Loading...
HomeMy WebLinkAboutDAQ-2024-004861^i\\.*"r"y. Dean P. Anderson Vice President Tesoro Refining & Marketing Company LLC Tesoro Refining & Marketing Company LLC A subsidiary of Marathon Petroleum Corpomtion i January 8,2024 Mr. Bryce Bird, Director Atbr: Jeremy Marsigli i Utah Division of Air Quality i 195 North 1950 West P.O. Box 144820 IN PERSON SI'BMITTAL Salt Lake city, uI 841144820 Fourth Ouarter VOC Monitorins Report Title V Ooeratins Permit 3500008001 Condition II.B.4.a.3 & Aoproval Order: DAOE-AI\10335007$18 40 CFR60 Subpart GGGa Q60.487a 40 CFR 63 Suboart CC t63.655 Attached is the fourth ryarter 2023 VOC monitoring report for the Tesoro Refining & Marketing Company LLC's (TMRC) Salt Lake City Refinery and Tesoro Logistics Operations, LLC (TLO). The information contained herein is for the reporting period October | , 2023, through Dece'mber 31, 2023. This report is required semiannually; however, TMRC Salt Lake City Refinery and TLO report quarterly. Pursuant to 40 CFR $60.487a(c)(1-3) this report includes monitoring information pertaining to leaking components, process rurit shutdowns, components placed on Delay of Repair (DOR), and applicable revisions to component inventories. This information is contained in the attached Tables 1.1 through 4. During routine monitoring and auditing, 28 valves were discovered as not being in the LDAR program. These components were immediately added to the fugitive monitoring program, tagged, monitored, and found to not be leaking. If you have any questions regarding this matter, please contact James Beardall 801-521-4914. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a syste,ur designed to asswe that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Sincere,ly, tt*-o/- Dean P. Anderson Vice President Tesoro Refining & Marketing Company LLC B-2-10335 Mr. Bryce Bird, Director Iamary 8,2024 Attachments: Table 1.1- Monitoring Information for Hydrocarbon Processing Division - North Table 1.2- Monitoring Information for Hydrocarbon Processing Division - South Table 1.3- Monitoring Information for Oil Movements Division Table 2.1- Revisions to InitiaUSemiannual Report - HPDN Table2.2- Revisions to InitiaVSemiannual Report - HPDS Table23- Revisions to InitiaVSemiannual Report - OMD Table 3.1- Dates of Process Unit Shutdowns IIPDN Table 3.2- Dates of Process Unit Shutdowns IIPDS Table 3.3- Dates of Process Unit Shutdowns OMD Table 4- Components on Delay of Repair cc: Mr. Scott H. Patefield, Branch Chief Via USPS USEPARegion 8 Enforcement and Compliance Assurance Division SENF-AT- Air and Toxics Enforcement Branch 1595 Wynkoop Sffeet Denver, Colorado 80202-1129 Hydrocarbon Processing Division - North (HPDN) Iable {.1: Monitoring lnformation - S40 CFR 60.487a(c)(2) Requirement ALKY FCCU GHT POLY VRU Oet Nov Dec Oct Nov Dec Oct Nov Dec Oct NoY Dec Oct Nov Dec y'alves - No. of leaks detected per i60.482- 7a(b)5 I 0 0 0 2 0 0 0 0 0 2 1 0 0 y'alves - No. of leaks not repaired :er $60.482-7a(d)(1 )0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 rumps - No. of leaks detected per i60.482-2a(b), (d)(a)(iXA) or (B)0 0 0 0 0 0 0 0 0 I 1 0 0 0 0 ,umps - No. of leaks not repaired rr $60.482-2a(c)(1) and (d)(6)0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SGGa Compressorsr - No. of eaks detected per $60.482-3a(f) 0 0 0 No Applicable Compressors No Appllcable Compressors No Applicable Compressors 0 0 0 Sompressors - No. of leaks not 'epaired per $60.482-3a(gXl ) 0 0 0 0 0 0 Tesoro Refining Marketing Company ttC Salt Lake City Refinery and Tesoro Logistics Operations LIC Salt Lake City, UT Subpart GGGa VOC Monitoring Report Table 2.1: Revisions to lnitial / Semiannual Report - S40 CFR 60.487a(c)(4) Requirement ALI(Y FCCU GHT POLY VRU Valves2'7 subject to $60.482-7a(a) 3159 1430 1048 810 1892 o Valves Added 6 6 0 I 0 . Valves Removed 1 0 0 0 0 Pumps3'7 subject to $60.482-2a 35 1'l 5 4 't3 . PumpsAdded 0 0 0 0 0 . Pumps Removed 0 0 0 0 0 Compressons4 7 subject to $60.482-3a 1 0 0 0 1 . Compressors Added 0 0 0 0 0 . Compr6sso6 Removed 0 0 0 0 0 able 3.1: Dates of Process Unit Shutdorrhs'- 540 CFR