between the affected emission units based upon the respective design heat input rates. 1R307-401-81 DAQE-AN107060057-23 Page 9 l.B.l.e Conditions on Fuel Oil-Fired Boilers and Heaters A. Visible emissions shall be no greater than 20 percent opacity for affected emission units constructed after April25,l97l B. Visible emissions shall be no greater than 40 percent opacity for affected emission units constructed before April 25, 197 I C. The combined consumpti on of #2 and # I diesel for all boilers and heaters on DPG that have a heat input that is greater than L0 MMBTU/hr, shall not exceed ++OO.0009A!-AAA gallons per rolling 12-month period. 1R307-401-81 Ir.B.r.f Conditions on Diesel-Fired Generators A. Visible emissions shall be no greater than 20 percent opacity for affected emission units manufactured after January l, 1973, except for operation not exceeding 3 minutes in any hour B. Visible emissions shall be no greater than 40 percent opacity for affected emission units manufactured before January 1,19'73, except for operation not exceeding 3 minutes in any hour C. The consumption of diesel on DPG for diesel-fired generators shall be no greater than 250,000 gallons per rolling l2-month period for all emission units except those used for emergency power generation. 1R307-401-81 I.B.l.g Conditions on Diesel, and LPG-Fired Emergency Generators Emergency generators shall be used for electricity producing operation only during the periods when electric power from the public utility is interrupted or during maintenance. 1R307-40r -81 ILB.l.h Conditions on A. 1R307-401-81 B. Outdoor Testing and Training Outdoor testing and training shall be performed at a location such that the intended actual point of release is not closer than2 km from the boundary of property comprising DPG or which DPG has a legal use agreement DPG shall submit an annual plan of outdoor tests and training operations for planned releases to be performed in the upcoming year (federal fiscal year beginning October 1) for approval of test parameters no later than June 30 of each year for the new federal fiscal year. The plan shall include all tests and training operations which may result in the release of criteria pollutants and HAPs into the atmosphere and the following information: 1) Name of each test or training operation material(s) which release criteria pollutants and HAPs into the air 2) Maximum quantities which may be released 3) Maximum rates of release (quantity per hour) 4) Projected dates ofrelease. DAQE-AN107060057-23 Page 10 I.B.l.i Conditions on Open Bum/Open Detonation (Source Wide) A. OB and OD of residual munitions and propellants, explosives, and pyrotechnics (PEP) at the affected emission unit shall be conducted in the DTTF (OBOD-1 and OBOD-2) unless emergency in-place OD on the open range (OBOD-3) is necessary for safety reasons and is conducted in compliance with the Utah State issued Resource Conservation and Recovery Act permit. The DTTF is located in the southeast area of the affected emission unit approximately 1.9 miles west of the affected emission unit east boundary and 1,400 feet north of Durand Road. The 4O-acre DTTF is oval-shaped, measuring approximately 1,300 feet by 1,800 feet. B. To meet the clearing index requirement of R307-202 -7 and BACT requirement of R307-401-8 (1), all of the following conditions shall exist at the time of each non-emergency OB and OD event at the approximate location of the event: 1) Mixing height greater than or equal to 500 meters, 2) Wind speed greater than or equal to 3 miles per hour, 3) Wind speed less than or equal to l5 miles per hour, and 4) No air quality advisories or alerts for Tooele County. Each event shall be conducted between I hour after sunrise and I hour before sunset. C. DPG shall conduct each OB and OD event at the DTTF (OBOD-I & OBOD-2) in accordance with the current sound focusing mitigation plan (SFMP) as approved by the Director. The current approved SFMP is dated March 21,2001 . The SFMP shall include procedures to minimize the effects of over pressure on people outside the DPG