Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DAQ-2024-004386
UTAH DEPARIMENT OF SilverEagle REFIN'NG SAF E. S U SfAI NAB LE. S E RVIC E Wood. Ctoss. Uf , Erabston WY DIVISION OF AIR OUALITY January 9,2024 Mr. Bryce Bird Utah Department of Environmental Quality Division of Air Quality Attn: Joe Randolph P.O. Box 144820 Salt Lake city, uT 84114-4820 Re: Leak Detection and Repair (LDAR) Reports Pursuant toR307-326-9. Dear Mr. Bird: Enclosed are Silver Eagle Refining's Fourth Quarter 2023 LDAR Reports required by R307-326- 9 and Semi-Annual Reports as required by 40 CFR 60.487. It is believed all monitoring was performed as stipulated in R307-326-9. Dates of Process Unit Shutdowns during this 2023 second semi-annual period were as follows: Unit Shutdown Date Startun Date MDDW November 28,2023 December 9,2023 Do not hesitate to contact me at 435-319-6861 if you have any questions concerning the attached reports. Thank you. Sincerely, for Silver Eagle Refining-Woods Cross Inc. Cc Stephen Jeffs Mike Platz James Shupe Mandy Joseph Gigi Camarena __l i Ii i Blaine ZwdH€n,P.E. 2355 South 1100 West . Woods Cross, Utah 84087 Semiannual Report - NSPS GGGa Date Range 71112023to 1213112023 Site.'Silver Eagle Refining Woods Cross Unit:Loading Dock and VRU Refurcnce #Gomoressor Julv Auouat Seoternber October ilovember D,ecember NI Monilor Coun 0 0 0 0 0 0 6O.487.c.2.v Leak Coun 0 0 0 0 0 0 Leak Percen 0.00%0.00%0.00%0.00o/o 0.00%0.00o/o 60.487.c.2.vi Not Repaired in'15 Dayr 0 0 0 0 0 0 Repair Delav New, Previour 0,0 0,0 0,0 0,0 0,0 0,0 Reierence #Prcssure Rellef Devlce Julv Auoust Seotember October J{ovember December A[ Monitor Coun 2 0 0 0 0 0 60.636.c.1 Leak Coun 0 0 0 0 0 0 Leak Percen 0.00o/o 0.00%0.00%0.00o/o 0.00%0.00o/o 60.636.c.2 Not Reoaired in 15 Dav!0 0 0 0 0 0 Repair Delav New, Previour 0,0 0,0 0,0 0,0 0,0 0,0 leierence *Pumo Julv Auoust Seoternber October November December Ail Monitor Coun 2 2 2 2 2 3 60.487.c.2.iii Leak Coun 0 0 0 0 0 0 Leak Percen 0.00%0.00%0.00o/o 0.00o/o 0.00%0.00% 60.487.c.2.iv Not Reoaired in 15 Davs 0 0 0 0 0 0 Repair Delay New, Previou:0,0 0,0 0,0 0,0 0,0 0,0 ilefetpnce *Valve Juh Auoust SeDtember October ilovember Ilecember A[ Monitor Coun 42 1 ,|36 1 39 )O.487.c.2.i Leak Coun ,|0 0 1 0 0 Leak Percen 2.38o/o 0.00o/o 0.00%2.78o/o 0.00%0.00% i0.487.c.2.ii Not ReDaired in 15 Davs 0 0 0 0 0 0 Repair Delav New, Previous 0,0 0,0 0,0 0,0 0,0 0,0 I I i I I i I t --urnH EEpnnr r'rre n r o; E NVIRo t li\4E NTAL Q',.JALITY DIVISION OF AIR