HomeMy WebLinkAboutDDW-2024-007387Rebecca Yoo <ryoo@utah.gov>
Salt Lake City (Sys #18026); File 13966 - Bonneville Blvd Water Pipe Liner Project
4 messages
DDW PNF <ddwpnf@utah.gov>Mon, Apr 22, 2024 at 7:30 AM
To: "Gray, Teresa" <Teresa.Gray@slcgov.com>, Rebecca Yoo <ryoo@utah.gov>
Cc: "Hamer, Courtney" <Courtney.Hamer@slcgov.com>, Nagendra Dev <ndev@utah.gov>
Ms. Gray:
On April 19, 2024, the Division of Drinking Water received the attached project notification form, plans, and
specifications for the Bonneville Blvd Water Pipe Liner project for the Salt Lake City water system. This project is
referenced as Water System #18026, File #13966 in our plan review database. Please use these numbers for
future correspondence related to this project. This project will be reviewed by Rebecca Yoo. Please contact her at
ryoo@utah.gov or (801) 388-3594 if you have any questions. Thank you.
DDW PNF Team
Division of Drinking Water
Phone: (801) 536-4200
Fax: (801) 536-4211
drinkingwater.utah.gov
Emails to and from this email address may be considered public records and thus subject to Utah GRAMA
requirements.
3 attachments
13966 PNF - Bonneville Blvd Water Pipe Liner.xlsm
28K
13966 Dwgs - Bonneville Blvd Water Pipe Liner.pdf
12078K
13966 Specs - Bonneville Blvd Water Pipe Liner.pdf
7064K
Rebecca Yoo <ryoo@utah.gov>Mon, Apr 29, 2024 at 4:49 PM
To: troberts@jub.com
Cc: "Gray, Teresa" <Teresa.Gray@slcgov.com>, "Hamer, Courtney" <Courtney.Hamer@slcgov.com>
Hello Tyler,
I took a look at this project and am wondering if it falls under O&M, as described in R309-500-2 (copied below). I have
bolded the relevant rules.
If so, this project is not subject to review. If SLCDPU would prefer to have it reviewed by DDW, I can certainly do so, but
wanted to check in with you first as it may not be required.
(2) On-going Operation and Maintenance Procedures.On-going operation and maintenance procedures are not
considered public drinking water projects and, accordingly, are not subject to the project notification, plan approval and
operating permit requirements of this rule. However, these activities shall be carried out in accordance with all
requirements contained in R309-500 through R309-550 and specifically the design, construction, disinfection, flushing,
4/30/24, 1:05 PM State of Utah Mail - Salt Lake City (Sys #18026); File 13966 - Bonneville Blvd Water Pipe Liner Project
https://mail.google.com/mail/u/0/?ik=211f337333&view=pt&search=all&permthid=thread-f:1797041841352010462&simpl=msg-f:17970418413520104…1/3
and bacteriological sampling and testing requirements before the facilities are placed back into service. The following
activities are considered to be on-going operation and maintenance procedures:
(a) pipeline leak repair,
(b) replacement of deteriorated pipeline where the new pipeline segment is the same size as the old pipeline or
the new segment is upgraded to meet the minimum pipeline sizes required by R309-550-5(4) or larger sizes as
determined by a hydraulic analysis in accordance with R309-550-5(3),
(c) tapping existing water mains with corporation stops to make connection to new service laterals to individual
structures,
(d) distribution pipeline additions where the pipeline size is the same as the main supplying the addition or the pipeline
addition meets the minimum pipeline sizes required by R309-550-5(4) or larger sizes as determined by a hydraulic
analysis in accordance with R309-550-5(3), the length is less than 500 feet, and contiguous segments of new pipe total
less than 1000 feet in any fiscal year,
(e) entry into a drinking water storage facility for the purposes of inspection, cleaning and maintenance,
(f) replacement of equipment or pipeline appurtenances with the same type, size and rated capacity (fire
hydrants, valves, pressure regulators, meters, service laterals, chemical feeders and booster pumps including
deep well pumps), and
(g) mechanical well rehabilitation or cleaning using a disinfectant previously approved for drinking water use
Thank you,
[Quoted text hidden]
--
Rebecca Yoo, P.E. (she/her)
Environmental Engineer III | Division of Drinking Water
P: (801) 388-3594
Hours: M-F 8:30 am - 4:30 pm
drinkingwater.utah.gov
Tyler Roberts <troberts@jub.com>Tue, Apr 30, 2024 at 9:05 AM
To: Rebecca Yoo <ryoo@utah.gov>
Cc: "Gray, Teresa" <Teresa.Gray@slcgov.com>, "Hamer, Courtney" <Courtney.Hamer@slcgov.com>, Jordan Pugmire
<jpugmire@jub.com>
Rebecca,
Thank you for reaching out and for looking at our plans for the Bonneville Blvd Water Pipe Liner project.
Yes, I do agree this project would fall under the O&M rules. Our project will address the leaking problem observed in an
old cast iron pipe. The method we are using will not affect the water system’s current hydraulic model or system.
Thank you for reaching out.
Tyler Roberts, PE
Project Engineer
J-U-B ENGINEERS, Inc.
392 E. Winchester Street, Suite 300, Salt Lake City, UT 84107
4/30/24, 1:05 PM State of Utah Mail - Salt Lake City (Sys #18026); File 13966 - Bonneville Blvd Water Pipe Liner Project
https://mail.google.com/mail/u/0/?ik=211f337333&view=pt&search=all&permthid=thread-f:1797041841352010462&simpl=msg-f:17970418413520104…2/3
E troberts@jub.com W web.jub.com
P 801-886-9052 C 801-520-6349
From: Rebecca Yoo <ryoo@utah.gov>
Sent: Monday, April 29, 2024 4:49 PM
To: Tyler Roberts <troberts@jub.com>
Cc: Gray, Teresa <Teresa.Gray@slcgov.com>; Hamer, Courtney <Courtney.Hamer@slcgov.com>
Subject: [EXTERNAL] Re: Salt Lake City (Sys #18026); File 13966 - Bonneville Blvd Water Pipe Liner Project
External Email - This Message originated from outside J-U-B ENGINEERS, Inc.
[Quoted text hidden]
Disclaimer
Note: This e-mail and any attachments involving J-U-B or a subsidiary business may contain information that is confidential and/or proprietary. Prior
to use, you agree to the provisions found on the Electronic Documents/Data License, which can be accessed from the footer on the J-U-B home
page. If you believe you received this email in error, please reply to that effect and then delete all copies.
This email has been scanned for viruses and malware, and may have been automatically archived.
Rebecca Yoo <ryoo@utah.gov>Tue, Apr 30, 2024 at 9:38 AM
To: Tyler Roberts <troberts@jub.com>
Cc: "Gray, Teresa" <Teresa.Gray@slcgov.com>, "Hamer, Courtney" <Courtney.Hamer@slcgov.com>, Jordan Pugmire
<jpugmire@jub.com>
Tyler,
Thank you for your confirmation. I have noted the project in our database as not needing a PA review. Please reach out if
you have any questions.
Thank you!
[Quoted text hidden]
4/30/24, 1:05 PM State of Utah Mail - Salt Lake City (Sys #18026); File 13966 - Bonneville Blvd Water Pipe Liner Project
https://mail.google.com/mail/u/0/?ik=211f337333&view=pt&search=all&permthid=thread-f:1797041841352010462&simpl=msg-f:17970418413520104…3/3