HomeMy WebLinkAboutDERR-2024-006587APST Equipment Verification
Ownership of Tanks Location of Tanks
St. George City Pow6r Red Rock Power Planl
175 E 200 N 895 East R6d Hills Park Way
sArNT GEoRGE lut la+77o SAINT GEoRG. I,T \uzIo
Contact Name:*lEmail:
SPCC Plan?: Yes No ltasf fire Marshal lnsp:ATG lnfo:
Complete tor each tank 3 Ll
Capacity of tank (gallons):.?-o k 7-,, h-7o k-z; k-
Orionlation of trank:
-Bottom of tank in conlac't with (soil,
gravel, concr€t€, not louching):
o ,7 c oncr..J<-
/") -
Substanc€ storod:oll rad Ll -*
Date last usod/deplh of product:
Type of spill provention device:L**.ov
Tlpe of Piping (Pressure or Suction):/rorytrJr.42..^c,l y','osL^,\::
Does pressure piping have LLD:Yes No tN/Yes No ($Yes No dP Yos No UA2 Y6s No NA Yes No NA
Spill buckei is clean, intac{, etc.:({9 No (eC) No 'gt No &i No Yes No Yes No
Type of overfill Prevention device:,4tr?t
Overfill alarm (audible or visible) is properly located so delivery driver can hear or see it, and is clearly identified Yes No ftD
Pip6 trans fl6x protoction melhod
(Sump, CP, lsolatod, Boot6d):Jin,) b./
io s:t;I
Containment sumps dry:Yes No (M Yes No /!f Yes No /NA Yes No tm)Yes No NA Yes No NA
Sump comments:
Stage 1 Vapor Becovery:2pt Coax (Noile 2pt Coax r(oryy'zpt hax(rgab 2pt Coax l(ql]d 2pt Coax None 2pt Coax None
Pressure Vent Valve is on vents:Yes No 1}/Yes No @ Yes No dqt Yes No OA Yes No NA Yes No NA
Secondary conlainment ar6a
comments:
Complete tor each dlepenser J
Flex protsc{ion method (UDC,
Cathodic Protoclion, lsolated, Booted):
UDC sump dry:Yas No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA
Fire valve anchored, located below
grade, and wilhout ball valve:
Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA
Commenls:
Addltlonal dirpeneer questlone
Flex prolection melhod (UDC,
Cathodic Proteclion, lsolalod, Booted):
UDC sump dry:Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA
Fire valve anchored, located below
grade, and no ball valve:
Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA
Comments:
Pagel otL
Additional Comments:
Utah Department of Environmental Quality 6001037
'i.k t^y' /"//
Tank l,{firsheet to lnspection with any edits.
Page2 ot f-Utah Department of Environmental Quality 6001037
APST Facility Site Plat
I ^rrk
),i'r'n
t',!1, ,
'aLt"'tc-X/'/nu
,TO
lqtk.
Show locations of all buildings, streets, tanks, piping, and dispenser islands. lndicate the product in each tank. Show locations of tank
manways and identify each: submersible pump (S), tank fill (R, ATG probe (A), interstitial probe (l), vapor recovery U), capped plug (C), other
(specify).
Comments:
"r:;tri:'
Underground Storage Tank lnspection Verification Form
Owner Name: Sl. George City Power
Owner Addrcac: 175 E 200 N
SAINT GEORGE, UT 84770
Operator A: No Dala I No Data /
Facility lD: 6001037
Faclllty Name: Red Rock Powor Plant
Sreet Address: 695 East Red Hills Pail Way
SAINTGEORGE,W 84770
Operator B: No Data / No Data /
UTll Coordlnates XIY: 271739 I 41106A4_ _ _9:g Elr:lt1u go.uu melo:grygs_
Tank ltYAlt lD: 1 /'l EGen/ASTEtat No /Yes / Plpe Materlal-Hod: Bare Steel - None
9lphottlGonrpfi: No/No PWStagel: PlpeTypeETPCont: Pressurized/No
Tank Strtus: Cunently ln Use STP FIex Connectort:
lnrtalled/Cap/l-*: 11111987 l2O00{J I LLD Model:
Subrtance Slored: Diesel I Olf-road Diesel SpllUroverllll6m dellv: > 15 gal. Spill Bucket / / No
Tank llaterhl-ltlod: Asphalt Coated or Bare Stael - None PIST Fund/lother Type: Yes /
ATG: I Tanlr/Plpe Rel Det: TrT/lc / LTT / NONE
ATGSpecr: I / STPSumpTett: SplllBkTert: 0O11312023
ATG Tert: Overllll Teet:
LTTTett: LLDTeet: CPTankTest: GP PlpeTeot:
TanklIVAltlD:212 EGen/AST/lStat NolYes/ Plpellaterlal-Mod: BareStgel -None
Slphon/Compart: No/No PWStagel: PlpeType6TPCont: Preswrized/No
Tank Strtus: Currently ln Use STP Flex Connectors:
lnrtalledcap/l-*: 11111987 l2O00o I LLD Model:
Subctance tilqed: Diesel / Olf-road Diesel SplllrOverlllulsm dellv: > 15 gal. Spill Bucket / / No
Tank llaterlal-llod: Asphalt Coaled or Bare Sleel - None P1ST Fundlother Type: Yes /
ATG: / Tanlc/Plpe Rel Det: TfT/rc I LTT / NONE
ATGSpecr: / / STPSumpTeot: SplllBkTelt: 0011312023
ATG Tett: Overllll Teel:
LTTTert: LLDTed: CPTankTest: CPPlpeTest:
Tank lIVAlt lD: 3 /3 EGedASTEffi No /Yes / Plp€ ilaterlal-Mod: Bare Steol - None
SlphorlCompart: No/No PWAtagel: PlpeTypeBTPConi: PressurizedlNo
Tank Status: Currently ln Use STP Flex Connectors:
lnetalledlcaptroc= 11111987 l29o0ol LLDModei:
Subrtance S:tored: Diessl I Off-road Diesel Splll/OverfilllSm deliv: > 15 gal. Spill Buckei / / No
Tank llaierlahllod: Asphalt Coatsd or Bare Steel - None PST Fundlother Type: Yes /
ATG: / Tanlr/Plpe Rel Det: Tfr/G / LTT / NONE
ATG Spec.r: / / STP Sump Teet: Splll BkTed: 0611312023
ATG Tett: Overllll Teet:
LTTTett: LLDTest: CPTankTest: CP PlpeTest:Lr r rE.t.