i OUALITY llaniat CaLtnl = la!al tnot)t:aeC Leak Couijt = tlrtlbet of leaks fauncl Not Repated - lletns nol epatte.l tn 15 alaf t af tiltlial teak tilcloa:es ieakng dat in sotne tn\tatrces) Repai Delay Ptevraus = i/e/ns o/) rcpati delal befate lhe autent p,orod based on il)tbal leak date ReDa[DelayNew=]tetnspolanrepaildelaydrtluglhe,aonentpetD(lanly' basedoitnflat ieakdale Leak Perce,t = Leak couill,N4antld Caunt rncludea ieaktna Cai in ran)e iDSl2nces) Page 1 of6 Semiannual Report - NSPS GGGa Date Range 711l2O23to 1213112023 Sife; Silver Eagle Refining Woods Cross Unit: MDDW Unit Relerence #Compressor Juhr August Sopt€mber October ilovombor December NI Monitor Coun'0 0 0 0 0 0 i0.487.c.2.v Leak Coun'0 0 0 0 0 0 Leak Percen 0.00%0.00%0.00%0.00o/o 0.00o/o 0.00o/o )O.487.c.2.vi Not Repaired in 15 Days 0 0 0 0 0 0 Reoair Delav New. Previous 0.0 0.0 0.0 0.0 0.0 0.0 Reference #Ptessure Rellef Devlca July Auoust September October November Docember qlt Monitor Coun 3 0 0 0 0 0 30.636.c.1 Leak Coun 0 0 0 0 0 0 Leak Percen 0.00%0.00o/o 0.00%0.00o/o 0.00%0.00o/o 50.636.c.2 Not Repaired in 15 Davs 0 0 0 0 0 0 Reoair Delav New. Previous 0.0 0.0 0.0 0.0 0.0 0,0 Roforcnce #Pump July August September October Novgmber Decembor {t Monitor Coun 6 6 6 8 6 6 30.487.c.2.iii Leak Coun'0 0 0 0 0 0 Leak Percen'0.00o/o 0.00%0.00o/o 0.00%0.00%0.00% iO.487.c.2.iv Not Reoaired in'15 Davs 0 0 0 0 0 0 Repair Delav New. Previour 0.0 0.0 0.0 0.0 0.0 0.0 Reference #Valve July August September October l{ovember D,ecember A[ Monitor Coun'449 0 0 445 0 0 30.487.c.2.i Leak Coun 0 0 0 0 0 0 Leak Percen 0.00%0.00%0.00%0.00%0.00o/o 0.00% i0.487.c.2.ii Not Reoaired in 15 Davs 0 0 0 0 0 0 Repair Delay New, Previous 0,0 0,0 0,0 0,0 0,0 0,0 Manlot Cotlnl = lafal tncnlateC Leak Co]t1l - nunbet of leaks faund Nat Repaned = ltems nal Epat.ed tn 1 5 da )/s cf tnltal leak tnclLtCes l-oakng dal r) so/ne ,lsla/)ces) ReparDel),y'Plevcus=/lelrsorrcpaideiaybefateli)ecLtrrentpeiod basedailinltal leakalale Repatt Delay ^lefi = llenS pul oD repat delay during the cLtnent pet oal otlly bas-od an tntltal leak date Leak Percenl = Leak coLtnt/Mantlat Cooni ltnc)udes leaktng iloi tn so/ne ilslancesl Page 2 of 6 Semiannual Report - NSPS GGGa Date Range 71112023to 1213112023 Site; Silver Eagle Refining \lUoods Gross Unit: No. 1 Crude Unit lefe!