Loading...
HomeMy WebLinkAboutDRC-2015-004291 - 0901a0688054fe92Department of Environmental Quality Alan Matheson Acting Executive Director PRC- Z0\5 - OO JfZ^I \ State of Utah GARY R HERBERT Governor DIVISION OF RADIATION CONTROL Rusty Lundberg Director Spencer J Cox Lieutenant Governor June 30,2015 Kathy Weinel Energy Fuels Resources (USA) Inc. (EFR) 225 Union Blvd., Suite 600 Lakewood, CO 80228 Subject: Compliance: Engineering Module 73, Inspection of Disposal of Bulk Byproduct Material: Radioactive Materials License UT1900479 (RML): DRC Findings and Cioseout Dear Ms. Weinel: On June 16, 2015, the Utah Division of Radiation Control (DRC) conducted an inspection of disposal operations for 1 le.(2) byproduct material at the White Mesa Uranium Mill. The inspection performed on the above referenced date did not reveal incidents of noncompliance with either the RML or Standard Operating Procedure No. PBL-10. In consideration of the findings enumerated above, the inspection conducted on February 6, 2015 is hereby closed. If you have any questions on these matters, please contact Russ Topham at (801) 536-4256. Sincerely, Rusty Lundberg Director cc: EFR White Mesa Mill: David Turk RL/RJT:rjt 195 North 1950 West • Salt Lake City, UT Mailing Address P O Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 -TDD (801) 536-4414 www deq Utah gov Printed on 100% recycled paper