Rio Tinto Kennecott Utah Gopper LLC (KUC) is submitting this letter in
compliance with Approval Order (AO) number DAQE-ANO 1 03460062-23
and Title V Operating Permit Oitle V) Number 3500030004. lncluded
herein is the monthly KUC Smelter monthly report for December 2023.
The following sections present data related to the Holman Boiler, Main
Stack particulate and lead emissions, and Main Stack gas flow.
Holman Boiler
The Holman Boiler 30-day average NOx emissions are measured as
outlined in the most recently approved monitoring plan in accordance with
AO condition ll.B.2.b and Title V condition 11.8.23.b.1. The information
provided in Table 1 is required to be reported monthly.
Table 1: Holman Boiler Data
LTTAH DEPARTMENT OF
ENVIRONMENTAL OUATITY
JAN ',l I ?C24
DIVISION OF AIH QUALIT\.'
HandDel.iverd
Were the 30-day average NOx emissions greater than 9.34
lbs/hr durino the oeriod?N/A
Were the 30-day average 02 levels greater than 3.3% during
the oeriod?N/A**
Were the Holman Boiler data recovery requirements met during
the period? "N/A*
Rio Tinto Konn6cotl Lnah Copp€r, LLC. 4700 Daybrsak Parhray, South Jordan, Ulah 8rrc09.
REVIEWED
Initials JBR Date 2/5/2024
Comp Status Meets
File # 10346 Blue 2
RioTinto Rio Tinto Kennecott Utah Copper, LLC
4700 Daybreak Parlorvay
South Jordan, Utah &4009
Main Stack Particulate Matter (PMl0) and Lead (Pb) Emissions
Notes:
" For compliance with data recovery requirements, a minimum of 75% of the
operating hours in each operating day must be achieved in at least 22 o130
successive operating days.
'* The planned Holman burner replacement is still ongoing. Once the burner
replacement project is complete, KUC willcomplete stack testing to determine a
new oxvoen limit for the new burner
able 2: Main Stack Particulate and Lead Emissions
Date Main Stack Particulate
(lbs/h0
Main Stack Lead
(lbs/hr)
12t',U2023 17.3 0.1
1212t2023 11.5 0.0
1213t2023 5.9 0.0
12t4t2023 0.5'
12t5t2023 0.5*
12t6t2023 0.5'
12nt2023 0.5*
12t8t2023 0.5'
12t9t2023 0.5*
12t10t2023 0.5*
12t11t2023 0.5*
12t12t2023 0.5*
12t1312023 7.0 0.5
12t14t2023 18.7 0.2
12t15t2023 54.5 0.4
12t16t2023 68.7 0.6
12t17t2023 20.8 0.1
12t18t2023 59.2 0.5
1?/19t2023 43.2 0.2
12t20t2023 10.3 0.7
12121t2023 5.0 0.3
12122t2023 16.0 0.7
12123t2023 14.7 1.0
'1212412023 15.7 0.8
12t25t2023 22.1 0.9
12t26t2023 22.2 0.5
12127t2023 t 0.5*
Rio Tinto K€nnecott l,nah Copper, LLC. 4700 Oaybroak Parlsay, South Jtrdan, Utah 84009.
RioTinto Rio Tinto Kennecott Utah Copper, LLC
4700 Daybreak Parkway
South Jordan, Utah &4009
Particulate and lead emissions are measured and calculated in
accordance with the most recently approved monitoring plan. Table 2
summarizes the daily particulate and lead emissions data. The daily main
stack particulate emissions are to be compared with the permit limit of
89.5 lbs/hr as set forth in AO condition ll.B.1.a (H) and Title V condition
ll.B.24.a (i).
Table 3 summarizes the Main Stack particulate and lead emissions
annual data calculations. This includes recovery percentages for
particulate and lead emissions samples and the annual average lead
emissions. The lead annual average emissions are to be compared with
the permit limit of 1 .3 lbs/hr as set forth in AO condition ll.B.1.a (H) and
Title V condition 11.8.24.d.
Main Stack Gas Flow
ln accordance with AO condition 11.B.3.a.6, main stack gas flow may be
estimated in the event that temperature and velocity measurements
malfunction. Table 4 summarizes the instances when main stack gas flow
was estimated.
Table 4: Main Stack Gas Flow Estimates
Number of instances when main stack gas
flow was estimated during the period:Zero (0)
12t28t2023 0.5*
12129t2023 22.7 1.1
12t30t2023 20.5 0.8
12t31t2023 19.6 0.7
Notes: Eleven samples were invalidated for particulate and lead emissions for
lhe month: December 4u,, 5r', 6t , 7th , 8th, gth,1 Oth,1 1h, and 12h were invalidated
lue to work on the Main Stack elevator. December 27th and 28h were invalidated
Jue to procedural errors (per section 6.6.3 of the Monitoring Plan). The monthly
average value for lead is substituted on these days for calculating the annual
average per the plan.
able 3: Main Stack Annual
Particulate Emissions Data Recovery*81.1%
Lead Emissions (Annual Average)0.2 lbs/hr
Lead Emissions Data Recovery*80.1o/o
Notes:
+ - Data recovery percentages are to be compared with the 80% data recovery
requirement outlined in the most recently approved monitorinq plan.
Rio Tinto Kennocott Lnah Copper, LLC. 4700 Oaybreak Parloay, South Jodan, Utah 84009.
RioTinto Rio Tlnto Kennecott Utah Copper, LLC
4700 Daybreak Pad$ay
South Jordan, Utah 84009
Based on information and belief formed after reasonable inquiry, the
statements and information in this document are true, accurate, and
complete (R307-41 Ssd).
lf you have any questions regarding this report, please contact me or Sean
Daly at 801-204-2563.
Jerome Dozol
General Manager -
JAN 1 I 2024
Yours sincerelv.
crra Fa'\ttotu*+a !4,rry*ra tFrriD I offruorrg
Rio Tinto Kenn€cott l.riah Copper, LLC. 4700 Dayb.sak Parlsay, South Jordan, Ln6h 84009.