€nce #]omDtpggor July August Septernber October l{ovembor Decombel \I Monitor Count 0 0 0 0 0 0 i0.487.c.2.v Leak Count 0 0 0 0 0 0 Leak Percent 0 00%0 00%0 00%0.00%0.00o/o 0.00% i0.487.c.2.vi Not Repaired in 15 Davs 0 0 0 0 0 0 Repair Delay New, Previous 0,0 0,0 0,0 0,0 0,0 0.0 llefsrence #,rcssuro Rellef Devlce Jutv AuqUst Seotember October November December u Monitor Count 1 0 0 1 0 0 i0.636.c.1 Leak Count 0 0 0 0 0 0 Leak Percent 0.00o/o 0.00%0.00%0.00%0.00%0.00% i0.636.c.2 Not Repaired in 15 Davs 0 0 0 0 0 0 ReDair Delav New. Previous 0.0 0.0 0.0 0.0 0.0 0,0 Reference #PUmp July August Se![6mber October November December \il Monitor Counl 4 4 4 4 4 4 i0.487.c.2.iii Leak Count 0 0 0 0 0 0 Leak Percenl 0.00%0.00%0.00o/o 0.00%0.00%0.00% i0.487.c.2.iv Not ReDaired in 15 Davs 0 0 0 0 0 0 Repair Delav New. Previous 0.0 0,0 0,0 0,0 0.0 0,0 Reiercnce #i/alve July Ausust September October l{ovember December Elt Monitor Counl 373 0 0 365 0 0 )0.487.c.2.i Leak Counl 0 0 0 0 0 0 Leak Percent 0.00o/o 0.00%0.00o/o 0.00%0.00%0.00% 3O.487.c.2.ii Not Reoaired in 15 Davs 0 0 0 0 0 0 Repair Delav New. Previous 0,0 0,0 0,0 0,0 0,0 0,0 Manlot aounl = lotal inontloEd Leak aat)i1t = nunbet af leaks fo]Dd Nal Repar ed = lletns nal repatrcd n 1 5 days af il)ttal leak (tnclLtdes leakiltg dot',n so/ne mslallcesl Repafi Delly Prcvtous = /lerrs o, epa[ delay befale lhe cunent perad baaed an nttal leak date RepatrDelayNet=llefispLtlanepardelayduingtltecLtrrenlpenadonly basedantntialleakdale Leak Peiceni = Leak caunUt,tiantlot Caunt lnclLtdes leaktDq dor it1 sone tnstances) Page 3 of 6 Semiannual Report - NSPS GGGa Date Range 711l2O23to 1213112023 Site; Silver Eagle Refining Woods Cross Unit: Tank Farm Refurcnce*Dompressor July August SeDtomber Octobor Novombor Dec6mber {t Monitor Counl 0 0 0 0 0 0 iO.487.c.2.v Leak Counl 0 0 0 0 0 0 Leak Percenj 0.00%0.00%0.00o/o 0.00o/o 0.00o/o 0.00o/o i0.487.c.2.vi Not Reoaired in '15 Davs 0 0 0 0 0 0 Repair Delay New, Previous 0,0 0,0 0,0 0,0 0,0 0,0 Reference #Pressure Rellef Devlce Julv Auoust Seotember October Novembsr December qlt Monitor Counl 4 0 0 1 0 0 i0.636.c.1 Leak Counl 0 0 0 0 0 0 Leak Percenl 0.00%0.00%0.00%0.00%0.00%0.00% i0.636.c.2 Not Reoaired in 15 Davs 0 0 0 0 0 0 Repair Delay New, Previous 0,0 0,0 0,0 0,0 0,0 0,0 Roference f PumD Julv Auoust Seotember October November December NI Monitor Count 21 21 21 2'l 21 21 i0.487.c.2.iii Leak Count 1 1 0 0 0 0 Leak Percent 4.760/o 4.760/o 0.00o/o 0.00o/o 0.00o/o 0.00% )0.487.c.2.iv Not Reoaired in 15 Davs 0 0 0 0 0 0 Repair Delay New, Previous 0,0 0,0 0,0 0,0 0,0 0,0 Refercnce #y'alve Juh Auqust Seotember October November December {t Monitor Count 439 0 0 420 