HomeMy WebLinkAboutDERR-2024-006579Pase 1 ot -L Utah Department of Environmental Quality 6000804
APST t Verification
Ownership of Tanks Location of Tanks
SUNROC CORPORATION SUNFOC FORT PIEFICE
1 825 E 3850 S 1825 EAST3850 SOUTH
sArNT GEoEGe lur luzto SAINT GEOHGE IUT IWZIO
Contact Name #lEmail:
SPGC Plan?: Yes No lt-as fire Marshal lnsp:ATG lnfo:
Complete lor each tank /D2 f 4a tl A)L6
Capacity ot lank (gallons):t2 K /L t<lL(
Oriontation of tank:WIzpcLl
Bottom of tank in contact with (soil,
grav6l, concrolB, not touching):,,trr hd"y
Subslance slored:c,L(/Yr*/ A I
Dal6 last used/depth of producl:
Type ol spill prevenlion device:buo
Type of Piping (Pressure or Suction):{'Ce-tfz<*'
Does pressure piping have LLD:Yes $ NA Yes @/ NA Yes @/ NA Yes No NA Yes No NA Yes No NA
Spill buckot is clean, intac{, etc.:(vey' no &d No WNo Yes No Yes No Yes No
Type of overfill Prevenlion davice://n.tL-5
Overfill alarm (audible or visible) is properly locatod so delivery driver can hear or see it, and is clearly identified:Yes No NA
Pipe trans flex prolection method
(Sump, CP, lsolaled, Booted):
Containmenl sumps dryr Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA
Sump comments:
Stage 1 Vapor Becovery:zpt CoaxTl.(EA 2pt Coaxlirlone zgt cou<ffiQ 2pt Coax None 2pt Coax None 2pt Coax None
Pr6ssur6 Venl Valve is on vents:Yes tto ritA Yes No 6y Yes 1ft9l NA Yes No NA Yes No NA Yes No NA
Secondary conlainment ar€a
comments:
Complcte tor each dlspenser t/L 3/'/5/6
Flex protection method (UDC,
Cathodic Proteclion, lsolated, Booted):ulQc --f
UDC sump dry:ed No NA (6sl No NA &o{ No NA Yes No NA Yes No NA Yes No NA
Fire valve anchored, localed below
grade, and Mthout ball vatue:
(gr' No NA &s/ i.lo NA 9xo NA Yes No NA Yes No NA Yes No NA
Comments:
Addltlonal dlapenrer queotlons
Fl€x proteclion method (UDC,
Cathodic Proteclion, lsolatBd, Bool€d):
UDC sump dry:Yos No NA Yes No NA Yes No NA Yes No NA Yos No NA Yes No NA
Fire valve anchored, located below
grade, and no ball valve:
Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA
Comments:
Additional Commonts:
(b2/
nul en2-y( //r.,,;77,L l*, 2//
AnachTank$lo Sheet to lns-peclion with any edits.
Page 2 of L Utah Department of Environmental Quality
APST Facility Site PIat
NORTH
6000804
Jr//qrl
Show locations of all buildings, streets, tanks, piping, and dispenser islands. lndicate the product in each tank. Show locations ol tank
manways and identfi each: submersible pump (S), tank fill (F), ATG probe (A), interstitial probe (l), vapor recovery U), capped plug (C), other
(specity).
comments: /)V)9 t/.y fu</i. ,r,k T*.r/
Underground Storage Tank lnspect,, "
"/r;,'ification
Form
Facility lD: 60ff1804
Ornetltane: SUNBOCCORPORATION Facititi .', r:,:,: iU,.trtOC =OBTPIERCE
(hner Addroce: 1825 E 3850 S Steet Aasree s: .t825 FIAS'|. 3850 SOUTH
SAINTGEORGE,W*77O IJAIN"I GEORGE,WUTTO
operatorA: NoData/NoData/ G1* , i;.: .\'oi :,* tll,sDd.el
_ _ _9g1gE!tp!l: ksarfeld@clydeiE.cg _ _ fJTrlcoordina_.;;,1 tfr::_,l7j7q? g !!1g2$5.1s_ _ _
Dlrp lUAlt Suhtance UIrC Plpe Flex Loe ln:tall Dab UIIC lnatall 1'; r : r;ir€ Sat U3c'k)rt Dlrp Flex Cp!D \/alve F?erent 'Teat
1 - 112 Gas/Diesel No '1es; No
2 -gl4 Diesol No 't er No
3 - 5rB Dies€l No i I i,lc3 - 5/6 Dles€l No i I i,lc
Tank lIVAlt lD: 1 /894025 EGen/ASTlStat No /Yes / Plpe M; .,.r:: f ;a,,: Stoal - Double-Walled
Slphott/Corprt: No/No PW/stagel: PlpeTyprr'] ,a rr.': i,ri:;sunza.i /No
TankStatua: Currentlyln Use STPFler 1,, , : r.. :",iteC,jteel Flex
lnrtalled/hAoc: 1/'llt910 / 12000 / ",i-,-. -,I*i.itl:
Subdance Staed: Diesel / Splll/loverlii,,,*-,,:: i:i.ljir: (rthgr / / No
Tank llaierlal-illod: Asphali Coatod or Baro Steel - Seoondary PIST Funr-r: , r ,,F , . ..- t
Containm6nt
ATG: / Tank, , i ', ." ,-,, i ,!C . i-TT i NONL
ATGSPecT:// STn :: SplllBkTeat:
ATGTert: orerrill rest:
LTTTeat: LLDTeet CF l' -'.--.:rt: CPPipeTeet:
Tank lIVAlt lD. 2 169-4027 EGen/ASTlStat No / Yes /
Slphon/Compart: No / No PWStagel:
Tank Status: Currently ln Use
lnstalled/cacloc; 11111910 I 12OOO I
Ssbstanoe Stored: Diosel / Off-road Diesel
Tank Materlal-l/lod: Asphalt Coaled or Bare Stoel - Secondary
Containmenl
ATG: /
ATG Spee: / /
ATG TeTt:
LTTTert:LLD Test:
Pipe; , : li,ul Dgrible-, ie I'c I
Pipe Ty1" : r ;s";r zed I r{c
STP Flex , , ied iteol l:lex
i;
PST Fun,
Tank' i' rf , \jONE
SI:
{ ..
