HomeMy WebLinkAboutDRC-2020-020942 - 0901a06880dca555Dam Safety Inspection
D C-20Z0-02D 9 La
Facility Energy Fuels White Mesa Mill -- Conventional Impoundment 4A Storage Level 5589.04 (measured 9/18/20)1
Date September 14, 2020 Weather Partly cloudy, 85° F Dry
people Present
Name Representing
Russ Topham DEQ cir
Phil Goble 6 DEQ
Garrin Palmer EFRI
Detail
Element N A Not Inspected Inundated Good Monitor Maintenance Critical
Embankment
1. Crest
2. Upstream Slope x3
3. Downstream Slope x4
4. Groins x
Abutment/Foundation
5. Left Abutment
6. Right Abutment x
7. Upstream Toe x3
8. Downstream Toe x
Reservoir Basins
9. Shore Stability
10. Reservoir Bottorn
Spillway
11. Freeboard x
12. Intake x
13. Concrete Structures x
14. Stilling Basin x
15. Outfall Channel x
Outlet
16. Conduit
17. Intake x
18. Stilling Basin x
19. Discharge Channel x
20. Controls x
21. Venting x
lnstrumentatton
22. Monuments
23. Staff Gage x
24. Piezometers x
25. Drains x
26. Other x
Notes
1. Value was taken from weekly compliance measurement data, provided to DEQ 9/30/20. Current level may be±1'.
No freeboard limit is in place for this impoundment inasmuch as spillway control is provided. Prior to
constructing Impoundment 4B, the freeboard limit was 5,593.74, which is above the spillway elevation.
2. Rain the previous week and subsequent driving left minor ruts on crest.
3. Upstream face and bottom of embankment are covered with synthetic liner, and cannot be viewed.
4. Rainstorms the week of Sept 7 produced minor rill erosion as noted in the photo log. EFR had an individual grooming the
downstream face of the embankments during the inspection. Work was nearly complete on Impoundment 4A.
Dam Safety Inspection
Facility Energy Fuels White Mesa Mill -- Non-conventional Impoundment 4B Storage Level 5563.87 (measured 9/18/20)1
Date September 14, 2020 Weather Partly cloudy, 85° F Dry
People Present
Name Representin
Russ Topham /i" DEQ
Phil Goble PP, 6 DEQ
Garrin Palmer EFRI
Detail.
Element NJA Not Inspected Inundated Good Monitor Maintenance Critcal
Embankment
1. Crest
2. Upstream Slope x3
3. Downstream Slope x4
4. Groins x
Abutment/Foundation
5. Left Abutment x
6. Right Abutment x
7. Upstream Toe x3
8. Downstream Toe x
ReservOir Basins
9. Shore Stability
10. Reservoir Bottom x3
Spillway
11. Freeboard
e
12. intake x
13. Concrete Structures x
14. Stilling Basin x
15. Outfall Channel x
Outlet
16. Conduit x
17. intake x
18. Stilling Basin x
19. Discharge Channel x
20. Controls x
21. Venting x
instrumentation
22. Monuments
23. Staff Gage x
24. Piezometers x
25. Drains x
26. Other x
Notes
1. Value was taken from weekly compliance measurement data, provided to DEQ 9/30/20. Current level may be ±1'.
2. Rain the previous week and subsequent driving left minor ruts on crest.
3. Upstream face and bottom of embankment are covered with synthetic liner, and cannot be viewed.
4. Rainstorms the week of Sept 7 produced minor rill erosion as noted in the photo log. EFR had an individual grooming the
downstream face of the embankments during the inspection.
Photo 3: Impoundment 4A, Downstream Face, looking southward from Left
Abutment. Photo taken September 14, 2020.
Photo 4: Impoundment 4A, Crest at Left Abutment, Downstream Face, looking
southward from Left Abutment. Photo taken September 14, 2020.
Photo 1: Impoundment 4A, Left Abutment, Downstream Face. Photo taken
September 14, 2020.
Photo 2: Impoundment 4A, Left Abutment, Downstream Face. Photo taken
September 14, 2020.
Photo 5: Impoundment 4A, Crest at Left Abutment, Upstream Face, looking Photo 6: Impoundment 4A, Downstream Face, looking northward from corner.
southward frorn Left Abutment. Photo taken September 14, 2020. Photo taken September 14, 2020.
Photo 7: Impoundment 4A, Downstream Face, looking northwest directly at
corner. Photo taken September 14, 2020.
Photo 8: Impoundment 4A, Downstream Face, looking westward frorn comer.
Photo taken September 14, 2020.
Photo 9: Impoundment 4A, Crest at corner looking northward. Photo taken Photo 10: Impoundment 4A, Crest at corner looking westward. Photo taken
September 14, 2020. September 14, 2020.
Photo 11: Impoundment 4A, Upstrearn Face at corner looking northward. Photo 12: Impoundment 4A, Upstream Face at corner looking westward. Photo
Photo taken Septernber 14, 2020. taken September 14, 2020.
Photo 14: Impoundment 4A/4B Common Abutment, looking north. Photo
taken September 14, 2020.
Photo 13: Impoundment 4A/4B Common Abutment, looking East along
Impoundment 4A face. Photo taken September 14, 2020.
Photo 16: Impoundment 4A/4B Common Abutment, looking east along
Impoundment 4A crest. Photo taken September 14, 2020.
Photo 15: Impoundment 4A/4B Common Abutment, looking west along
Impoundment 4B face. Photo taken September 14, 2020.
Photo 18: Impoundrnent 4A/4B Common Abutrnent, looking east along
Impoundment 4A upstream face. Photo taken September 14, 2020.
Photo 17: Impoundment 4A/4B Comrnon Abutment, looking west along
Impoundment 4A crest. Photo taken September 14, 2020.
Photo 19: Impoundment 4A/4B Spillway, looking north along upstream face of
common embankment. Photo taken September 14, 2020.
Photo 20: Impoundment 4A/4B Spillway, looking north along upstream face of
common embankment. Photo taken September 14, 2020.
Photo 21: Impoundment 4A/4B Common Abutment, looking west along Photo 22: Impoundment 4B Right Abutment, looking east along Impoundment
Impoundment 4A upstream face. Photo taken September 14, 2020. 4B downstream face. Photo taken September 14, 2020.
Photo 23: Impoundment 4B Right Abutment, looking east along crest face. Photo 20Impoundment 4B Right Abutment, looking east along Impoundment
Photo taken September 14, 2020. 4B upstream face. Photo taken September 14, 2020.