Loading...
HomeMy WebLinkAboutDERR-2024-006646Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name MILLER PAVING INC Address PO BOX 571039 SALT LAKE CITY, UT 84157 Contact MILLER PAVING INC Phone Email dmiller@millerpaving.com TANK LOCATION Name MILLER PAVING INC. Address 5640 S RILEY LN MURRAY, UT 84107 A Operator JON W. KISSELL Phone (801) 262-5922 B Operator SAME Phone SAME Facility ID: 4000569 Inspection Date: 04/17/2024 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1 Gasoline No Booted Steel Flex None None Yes No None None 2 - 2 Diesel No Booted Steel Flex None None Yes No None None TANK DETAILS Tank ID/Alt ID 7 / 7 E-Gen/AST No / Yes Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc Oct. 1, 2020 / 20000 / Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Asphalt Coated or Bare Steel- Double-Walled ATG / LTT Test None LLD Test None Pipe Material- Mod Flexible Plastic / Secondary Containment Pipe type/STP Cont Pressurized / No STP Flex Connectors LLD Model Spill/Overfill/Sm Delivery > 15 gal. Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankTightness / TankLDNotListed PipeLineTightness CP Tank Test None CP Pipe Test None INSPECTION COMMENTS None 2024-04-17 Page 1 of 3 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Financial Responsibility Financial responsibility method is ok?Yes TANK RESPONSES Tank 7 Pressure Piping Leak Detection Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 7 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank 7 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes DISPENSER RESPONSES Dispenser 2 Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1 Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes MONTHLY LEAK DETECTION MONITORING Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Tank 7 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS All items are in compliance. 2024-04-17 Page 2 of 3 Prepared by fueloperator.com Inspection Information Inspector:Ottley, Melissa Record Created:April 17, 2024, 3:05 p.m. Inspection Date:April 17, 2024 2024-04-17 Page 3 of 3