Spill Bk Test:
vvertrtt Test:
Gtr Pipe Teat:
TanklUAltlD:3169-4026 EGen/ASTEtat NolYes/ Plpeir', i .-, .r : i,',,:Skrel -Oouble-WarleJ
Slphon/Comp.n: No / No PW6tagel: Plpe Ty.,. , : r ,s'.rr zed / lrlo
Tankstatua: Currenlly ln Use STP Flex , . r ,r : ',.'ied itoel l:l6x
lnstalled/GapAoct1lll191Ol12ffil ' 4'.+
SubrtanceStored: Gasoline/Begular SpllM0verri';'.'r rr,-,ri: flli':r1lNo
Tankmaterlal-ltlod: AsphallCoaledorBareSteel -Secondary PSTFun4,i^"'..n';..'ri \ €,: I
Containment
ATG: / Tan?.. . , ., r'.' '!i. :-TTI:JO|{E
ATG Spece : / / S'l'r, , Splll Fli Test:
ATG Te*: f./vertltl Test:
___LII11: _!Lgrjt_ ___1, __c_p.Prr.-"-r."t'
41812024 Page 1 of1
Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name SUNROC CORPORATION
Address 1825 E 3850 S
SAINT GEORGE, UT 84770
Contact SUNROC CORPORATION
Phone
Email kgarfield@clydeinc.com
TANK LOCATION
Name SUNROC FORT PIERCE
Address 1825 EAST 3850 SOUTH
SAINT GEORGE, UT 84770
A Operator None
Phone None
B Operator SAME
Phone SAME
Facility ID: 6000804 Inspection Date: 04/24/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1/2 Gas/Diesel No None None Yes No None None
2 - 3/4 Diesel No None None Yes No None None
3 - 5/6 Diesel No None None Yes No None None
TANK DETAILS
Tank ID/Alt ID 1 / 69-4025
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Jan. 1, 1910 / 12000 /
Substance
Stored Diesel /
Tank Material-
Mod
Asphalt Coated or Bare Steel-
Secondary Containment
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod Bare Steel / Double-Walled
Pipe type/STP Cont Pressurized / No
STP Flex Connectors Booted Steel Flex
LLD Model
Spill/Overfill/Sm
Delivery Other / / No
PST Fund/Other Type Yes / None
Tank/Pipe Rel Det TankTightness
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 2 / 69-4027
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Jan. 1, 1910 / 12000 /
Substance
Stored Diesel / Off-road Diesel
Tank Material-
Mod
Asphalt Coated or Bare Steel-
Secondary Containment
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod Bare Steel / Double-Walled
Pipe type/STP Cont Pressurized / No
STP Flex Connectors Booted Steel Flex
LLD Model
Spill/Overfill/Sm
Delivery Other / / No
PST Fund/Other Type Yes / None
Tank/Pipe Rel Det TankTightness
PipeLineTightness
CP Tank Test None
CP Pipe Test None
2024-04-24 Page 1 of 5
Tank ID/Alt ID 3 / 69-4026
E-Gen/AST No / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Jan. 1, 1910 / 12000 /
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Asphalt Coated or Bare Steel-
Secondary Containment
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod Bare Steel / Double-Walled
Pipe type/STP Cont Pressurized / No
STP Flex Connectors Booted Steel Flex
LLD Model
Spill/Overfill/Sm
Delivery Other / / No
PST Fund/Other Type Yes / None
Tank/Pipe Rel Det TankTightness
PipeLineTightness
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2024-04-24 Page 2 of 5
FACILITY RESPONSES
The above accurately represents the
facility's release detection records Yes
Financial Responsibility
Financial responsibility method is ok?Yes
TANK RESPONSES
Tank 69-4025 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 69-4027 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank 69-4027 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Tank 69-4026 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 69-4025 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank 69-4025 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Tank 69-4027 Pressure Piping Leak Detection
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 69-4026 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank 69-4026 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
DISPENSER RESPONSES
2024-04-24 Page 3 of 5
Dispenser 3/4
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1/2
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 5/6
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
MONTHLY LEAK DETECTION MONITORING
Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24
Tank 1 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 2 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 3 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
All items are in compliance.
2024-04-24 Page 4 of 5
Prepared by fueloperator.com
Inspection Information
Inspector:Saathoff, Rick
Record Created:April 24, 2024, 1:38 p.m.
Inspection Date:April 24, 2024
2024-04-24 Page 5 of 5