boundary. The plan shall contain specific criteria that will be used to decide whether or not to proceed with each OB and OD event. If a nuisance as defined in Section 76-10-803 of the Utah Code is created by an OB event, the OB portion of the SFMP shall be revised and approved by the Director before conducting any additional OB events. If a nuisance as defined in Section 76-10-803 is created by an OD event, the OD portion of the SFMP shall be revised and approved by the Director before conducting any additional OD events D. A sign cautioning the public must be posted on the facility boundary and Durand road if an OB burn event is used to thermally treat waste containing more than 325 pounds of HCl. 1R307-40r -81 |.8.2 Source specilic requirements II.B.2.a Conditions to Open Bum in DTTF A. Net explosive weight shall be no greater than 1,500 lbs per event B. Net explosive weight shall be no greater than 150,000 lbs per rolling l2-month period. 1R307-401-81 DAQE-ANr 070600s7-23 Page 11 PER}IIT HISTORY This Approval Order shall supersede (if a modification) or will be based on the following documents: Supersedes Incorporates Incorporates Is Derived From Incorporates Incorporates Incorporates Incorporates Incorporates DAQE-AN I 07060055-20 dated May 14, 2020 Additional Information dated April 1,2021 Additional Information dated May 28,2021 NOI dated November 15,2021 Revised NOI dated April19,2022 Additional Information dated May 12,2022 DAQE-MN I 07 060057 -22 dated June 28, 2022 Additional Information dated August 4,2022 Additional Information dated October 26,2022 Lts.'.L.b Conditions on Open Detonation in DTTF A. Net explosive weight shall be no greater than 1,500 lbs per event B. Net explosive weight shall be no greater than 150,000 lbs per rolling l2-month period. 1R307-401-81 II.B.2.c Conditions on Open Detonation on Open Range A. Each event shall be conducted after the area has been secured according to Table 3-4 in PAM 385-64 "Withdrawal Distances for Nonessential Personnel", and between t hour after sunrise and I hour before sunset B. Net explosive weight shall be no greater than 1,500 lbs per event C. Net explosive weight shall be no greater than 50000 lbs per rolling 12-month period. 1R307-401-81 DAQE-AN1070600s7-23 Page 12 ACRONYMS The following lists commonly used acronyms and associated translations as they apply to this document: 40 CFR Title 40 of the Code of Federal RegulationsAO Approval OrderBACT Best Available Control Technology CAA Clean AirActCA,M Clean Air Act Amendments CDS Classification Data System (used by Environmental Protection Agency to classifi sources by sizeltype)CEM Continuous emissions monitorCEMS Continuous emissions monitoring system CFR Code of Federal RegulationsCMS Continuous monitoring system CO Carbon monoxideCOz Carbon Dioxide COze Carbon Dioxide Equivalent - Title 40 of the Code of Federal Regulations Part 98, Subpart A, Table A-1COM Continuous opacity monitorDAQruDAQ Division of Air QualityDAQE This is a document tracking code for intemal Division of Air Quality useEPA Environmental Protection AgencyFDCP Fugitive dust control plan GHG Greenhouse Gas(es) - Title 40 of the Code of Federal Regulations 52.21 (bX49Xi) GWP Global Warming Potential - Title 40 of the Code of Federal Regulations Part 86.1818- 12(a) HAP or HAPs Hazardous air pollutant(s) ITA Intent to Approve LB/YR Pounds peryear MACT Maximum Achievable Control TechnologyMMBTU Million British Thermal UnitsNAA Nonattainment AreaNAAQS National Ambient Air Quality Standards NESHAP National Emission Standards for Hazardous Air PollutantsNOI Notice of IntentNO- Oxides of nitrogen NSPS New Source Performance Standard NSR New Source Review PMro Particulate matter less than 10 microns in size PMz s Particulate matter less than 2.5 microns in size PSD Prevention of Significant Deterioration PTE Potential to Emit R307 Rules Series 307 R307-401 Rules Series 307 - Section 40 I SOz Sulfur dioxide Title IV Title IV of the Clean Air Act Title V Title V of the Clean Air Act TPY Tons per year UAC Utah Administrative Code VOC Volatile organic compounds