Loading...
HomeMy WebLinkAboutDRC-2019-003322 - 0901a06880a16282State of Utah GARY R. HERBERT Governor Spencer J. Cox Lieutenant Governor Department of Environmental Quality Alan Matheson Executive Director DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL Ty L. Howard Director 7izt-20/9-003322_ MEMORANDUM TO: File C-2019-35 THROUGH: Phil Goble, Section Manager PE 4c).-53 FROM: Russell J. Topham, P.E. DATE: April 10, 2019 SUBJECT: Engineering Module 70, Annual Surety Review, Energy Fuels Resources (EFRI), White Mesa Mill, Blanding, Utah. On March 6, 2019 the Utah Division of Waste Management and Radiation Control (DWMRC) received the 2019 surety update for the White Mesa Mill (dated March 1, 2018, eDocs # DRC-2019-002245). The proposed surety represents an increase of $416,044 from the approved 2018 surety value of $19,759,960. I recommend approving the 2019 surety in the amount of $20,176,004. Comments No new issues or items of work were introduced in the 2019 surety, and no decommissioning took place during 2018. The approach to the surety mirrors the approved 2018 surety, with no change in methods or breadth of coverage. The principal changes to the surety from 2018 include adjustments to fuel, labor and equipment rental costs. During the 2018 surety review the Division found an error in Haul Route J-J which the surety showed canying material to Cell 4B which was supposed to go to Cell 4A. Correcting the destination point for this haul route and re-mapping resulted in a slightly longer haul, but the resulting adjustment in cost was negligible, and so correction was deferred. The 2019 submittal reflects this adjustment. No conventional ore runs are anticipated in 2019. The company has included funds to handle the maximum quantities of alternate feed the licensee expects to see on site. Unit costs have been updated, partly through applying the CPI-U deflator to costs actually experienced during the 2017 Cell 2 radon barrier installation, where applicable. All vendor bids but one were updated in 2018. With the 2019 update, all vendor bids have been updated within the required 3 year window. The breadth of coverage provided is consistent with that required of other licensees. Items of work include mobilization, demolition and disposal of office facilities, mill decommissioning and disposal, decommissioning of all tailings and fluid management impoundments with Impoundment 1 used for 195 North 1950 West • Salt Lake City, UT Mailing Address: P O. Box 144880 • Salt Lake City, UT 84114-4880 Telephone (801) 536-0200 • Fax (801) 536-0222 • T D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper C-2019-35 Memorandum: 2019 Surety Review Page 2 uncontaminated waste and Impoundment 4B cleaned up for unrestricted release. The licensee has included budget allowances for project management and legal support, 10 years of active post-closure monitoring, long-term care, contractor's profit, licensing and bonding, contract administration, redesign, automobile and general liability insurance, and equipment rental.