Loading...
HomeMy WebLinkAboutDRC-2020-020942 - 0901a06880dca555Dam Safety Inspection D C-20Z0-02D 9 La Facility Energy Fuels White Mesa Mill -- Conventional Impoundment 4A Storage Level 5589.04 (measured 9/18/20)1 Date September 14, 2020 Weather Partly cloudy, 85° F Dry people Present Name Representing Russ Topham DEQ cir Phil Goble 6 DEQ Garrin Palmer EFRI Detail Element N A Not Inspected Inundated Good Monitor Maintenance Critical Embankment 1. Crest 2. Upstream Slope x3 3. Downstream Slope x4 4. Groins x Abutment/Foundation 5. Left Abutment 6. Right Abutment x 7. Upstream Toe x3 8. Downstream Toe x Reservoir Basins 9. Shore Stability 10. Reservoir Bottorn Spillway 11. Freeboard x 12. Intake x 13. Concrete Structures x 14. Stilling Basin x 15. Outfall Channel x Outlet 16. Conduit 17. Intake x 18. Stilling Basin x 19. Discharge Channel x 20. Controls x 21. Venting x lnstrumentatton 22. Monuments 23. Staff Gage x 24. Piezometers x 25. Drains x 26. Other x Notes 1. Value was taken from weekly compliance measurement data, provided to DEQ 9/30/20. Current level may be±1'. No freeboard limit is in place for this impoundment inasmuch as spillway control is provided. Prior to constructing Impoundment 4B, the freeboard limit was 5,593.74, which is above the spillway elevation. 2. Rain the previous week and subsequent driving left minor ruts on crest. 3. Upstream face and bottom of embankment are covered with synthetic liner, and cannot be viewed. 4. Rainstorms the week of Sept 7 produced minor rill erosion as noted in the photo log. EFR had an individual grooming the downstream face of the embankments during the inspection. Work was nearly complete on Impoundment 4A. Dam Safety Inspection Facility Energy Fuels White Mesa Mill -- Non-conventional Impoundment 4B Storage Level 5563.87 (measured 9/18/20)1 Date September 14, 2020 Weather Partly cloudy, 85° F Dry People Present Name Representin Russ Topham /i" DEQ Phil Goble PP, 6 DEQ Garrin Palmer EFRI Detail. Element NJA Not Inspected Inundated Good Monitor Maintenance Critcal Embankment 1. Crest 2. Upstream Slope x3 3. Downstream Slope x4 4. Groins x Abutment/Foundation 5. Left Abutment x 6. Right Abutment x 7. Upstream Toe x3 8. Downstream Toe x ReservOir Basins 9. Shore Stability 10. Reservoir Bottom x3 Spillway 11. Freeboard e 12. intake x 13. Concrete Structures x 14. Stilling Basin x 15. Outfall Channel x Outlet 16. Conduit x 17. intake x 18. Stilling Basin x 19. Discharge Channel x 20. Controls x 21. Venting x instrumentation 22. Monuments 23. Staff Gage x 24. Piezometers x 25. Drains x 26. Other x Notes 1. Value was taken from weekly compliance measurement data, provided to DEQ 9/30/20. Current level may be ±1'. 2. Rain the previous week and subsequent driving left minor ruts on crest. 3. Upstream face and bottom of embankment are covered with synthetic liner, and cannot be viewed. 4. Rainstorms the week of Sept 7 produced minor rill erosion as noted in the photo log. EFR had an individual grooming the downstream face of the embankments during the inspection. Photo 3: Impoundment 4A, Downstream Face, looking southward from Left Abutment. Photo taken September 14, 2020. Photo 4: Impoundment 4A, Crest at Left Abutment, Downstream Face, looking southward from Left Abutment. Photo taken September 14, 2020. Photo 1: Impoundment 4A, Left Abutment, Downstream Face. Photo taken September 14, 2020. Photo 2: Impoundment 4A, Left Abutment, Downstream Face. Photo taken September 14, 2020. Photo 5: Impoundment 4A, Crest at Left Abutment, Upstream Face, looking Photo 6: Impoundment 4A, Downstream Face, looking northward from corner. southward frorn Left Abutment. Photo taken September 14, 2020. Photo taken September 14, 2020. Photo 7: Impoundment 4A, Downstream Face, looking northwest directly at corner. Photo taken September 14, 2020. Photo 8: Impoundment 4A, Downstream Face, looking westward frorn comer. Photo taken September 14, 2020. Photo 9: Impoundment 4A, Crest at corner looking northward. Photo taken Photo 10: Impoundment 4A, Crest at corner looking westward. Photo taken September 14, 2020. September 14, 2020. Photo 11: Impoundment 4A, Upstrearn Face at corner looking northward. Photo 12: Impoundment 4A, Upstream Face at corner looking westward. Photo Photo taken Septernber 14, 2020. taken September 14, 2020. Photo 14: Impoundment 4A/4B Common Abutment, looking north. Photo taken September 14, 2020. Photo 13: Impoundment 4A/4B Common Abutment, looking East along Impoundment 4A face. Photo taken September 14, 2020. Photo 16: Impoundment 4A/4B Common Abutment, looking east along Impoundment 4A crest. Photo taken September 14, 2020. Photo 15: Impoundment 4A/4B Common Abutment, looking west along Impoundment 4B face. Photo taken September 14, 2020. Photo 18: Impoundrnent 4A/4B Common Abutrnent, looking east along Impoundment 4A upstream face. Photo taken September 14, 2020. Photo 17: Impoundment 4A/4B Comrnon Abutment, looking west along Impoundment 4A crest. Photo taken September 14, 2020. Photo 19: Impoundment 4A/4B Spillway, looking north along upstream face of common embankment. Photo taken September 14, 2020. Photo 20: Impoundment 4A/4B Spillway, looking north along upstream face of common embankment. Photo taken September 14, 2020. Photo 21: Impoundment 4A/4B Common Abutment, looking west along Photo 22: Impoundment 4B Right Abutment, looking east along Impoundment Impoundment 4A upstream face. Photo taken September 14, 2020. 4B downstream face. Photo taken September 14, 2020. Photo 23: Impoundment 4B Right Abutment, looking east along crest face. Photo 20Impoundment 4B Right Abutment, looking east along Impoundment Photo taken September 14, 2020. 4B upstream face. Photo taken September 14, 2020.