Process Unit Dates of Shutdowns Scheduled (Y/N) ALKY No Shutdowns N/A FCCU No Shutdowns N/A GHT 1227123 - 12128t23 N POLY No Shutdowns N/A VRU No Shutdowns N/A Page 1 of4 Hydrocarbon Processing Division - South (HPDS) Iable 1.2: Monitoring lnformation - $l40 CFR 60.a87a(c)(2) Requirement BSU DDU FGR N2C UFU vNs Oct Nov D6c Oct ilov Dec Oct Nov Dec Oct Nov tlec Oct Nov Erc Oct Nov D.c Valves - No. of leaks detected rer 560.482- 7a(b)0 1 0 1 0 0 0 0 0 0 0 0 0 11 0 0 ,|0 Valves - No. of leaks not €paired per 560 .482-7 a(d\('l I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pumps - No. of leaks detected per $60.482-2a(b), (dX4Xii)(A) or (B) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pump.s . No. of leaks not repaired per $60.482-2a(c)('1 ) and (d)(6) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 GGGa Compressorsi - No. o1 leaks detected per 560.482- 3a(0 No Applicable Compressors 0 0 0 0 0 0 0 0 0 0 0 0 No Applicable CompressorsCompreasors . No. of leaks not repaired per $60.482- 3a(sX1) 0 0 0 0 0 0 0 0 0 0 0 0 ,Tesoro Refining Marketing Company LLC Salt Lake City Refinery and Tesoro Logistics Operations LLC Salt Lake City, UT Subpart GGGa VOG Monitoring Report Shutdownss Table 2.2: Revisions to lnitial / Semiannual Report - S40 CFR 60.487a(c)(a) Requirement BSU DDU FGR N2C8 UFU VNS Valves2'7 subject to $60.482-7a(a) 1291 1431 275 1859 1919 747 . Valvs Added 0 0 0 7 0 16 . Valvss Remov6d 0 6 0 6 2 0 Pumpsl T subject to S60.482-2a 11 5 2 11 12 't0 . PumpsAdded 0 0 0 0 0 0 . Pumps Removed 0 0 0 0 0 0 Compressors'' 7 subject to S60.482-3a 0 3 3 1 3 0 . Compresso6Added 0 0 0 0 0 0 . Compressors Removed 0 0 0 0 0 0 Table 3.2: Dates of Process Unit Shutdowns" 540 CFR rs, qle^e, Process Unit Dates of Shutdowns Scheduled (Y/N) BSU 10t1123 - ',t2t3',\123 DDU 10128123 - 10130123 N FGR No Shutdowns N/A N2C No Shutdowns N/A UFU No Shutdowns N/A VNS No Shutdou,ns N/A Page 2 ol 4 Oil Movements Division (OMD) Iable 1.3: Monitoring lnformation - S40 CFR 60.487a(cX2) Requirement BLR COGEN RTF SRU TKF TLR Oct Nov Dec Oct Nov Dec Oct Nov D€c Oct Nov D.c Oct l{oY Dcc Oct Nov Dec 9alves - No. of leaks lstectod per 560.482- 7a(b)0 1 0 0 0 0 0 0 0 0 0 2 0 0 5 0 0 0 y'alves - No. of leaks not epaired per $60 .a82-7 a(d\(l ) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pumps - No. of leaks letected per $60.482-2a(b), ldXaXiiXA) or (B) 0 0 0 No Applicable Light Liquid Pumps 0 0 0 0 0 0 0 0 0 0 0 0 Pumps - No. of leaks not epaired per $60 .482-2a(c)(1 ) md (d)(6) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 GGGa Gompreesorsr - No. rf leaks detected per 560.,+82, la(0 0 0 0 0 0 0 No Applicable Compressors No Applicable Compressors No Applicable Compressors No Applicable CompressorsGompressors - No. of leaks not repaired per 560.482- 3a(g)(1 ) 0 0 0 0 0 0 Tpsoro Refining Marketing Company LLG Salt Lake City Refinery and Tesoro Logistics Operations LLC Salt Lake Caty, UT Subpart GGGa VOC Monitoring Report Table 2.3: Revisions to lnitial / Semiannual Report - S40 CFR 60.487a(cXa) Requirement BLR COGEN RTF SRU TKFt TLR Valves2'7 subject to S60.482-7a(a) 1256 189 821 525 3367 1 591 . ValvesAdded 2 3 0 0 65 38 . ValvesRemoved 1 0 0 0 18 0 Pumpsr'7 subject to 560.482-2a 11 0 I 2 72 28 . PumpsAddod 0 0 0 0 0 0 . PumpsRomovad 0 0 0 0 0 o Compressorsa'' subject to S60.482-3a 2 I 0 0 0 0 . CompressorsAdded 0 0 0 0 0 0 . Compressors Removed 0 0 0 0 0 0 Table 3.3: Dates of Process Unit Shutdowns" - S40 CFR Process Unit Dates of Shutdowns Scheduled (YN) BLR No Shutdowns N/A E COGEN 't0129123 - vru23 N W COGEN 12t8t23 - 12i14123 N SRU No Shutdowns N/A TLR No Shutdowrs N/A Page 3 of 4 . Tesoro Refining Marketing Company ttC Salt take City Refinery and Tesoro Logistics Operations LLC Salt Lake City, UT Subpart GGGa VOC Monitoring Report Iable 4: Gomponents Added to Delay of Repair (DOR)6 -s40 CFR 6o.a87a(cX2Xxi) Process Unit Component Type LDAR Tag #Monitoring Date Date Placed on DOR Date Repaired Date Removed from DOR None Page 4 of 4 , Teso;o Refining Marketing Company LLG Salt Lake Gity Refinery and Tesoro Logistics Operations LLC Salt Lake City, UT Subpart GGGa VOG Monitoring Report Table Notes 1 - Existing compressors in ALKY, COGEN, DDU, and N2C units were constructed prior to November 7,2006. Tesoro has not conducted any construction, modification, or reconstruction activities that would trigger GGGa applicability for these compressors; however due to the Utah State lmplementation Plan Section lX, Part H.11(gxiv) all affected equipment is required to comply with the provisions of 60.590a to 60.593a no later than January 1,2016. The Utah SIP was adopted by the Air Quality Board on December 2,2015. 