HomeMy WebLinkAboutDWQ-2024-002974 FACT SHEET AND STATEMENT OF BASIS BLX MAYFLOWER, LLC MINOR PERMIT MODIFICATION UPDES PERMIT NUMBER: UT0026140 MINORINDUSTRIAL FACILITY CONTACTSPerson Name:Brooke HontzPosition:Asst. VP DevelopmentPhone Number:(435) 640-1941Person Name:Brad RasmussenPosition:Consultant, AQUA EngineeringPhone Number:(801) 299-1327Facility Name:BLX Mayflower, LLCMailing and Facility Address:2750 West Rasmussen Road, Suite 206Park City, Utah 84098Telephone:(435) 640-1941 Actual Address:TBD DESCRIPTION OF FACILITY This minor modification is in response to a letter from BLX Mayflower, LLC (DWQ-2024-001462), received on April 11, 2024, requesting a compliance schedule milestone extension for milestones found in Part I.C.3.a. of Utah Pollutant Discharge Elimination System (UPDES) Permit No. UT0026140. The Division of Water Quality approves this request. The below compliance schedule tables have been modified; modified dates have been bolded. This is also reflected in Part I.C.3.a. of the UPDES Permit. Since this modification is a change to interim compliance dates in a schedule of compliance, that is no more than 120 days after the date specified in the existing permit and does not interfere with the attainment of the final compliance date, it is considered a Minor Modification. Minor Modifications are not required to follow the procedures in Utah Administrative Code R317-8-6, including public notice procedures. This permit contains a Compliance Schedule for Water Treatment Milestones.Final limits will go into effect January 1, 2026.Table A: On-site Water Treatment Plant PathDateMilestoneSeptember 1, 2023Mayflower notifies DWQ of the selected Water Treatment Plan path. If Mayflower chooses the on-site Water Treatment Plant path continue using Table A. If Mayflower chooses the Keetley Water Treatment Plant Path, continue using Table B.January 1, 2024Updated Construction Plan Submitted to DWQ (if applicable)May 31, 2024Begin ConstructionOctober 1, 2025Construction Completed and Approved by DWQJanuary 1, 2026 Final Effluent Limitations in Effect PERMIT DURATIONIt is recommended that this permit be effective through the current permit expiration date, November 30, 2025.Drafted and Reviewed byLindsay Cowles, Environmental ScientistDWQ-2024-001