HomeMy WebLinkAboutDERR-2024-006633Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name THE BOYER COMPANY
Address 101 SOUTH 200 EAST, SUITE 200
SALT LAKE CITY, UT 84111
Contact THE BOYER COMPANY
Phone
Email agowans@boyercompany.com
TANK LOCATION
Name ONE UTAH CENTER
Address 201 S MAIN B-1OO
SALT LAKE CITY, UT 84111
A Operator Alan Gowans
Phone (801) 366-7156
B Operator SAME
Phone SAME
Facility ID: 4002015 Inspection Date: 04/24/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
TANK DETAILS
Tank ID/Alt ID 1 / 1
E-Gen/AST Yes / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Aug. 1, 1990 / 1000 / Single
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Pneumercator / TMS 2000 & TMS
3000
LTT Test March 30, 2023
LLD Test None
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Not Listed
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG PipeLDDeferred /
PipeLineTightness /
PipeMonthlyLineTest
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2024-04-30 Page 1 of 4
FACILITY RESPONSES
Financial Responsibility
Financial responsibility method is ok?Yes
The above accurately represents the
facility's release detection records Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
Is the site unmanned?Yes
Is a sign posted in a conspicuous area
giving the name and telephone number
of a person in case of an emergency
and if the station is manned part of the
time, are C operators trained?
Yes
Does the site have emergency shutoff
device?Yes
TANK RESPONSES
Tank 1 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 1 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 1 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 1 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
No
Tank 1 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
2024-04-30 Page 2 of 4
Tank 1 ATG/IM
Does the ATG system have a valid
annual test?No
DISPENSER RESPONSES
MONTHLY LEAK DETECTION MONITORING
Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24
Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
TANK 1
No Photos
Question:Does the pressurized piping system have a valid annual line tightness test or valid monthly
monitoring?
Comments:None
TANK 1
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
2024-04-30 Page 3 of 4
Prepared by fueloperator.com
Inspection Information
Inspector:Rasmussen, DeAnn
Record
Created:
April 30, 2024, 10:06
a.m.
Inspection
Date:April 24, 2024
2024-04-30 Page 4 of 4