0 0 i0.487.c.2.i Leak Counl 0 0 0 0 0 0 Leak Percenl 0.00o/o 0.00%0.00%0.00%0.00%0.00% )0.487.c.2.ii Not Repaired in 15 Davs 0 0 0 0 0 0 Reoair Delav New. Previous 0.0 0,0 0,0 0,0 0,0 0,0 Mantiat aarnl = iotal fianiiaied Leek t:orni = nlrrrbef oF /eaks Fo(/rd Nat Repaileal = llefis nol rcpatted tn 1 5 days af tllltal leak tincluclet leakng Ca.rr s.rre /nslarcesJ Repat Delly Prevpus = ltens on rcpa[ delay befaie lhe crx'..n| peitaci baaed at) nl1l leal\ date RepatDelayile*=llenspolanepatrdeiaydrtitigihecurenlpetodanly basedannltalleakCale Leak Peraeii = Leak cauni/lv4anllot CaLtnt !ncludes leaktnq dai tn satne tnstances) Page 4 of 6 Semiannual Report - NSPS GGGa Date Range 71112023to 1213112023 Sife.' Silver Eagle Refining Woods Gross Unit: Utilities Reference #Bompressor July Auqust Seotember Octobor November Decembe. NI Monitor Counl 0 0 0 0 0 0 )O.487.c.2.u Leak Counl 0 0 0 0 0 0 Leak Percenl 0.00%0.00%0.00%0.00%0.00%0.000/o i0.487.c.2.vi Not Reoaired in 15 Davs 0 0 0 0 0 0 Repair Delay New, Previous 0,0 0,0 0,0 0,0 0,0 0,0 Roference lf Prossure Rellef Devlce July Ausust SeDtembor October November Ihcember \[ Monitor Counl 1 0 0 1 0 0 30.636.c.1 Leak Counr 0 0 0 0 0 0 Leak Percenl 0.00%0.00o/o 0.00%0.00o/o 0.00%0.00% i0.636.c.2 Not ReDaired in 15 Davs 0 0 0 0 0 0 Reoair Delav New. Previous 0.0 0,0 0,0 0,0 0,0 0,0 Reference #Pump Julv Aucust SEptember October Iovember December {[ Monitor Counl 4 4 4 4 4 4 i0.487.c.2.iii Leak Count 0 1 0 0 0 0 Leak Percent 0.00o/o 25.OOok 0.00o/o 0.00%0.00%0.00o/o i0.487.c.2.iv Not Repaired in 15 Days 0 0 0 0 0 0 Reoair Delav New. Previous 0.0 0,0 0.0 0.0 0,0 0,0 Refetpnce #y'alve July August September October Novombel Docember \[ Monitor Count 277 1 I 247 0 0 i0.487.c.2.i Leak Count 1 0 0 0 0 0 Leak Percent 0.36%0.00%0.00%0.00o/o 0.00%0.00% i0.487.c.2.ii Not Reoaired in l5 Davs 0 0 0 0 0 0 Repair Delav New, Previous 0,0 0,0 0.0 0.0 0.0 0.0 llantlot caLtil! = tatal ;nonliareal Leak,,at.ttl = n|n',Det ,i leakt t'aund Ilol Repareal = ltetns nal repatrccl tn 1 5 days af tnnlal leak ()ticlLt.les ieakng dal ,, so/re ,lilA/lae;l Repat Del?y nevDus = /te/rs o, tepait delay befate li)e cuirenl petL.d baaed on ntlal |eal., date Repat Delay Ne,t = lleffi, pLtl An lepat Ceiaf dunng lhe aorenl peilad anly based all tnltal leak date Lerk trerrerl = Leek caunt'l,lantlai Cat)nl (jnclildes leaktng dat n satne nsAoCeS) Page 5 of 6 Semiannual Report - NSPS GGGa Date Range 71112023to 12131t2023 Sife; Silver Eagle Refining Woods Cross Unit: Vacuum Unit Reierence #Comptpssor July Auqtrsl Sedember October November Decembor \[ Monitor Counl 0 0 0 0 0 0 )O.487.c.2.u Leak Counl 0 0 0 0 0 0 Leak Percenl 0.00o/o 0.00%0.00%0.00%0.00%0.00% i0.487.c.2.vi Not Repaired in'15 Davs 0 0 0 0 0 0 Repair Delay New, Previous 0,0 0,0 0,0 0,0 0,0 0.0 Reference #Preqsure Rellef Devlce July Auoust Seotember October November Ilecember NI Monitor Count 0 0 0 0 0 0 i0.636.c.1 Leak Counl 0 0 0 0 0 0 Leak Perceni 0.00%0.00%0.00o/o 0.00%0.000/o 0.00% i0.636.c.2 Not Repaired in 15 Davs 0 0 0 0 0 0 ReDair Delav New. Previous 0,0 0,0 0,0 0,0 0,0 0,0 Reference #Pump July Auqust SoDtember October Iovember December \[ Monitor Counl 0 0 0 0 0 0 i0.487.c.2.iii Leak Coun 0 0 0 0 0 0 Leak Percen 0.00%0.00%0.00o/o 0.00%0,00%0.00% )O.487 .c.2.iv Not Repaired in 15 Davs 0 0 0 0 0 0 Reoair Delav New. Previous 0,0 0,0 0,0 0,0 0,0 0,0 lleference *Yalve July Auoust Seotember October November December AI Monitor Coun 2 0 0 0 0 )O.487.c.2.i Leak Coun 0 0 0 0 0 0 Leak Percen 0.00%0.00o/o 0.00o/o 0.00o/o 0.00%0.00% 60.487.c.2.ii Not Repaired in 15 Davr 0 0 0 0 0 0 Repair Delav New. Previous 0.0 0.0 0,0 0,0 0,0 0,0 Mantlat C,alrnl = lolal manlated Lei( 1_Clri . ,loDer !.F /ealis fourd Nat Repaued = lletns nat tepateC ilJ 1 5 da'y's af nltal leak lncludes leaktig clat tn sone tnstance3) Repatt Delair' F;erDli = ilerns o, tepai a)elay betoe the cLtreat petnd based on [1t61 ]eak alate ReDar Delay Net = lleins put an tepail delay dlrnng lhe cun'enl penad anly basett oi tnlld leak dale Leak Petcetli = Leak caLr)UManlat Carnl ltlcludes leakng dai jn \ane 4isli/rcesl Page 6 of 6 LDAR Component Count Changes EY ERATtrLIAEI'AY Sifuer Eagle Refining Woods Cross From:71112023, To: 1213112023, Rule: NSPS GGGa Unit:Dock and VRU Component Type Freouencv # of Beginning # of Tags Total # of # of Tags # of EndingTags Added Taos Removed Taos PRESS RELIEF DEVICE I Exempt I Yearly-O7 Total: 3 0 3 0 3 2 0 2 0 2 5 0 5 0 5 PUMP Exempt 36 1 37 0 37 Dec2023 1 2 0 2 0 2 Total:38 1 39 0 39 VALVE Exempt 513788088 Dec2023 37 Quarterly-1 36 0 36 0 36 6 0 6 0 6 Total 93 37 130 0 130 Unit Total: 136 38 174 O 174 Unit: MDDW Unit Unit Total: 1525 0 1525 0 1525 Unit: No. I Grude Unit Unit Total: 1133 0 1133 0 1i33 Page 1 of 2 on 11312024'10:55:23 AM Printed By: MArnotd Component Type Frequency # of Beginning # of Tags Total # of # of Tags # of EndingTags Added Tags Removed TagsCONNECTOR I Exempt I Yearly-07 Total: 195 0 195 0 195 6 0 6 0 6 201 0 201 0 201 PRESS RELIEF DEVICE