Tank lIVAlt lD: 414 EGen/ASTtStat No /Yes / Plpe Materlal-Mod: Baro Sleel - None
Slphon/Compart: No / No PW6tagel: PIpe TypeETP Conl: Pressurized / No
Tank Status: Currenily ln Use STP Flex Ccnnecters:
lnrtalled/Cap/l-*: 1 1111987 I 2OAO0 I L.[.D Mode,:
Subrtance Stored: Diesel / Off-road Diesel SplllltOverlilLfiim delir': > 15 gal. Spill Bucket / / No
Tank llaterlal-ilod: Asphalt Coated or Bare Steel - None PST Fund/l0ther Type: Yes i
ATG: / Tanlr/Pi6re Flel Det: TTl7lC I LTT / NONE
ATG Specr: I / STP Strmp Tesr;: Splll Bk Tett: OOl13l2O23
ATG Tert: (hrcrlll! Ted:
LTTTed: LLD Teet CP Tank Tes'i: CP Plpe Tert:
41812024 Page 1 ofl
Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name St. George City Power
Address 175 E 200 N
SAINT GEORGE, UT 84770
Contact St. George City Power
Phone
Email brad.burner@sgcity.org
TANK LOCATION
Name Red Rock Power Plant
Address 695 East Red Hills Park Way
SAINT GEORGE, UT 84770
A Operator None
Phone None
B Operator SAME
Phone SAME
Facility ID: 6001037 Inspection Date: 04/24/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
TANK DETAILS
Tank ID/Alt ID 1 / 1
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Jan. 1, 1987 / 20000 /
Substance
Stored Diesel / Off-road Diesel
Tank Material-
Mod
Asphalt Coated or Bare Steel-
None
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod Bare Steel / None
Pipe type/STP Cont Pressurized / No
STP Flex Connectors
LLD Model
Spill/Overfill/Sm
Delivery > 15 gal. Spill Bucket / / No
PST Fund/Other Type Yes / None
Tank/Pipe Rel Det TankTightness
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 2 / 2
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Jan. 1, 1987 / 20000 /
Substance
Stored Diesel / Off-road Diesel
Tank Material-
Mod
Asphalt Coated or Bare Steel-
None
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod Bare Steel / None
Pipe type/STP Cont Pressurized / No
STP Flex Connectors
LLD Model
Spill/Overfill/Sm
Delivery > 15 gal. Spill Bucket / / No
PST Fund/Other Type Yes / None
Tank/Pipe Rel Det TankTightness
PipeLineTightness
CP Tank Test None
CP Pipe Test None
2024-04-24 Page 1 of 4
Tank ID/Alt ID 3 / 3
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Jan. 1, 1987 / 20000 /
Substance
Stored Diesel / Off-road Diesel
Tank Material-
Mod
Asphalt Coated or Bare Steel-
None
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod Bare Steel / None
Pipe type/STP Cont Pressurized / No
STP Flex Connectors
LLD Model
Spill/Overfill/Sm
Delivery > 15 gal. Spill Bucket / / No
PST Fund/Other Type Yes / None
Tank/Pipe Rel Det TankTightness
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 4 / 4
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Jan. 1, 1987 / 20000 /
Substance
Stored Diesel / Off-road Diesel
Tank Material-
Mod
Asphalt Coated or Bare Steel-
None
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod Bare Steel / None
Pipe type/STP Cont Pressurized / No
STP Flex Connectors
LLD Model
Spill/Overfill/Sm
Delivery > 15 gal. Spill Bucket / / No
PST Fund/Other Type Yes / None
Tank/Pipe Rel Det TankTightness
PipeLineTightness
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2024-04-24 Page 2 of 4
FACILITY RESPONSES
The above accurately represents the
facility's release detection records Yes
Financial Responsibility
Financial responsibility method is ok?Yes
TANK RESPONSES
Tank 1 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 2 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank 2 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Tank 3 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 4 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank 4 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Tank 1 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank 1 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Tank 2 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 3 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank 3 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Tank 4 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
DISPENSER RESPONSES
2024-04-24 Page 3 of 4
Prepared by fueloperator.com
MONTHLY LEAK DETECTION MONITORING
Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24
Tank 1 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 2 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 3 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 4 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
All items are in compliance.
Inspection Information
Inspector:Saathoff, Rick
Record Created:April 24, 2024, 8:51 a.m.
Inspection Date:April 24, 2024
2024-04-24 Page 4 of 4