Loading...
HomeMy WebLinkAboutDAQ-2024-004349RioTinto Date 11 Jan2024 Rio Tinto Kennecott Utah Copper,LLC 4700 Daybreak Parkway South Jordan, Utah 84009 Tel: (801) 204 2oo0 -UrA{ DEPARIUENT OF EllvtRo{itEMrAL O'JAUn JAN 1 6 2A24 DMSION OF AIR QI.,|.AUTY lfo^,t t)rL'vz"rL Mr. Bryce Bird - Director Department of Environmental Quality Division of Air Quality P.O Box 144820 Salt Lake City, Utah 84114-4820 Attn: Joe Randolph RE: Potential Deviation: Refinery Emergency Generator - Precious Metals visual observation was not performed within twelve consecutive hours Operating Permit No. 3500030004 Kennecott Utah Gopper - Smelter / Refinery Dear Mr. Bird, Kennecott Utah Copper, LLC (Kennecott) is submitting this letter to provide informantion regarding a potential administrative deviation. Condidition 11.8.44.a.1 of Kennecott's Title V Operating Permit specifies that, 'During any period that an emergency generator is operated for longer than 12 hours consecutively, a visual obseruation of that generator's exhaust shall be made by an indivdual trained on the observations procedures of 40 CFR 60, Appendix A, Method 9....". Due to the scheduled Refinery shutdown which started on 51112023 and ended 91512023. The generator ran for 24 hours between 511612023 through 61612023 without a visual observation being completed. The power was locked out to the Precious Metals plant due to scheduled maintenance projects. The Precious Metals generator ran to support essential equipment like lights, agitators, and maintenance equipment during the work. The Refinery is currently working on training to inform operations of the requirements associated with the generator. The refinery is also working on signage for operations to notify the environmental team when the generator is running. Based on information and belief formed after reasonable inquiry, the statement and information contained in this document are true, accurate, and complete (R307-415-5d). Should you have any questions or need further information regarding this deviations please contact Sean Daly at 801-204-2563. REVIEWED Initials JBR Date 1/29/24 Comp Status Meets File # 10346 Blue 1 dev for gen no veo ran over 12 hours. Gen ran 24 hours no veo done. Oper log shows no emissions company will redo req for notifications. Gen tested 1/4. NFA. RioTinto Rio Tinto Kennecott Utah Copper,LLC 4700 Daybreak Parkway South Jordan, Utah 84009 Tel: (801 ) 204 2OO0 Yours sincerely,44 Dustin Morris Manager-Refinery&Rail