I Exempt I Yearly-07 Total: 3 0 3 0 3 3 0 3 0 3 6 0 6 0 6PUMP I Exempt er!!f"____%Ei 10 0 10 0 10 6 0 6 0 6 16 0 16 0 16 VALVE 853 0 853 0 853 442 0 442 0 442 Yearly-07 7 0 7 0 7 Total:1302 0 1302 0 1302 Component Type Frequency # of Beginning # of Tags Total # of # of Tags # of EndingTags Added Tags Removed Tags CONNECTOR Exempt 54 0 54 0 54 PRESS RELIEF DEVICE I Quarterly-1 1 0 1 0 1PUMP I Exempt I Montily Total: 17 0 17 0 17 4 0 4 0 4 21 0 21 0 21 VALVE 684 0 684 0 684 Quarterly-1 365 0 365 0 365 Yearly-07 8 0 8 0 I Total 1057 0 1057 0 1057 LDAR Component Count Changes EY mANE' 3AFWAY sifuer Eagle Refining woods Cross F r om: 7 I 1 12023, T o: 12131 12023, Ru le: NS PS G GGa Unit: Tank Farm Comoonent Tvoe Freouencv # of Beginnin g # of Tags Total # of # of Tags # of Ending Taos Added Taqs Removed Taqs PRESS RELIEF DEVICE Exempt 3 0 3 0 3 1 0 1 0 1 3 0 3 0 3 Total:7 0 7 0 7 PUMP 37 0 37 0 37 Monthly 22 0 22 1 21 Jul2023 1 Total:59 0 59 1 58 VALVE Exempt 1883 0 1 883 0 1 883 420 0 420 0 420 Yearly-07 19 0 19 0 19 Total:2322 0 2322 0 2322 Unit Total: 2388 0 2388 1 2387 unit: Utilities UnitTotal: 2230 O 2230 0 2230 Unit: Vacuum Unit Component Type Frequencv # of Beginnin g # of Tags Total # of # of Tags # of EndingTaqs Added Taqs Removed Taqs CONNECTOR Exempt 3 0 3 0 3 PRESS RELIEF DEVICE I Exempt I Quarterly-1 Total: 8 0 8 0 8 1 0 I 0 1 9 0 9 0 I PUMP Monthly 4 0 4 0 4 VALVE 19370193701937 Quarterly-1 247 0 247 0 247 Yearly-07 30 0 30 0 30 Total:2214 0 2214 0 2214 Component Type Frequency # of Beginning # of Tags Total # of # of Tags # of EndingTags Added Tags Removed Tags PUMP Exempt 13 0 13 0 13 VALVE Exempt 574 0 574 0 574 1 0 1 0 1 Yearly-07 1 0 1 0 1 Total 576 0 576 0 576 Unit Total: 589 0 589 0 589 Facility Total: 8001 38 8039 I 8038 Page2 of 2 on 1131202410:55:23 AM Printed By: MArnold LDAR Monitor Summary Report EYmAIUtrMTltav sifuer Eagle Refining woods cross F rom: 1011 12023 To: 10131 12023 Component Type: PRESS RELIEF DEVICE Unit:Total Monitored Total Leaks Leak % Late First Reoairs Late Final Repairs Placed on DOR Current DORs \o. 1 Crude Unit 1 0 0.00%0 0 0 0 Iank Farm 1 0 0.00%0 0 0 0 Jtilities 1 0 0.00%0 0 0 0 otals:3 0 lYo 0 0 0 0 : PUMP Unit:TotalMonitored Total Leaks Leak % Late First Reoairs Late Final Repairs Placed on DOR Current DORs Loadino Dock and VRU 2 0 0.00%0 0 0 0 MDDW Unit 8 0 0.00%0 0 0 0 No. 1 Crude Unit 4 0 0.00%0 0 0 0 Tank Farm 21 0 0.00%0 0 0 0 Utilities 4 0 0.00%0 0 0 0 T 39 0 o%0 0 0 0 ComponentType: VALVE Unit:Total