Loading...
HomeMy WebLinkAboutDRC-2017-004903 - 0901a068807274a1Energy Fuels Resources (USA) Inc. 22S Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 June30, 2017 Div of Waste Management and Radiation ControlSent VIA E-MAIL AND EXPRESS DELIVERY Mr. Scott Anderson Director JUL 11 2017 X^yzorbOOi^Division of Waste Management and Radiation Control ' Utah Department of Environmental Quality 195 North 1950 West P.O. Box 144880 Salt Lake City, UT 84114-4880 Re: Transmittal of As-Built Report for the White Mesa Cell 2 Cover Test Section Dear Mr. Anderson: In accordance with the Stipulation and Consent Agreement (“SCA” dated February 23, 2017) between the Division of Waste Management and Radiation Control (“DWMRC”) and Energy Fuels Resource (USA) Inc. (“EFRI”), EFRI constructed a cover performance monitoring test section on Cell 2 in August-September, 2016. Per the SCA, an as-built report for the Primary Test Section construction, as well as the test results for the samples collected from the test section during construction, must be provided to DWMRC within 90 days after completion of construction of the test section and receipt of laboratory test results. The laboratory testing report was finalized in May 2017. This letter transmits via email a pdf of the White Mesa Uranium Mill Cell 2 Cover Performance Test Section As-Built Report. For your convenience, two hard copies and two CDs of the As-Built Report, each containing a word searchable electronic copy of the files, will be mailed to DWMRC next week. If you should have any questions regarding this transmittal please contact me at 303-389-4134. Yours very truly, Energy Fuels Resources (USA) Inc. Kathy Weinel Quality Assurance Manager CC: David C. Frydenlund Mark Chalmers David Turk Logan Shumway Scon Bakken