Loading...
HomeMy WebLinkAboutDSHW-2024-005996April 30, 2024 William Simmons, Facility General Manager Clean Harbors Aragonite, LLC P.O. Box 1339 Grantsville, UT 84029-1339 RE:Class 2 Modification Approval – Additional Container Pumping Station and Storage Capacity in E-4 DecantUTD981552177 Dear Mr. Simmons: On May 30, 2023, Clean Harbors Aragonite (Aragonite) submitted a Class 2 permit modification request seeking approval to construct and operate an additional container pumping station and add the ability to store containers in the E-4 decant area. As part of the Class 2 modification process, a 60-day public comment period and an informational public meeting were held. No public comments were received. Following review of the request, the Division of Waste Management and Radiation Control issued an approval to construct the additional container pumping station on August 31, 2023. On April 3, 2024, Aragonite submitted a construction certification indicating the additional container pumping station had been constructed andwas ready for use. Division staff inspected the newly constructed container pumping station on April 8, 2024, and determined that construction of the feed piping had not yet been completed. On April 11, 2024, Aragonite submitted an amendment to the construction certification indicating that the unfinished elements of the feed piping had been completed, and also indicated that the E-4 decant storage areafloor had been painted to delineate the container storage locations outlined on permit drawing D-800-M-402. Photos were also included with the amended construction certification to confirm these most recent changes. During review of the construction certification for the additional container pumping station, an issue was noted with drawing D-800-M-402 and the new storage capacity listed on the drawing capacity table versus that shown for building E-4. The discrepancy was resolved when Aragonite submitted a corrected drawing. Based upon our review of the latest construction certification information and the on-site inspection, the Class 2 modification is approved as enclosed. Aragonite should update its copy of the permit by making the following changes: Replace Module 3 – Storage and Treatment in Containers with the enclosed copy. Replace Attachment 3 – Inspections with the enclosed copy. Replace Attachment 7 – Closure Plan with the enclosed copy. Replace Attachment 7, Appendix 1 – Closure Cost Estimate with the enclosed copy which consists of two separate files that combine to form the Appendix. Replace Attachment 8 –Waste Storage, Processing, and Tracking with the enclosed copy. Replace Attachment 10 – Design Drawings with the enclosed copy. Replace Attachment 12 – WFCO Systems Testing Procedure with the enclosed copy. Replace Attachment 13 – Instrument Calibration with the enclosed copy. Replace Attachment 14 – Fume Management with the enclosed copy. Replace Drawing D-034-PI-106, Rev 35 with the enclosed Rev 37 Replace Drawing D-034-PI-109, Rev 12 with the enclosed Rev 14 Replace Drawing D-034-PI-302-1, Rev 24 with the enclosed Rev 25 Replace Drawing D-034-PI-302-2, Rev 5 with the enclosed Rev 7 Replace Drawing D-034-M-002, Rev 35 with the enclosed Rev 36 Replace Drawing D-800-M-402, Rev 16, with the enclosed Rev 18 Replace Drawing D-800-M-403, Rev 9, with the enclosed Rev 11 Also enclosed is an updated copy of theList of Permit Revisions. As part of this approved permit modification, the container storage capacity at the facility has been increased. Accordingly, the closure cost estimate, as indicated in Attachment 7, Appendix 1, has increased to a current value of $20,228,969. Effective with this approval to begin using the additional container pumping station and additional container storage in building E-4, a 60-day window begins during which Aragonite must update the facility financial assurance mechanism (closure insurance) to address the increase in the estimated closure cost estimate associated the increased storage capacity and provide evidence of this update to the Division with an updated Certificate of Insurance for Closure or Post-Closure Care. If you have any questions, please call Boyd Swenson at (385) 499-4935. Sincerely, Douglas J. Hansen, Director Division of Waste Management and Radiation Control DJH/BAS/wa Enclosures:Module 3 – Storage and Treatment in Containers (DSHW-2012-011662) Attachment 3 – Inspections (DSHW-2012-011640) Attachment 7 – Closure Plan (DSHW-2012-011646) Attachment 7, Appendix 1 - Closure Plan Cost Estimate (DSHW-2012-011645) Attachment 7, Appendix 1 - Closure Plan Cost Estimate – Calculations (DSHW-2023-005060) Attachment 8 – Waste Storage, Processing, and Tracking (DSHW-2012-011647)Attachment 10 – Design Drawings (DSHW-2012-011628) Attachment 12 – WFCO Systems Testing Procedure (DSHW-2012-011630) Attachment 13 – Instrument Calibration (DSHW-2012-011632) Attachment 14 – Fume Management (DSHW-2012-011633) Drawing D-034-PI-106, Rev 37 (DSHW-2012-011689) Drawing D-034-PI-109, Rev 14 (DSHW-2012-011692) Drawing D-034-PI-302-1, Rev 25 (DSHW-2012-011711) Drawing D-034-PI-302-2, Rev 7 (DSHW-2012-011712) Drawing D-034-M-002, Rev 36 (DSHW-2012-011670) Drawing D-800-M-402, Rev 18 (DSHW-2012-011737)Drawing D-800-M-403, Rev 11(DSHW-2012-011738)List of Permit Revisions (DSHW-2023-005042) c:Jeff Coombs, Health Officer, Tooele County Health DepartmentBryan Slade, Environmental Health Director, Tooele County Health Department Annette Maxwell, US EPA, Region 8 Natalie Cannon, US EPA, Region 8 Bryan Lunt, Facility Operations Manager, Clean Harbors Aragonite (Email) lunt.bryan@cleanharbors.com Ken Banks, Senior Environmental Compliance Manager, Clean Harbors Aragonite (Email) banks.kenneth@cleanharbors.com Gabrielle Marinick, Division of Waste Management and Radiation Control, UDEQ Kaci McNeill, Division of Waste Management and Radiation Control, UDEQ Brent Gaschler, Division of Waste Management and Radiation Control, UDEQ