HomeMy WebLinkAboutDAQ-2024-004204Robert Checketts
Yice President
Operations and Engineering
January 16,2024
Mr. Bryce Bird
Executive Secretary
Utah Division of Air Quality
195 North 1950 West
Salt Lake City, Utah 84116
A BERKSHIRE HATHAWAY ENERGY COMPANY
2755 E. Cottonwood Parkway, Suite 300
Salt Lake Ciry, UT 84121
80 l -937-6 103
UTAH DEPARTMENT OF
ENVIRONMENTAL QUAUTY
JAN 1 9 'ti)2,!
DiVISION OF AIR QUALIT\:
RE: Salt Lake Compressor Station, Unit2 Turbine Overhaul/Exchange
Perm it DAQE-AN 1259 60016 -23
Dear Mr. Bird:
Kern River Gas Transmission Company (Kern River) is submitting notification of a like-kind
exchange of Unit 2 at the Fillmore compressor station. The like-kind exchange is scheduled for
the week of March 18,2024. Kern River will schedule a Subpart GG test of this turbine to occur
after the exchange is complete. A protocol will be submitted to the Division at least 30 days prior
to testing.
The exchange of Unit 2 involves the gas producer and power turbine modular component of the
turbine. The exchange of these components is part of Kern fuver's routine maintenance program.
Failure to perform the exchange could result in the catastrophic failure of critical components with
inherent risk to property, persorurel, and the environment.
Replaced components were refurbished in Solar Turbines, Incorporated overhaul facility. The
overhaul consists of the complete disassembly, inspection rework, reassembly, and testing of the
gas turbine to the original thermodynamic and mechanical performance. The exchange turbine is
identical or functionally equivalent and will have the identical horsepower, heat rate, and emissions
characteristics as the components being replaced. There are no physical or operational changes in
the equipment. A refurbished engine core maintains the same mass flow, firing temperature, and
control parameters as it did before the overhaul.
Other components of the original package including the control system, fuel system, lubrication
system, backup power system, cooling system, driven equipment, structures, enclosures, skids,
inlet and exhaust ducting, etc., remain unchanged and in place. Only the accessory gearbox, gas
producer and power turbine modular components are affected by the exchange.
Enclosed is the pricing for the exchange unit. The cost of the exchange is less than 50Yo of the cost
of the new turbine. The turbine exchange cost is $3.2m and the cost of a new turbine package
would be $10.4m. This exchange does not meet the definition of reconstruction and therefore no
permiuing should be required.
This exchange should be considered routine . If you have any questions or comments
please contact Denise Kohtala at (801) 937 7 or denise.kohtala@Iemrivergas.com.
I certifr that, based on information and beli after reasonable inquiry, the statements and
information in this document are true,and complete.
tl
't
cc: Jon L. Black
Manager New source Review Section
Utah Division of Air Quahty
195 North 1950 West
salt Lake city, utah 841l6
Enclosure
Kem River Salt Lake Engine Unit 2 Overhaul-EOH/SSolarTurbines
A Catupillu Conpaay
Confidential: Do Not Fonilard Without Solar's Written
Approval
Page 1