Monitored Total Leaks Leako/o Late First Repairs Late Final Repairs Placed on DOR Current DORs -oadinq Dock and VRU 36 1 2.78%0 0 0 0 VIDDW Unit 445 0 0.00%0 0 0 0 rlo. 1 crude Unit 365 0 0.00%0 0 0 0 [ank Farm 420 0 0.00%0 0 0 0 Jtilities 247 0 0.00%0 0 0 0 y'acuum Unit 1 0 0.00%0 0 0 0 Totals:1514 1 0.07%0 0 0 0 FacilityTotals:l 1556 I 1 I 0.06% I 0 I 0 I 0 I 0 Page 1 of 1 on 1'113120231:56:12 PM Printed By: MArnold LDAR Monitor Summary Report EYmailDL? ruaY siMer Eagle Refining woods cross From: 1 1 I 1 12023 To: 11 l3Ol2O23 Component PUMP Unit:TotalMonitored Total Leaks Leak % Late First Repairs Late Final Repairs Placed on DOR Current DORs -oadino Dock and VRU 2 0 0.00%0 0 0 0 VIDDW Unit 6 0 0.00%0 0 0 0 rlo. 1 crude Unit 4 0 0.00%0 0 0 0 [ank Farm 21 0 0.00%0 0 0 0 Jtilities 4 0 0.00%0 0 0 0 T 37 0 o%0 0 0 0 ComponentType: VALVE Unit:TotalMonitored Total Leak:Leak % Late First Repairs Late Final Reoairs Placed on DOR Current DORs -oadinq Dock and VRU 1 0 0.00%0 0 0 0 T 1 0 o%0 0 0 0 FacitityTotals:l 38 | 0 I o% I 0 | 0 | 0 | 0 Page 1 of 1 on 1214120231:08:01 PM Printed By: MArnold LDAR sYmaroll^nrAY Component T VALVE Monitor Summary Report Silver Eagle Refining Woods Cross F rom: 1211 12023 To: 12131 12023 : PUMP Unit:TotalMonitored Total Leaks Leak % Late First Reoairs Late Final Reoairs Placed on DOR Current DORs Loadinq Dock and VRU 3 0 0.00%0 0 0 0 MDDW Unit 6 0 0.00%0 0 0 0 rlo. 1 crude Unit 4 0 0.00%0 0 0 0 [ank Farm 21 0 0.00%0 0 0 0 Jtilities 4 0 0.00%0 0 0 0 Totals:38 0 0%0 0 0 0 Unit:Total Monitored Total Leaks Leak % Late First Repairs Late Final Reoairs Placed on DOR Current DORs -oadino Dock and VRU 39 0 0.00%0 0 0 0 39 0 OYo 0 0 0 0 Totals:l 77 lOlOV"lOlOlOlO Pagel of 1on 11312024 9:55:18AM Printed By: MArnold LDAR rYnAxo)rulrwAY Leak Detail Report Silver Eagle Refining Woods Cross F rom:'l0l'l 12023 To: 10131 12023 lnclude Leaks found while on DOR and IRO Leaks Tag I Monitor Date lnspector I lnstrument PPM Thresh. I Rep. Date I Repaired By:Repair Type 858 1 3-000 Unit: Loading Dock and VRU CompType: VALVE Leak Source: PACKING Area: Quarterly-1 Rules: NSPS GGGa, Follow-Up Size: 4 Service Type: LIGHT LIQUIO E RACK BLUE 10/19/23 9:12 AM AJ 13916 900 5m 10/19/23 10:25 AM AJ 13916 71 500 10t19t2023 OPERATIONS TIGHTENED PACKING This report was generated using a filter: Rule Name is equalto NSPS GGGa UTAH DEPARTfu1ENI OF ENVIRONMENTAL QUALITY 1 I ^/1n r Itut4 | I I DIVISION OF AIR QUALITY Page 1 of 1 on 1'113120231:56:58 PM Printed By: MArnold