2 - Excluding those valves designated for no detectable emissions under the provisions of $60.482-7a(f), 3 - Excluding those pumps designated for no detectable emissions under the provisions of $60.482-2a(e) and those pumps compllng with $60.482-2a(f). 4 - Excluding those compressors designated for no detectable emissions under the provisions of $60.482-3a(i), S60.482-3a(h), and 60.593a(bXl ). Tesoro demonstrates compressors are in hydrogen service per 60.593a(b)(3)(i). 5 - Process unit shutdown means a work practice or operational procedure that stops production from a process unit or part of a process unit during which it is technically feasible to clear process material from a process unit or part of a process unit consistent with safety constraints and during which repairs can be accomplished. The following are not considered process unit shutdowns: (a) An unscheduled work practice or operational procedure that stops production from a process unit or part of a process unit for less than 24 hours. (b) An unscheduled work practice or operational procedure that would stop production from a process unit or part of a process unit for a shorter period of time than would be required to clear the process unit or part of the proce$s unit of materials and start up the unit, and would result in greater emissions than delay of repair of leaking components until the next scheduled process unit shutdown. (c) The use of spare equipment and technically feasible bypassing of equipment without stopping production. 6 - For leaking components that remain in VOC seMce the delay of repair designation will be removed once two consecutive monthly monitoring instrument readings are below the leak definition. 7 - Component changes involving CLVS, PRVs, Heavy Liquids, or a Process Unit switch do not show up as "added" or "removed'because they have been in service; only the component class or Unit identifier has been changed. 8-During routine monitoring and auditing, 28 valves were discovered as not being in the LDAR program. These components were immediately added to the fugitive monitoring program, tagged, monitored, and found to not be leaking. . Terofo Refining Marketing Gompany LLG Salt Lake Gity Refinery and Tesoro Logistics Operations LLG Salt Lake Gity, UT Subpart GGGa VOC Monitoring Report The following is a list of codes to describe component types in the report: AVO - Audio, Visual, Olfactory COMP - Compressor CLVS - Closed Vent Vapor Recovery System DTM - Difficult to Monitor GV - Components in Gas Vapor service LL - Components in Light Liquid SeMce PMP - Pump PRV - Pressure Relief Valve UTM - Unsafe to Monitor VLV - Valve OOS - Out of SeMce or not in VOC service. OEL - Open Ended Line "Heayy Liquid" or "HL" denotes components in heavy liquid service. "Light Liquid" or'LL" denotes components in light liquid service. Yapof or "G\f denotes components in gas vapor service. The following is a list of codes used to describe process units in the report: ALKY - Alkylation Unit BSU - Benzene Saturation Unit BLR - Butane Loading Rack BP - Boiler Plant COGEN - Cogeneration Unit (East and West) DDU - Distillate Desulfurization Unit FCCU - Fluid Catalytic Cracking Unit FGR- Flare Gas Recovery Unit GHT - Gasoline Hydrotreater Unit N2C - Crude Unit #2 POLY - Polydebutanizer Unit RTF - Remote Tank Farm SRU - Sulfur Recovery Unit TKF - Tank Farm TLR - Transport Loading Rack UFU - Ultraformer VNS - Virgin Naphtha Stabilizer VRU - Vapor Recovery Unit UTAH DEPARTMENT OF ENVIHONMENTAL QUAUTY JAN 'l 1 2024 DIVISION OF AIR QUALIW